Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-23394 Classification Reform; Implementation Standards
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48071-48072]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23394]

=======================================================================
-----------------------------------------------------------------------

POSTAL SERVICE

39 CFR Part 111

Classification Reform; Implementation Standards

AGENCY: Postal Service.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule sets forth additional Domestic Mail Manual 
(DMM) standards adopted by the Postal Service to implement the Decision 
of the Governors of the United States Postal Service on the Recommended 
Decision of the Postal Rate Commission on Nonprofit Standard Mail, 
Nonprofit Enhanced Carrier Route Standard Mail, Nonprofit Periodicals, 
and Within County Periodicals, Docket No. MC96-2, Classification Reform 
II.

EFFECTIVE DATE: October 6, 1996.

FOR FURTHER INFORMATION CONTACT:
Leo F. Raymond, (202) 268-5199.

SUPPLEMENTARY INFORMATION: On April 4, 1996, pursuant to its authority 
under 39 U.S.C. 3621, et seq., the Postal Service filed with the Postal 
Rate Commission (PRC) a request for a recommended decision on several 
mail classification reform proposals for nonprofit Periodicals and 
Standard Mail (Classification Reform II). The PRC designated the filing 
as Docket No. MC96-2. On April 11, 1996, the PRC published a notice of 
the filing, with a description of the Postal Service's proposals, in 
the Federal Register (61 FR 16129-16146). The PRC issued its Opinion 
and Recommended Decision on Docket No. MC96-2 on July 19, 1996. In that 
document, the PRC favorably recommended what the Postal Service had 
proposed, with the exception of those provisions in the Classroom 
Periodicals rate schedule; the PRC reopened the record in Docket No. 
MC96-2 for further proceedings on that category of mail. On August 6, 
1996, the Governors of the Postal Service accepted the Recommended 
Decision and the Board of Governors set October 6, 1996, as the date on 
which the provisions of Docket No. MC96-2 would take effect. A notice 
of the Decision of the Governors was published on August 15, 1996 (61 
FR 42464-42476).

    The DMM standards that were proposed to take effect to implement 
Docket No. MC96-2 were published for public comment in the Federal 
Register on June 24, 1996 (61 FR 32606-32616). Because no comments were 
received on the proposed rule, it was adopted without change as the 
final rule, except as noted therein to reflect the absence of rate 
provisions for Classroom Periodicals in the PRC's Recommended Decision 
that was accepted and implemented by the Governors, and published on 
August 15, 1996 (61 FR 42478-42489).
    Because the PRC's Recommended Decision, as accepted and implemented 
by the Governors, excluded rate changes for Classroom Periodicals that 
had been proposed by the Postal Service, the rate schedule for 
Classroom Periodicals was unchanged, retaining ZIP+4 Classroom rates. 
Because of this difference from what the Postal Service had proposed in 
its request and in the proposed rule, the August 15 final rule also 
proposed standards for ZIP+4 Classroom rate mail that were different 
from those published in DMM Issue 50. (In general, the Postal Service 
proposed to establish eligibility standards for ZIP+4 Classroom rate 
mail that parallel those for other automation rate Periodicals. Mail 
preparation standards for ZIP+4 Classroom rate mail would be 
essentially similar to those for upgradable mail in other classes, 
except a ZIP+4 code would be required in the address. The Postal 
Service anticipated minimal adverse impact from this proposal on the 
mailing community, given the applicability of ZIP+4 rates to only 
letter-size pieces and the likely absence of a significant volume of 
letter-size mail in the Classroom Periodicals subclass.) Because those 
specific standards were not part of the June 24 proposed rule, the 
Postal Service accepted further comments on those standards from 
interested parties for an additional 21 days (i.e., through September 
5, 1996).
    No comments were received on the proposed rule for ZIP+4 Classroom 
Periodicals rate eligibility and mail preparation. Therefore, the 
Postal Service adopts the corresponding DMM standards as the final 
rule.
    These relevant standards are shown below for the information of 
readers, but are the same as the corresponding standards published in 
the August 15 final rule.
    All references to DMM sections shown in this rule are based on DMM 
Issue 50 (July 1, 1996) as amended by the August 15 final rule.

List of Subjects in 39 CFR Part 111

    Postal Service.

    For the reasons discussed above, the Postal Service hereby adopts 
the following amendments to the Domestic Mail Manual, which is 
incorporated by reference in the Code of Federal Regulations (see 39 
CFR part 111).

PART 111--[AMENDED]

    1. The authority citation for 39 CFR part 111 continues to read as 
follows:

    Authority: 5 U.S.C. 552(a); 39 U.S.C. 101, 401, 403, 404, 3001-
3011, 3201-3219, 3403-3406, 3621, 3626, 5001.

    2. Revise the following sections of the Domestic Mail Manual as set 
forth below:

C  CHARACTERISTICS AND CONTENT

* * * * *

C800  Automation-Compatible Mail

C810  Letters and Cards

* * * * *
2.0  DIMENSIONS
* * * * *
[Revise the heading of 2.3 to read as follows:]

2.3  Maximum Weight

[Revise 2.3a to read as follows:]
    Maximum weight limits are as follows:
    a. 2.5 ounces: upgradable Presorted First-Class Mail, ZIP+4 
Classroom Periodicals, and upgradable nonautomation Standard Mail.
* * * * *

C840  Barcoding Standards

* * * * *
2.0  BARCODE LOCATION--LETTER-SIZE PIECES

2.1  Barcode Clear Zone

[Amend 2.1 by revising the first sentence to read as follows:]

    Each letter-size piece in an automation rate mailing, each piece of 
ZIP+4 Classroom Periodicals, and each piece of upgradable Presorted 
First-Class Mail or upgradable Standard Mail (A) must have a barcode 
clear zone unless the piece bears a DPBC in the address book. * * *
* * * * *

E  ELIGIBILITY

* * * * *

E200  Periodicals

* * * * *

E240  Automation Rates

1.0  BASIC STANDARDS

1.1  All Pieces

[Amend 1.1 by revising the introductory text to read as follows:]

[[Page 48072]]

    Except for Classroom Periodicals under 3.0, all pieces in an 
automation Periodicals mailing must:
* * * * *
[Revise the heading of 2.0 to read as follows:]

2.0  RATE APPLICATION--EXCEPT CLASSROOM PERIODICALS

* * * * *
[Add new 3.0 to read as follows:]
3.0  RATE APPLICATION--CLASSROOM PERIODICALS ONLY

3.1  ZIP+4 Rates

    ZIP+4 Classroom Periodicals must meet the basic standards in 1.1a 
through 1.1f and 1.2, except each piece must meet the physical 
standards for letter-size mail in C810 and the standards for OCR 
processing in C830, must bear the correct ZIP+4 code in the address, 
and must have address elements in the standardized format placed in the 
OCR read area, under A010. ZIP+4 rates apply to each letter-size piece 
that is sorted under M810 into the corresponding qualifying groups:
    a. Groups of 150 or more pieces in 5-digit or unique 3-digit trays 
qualify for the 3/5 ZIP+4 rate.
    b. Groups of fewer than 150 pieces in origin/entry 3-digit trays 
and groups of 150 or more pieces in other 3-digit or AADC trays, and 
all pieces in mixed AADC trays qualify for the Basic ZIP+4 rate.

3.2  Barcoded Rates

    Barcoded Classroom Periodicals must meet the basic standards in 
1.00 Barcoded rates apply to each letter-size piece that is sorted 
under M810 into the corresponding qualifying groups:
    a. Groups of 150 or more pieces in 5-digit trays qualify for the 5-
Digit Barcoded rate.
    b. Groups of 150 or more pieces in unique 3-digit trays qualify for 
the 3-Digit Barcoded rate.
    c. Pieces for unique 3-digit destination that is part of a 3-digit 
scheme group in L003 qualify for the 3-Digit Barcoded rate when placed 
in a 3-digit scheme tray if grouped separately from pieces for other 3-
digit areas.
    d. Groups of fewer that 150 pieces in origin/entry 3-digit/scheme 
trays and groups of 150 or more pieces in other 3-digit, 3-digit 
scheme, or AADC trays and all pieces in mixed AADC trays qualify for 
the Basic Barcoded rate.
* * * * *

M  MAIL PREPARATION AND SORTATION

* * * * *

M800  All Automation Mail

[Revise the heading of M810 to read as follows:]

M810  Letter-Size Mail

1.0  BASIC STANDARDS

1.1  Standards

[Amend 1.1 by replacing the term ``Regular Periodicals'' with 
``Periodicals'' in the first sentence to read as follows:]

    Letter-size automation rate First-Class Mail, Periodicals, and 
Standard Mail (A) must be prepared under M810 and the eligibility 
standards for the rate claimed.* * *

1.2  Mailings

[Amend 1.2 by adding the following sentence to the end of the section 
to read as follows:]

    * * *A Periodicals mailings may not contain both ZIP+4 Classroom 
pieces and any other automation rate Periodicals.
* * * * *

1.6  Scheme Sortation

[Amend 1.6 by adding the following sentence to the end of the section 
to read as follows:]

    * * *Scheme sortation is not available for ZIP+4 Classroom 
Periodicals.
* * * * *
3.0  PREPARATION--PERIODICALS

3.1  Tray Preparation

[Amend 3.1 by revising 3.1b to read as follows:]

    Tray size, preparation sequence, and labeling:
* * * * *
    b. 3-digit/scheme (3-digit only for ZIP+4 Classroom Periodicals): 
required (150-piece minimum except no minimum for required origin/
optional entry 3-digit(s)/scheme); overflow allowed; for Line 1, use 
L002, Column B (except use L002, Column A, for ZIP+4 Classroom 
Periodicals).
* * * * *

3.2  Line 2

[Revise 3.2 to read as follows:]

    Line 2: PER or NEWS (as appropriate), LTRS BC (except LTRS UPGR for 
ZIP+4 Classroom Periodicals), and:
* * * * *
Stanley F. Mires,
Chief Counsel, Legislative.
[FR Doc. 96-23394 Filed 9-11-96; 8:45 am]
BILLING CODE 7710-12-M

Complete official Federal Register PDF

FR Doc. 96-23367 Revision of Class E Airspace; Gainesville, TX
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48069-48070]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23367]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-ASW-15]

Revision of Class E Airspace; Gainesville, TX

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This action corrects an error in the geographic coordinates of 
a final rule that was published in the Federal

[[Page 48070]]

Register on June 4, 1996 (61 FR 28037), Airspace Docket No. 95-ASW-15.

EFFECTIVE DATE: September 12, 1996.

FOR FURTHER INFORMATION CONTACT:
Chuck Frankenfield, Operations Branch, Air Traffic Division, Southwest 
Region, Federal Aviation Administration, Fort Worth, TX 76193-0530, 
telephone 817-222-5591.

SUPPLEMENTARY INFORMATION:

History

    Federal Register Document 96-13929, Airspace Docket No. 95-ASW-15, 
published on June 4, 1996 (61 FR 28037), revised the description of the 
Class E airspace area at Gainesville, TX. An error was discovered in 
the geographic coordinates for the Gainesville Municipal Airport, 
Gainesville, TX, and for the Gainesville Radio Beacon (RBN). The 
coordinates for the Gainesville Municipal Airport were published as 
latitude 33 deg.38'57''N., longitude 97 deg.11'43''W.; they should have 
been published as latitude 33 deg.39'05''N., longitude 97 deg.11'49''W. 
The coordinates for the Gainesville RBN were published as latitude 
33 deg.42'24''N., longitude 99 deg.10'19''W.; they should have been 
published as latitude 33 deg.43'07''N., longitude 97 deg.11'55''W. This 
action corrects the geographic coordinates that were published in 
error.

Correction to Final Rule

    Accordingly, pursuant to the authority delegated to me, the 
geographic coordinates for the description of the Class E airspace area 
at Gainesville, TX, as published in the Federal Register on June 4, 
1996 (61 FR 28037), (Federal Register Document 96-13929: page 28037, 
column 3), are corrected as follows:

Sec. 71.1  [Corrected]

* * * * *

ASW TX E5 Gainesville, TX [Corrected]

Gainesville Municipal Airport, TX

Removing ``(Lat. 33 deg.38'57''N., long. 97 deg.11'43''W.)'' and 
substituting
    ``(Lat. 33 deg.39'05''N., long. 97 deg.11'49''W.)''

Gainesville RBN

Removing ``(Lat. 33 deg.42'24''N., long. 99 deg.10'19''W.)'' and 
substituting
    ``(Lat. 33 deg.43'07''N., long. 97 deg.11'55''W.)''
* * * * *
    Issued in Fort Worth, TX, on September 3, 1996.
Albert L. Viselli,
Acting Manager, Air Traffic Division, Southwest Region.
[FR Doc. 96-23367 Filed 9-11-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-23331 Office of the Assistant Secretary for Financial Markets; Government Securities Act Regulations: Large Position Rules
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48338-48351]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23331]

[[Page 48337]]

_______________________________________________________________________

Part IV

Department of the Treasury

_______________________________________________________________________

17 CFR Parts 400 and 420

Government Securities Act Regulations: Large Position Rules; Final Rule

Federal Register / Vol. 61, No. 178 / Thursday, September 12, 1996 / 
Rules and Regulations

[[Page 48338]]

DEPARTMENT OF THE TREASURY

17 CFR Parts 400 and 420

RIN 1505-AA53

Office of the Assistant Secretary for Financial Markets; 
Government Securities Act Regulations: Large Position Rules

AGENCY: Office of the Assistant Secretary for Financial Markets, 
Treasury.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of the Treasury (``Department'' or 
``Treasury'') is publishing final rules that establish a new Part 420 
providing recordkeeping and reporting requirements pertaining to very 
large positions in certain Treasury securities. The regulations are 
promulgated pursuant to the Government Securities Act Amendments of 
1993, which authorized the Secretary of the Treasury to prescribe rules 
requiring persons holding, maintaining or controlling large positions 
in to-be-issued or recently-issued Treasury securities to keep records 
and file reports of such large positions. The proposed rules were 
published to solicit public comment on December 18, 1995.
    The recordkeeping rules require any person or entity that controls 
a position equal to or greater than $2 billion in a specific Treasury 
security to maintain and preserve certain records that enable the 
entity to compile, aggregate and report large position information. If 
the Treasury requests large position information, the reporting rules 
require entities to file a large position report with the Federal 
Reserve Bank of New York if their reportable position equals or exceeds 
the large position threshold in a particular Treasury security as 
specified by the Treasury in the notice requesting the large position 
information. The Department's large position rules are intended to 
provide the Treasury and other securities regulators with information 
on concentrations of control that will enable them to understand better 
the possible reasons for apparent significant price distortions and the 
causes of market shortages in certain Treasury securities. Requests by 
the Treasury for this information are expected to be very infrequent.

DATES: The effective date is October 15, 1996. Further dates: See 
Secs. 420.4(a) and 420.5.

FOR FURTHER INFORMATION CONTACT: Ken Papaj, Director, or Kerry Lanham, 
Government Securities Specialist, Bureau of the Public Debt, Department 
of the Treasury, at 202-219-3632.

SUPPLEMENTARY INFORMATION:

I. Background

A. Statutory Authority

    The Government Securities Act Amendments of 1993 (GSAA) 1 
included a provision granting the Department the authority to write 
rules for large position recordkeeping and reporting in certain 
Treasury securities. Specifically, Section 104 of the GSAA, which 
amended Section 15C of the Securities Exchange Act of 1934,2 
authorizes the Treasury to adopt rules requiring specified persons 
holding, maintaining or controlling large positions in to-be-issued or 
recently-issued Treasury securities to maintain records and file 
reports regarding such positions.3 The provision was in response 
to certain market events in 1990-91 and is designed to improve the 
information available to the Treasury and other regulators regarding 
very large positions of recently-issued Treasury securities held by 
market participants and to ensure that regulators have the tools 
necessary to understand unusual conditions in the Treasury securities 
market.
---------------------------------------------------------------------------

    \1\ Pub. L. 103-202, 107 Stat. 2344 (1993).
    \2\ 15 U.S.C. 78o-5.
    \3\ Pub. L. 103-202, Sec. 104; 107 Stat. 2344, 2346-2348; 15 
U.S.C. 78o-5(f).
---------------------------------------------------------------------------

    The GSAA gives the Department wide latitude and discretion in 
determining several key features and conditions that would form the 
underpinnings of the large position recordkeeping and reporting rules. 
Among the most significant of these features are: defining which 
persons (individually or as a group) hold, maintain or control large 
positions; determining the minimum size of positions to be reported; 
determining what constitutes ``control'' for the purposes of the rules; 
prescribing the manner in which positions and accounts are to be 
aggregated; identifying the types of positions to be reported; 
determining the securities that would be subject to the rules; and 
developing the form, manner and timing of reporting. Both the proposed 
and final rules address these points.

B. Participation in Rulemaking Process/Solicitation of Comments

    Throughout the process of developing large position rules, the 
Department has sought the views of the market participants who would be 
directly affected by such regulations. We believed that market 
participant involvement in the rulemaking initiative from its outset 
would facilitate greater understanding of, and support for, the final 
rules when implemented. Due to the potential complexity of the rules 
and the myriad of ways to approach them, we sought advice and initial 
comment on a variety of conceptual approaches to designing a large 
position recordkeeping and reporting system.
    Accordingly, the Department issued an Advance Notice of Proposed 
Rulemaking (ANPR) on January 24, 1995.4 The ANPR addressed several 
key issues, concepts and approaches to be considered in developing 
large position recordkeeping and reporting rules and solicited 
comments, suggestions and recommendations regarding how the 
requirements should be structured. The ANPR also contained a detailed 
historical background that provides a fuller understanding of the 
events and circumstances that resulted in the establishment of this 
regulatory authority, the purposes and objectives to be achieved from 
large position rules, and the Congressional intent behind this 
legislation. The comment period on the ANPR ran through May 24, 
1995.5 In response to the ANPR, the Department received seven 
comment letters which were summarized in the preamble to the proposed 
rules.6 Rather than repeating that information here, readers are 
referred to the proposed rules for a discussion of the comments.
---------------------------------------------------------------------------

    \4\ 60 FR 4576 (January 24, 1995).
    \5\ 60 FR 20065 (April 24, 1995).
    \6\ 60 FR 65214 (December 18, 1995).
---------------------------------------------------------------------------

C. The Proposed Rules

    The Department published for comment proposed large position 
recordkeeping and reporting rules on December 18, 1995.7 The 
proposed rules were designed to strike a balance between achieving the 
purposes and objectives of the statute and minimizing costs and burdens 
to those entities affected by the regulations. The proposed rules 
required reports to be submitted only in response to a specific request 
by the Treasury for large position information on a particular Treasury 
security issue. Using this approach, reporting would be an infrequent 
event required primarily in response to pricing anomalies in a specific 
Treasury security rather than a regular, on-going process resulting 
from a certain pre-determined large position threshold being exceeded 
in a broader range of securities.
---------------------------------------------------------------------------

    \7\ Ibid.
---------------------------------------------------------------------------

    The proposed rules provided a minimum large position threshold of 
$2 billion, below which the Treasury would not request large position 
reports.

[[Page 48339]]

As a result, very few entities would be required to file large position 
reports. The proposed recordkeeping requirements would generally not 
apply to any reporting entity (as defined in the rules) that did not 
control a position that equalled or exceeded $2 billion in a Treasury 
security. For those entities currently subject to recordkeeping rules 
of the Securities and Exchange Commission (SEC), the Treasury or the 
bank regulatory agencies, the proposed rules would have imposed only 
minor additional recordkeeping requirements and only if certain 
conditions were present. Finally, the proposed rules incorporated 
several concepts from the Treasury's auction rules (e.g., positions to 
be included in a reportable large position, definition of a reporting 
entity and method of aggregating positions) which have been in effect 
since March 1993 and are understood by many of the major participants 
in the Treasury securities market.8
---------------------------------------------------------------------------

    \8\ Uniform Offering Circular for the Sale and Issue of 
Marketable Book-Entry Treasury Bills, Notes, and Bonds; 31 CFR 
Chapter II, Subchapter B, Part 356.
---------------------------------------------------------------------------

    In addition to considering the views expressed by the commenters to 
the two rulemaking proposals, Department staff has also consulted with 
various regulatory agencies (i.e., staff of the SEC, the Commodity 
Futures Trading Commission, the Board of Governors of the Federal 
Reserve System and the Federal Reserve Bank of New York (FRBNY)) in 
developing the ANPR, the proposed rules and these final rules.

D. Scope of Large Position Rules

    It is important for all market participants to recognize that large 
position rules create a requirement to maintain records and report 
information about such positions. However, these requirements apply 
only to entities that hold or control (i.e., exercise investment 
discretion over) very large positions, as determined by the Department, 
in specific Treasury security issues. Accordingly, there is no 
obligation on executing brokers and dealers to report large trades nor 
is there an affirmative duty to inform their customers of the large 
position recordkeeping and reporting requirements prescribed by this 
rulemaking.
    The Department emphasizes that large positions are not inherently 
harmful and there is no presumption of manipulative or illegal intent 
on the part of the controlling entity merely because a position is 
large enough to be subject to these rules. In addition, the rules do 
not establish trading or position limits or require the identification 
of large traders or the reporting of large trades. Finally, the GSAA 
specifically provides that the Department shall not be compelled to 
disclose publicly any information required to be kept or reported for 
large position reporting. In particular, such information is exempt 
from disclosure under the Freedom of Information Act (FOIA).9
---------------------------------------------------------------------------

    \9\ 5 U.S.C. 552(b)(3)(B).
---------------------------------------------------------------------------

II. Comments Received in Response to Proposed Rules

    As discussed in the ANPR 10 and the proposed rules,11 the 
Department made the decision, early on, to obtain the views of the 
market participants who would be directly affected by such regulations. 
In the proposed rules, which addressed and incorporated those comments 
received in response to the ANPR, the Department strongly encouraged 
market participants to submit comments, including any suggestions for 
reducing burdens on the industry while still achieving the objective of 
the rules.
---------------------------------------------------------------------------

    \10\ See supra note 4.
    \11\ See supra note 6.
---------------------------------------------------------------------------

    In response to the proposed rules, the Department received thirteen 
comment letters. The letters were submitted by four trade associations, 
three primary government securities dealers, four bank holding 
companies (including two primary dealers), and one mutual fund 
manager.12 The Department has carefully considered the comments 
that were received, which generally supported the approach and process 
adopted in the proposed rules. Each comment letter did not necessarily 
address all aspects of the proposed rules.
---------------------------------------------------------------------------

    \12\ Public Securities Association (two letters); Investment 
Company Institute; British Bankers' Association; London Investment 
Banking Association; Goldman, Sachs & Co.; J.P. Morgan Securities, 
Inc.; HSBC Securities, Inc.; Bank of America; Chemical Banking 
Corporation; Norwest Corporation; BANC ONE Corporation; and Fidelity 
Management & Research Co., respectively.
---------------------------------------------------------------------------

    The comments have been summarized and organized into the following 
eight basic categories: Control and the Definition of a Reporting 
Entity; Reporting Threshold; Time Frame for Submitting Reports; 
Reportable Position Components; Report and Recordkeeping 
Certifications; Recordkeeping; Announcement of a Request for Reports; 
and General Commentary.

A. Control and the Definition of a Reporting Entity

    Eight comment letters specifically addressed this issue. While the 
comments were generally in agreement with the definition of control as 
proposed, the concept of control premised on an entity's investment 
discretion, and defining a reporting entity or a separate reporting 
entity under a requested ``carve out'' in conformity with the single 
bidder process in the uniform offering circular, four letters had 
specific recommendations.
    One commenter expressed concern about the timing and aggregation 
requirements given the definitions of ``control'' and ``entity'' and 
believed that it would be difficult to aggregate all of its holdings 
within the proposed reporting time frame. This commenter recommended 
that the definition of ``reporting entity'' be limited to a legal 
entity that exercises independent investment discretion, believing that 
if a narrower definition were adopted then their concerns would be 
eliminated. The second commenter, while agreeing with the concept of 
control premised on investment discretion, suggested that a participant 
be allowed to exclude from its reportable position those securities for 
which the entity has investment discretion but which do not exceed a 
minimum threshold. This approach, which would be similar to the net 
long position reporting requirement in the uniform offering circular, 
permits bidders to exclude amounts in non-bidding controlled accounts 
under a certain threshold from their reporting requirement. This 
commenter asserted that this exclusion would significantly alleviate 
the burden in tracking amounts of the security subject to investment 
discretion.
    The third letter, in specifically commenting on the application for 
separate reporting status, similar to the separate bidder application 
incorporated in the uniform offering circular, recommended that 
Appendix A of the rules be changed to encompass organizational 
components previously recognized under the uniform offering circular's 
definition. The fourth commenter expressed concern with the various 
distinctions being drawn among reporting entities, aggregating entities 
and separate reporting entities, stating that this will cause a myriad 
of problems for complex and changing financial services businesses. The 
commenter proposed that a narrower reporting population be defined, 
such as those business units which are the primary bidders for, and 
proprietary traders in, U.S. government securities. Within these 
groups, the commenter suggested excluding those securities that are not 
held for proprietary trading. This commenter further suggested an 
alternative approach which would not require the aggregation of 
positions, where the different business units within a firm are clearly 
independent,

[[Page 48340]]

while excluding all business units where securities are held as long-
term investments.

B. Reporting Threshold

    Seven letters directly addressed the proposed $2 billion minimum 
large position threshold. Two of the seven commenters believed this 
threshold to be an appropriate level, with one of these commenters 
suggesting that the rules specifically provide that the threshold be 
raised from time to time based on market developments. Three other 
commenters stated that by including gross financing positions in the 
total reportable position, all primary dealers and large market 
participants would trigger the $2 billion threshold and effectively be 
required to report their positions in all instances, due to their 
matched repo book and other financing activity, thereby resulting in 
numerous reports. Given these large matched book positions, one of the 
three commenters advocated that this threshold be increased to $5 
billion, while another suggested that the reportable position be based 
on the participant's net financing position. The third commenter, while 
also advocating a significant increase in the threshold, went further 
by recommending two other alternative approaches. In the first 
approach, the $2 billion threshold would be triggered by the aggregate 
of the net trading position and the net fails position, excluding the 
gross financing position. The second alternative approach would provide 
participants with the option of netting the gross par amounts of 
securities received in financing transactions against the gross par 
amount of securities delivered with the same term to the same 
counterparty. In both approaches, the commenter stated that this would 
only be to determine if a firm had crossed the threshold. Once it was 
determined that the firm was subject to reporting, then its gross 
financing positions would be reported to provide for a full range of 
large position information.
    The sixth letter, focusing on those large firms that operate in 
foreign markets, represented that even if the normal activity of a 
participant was below the threshold, if the participant was a part of a 
group of affiliates, it may be subject to the reporting rules. The 
commenter went on to state that foreign affiliates, however minimal 
their activity, would need to report information to the designated 
filing entity unless they qualified for, and received, separate 
reporting status. This commenter, and a seventh commenter which 
supported increasing the minimum threshold, suggested that the process 
could be simplified by setting a minimum threshold for each aggregating 
entity below which the entity's position would not need to be included 
in the reporting entity's report.

C. Time Frame for Submitting Reports

    Only one of the thirteen comment letters did not specifically 
address the subject of the proposed reporting time frame in which 
reports must be submitted once an announcement for large position 
information on a particular security is made by the Treasury. All 
twelve letters basically stated that the proposed one and one-half 
business day time frame was too short given the enormity of the data 
that would need to be gathered, reviewed and aggregated. These letters 
suggested that a longer period would seem more appropriate based on the 
effort required to compile the information, the fact that current 
requirements do not require holdings to be aggregated at a reporting 
level, and the time needed for participants with large international 
presences to gather the data from worldwide affiliates, especially 
given the different time zones. One commenter recommended extending 
this turnaround time to at least three business days. Others suggested 
four or five business days while several commenters recommended that a 
minimum of ten business days would be appropriate. Commenters noted 
that a turnaround time frame of ten business days is the same as that 
for large position rules in place for the equities securities market 
(i.e., 13d filings) and is the same as that for the SEC's proposed 
large trader reporting rules.
    One of the commenters, while not recommending a specific time 
frame, suggested that even a ten business day turnaround would be 
insufficient. This letter proposed several alternatives to balance the 
need to collect information quickly and the burdens on the reporting 
entity. The commenter suggested that an initial or ``first cut'' report 
of summary positions be prepared which would contain less precise 
information. Possible alternatives would be to subsequently provide a 
breakdown of the various components upon request; or, accept an initial 
report with only trading, reverse repo, and securities borrowed 
positions, with additional information to follow in a longer time 
frame; or, permit U.S.-based entities to report first, with information 
regarding foreign holdings to follow upon request; or, permit filing of 
partial reports to address situations where an aggregating entity does 
not have its reportable position ready in time.
    Another commenter, while recommending a time frame of not less than 
ten business days if the reportable position includes all securities 
received in pledge and in other collateralized transactions, also 
advocated the implementation of a phased reporting system where 
participants would provide certain information in less than ten 
business days, with the balance of the required information to be 
provided by the tenth business day. This commenter went on to state 
that many participants would be able to report their net trading 
positions for all aggregating entities within five to seven business 
days. One commenter requested that the final rule specifically provide 
that the reporting entities could amend a filing if the original 
reported information was inaccurate.

D. Reportable Position Components

    Eleven of the thirteen comment letters addressed the subject of the 
composition of a reportable position. Certain commenters generally 
supported including in the total reportable position the selected 
components as proposed, such as net forward and net fails positions. 
However, the majority of commenters objected to how certain aspects of 
the net trading and gross financing positions were to be included or 
whether they should even be included in the total reportable position. 
For example, two commenters specifically objected to a separate 
reporting of the net trading position components since, as stated by 
one of these commenters, separate reporting serves no useful purpose 
because all these positions represent control. Both commenters stated 
that the positions should be reported as of trade date, not settlement 
date. These same commenters stated that those securities received under 
overnight repos should be excluded from the reporting and recordkeeping 
obligations since investment advisers do not exercise effective control 
over them, they are not rehypothecated, and a significant portion of 
these transactions are tri-party repos where the counterparties 
typically have the right of substitution.
    The inclusion of securities received in pledge as collateral for 
margin loans, swap transactions, and other collateralized credit 
extended in the gross financing position generated the most comments 
from those that addressed the reportable position's components. Nine 
comment letters responded similarly that these pledged securities 
should be excluded from being reported in the gross financing position. 
The commenters stressed there are minimal policy benefits to be

[[Page 48341]]

derived by including them and that this information would be of 
marginal utility. The inclusion of these securities is based on the 
premise that the pledgee maintains control. However, the commenters 
stated that firms do not control those securities received in pledge 
since the pledgor often has the right to substitute them in accordance 
with the market practice of pledging general collateral rather than 
specific securities identified by particular CUSIPs (i.e., a unique 
identifying number assigned to each separate security issue and 
separate STRIPS component). The letters also stressed that most firms 
or market participants do not have a systematic method for aggregating 
these positions firm-wide and do not possess the operational capacity 
or systems to track those securities pledged by CUSIP. It was argued 
that it would be prohibitively expensive to design and implement 
systems and procedures to track these pledged securities by CUSIP. Two 
letters, in particular, stressed that if these securities received in 
pledge and securities in other collateralized transactions were to be 
included in the final rules then market participants should continue to 
be provided the option to exclude the securities collateral over which 
the pledgor retains the right to substitute or which is subject to 
third party custodial relationships. Further, the amount of such 
exclusions should not be required to be reported separately in a 
memorandum entry in the report. One letter stated that the rules should 
allow for the netting of repos and reverse repos when the counterparty 
is a primary government securities dealer.
    Two commenters requested further clarification on different 
position components. One of the letters stated that while fails should 
be included in a reportable position, the rules should clarify that 
fails are not included in the calculation for the cash/immediate net 
settled position. The second letter requested clarification on the 
treatment of forward start repos and reverse repos, believing that they 
should be included in the gross financing position. This commenter also 
requested clarification that fails to receive or fails to deliver would 
not be included in the cash/immediate net settled position since this 
would avoid double counting in the reports. This letter suggested that 
fails be treated similarly to forwards and that fails should be able to 
be netted with other components as either a positive or negative 
number. This commenter suggested amending the proposed rules to permit 
net fails to be less than zero.

E. Report and Recordkeeping Certifications

    Six letters specifically commented on the proposed report and 
recordkeeping certifications and essentially objected to, or would find 
problematic, the requirement that only certain senior executives would 
be permitted to sign the report and certify the adequacy of the 
reporting entity's recordkeeping system. It was recommended that the 
rules be broadened to provide that others, such as the chief legal or 
compliance officers, or individuals authorized by the designated filing 
entity, be able to sign the reports and recordkeeping certifications. 
This approach would be consistent with the requirement under Section 13 
of the Securities Exchange Act of 1934.
    Three letters, in particular, expressed concern about the 
obligations and responsibilities with respect to the certifications 
that must be given by the designated filing entity on behalf of the 
reporting entity and its aggregating entities. It was recommended that 
the certifications in the final rules specifically permit the 
designated filing entity to rely on certifications or other reasonable 
bases of evidence of the accuracy of the information as provided by the 
aggregating entities.

F. Recordkeeping

    Five letters directly addressed the proposed recordkeeping 
requirements. Two of these letters objected to applying the rules to 
those entities that had a large position at any time during the two-
year period ending ninety days after publication of the final rules 
since the reviews of records to determine whether a large position was 
held would be an extensive, time consuming, and very costly process and 
would amount to a retroactive application of a new requirement. It was 
recommended that if this requirement were retained, entities be given 
the option of certifying or notifying the FRBNY that the holding of a 
large position is based on the entity's general knowledge of past 
investment and trading activities, without actually reviewing their 
records to document this fact. Another two letters specifically 
commented on the imposition of a significant recordkeeping burden on 
unregulated aggregating entities. Both letters stressed the view that 
this additional compliance burden, with these unregulated firms having 
to design and implement recordkeeping systems, may cause certain 
entities to either re-evaluate or curtail their participation in the 
Treasury market. One letter suggested that these unregulated entities 
be excluded from these requirements.

G. Announcement of a Request for Reports

    Five letters addressed the issue that the Treasury would annually 
test the reporting of large positions by requesting reports. Four 
letters recommended that when this request for large position 
information is made, the Treasury should notify market participants 
that it is a test. This is because some participants will assume that 
all such requests are real and their reactions may create price 
anomalies where none existed. One letter, in particular, stressed that 
advising market participants that the request is a test would not cause 
firms to be less diligent in complying with the rules and that firms 
would in every case have a legal obligation to submit the required 
information in a timely and accurate manner.
    One letter recommended that the start of the response period, in 
which the reports would be required to be submitted, should be 
triggered by publication of the announcement in the Federal Register, 
which would provide more certainty than a press release, that the 
notice was received. Another letter, from a trade association, 
suggested that while they support the issuance of a press release and 
publication in the Federal Register, they would also like to be 
immediately notified when the release is provided to third party wire 
services so that they can redistribute the notice to their members.

H. General Commentary

    Nine of the thirteen comment letters expressed general support for 
the proposed rules and the desired effect to prevent and detect market 
manipulation. Specifically, the letters supported the approach taken in 
providing for a $2 billion reporting threshold, an on-demand reporting 
system where reports are required to be submitted in response to 
infrequent requests, and relying on records that are already required 
to be maintained. Three of the nine letters stated that certain 
features of the proposed rules would be overly burdensome and pose 
compliance problems.
    One commenter agreed that the proposed rules strike the appropriate 
balance between achieving the purposes of the statute and minimizing 
the costs to the affected entities. Another commenter, while generally 
supportive, strongly objected to the Treasury reserving the right to 
collect information on securities issues that are older than those 
specified, since accommodating

[[Page 48342]]

historical information requests would impose significant cost burdens 
and business disruptions. A third commenter suggested that the FRBNY 
adopt an appendix to the final rules that would identify acceptable 
submission methods. A fourth commenter reiterated the view it expressed 
in response to the ANPR that the particular features of the Treasury 
bill market make it difficult to accumulate a concentration in these 
issues. A fifth commenter stated that the final rules should explicitly 
include a provision providing that any information required to be kept 
or reported will be exempt from FOIA and provided confidential 
treatment given its concern that the Treasury, in following up on a 
report, would seek the names of its advisory clients. This same 
commenter also stated that it does not believe that the GSAA provides 
the Treasury with the authority to request information on securities 
issues older than those defined as recently-issued and, therefore, this 
provision should be eliminated.
    Three commenters opposed the application of the large position 
rules to foreign firms. One letter expressed the commenter's belief 
that there are complications for those firms operating in foreign 
markets and that the proposed rules raise concerns about the potential 
effect on the liquidity of the government securities market. This 
commenter stated that the recordkeeping requirements and open-ended 
obligation to file large position reports could make Treasury 
securities less attractive to foreign participants, many of whom 
structure their business so as not to bring themselves under direct 
U.S. regulation. This letter further urged that the issuance of the 
final rules be delayed until the Treasury is absolutely certain that 
these rules meet the stated goal. Another commenter, in addition to 
expressing concerns with compliance costs (particularly for major 
European financial conglomerates), raised the issue of the extension of 
extra-territorial regulation by U.S. authorities. It was this 
commenter's belief that the extra-territorial application of the rules 
would be unwarranted in principle and unworkable in practice and would 
``aggravate problems over the trade in services.'' The commenter 
suggested that an alternative approach would be to rely more on 
memoranda of understanding (MOUs) with European supervisors and less on 
regulations. This letter further questioned the enforcement capacity 
with which U.S. authorities would have to enforce the regulations 
outside national jurisdiction, in the context of large foreign 
conglomerates. To this extent, the commenter recommended a narrower 
definition of the reporting population.
    A third commenter stated that the extra-territorial scope of the 
large position rules should be modified, particularly with respect to 
firms domiciled in countries where foreign regulators have MOUs with 
U.S. authorities. This commenter stated that the Treasury should 
explore the possibility of obtaining large position information from 
the foreign regulatory authorities rather than directly from the firms. 
It was represented that this process would ``build on * * * the 
increasing and important trend of enhancing cooperation between 
regulators in the securities markets * * *.'' This commenter further 
stated that large position reporting may not be needed at all for firms 
based in foreign jurisdictions which have rules in place to prohibit 
market manipulation.

III. Section-by-Section Analysis of Changes in Response to Comments

A. Section 420.1--Applicability

    In preparing the applicability section of the final rules, one 
change was made from the proposed rules. The change provides a total 
exemption from the large position rules to foreign central banks, 
foreign governments and international monetary authorities (e.g., World 
Bank) (collectively, foreign official organizations). The proposed 
rules had provided these entities a partial exemption from the rules 
limited to the portion of their positions maintained at the FRBNY. In 
response to the ANPR, the Treasury had received comments (from the 
FRBNY and the Investment Company Institute) on the regulatory treatment 
of these organizations and public comment was specifically requested on 
the approach taken in the proposed rules. No further comments were 
received.
    The Department has determined to grant the foreign official 
organizations a total exemption after careful consideration of the 
costs and benefits resulting from subjecting them to large position 
rules. The Treasury believes that attempting to regulate these entities 
would create significant potential legal and practical problems. 
Additionally, for the infrequent occasion when foreign official 
organizations may control a large position in a Treasury security, this 
information is likely to be available from other sources. Accordingly, 
the Treasury perceives very little benefit to be obtained from 
regulating the foreign official organizations in relation to the costs 
that would be incurred. It is for this reason that they are being 
granted a full exemption.
    The exemption provided to foreign official organizations does have 
one limitation. To the extent that such an organization has an 
ownership interest in an entity that engages primarily in commercial 
transactions (e.g., a nationalized commercial bank), the exemption does 
not extend to that entity. This limitation is designed to provide 
equivalent treatment to all commercial market participants regardless 
of their ownership structure.
    Three commenters objected to the applicability of the rules to 
foreign firms (i.e., foreign private financial enterprises). Two argued 
that the extra-territorial application of the rules by U.S. regulators 
would be either unwarranted in principle and unworkable in practice or 
unnecessary for many foreign firms since they are already subject to 
the rules of their domestic supervisor prohibiting market manipulation. 
The commenters recommended that, in lieu of an extra-territorial 
application of the rules, Treasury: (1) Rely more on MOUs with foreign 
regulators to obtain needed information, and (2) define a narrower 
reporting population for the rules (e.g., only business units that are 
primary bidders for, and proprietary traders in, Treasury securities).
    Treasury has considered the problems related to the ability of U.S. 
regulators to obtain large position information from foreign investors. 
As a result, Treasury expects that U.S. regulators will continue to 
cooperate with foreign securities regulators through MOUs and other 
means when and if such actions become necessary. It is impractical to 
exempt foreign investors from the large position rules since the 
potential exists for these entities to amass large positions in 
Treasury securities, and further, the granting of such an exemption 
could cause U.S.-based entities to move their securities holdings 
overseas to foreign firms. Accordingly, the Treasury has decided to 
retain the requirement that foreign private financial enterprises be 
subject to the large position rules.
    The commenters also asserted that compliance costs for foreign 
firms--especially European financial conglomerates--would be 
considerable. The Treasury believes that the changes made to the 
proposed rules, as explained in the remainder of this section of the 
preamble, together with the fact that the on-demand reporting system 
does not require aggregation of positions on a daily basis, will 
facilitate the ability of affected firms, including foreign firms, to 
comply with the rules

[[Page 48343]]

without incurring substantial compliance costs.

B. Section 420.2--Definitions

    Comments were received on paragraph 420.1(d) of the proposed rules, 
which reserves the Treasury's right to collect information on certain 
Treasury securities which do not meet the regulatory definition of 
``recently-issued'' but reporting on them would be consistent with the 
purposes of the GSAA. The commenters believed that such a reservation 
of rights was beyond the scope of the Treasury's authority. The purpose 
of the provision was to provide notice to market participants that, 
while the definition of ``recently-issued'' narrowed the routine 
coverage of the large position rules to a small universe of securities, 
the authority provided to the Treasury by the GSAA is broad enough to 
be applied to a larger group of securities and that, in certain rare 
circumstances, the Treasury may choose to invoke this broader 
authority. Treasury continues to hold this view.
    After consideration of these comments, and to make clear that 
``recently-issued'' is not limited by statute to the two or three most 
recent issues of a security, the Department has removed paragraph 
420.1(d) but revised the definition of ``recently-issued'' in paragraph 
420.2(g) of the final rules. The revision adds a new subparagraph (5) 
to the definition of ``recently-issued'' to include Treasury security 
issues older than those specified in subparagraphs 420.2(g)(1) and (2) 
where the large position information is necessary and appropriate for 
monitoring the impact of concentrations of positions in Treasury 
securities. As discussed in the preamble to the proposed rule,13 
the Treasury believes that this authority to request large position 
information on older security issues would only be used in exceptional 
circumstances. One example is the April and May 1991 two-year Treasury 
note squeeze situations in which these securities remained of concern 
to the Treasury beyond the time that would otherwise have been covered 
by the definition of ``recently-issued'' in subparagraphs 420.2(g) (1) 
and (2). It is not the Department's intention to gather information on 
securities that have been outstanding for an extended period of time.
---------------------------------------------------------------------------

    \13\ 60 FR 65214, 65217 (December 18, 1995).
---------------------------------------------------------------------------

    The definition of gross financing position, paragraph 420.2(c), was 
the subject of a number of comments principally on two different 
aspects of the proposed definition; the inclusion of securities 
collateral and the scope of the optional exclusion. As previously 
described in Section II.D., many commenters were particularly concerned 
about the broad scope of the definition of the gross financing 
position. As proposed, the gross financing position included amounts of 
a security received from any financing transaction, including 
collateral for commercial loans or financial derivatives. Commenters 
represented that compliance with the extensive reach of this position 
component would be unduly burdensome and for a large, diversified 
reporting entity could not be calculated within the provided reporting 
time frame. Some of the commenters stated that in order to calculate 
the gross financing position they would have to develop automated 
systems at substantial cost. The commenters did not object to the 
treatment of security financing transactions such as reverse repurchase 
agreements and bonds borrowed.
    After reviewing the comments, the Department has determined to 
limit the scope of the gross financing position. Specifically, all 
commercial lending transactions that include Treasury securities as 
collateral will be excluded from the gross financing position. These 
transactions include financings such as lines of credit, general 
purpose business loans and other securitized loans unrelated to 
activities in the financial markets. This change should greatly 
simplify the computation of the gross financing position for entities 
such as large commercial banks that extend secured commercial credit 
from a large number of locations and do not maintain a centralized 
register of the specific collateral for these transactions.
    In preparing the final rules, the Treasury carefully considered the 
commenters' further objections to the inclusion of securities received 
as collateral for financial derivatives such as swap agreements. The 
commenters represented that since these activities are generally 
conducted in unregulated affiliates of regulated entities, there are 
few standardized systems for tracking the specific collateral obtained 
and that creating an obligation to determine whether a specific 
security is held as collateral in a very short time frame, even on an 
on-demand basis, would require the development of extremely expensive 
automated systems. The Department weighed these arguments against the 
potential importance of this information in ascertaining control of a 
particular security and decided that the benefits of including them 
were greater than the burdens to market participants. Factors affecting 
this decision were the growing popularity of collateral structures for 
financial derivatives, the practical similarities between these 
structures and reverse repos and bonds borrowed transactions, as well 
as the fact that large market participants that would be affected by 
the large position rules already have non-integrated systems for 
tracking this collateral to conduct daily mark-to-market calculations 
and to determine the sufficiency of the collateral. Additionally, as is 
discussed later in the preamble, the Department has also determined to 
extend the reporting time frame. Accordingly, a Treasury security that 
has been received as collateral for a financial derivative transaction 
or other securities transaction (e.g., margin loan) must be included in 
the gross financing position.
    In response to the proposed rules, commenters also noted that the 
optional exclusion provided in the definition of gross financing 
position for transactions in which securities were transferred without 
effective control was restricted to only some financing transactions. 
The Department is sympathetic to this concern and is revising the 
definition in paragraph 420.2(c) in the final rules to permit the 
optional exclusion to be available on the same terms for any collateral 
transaction in which securities are received. The circumstances in 
which control is deemed to not exist--the right to substitute 
securities, a third party custodial relationship or hold-in-custody 
agreements--remain unchanged from the proposal. Extension of the 
exclusion to all components of the gross financing position should 
further mitigate the impact of including financial derivatives 
collateral in the definition since many of these agreements provide for 
the right to substitute securities.
    As a clarifying point in response to one commenter, the Department 
notes that forward start reverse repo transactions are to be included 
in the gross financing position just as forward settling trades are in 
the net trading position.
    While the Department is not revising the definition in paragraph 
420.2(d) of large position threshold, it emphasizes that the $2 billion 
level is only an absolute minimum reporting level. The Treasury wishes 
to reiterate that, while the $2 billion threshold triggers the 
recordkeeping requirements pursuant to section 420.4, no reporting 
burden is created until the Treasury issues a notice for information on 
a specific security. The Treasury envisions that the level specified in 
any actual request for large position information would most likely be 
significantly in excess of $2 billion and would, therefore, affect

[[Page 48344]]

only a small number of entities. Accordingly, no change is being made 
to the definition.
    Comments were specifically requested on the treatment of fails in 
the composition of a reportable position. The only negative comments 
received on this component suggested that the net fails position be 
permitted to be a negative number. The Department has decided to retain 
the current restriction that the net fails position should be reported 
as zero if it is negative. Fails to deliver that exceed fails to 
receive should not be used to reduce the size of a reportable position 
because their size is, to a great extent, controllable by the reporting 
entity. The Department also wishes to clarify that fails are not to be 
included in the net trading position and, therefore, are not double 
counted in computing a reportable position.
    In paragraph 420.2(f), the definition of net trading position, the 
Department requested comment on the proposed treatment of forward 
settling positions. The comments that were received on this issue were 
supportive of the proposed treatment. Accordingly, no change has been 
made to the treatment of forward settling positions in the net trading 
position. As a reminder, all the components of a reportable position 
are to be computed on a trade date basis.
    One commenter requested that the criteria for designation of a 
separate reporting entity within the definition of a reporting entity, 
paragraph 420.2(i) and Appendix A, be modified to parallel more closely 
the criteria for designation as a separate bidder in the uniform 
offering circular. 14 Specifically, the commenter asked that 
organizational components within an entity be permitted to establish 
themselves as separate reporting entities as they are permitted to be 
separate bidders in the uniform offering circular. To ensure 
consistency between the uniform offering circular and the large 
position rules, the Department has made a clarifying change to the term 
aggregating entity as defined in paragraph 420.2(a) and as used in 
Appendix A of the large position rules. These revisions clarify that an 
organizational component (e.g., a bank trust department) falls within 
the definition of aggregating entity and may be recognized as a 
separate reporting entity. Appendix A has been further revised to 
clarify that any entity, including an organizational component thereof, 
that has already received recognition from the Treasury as a separate 
bidder in Treasury auctions pursuant to the uniform offering circular 
is also recognized as a separate reporting entity without requesting 
such status. However, the separate reporting entity must continue to 
abide by the conditions set out in the uniform offering circular that 
are required for recognition as a single bidder, which parallel the 
conditions set out in Appendix A of the large position rules for 
recognition as a separate reporting entity.
---------------------------------------------------------------------------

    \14\ 31 CFR 356 Appendix A.
---------------------------------------------------------------------------

C. Section 420.3--Reporting

1. On-Demand Reporting System
    The on-demand reporting system approach that the Treasury proposed 
for filing large position reports received overwhelming support from 
the commenters. In an on-demand reporting system, large position 
reports are required to be prepared and filed only in response to a 
notice from the Treasury requesting large position information on a 
specific issue of a Treasury security by those reporting entities whose 
positions exceeded the large position reporting threshold specified in 
the notice.
    Nine of the twelve organizations that submitted comment letters 
addressed the on-demand reporting requirement and all of them supported 
the proposed reporting method in which large position reports would be 
submitted only in response to a specific, infrequent request by the 
Treasury. The commenters agreed with the Treasury's assessment that an 
on-demand reporting system would be significantly less costly and 
burdensome than a regular reporting system. An on-demand system would 
target the reporting to a specific issue of a Treasury security in 
response to price distortions or market anomalies, while still 
achieving the legislative and policy goals of strengthening the ability 
of the regulatory agencies to deter possible manipulation of the 
Treasury securities market. Thus, the on-demand approach is essential 
to the Treasury's overall commitment to design rules that strike an 
appropriate balance between achieving the purposes and objectives of 
the statute and minimizing costs and burdens to those entities affected 
by the regulations. Accordingly, the on-demand reporting requirement in 
paragraph 420.3(a) is being adopted without change from the proposed 
rules.
2. Notice Requesting Large Position Reports
    Another of the provisions of paragraph 420.3(a) identifies the 
information that will be provided in the notice that will be issued by 
the Treasury (i.e., press release and subsequent Federal Register 
notice) requesting the preparation and submission of large position 
reports. Paragraph 420.3(a) is being modified to indicate that the 
notice will also contain, where applicable, identification of the 
STRIPS principal component that is related to the specific Treasury 
security issue for which large position information is being requested. 
This information is being added because the STRIPS principal component, 
which must be reported as part of the net trading position, has a 
different security description and CUSIP number from the related 
Treasury note or bond that would be the subject of the Treasury's 
request for information.
    The preamble discussion to the proposed rules indicated that the 
Treasury notice requesting large position information would be provided 
to major news and financial publications and electronic financial wire 
services for subsequent dissemination, and published in the Federal 
Register.15 This procedure was proposed because we believe that 
the press release requesting large position information would be given 
wide and timely distribution without undue delay in the same manner as 
Treasury offering announcements and auction results. However, the 
Public Securities Association (PSA) has expressed concern about relying 
on the press for notification of the large position information request 
and that some entities may not have access to the particular wire 
service carrying the notice. For these reasons, the PSA has requested 
that the Treasury provide it with a facsimile copy of the notice so 
that the PSA can immediately notify its members of the reporting 
obligation. To facilitate broad and timely dissemination of the notice, 
Treasury will provide the PSA with a copy of the press release at the 
time it is issued. The Treasury will similarly make a copy of the 
notice available to other industry or trade associations at their 
request.
---------------------------------------------------------------------------

    \15\ Since the Federal Register is the designated federal 
publication for providing official notice, publishing the Treasury 
notice in that publication is legally sufficient for ``constructive 
notice'' of the request.
---------------------------------------------------------------------------

3. Information Required in Large Position Reports
--Net Trading Position
    Paragraph 420.3(c), together with Appendix B, details the specific 
information that must be provided in the large position information 
reports. In the proposed rules, paragraph 420.3(c)(1) identified the 
specific component positions of the total reportable position that must 
be reported by the reporting entity. For the

[[Page 48345]]

net trading position, which is one of three positions that constitute 
the total reportable position, the proposed rules required each of the 
following five components to be listed in the large position report: 
(1) Cash/immediate net settled positions; (2) net when-issued positions 
for to-be-issued and reopened issues; (3) net forward settling 
positions, including next day settling positions; (4) net positions in 
futures contracts that require delivery of the specific security; and 
(5) net holdings of STRIPS principal components of the security.
    Two commenters objected to the requirement that each of the five 
components of the net trading position be reported separately since the 
only difference among these items is their settlement date. One of 
these commenters also stated that the separate reporting of the net 
holdings of STRIPS principal components of a security does not appear 
to be necessary. In response to the comments and also to reduce the 
amount of information that must be included in the large position 
report, we are revising the final rules to eliminate the separate 
reporting of the five components that comprise the net trading 
position. Reporting only the total net trading position, rather than 
each of the five components, is also consistent with the way the net 
long position is reported under the Treasury's auction rules.16 
Accordingly, paragraph 420.3(c)(1) has been revised to require a 
reporting entity to report only its net trading position, gross 
financing position, net fails position and the total reportable 
position, which is the sum of the three positions. However, Treasury or 
FRBNY staff may require, as a follow-up inquiry pursuant to paragraph 
420.3(e), a reporting entity to provide the amount of each component 
that constitutes the net trading position. Reporting entities must make 
good faith efforts to respond to such inquiries and provide any 
additional information requested in a timely manner.
---------------------------------------------------------------------------

    \16\ 31 CFR 356.13(b).
---------------------------------------------------------------------------

--Gross Financing Position
    The gross financing position is the second of three positions 
constituting the total reportable position that must be included in the 
large position report pursuant to paragraph 420.3(c)(1) of the final 
rules. As discussed at length in Sections II.D. and III.B. of this 
preamble, the gross financing position was the subject of extensive 
comments regarding the inclusion of securities collateral in the 
position, the scope of the voluntary exclusion that permitted firms to 
reduce the gross financing position by the amount of securities 
received over which they did not have effective control, and the 
requirement to report the amount of the voluntary exclusion as a 
memorandum entry. Section III.B. discusses how the definition of gross 
financing position is being modified to narrow the scope of 
transactions that are covered and how the voluntary exclusion is being 
expanded to cover all components in the gross financing position. No 
changes to paragraph 420.3(c)(1) are necessary to address these issues.
    However, the Treasury has changed the provision in paragraph 
420.3(c)(2) of the proposed rules that would have required the amount 
of the voluntary exclusion to be reported. Entities that would have 
taken advantage of the voluntary exclusion would have been required to 
report the amount of the exclusion in Memorandum #2. The Treasury 
agrees with the commenters who stated that requiring this memorandum 
entry would impose additional burdens, thus negating the benefits that 
would be derived from exercising the voluntary exclusion. As a result, 
the Treasury is revising paragraph 420.3(c)(2) in the final rules by 
deleting the requirement to report Memorandum #2--the amount excluded 
from the gross financing position--in the large position report.
--Net Fails Position
    Regarding the net fails position, which is the third component of 
the total reportable position, two commenters requested clarification 
that fails should not be included in the cash/immediate net settled 
position component of the net trading position. The Department concurs 
with the views expressed by the commenters and reiterates the 
clarification it made in the preamble to the proposed rules that 
positions remaining unsettled after their scheduled settlement date are 
not to be included in the computation of the net trading position. As 
discussed earlier, the final rules adopt without change the treatment 
of the net fails position as proposed, i.e., net fails must be reported 
either as a positive number or zero.
--Trade Date Reporting
    Paragraph 420.3(c)(3) has been revised with technical and 
conforming changes. Language has been added to this provision to state 
explicitly that all position amounts on the large position report 
should be reported on a trade date basis. Since two commenters stated 
that positions should be reported as of trade date rather than 
settlement date, we believe this revision to the final rules will 
eliminate any confusion or misunderstanding regarding this issue.
    A conforming change is also being made to paragraph 420.3(c)(3) to 
reflect that the net trading position should be reported as one net 
number rather than reporting each of the five net trading position 
elements. See the discussion above in the section entitled Net Trading 
Position.
--Supplemental Information
    As described in the proposed rules, paragraph 420.3(e) requires 
that a reporting entity provide, in response to a request from the 
FRBNY or the Treasury, information in support of its large position 
report. Such a request could include the detail on the five components 
of a net trading position. Examples of other information that may be 
requested include the terms of repurchase agreements involving the 
security, such as rate and maturity, as well as transaction volume for 
the reported security.
4. Report Signatories and Certifications
    In the proposed rules, paragraph 420.3(c)(5) provided a listing of 
the administrative information that must be included in the large 
position report, the individuals authorized to sign the report, and the 
required certification language attesting to the accuracy and 
completeness of the report and to compliance by the reporting entity 
with the large position rules under this part. A number of commenters 
recommended that the list of those individuals authorized to sign the 
large position reports be expanded to include other officials and 
further that authority to sign be permitted to be delegated to other 
individuals. Additionally, many commenters requested that the 
certification language be changed to permit the designated filing 
entity to rely on certifications or other reasonable bases of evidence 
received from the aggregating entities regarding the accuracy and 
completeness of the large position information provided by the 
aggregating entities.
    In response to these comments, the Department is liberalizing and 
providing greater flexibility for the signatory and certification 
requirements. Paragraph 420.3(c)(5) as it appeared in the proposed 
rules is being separated into two paragraphs. New paragraph 420.3(c)(5) 
lists the specific administrative information that must be provided in 
the large position report without any substantive change from the 
proposal.
    New paragraph 420.3(c)(6) lists the individuals authorized to sign 
the large position reports and provides the specific certification 
language that must be included in each report. This

[[Page 48346]]

provision is being revised in the final rules by adding the chief 
compliance officer and chief legal officer to the list of officials 
authorized to sign the large position reports. In broadening the list 
of authorizing officials, the Department believes affected firms will 
have greater flexibility to determine the appropriate signatory for a 
particular report.
    New paragraph 420.3(c)(6) also contains a provision requiring two 
certification statements. The first certification statement requires 
the person signing the large position report to certify that the 
information contained in the report with respect to the designated 
filing entity is accurate and complete. This is consistent with the 
certification in the proposed rules. However, the certification 
language regarding (i) the accuracy and completeness of the large 
position information related to the other aggregating entities and (ii) 
compliance by the reporting entity, including all aggregating entities, 
with the large position recordkeeping and reporting rules has been 
modified to permit such certifications based on lesser standards of 
assurance. The final rule language will enable the signatories to make 
the required certifications based on a standard of reasonable inquiry 
and best knowledge and belief. Such an approach permits the authorized 
official to rely on certifications, schedules or other reasonable bases 
of evidence that the aggregating entities provide to the designated 
filing entity pertaining to their holdings of large positions and 
compliance with the rules.
    This certification approach adopted in the final rules is similar 
to that used by the SEC regarding reports filed under Sections 13(d) 
and 13(g) of the Securities Exchange Act of 1934.17
---------------------------------------------------------------------------

    \17\ 17 CFR 240.13d-1; 240.13d-101; 240.13d-102, item 10; 15 
U.S.C. 78m(d), 78m(g).
---------------------------------------------------------------------------

5. Reporting Time Frame
    Twelve of the thirteen comment letters objected to the one and one-
half business day reporting time frame in the proposed rules and 
recommended longer time frames ranging from three to ten business days. 
In addition, two commenters recommended a phased reporting approach 
with staggered deadlines for different types of positions.
    The Department is extending the time frame for filing the large 
position reports from one and one-half to three and one-half business 
days as prescribed in new paragraph 420.3(c)(7). Accordingly, reports 
must be received by 12:00 noon Eastern time at the FRBNY, Market 
Reports Division, on the fourth business day after the issuance of the 
Treasury press release requesting large position information.
    The Department is sympathetic to the concerns expressed by the 
commenters regarding the time and effort that will be needed to 
compile, aggregate and file the large position reports, particularly 
where reporting entities have a large number of aggregating entities, 
including foreign affiliates. To be weighed against these concerns is 
the need that the report be filed relatively quickly in order to 
accomplish its purpose. However, we believe that the significant 
changes that have been made in the final rules--revising the definition 
of gross financing position to exclude securities received as 
collateral for commercial loans; expanding the voluntary exclusion for 
the gross financing position to cover securities received on any 
component of the position; eliminating the requirement to report as a 
memorandum entry the amount of the voluntary exclusion; eliminating the 
need to report separately each of the five components of the net 
trading position; and expanding the flexibility regarding the signatory 
and certification requirements--will reduce the burdens associated with 
meeting the three and one-half business day reporting requirement.
    The Department also wants to clarify a misunderstanding on the part 
of some commenters that the large position rules impose an on-going 
aggregation requirement. Neither the proposed rules nor these final 
rules impose a daily aggregation requirement for large position 
information. The Department adopted the on-demand method of reporting 
specifically to avoid requiring entities to redesign or develop systems 
that would summarize, compile and aggregate large position information 
on a daily basis. While all aggregating entities subject to the rules 
must make records of their transactions on a daily basis, only the 
designated filing entities are required to have a process to aggregate 
the large position information on behalf of the reporting entity, and 
then only in response to a specific request from the Treasury for large 
position reports. The Department is not persuaded that the rules 
require firms to develop system interfaces or integrated systems to 
compile and aggregate the required large position information.
    The Department did not adopt the recommendation for a phased 
reporting system. We believe such a system would impose unnecessary 
administrative burdens and add unneeded complexity to the reporting 
process.
6. Report Media
    In response to a request for clarification, paragraph 420.3(d) has 
been revised to indicate that facsimile and delivered hard copy reports 
are the acceptable media for the large position reports. Reporting 
entities should contact the FRBNY staff to work out arrangements if 
they wish to submit the reports in a different type of media.
7. Testing of Large Position Reporting System
    The Department reiterates its intention to test the accuracy and 
reliability of the large position reporting system by requesting large 
position reports at least annually, regardless of market conditions for 
a particular security. Many commenters expressed concerns that, by the 
Treasury not disclosing that a request for large position information 
is a test, the market will assume the request is real and may react 
negatively, thus creating price anomalies where none existed. While the 
Department may announce a test as such, we intend to preserve our 
policy prerogative to request large position information without 
stating that the request is a test. The Department appreciates and 
understands these concerns but believes that the market should be able 
to discern, based on the market prices for the security issue selected 
for the test, that the request for large position information is only a 
test.

D. Section 420.4--Recordkeeping

    The recordkeeping rules require large position holders to make and 
preserve records related to large position reporting requirements. The 
final recordkeeping rules contain minor modifications to the proposed 
rules, reflecting the Treasury's review of issues raised in the comment 
letters.
    The proposed recordkeeping rules required, among other things, that 
each designated filing entity, in instances where its reporting entity 
controlled a reportable position of at least $2 billion in any Treasury 
security during the prior two-year period ending 90 days after 
publication of the final rule, submit a letter to the FRBNY 
``certifying'' that the designated filing entity had or would have by 
the effective date a recordkeeping system capable of making, verifying 
the accuracy of, and preserving the requisite records. (A technical 
change has been made in these final rules regarding this letter. 
Pursuant to section 420.4(a)(2) of the final large position rules, the 
letter must now be submitted to the Treasury's Bureau of the Public 
Debt, rather than to the FRBNY.)

[[Page 48347]]

    Four commenters objected to this requirement. Three commenters 
asserted that the provision, which effectively required certain firms 
to review positions dating back two years, was unduly time-consuming 
and costly since such information could not be readily collected and 
aggregated. The third commenter objected on the grounds that certain 
entities, particularly banks, are not required to maintain securities-
related records that cover all Treasury securities held as collateral 
(e.g., collateral received to secure extensions of credit) and are not 
required to maintain records by CUSIP. In addition, three commenters 
stated that the designated filing entity should not be expected to 
certify the accuracy of the records of other aggregating entities 
within the reporting entity.
    The Treasury believes that relatively few entities will be subject 
to the recordkeeping rules because few entities hold, have held, or 
expect to hold reportable positions equal to or greater than $2 
billion. Nevertheless, in order to ease the burden on, and costs to, 
the firms that will be subject to the rules when they become effective, 
the final recordkeeping rules eliminate the requirement that an 
affected designated filing entity make a certification in its letter to 
the Bureau of the Public Debt. Instead, paragraph 420.4(a)(2) of the 
final rules requires the designated filing entity to ``state'' in its 
letter that it has in place or will have in place a recordkeeping 
system to meet the requirements of the rules. Further, the final rules 
clarify the distinction between the designated filing entity's 
recordkeeping system requirements and those of the other aggregating 
entities in the reporting entity; each letter to the Bureau of the 
Public Debt now must also contain a statement that, after reasonable 
inquiry and to the best of its knowledge and belief, the designated 
filing entity ``represents'' that its aggregating entities also have in 
place or will have in place specified recordkeeping systems. In 
determining whether to submit a letter and to have the required 
recordkeeping systems in place by the effective date, a designated 
filing entity can now make such determinations as a result of a 
reasonable bases of evidence, or its general knowledge, of the 
magnitude of its own positions and those of its aggregating entities 
over the two-year time frame. These changes allow firms to avoid the 
time and cost of conducting a detailed review of their positions 
covering the prior two-year time period.
    Further, as described in Section III.C. of this preamble, the final 
rules substantially reduce the amount of information required to be 
reported pertaining to certain kinds of collateral received to secure 
extensions of credit (e.g., collateral for commercial loans). This 
change obviates the need to maintain information on some of the 
securities collateral about which one commenter expressed concerns.
    Section III.C. also discussed the reasons for incorporating into 
the final reporting rules an expansion of categories of officials who 
are authorized to sign and certify the reports. Using the same 
rationale, the final recordkeeping rules in paragraph 420.4(a)(3) 
provide that the same expanded list of officials of the designated 
filing entity are authorized to sign the letter to the Bureau of the 
Public Debt.
    The final recordkeeping rules include two additional changes from 
the proposed rules. In the event that a designated filing entity 
obtains any certifications or schedules from its aggregating entities 
pertaining to their holdings of a reportable position, paragraphs 
420.4(b)(2) and 420.4(c)(2)(ii) require the designated filing entity to 
maintain copies of such certifications or schedules.
    The Treasury emphasizes that, although the final recordkeeping 
rules impose a modest amount of new requirements, particularly with 
regard to entities that are not currently subject to federal securities 
recordkeeping rules, the new requirements are not expected to 
necessitate significant automation or administrative expenses for the 
affected firms. As discussed in the preamble to the proposed rules, 
Treasury places a great deal of importance on minimizing the compliance 
burden on all affected entities, including unregulated ones. As a 
result, Treasury intentionally avoided imposing the vast majority of 
the requirements contained in SEC Rule 17a-3 18 on the unregulated 
entities. Instead, Treasury
FR Doc. 96-23331 Office of the Assistant Secretary for Financial Markets; Government Securities Act Regulations: Large Position Rules
 selected the most basic record (similar to 
the blotter requirement of SEC Rule 17a-3) that would be crucial to 
documenting and preparing large position reports without imposing a 
burden on the few unregulated firms that are likely to be subject to 
the recordkeeping requirements. It is our understanding that such 
investors already maintain records capturing most or all of the 
information required by the recordkeeping rules.
---------------------------------------------------------------------------

    \18\ 17 CFR 240.17a-3.
---------------------------------------------------------------------------

E. Section 420.5--Effective Date

    Section 420.5 sets out the effective date for both the 
recordkeeping and reporting provisions of the large position rules. The 
rules provide for a delayed effective date approximately six months 
after the date of this publication. This period of time is provided to 
give affected entities sufficient time to make the necessary 
preparations for compliance. Only paragraph 420.4(a) is not subject to 
this date but instead contains its own specific dates for compliance.

F. Appendix B to Part 420--Sample Large Position Report

    The sample large position report in Appendix B has been shortened 
to conform to the changes in paragraph 420.3(c) of the final reporting 
rules. Refer to Section III.C. of this preamble for an explanation of 
the changes.

IV. Special Analysis

    The rules do not meet the criteria for a ``significant regulatory 
action'' pursuant to Executive Order 12866.
    In the preamble to the proposed rules, pursuant to the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.), the Department certified that 
these amendments, if adopted, would not have a significant economic 
impact on a substantial number of small entities. Accordingly, a 
regulatory flexibility analysis was not prepared. The proposed and 
final rules establish a minimum large position threshold of $2 billion 
which assures market participants that the Treasury would not request 
large position reports below that minimum amount. The Department 
continues to believe that there are no small entities that will control 
positions of $2 billion or greater in any Treasury security. Based on 
this fact and its review of the final rules being adopted herein, and 
since no comments were received related to this particular issue, the 
Department has concluded there is no reason to alter the previous 
certification.
    The collections of information contained in the final regulations 
have been reviewed and approved by the Office of Management and Budget 
under section 3507(d) of the Paperwork Reduction Act of 1995 (44 U.S.C. 
Chapter 35) under Control Number 1535-0089. Under the Act, an agency 
may not conduct or sponsor, and a person is not required to respond to, 
a collection of information unless it displays a valid OMB control 
number.
    The information is being collected by the Department to enable the 
Treasury and other regulators to understand better the possible reasons 
for any apparent significant price distortions and the possible causes 
of market shortages in certain Treasury securities. The collection of 
information will help

[[Page 48348]]

ensure that the Treasury securities market remains liquid and 
efficient, and is not viewed as subject to manipulation. The final 
rules apply to nearly all market participants controlling large 
positions as defined in the rules. Per paragraph 420.3(c), it is a 
mandatory requirement that reporting entities with reportable positions 
that equal or exceed the specified threshold in a Treasury notice 
respond through their designated filing entities by filing a report in 
the required format and within the specified reporting time frame. The 
GSAA provides that the Department shall not be compelled to disclose 
publicly any information required to be kept or reported for large 
position reporting. Such information is exempt from disclosure under 
FOIA.\19\
---------------------------------------------------------------------------

    \19\ See supra note 9.
---------------------------------------------------------------------------

    Estimated total annual reporting and recordkeeping burden: 4,940 
hours.
    Estimated annual number of recordkeepers: 100.
    Estimated annual number of respondents: 10.
    Estimated annual frequency of response: On occasion.
    Comments on the accuracy of the estimate for this collection of 
information or suggestions to reduce the burden should be sent to the 
Office of Information and Regulatory Affairs of the Office of 
Management and Budget, Attention: Desk Officer for Department of the 
Treasury, Washington, D.C., 20503; with copies to the Government 
Securities Regulations Staff, Bureau of the Public Debt, Room 515, 999 
E Street, NW., Washington, D.C. 20239-0001.

List of Subjects

17 CFR Part 400

    Administrative practice and procedure, Banks, banking, Brokers, 
Government securities, Reporting and recordkeeping requirements.

17 CFR Part 420

    Foreign investments in U.S., Government securities, Investments, 
Reporting and recordkeeping requirements.
    For the reasons set out in the preamble, 17 CFR Chapter IV, 
subchapter A is amended as follows:

PART 400--RULES OF GENERAL APPLICATION

    1. The authority citation for part 400 is revised to read as 
follows:

    Authority: 15 U.S.C. 78o-5.

    2. In Sec. 400.1, paragraph (e) is added as follows:

Sec. 400.1  Scope of regulations.

* * * * *
    (e) Section 104 of the Government Securities Act Amendments of 1993 
(Pub. L. 103-202, 107 Stat. 2344) amended Section 15C of the Act (15 
U.S.C. 78o-5) by adding a new subsection (f), authorizing the Secretary 
of the Treasury to adopt rules to require specified persons holding, 
maintaining or controlling a large position in to-be-issued or 
recently-issued Treasury securities to report such a position and make 
and keep records related to such a position. Part 420 of this 
subchapter contains the rules governing large position reporting.
    3. Part 420 is added to read as follows:

PART 420--LARGE POSITION REPORTING

Sec.
420.1  Applicability.
420.2  Definitions.
420.3  Reporting.
420.4  Recordkeeping.
420.5  Effective Date.
Appendix A to Part 420--Separate Reporting Entity.
Appendix B to Part 420--Sample Large Position Report.

    Authority: 15 U.S.C. 78o-5(f).

Sec. 420.1  Applicability.

    (a) This part, including the Appendices, is applicable to all 
persons that participate in the government securities market, 
including, but not limited to: government securities brokers and 
dealers, depository institutions that exercise investment discretion, 
registered investment companies, registered investment advisers, 
pension funds, hedge funds and insurance companies that may control a 
reportable position in a recently-issued marketable Treasury bill, note 
or bond as those terms are defined in Sec. 420.2.
    (b) Notwithstanding paragraph (a) of this section, foreign central 
banks, foreign governments and international monetary authorities are 
exempt from this part. This exemption is not applicable to a broker, 
dealer, financial institution or other entity that engages primarily in 
commercial transactions and that may be owned in whole or in part by a 
foreign government.
    (c) Notwithstanding paragraph (a) of this section, Federal Reserve 
Banks are exempt from this part for the portion of any reportable 
position they control for their own account.

Sec. 420.2  Definitions.

    For the purposes of this part:
    (a) ``Aggregating entity'' means a single entity (e.g., a parent 
company, affiliate, or organizational component) that is combined with 
other entities, as specified in paragraph (i) of this section, to form 
a reporting entity. In those cases where an entity has no affiliates, 
the aggregating entity is the same as the reporting entity.
    (b) ``Control'' means having the authority to exercise investment 
discretion over the purchase, sale, retention or financing of specific 
Treasury securities. Only one entity should be considered to have 
investment discretion over a particular position.
    (c) ``Gross financing position'' is the sum of the gross par 
amounts of a security issue received from financing transactions, 
including reverse repurchase transactions and bonds borrowed, and as 
collateral for financial derivatives and other securities transactions 
(e.g., margin loans). In calculating the gross financing position, a 
reporting entity may not net its positions against repurchase 
transactions, securities loaned, or securities pledged as collateral 
for financial derivatives and other securities transactions. However, a 
reporting entity may elect to reduce its gross financing position by 
the par amount of the security received in transactions: in which the 
counterparty retains the right to substitute securities; that are 
subject to third party custodial relationships; or that are hold-in-
custody agreements.
    (d) ``Large position threshold'' means, with respect to a 
reportable position, the dollar par amount such position must equal or 
exceed in order for a reporting entity to be required to submit a large 
position report. The large position threshold will be announced by the 
Department and may vary with each notice of request to report large 
position information and with each specified Treasury security. 
However, under no circumstances will a large position threshold be less 
than $2 billion.
    (e) ``Net fails position'' is the net par amount of ``fails to 
receive'' less ``fails to deliver'' in the same security. The net fails 
position, as reported, may not be less than zero.
    (f) ``Net trading position'' is the net sum of the following 
respective positions in the specific security issue:
    (1) Cash/immediate net settled positions;
    (2) Net when-issued positions;
    (3) Net forward positions, including next-day settling;
    (4) Net futures contract positions that require delivery of the 
specific security; and
    (5) Net holdings of STRIPS principal components of the security.

[[Page 48349]]

    (g) ``Recently-issued'' means:
    (1) With respect to Treasury securities that are issued quarterly 
or more frequently, the three most recent issues of the security (e.g., 
in early April, the January, February, and March 2-year notes).
    (2) With respect to Treasury securities that are issued less 
frequently than quarterly, the two most recent issues of the security.
    (3) With respect to a reopened security, the entire issue of a 
reopened security (older and newer portions) based on the date the new 
portion of the reopened security is issued by the Department (or for 
when-issued securities, the scheduled issue date).
    (4) For all Treasury securities, a security announced to be issued 
or auctioned but unissued (when-issued), starting from the date of the 
issuance announcement. The most recent issue of the security is the one 
most recently announced.
    (5) Treasury security issues other than those specified in 
paragraphs (g)(1) and (2) of this section, provided that such large 
position information is necessary and appropriate for monitoring the 
impact of concentrations of positions in Treasury securities.
    (h) ``Reportable position'' is the sum of the net trading 
positions, gross financing positions and net fails positions in a 
specified issue of Treasury securities collectively controlled by a 
reporting entity.
    (i) ``Reporting entity'' means any corporation, partnership, person 
or other entity and its affiliates, as further provided herein. For the 
purposes of this definition, an affiliate is any: entity that is more 
than 50% owned, directly or indirectly, by the aggregating entity or by 
any other affiliate of the aggregating entity; person or entity that 
owns, directly or indirectly, more than 50% of the aggregating entity; 
person or entity that owns, directly or indirectly, more than 50% of 
any other affiliate of the aggregating entity; or entity, a majority of 
whose board of directors or a majority of whose general partners are 
directors or officers of the aggregating entity or any affiliate of the 
aggregating entity.
    (1) Subject to the conditions prescribed in Appendix A, one or more 
aggregating entities, either separately or together with one or more 
other aggregating entities, may be recognized as a separate reporting 
entity.
    (2) Notwithstanding this definition, any persons or entities that 
intentionally act together with respect to the investing in, retention 
of, or financing of, Treasury securities are considered, collectively, 
to be one reporting entity.

Sec. 420.3  Reporting.

    (a) A reporting entity is subject to the reporting requirements of 
this section only when its reportable position equals or exceeds the 
large position threshold specified by the Department for a specific 
Treasury security issue. The Department shall provide notice of such 
threshold by issuance of a press release and subsequent publication of 
the notice in the Federal Register. Such notice will identify the 
Treasury security issue to be reported (including, where applicable, 
identification of the related STRIPS principal component); the date or 
dates (as of close of business) for which the large position 
information must be reported; and the applicable large position 
threshold for that issue. It is the responsibility of a reporting 
entity to take reasonable actions to be aware of such a notice.
    (b) A reporting entity shall select one entity from among its 
aggregating entities (i.e., the designated filing entity) as the entity 
designated to compile and file a report on behalf of the reporting 
entity. The designated filing entity shall be responsible for filing 
any large position reports in response to a notice issued by the 
Department and for maintaining the additional records prescribed in the 
applicable paragraph of Sec. 420.4.
    (c)(1) In response to a notice issued under paragraph (a) of this 
section requesting large position information, a reporting entity with 
a reportable position that equals or exceeds the specified large 
position threshold stated in the notice shall compile and report the 
amounts of the reporting entity's reportable position in the order 
specified, as follows:
    (i) net trading position;
    (ii) gross financing position;
    (iii) net fails position; and
    (iv) total reportable position.
    (2) The large position report should include the following 
additional memorandum item: a total that includes the amounts of 
securities delivered through repurchase agreements, securities loaned, 
and as collateral for financial derivatives and other securities 
transactions. This total should not be reflected in the gross financing 
position.
    (3) An illustration of a sample report is contained in Appendix B. 
The net trading position shall be one net number and reported as the 
applicable positive or negative number (or zero). The gross financing 
position and net fails position should each be reported as a single 
entry. If the amount of the net fails position is zero or less, report 
zero. All position amounts should be reported on a trade date basis and 
at par in millions of dollars.
    (4) All positions must be reported as of the close of business of 
the reporting date(s) specified in the notice.
    (5) Each submitted large position report must include the following 
administrative information in addition to the reportable position: the 
name of the reporting entity, the address of the principal place of 
business, the name and address of the designated filing entity, the 
Treasury security that is being reported, the CUSIP number for the 
security being reported, the report date or dates for which information 
is being reported, the date the report was submitted, the name and 
telephone number of the person to contact regarding information 
reported, and the name and position of the authorized individual 
submitting this report.
    (6) The large position report must be signed by one of the 
following: the chief compliance officer; chief legal officer; chief 
financial officer; chief operating officer; chief executive officer; or 
managing partner or equivalent. The designated filing entity must also 
include in the report, immediately preceding the signature, a statement 
of certification as follows:

    By signing below, I certify that the information contained in 
this report with regard to the designated filing entity is accurate 
and complete. Further, after reasonable inquiry and to the best of 
my knowledge and belief, I certify: (i) That the information 
contained in this report with regard to any other aggregating 
entities is accurate and complete; and (ii) that the reporting 
entity, including all aggregating entities, is in compliance with 
the requirements of 17 CFR Part 420.

    (7) The report must be filed before noon Eastern time on the fourth 
business day following issuance of the press release.
    (d) A report to be filed pursuant to paragraph (c) of this section 
will be considered filed when received by the Federal Reserve Bank of 
New York, Market Reports Division. The report may be filed with the 
Federal Reserve Bank of New York by facsimile or delivered hard copy. 
The Federal Reserve Bank of New York may in its discretion also 
authorize additional means of reporting.
    (e) A reporting entity that has filed a report pursuant to 
paragraph (c) of this section shall, at the request of the Department 
or the Federal Reserve Bank of New York, timely provide any 
supplemental information pertaining to such report.

(Approved by the Office of Management and Budget under control 
number 1535-0089)

[[Page 48350]]

Sec. 420.4  Recordkeeping.

    (a)(1) Notwithstanding the provisions of paragraphs (b) and (c) of 
this section, an aggregating entity must make and maintain records 
pursuant to this part as of its effective date, but only if the 
aggregating entity has controlled a portion of its reporting entity's 
reportable position in any Treasury security when such reportable 
position of the reporting entity has equaled or exceeded the minimum 
large position threshold specified in Sec. 420.2(d) (i.e., $2 billion) 
during the prior two-year period ending December 11, 1996. Subsequent 
to the effective date, an aggregating entity that controls a portion of 
its reporting entity's reportable position in a recently-issued 
Treasury security, when such reportable position of the reporting 
entity equals or exceeds the minimum large position threshold, shall be 
responsible for making and maintaining the records prescribed in this 
section.
    (2) In the case of a reporting entity whose reportable position in 
any Treasury security has equaled or exceeded the minimum large 
position threshold during the prior two-year period ending December 11, 
1996, each such reporting entity's designated filing entity shall 
submit a letter to the Government Securities Regulations Staff, Bureau 
of the Public Debt, 999 E Street, N.W., Room 515, Washington, DC 20239, 
stating that the designated filing entity has in place, or will have in 
place by the effective date, a recordkeeping system (including policies 
and procedures) capable of making, verifying the accuracy of, and 
preserving the records required pursuant to this section. The letter 
shall further state that, after reasonable inquiry and to the best of 
its knowledge and belief, the designated filing entity represents that 
all other aggregating entities have in place, or will have in place by 
the effective date, a system (including policies and procedures) 
capable of making, verifying the accuracy of, and preserving the 
records required pursuant to this section.
    (3) The letter specified in paragraph (a)(2) of this section must 
be signed by one of the following: the chief compliance officer; chief 
legal officer; chief financial officer; chief operating officer; chief 
executive officer; or managing partner or equivalent. The letter must 
be received by the Bureau of the Public Debt no later than January 21, 
1997.
    (b) Records to be made and preserved by entities that are subject 
to the recordkeeping provisions of the Commission, the Department, or 
the appropriate regulatory agencies for financial institutions. As an 
aggregating entity, compliance by a registered broker or dealer, 
registered government securities broker or dealer, noticed financial 
institution, depository institution that exercises investment 
discretion, registered investment adviser, or registered investment 
company with the applicable recordkeeping provisions of the Commission, 
the Department, or the appropriate regulatory agencies for financial 
institutions shall constitute compliance with this section, provided 
that if such entity is also the designated filing entity it:
    (1) Makes and keeps copies of all large position reports filed 
pursuant to this part;
    (2) Makes and keeps supporting documents or schedules used to 
compute data for the large position reports filed pursuant to this 
part, including any certifications or schedules it receives from 
aggregating entities pertaining to their holdings of a reportable 
position;
    (3) Makes and keeps a chart showing the organizational entities 
that are aggregated (if applicable) in determining a reportable 
position; and
    (4) With respect to recordkeeping preservation requirements that 
contain more than one retention period, preserves records required by 
paragraphs (b)(1)-(3) of this section for the longest record retention 
period of applicable recordkeeping provisions.
    (c) Records to be made and kept by other entities. (1) An 
aggregating entity that is not subject to the provisions of paragraph 
(b) of this section shall make and preserve a journal, blotter, or 
other record of original entry containing an itemized record of all 
transactions that fall within the definition of a reportable position, 
including information showing the account for which such transactions 
were effected and the following information pertaining to the 
identification of each instrument: the type of security, the par 
amount, the CUSIP number, the trade date, the maturity date, the type 
of transaction (e.g., a reverse repurchase agreement), and the name or 
other designation of the person from whom sold or purchased.
    (2) If such aggregating entity is also the designated filing 
entity, then in addition, it shall make and preserve the following 
records:
    (i) Copies of all large position reports filed pursuant to this 
part;
    (ii) Supporting documents or schedules used to compute data for the 
large position reports filed pursuant to this part, including any 
certifications or schedules it receives from aggregating entities 
pertaining to their holdings of a reportable position; and
    (iii) A chart showing the organizational entities that are 
aggregated (if applicable) in determining a reportable position.
    (3) With respect to the records required by paragraphs (c) (1) and 
(2) of this section, each such aggregating entity shall preserve such 
records for a period of not less than six years, the first two years in 
an easily accessible place. If an aggregating entity maintains its 
records at a location other than its principal place of business, the 
aggregating entity must maintain an index that states the location of 
the records, and such index must be easily accessible at all times.

    (Approved by the Office of Management and Budget under control 
number 1535-0089)

Sec. 420.5  Effective Date.

    The provisions of this part, except for Sec. 420.4(a), shall be 
first effective on March 31, 1997.

Appendix A to Part 420--Separate Reporting Entity

    Subject to the following conditions, one or more aggregating 
entity(ies) (e.g., parent, subsidiary, or organizational component) in 
a reporting entity, either separately or together with one or more 
other aggregating entity(ies), may be recognized as a separate 
reporting entity. All of the following conditions must be met for such 
entity(ies) to qualify for recognition as a separate reporting entity:
    (1) Such entity(ies) must be prohibited by law or regulation from 
exchanging, or must have established written internal procedures (i.e., 
Chinese walls) designed to prevent the exchange of information related 
to transactions in Treasury securities with any other aggregating 
entity;
    (2) Such entity(ies) must not be created for the purpose of 
circumventing these large position reporting rules;
    (3) Decisions related to the purchase, sale or retention of 
Treasury securities must be made by employees of such entity(ies). 
Employees of such entity(ies) who make decisions to purchase or dispose 
of Treasury securities must not perform the same function for other 
aggregating entities; and
    (4) The records of such entity(ies) related to the ownership, 
financing, purchase and sale of Treasury securities must be maintained 
by such entity(ies). Those records must be identifiable--separate and 
apart from similar records for other aggregating entities.

[[Page 48351]]

    To obtain recognition as a separate reporting entity, each 
aggregating entity or group of aggregating entities must request such 
recognition from the Department pursuant to the procedures outlined in 
paragraph 400.2(c) of this title. Such request must provide a 
description of the entity or group and its position within the 
reporting entity, and provide the following certification:
    ``[Name of the entity(ies)] hereby certifies that to the best of 
its knowledge and belief it meets the conditions for a separate 
reporting entity as described in Appendix A to 17 CFR Part 420. The 
above named entity also certifies that it has established written 
policies or procedures, including ongoing compliance monitoring 
processes, that are designed to prevent the entity or group of entities 
from:
    ``(1) Exchanging any of the following information with any other 
aggregating entity (a) positions that it holds or plans to trade in a 
Treasury security; (b) investment strategies that it plans to follow 
regarding Treasury securities; and (c) financing strategies that it 
plans to follow regarding Treasury securities, or
    ``(2) In any way intentionally acting together with any other 
aggregating entity with respect to the purchase, sale, retention or 
financing of Treasury securities.
    ``The above-named entity agrees that it will promptly notify the 
Department in writing when any of the information provided to obtain 
separate reporting entity status changes or when this certification is 
no longer valid.''
    Any entity, including any organizational component thereof, that 
previously has received recognition as a separate bidder in Treasury 
auctions from the Department pursuant to 31 CFR Part 356 is also 
recognized as a separate reporting entity without the need to request 
such status, provided such entity continues to be in compliance with 
the conditions set forth in Appendix A of 31 CFR Part 356.

Appendix B to Part 420--Sample Large Position Report

              Formula for Determining a Reportable Position             
          [$ Amounts in millions at par value as of trade date]         
                                                                        
                                                                        
                                                                        
Security Being Reported........................             ____________
Date For Which Information is Being Reported...             ____________
1. Net Trading Position (Total of cash/                                 
 immediate net settled positions; net when-                             
 issued positions; net forward positions,                               
 including next day settling; net futures                               
 contracts that require delivery of the                                 
 specific security; and net holdings of STRIPS                          
 principal components of the security.)........             ____________
2. Gross Financing Position (Total of                                   
 securities received through reverse repos                              
 (including forward settling reverse repos),                            
 bonds borrowed, financial derivative                                   
 transactions and as collateral for other                               
 securities transactions which total may be                             
 reduced by the optional exclusion described in                         
 Sec.  420.2(c).)..............................         + $ ____________
3. Net Fails Position (Fails to receive less                            
 fails to deliver. If equal to or less than                             
 zero, report 0.)..............................         + $ ____________
4. Total Reportable Position...................         = $ ____________
Memorandum: Report one total which includes the gross par amounts of    
 securities delivered through repurchase agreements, securities loaned, 
 and as collateral for financial derivatives and other securities       
 transactions. Not to be included in item #2 (Gross Financing Position) 
 as reported above.                                                     
                                                          $ ____________
                                                                        
         Administrative Information To Be Provided in the Report        
                                                                        
Name of Reporting Entity:                                               
Address of Principal Place of Business:                                 
Name and Address of the Designated Filing Entity:                       
Treasury Security Reported on:                                          
CUSIP Number:                                                           
Date or Dates for Which Information Is Being Reported:                  
Date Report Submitted:                                                  
Name and Telephone Number of Person to Contact Regarding Information    
 Reported:                                                              
Name and Position of Authorized Individual Submitting this Report (Chief
 Compliance Officer; Chief Legal Officer; Chief Financial Officer; Chief
 Operating Officer; Chief Executive Officer; or Managing Partner or     
 Equivalent of the Designated Filing Entity Authorized to Sign Such     
 Report on Behalf of the Entity):                                       
Statement of Certification: ``By signing below, I certify that the      
 information contained in this report with regard to the designated     
 filing entity is accurate and complete. Further, after reasonable      
 inquiry and to the best of my knowledge and belief, I certify: (i) that
 the information contained in this report with regard to any other      
 aggregating entities is accurate and complete; and (ii) that the       
 reporting entity, including all aggregating entities, is in compliance 
 with the requirements of 17 CFR Part 420.''                            
Signature of Authorized Person Named Above:                             
                                                                        

    Dated: August 14, 1996.
Darcy Bradbury,
Assistant Secretary (Financial Markets).
[FR Doc. 96-23331 Filed 9-11-96; 8:45 am]
BILLING CODE 4810-39-P

Complete official Federal Register PDF

FR Doc. 96-23322 Fisheries of the Exclusive Economic Zone Off Alaska; Pollock by Vessels Using Nonpelagic Trawl Gear in the Bering Sea and Aleutian Island Area
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Page 48074]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23322]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 679

[Docket No. 960129019-6019-01; I.D. 090696F]

Fisheries of the Exclusive Economic Zone Off Alaska; Pollock by 
Vessels Using Nonpelagic Trawl Gear in the Bering Sea and Aleutian 
Island Area

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is closing the directed fishery for pollock by trawl 
vessels using nonpelagic trawl gear in the Bering Sea and Aleutian 
Islands management area (BSAI). This action is necessary to prevent 
exceeding the BSAI bycatch allowance of halibut specified for the trawl 
pollock/Atka mackerel/``other species'' fishery category.

EFFECTIVE DATE: 1200 hrs, Alaska local time (A.l.t.), September 7, 
1996, until 2400 hrs, A.l.t., December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Mary Furuness, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by the NMFS according to the Fishery 
Management Plan for the Groundfish Fishery of the Bering Sea and 
Aleutian Islands Area (FMP) prepared by the North Pacific Fishery 
Management Council under authority of the Magnuson Fishery Conservation 
and Management Act. Fishing by U.S. vessels is governed by regulations 
implementing the FMP at 50 CFR parts 600 and 679.
    The 1996 bycatch allowance of halibut specified for the trawl 
pollock/Atka mackerel/``other species'' fishery category which is 
defined at Sec. 679.21(e)(3)(iv)(F), was established as 430 metric tons 
by the Final 1996 Harvest Specifications of Groundfish (61 FR 4311, 
February 5, 1996).
    The Administrator, Alaska Region, NMFS, has determined, in 
accordance with Sec. 679.21(e)(7), that the bycatch allowance of 
halibut specified for the trawl pollock/Atka mackerel/``other species'' 
fishery category has been reached. Therefore, NMFS is closing the 
directed fishery for pollock by trawl vessels using nonpelagic trawl 
gear in the BSAI.
    Maximum retainable bycatch amounts for applicable gear types may be 
found in the regulations at Sec. 679.20(e).

Classification

    This action is taken under 50 CFR 679.21 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: September 6, 1996.
Gary C. Matlock,
Director, Office of Sustainable Fisheries, National Marine Fisheries 
Service.
[FR Doc. 96-23322 Filed 9-6-96; 5:02 pm]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-23321 Fisheries of the Exclusive Economic Zone Off Alaska; Sharpchin and Northern Rockfish in the Aleutian Islands Subarea
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48073-48074]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23321]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 679

[Docket No. 960129019-6019-01; I.D. 090696D]

Fisheries of the Exclusive Economic Zone Off Alaska; Sharpchin 
and Northern Rockfish in the Aleutian Islands Subarea

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Inseason adjustment; request for comments.

-----------------------------------------------------------------------

SUMMARY: NMFS issues an inseason adjustment prohibiting retention of 
Atka mackerel in the Aleutian Islands subarea of the Bering Sea and 
Aleutian Islands management area (BSAI). This action is necessary to 
prevent overfishing of the sharpchin/northern rockfish species group.

DATES: 1200 hrs, Alaska local time (A.l.t.), September 7, 1996, until 
2400 hrs, A.l.t., December 31, 1996. Comments must be received at the 
following address no later than 4:30 p.m., A.l.t., September 23, 1996.

ADDRESSES: Comments may be sent to Ronald J. Berg, Chief, Fisheries 
Management Division, Alaska Region, NMFS, P.O. Box 21668, Juneau, AK 
99802, Attn: Lori Gravel, or be delivered to the fourth floor of the 
Federal Building, 709 West 9th Street, Juneau, AK.

FOR FURTHER INFORMATION CONTACT: Andrew Smoker, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for the Groundfish Fishery of the Bering Sea and Aleutian Islands 
Area (FMP) prepared by the North Pacific Fishery Management Council 
under authority of the Magnuson Fishery Conservation and Management Act 
(Magnuson Act). Fishing by U.S. vessels is governed by regulations 
implementing the FMP at subpart H of 50 CFR part 600 and 50 CFR part 
679.
    The Magnuson Act requires that conservation and management measures 
prevent overfishing. The 1996 overfishing level for the sharpchin/
northern rockfish species group in the Aleutian Islands subarea of the 
BSAI is established by the Final 1996 Harvest Specifications of 
Groundfish (61 FR 4311, February 5, 1996) as 5,810 metric tons (mt) and 
the acceptable biological catch as 5,810 mt. As of August 24, 1996, 
6,578 mt of sharpchin/northern rockfish have been caught.
    NMFS closed directed fishing for sharpchin/northern rockfish on May 
30, 1996 (61 FR 28072, June 4, 1996) and prohibited retention of 
sharpchin/northern rockfish on July 27, 1996 (61 FR 40158, August 1, 
1996). Substantial trawl fishing effort will be directed at remaining 
amounts of Atka mackerel in the Aleutian Islands subarea during 1996. 
This fishery can have a significant bycatch of sharpchin/northern 
rockfish.
    The Administrator, Alaska Region, NMFS, has determined, in 
accordance with Sec. 679.25(a)(1)(i) and (a)(2)(iii), that closing the 
season by prohibiting retention of Atka mackerel by vessels using trawl 
gear is necessary to prevent overfishing of the sharpchin/northern 
rockfish species group, and is the least restrictive measure to achieve 
that purpose. Without this prohibition of retention, significant 
incidental catch of sharpchin/northern rockfish would occur by trawl 
vessels targeting Atka mackerel.
    Therefore, NMFS is requiring that further catches of Atka mackerel 
by vessels using trawl gear in the Aleutian Islands subarea of the BSAI 
be treated as prohibited species in accordance with Sec. 679.21(b)(2).

[[Page 48074]]

    The Assistant Administrator for Fisheries, NOAA, finds for good 
cause that providing prior notice and public comment or delaying the 
effective date of this action is impracticable and contrary to the 
public interest. Immediate effectiveness is necessary to prevent 
overfishing of sharpchin/northern rockfish in the Aleutian Islands 
subarea of the BSAI. Under Sec. 679.25(c)(2), interested persons are 
invited to submit written comments on this action to the above address 
until September 23, 1996.

Classification

    This action is taken under Sec. 679.20 and is exempt from OMB 
review under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.
    Dated: September 6, 1996.
Gary Matlock,
Director, Office of Sustainable Fisheries, National Marine Fisheries 
Service.
[FR Doc. 96-23321 Filed 9-6-96; 5:02 pm]
BILLING CODE 3510-22-P

Complete official Federal Register PDF

FR Doc. 96-23318 United States Standards for Grades of Frozen Field Peas and Frozen Black-Eye Peas
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Page 48066]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23318]

[[Page 48066]]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
7 CFR Part 52

[FV-95-329]

United States Standards for Grades of Frozen Field Peas and 
Frozen Black-Eye Peas

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (USDA) is adopting as a final 
rule with change the provisions of an interim final rule amending U.S. 
grade standards for Frozen Field Peas and Frozen Black-Eye Peas. The 
change would allow producers of frozen field peas and frozen black-eye 
peas the option to pack black-eye peas and cream peas without the 
requirement that these peas have an ``obvious green color.'' In 
addition, this rule enables the frozen food industry to produce frozen 
black-eye peas and frozen field peas more efficiently.

EFFECTIVE DATE: October 15, 1996.

FOR FURTHER INFORMATION CONTACT: James R. Rodeheaver, Processed 
Products Branch, Fruit and Vegetable Division, Agricultural Marketing 
Service, U.S. Department of Agriculture, Room 0709, South Building, 
P.O. Box 96456, Washington, D.C. 20090-6456, Telephone (202) 720-4693.

SUPPLEMENTARY INFORMATION: This rule is issued under the United States 
Standards for Grades of Frozen Field Peas and Frozen Black-Eye Peas (7 
CFR Part 52) to improve grade standards. The standards are effective 
under the Agricultural Marketing Act of 1946 as amended (7 U.S.C. 1621-
1627), hereinafter referred to as the Act. The USDA is issuing this 
rule in conformance with Executive Order 12866.
    This rule has been reviewed under Executive Order 12988, Civil 
Justice Reform. This action is not intended to have retroactive effect. 
This final rule will not preempt any State or local laws, regulations, 
or policies, unless they present irreconcilable conflict with this 
rule. There are no administrative procedures which must be exhausted 
prior to any judicial challenge to the provisions of this rule.
    The Agricultural Marketing Service has certified that this action 
will not have a significant economic impact on a substantial number of 
small entities, as defined in the Regulatory Flexibility Act, (5 U.S.C. 
601 et seq.), because it reflects current marketing practices. In 
addition, these standards are voluntary. Therefore, a small entity may 
avoid incurring any additional economic impact by not employing the 
standards. Further, no additional costs are expected to result from 
this action for producers and benefits derived from this action may be 
passed on to consumers.
    The American Frozen Food Institute (AFFI) petitioned for emergency 
relief from a requirement in the United States grade standards for 
frozen field peas and frozen black-eye peas. AFFI is a trade 
association representing over 560 food industry companies that account 
for over 90 percent of frozen food production in the United States. The 
frozen food industry requested USDA revise the grade standards to bring 
it in line with current harvesting and marketing practices. This would 
give economic relief to the frozen field pea and black-eye pea 
industry. The U.S. grade standards are voluntary standards. However, 
there is widespread use of the standards in contracts.
    When these grade standards were promulgated in 1976, it included a 
``Grade A'' color requirement for frozen black-eye peas and cream peas 
that approximately 14 percent of these type peas have an obvious green 
color.
    This requirement was applicable when hand harvesting techniques 
forced growers to harvest their crops earlier in the growing season 
which allowed for a high percentage of immature peas. Today, modern 
mechanical harvesting techniques allow growers to harvest these types 
of peas with more mature pods that are easily shelled.
    The requirement for these types of peas to have an obvious green 
color has caused undue economic stress on the industry.
    Frozen field pea and black-eye pea processors must purchase 
imported, hand-harvested peas and blend them with domestic crops to 
meet the ``Grade A'' color requirement. AFFI estimates that 10 million 
pounds of imported peas must be purchased by U.S. processors per year 
at an approximate annual cost of more than $2 million.
    Based on all the information received, USDA amended Section 52.1669 
in the United States Standards for Grades of Frozen Field Peas and 
Frozen Black-Eye Peas by removing the color attribute requirements for 
frozen black-eye peas and frozen cream peas from the text and Table III 
of this section.
    No additional costs are expected to result from this action for 
producers and benefits derived from this action may be passed on to 
consumers. This change is expected to facilitate marketing of frozen 
field peas and frozen black-eye peas.
    The interim final rule became effective when it was published in 
the Federal Register (60 FR 62709) on December 7, 1995, with a 30-day 
comment period. In response to the interim final rule the only comment 
received was from AFFI, which agreed with this revision.
    This action will finalize the interim final rule. An editorial 
change will be made for clarity in Section 52.1669 (b)(2) to specify 
that in the classification of color for ``field peas'' and ``mixed 
types'', ``black-eye peas'' and ``cream peas'' are not considered. In 
addition, in the interim final rule, corrections are made to the 
authority citation.

List of Subjects in 7 CFR Part 52

    Food grades and standards, Food labeling, Frozen foods, Fruit 
juices, Fruits, Reporting and recordkeeping requirements, Vegetables.

    Accordingly, the interim final rule amending 7 CFR part 52, which 
was published at 60 FR 62710 on December 7, 1995, is adopted as a final 
rule with the following change.

PART 52--[AMENDED]

    1. The authority citation for part 52 is revised to read as 
follows:

    Authority: 7 U.S.C. 1621-1627.

    2. In Sec. 52.1669, paragraph (b)(2) is revised to read as follows:

Sec. 52.1669  Classification of color and grade compliance.

* * * * *
    (b) * * *
    (2) ``Field peas'' and ``mixed types''. Each unit with a color that 
is characteristic of very young peas (``black-eye peas'' and ``cream 
peas'' are not considered.)

    Dated: September 6, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-23318 Filed 9-11-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-23317 United States Standards for Grades of Frozen Okra
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Page 48065]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23317]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 178 / Thursday, September 12, 1996 / 
Rules and Regulations

[[Page 48065]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 52

[FV-95-328]

United States Standards for Grades of Frozen Okra

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (USDA) is adopting as a final 
rule, with change, the provisions of the interim final rule that amends 
the existing U.S. standards for Frozen Okra by removing references to 
trimmed pods. This change will allow producers of frozen okra the 
option to pack whole and cut okra without trimming.

EFFECTIVE DATE: October 15, 1996.

FOR FURTHER INFORMATION CONTACT: James R. Rodeheaver, Processed 
Products Branch, Fruit and Vegetable Division, Agricultural Marketing 
Service, U.S. Department of Agriculture, room 0709, South Building, 
P.O. Box 96456, Washington, D.C. 20090-6456, Telephone (2) 720-4693.

SUPPLEMENTARY INFORMATION: This rule is issued under the United States 
Standards for Grade of Frozen Okra (7 CFR Part 52) to improve grade 
standards.
    The standards are effective under the Agricultural Marketing Act of 
1946 as amended (7 U.S.C. 1621-1627), hereinafter referred to as the 
Act.
    The USDA is issuing this rule in conformance with Executive Order 
12866.
    This rule has been reviewed under Executive Order 12988, Civil 
Justice Reform. This action is not intended to have retroactive effect. 
This final rule will not preempt any State or local laws, regulations, 
or policies, unless they present irreconcilable conflict with this 
rule. There are no administrative procedures which must be exhausted 
prior to any judicial challenge to the provisions of this rule.
    The Agricultural Marketing Service has certified that this action 
will not have a significant economic impact on a substantial number of 
small entities, as defined in the Regulatory Flexibility Act, (5 U.S.C. 
601 et seq.), because it reflects current marketing practices. In 
addition, these standards are voluntary. A small entity may avoid 
incurring any additional economic impact by not employing the 
standards.
    Further, no additional costs are expected to result from this 
action for producers and benefits derived from this action may be 
passed on to consumers.
    The American Frozen Food Institute (AFFI) petitioned for emergency 
relief from a requirement in the United States Standards for Grades of 
Frozen Okra.
    AFFI is a trade association representing over 560 food industry 
companies that account for over 90 percent of frozen food production in 
the United States.
    The frozen okra industry requested that USDA revise the grade 
standards for frozen okra so that producers of frozen okra will have 
the option to pack whole an cut okra without trimming and still meet 
the requirements of the United States Standards for Grades of Okra. The 
U.S. grade standards are voluntary standards. However, there is 
widespread use of the standards for frozen okra in contract 
requirements.
    When the United States grade standards were first issued, okra was 
cut by hand. With the advent of mechanical harvesting, the techniques 
of harvesting have changed. Also processing equipment, including 
electronic sorters, has improved the quality such that the frozen okra 
industry can control quality more effectively without extensive 
handling.
    Moreover, AFFI stated in its petition to revise the standards that 
since the frozen okra standards were last revised in 1969, new 
varieties have been established which leave the stems edible and tender 
when harvested with pods of the desirable length for freezing. AFFI 
noted that all other forms of whole okra including fresh, pickled, 
etc., are marketed untrimmed.
    AFFI also stated that the cost associated with trimming frozen 
whole okra was approximately $.0625 per pound of okra. Based on 1994 
United States production of 65,114,000 pounds of frozen okra sold, 
trimming okra costs U.S. processors of frozen okra approximately 
$4,069,625 each year.
    AFFI claimed that in the time it takes to revise the frozen okra 
standard through ordinary channels, frozen okra processors could incur 
costs of more than $8 million.
    Based on all the information received, USDA revised the grade 
standards by amending the product description in Sec. 52.1511 and 
Sec. 52.1512, Styles, in the United States Standards for Grades of 
Frozen Okra. Also, in Sec. 52.1517(c)(5)(i), ``apparent untrimmed 
pods'' was removed from the standards as a defect since it no longer 
applies.
    No additional costs are expected to result from this action for 
producers and benefits derived from this action may be passed on to 
consumers. This change is expected to facilitate marketing of frozen 
okra.
    The interim final rule became effective when it was published in 
the Federal Register (60 FR 62708) on December 7, 1995, with a 30-day 
comment period. In response to the interim final rule the only comment 
received was from AFFI, which agreed with this revision.
    This action will finalize the interim final rule. In addition, in 
the interim final rule, corrections are made to the authority citation.

List of Subjects in 7 CFR Part 52

    Food grades and standards, Food labeling, Frozen foods, Fruit 
juices, Fruits, Reporting and record keeping requirements, Vegetables.

    Accordingly, the interim final rule amending 7 CFR part 52, which 
was published at 50 FR 62709 on December 7, 1995, is adopted as a final 
rule with the following change.

PART 52--[AMENDED]

    The authority citation for part 52 is revised to read as follows:

    Authority: 7 U.S.C. 1621-1627.

    Dated: September 6, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-23317 Filed 9-11-96; 8:45 am]
BILLING CODE 3410-02-M

Complete official Federal Register PDF

FR Doc. 96-23253 Fisheries Off West Coast States and in the Western Pacific; West Coast Salmon Fisheries; Closures from the Oregon-California Border to Humboldt South Jetty, CA, and from the U.S.-Canadian Border to Leadbetter Point, WA
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48072-48073]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23253]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 660

[Docket No. 960126016-6121-04; I.D. 090396B]

Fisheries Off West Coast States and in the Western Pacific; West 
Coast Salmon Fisheries; Closures from the Oregon-California Border to 
Humboldt South Jetty, CA, and from the U.S.-Canadian Border to 
Leadbetter Point, WA

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closures.

-----------------------------------------------------------------------

SUMMARY: NMFS announces that commercial salmon fisheries were closed in 
the following areas: from the Oregon-California border (42 deg.00'00'' 
N. lat.) to Humboldt South Jetty, CA (40 deg.45'53'' N. lat.), at 
midnight, August 22, 1996; and from the U.S.-Canadian border to 
Leadbetter Point, WA (46 deg.38'10'' N. lat.), at midnight, August 24, 
1996. The Director, Northwest Region, NMFS (Regional Director), has 
determined that the commercial quotas of 2,500 chinook salmon and 
20,800 coho salmon for the respective areas have been reached. This 
action is necessary to conform to the preseason announcement of the 
1996 management measures and is intended to ensure conservation of 
chinook and coho salmon.

DATES: Closure from the Oregon-California border to Humboldt South 
Jetty, CA, is effective at 2400 hours local time, August 22, 1996, 
through 0001 hours local time, September 1, 1996, at which time the 
season reopens under the terms of the preseason announcement of the 
1996 management measures. Closure from the U.S.-Canadian border to 
Leadbetter Point, WA, is effective at 2400 hours local time, August 24, 
1996, through 2400 hours local time, September 30, 1996, at which time 
the season remains closed under the terms of the preseason announcement 
of the 1996 management measures. Comments will be accepted through 
September 26, 1996.

ADDRESSES: Comments may be mailed to William Stelle, Jr., Director, 
Northwest Region, NMFS, 7600 Sand Point Way NE., Seattle, WA 98115-
0070, or Hilda Diaz-Soltero, Director, Southwest Region, NMFS, 501 W. 
Ocean Blvd., Suite 4200, Long Beach, CA 90802-4132. Information 
relevant to this action

[[Page 48073]]

has been compiled in aggregate form and is available for public review 
during business hours at the Northwest Regional Office or Southwest 
Regional Office.

FOR FURTHER INFORMATION CONTACT: William L. Robinson, 206-526-6140, or 
Rodney R. McInnis, 310-980-4030.

SUPPLEMENTARY INFORMATION: Regulations governing the ocean salmon 
fisheries at 50 CFR 660.409(a)(1) state that when a quota for the 
commercial or the recreational fishery, or both, for any salmon species 
in any portion of the fishery management area is projected by the 
Regional Director to be reached on or by a certain date, NMFS will, by 
notice issued under 50 CFR 660.411, close the commercial or 
recreational fishery, or both, for all salmon species in the portion of 
the fishery management area to which the quota applies as of the date 
the quota is projected to be reached.
    In the annual management measures for ocean salmon fisheries (61 FR 
20175, May 6, 1996), NMFS announced that the 1996 commercial fishery in 
the area between the Oregon-California border and Humboldt South Jetty, 
CA, would open on August 15 and continue through August 31 or 
attainment of the 2,500 chinook salmon quota, whichever occurred first. 
NMFS also announced that a 1996 commercial fishery contingency season 
in the area between the U.S.-Canadian border and Leadbetter Point, WA, 
would open on July 26 and continue through September 30 or attainment 
of the 18,800 chinook salmon quota, whichever occurred first. An 
inseason action at 61 FR 40157, August 1, 1996, announced 
implementation of the contingency season. A further inseason action at 
61 FR 43472, August 23, 1996, increased the commercial coho salmon 
quota for the area to 20,800 fish.
    The best available information on August 21 indicated that catch 
and effort data and projections supported closure of the commercial 
fishery in the area between the Oregon-California border and Humboldt 
South Jetty, CA, at midnight, August 22, and closure of the commercial 
fishery in the area between the U.S.-Canadian border and Leadbetter 
Point, WA, at midnight, August 24.
    The Regional Director consulted with representatives of the Pacific 
Fishery Management Council, the California Department of Fish and Game, 
and the Washington Department of Fish and Wildlife regarding these 
closures. The States of California and Washington will manage the 
commercial fishery in state waters adjacent to these areas of the 
exclusive economic zone in accordance with this Federal action. As 
provided by the inseason notice procedures of 50 CFR 660.411, actual 
notice to fishermen of this action was given prior to 2400 hours local 
time, August 22, 1996 (closure from the Oregon-California border to 
Humboldt South Jetty, CA) and 2400 hours local time, August 24, 1996 
(closure from the U.S.-Canadian border to Leadbetter Point, WA) by 
telephone hotline number 206-526-6667 or 800-662-9825 and by U.S. Coast 
Guard Notice to Mariners broadcasts on Channel 16 VHF-FM and 2182 kHz. 
Because of the need for immediate action to stop the fishery upon 
achievement of the quota, NMFS has determined that good cause exists 
for this notice to be issued without affording a prior opportunity for 
public comment. This notice does not apply to other fisheries that may 
be operating in other areas.

Classification

    This action is authorized by 50 CFR 660.409 and 660.411 and is 
exempt from review under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: September 5, 1996
Gary C. Matlock,
Director, Office of Sustainable Fisheries, National Marine Fisheries 
Service.
[FR Doc. 96-23253 Filed 9-11-96; 8:45 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-23210 Order Execution Obligations
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48290-48332]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23210]

[[Page 48289]]

_______________________________________________________________________

Part III

Securities and Exchange Commission

_______________________________________________________________________

17 CFR Part 240

Order Execution Obligations; Final Rule; Proposed Quote Rule Amendment

Federal Register / Vol. 61, No. 178 / Thursday, September 12, 1996 / 
Rules and Regulations

[[Page 48290]]

SECURITIES AND EXCHANGE COMMISSION

17 CFR Part 240

[Release No. 34-37619A; File No. S7-30-95]
RIN 3235-AG66

Order Execution Obligations

AGENCY: Securities and Exchange Commission.

ACTION: Final Rules.

-----------------------------------------------------------------------

SUMMARY: The Securities and Exchange Commission (``Commission'') is 
adopting a new rule requiring the display of customer limit orders and 
amending a current rule governing publication of quotations to enhance 
the quality of published quotations for securities and to enhance 
competition and pricing efficiency in our markets. These rules have 
been designed to address growing concerns about the handling of 
customer orders for securities.
    Specifically, the Commission is adopting new Rule 11Ac1-4 
(``Display Rule'') under the Securities Exchange Act of 1934 
(``Exchange Act'') to require the display of customer limit orders 
priced better than a specialist's or over-the-counter (``OTC'') market 
maker's quote or that add to the size associated with such quote. The 
Commission also is adopting amendments to Rule 11Ac1-1 (``Quote Rule'') 
under the Exchange Act to require a market maker to publish quotations 
for any listed security when it is responsible for more than 1% of the 
aggregate trading volume for that security and to make publicly 
available any superior prices that a market maker privately quotes 
through certain electronic communications networks (``ECNs'') (``ECN 
amendment''). Finally, the Commission is deferring action on proposed 
Rule 11Ac1-5 (``Price Improvement Rule'').

Effective Date: January 10, 1997. For specific phase-in dates for the 
Display Rule, see section III.A.3.d of this Release.

FOR FURTHER INFORMATION CONTACT: Elizabeth Prout Lefler or Gail A. 
Marshall regarding amendments to the Quote Rule and David Oestreicher 
regarding the Display Rule at (202) 942-0158, Division of Market 
Regulation, Securities and Exchange Commission, 450 Fifth Street, N.W., 
Mail Stop 5-1, Washington, D.C. 20549.

SUPPLEMENTARY INFORMATION:

I. Introduction and Summary

    On September 29, 1995, the Commission issued a release 1 
proposing for comment new Rules 11Ac1-4 and 11Ac1-5 and amendments to 
Rule 11Ac1-1 2 under the Exchange Act.3 As proposed, new Rule 
11Ac1-4 would require the display of customer limit orders that improve 
certain OTC market makers' and specialists' quotes or add to the size 
associated with such quotes. The proposed amendments to the Quote Rule 
would require OTC market makers and specialists who place priced orders 
with ECNs to reflect those orders in their published quotes. The 
proposed Quote Rule amendments also would require OTC market makers and 
specialists that account for more than 1% of the volume in any listed 
security to publish their quotations for that security (``Mandatory 
Quote Rule''). The Price Improvement Rule would have required OTC 
market makers and specialists to provide their customer market orders 
an opportunity for price improvement; it also would have included a 
non-exclusive safe harbor to satisfy the price improvement obligation.
---------------------------------------------------------------------------

    \1\ Securities Exchange Act Release No. 36310 (September 29, 
1995), 60 FR 52792 (October 10, 1995) (``Proposing Release'').
    \2\ 17 CFR 240.11Ac1-1.
    \3\ 15 U.S.C. 78a to 78ll (1988).
---------------------------------------------------------------------------

    The Commission received 152 comment letters (from 145 commenters) 
in response to the Proposing Release.4 Commenters generally 
supported the Display Rule and the Mandatory Quote Rule, with some 
commenters suggesting specific modifications or alternatives to the 
proposed rules. Commenters also supported the objectives of the ECN 
amendment, but many expressed concerns that diminishing the anonymity 
of such systems would threaten their viability. Most commenters 
believed the Price Improvement Rule would be costly to implement and 
would not be necessary if the other proposals were adopted.
---------------------------------------------------------------------------

    \4\ The comment letters and a summary of comments have been 
placed in Public File No. S7-30-95, which is available for 
inspection in the Commission's Public Reference Room. The Commission 
received comments on the proposals from 77 individual investors, ten 
industry associations, seven exchanges and the National Association 
of Securities Dealers (``NASD''), eight academics, 41 market 
participants and the United States Department of Justice. In 
addition, the Commission met with representatives of broker-dealers, 
self-regulatory organizations (``SROs''), industry associations, and 
the U.S. Department of Justice to discuss the proposals. The 
Commission has conducted its own economic analysis of the likely 
economic effects of the various proposals.
---------------------------------------------------------------------------

    After considering the comments and relevant economic research, and 
based on the Commission's experience with the development of the 
national market system (``NMS'') and its knowledge of current market 
practices, the Commission is adopting the Display Rule and the proposed 
amendments to the Quote Rule, with certain modifications. The 
Commission believes that these modifications are consistent with the 
proposals and responsive to many of the concerns voiced by the 
commenters.
    The Display Rule adopted today requires OTC market makers and 
specialists to display the price and full size of customer limit orders 
when these orders represent buying and selling interest that is at a 
better price than a specialist's or OTC market maker's public quote. 
OTC market makers and specialists also must increase the size of the 
quote for a particular security to reflect a limit order of greater 
than de minimis size when the limit order is priced equal to the 
specialist's or OTC market maker's disseminated quote and that quote is 
equal to the national best bid or offer.
    The Commission has modified the proposed Display Rule in some 
respects in response to comments. The proposal included an exception to 
permit a specialist or OTC market maker to deliver a limit order to an 
exchange or registered national securities association 
(``association'') sponsored system that complies with the Display Rule. 
This exception has been expanded to permit delivery to ECNs that 
display and provide access to these orders. Additionally, with regard 
to implementation of the rule, the Commission has provided for a phase-
in over a one year period for non-exchange-traded securities covered by 
the Display Rule.
    Today, the Commission also is adopting two significant amendments 
to the Quote Rule. These amendments are designed to ensure that more 
comprehensive quotation information is made available to the public. 
The first amendment requires a specialist or OTC market maker to make 
publicly available the price of any order it places in an ECN if the 
ECN price is better than the specialist's or OTC market maker's public 
quotation. The Commission has adopted this amendment as proposed, with 
an alternative (``ECN display alternative'') that deems OTC market 
makers and specialists in compliance with the Quote Rule if prices 
these OTC market makers and specialists enter into an ECN are publicly 
disseminated and the ECN provides access to other broker-

[[Page 48291]]

dealers to trade at those prices.5 Thus, OTC market makers and 
specialists may comply directly with the ECN amendment by changing 
their public quote to reflect their ECN order, or by using an ECN that 
facilitates their compliance with the rule as described above.
---------------------------------------------------------------------------

    \5\ This alternative means of compliance with the ECN amendment 
is referred to hereinafter as the ``ECN display alternative''.
---------------------------------------------------------------------------

    Implementation of the ECN display alternative requires the 
cooperation of the SROs in order to include the ECN prices in the 
public quotation system and to provide equivalent access to these 
quotations. The Commission expects the SROs to work expeditiously with 
ECNs that wish to avail themselves of this alternative to develop rules 
or understandings of general applicability. The Commission is prepared 
to act if necessary to ensure implementation of the ECN display 
alternative prior to the effective date of the Quote Rule.
    The second amendment to the Quote Rule expands the categories of 
securities covered by the Mandatory Quote Rule. As amended, the Quote 
Rule will require that OTC market makers and specialists publish quotes 
in any listed security if their volume in that security exceeds 1% of 
the aggregate volume during the most recent calendar quarter. 
Previously, these requirements applied only to certain listed 
securities.6
---------------------------------------------------------------------------

    \6\ Additional amendments to the Quote Rule adopted today 
provide that certain Quote Rule provisions that previously applied 
to market makers that elected to quote a Nasdaq National Market 
security now also will apply to market makers electing to quote a 
Nasdaq SmallCap security. See section III.B.d.iii.
---------------------------------------------------------------------------

    The Commission is deferring final action on the Price Improvement 
Rule at this time. The Commission will consider the effect of the new 
Display Rule and the amendments to the Quote Rule adopted today before 
determining the appropriate course of action on that proposal.
    In a parallel action, the Commission today is proposing for comment 
an additional amendment to the Quote Rule. The proposed amendment would 
require OTC market makers and specialists that account for more than 1% 
of the volume in any Nasdaq security to publish their quotations for 
that security.7
---------------------------------------------------------------------------

    \7\ See Securities Exchange Act Release No. 37620 (August 28, 
1996) (``Companion Release'').
---------------------------------------------------------------------------

II. Basis and Purpose of the Display Rule and Quote Rule Amendments

    Twenty years ago, Congress directed the Commission--having due 
regard for the public interest, the protection of investors, and the 
maintenance of fair and orderly markets--to use the Commission's 
authority granted under the Exchange Act to facilitate the 
establishment of a national market system for securities.8 
Congress further determined that the public interest, investor 
protection and the maintenance of fair and orderly markets required the 
NMS to feature:
---------------------------------------------------------------------------

    \8\ Pub. L. No. 94-29, 89 Stat. 97 (1975) (``1975 Amendments'').
---------------------------------------------------------------------------

    (i) Economically efficient executions;
    (ii) Fair competition among brokers and dealers, among exchange 
markets, and between exchange markets and markets other than exchange 
markets;
    (iii) Public availability of quotation and transaction information;
    (iv) An opportunity to obtain best execution; and
    (v) An opportunity to obtain execution without dealer intervention 
to the extent consistent with economically efficient executions and the 
opportunity to obtain best execution.9
---------------------------------------------------------------------------

    \9\ Exchange Act section 11A(a)(1), 15 U.S.C. 78k-1(a)(1). This 
Section also recites the Congressional findings that: The securities 
markets are an important national asset which must be preserved and 
strengthened; and new data processing and communications techniques 
create the opportunity for more efficient and effective market 
operations.
---------------------------------------------------------------------------

    The years since the 1975 Amendments have witnessed dramatic 
developments in the U.S. securities markets. Last sale reporting, which 
enables investors to determine the current market for a security, has 
been extended to OTC-traded securities. The Consolidated Quotation 
System (``CQS''), which allows investors to view in a single source 
quotes disseminated from dispersed market centers, did not exist in 
1975. The Intermarket Trading System (``ITS''), which permits 
investors' orders in certain exchange-listed securities to be routed to 
the market center displaying the best quotation, has greatly 
facilitated quote competition. Moreover, technological developments not 
envisioned twenty years ago have enabled market centers to handle 
volume levels many times greater than those that led to the ``back 
office'' crisis of the late 1960s and early 1970s. Taken together, 
these and other developments have made it possible for investors' 
orders to be executed much more rapidly and at far lower cost.
    The Commission recognized that U.S. equity markets had undergone 
significant changes since passage of the 1975 Amendments and were 
likely to undergo further changes of equal magnitude.10 
Accordingly, the Commission announced in July 1992 that its Division of 
Market Regulation (``Division'') would undertake a study of the 
structure of the U.S. equity markets and of the regulatory environment 
in which those markets operate.11
---------------------------------------------------------------------------

    \10\ See Securities Exchange Act Release No. 30920 (July 14, 
1992), 57 FR 32587 (July 22, 1992) (``Market 2000 Concept 
Release'').
    \11\ Id.
---------------------------------------------------------------------------

    In January 1994, the Division published a study,12 which 
reviewed, among other things, market practices and structures that 
could affect the ability of customers to obtain opportunities for 
better prices. The Market 2000 Study noted that U.S. equity markets had 
evolved since 1975 to provide a much wider array of trading venues to 
meet the diverse needs of investors and made a series of 
recommendations intended to facilitate the further development of a 
national market system. As expected, U.S. equity markets have continued 
to evolve since the Market 2000 Study was published.
---------------------------------------------------------------------------

    \12\ Division of Market Regulation, Market 2000: An Examination 
of Current Equity Market Developments (January 1994) (``Market 2000 
Study'' or ``Study'').
---------------------------------------------------------------------------

    This evolution of the markets is reflected in part by comparing 
trading volumes and the venues in which orders are executed. In 1976, 
the New York Stock Exchange (``NYSE'') average daily trading volume was 
approximately 21.2 million shares.13 By 1995, average daily 
trading volume exceeded 346 million shares.14 Third market 
trading, i.e., OTC trading of listed securities, in NYSE-listed issues 
accounted for 4.57% of consolidated volume in 1976.15 By 1995, 
third market trading increased to 7.94% of consolidated volume.16 
In 1987, the NYSE handled almost 74% of trades of NYSE-listed issues 
reported on the consolidated tape; in 1995, it handled 70.22% of such 
trades.17
---------------------------------------------------------------------------

    \13\ 1982 NYSE Fact Book.
    \14\ 1995 NYSE Annual Report.
    \15\ 1982 NYSE Fact Book.
    \16\ 1995 NYSE Fact Book.
    \17\ Regional exchanges, namely, the Boston Stock Exchange 
(``BSE''), the Philadelphia Stock Exchange (``Phlx''), the 
Cincinnati Stock Exchange (``CSE''), the Chicago Stock Exchange 
(``CHX''), and the Pacific Stock Exchange (``PSE''), have captured a 
significant share of volume in NYSE-listed issues, particularly with 
respect to smaller investor orders. In 1995, the regional exchanges 
accounted for 9.96% of consolidated volume in NYSE-listed issues but 
accounted for 19.01% of trades of NYSE-listed issues reported on the 
consolidated tape. Id. They also accounted for approximately 35% of 
share volume in trades of 100 to 2,099 shares. Shapiro, U.S. Equity 
Markets: Recent Equity Developments, in Global Equity Markets: 
Technological, Competitive, and Regulatory Challenges 21 (R. 
Schwartz ed. 1995). In January 1996, trades of 100-499 shares 
represented between 65-72% of all trades in NYSE-listed issues on 
regional exchanges; such trades represented only 37% of all trades 
on the NYSE. Ross, Shapiro and Smith, Price Improvement of SuperDOT 
Market Orders on the NYSE (NYSE Working Paper 96-01) (March 11, 1996 
draft) (prepared for the NYSE Conference for the Search for Best 
Price) (``Ross, Shapiro and Smith'').
---------------------------------------------------------------------------

    Comparable figures for The Nasdaq Stock Market (``Nasdaq'') are 
even more

[[Page 48292]]

dramatic. In 1975, Nasdaq annual volume was approximately 1.39 billion 
shares.18 By 1995, Nasdaq annual volume increased to 101.2 billion 
shares,19 which means that more shares traded hands on three 
average trading days in 1995 than in all of 1975. In 1993, volume in 
all proprietary trading systems combined represented 13% of the total 
volume in Nasdaq/National Market securities; 20 by January 1996, 
volume on Instinet alone represented approximately 15% of total Nasdaq 
volume and 20% of total volume for the 250 Nasdaq stocks with the 
highest median dollar volume.21
---------------------------------------------------------------------------

    \18\ 1992 Nasdaq Fact Book.
    \19\ 1995 NASD Annual Report.
    \20\ Market 2000 Study at Appendix IV-2.
    \21\ The Introduction of NAqcess into the Nasdaq Stock Market: 
Intent and Expectation, NASD Economic Research Staff, June 6, 1996 
(``NASD Study''), Exhibit D to Securities Exchange Act Release No. 
37302 (June 11, 1996), 61 FR 31574 (June 20, 1996) (Notice of Filing 
of Amendment No. 2 to Proposed Rule Change by National Association 
of Securities Dealers Relating to the NAqcess System and 
Accompanying Rules of Fair Practice)(``NAqcess Release 2'').
---------------------------------------------------------------------------

    The Study addressed the development of certain practices, such as 
internalization,22 payment for order flow 23 and the non-
disclosure of certain customer trading interest to all market 
participants, that raise a variety of market structure and customer 
order handling concerns. For example, brokers today may quote one price 
publicly to retail customers, while showing a better price privately to 
other investors and dealers on an ECN. In addition, the quotes 
displayed to public investors may not accurately reflect the best price 
for a security because limit orders, which specify the price at which 
customers will buy or sell a security, are not uniformly required to be 
included in the quote.
---------------------------------------------------------------------------

    \22\ Internalized orders are customer orders routed by a broker-
dealer to an affiliated specialist or executed by that broker-dealer 
as a market maker.
    \23\ The Commission now requires enhanced disclosure of payment 
for order flow practices on customer confirmations and account 
statements, as well as upon opening new accounts. Securities 
Exchange Act Release No. 34902 (October 27, 1994), 59 FR 55006 
(November 2, 1994) (adopting rules requiring enhanced disclosure of 
payment for order flow practices on customer confirmations, and 
account statements, as well as upon opening new accounts) (``Payment 
for Order Flow Release''). See also Securities Exchange Act Release 
No. 35473 (March 10, 1995), 60 FR 14366 (March 17, 1995).
---------------------------------------------------------------------------

    The Study recommended that the exchanges and the NASD consider 
taking action to respond appropriately to certain of these 
developments. Since that time, Nasdaq market makers holding customer 
limit orders have been prohibited from trading ahead of those 
orders,24 and some market makers have begun to offer price 
improvement opportunities in OTC transactions to their retail 
customers.25 In addition, the NYSE now requires almost all limit 
orders transmitted through SuperDOT to be displayed to the 
market.26 Further, Commission rules require enhanced disclosure of 
payment for order flow practices on customer confirmations and account 
statements, as well as upon opening new accounts.27
---------------------------------------------------------------------------

    \24\ Securities Exchange Act Release No. 34279 (June 29, 1994), 
59 FR 34883 (July 7, 1994) (``Manning I''); Securities Exchange Act 
Release No. 35751 (May 22, 1995), 60 FR 27997 (May 26, 1995) 
(``Manning II'').
    \25\ See, e.g., Louis, Schwab Debuts New Trading System, San 
Francisco Chronicle, October 17, 1995, at D1.
    \26\ Securities Exchange Act Release No. 36231 (September 14, 
1995), 60 FR 48736 (September 20, 1995).
    \27\ See Payment for Order Flow Release supra note 23.
---------------------------------------------------------------------------

    Notwithstanding the progress achieved in this period, the 
Commission believes that further regulatory initiatives are warranted 
at this time. These changes, as indicated in the Proposing Release, are 
intended to address current market practices that inhibit opportunities 
for order interaction and that are inconsistent with Congress's vision 
of the national market system. These changes also address certain 
problems in Nasdaq. The Commission recently reported that, among other 
things: (i) Nasdaq market makers widely followed a pricing convention 
concerning the increments they used to adjust their displayed quotes; 
(ii) adherence to the pricing convention was not the result of natural 
economic forces, often impacted the fairness and accuracy of public 
quotation information and interfered with the economically efficient 
execution of customer transactions; (iii) the pricing convention 
impaired the ability of investors to ascertain the best market for 
their trades, increased the costs of transactions, and resulted in 
unfair discrimination among classes of market participants; (iv) 
numerous market makers collaborated in ways that misled and 
disadvantaged their customers and other market participants and 
frequently failed to honor their price quotations; and (v) many market 
makers have not consistently reported their trades on time or 
appropriately designated them as late as required by NASD rules.28
---------------------------------------------------------------------------

    \28\ Report Pursuant to Section 21(a) of the Securities Exchange 
Act of 1934 Regarding the NASD, the Nasdaq Market, and Nasdaq Market 
Makers, Securities Exchange Act Release No. 37542 (August 8, 1996) 
(``21(a) Report'').
---------------------------------------------------------------------------

    The Commission has taken specific regulatory and enforcement 
actions to address these problems.29 The Display Rule and Quote 
Rule amendments adopted today should bring about other, significant 
changes in the operation of Nasdaq, by ensuring the disclosure of 
customer and market maker buying and selling interest that heretofore 
has been hidden from many market participants. At the same time, the 
new rules will benefit investors in the exchange markets by increasing 
transparency in those markets and improving opportunities for the best 
execution of customer orders.
---------------------------------------------------------------------------

    \29\ See id.
---------------------------------------------------------------------------

    The Commission firmly believes that the actions it is taking today 
are consistent with the regulatory framework for a national market 
system established by Congress in the 1975 Amendments. Congress 
envisioned a national market system supported by accurate and reliable 
public quotation and transaction information, and fair competition 
among market centers. Congress also believed that linking all markets 
for qualified securities through communication and data processing 
facilities would foster efficiency, enhance competition, increase 
information available to market participants and contribute to the best 
execution of customer orders.30
---------------------------------------------------------------------------

    \30\ See Exchange Act section 11A(a)(1)(D), 15 U.S.C. 78k-
1(a)(1)(D).
---------------------------------------------------------------------------

    The Commission recognizes that investors will lose confidence in 
the fairness of the markets unless market structures and practices 
treat all investors fairly. The regulatory initiatives adopted today 
address current market practices that hinder competition among markets 
and affect the prices at which customer orders are executed. The 
Display Rule and Quote Rule amendments enhance transparency and 
facilitate best execution of customer orders in a manner that preserves 
maximum flexibility for the markets to design and implement trading and 
communication systems that are consistent with the objectives of the 
national market system. These rules contribute to the achievement of 
the full potential of the national market system as envisioned by 
Congress. They represent one more step to facilitate the development of 
an efficient, competitive and transparent national market system in 
which all market participants can achieve best execution of their 
orders.

III. Discussion

A. Display of Customer Limit Orders

1. Introduction
    As discussed above, the 1975 Amendments contain an explicit 
statutory mandate for the establishment of a national market system. 
Congress considered mandating certain minimum

[[Page 48293]]

components of the national market system, but instead created a 
statutory scheme granting the Commission broad authority to oversee the 
implementation, operation and regulation of the national market 
system.31 At the same time, Congress charged the Commission with 
the responsibility to assure that the national market system develop 
and operate in accordance with specific goals and objectives.32 
The Commission believes that the adoption of a limit order display rule 
furthers these goals and objectives determined by Congress.
---------------------------------------------------------------------------

    \31\ S. Rep. No. 75, 94th Cong., 1st Sess. 8-9 (1975) (``Senate 
Report'').
    \32\ Id. at 9. Among other things, Congress found it in the 
public interest and appropriate for the protection of investors and 
the maintenance of fair and orderly markets to assure an opportunity 
for investors' orders, in both dealer and auction markets, to be 
executed without the participation of a dealer, to the extent that 
this was consistent with economically efficient executions of such 
orders in the best market. Exchange Act Section 11A(a)(1(c), 15 
U.S.C. 78k-1(a)(1)(C).
---------------------------------------------------------------------------

    Specifically, the display of customer limit orders advances the 
national market system goal of the public availability of quotation 
information, as well as fair competition, market efficiency, best 
execution and disintermediation. The enhanced transparency of such 
orders increases the likelihood that limit orders will be executed 
because contra-side market participants will have a more accurate 
picture of trading interest in a given security. Further, this 
increased visibility will enable market participants to interact 
directly with limit orders, rather than rely on the participation of a 
dealer for execution.
    Moreover, as noted in the Proposing Release, the display of limit 
orders that are priced better than current quotes addresses at least 
three regulatory concerns. First, displaying customer limit orders in 
the quotation can increase quote competition. If the quotes from a 
market or market maker represent only market maker buying and selling 
interest in a given security, the market or market maker faces less 
price competition than if customer buying and selling interest is made 
public. As a result, the price discovery process may be constrained. 
Second, the display of limit orders can narrow quotation spreads. 
Third, because many markets and market makers offer automatic 
executions of small orders at the best displayed quotes, the display of 
limit orders that improve the best displayed quotes can result in 
improved executions for these orders.
    Limit orders currently are handled differently in the various 
auction and dealer markets. Generally, the rules of most exchanges 
require that a limit order be displayed in the quotation for a security 
when it improves the best bid or offer. NYSE specialists, for example, 
must reflect a customer limit order in their quotations at the limit 
price when requested to do so.33 In addition, the NYSE's order 
handling procedures assume that all limit orders routed to a specialist 
through SuperDOT contain a display request.34 Therefore, except in 
the unusual and infrequent circumstance where a specialist believes 
market conditions suggest the likelihood of imminent price improvement, 
a limit order received by a specialist through SuperDOT should be 
reflected in the specialist's quote as soon as practicable following 
receipt of the order.35 According to the NYSE, 93% of all SuperDOT 
limit orders that improve the best bid or offer displayed are reflected 
in the specialist's quote within two minutes of receipt, while 98% of 
such limit orders are reflected within five minutes of receipt.36
---------------------------------------------------------------------------

    \33\ See NYSE Rule 79A.10 (when a limit order is presented to 
the specialist by a floor broker, the floor broker must 
affirmatively request that the specialist display the limit order; 
failure to so request leaves the decision whether to display the 
limit order to the discretion of the specialist); see also NYSE Rule 
60 (requiring specialists to promptly report, inter alia, the best 
bid and offer in the trading crowd in each reported security in 
which the specialist is registered).
    \34\ NYSE Information Memo 93-12 (Mar. 30, 1993).
    \35\ Id.
    \36\ Telephone Conference between Edward A. Kwalwasser, 
Executive Vice President, NYSE, and Holly H. Smith, Associate 
Director, Division of Market Regulation, SEC, January 9, 1995.
    Other exchanges also have rules regarding dissemination of bids 
and offers. However, no uniform standard has been adopted among the 
exchanges. Generally, the rules either cite, in whole or in part, 
language from the Quote Rule, or are drafted in such a manner as to 
allow for broad interpretation with respect to the display of limit 
orders. See, e.g., BSE Guide, Rules of the Board of Governors, 
Chapter II, Sec. 7, (CCH) para. 2020; PSE Guide, Rules of the Board 
of Governors, Rule 5.6(f), (CCH) para. 3979; American Stock Exchange 
Guide, General and Floor Rules, Rule 115, (CCH) para. 9265; CHX 
Guide, Article XX, Rule 7, (CCH) para. 1688; Phlx Guide, Rules 105 
and 229 (CCH) para. 2105 and 2229; Cincinnati Stock Exchange Rules, 
Rule 11.9.
---------------------------------------------------------------------------

    A recent NYSE policy statement requires specialists to display the 
full size of all orders received through SuperDOT as well as orders 
received by specialists manually that are subsequently entered into the 
electronic book.37 When a member requests that less than the full 
size of the order be shown, the specialist is obligated to show the 
size requested. Specialists must display as soon as practicable any 
order that, in relation to current market conditions in a particular 
security, represents a material change in the supply or demand for that 
security. This requirement includes increasing the size of a quotation 
for orders at the same price as the current bid or offer. If the 
quotation already reflects significant supply or demand, and the 
specialist receives an order that is de minimis in relation to such 
supply or demand, the specialist may take a reasonable time (generally 
not more than two minutes) before updating the size of the 
quotation.38
---------------------------------------------------------------------------

    \37\ See supra note 26.
    \38\ The NYSE provides the following example of when a 
specialist may take a reasonable time to update the size of the 
quotation: If the market in XYZ security is 20 (5,000)--20\1/4\ 
(50,000), and the specialist receives an order to sell 200 shares at 
20\1/4\, such order would be considered de minimis and the 
specialist would be permitted to wait a reasonable period of time 
(but not more than two minutes) before changing the size of the 
offer to 50,200.
---------------------------------------------------------------------------

    Currently in the OTC market, the quote for any security typically 
represents a dealer's own bid and offer. The rules of the NASD do not 
require market makers to display customer limit orders, whether or not 
they better the best bid or offer for the security.39 Generally, 
customer limit orders in OTC securities either will be routed to a 
broker-dealer's market making desk or to another market maker for 
execution if the customer's firm does not make a market in the 
security. In the past, market makers typically did not execute limit 
orders until the best bid (for sell orders) or offer (for buy orders) 
displayed on Nasdaq reached the limit price. This practice has changed, 
however, in recent years. In June 1994, the Commission approved a rule 
change filed by the NASD that prohibits broker-dealers from trading 
ahead of their customers' limit orders.40 This rule was expanded 
in May 1995, to prohibit broker-dealers from trading ahead of customer 
limit orders they accept from other brokers.41 The NASD also has 
filed a proposed rule change that would require, in certain 
circumstances, the display of customer limit orders for exchange-listed 
securities traded OTC.42
---------------------------------------------------------------------------

    \39\ See NASD Manual, Rule 4613.
    \40\ See Manning I, supra note 24.
    \41\ See Manning II, supra note 24.
    \42\ See Securities Exchange Act Release No. 35471 (March 10, 
1995), 60 FR 14310 (March 16, 1995). The NASD proposal, applicable 
to exchange-listed securities traded OTC, generally would require a 
market maker either to execute immediately a limit order of less 
than the minimum quotation size priced better than the market 
maker's quotation, or display the order in its quotation for an 
amount equal to the minimum quotation size. Market makers would have 
to display a limit order greater than the minimum quotation size for 
that security but would not have to display the full size of the 
order. Any portion of the order not displayed, however, would have 
to be executed at a price at least as favorable as the displayed 
price if the displayed portion is executed in its entirety. At the 
NASD's request, the Commission has postponed final action on the 
NASD's proposal in order to permit the NASD to evaluate its proposal 
in light of the Commission's actions on the proposals it is adopting 
today.

---------------------------------------------------------------------------

[[Page 48294]]

    The exchanges and the NASD use automated trading systems to route 
and, in some instances, execute orders up to a predetermined size. Some 
of these systems accept limit orders. Each system, however, may differ 
in its handling of limit orders that are not executed immediately upon 
receipt. For example, the NYSE's SuperDOT system routes limit orders to 
the specialists' posts where they are handled in accordance with NYSE 
rules governing specialist representation of such orders. The American 
Stock Exchange's (``Amex'') PER system routes limit orders in the same 
manner as SuperDOT and the orders are handled in accordance with Amex 
rules. The NASD's Small Order Execution System (``SOES'') treats limit 
orders priced at the current inside market as market orders that are 
immediately executed.43 All other limit orders reside in a limit 
order file that can be viewed only by market makers.44 SOES does 
not provide an opportunity for limit orders to interact with incoming 
market orders. The Commission has published for comment an NASD 
proposal to replace SOES with ``NAqcess,'' a system that would include 
a limit order file designed to display certain customer limit 
orders.45
---------------------------------------------------------------------------

    \43\ Preferenced orders (i.e., orders routed to a specific 
market maker pursuant to a pre-existing agreement) are executed 
immediately at the inside quote. Unpreferenced orders are executed 
against market makers in a security in rotation. SOES, however, does 
not execute an unpreferenced order against a single market maker 
more than once every 15 seconds.
    \44\ The current SOES rules have been extended, with certain 
changes that do not affect the handling of limit orders, through 
January 31, 1997. Securities Exchange Act Release No. 37502 (July 
30, 1996), 61 FR 40869 (August 6, 1996).
    \45\ See Securities Exchange Act Release No. 36548 (December 1, 
1995), 60 FR 60392 (December 8, 1995) (``NAqcess Release 1''); 
NAqcess Release 2, supra note 21. As proposed, NAqcess would act as 
an order delivery system with a limited public limit order file.
    Limit orders up to 9,900 shares would be permitted in NAqcess 
for the top 250 Nasdaq National Market securities, defined by median 
daily dollar volume, and for 1,000 shares for all other Nasdaq 
securities. Market makers would be allowed to query the entire limit 
order file. All other market participants would be limited to 
viewing the top of the NAqcess limit order file (i.e., the best 
priced buy and sell limit orders, and the size associated with those 
orders--the NAqcess inside market). This inside market would be 
factored into the calculation for the inside quote for each Nasdaq 
security. Although use of NAqcess would be voluntary, limit orders 
not entered in NAqcess would be provided with market-wide price 
protection under the proposal.
---------------------------------------------------------------------------

    The disparate treatment of limit orders across markets was raised 
as an issue in the Market 2000 Study. The Commission received numerous 
comments concerning whether the optimal degree of pre-trade disclosure 
of limit orders was being achieved within the U.S. equity markets. Some 
commentators alleged that specialists and third market dealers 
sometimes fail to display limit orders priced better than the displayed 
quotation.46 Questions also were raised about the lack of limit 
order exposure on Nasdaq. After considering these comments, the 
Division recommended in the Study that the securities exchanges 
consider whether to encourage the display of all limit orders in listed 
stocks priced better than the best intermarket quotes, unless the 
ultimate customer requests that the order not be displayed. The Market 
2000 Study also recommended the display of limit orders in Nasdaq 
stocks when the orders are at prices better than the best Nasdaq 
quotes, unless the customer requests that the order not be 
displayed.47
---------------------------------------------------------------------------

    \46\ See generally Thomas H. McInish & Robert A. Wood, Hidden 
Limit Orders on the NYSE, 21 J. Portfolio Mgmt. 19 (No. 3, Spring 
1995) (``McInish & Wood Study''). The authors asserted that NYSE 
specialists only display about 50% of limit orders that better 
existing quotes. In their opinion, this practice represents a 
serious policy issue because it places both public investors and 
regional exchanges at a disadvantage. They asserted that hiding 
limit orders impedes strategic decisions on order placement; results 
in publicly submitted market orders receiving inferior prices; 
hampers the monitoring of order executions; reduces the probability 
of a limit order being executed; results in a delay in reporting 
limit order executions; interferes with the ability of the regional 
exchanges to execute public orders; and artificially improves NYSE 
performance relative to the regional exchanges using a common 
benchmark. The authors also claimed that NYSE Rule 60 is ambiguous 
in that the specialists may have some leeway in choosing what to 
disclose in their quotes.
    In its comment letter to the Market 2000 Study, however, the 
NYSE asserted that its publicly disseminated best bid or offer 
includes all firm trading interest announced on the floor as 
required by the exchange's rules. See Letter from William H. 
Donaldson, Chairman and Chief Executive Officer, NYSE, to Jonathan 
G. Katz, Secretary, SEC at 25-26 (November 24, 1992). In addition, 
the NYSE issued a policy statement that reiterates that specialists 
have an obligation to reflect in their quotes certain limit orders 
received manually or via SuperDOT that are not executed on receipt. 
See supra note 26.
    \47\ Market 2000 Study, at IV-6.
---------------------------------------------------------------------------

2. Discussion
a. Basis for Adoption of the Rule
    After carefully considering all of the comments as well as economic 
research regarding the Display Rule, and based on the Commission's 
experience and knowledge of current market practices and conditions, 
the Commission believes that adoption of the Display Rule will promote 
transparency and enhance execution opportunities for customer orders, 
and encourage liquidity.48
---------------------------------------------------------------------------

    \48\ See, e.g., Letter from Thomas F. Ryan, Jr., President and 
Chief Operating Officer, Amex, to Jonathan G. Katz, Secretary, SEC, 
dated February 1, 1996 (``Amex Letter''); Letter from David E. Shaw, 
Ph.D., Chairman, D.E. Shaw & Co., to Jonathan G. Katz, Secretary, 
SEC, dated January 9, 1996 (``D.E. Shaw Letter'') (rule will promote 
transparency); Letter from Paul A. Merolla, Vice President, 
Associate General Counsel, Goldman, Sachs & Co., to Jonathan G. 
Katz, Secretary, SEC, dated January 26, 1996 (``Goldman Sachs 
Letter'') (rule would benefit marketplace); Letter from Craig S. 
Tyle, Vice President and Senior Counsel, Securities and Financial 
Regulation, Investment Company Institute, to Jonathan G. Katz, 
Secretary, SEC, dated January 16, 1996 (``ICI Letter'') (increased 
transparency of customer limit orders in all markets could produce 
benefits to the markets and investors); Letter from Donald L. 
Crooks, Managing Director, Lehman Brothers, Inc., to Jonathan G. 
Katz, Secretary, SEC, dated February 26, 1996 (``Lehman Letter'') 
(rule promotes transparency and results in improved opportunities 
for execution of customer orders); Letter from Bernard L. Madoff and 
Peter B. Madoff, Bernard L. Madoff Investment Securities, to 
Jonathan G. Katz, Secretary, SEC, dated January 12, 1996 (``Madoff 
Letter'') (rule will help achieve true price discovery and fairness 
to investors); Letter from Andrew E. Feldman, Director and Associate 
General Counsel, Smith Barney Inc., to Jonathan G. Katz, Secretary, 
SEC, dated January 29, 1996 (``Smith Barney Letter'') (rule will 
promote transparency and assist in achieving best execution of 
orders). But see Letter from Charles R. Hood, Senior Vice President 
and General Counsel, Instinet, to Jonathan G. Katz, Secretary, SEC, 
dated January 16, 1996 (``Instinet Letter'') (exceptions to rule 
eliminate potential positive impact on transparency).
---------------------------------------------------------------------------

    The Commission stresses, however, that the rule is not meant to 
displace any SRO rules that provide additional order handling 
protections to customer limit orders. Instead, the Commission rule 
represents only a minimum display standard.
    The Commission believes that limit orders are a valuable component 
of price discovery. The uniform display of such orders will encourage 
tighter, deeper, and more efficient markets. Limit orders convey buying 
and selling interest at a given price. The display of limit orders can 
be expected to narrow the bid-ask spread when this buying and selling 
interest is priced better than publicly disclosed prices.49 Both 
large and small orders stand to benefit from the Display Rule's effect 
on price discovery.50 In fact, the importance of

[[Page 48295]]

limit orders in the trading process was documented in recent 
studies.51 The author quantified the impact of exposing limit 
orders on quoted spreads and effective transaction costs. Using NYSE 
data, he determined that the quote spreads resulting from participation 
of the limit order book were approximately 4 to 6 cents smaller than 
the spreads not set by the limit order book. Further, trading costs on 
the NYSE were approximately 3-4 cents less per share on a ``round 
trip'' transaction when both the purchase and the sale were executed 
against the limit order book.52
---------------------------------------------------------------------------

    \49\ For example, limit order trading allows investors the 
opportunity to trade at prices superior to those represented by the 
prevailing inside bid and offer. See NASD Study, supra note 21.
    \50\ According to SuperDOT trade data analyzed by the 
Commission's Office of Economic Analysis (``OEA''), customer limit 
orders account for 50% of all NYSE customer trades originating from 
orders routed through SuperDOT (``customer trades'') of 100-500 
shares; 66% of all customer trades of 600-1,000 shares; 71% of all 
customer trades of 1,100-3,000 shares; and 74% of all customer 
trades of 3,100-9,900 shares. The Commission believes that these 
high percentages are based, at least in part, on the fact that limit 
orders routed through SuperDOT are required to be displayed in the 
specialist's quote. The Commission believes that these percentages 
help demonstrate the benefits associated with limit order display 
for both large and small order sizes. In addition, OEA data shows 
that NYSE customer limit orders routed through SuperDOT narrow the 
NYSE quote 22% of the time and match the quote 39% of the time for 
customer limit orders of 100-1,000 shares; narrow the quote 17% of 
the time and match the quote 43% of the time for customer limit 
orders of 1,100-3,000 shares; and narrow the quote 14% of the time 
and match the quote 46% of the time for customer limit orders of 
3,100-9,900. OEA data also shows that, when the NYSE bid-ask spread 
was \1/4\ point or more, customer limit orders routed through 
SuperDOT narrow the NYSE spread between 41% and 50% of the time, 
depending on the size of the customer order.
    \51\ See Jason T. Greene, The Impact of Limit Order Executions 
on Trading Costs in NYSE Stocks (An Empirical Examination), December 
1995 (``Greene Study''); see also Jason T. Greene, Limit Order 
Executions and Trading Costs for NYSE Stocks, June 1996 (``Greene 
Study II'').
    \52\ The Commission further believes that the display 
requirement will improve price transparency in securities with 
diverse trading characteristics. Based on SuperDOT trade data, the 
Commission's OEA has determined that for NYSE securities with an 
average daily trading value (``ADTV'') of under $100,000, customer 
limit orders account for 57% of all NYSE customer trades originating 
from orders routed through SuperDOT (``customer trades'') of 100-500 
shares; 69% of all customer trades of 600-1,000 shares; 76% of all 
customer trades of 1,100-3,000 shares; and 83% of all customer 
trades of 3,100-9,900 shares. Limit orders also are frequently used 
for securities with higher ADTVs. For example, for NYSE securities 
with an ADTV of over $5,000,000, customer limit orders account for 
48% of all NYSE customer trades of 100-500 shares; 68% of all 
customer trades of 600-1,000 shares; 72% of all customer trades of 
1,100-3,000 shares; and 73% of all customer trades of 3,100-9,900 
shares. Moreover, OEA data shows that for NYSE securities with an 
ADTV of under $100,000, customer limit orders routed through 
SuperDOT narrow the NYSE quote 30% of the time and match the quote 
32% of the time. For less liquid securities, therefore, the display 
of customer limit orders narrows spreads, improves price discovery, 
and increases market depth. For NYSE securities with an ADTV of 
$5,000,000 or more, customer limit orders routed through SuperDOT 
narrow the NYSE quote 18% of the time and match the quote 41% of the 
time.
    The NASD has suggested that the greater the size of the 
displayed spread, the greater the use of limit orders. See NASD 
Study, supra note 21.
---------------------------------------------------------------------------

    The uniform display of limit orders also will lead to increased 
quote-based competition. Market makers will not only be competing 
amongst themselves, but also against customer limit orders represented 
in the quote. The Commission believes that this result will reduce the 
possibility of certain trading behavior on Nasdaq that was recently the 
subject of a Commission investigation.\53\ As reported in the 21(a) 
Report, Nasdaq market makers widely adhered to a ``pricing 
convention,'' whereby Nasdaq market makers maintained artificially 
inflexible quotations and as a result often traded with the public at 
prices unduly favorable to such market makers.\54\ In addition, the 
Commission determined that Nasdaq market makers adhered to a ``size 
convention'' that deterred Nasdaq market makers from narrowing their 
quotes to create a new inside market unless the market makers were 
willing to trade at least 2,000 to 5,000 shares at that price, rather 
than the minimum quotation size as determined by NASD rules.\55\ This 
practice prevented the dissemination of improved quotes when a trader 
sought to trade stock only at a size equal to the minimum quotation 
size. Thus, the true buying and selling interest in a given security 
was not reflected in the published quotes.
---------------------------------------------------------------------------

    \53\ See 21(a) Report, supra note 28. The investigation 
identified a number of practices in the Nasdaq market that are 
similar to practices identified in the 1963 Special Study. See SEC, 
Report of Special Study of Securities Markets (1963). For example, 
the 1963 Special Study discussed cooperation and information sharing 
between traders, as well as other non-competitive practices. Id. at 
pt. 2, 576-577.; See also Competitive Impact Statement of the U.S. 
Department of Justice Antitrust Division, United States v. Alex. 
Brown & Sons, et. al., (S.D.N.Y. 1996).
    \54\ As a result of this convention, most Nasdaq stocks were 
quoted only in increments of \1/4\. Under the convention, stocks 
with a dealer spread of \3/4\ or more would only be quoted in even-
eighths (i.e., \1/4\, \1/2\, \3/4\), thereby giving rise to a 
minimum inside spread of \1/4\. Stocks with dealer spreads less than 
\3/4\ would be quoted in both even and odd-eighths, thereby allowing 
a minimum inside spread of \1/8\. The pricing convention 
significantly limited the flexibility and competitiveness of price 
quotations in the Nasdaq market.
    \55\ See 21(a) Report, supra note 28.
---------------------------------------------------------------------------

    In addition to the Commission's actions, and those of the 
Department of Justice in connection with its investigation of the 
Nasdaq market, the Commission believes the requirement to display 
customer limit orders in market maker quotes would inhibit market 
makers from engaging in the conduct described above. Moreover, the 
display of limit orders reduces the potential for certain other conduct 
described in the 21(a) Report, including market maker collaboration and 
coordination of trade and quote activities. Market makers will be less 
able to improperly coordinate such behavior due to the display of 
competing customer order flow and the resulting transparency of 
ultimate buying and selling interest. The Commission believes that the 
display requirement will both foster renewed quote-based competition 
among market makers and introduce new competition from customer limit 
orders.
    The Commission also believes that overall market liquidity should 
be enhanced due to the increased trading volume that is expected to 
result from the display of limit orders.\56\ As noted previously, 
customer limit orders account for a significant percentage of total 
customer orders on the NYSE, where customer limit orders generally are 
required to be displayed when they represent a better price.\57\ 
Moreover, previous Commission initiatives designed to enhance 
transparency have resulted in increased competition and liquidity for 
the markets.\58\
---------------------------------------------------------------------------

    \56\ See Greene Study and Greene Study II, supra note 51 (limit 
orders affect the quoted spread, provide liquidity to traders that 
demand immediacy of execution, and may contribute to reduced trading 
costs); NASD Study, supra note 21 (the liquidity supplied by limit 
orders reduces trading costs of market participants); OEA Data, 
supra notes 50 and 52 (limit orders narrow spreads, improve price 
discovery, and increase market depth).
    \57\ See OEA Data, supra notes 50 and 52.
    \58\ See Market 2000 Study at Study IV. See also discussion at 
section III.A.b.iii., infra; Simon & Colby The National Market 
System For Over-The-Counter Stocks (``Simon and Colby''), 55 Geo. 
Wash. L. Rev. 17 (1986).
---------------------------------------------------------------------------

    Customers also will be better able to monitor the quality of their 
executions. Currently, the failure to display limit orders often 
results in inferior or missed executions for these orders. The 
Commission has received frequent complaints from customers whose limit 
orders have not been filled while other executions are reported at 
prices inferior to their limit order prices. Requiring the display of 
customer limit orders in specialist and market maker quotes, although 
not guaranteeing that such limit orders will be executed, will help 
ensure that other orders are not executed at inferior prices until 
better priced limit orders are executed. Similarly, customers entering 
market orders will be able to determine whether their orders are 
receiving the best price available. Customers also will be in a better 
position to compare the execution quality provided by different broker-
dealers.\59\
---------------------------------------------------------------------------

    \59\ The Commission notes that if the Display Rule leads some 
market makers to charge commissions for handling limit orders, 
Commission rules require disclosure of such charges. See 17 CFR 
240.10b-10.
---------------------------------------------------------------------------

    The absence of a uniform limit order display requirement across all 
markets has contributed to the controversy among market participants 
regarding the availability of true price improvement

[[Page 48296]]

opportunities. Many claim that ``hidden'' limit orders in exchange 
markets contribute to distorted price improvement figures for these 
markets.\60\ This potential distortion also hinders a customer's 
ability to monitor execution quality. Pursuant to the Display Rule, the 
vast majority of limit orders will be publicly disclosed, thus enabling 
a more accurate comparison of price improvement opportunities, and 
enabling customers and broker-dealers to make more informed order 
routing decisions.\61\
---------------------------------------------------------------------------

    \60\ See James J. Angel, Who Gets Price Improvement on the 
NYSE?, Working Paper, December 1994. In studying the availability of 
price improvement on the NYSE, the author noted that over 18% of the 
market orders that were price improved were filled by SuperDOT limit 
orders. Based on this percentage, the author estimated the 
percentage of orders price improved by ``hidden'' limit orders and 
determined that if such limit orders were represented in the 
specialist's quote rather than ``hidden,'' spreads would have been 
narrower and NYSE price improvement statistics would have declined. 
See also, McInish & Wood Study, supra note 46; Mitchell A. Petersen 
& David Fialkowski, Posted Versus Effective Spreads: Good Prices or 
Bad Quotes, 35 J. Fin. Econ. 269 (1994) (the fact that so many 
orders execute inside the posted spreads indicates that quotes do 
not represent the true supply and demand of a given security, and 
may be based, in part, on the failure to display public limit order 
interest in the quote). Cf. Ross, Shapiro and Smith, supra note 17 
(although the authors did not examine limit orders in detail, and 
discounted the effect of ``hidden'' limit orders on their 
statistics, the authors found that limit orders provide 27% of the 
price improvement afforded to SuperDOT market order volume).
    \61\ See, e.g., Amex Letter (rule would help eliminate hidden 
limit orders); Letter from Frederick Moss, Chairman of the Board, 
CSE, to Jonathan G. Katz, Secretary, SEC, dated January 16, 1996 
(``CSE Letter'') (elimination of hidden limit orders will eliminate 
illusion of superior price improvement); Letter from Harold S. 
Bradley, Vice President and Director of Trading, Investors Research 
Corporation, to Jonathan G. Katz, Secretary, SEC, dated January 13, 
1996 (``Investors Research Letter'') (hidden limit orders are not 
justified).
---------------------------------------------------------------------------

    Moreover, the Commission believes that the display of limit orders 
will benefit orders routed to automated execution systems. To the 
extent these systems execute orders at prices based on the best 
displayed quotation for a particular security,\62\ customers whose 
orders are executed through these systems will receive the benefit of 
prices that more accurately reflect buying and selling interest in the 
market.
---------------------------------------------------------------------------

    \62\ Compare discussion of best execution at section III.C.2.
---------------------------------------------------------------------------

    In sum, the Commission believes the adoption of the Display Rule is 
an important step in furthering the goals expressed by Congress in the 
1975 Amendments. The Display Rule will provide enhanced opportunities 
for public orders to interact with other public orders, consistent with 
congressional goals.63 In addition, the display requirement will, 
among other things, narrow quotes, enhance market liquidity, and 
improve an investor's ability to monitor the quality of its 
executions.64 This will create a better environment for execution 
of both limit and market orders without the participation of a dealer. 
The increased order interaction will result in quicker and more 
frequent executions of customer limit orders. The Display Rule, 
therefore, will increase the likelihood that limit orders will be 
executed, a result that the Commission believes is consistent with the 
duty of best execution.
---------------------------------------------------------------------------

    \63\ See 15 U.S.C. 78k-1(a)(1)(C)(v).
    \64\ The Commission notes that a few commenters are concerned 
about the potential effects of the Commission's proposals on 
institutional customers. See Goldman Sachs Letter; Letter from 
Howard J. Schwartz, Chairman and Chief Executive Officer, and James 
Hanrahan, Managing Director--Trading, Lynch, Jones & Ryan, Inc., to 
Jonathan G. Katz, Secretary, SEC, dated February 9, 1996 (``LJR 
Letter''); Letter from A.B. Krongard, Chairman, SIA Board of 
Directors, and Bernard L. Madoff and Robert Murphy, Co-Chairmen, 
Order Execution Committee, Securities Industry Association, to 
Jonathan G. Katz, Secretary, SEC, dated February 26, 1996 (``SIA 
Letter''). The Commission believes that the Display Rule will 
benefit both retail and institutional customers, while preserving 
the access to the markets that institutional customers have today. 
For example, an institutional customer's block size limit order 
would not be subject to the rule unless such customer requests that 
the order be displayed. Moreover, any customer, whether individual 
or institutional, can request that its non-block size limit order 
not be displayed. The Commission also notes that increased quote 
competition and enhanced transparency should improve the prices at 
which institutions and market makers begin their negotiations for 
the execution of institutional orders. See also 21(a) Report, supra 
note 28.
---------------------------------------------------------------------------

b. Response to Comments 65
    The Commission proposed Rule 11Ac1-4 to establish minimum display 
requirements for customer limit orders that improve a specialist's or 
OTC market maker's best bid or offer for a particular security as well 
as the size of such orders. In addition, the rule requires the display 
of the size of certain limit orders priced at the national best bid or 
offer (``NBBO''). Although the rule generally would mandate the display 
of limit orders, market makers and specialists still would retain some 
flexibility in handling limit orders accepted for execution.
---------------------------------------------------------------------------

    \65\ For further discussion of the views of commenters, see the 
Summary of Comments, supra note 4.
---------------------------------------------------------------------------

    Specifically, the rule allows an OTC market maker or specialist, 
immediately upon receipt of a limit order, to: (1) Change its quote and 
the size associated with its quote to reflect the limit order; (2) 
execute the limit order; (3) deliver the limit order in an exchange- or 
association-sponsored system that complies with the requirements of the 
rule; or (4) send the limit order to another market maker or specialist 
who complies with the requirements of the rule. The rule would require 
a specialist or OTC market maker to display a customer limit order when 
the order was ``held'' by the specialist or OTC market maker. If the 
specialist or OTC market maker immediately sends the order to a system 
or to another specialist or OTC market maker that complies with the 
rule, the specialist or OTC market maker that routed the order would 
have satisfied its obligation to display the order. These alternatives 
are intended to allow market makers, specialists, and market centers an 
opportunity to continue to provide their valuable services while 
offering customers the best available execution opportunities.
    The Display Rule as adopted maintains these alternatives as 
proposed. Additionally, to better achieve its aims and to respond to 
comments, the Commission has made some modifications to the proposed 
rule. For example, the Commission has decided to permit a specialist or 
OTC market maker to deliver a limit order to certain ECNs as an 
alternative to representing the limit order in its quote. This change 
is an extension of the proposed exception that permits a specialist or 
OTC market maker to deliver a limit order to an exchange- or 
association-sponsored system that complies with the Display Rule. 
Moreover, with regard to implementation of the rule, the Commission is 
providing for a four-stage phase-in over a one year period for non-
exchange-traded securities.
    Of the commenters who specifically addressed the proposed Display 
Rule, an overwhelming majority strongly support the inclusion of 
customer limit orders in the quote.66 One commenter

[[Page 48297]]

notes that true price discovery and fairness for public investors can 
only be achieved when limit orders are reflected in the NBBO.67 
Other commenters, expressing strong support for the proposed rule, 
believe that market-wide limit order procedures will improve the 
markets by enhancing overall market transparency 68 and 
eliminating the advantages derived by some markets from hidden limit 
orders.69 The Department of Justice states that the proposed rule 
encourages quote competition, which is likely to reduce spreads,70 
and allows customer orders to interact with one another.71 In this 
regard, several commenters recognize that the proposed rule would 
assist in achieving best execution of customer orders 72 by 
increasing the opportunities for execution of limit orders, and 
improving the prices for market orders.73 Another commenter states 
that the proposed rule is consistent with investor expectations and 
will act to protect retail customer interests.74
---------------------------------------------------------------------------

    \66\ See, e.g., Amex Letter; Letter from Marshall E. Blume, 
Director, Howard Butcher Professor of Financial Management, The 
Wharton School of the University of Pennsylvania, to Jonathan G. 
Katz, Secretary, SEC, dated January 11, 1996 (``Blume Letter''); 
Letter from George W. Mann, Jr., Senior Vice President and General 
Counsel, BSE, to Jonathan G. Katz, Secretary, SEC, dated January 26, 
1996 (``BSE Letter''); Letter from Robert H. Forney, CHX, to 
Jonathan G. Katz, Secretary, SEC, dated January 23, 1996 (``CHX 
Letter''); D.E. Shaw Letter; Letter from Antitrust Division, U.S. 
Department of Justice, to SEC, dated January 26, 1996 (``DOJ 
Letter''); Letter from Preston Estep, Estep Trading Partners L.P., 
to Jonathan Katz, Secretary, SEC, dated December 21, 1995 (``Estep 
Letter''); Goldman Sachs Letter; ICI Letter; Lehman Letter; Madoff 
Letter; Letter from William A. Lupien, Chairman and Chief Executive 
Officer, Mitchum, Jones & Templeton, Inc., to Jonathan G. Katz, 
Secretary, SEC, dated January 8, 1996 (``MJT Letter''); Letter from 
Joseph R. Hardiman, President, National Association of Securities 
Dealers, Inc., to Jonathan G. Katz, Secretary, SEC, dated January 
26, 1996 (``NASD Letter''); Letter from James E. Buck, Senior Vice 
President and Secretary, NYSE, Inc., to Jonathan G. Katz, Secretary, 
SEC, dated January 15, 1996 (``NYSE Letter''); Letter from David S. 
Pottruck, President and Chief Operating Officer, The Charles Schwab 
Corporation, to Jonathan G. Katz, Secretary, SEC, dated May 7, 1996 
(``Schwab Letter II''); SIA Letter; Letter from William R. Rothe, 
Chairman, and John L. Watson III, President, Security Traders 
Association, to Jonathan G. Katz, Secretary, SEC, dated January 15, 
1996 (``STA Letter''); Letter from John F. Luikart, President and 
Chief Executive Officer, Sutro & Co., to Jonathan Katz, Secretary, 
SEC, dated January 16, 1996 (``Sutro Letter'').
    \67\ Madoff Letter.
    \68\ See, e.g., Amex Letter; CHX Letter; CSE Letter; D.E. Shaw 
Letter; ICI Letter; Investors Research Letter; Lehman Letter; Smith 
Barney Letter.
    \69\ See, e.g., Amex Letter (rule would help eliminate hidden 
limit orders); CSE Letter (elimination of hidden limit orders will 
eliminate illusion of superior price improvement); Investors 
Research Letter (hidden limit orders are not justified).
    \70\ DOJ Letter.
    \71\ Id; see also Amex Letter; Lehman Letter.
    \72\ See, e.g., Lehman Letter; Smith Barney Letter.
    \73\ Lehman Letter.
    \74\ D.E. Shaw Letter.
---------------------------------------------------------------------------

    Other commenters oppose the proposal. Several commenters in this 
group have raised the following general concerns regarding the proposed 
rule.
i. Distinction Between Markets
    Several commenters argue that the Display Rule does not take into 
account distinctions between auction and dealer markets. Some of these 
commenters, discussing the Proposing Release as a whole, argue that the 
Commission's proposals would ``auctionize'' the dealer market.75 
One commenter warns that, because auction and dealer markets are 
fundamentally different, a single set of rules for both auction and 
dealer markets would reduce quote quality and damage overall market 
integrity in dealer markets.76 Although the SIA reports that the 
consensus view of its Ad Hoc Committee on Order Execution is to require 
a market maker to reflect customer limit orders in the quote, the SIA 
argues that the adoption of the proposed rule, without suggested 
modifications, could adversely affect the dealer market so as to weaken 
competition between dealer and auction markets.77
---------------------------------------------------------------------------

    \75\ See, e.g., Letter from R. Steven Wunsch, President, AZX, 
Inc., to Jonathan G. Katz, Secretary, SEC, dated January 15, 1996 
(``AZX Letter''); Goldman Sachs Letter; Letter from David Rich, Vice 
President, Jefferies & Company, Inc., to Jonathan G. Katz, 
Secretary, SEC, dated January 25, 1996 (``Jefferies Letter''); 
Letter from Robert W. Murphy, President, RPM Specialist Corporation, 
to Jonathan G. Katz, Secretary, SEC, dated February 26, 1996 (``RPM 
Letter''); Letter from Robert A. Schwartz, Professor of Finance and 
Economics, and Yamaichi Faculty Fellow, Leonard N. Stern School of 
Business, New York University, and Robert A. Wood, Distinguished 
Professor of Finance, Fogelman College of Business and Economics, 
University of Memphis, to Jonathan G. Katz, Secretary, SEC, dated 
January 23, 1996 (``Schwartz & Wood Letter''); SIA Letter.
    \76\ RPM Letter.
    \77\ SIA Letter. Cf. Letter from A.B. Krongard, Chairman, SIA 
Board of Directors, and Bernard L. Madoff, Chairman, Trading 
Committee, to Jonathan G. Katz, Secretary, SEC, dated August 1, 1996 
(``SIA NAqcess Letter'') (the SIA, in its letter to the Commission 
regarding the NASD's NAqcess proposal, states that the Commission's 
Order Execution Obligations proposal would narrow quotation spreads, 
improve transparency, and provide customers with best execution of 
their orders, consistent with the 1975 Amendments).
---------------------------------------------------------------------------

    The Commission believes that the application of the principles 
underlying the limit order display rule to the dealer market is neither 
a new nor radical concept. In 1975, Congress envisioned an NMS in which 
public limit orders in qualified securities would have a central 
role.78 Congress anticipated that the NMS would make all 
specialists and market makers aware of public customer limit orders 
held anywhere in the system, and provide enhanced protection and 
priority for limit orders in stocks qualified for trading in a national 
market system.79 The Commission has consistently recognized since 
1975 that, in order to satisfy this Congressional vision, multiple-
market display of limit orders was an important component for qualified 
securities.80 More recently, the Market 2000 Study recommended 
that the SROs, including the NASD, consider requiring the display of 
customer limit orders,81 and the NASD, in a proposed rule change 
filed with the Commission, proposed that CQS market makers display in 
their quotes certain customer limit orders for exchange-listed 
securities traded OTC.82 The NASD also has proposed a mechanism 
for the display and protection of customer limit orders in Nasdaq 
securities.83
---------------------------------------------------------------------------

    \78\ Senate Report, supra note 31.
    \79\ Id. The Senate Report stressed the need to establish a 
mechanism by which specialists and market makers could be made aware 
of customer orders within the NMS. The Senate Report was ``satisfied 
that [the legislation] grant[ed] the Commission complete and 
effective authority to implement a system for the satisfaction of 
public limit orders.'' Id. at 18.
    \80\ See Securities Exchange Act Release No. 15671 (March 22, 
1979), 44 FR 20360 (April 4, 1979) (Development of a National Market 
System Status Report). See also Securities Exchange Act Release No. 
18738 (May 13, 1982), 47 FR 22376 (May 24, 1982) (proposing limit 
order display requirement for Rule 19c-3 securities).
    \81\ Market 2000 Study, at IV-6.
    \82\ See supra note 42.
    \83\ See supra note 45.
---------------------------------------------------------------------------

    Although some commenters claim that the Commission is attempting to 
``auctionize'' the dealer market, the display requirement is based on 
transparency and agency concerns, including a broker-dealer's 
obligation to provide its customers with best execution.84 The 
display of customer limit orders will act to narrow spreads, improve 
price discovery, and increase market depth. The enhanced transparency 
resulting from the Display Rule will increase the likelihood that 
customer limit orders will be executed, improve the execution prices of 
market orders, and strengthen an investor's ability to monitor the 
quality of executions.85 These results further several 
Congressional goals.
---------------------------------------------------------------------------

    \84\ See NASD Study, supra note 21 (enhancements to limit order 
handling, within the dealer market structure, will create 
significant benefits for investors). See also Manning II, supra note 
24 (Commission's extension of limit order protection to Nasdaq does 
not suggest an intention to ``auctionize'' the dealer market).
    \85\ See Senate Report, supra note 31 at 16-18 (discussing 
desirability of incorporating certain auction market principles, 
such as limit order display and protection, for certain qualifying 
securities in dealer markets).
--------------------------------------------------
FR Doc. 96-23210 Order Execution Obligations
-------------------------

    In keeping with Congressional intent, the Commission believes the 
treatment of limit orders should reflect the very real changes in 
market structure that have taken place since the enactment of the 1975 
Amendments. These changes include the development of a robust, liquid 
OTC dealer market that attracts significant investor trading interest, 
that trades at many multiples of the volume extant in 1975, and that is 
characterized by the inclusion of thousands of securities that meet the 
NMS designation.86 In addition, the

[[Page 48298]]

Commission believes that application of the Display Rule should also 
benefit investors in those securities that do not yet meet the NMS 
designation.87 As noted earlier, the Commission believes that the 
increased use of limit orders in these securities will lead to a 
narrowing of spreads and ameliorate certain anti-competitive practices 
that have developed in the Nasdaq market.88 The Commission has 
determined that certain practices on Nasdaq have contributed to 
artificially wide spreads for OTC securities.89 The display of 
customer limit orders in all Nasdaq securities will promote accurate 
pricing and convey the true buying and selling interest in such 
securities.
---------------------------------------------------------------------------

    \86\ To date, approximately 4,000 Nasdaq securities have 
qualified for the NMS designation. In order to qualify as an NMS 
security, transaction reports are required to be reported on a real-
time basis pursuant to an effective transaction reporting plan 
approved by the Commission. See 17 CFR 240.11Aa2-1 and 11Aa3-1.
    \87\ As discussed below, the Display Rule will apply only to 
``covered securities.'' At the present time, the Commission does not 
believe the rule should be extended to securities for which market 
makers are not required to quote continuous firm two-sided markets, 
such as OTC Bulletin Board securities.
    \88\ See supra discussion at section III.A.2.a.
    \89\ 21(a) Report, supra note 28.
---------------------------------------------------------------------------

    A few commenters believe that the Display Rule was proposed solely 
to address problems in the OTC market, and accordingly there is no need 
for a uniform rule applicable to exchange markets.90 As noted 
previously, the Commission's intention is to create a minimum standard 
for the handling of limit orders across all markets, consistent with 
market transparency, competition, and best execution principles. 
Currently, the national securities exchanges do not handle limit orders 
uniformly, and in fact the non-display of retail-size limit orders is 
permitted under certain circumstances. The rule will ensure that 
investors benefit from the display of limit orders, no matter where an 
order is sent for execution.91 A minimum standard also addresses 
concerns regarding the prevalence of hidden limit orders.92 The 
Commission believes, therefore, that a market-wide limit order display 
requirement is most consistent with the duty of best execution and the 
expectations of investors.
---------------------------------------------------------------------------

    \90\ See, e.g., BSE Letter; NYSE Letter; RPM Letter; Letter from 
David E. Humphreville, Executive Director, The Specialist 
Association, to Jonathan G. Katz, Secretary, SEC, dated February 2, 
1996 (``Specialist Assoc. Letter'').
    \91\ See, e.g., Greene Study & Greene Study II, supra note 51.
    \92\ See generally McInish & Wood Study, supra note 46 (hidden 
limit orders result in, among other things, artificial price 
improvement statistics and inferior order executions); Traders 
Accuse Specialists of Holding Back Limit Orders, Investment Dealers' 
Digest, 8, (February 14, 1994) (some traders have continued to 
accuse NYSE specialists of hiding limit orders even after the NYSE 
issued an Information Memo reminding specialists of their duties); 
Greene Study and Greene Study II, supra note 51 (one explanation for 
the significantly lower bid-ask spreads in the 1994-95 sample than 
in the 1990 sample, and the increase in the percentage of 
transactions at the quoted prices from the 1990 sample to the 1994-
95 sample, may be that NYSE specialists were more diligent in 
reflecting the limit order book in their quotes as per Information 
Memo 93-12); Amex Letter (rule would help eliminate hidden limit 
orders); CSE Letter (elimination of hidden limit orders will 
eliminate illusion of superior price improvement); Investors 
Research Letter (hidden limit orders are not justified).
---------------------------------------------------------------------------

ii. Distinction Between Quotes and Orders
    Some commenters maintain that the rule blurs the distinction 
between quotations and orders.93 One commenter states that limit 
orders represent only a finite trading interest while quotes represent 
the ``actual'' market for a security; thus, displaying limit orders 
would not reflect the ``true'' state of the market and impair the 
quality of quotation information.94 The commenter suggests that a 
separate limit order file would be more appropriate in light of these 
distinctions.95 In this vein, several commenters mention the 
NASD's proposed NAqcess system,96 suggesting that the Commission 
postpone implementation of the Display Rule until the Commission has an 
opportunity to assess the effects of NAqcess.97 A few commenters 
suggest the implementation of an industry-wide consolidated limit order 
book as an alternative or a logical outgrowth of the Display 
Rule.98
---------------------------------------------------------------------------

    \93\ See, e.g., Letter from Raymond L. Aronson, Senior Managing 
Director, Bear, Stearns & Co. Inc., to Jonathan G. Katz, Secretary, 
SEC, dated February 1, 1996 (``Bear Stearns Letter''); Instinet 
Letter; Letter from Carol L. Cunniff, Executive Vice President, 
Ruane, Cunniff & Co., Inc., to Jonathan G. Katz, Secretary, SEC, 
dated February 23, 1996 (``Ruane Letter''); Letter from Charles R. 
Schwab, Chairman and Chief Executive Officer, The Charles Schwab 
Corporation, to Jonathan G. Katz, Secretary, SEC, dated January 25, 
1996 (``Schwab Letter''). But see Schwab II Letter (supporting the 
Display Rule).
    \94\ Ruane Letter.
    \95\ Id. See also Bear Stearns Letter (discussion of proposed 
central limit order file for The Nasdaq Stock Market so as to 
preserve distinction between dealer quotes and agency or proprietary 
orders).
    \96\ See supra note 45.
    \97\ See, e.g., Letter from A.B. Krongard, Chief Executive 
Officer, Alex. Brown & Sons, Inc., to Jonathan G. Katz, Secretary, 
SEC, dated February 29, 1996 (``Alex. Brown Letter''); Letter from 
Albert G. Lowenthal, Chairman of the Board, Fahnestock & Co., Inc., 
to Jonathan G. Katz, Secretary, SEC, dated January 15, 1996 
(``Fahnestock Letter''); Jefferies Letter; Letter from Gerard S. 
Citera, Deputy General Counsel, First Vice President, PaineWebber 
Incorporated, to Jonathan G. Katz, Secretary, SEC, dated February 9, 
1996 (``PaineWebber Letter''); Schwab Letter; STA Letter; Letter 
from Charles Snow, Counsel, Securities Traders Association of New 
York, to Jonathan G. Katz, Secretary, SEC, dated January 30, 1996 
(``STANY Letter''); see also Letter from C. Robert Paul, III, 
Associate General Counsel, Dean Witter Reynolds, Inc., to Jonathan 
G. Katz, Secretary, SEC, dated January 31, 1996 (``Dean Witter 
Letter''); Goldman Sachs Letter.
    \98\ See, e.g., DOJ Letter; MJT Letter; Schwab Letter; Letter 
from Junius W. Peake, Monfort Distinguished Professor of Finance, 
University of Northern Colorado, to Jonathan G. Katz, Secretary, 
SEC, dated January 15, 1996 (``Peake Letter''); Letter from Jeffrey 
P. Ricker, CFA, to Jonathan G. Katz, Secretary, SEC, dated January 
15, 1996 (``Ricker Letter''); Letter from Peter W. Jenkins, 
Chairman, and Holly A. Stark, Vice Chairman, Institutional 
Committee, Securities Traders Association, to Jonathan G. Katz, 
Secretary, SEC, dated January 19, 1996 (``STAIC Letter'').
---------------------------------------------------------------------------

    The Commission believes that the display of limit orders is an 
essential component of accurate price discovery. A quote provides 
market participants with information regarding a market maker's or 
specialist's trading interest at a given price. A market maker or 
specialist could be willing to purchase or sell additional shares above 
its quoted size.99 Entry of a customer limit order that improves 
the quote serves a similar purpose. A limit order accurately represents 
trading interest for a specific volume of a security at the limit 
price. There are few practical differences between customer limit 
orders and a market maker's quotation that is firm only for its quoted 
size. Nonetheless, the proposed rule was not intended to equate 
customer limit orders with market maker quotes. Instead, the proposed 
rule was designed to facilitate greater transparency of customer 
trading interest, with the expectation that orders would have an 
increased opportunity for best execution without the interaction of a 
dealer. In the Commission's opinion, these objectives are more 
difficult to achieve if customer trading interest is not routinely 
represented in publicly displayed quotes. The Commission notes that the 
Display Rule provides other means by which a market maker or specialist 
may comply with the requirements of the rule in the event a specialist 
or market maker elects not to display customer trading interest in its 
quote.100
---------------------------------------------------------------------------

    \99\ Under Commission rules, the market maker's quote is only 
required to be firm up to its published size. See 17 CFR 240.11Ac1-
1(c)(2).
    \100\ For example, a market maker or specialist may deliver a 
customer limit order immediately upon receipt to another market 
maker or specialist, or to an ECN or an exchange or association 
sponsored system pursuant to the rule. Section 240.11Ac1-4(c) (5) 
and (6).
---------------------------------------------------------------------------

    Further, the Commission does not agree with the suggestion that the 
Commission postpone the adoption of the Display Rule until the 
Commission has had an opportunity to evaluate the NASD's NAqcess 
proposal.101 Although

[[Page 48299]]

the NASD has argued that limit orders entered into NAqcess, as 
proposed, would result in greater display of OTC limit order prices, 
there is no assurance that market makers will enter such orders into 
NAqcess rather than hold the orders internally.102 Therefore, the 
Commission believes that the Display Rule is necessary to ensure 
display of these orders in the OTC market.103 If approved, NAqcess 
can assist in compliance with the Display Rule to the extent that the 
system incorporates customer limit orders in the consolidated quote 
stream, thereby allowing market makers to enter limit orders in NAqcess 
rather than displaying limit orders in their quotes.104 As noted 
earlier, the Commission has identified important benefits associated 
with limit order display. Accordingly, the Commission believes that it 
is not necessary to observe the effects of NAqcess in order to 
determine the benefits of the limit order display requirement.
---------------------------------------------------------------------------

    \101\ The Commission notes that the proposed NAqcess system is a 
significant and controversial proposal which has generated 
approximately 1,100 comment letters. The Commission is in the 
process of reviewing the comments and has yet to decide what action 
to take on the proposal.
    \102\ See NAqcess Releases, supra note 45. As noted above, limit 
orders not entered in NAqcess would be provided with market-wide 
price protection.
    \103\ In any event, NAqcess will not address at all the issues 
of disparate limit order handling practices or hidden limit orders 
in the exchange markets.
    \104\ See Section 240.11Ac1-4(c)(5).
---------------------------------------------------------------------------

iii. Liquidity
    Several commenters assert that application of the Display Rule to 
Nasdaq securities could reduce liquidity in the Nasdaq market.105 
These commenters believe that market maker profits may decline due to 
narrowed spreads or increased compliance costs, with the result that 
many firms will decide not to make the necessary capital commitment to 
continue their market making operations. The commenters conclude that 
as the number of market makers in a security declines, liquidity will 
be adversely affected, leading to wider spreads. Moreover, some 
commenters believe that the decrease in liquidity will impair the 
capital formation process, especially for securities that are not 
mature enough for auction trading.106
---------------------------------------------------------------------------

    \105\ See, e.g., Alex. Brown Letter; Bear Stearns Letter; Dean 
Witter Letter; Letter from Robert F. Mercandino, Senior Vice 
President, Dillon, Read & Co., Inc., to Jonathan G. Katz, Secretary, 
SEC, dated March 15, 1996 (``Dillon Letter''); Jefferies Letter; 
Lehman Letter; Letter from Robert J. McCann, Managing Director, Co-
Head, Global Equity Markets, Merrill Lynch, Pierce, Fenner & Smith 
Incorporated, to Jonathan G. Katz, Secretary, SEC, dated January 26, 
1996 (``Merrill Letter''); NASD Letter; PaineWebber Letter; Letter 
from David P. Semak, Vice President Regulation, PSE, to Jonathan G. 
Katz, Secretary, SEC, dated January 15, 1996 (``PSE Letter''); SIA 
Letter.
    \106\ See, e.g., NASD Letter; SIA Letter.
---------------------------------------------------------------------------

    At least one commenter states that the usefulness of limit orders 
could be diminished by the refusal of some market makers to accept such 
orders, or by the imposition of high commission costs charged to recoup 
lost profits on spreads.107 Other commenters believe, however, 
that it will be difficult for market makers to increase their 
commissions for limit orders.108 They believe commission charges 
would not compensate for lost trading profits or prevent the ebb of 
market liquidity.109
---------------------------------------------------------------------------

    \107\ Letter from David K. Whitcomb, Professor of Finance and 
Economics, Rutgers University Graduate School of Management, to 
Secretary, SEC, dated January 12, 1996 (``Whitcomb Letter'').
    \108\ See, e.g., Letter from Irving M. Pollack, Alan B. 
Levenson, and Robert H. Rosenblum, Fulbright & Jaworski L.L.P., on 
behalf of Herzog, Heine and Geduld, Inc., to Jonathan Katz, 
Secretary, SEC, dated January 16, 1996 (``HHG Letter''); STA Letter.
    \109\ Id.
---------------------------------------------------------------------------

    Other commenters believe the proposed rule will not have a negative 
impact on market liquidity. One commenter explicitly states that the 
benefits of the proposed rule would outweigh any potential adverse 
effects on liquidity.110 Another commenter says that the proposed 
rule would not result in any significant reduction in market making 
activity.111 The CSE notes that it has not noticed any negative 
effects on market liquidity as a result of the implementation of its 
own limit order display rule.112 Yet another commenter states that 
although it currently does not trade OTC securities, it expects that 
many market participants, including the commenter, would begin trading 
such securities if the proposed rule was adopted, thereby increasing 
market liquidity.113
---------------------------------------------------------------------------

    \110\ Lehman Letter.
    \111\ Letter from Daniel G. Weaver, Ph.D., Assistant Professor 
of Finance, Marquette University, to Jonathan G. Katz, Secretary, 
SEC, dated January 10, 1996 (``Weaver Letter'').
    \112\ CSE Letter.
    \113\ The commenter noted further that it does not currently 
trade OTC securities because it cannot be sure that its order will 
be represented to the whole market. Estep Letter.
---------------------------------------------------------------------------

    The display of limit orders is designed, among other objectives, to 
publicize accurate market interest and increase quote 
competition.114 The Commission understands that certain costs, 
including a diminution in market maker profits, are associated with 
this increased market transparency. For example, a market maker that 
holds a customer limit order has, in effect, a private ``option'' to 
execute the order as principal. The longer this ``option'' remains 
open, the more time the market maker has to determine whether it can 
profit from executing the order as principal.115 This private 
market maker ``option,'' however, is potentially detrimental to the 
execution opportunities for the limit order. The Display Rule will 
limit this ``option'' and expose the order to market-wide trading 
interest. Moreover, increased price competition from limit orders may 
reduce market maker profits through the narrowing of spreads.116 
As a result, the Display Rule may force less efficient competitors to 
stop making markets in some of the securities they now quote.
---------------------------------------------------------------------------

    \114\ See Market 2000 Study, at Study IV.
    \115\ The Commission recognizes that there is also a cost 
associated with holding that limit order, because a market maker is 
required to execute that limit order if it has engaged in a 
transaction for its own account that would have satisfied the limit 
order. See Manning I & II, supra note 24.
    \116\ See supra notes 53-55 and accompanying text (display of 
customer limit orders in market maker quotes will act to eliminate 
certain trading behavior on Nasdaq and foster quote competition).
---------------------------------------------------------------------------

    Although the rule could lead to a reevaluation by some market 
makers of the services they wish to provide, after considering the 
available evidence, and in light of its experience, the Commission does 
not believe that there will be a significant negative impact on the 
markets for covered securities. The Commission is not convinced that 
the loss of some market competitors in securities with many market 
makers would impair liquidity in these securities.117 The 
Commission believes that customer orders are the ultimate source of 
liquidity to the markets, and that adoption of a rule that improves the 
handling of such orders will have the effect of enhancing market 
liquidity.118 The Commission believes that a limit order display 
requirement will encourage new limit orders in securities to be 
entered, thus providing additional liquidity to the market from 
customers.119 The potential of limit orders to narrow quotes also 
may encourage the entry of additional market

[[Page 48300]]

orders.120 The Commission believes that the additional liquidity 
due to narrower spreads and increased customer orders will outweigh any 
potential loss of liquidity provided by market makers.
---------------------------------------------------------------------------

    \117\ See, e.g., STAIC Letter (limit orders are critical to 
market liquidity).
    \118\ The Commission does not thereby denigrate the contribution 
OTC market makers provide in a dealer market. The Commission notes, 
however, that most market makers provide primarily intra-day 
liquidity to customers, and generally seek to end the trading day 
with a limited inventory position in order to minimize inventory 
risk. Customer limit orders represent buying or selling interest at 
specified prices for their stated duration, which may be longer than 
intra-day. Market makers holding customer limit orders rely in part 
on these limit orders in quoting their own prices to buy and sell 
securities.
    \119\ See Greene Study & Greene Study II, supra note 51 (limit 
orders affect the quoted spread and provide liquidity); NASD Study, 
supra note 21 (limit orders, like market maker quotes, supply 
liquidity to the markets); OEA Data, supra notes 50 and 52.
    \120\ See NASD Study, supra note 21 (those investors that demand 
immediate execution, e.g. those entering market orders, will pay 
less for executions due to the augmented liquidity supplied by limit 
orders); Greene Study and Greene Study II, supra note 51 (limit 
orders provide liquidity to traders that demand immediacy of 
execution and may contribute to reduced trading costs); OEA Data, 
supra notes 50 and 52 (display of limit orders narrows spreads, 
improves price discovery, and increases market depth for a variety 
of securities, including those NYSE securities that are thinly 
traded).
---------------------------------------------------------------------------

    As noted above, some commenters expressed concern regarding the 
effect of the Display Rule on the availability of liquidity to small 
issuers.121 In response to these comments, the Commission's OEA 
examined market maker participation in 4,839 Nasdaq issuers over a one 
month period in 1996. The findings indicate that: (1) the median number 
of market makers in a security is not appreciably lower for initial 
public offering (``IPO'') issuers or for securities with the smallest 
market capitalization; (2) broker-dealers that participated in IPO 
underwriting syndicates were active participants in aftermarket 
trading, but were not alone in providing significant market maker 
liquidity; and (3) in Nasdaq securities with the smallest market 
capitalization ($2 million or less), the single most active market 
maker in an issue typically participated in one-third or fewer trades. 
Thus, there is no convincing evidence that Nasdaq issuers, including 
IPO issuers, are dependent for liquidity on any one market maker. The 
pattern of market making activity indicates that significant liquidity 
is provided by market makers who are not the ``most active'' market 
makers in a security. Because there does not appear to be high 
concentration in market making, and because of the Commission's belief 
that customer order flow is a critical source of market liquidity, the 
Commission believes that the proposals adopted today will not unduly 
impact liquidity for small or new issuers.
---------------------------------------------------------------------------

    \121\ This concern also was raised in the context of the ECN 
Amendment to the Quote Rule.
---------------------------------------------------------------------------

    Furthermore, Commission experience has been that enhancements to 
transparency result in improved liquidity.122 The Commission 
believes that these improvements are attributable, at least in part, to 
the impact of transparency on market integrity and investor confidence. 
In addition, while market maker profits per trade may be reduced as 
spreads are narrowed, increased volume over time may result in stable 
profit levels.123
---------------------------------------------------------------------------

    \122\ In several instances in the past, commenters have claimed 
that other Commission initiatives to increase transparency would act 
to reduce liquidity; others have warned that such initiatives would 
decrease the competitiveness of the U.S. markets in relation to 
foreign counterparts. These claims, however, have not been borne 
out. For example, many industry participants argued that the NASD's 
adoption of its ``Manning'' rules would severely impact market 
liquidity. See Market 2000 Study. However, there has been no 
evidence offered to the Commission of adverse liquidity consequences 
caused by these limit order protections, and the Commission is not 
aware of any significant diminution in liquidity. Further, as 
discussed in the Market 2000 Study, other transparency initiatives, 
such as the adoption of real-time transaction and quotation 
reporting, have resulted in increases in the competitiveness and 
liquidity of both listed and OTC equity markets despite market maker 
protestations to the contrary prior to adoption of these 
initiatives. See Id. at Study IV. See also Simon & Colby, supra note 
58. Even the creation of Nasdaq itself was met with much opposition. 
The result of this major structural change was far from the 
predicted ``death knell'' of the OTC market. Rather, OTC market 
strength and liquidity have flourished since Nasdaq's inception. 
Based on the Commission's experience with other market structure 
initiatives, therefore, the Commission believes that improvements in 
order handling, market transparency, and efficiency will likely 
improve market liquidity.
    \123\ Although the display requirement may decrease a market 
maker's per trade profit due to narrowed spreads, the Commission 
believes that this decrease will be made up for in part by expected 
increases in trading volume attributable to enhanced liquidity and 
pricing efficiency. See supra note 24. The Commission believes this 
potential impact on market maker profits is justified in light of 
the benefits that will accrue to investors and the markets as a 
whole. Moreover, even if market makers' profits from trading do 
decline, market makers may be able to obtain increased revenues from 
commissions or other fees charged directly to customers. Because 
these other revenue sources are more transparent to customers than 
are revenues from market maker trading with customers on a 
proprietary basis, increased reliance on these other revenue sources 
will enable customers to make more informed trading decisions.
---------------------------------------------------------------------------

    It also may become feasible for market makers to charge customers 
commissions for handling limit orders, even if that is not the current 
practice today. As noted earlier, some commenters claim that the 
Display Rule will have a disparate impact on wholesale Nasdaq market 
makers in that such market makers would not be able to offset the 
increased costs associated with limit order display through charges or 
commissions.124 The Commission believes, however, that the systems 
costs associated with the Display Rule should not be overly 
burdensome,125 nor should systems costs or any reduced market 
maker profitability from declining spreads be more extensive for 
wholesale market makers than for integrated market makers. Although 
exchange specialists and integrated firms may find it easier than 
wholesale firms to charge commissions initially, the Commission notes 
that wholesale firms are not prohibited from attempting to compensate 
for handling limit orders, either through negotiated fee arrangements, 
or reducing any payment made for order flow for limit orders.126
---------------------------------------------------------------------------

    \124\ See, e.g., HHG Letter.
    \125\ See Memorandum from Stephen L. Williams, S.L. Williams Co. 
to Richard R. Lindsey, Director, Division of Market Regulation, SEC 
(July 29, 1996) (``Williams Study'').
    \126\ The level of these fees, of course, would be determined by 
competitive forces in the marketplace. Any fees passed on to non-
broker-dealer customers would have to be disclosed in a clear 
fashion to the customer, and otherwise comply with applicable law. 
For example, NASD Rule 2440 states, in part, that if a member acts 
as agent for a customer in a transaction, the customer shall not be 
charged more than a fair commission or service charge, taking into 
consideration all relevant circumstances. See also NASD Regulatory & 
Compliance Alert Vol. 7, No. 4 (December 1993). At least one 
commenter argued that because spreads are ascertainable from public 
quotations and commissions are not, a rule that encourages charging 
commissions does not satisfy the goal of increased transparency. See 
Letter from Bruce C. Hackett, Managing Director, Salomon Brothers 
Inc., to Jonathan G. Katz, Secretary, SEC, dated January 25, 1996 
(``Salomon Letter''). The Commission notes, however, that Rule 10b-
10 under the Exchange Act requires customer confirmations to 
disclose commissions and, for listed and Nasdaq securities, the 
difference between the reported price and the price to the customer. 
Based on this disclosure, execution costs could actually become 
better known to customers if explicit fees are charged. Therefore, 
the Commission believes that the Display Rule will allow a customer 
to more easily monitor the execution quality of its limit orders, 
even if subject to fees for limit order executions. In addition, 
this situation should foster competition with respect to the amount, 
if any, firms will charge for the execution of a customer limit 
order.
---------------------------------------------------------------------------

iv. Discretion
    Several commenters are concerned that the Display Rule would 
eliminate their discretion to determine the best way in which to 
execute a customer's order. The commenters also claim that customers 
rely on the judgment of a market professional in choosing whether to 
display a limit order.127 For example, the NYSE believes that its 
current procedures allow broker-dealers to achieve the best prices for 
their customers.128 Other commenters suggest that if the rule were 
amended to require the display of representative size, a dealer would 
retain some discretion on

[[Page 48301]]

how best to execute the order.129 To preserve discretion, at least 
one commenter argues that the rule should apply only when the customer 
requests that its order be displayed.130
---------------------------------------------------------------------------

    \127\ See, e.g., NYSE Letter; RPM Letter; Specialist Assoc. 
Letter.
    \128\ See, e.g., NYSE Letter; Specialist Assoc. Letter. 
According to the NYSE, a customer can choose to benefit from the 
display of its order or to benefit from relying on the specialist's 
discretion, depending on whether the order is sent to the post via 
SuperDOT, or is manually submitted. The NYSE also notes that 
enabling a specialist to use discretion in the handling of limit 
orders is important in light of the fact that the NYSE defines a 
limit order as an order to buy or sell at a specified price, or at a 
better price, if obtainable after the order is represented in the 
trading crowd. See NYSE Rule 13.
    \129\ See, e.g., Madoff Letter; NASD Letter; SIA Letter.
    \130\ Jefferies Letter.
---------------------------------------------------------------------------

    The Commission believes that the rule appropriately establishes a 
presumption that limit orders should be displayed, unless such orders 
are of block size, the customer requests that its order not be 
displayed, or one of the exceptions to the rule applies. The exception 
allowing a customer to request that its limit order not be displayed 
gives the customer ultimate control in determining whether to trust the 
display of the limit order to the discretion of a market professional, 
or to display the order either in full, or in part, to other potential 
market interest.131
---------------------------------------------------------------------------

    \131\ See discussion of the exceptions to the Display Rule at 
section III.A.3.c., infra. See also Sec. 240.11Ac1-4(c)(2); 
Sec. 240.11Ac1-4(c)(4) (permitting a customer with a block size 
limit order to request that the order be displayed pursuant to the 
Display Rule). The Commission does not mean to imply that a 
specialist or OTC market maker that is not displaying a limit order 
pursuant to the request of its customer may not change its quotation 
in that security based on the specialist's or market maker's own 
trading interest.
---------------------------------------------------------------------------

v. Systems Burdens
    Based on their belief that compliance with the Display Rule would 
result in a large increase in quotation traffic, a number of commenters 
maintain that the rule would require major overhauls of the order 
handling systems used by brokers, market makers and markets. For 
example, one commenter believes that it would be impossible to comply 
with the rule without additional automated systems.132 The 
commenter concludes that the costs associated with new systems and 
additional staff necessary to monitor a more volatile market would 
contribute to wider spreads and higher commissions.133 In 
addition, one SRO claims that quotation traffic must be kept at 
manageable levels in order to allow entities to continue to manually 
process limit orders, thus eliminating the need for entities to bear 
the costs associated with automation of such orders.134 Other 
commenters also note their concern over the potential operational costs 
associated with the rule.135 The STA states that an in-depth 
review is needed to determine the costs for new equipment and 
technology necessary to comply with the rule.136
---------------------------------------------------------------------------

    \132\ PaineWebber Letter.
    \133\ Id.; see also Bear Stearns Letter (noting that the display 
rule would increase the volatility of quotes and, as a result, 
market makers would have a difficult time keeping up with the rapid 
changes in bids, offers, and quote sizes).
    \134\ PSE Letter.
    \135\ See, e.g., Alex. Brown Letter; Bear Stearns Letter; 
Jefferies Letter.
    \136\ STA Letter.
---------------------------------------------------------------------------

    A few commenters are concerned that the increased quotation traffic 
that may be associated with the rule could pose a threat to the 
integrity of the central quotation system.137 One commenter 
suggests that the rule be suspended for the first 30 minutes of 
trading.138 Another commenter argues that modifying the rule to 
require only the display of representative size could act to alleviate 
some of the traffic concerns.139
---------------------------------------------------------------------------

    \137\ See, e.g., Letter from Thomas J. Jordan, Financial 
Information Forum, to Jonathan G. Katz, Secretary, SEC, dated 
January 12, 1996 (``FIF Letter''); PaineWebber Letter; PSE Letter. 
This concern was expressed with respect to the proposal that the 
Commission adopt both the Display Rule and Price Improvement Rule. 
The fact that the Commission has deferred action on the Price 
Improvement Rule, as discussed below, should substantially diminish 
any system capacity concerns. Moreover, the Commission's decision 
not to require display of de minimis orders also should minimize 
system capacity concerns.
    \138\ FIF Letter. According to FIF, the heaviest traffic volume 
usually occurs within the first 30 minutes of trading.
    \139\ PSE Letter. The PSE notes, however, that the rule, even if 
modified, still may result in an increase in staffing costs. Id.
---------------------------------------------------------------------------

    The Commission recognizes that achieving greater transparency for 
limit orders depends upon the existence of systems that are capable of 
the smooth and efficient display of trading interest. The Commission 
believes that the Display Rule will not substantially increase the 
quotation burden for exchange markets, where systems currently exist 
for the display of quotes.140 In the OTC market, the Display Rule 
will result in additional quotation entries for market makers that 
display customer limit orders in their quotes. The Commission believes, 
however, that current systems can handle the additional volume, or can 
be expanded at moderate cost to handle the additional volume.141 
Further, the Commission notes that the Display Rule contains an 
exception to the display requirement for limit orders of de minimis 
size priced at the NBBO when the market maker's or specialist's quote 
matches the NBBO.142 The Display Rule also allows a specialist or 
OTC market maker several ways to comply with the rule by routing the 
order elsewhere without displaying the limit order in its own quote by 
transmitting a customer limit order to an exchange-or association-
sponsored system or to a qualifying ECN.
---------------------------------------------------------------------------

    \140\ For example, SuperDOT data indicates that 57% of all 
customer trades originating from orders routed through SuperDOT are 
limit orders. Of these limit orders, 20% narrowed the NYSE quote. 
See supra note 52. According to the NYSE, 93% of such orders are 
reflected in the NYSE quote within two minutes of receipt. See supra 
note 36 and accompanying text (teleconference). See also CSE Letter 
(costs associated with implementing such a system are minimal, 
especially in light of the benefits to the public); Paperwork 
Reduction Act discussion at section VII, infra.
    \141\ The Commission notes that many small to medium broker-
dealers utilize shared trading systems that enable such broker-
dealers to streamline their OTC market making and back office 
responsibilities. Subscribers to such systems benefit by sharing 
costs associated with the application of improved technologies, 
rather than creating and updating systems of their own. Therefore, 
it is assumed that any changes deemed necessary to these shared 
systems to facilitate efficient compliance with the Display Rule 
also would be shared by all subscribers.
    In addition, the Commission specifically evaluated the costs 
associated with implementation of the Display Rule. Based on this 
evaluation, the Commission concluded that most market makers will 
not be required to invest substantial amounts of money in systems 
development in order to comply with the Display Rule as adopted. See 
Williams Study, supra note 125. See also CSE Letter (costs of 
implementing a system for display of limit orders are minimal).
    \142\ See, Sec. 240.11Ac1-4(b)(1)(ii). See also Sec. 240.11Ac1-
4(b)(2)(ii).
---------------------------------------------------------------------------

    Additionally, a few commenters believe that the Commission should 
give more consideration to the Display Rule's impact on automatic 
execution systems.143 These commenters express concern that a 
market maker could be exposed to multiple transactions from its own 
customers in the firm's automatic execution system, which executes 
orders at the NBBO, even if the NBBO represents a customer limit order 
as opposed to the price at which a market maker is willing to trade. 
They claim this result is unfair, especially if the automatic system 
has a minimum share requirement that exceeds the customer limit order.
---------------------------------------------------------------------------

    \143\ See, e.g., Dillon Letter; HHG Letter; Merrill Letter; 
PaineWebber Letter; Schwab Letter.
---------------------------------------------------------------------------

    The Commission acknowledges the concern of some commenters 
regarding the rule's interaction with automated execution systems. 
However, because customer limit orders reflect actual trading interest, 
it has been the Commission's intention to enhance customer order 
executions throughout the markets by requiring the display of these 
customer limit orders.144 Where a limit order represents the best 
quote, a

[[Page 48302]]

market maker can respond by sending its customer order to the market 
maker displaying the limit order at the NBBO, thereby attempting to 
execute the limit order setting that price and removing it as the 
NBBO.145 Moreover, where the size of a limit order represented in 
the best quote is smaller than the size eligible for execution in an 
automated execution system, the Commission believes that it is not 
inconsistent with best execution principles for market makers and 
specialists using automated execution systems to take into account the 
size of the limit order quote in determining the price at which an 
order, or portions thereof, should be automatically executed. The 
Commission believes, however, that in such a case the market maker or 
specialist should provide the customer order an execution at the 
displayed price at least up to the displayed size of the limit 
order.146 For example, if customer limit orders compose the NBBO 
of 10 \1/4\-10 \1/2\ (100  x  300), and a market maker receives a 
market order to sell 1,000 shares via an automatic execution system, 
the market maker may automatically execute 100 shares of the order at 
10 \1/4\, and the remaining portion of the order at the next best bid.
---------------------------------------------------------------------------

    \144\ The Commission recognizes that SROs may have rules 
regarding the minimum quotation sizes associated with a specialist's 
or market maker's quote. The Commission believes that SROs should 
consider amending such rules and modifying certain systems to allow 
a specialist or market maker to quote in sizes smaller than the 
minimum quotation size when such quote represents a customer limit 
order. With these changes, a specialist or market maker that 
displays a customer limit order in its quote pursuant to the Display 
Rule would not be responsible for executing as principal any 
additional shares at the limit price where the size of the customer 
limit order is less than the minimum quotation size set by the SRO.
    \145\ The Commission notes that the NASD's NAqcess system, as 
proposed, would permit market makers to send orders, including 
proprietary orders, to other market makers through the system. See 
supra note 45. See also ITS Plan. Moreover, the Commission believes 
that the NASD should consider modifying its SOES system to allow OTC 
market makers to route customer orders for execution against limit 
orders displayed by another market maker in the same security.
    \146\ If the market maker or specialist attempted but was unable 
to execute the displayed limit order through a reasonable and 
efficient means, such as sending an order through an automated 
system for an OTC security, the market maker or specialist would not 
be expected to give that limit order price to its customer.
---------------------------------------------------------------------------

3. The Operation of the Rule as Adopted 147
    The rule as adopted applies to: (i) every member of an exchange 
that is registered by that exchange as a specialist or has been 
authorized by an exchange to perform functions substantially similar to 
that of a specialist (``specialist''); and (ii) OTC market 
makers.148 The rule as adopted applies to specialists that trade 
on the floor of an exchange; 149 third market makers; 150 
members of a national securities association that are OTC market 
makers; 151 and specialists that trade an OTC security pursuant to 
unlisted trading privileges (``UTP'').152 These market makers are 
required to reflect immediately in their bid or offer the price and the 
full size of each customer limit order they hold at a price that would 
improve their bid or offer in the security.153 In addition, all 
market makers covered by the rule are obligated to reflect in their 
quotes the full size of a customer limit order that: (1) is priced 
equal to their bid or offer; (2) is priced equal to the national best 
bid or offer for the security; and (3) represents more than a de 
minimis change in relation to the size associated with their bid or 
offer.154
---------------------------------------------------------------------------

    \147\ SRO rules that impose more stringent standards would 
continue to apply.
    \148\ Although the Commission consolidated certain sections of 
the proposed rule for clarity, the rule as adopted applies to the 
same entities identified in the proposed rule.
    \149\ Section 240.11Ac1-4(b)(1).
    \150\ Section 240.11Ac1-4(b)(2).
    \151\ Section 240.11Ac1-4(b)(2).
    \152\ Section 240.11Ac1-4(b)(1).
    \153\ Section 240.11Ac1-4(b)(1)(i) and (b)(2)(i). The Commission 
wants to clarify that references to a specialist's or OTC market 
maker's bid or offer include instances where the bid or offer is a 
proprietary quote, as well as instances where the bid or offer 
represents a customer limit order. Further, if a market maker is not 
quoting publicly (e.g., a market maker that does not meet the 1% 
threshold of the Quote Rule), it still must publish a quotation that 
displays the limit order, or avail itself of one of the exceptions. 
Moreover, the Commission notes that some commenters suggest that the 
rule should require broker-dealers that are not specialists or OTC 
market makers to immediately transmit limit orders they receive to 
an entity or system that will display the orders in a manner 
consistent with the rule. See, e.g., CSE Letter; Madoff Letter; 
Whitcomb Letter. Also, at least one commenter believes that 
institutional firms trading in block size should be considered ``OTC 
market makers'' for purposes of the rule and subject to the display 
requirement. Amex Letter. See generally infra notes 191-193 and 
accompanying text. The fact that the Commission has not adopted 
these suggestions as part of the Display Rule does not relieve 
broker-dealers which receive such orders from compliance with their 
obligation to obtain best execution for those orders.
    \154\ Section 240.11Ac1-4(b)(1)(ii) and (b)(2)(ii).
---------------------------------------------------------------------------

a. ``Covered Securities'' and ``Customer Limit Orders''
    Rule 11Ac1-4 applies to ``customer limit orders'' in ``covered 
securities.'' A covered security is defined as any reported security 
and any other security for which transaction reports, last sale data or 
quotation information is disseminated through an automated quotation 
system that is sponsored by a registered securities association. This 
definition is designed to encompass all exchange-listed securities, 
Nasdaq National Market securities and Nasdaq SmallCap 
securities.155
---------------------------------------------------------------------------

    \155\ Securities listed on regional exchanges that do not 
substantially meet NYSE or Amex original listing criteria do not 
satisfy the definition of ``covered security.'' Such securities are 
not ``reported securities'' as that term is defined, nor do they 
meet the other elements of the definition of covered security. OTC 
Bulletin Board (``OTCBB'') securities also do not satisfy the 
definition of covered security. The Commission has determined not to 
extend the display requirement to any of those securities at the 
present time.
---------------------------------------------------------------------------

    The Commission received several comments regarding the application 
of the rule to Nasdaq securities. Some commenters believe that the rule 
should not extend to all Nasdaq securities, and that some measure of 
liquidity should be used to determine which Nasdaq securities should be 
subject to the rule.156 For example, one commenter suggests 
limiting the rule's application to the top 250 Nasdaq National Market 
securities with the highest average daily trading volume over the 
previous calendar quarter.157 In contrast, another commenter 
favors the inclusion of Nasdaq SmallCap securities within the 
definition of ``covered security.'' 158 Further, at least one 
commenter suggests that the rule apply not only to all Nasdaq 
securities, but also to OTCBB securities.159
---------------------------------------------------------------------------

    \156\ See, e.g., Bear Stearns Letter; Lehman Letter; Merrill 
Letter; NASD Letter; SIA Letter.
    \157\ SIA Letter.
    \158\ PSE Letter.
    \159\ Ricker Letter.
---------------------------------------------------------------------------

    As noted above, the Commission believes that the Display Rule 
should apply equally to exchange-traded as well as non-exchange-traded 
securities. In addition, the Commission believes it is appropriate to 
include all Nasdaq securities within the definition of ``covered 
security.'' The Commission believes that, regardless of the current 
trading volume of a particular security, the investors in any security 
can benefit from the uniform display of customer buying and selling 
interest if all quotations in that security are required to be firm. As 
noted previously,160 data analyzed by the Commission shows that 
limit orders are used frequently for transactions in NYSE securities 
with ADTVs under $100,000. On average, 63% of customer orders in such 
securities are limit orders. Of those limit orders, 30% narrowed the 
NYSE quote and 32% matched the quote. This data indicates that the 
display requirement may lead to increased customer trading interest in 
securities that are currently thinly traded.161
---------------------------------------------------------------------------

    \160\ See supra notes 50 and 52.
    \161\ As stated previously, because dealers are not required to 
register as OTC market makers in OTCBB securities and are not 
required to enter and maintain continuous firm two-sided quotations 
in OTCBB securities, the Commission does not believe that the 
Display Rule should be extended to such securities at this time.
---------------------------------------------------------------------------

    The Commission reiterates that limit order display is not solely an 
issue of improved transparency. The Display Rule will improve the 
handling of customer orders across all markets and increase the 
probability that a customer limit order will be executed. Therefore, 
the Commission believes that a uniform limit order display requirement 
is

[[Page 48303]]

closely related to a broker-dealer's ability to obtain best execution 
for limit orders.
    The Commission recognizes, however, that the rule represents a 
significant change for the OTC market. The Commission, therefore, has 
determined to provide a phase-in period for application of the rule to 
customer limit orders in Nasdaq securities.162 The Commission 
believes that the phase-in period will allow the Commission to monitor 
the effects of the rule on the most liquid Nasdaq securities first, 
while ensuring that customer limit orders in all Nasdaq securities will 
receive the benefits of the rule within one year of its adoption. This 
schedule also will provide OTC market makers with time to adjust their 
systems to comply with the rule's requirements.163
---------------------------------------------------------------------------

    \162\ See description of the phase-in at section III.A.3.d., 
infra.
    \163\ See, e.g., Amex Letter.
---------------------------------------------------------------------------

    Under the rule, a customer limit order includes any order to buy or 
sell a covered security at a specified price not for the account of a 
broker or dealer. Customer limit orders transmitted from one broker-
dealer to another for execution are included in the definition. 
Although some commenters believe that the rule should be extended to 
orders for the account of a broker or dealer, the Commission does not 
believe such extension is appropriate at this time. The Commission 
acknowledges that the display of all limit orders, including those of a 
broker or dealer, would further enhance transparency.164 Requiring 
the display of broker-dealer limit orders, however, would be a 
significant extension of the rule that could change its impact on 
market maker participation and increase its operational burdens. 
Therefore, the Commission believes that the effects of the rule should 
be observed, and additional comment should be solicited, before the 
rule is expanded.165
---------------------------------------------------------------------------

    \164\ The Commission also is sensitive to the fact that 
providing suitable opportunities for broker-dealers, including 
options market makers, to lay off risk is an important component of 
overall market liquidity and efficiency. See Manning II, supra note 
24.
    \165\ The Commission notes that other actions recently taken by 
the Commission address certain anti-competitive behavior in the 
Nasdaq market that heretofore may have negatively impacted the 
ability of some broker-dealers, including options market makers, to 
efficiently perform their market making function. See 21(a) Report, 
supra note 28.
---------------------------------------------------------------------------

b. Size
    As noted above, some commenters expressed concern regarding the 
requirement that specialists and OTC market makers display the full 
size of a customer limit order. These commenters suggest that the rule 
only require the display of representative size.166 They argue 
that the use of representative size would preserve the ability of a 
specialist or OTC market maker to exercise some discretion in 
determining the best execution of the order.167
---------------------------------------------------------------------------

    \166\ See, e.g., BSE Letter; CSE Letter; Madoff Letter; NASD 
Letter; NYSE Letter; PSE Letter; SIA Letter; Specialists Assoc. 
Letter; see also LJR Letter (questioning whether the display of 
size, at least with respect to institutional orders, would be 
consistent with best execution obligations).
    \167\ See, e.g., Madoff Letter; NASD Letter; NYSE Letter; SIA 
Letter; Specialists Assoc. Letter.
---------------------------------------------------------------------------

    Other commenters, however, believe that the full size of a customer 
limit order should be required to be displayed.168 Such commenters 
argue that the display of full size is an important element in the 
Commission's effort to improve transparency and, therefore, no dealer 
discretion should be permitted unless a customer expressly requests 
that its order not be displayed, or expressly grants discretion, 
pursuant to the Display Rule.169
---------------------------------------------------------------------------

    \168\ See, e.g., Amex Letter; CHX Letter; D.E. Shaw Letter.
    \169\ See, e.g., Amex Letter; CHX Letter; D.E. Shaw Letter; ICI 
Letter.
---------------------------------------------------------------------------

    The Commission continues to believe that the display of full size 
is important to improved transparency. The display of full size will 
provide the most accurate picture of the depth of the market at a 
particular price.170 The Commission believes that size, as well as 
price, is a factor in attracting order flow and that the display of 
full size increases the likelihood that a limit order will be executed. 
The Commission, however, understands that there may be instances where 
a customer would not want its order displayed, or does not want the 
full size of its order displayed. The Display Rule, therefore, still 
contains an exception for a customer that decides to rely on the 
discretion of a broker-dealer rather than to take advantage of the 
display requirement for its limit order.171 The Display Rule also 
permits a customer to state explicitly what portion, if any, the 
customer wants displayed.172 Furthermore, the Display Rule 
contains other exceptions to the display requirement that will ease any 
potential operational burdens associated with the display of full 
size.173
---------------------------------------------------------------------------

    \170\ A few commenters believe that all customer limit orders 
should be displayed, including the size of those orders that equal 
the specialist's or OTC market maker's bid or offer, but are not 
equal to the NBBO. See, e.g., CHX Letter; Letter from Edward J. 
Johnsen, Vice President and Counsel, Morgan Stanley & Co., to 
Jonathan G. Katz, Secretary, SEC, dated January 16, 1996 (``Morgan 
Stanley Letter''); Peake Letter; Weaver Letter. The Commission 
believes, however, that the burden associated with the commenters' 
suggestion would outweigh the corresponding benefit to market 
transparency. Of course, the rule represents a floor, rather than a 
ceiling. An exchange, association, or broker-dealer may determine to 
adopt more stringent display requirements. Requiring display of size 
when the limit order is away from the NBBO and equals the market 
maker's or specialist's quote would provide some additional market 
information but also would require market makers not quoting at the 
NBBO to change their quote size on an ongoing basis. Although some 
market makers or specialists may choose to do so to be prepared if 
their quotation becomes the NBBO, on the whole the Commission 
believes the increased transparency that would result from this 
updating would not outweigh the burdens imposed by a display 
requirement.
    \171\ Section 240.11Ac1-4(c)(2).
    \172\ Id.
    \173\ As noted above, a specialist or OTC market maker has the 
ability to execute a customer limit order upon receipt; transmit the 
order to another exchange member or OTC market maker that will 
display the limit order in accordance with the rule; or transmit the 
order to an exchange or association sponsored system pursuant to the 
rule. Additionally, a specialist or OTC market maker may transmit an 
order to an ECN that provides for public display of limit orders and 
provides access to these orders. Moreover, the rule contains an 
exception to the display requirement for certain orders of de 
minimis size.
---------------------------------------------------------------------------

    The following example illustrates the application of the Display 
Rule where a customer limit order improves the price of a specialist's 
or market maker's quote. Assume that a market maker covered by the rule 
is quoting 10-10\1/2\ (2,000 x 2,000) when it receives a customer limit 
order in a covered security to buy 4,000 shares at 10\1/4\. Under the 
rule, the market maker must change the price and size associated with 
its quote to 10\1/4\-10\1/2\ (4,000 x 2,000). If this new quote 
represents the NBBO, the Display Rule would require the market maker to 
increase the size associated with the quote upon the receipt of 
additional customer limit orders. For example, if the market maker 
subsequently accepts another customer limit order to buy 4,000 shares 
at 10\1/4\, the market maker must change its quote to 10\1/4\-10\1/2\ 
(8,000 x 2,000).
    The rule as adopted contains a de minimis standard applicable in 
situations where a customer limit order equals a specialist's or market 
maker's displayed price and that price is equal to the NBBO. One 
commenter states that the use of representative size would eliminate 
the Commission's need to rely on a de minimis standard.174 Another 
commenter believes that the rationale underlying the de minimis 
standard demonstrates that the display of size does not benefit public 
customers.175 Some commenters also believe that the de minimis 
standard should be clarified or even eliminated.176
---------------------------------------------------------------------------

    \174\ CSE Letter.
    \175\ Dean Witter Letter.
    \176\ See, e.g., Amex Letter; CHX Letter; Schwab Letter.
---------------------------------------------------------------------------

    The Commission proposed the de minimis standard to strike a balance

[[Page 48304]]

between the benefits of increased transparency and operational burdens 
that might arise under the display requirement in displaying limit 
orders irrespective of size. The de minimis standard was intended to 
reduce the burdens of displaying the smallest of limit orders where the 
frequent updating of the quote for smaller orders would not result in 
significant improvements in quotation size. The Commission believes 
that the size of a customer limit order should be considered de minimis 
if it is less than or equal to 10% of the displayed size associated 
with a specialist's or OTC market maker's bid or offer.177
---------------------------------------------------------------------------

    \177\ Any SRO may set more stringent display requirements 
through its own rules.
---------------------------------------------------------------------------

    The Commission believes that this de minimis standard will ease 
potential operational burdens associated with the display of additional 
size in a specialist's or OTC market maker's quote. The following 
example illustrates the application of the de minimis standard.
    Assume a market maker's quote is 10-10\1/2\ (1,000 x 1,000), and 
the NBBO is 10-10\1/4\ when the market maker receives a customer limit 
order to buy 2,000 shares at 10. Under the rule, the market maker is 
obligated to change the size of its quote immediately to 10-10\1/2\ 
(3,000 x 1,000).178 In this case, the 2,000 share order size is 
more than de minimis in relation to the size associated with the market 
maker's quote. If the limit order was for 100 shares, however, the 
market maker would not be required to change its quotation size because 
the order is de minimis in relation to its quote.179 
Alternatively, the market maker could voluntarily display the 
additional 100 shares.
---------------------------------------------------------------------------

    \178\ If the original 1,000 shares displayed represents the 
market maker's proprietary quote and, consistent with Rule 11Ac1-1, 
the market maker no longer wishes to trade for its own account at 
10, the market maker may quote at 10-10\1/2\ (2,000 x 1,000).
    \179\ The Commission stresses that all other orders previously 
considered de minimis and not displayed must be added to the order 
under consideration for purposes of the de minimis calculation. 
Therefore, in the case of a 100 share limit order to buy at 10, 
where the market maker had a previous 100 share limit order to buy 
at 10 that was not displayed pursuant to the de minimis standard, 
both orders must be considered together for purposes of making the 
de minimis calculation. Because 200 shares is more than 10% of the 
displayed size of 1,000, the market maker must include the 200 
shares in its quote.
    The Commission notes that if an OTC market maker chooses not to 
display a de minimis limit order, the NASD's interpretation 
regarding limit orders would prohibit the market maker from trading 
ahead of the limit order. See Manning I & II, supra note 24. In 
addition, the NASD has indicated that market makers must establish 
and consistently follow policies regarding the priority in which 
limit orders received from customers, which would include de minimis 
orders, will be executed. See Special NASD Notice to Members 95-43 
(June 5, 1995).
---------------------------------------------------------------------------

c. Exceptions
    The rule requires the ``immediate'' display of certain customer 
limit orders. To satisfy this requirement, a specialist or OTC market 
maker must display the limit order immediately upon receipt unless 
there exists an applicable exception to the display requirement. Some 
commenters have asked for clarification of the ``immediate'' display 
requirement.180 The Commission is mindful that some measure of 
time is needed for specialists or market makers to display limit orders 
in the quote. Assuming that a specialist or OTC market maker does not 
rely on one of the exceptions to the Display Rule, however, such 
specialist or OTC market maker must display the order as soon as is 
practicable after receipt which, under normal market conditions, would 
require display no later than 30 seconds after receipt.181
---------------------------------------------------------------------------

    \180\ See, e.g., Amex Letter; D.E. Shaw Letter; NYSE Letter; PSE 
Letter.
    \181\ The Commission stresses that specialists and OTC market 
makers still are under an obligation to protect the customer limit 
order even during the time the limit order is not displayed. See, 
e.g., Manning I & II, supra note 24 (prohibiting trading ahead of 
customer limit orders). It should also be noted that this standard 
would supersede SRO rules that are less stringent with regard to the 
time in which limit orders are to be displayed. Those rules that 
impose more stringent standards may continue to apply.
---------------------------------------------------------------------------

    There are seven exceptions to the general requirements of the rule. 
The first exception applies to any customer limit order that is 
executed upon receipt of the order.182 If the order is executed 
upon receipt, then no duty arises under the rule.
---------------------------------------------------------------------------

    \182\ Section 240.11Ac1-4(c)(1).
---------------------------------------------------------------------------

    The second exception applies to any limit order that is placed by a 
customer who expressly requests that the order not be 
displayed.183 This request may take place on an order by order 
basis, or may be agreed to prospectively. Most commenters that 
addressed the issue were in favor of the exception.184 The 
Commission included this exception because there could be instances in 
which a customer prefers to exclude its order from public display. For 
example, a customer with a large limit order could wish to let its 
broker work the order rather than display the entire order. This 
exception gives the customer the right to decide if the order should be 
displayed in its entirety, in part, or not at all.185 The 
Commission notes that under this exception, a customer may leave the 
decision to display an order to the discretion of a broker-dealer. 
Therefore, rather than instructing a broker-dealer not to display an 
order, a customer, consistent with this exception, may instruct the 
broker-dealer to use its discretion in determining whether to display 
the order. Although allowing some orders to not be displayed or to be 
displayed partially in the system reduces transparency, the Commission 
believes this exception is appropriate to give investors flexibility in 
deciding how their orders should be handled.
---------------------------------------------------------------------------

    \183\ Section 240.11Ac1-4(c)(2).
    \184\ But see, e.g., Madoff Letter; Morgan Stanley Letter.
    \185\ Any portion of a customer limit order that is not 
displayed pursuant to this exception shall not be included in the 
calculation for determining whether any other limit order is de 
minimis. See supra note 179.
---------------------------------------------------------------------------

    The exception to the rule requires a customer to expressly request 
that an order not be displayed.186 A customer request that an 
order be placed in a particular non-public trading system would not, by 
itself, be deemed to be a non-display request. The Commission expects 
that most retail customers will want their limit orders displayed 
pursuant to the rule. Thus, the Commission has written the rule to 
require specialists and OTC market makers to assume that retail 
customers wish to have their orders displayed unless the customer 
specifically requests that the order not be displayed.
---------------------------------------------------------------------------

    \186\ At least one commenter believes that documentation of such 
customer requests should be required. CHX Letter. Although the 
Commission does not believe it necessary to mandate a particular 
method of record keeping, the Commission expects the compliance 
departments of individual firms to discharge their responsibilities 
in such a manner as to allow adequate supervision of compliance with 
the customer's request not to display or to display pursuant to 
discretionary authority provided by the customer.
---------------------------------------------------------------------------

    The exception also permits any customer to negotiate with its 
broker-dealer an individual agreement regarding the display of its 
limit orders either on an order-by-order basis or prospectively. 
Standardized disclaimers or contractual language in broker-dealer new 
account agreements, however, would not be deemed to be an individual 
request by a customer that its order or orders not be displayed.
    The third exception applies to odd-lot orders.187 The rule 
does not require the display of an order for less than a unit of 
trading as established by the rules of the exchange or association. In 
the event that a round-lot limit order represented in the quote is 
partially filled and, as a result, the remainder of the order would 
then be deemed an odd-lot order, the remainder of the order may be 
treated as an odd-lot for purposes of this exception. For example, 
assume a

[[Page 48305]]

market maker is quoting at the NBBO (10\1/4\-10\3/8\ (200 x 1000)) and 
is representing a 200 share customer limit order to buy when a market 
order to sell 150 shares is received. Upon execution of 150 shares of 
the 200 share customer limit order, the market maker is not required to 
display the remaining 50 shares of the order at 10\1/4\.188
---------------------------------------------------------------------------

    \187\ Section 240.11Ac1-4(c)(3).
    \188\ The market maker still will have best execution 
obligations with respect to the remaining odd-lot portion of the 
customer limit order.
---------------------------------------------------------------------------

    The fourth exception applies to block size orders.189 Orders 
of at least 10,000 shares or for a quantity of stock having a market 
value of at least $200,000 need not be displayed in accordance with the 
rule, unless the customer so requests.190 The Commission 
recognizes that the display of block size orders would add to market 
transparency. In practice, however, the handling of block size orders 
differs from other orders. For example, in the OTC market, market 
makers often negotiate terms and conditions with respect to the 
handling of block size orders, and display of block size orders may 
impact market maker quotations in a security more than would smaller 
limit orders.191 Further, one of the major objectives in proposing 
the Display Rule was to improve the handling and execution 
opportunities afforded to customers that lack the power to negotiate 
better terms. Because most investors that trade in block size have such 
power, the Commission has chosen not to mandate the display of block 
size orders, unless the customer so requests.192 The Commission is 
satisfied that the current definition strikes an appropriate regulatory 
balance by requiring a presumption in favor of display for those orders 
requiring enhanced protection, while not extending the presumption to 
those orders less likely to need such protection. Of course, the 
Commission may reevaluate its treatment of block size orders at a later 
date.
---------------------------------------------------------------------------

    \189\ Section 240.11Ac1-4(c)(4).
    \190\ This block definition is consistent with the current 
definition used in NYSE Rule 127.10. Some commenters, however, 
suggest that the parameters for such orders be increased or made 
flexible depending on the liquidity of a particular security. See, 
e.g., D.E. Shaw Letter; PSE Letter; Schwab Letter. Still others 
believe that there should be no exception for orders of block size. 
Instead, these commenters want such orders to be included within the 
scope of the rule so as to add to market transparency. See, e.g., 
Amex Letter; ICI Letter; Lehman Letter; Peake Letter; Ricker Letter. 
One commenter suggests the use of a ``block indicator'' to give a 
specialist or OTC market maker the option of displaying the full 
size of the order or using the indicator to identify the quote as 
representing a block size order. Lehman Letter.
    \191\ See, e.g., Manning II, supra note 24.
    \192\ Customers placing block orders, however, may request that 
the order be displayed in accordance with the requirements of the 
rule; a specialist or OTC market maker that accepts the order will 
be obligated to honor such a request. Section 240.11Ac1-4(c)(4). The 
Commission expects that adequate procedures will be developed to 
ensure compliance with a customer request. See supra note 186.
---------------------------------------------------------------------------

    As proposed, the fifth exception would have applied to a limit 
order that is delivered immediately to an exchange or association 
sponsored system that displays limit orders and complies with the 
requirements of the rule with respect to that order.193 This 
exception did not relieve a specialist or OTC market maker from its 
display obligation for orders it received through exchange or 
association facilities, unless the facility itself displayed the 
order.194
---------------------------------------------------------------------------

    \193\ Section 240.11Ac1-4(c)(5). A facility would not be deemed 
to comply with the requirements of the Display Rule if the highest 
priced buy orders and lowest priced sell orders entered by a 
specialist or OTC market maker in the facility for a particular 
security were not included in calculating the best bid and offer for 
the market and incorporated in the consolidated quote.
    \194\ One commenter argues that the exception permits 
specialists and OTC market makers to become ``fair weather 
dealers,'' effectively allowing them to selectively withdraw from 
the national market system, which creates a misleading picture of 
liquidity. Madoff Letter. The Commission believes, however, that the 
exception provides a specialist or OTC market maker with an 
appropriate amount of discretion in handling a customer limit order 
while ensuring that orders at the best price are displayed to the 
marketplace.
---------------------------------------------------------------------------

    In the Proposing Release, the Commission requested comment on 
whether to extend this exception from display to instances where 
customer limit orders are sent to ECNs or PTSs by a specialist or OTC 
market maker.195 As discussed below in connection with the 
amendments to the Quote Rule, the Commission is amending the Quote Rule 
to require specialists and OTC market makers to include priced orders 
they enter into ECNs in the bids and offers they communicate to their 
exchange or association for reflection in their published quotations, 
when such orders improve their published quotations.196 In 
recognition of the concerns raised by commenters, the Commission also 
has included an alterna
FR Doc. 96-23210 Order Execution Obligations
tive to the amendment designed to preserve the 
anonymity of specialists and OTC market makers that is currently 
provided by certain ECNs, while still publicizing in the public 
quotation stream better prices entered into ECNs. The ECN display 
alternative in the Quote Rule is available only if the ECN provides for 
public dissemination of the price and full size of the orders entered 
by specialists and OTC market makers to an exchange or association and 
provides access to other broker-dealers to trade at those prices which 
is equivalent to that provided in the market where the prices are 
disseminated.197
---------------------------------------------------------------------------

    \195\ See, e.g., Letter from James Lynch, General Counsel, ITG, 
Inc., to Jonathan G. Katz, Secretary, SEC, dated, January 15, 1996 
(``POSIT Letter'') (not supporting the extension of the exception); 
PSE Letter (extension of exception should be contingent on access 
provided by ECNs); Whitcomb Letter (doubtful that exception could be 
extended in today's environment); see also Madoff Letter (market 
makers and specialists should be able to represent a portion of the 
size of a customer limit order in other markets or ECNs, but the 
best price and some size should be reflected in their quote).
    \196\ See Sec. 240.11Ac1-1(c)(5)(i)(A); see also Amendments to 
the Quote Rule discussion at section III.B.2.c.ii., infra.
    \197\ As discussed, the Commission expects the SROs to work 
expeditiously with ECNs that wish to avail themselves of this 
alternative, and is prepared to act if necessary to ensure the 
effectiveness of the ECN display alternative, prior to the effective 
date of the Quote Rule amendments. See Introduction and Summary, 
supra; see also Sec. 240.11Ac1-1(c)(5)(ii); Amendments to the Quote 
Rule discussion at section III.B.2.c.iii., infra.
---------------------------------------------------------------------------

    The Commission believes that ECNs that provide their best 
specialist and market maker prices to the public quotation system and 
provide ready access to their prices can provide an effective means for 
specialists and OTC market makers to ensure that customer limit orders 
are handled in a manner consistent with the Display Rule. In view of 
the ECN display alternative in the Quote Rule, the Commission believes 
it is appropriate to extend the exception in the Display Rule to orders 
entered into ECNs that comply with the Quote Rule alternative.198 
Accordingly, a specialist or OTC market maker that delivers a customer 
limit order to an ECN will be deemed to have satisfied its display 
obligation with regard to that order if the ECN complies with the 
requirements of the new alternative in the Quote Rule.199 The 
proposed exception for limit orders entered into exchange or 
association sponsored systems contemplated that such orders would be 
transparent and accessible. Therefore, expanding the exception to 
include the use of ECNs that provide for the requisite transparency and 
accessibility is consistent with the rule as proposed.
---------------------------------------------------------------------------

    \198\ See Amendments to the Quote Rule discussion at section 
III.B.2.c.i., infra, for a description of the ECN definition; see 
also Sec. 240.11Ac1-1(a)(8); Sec. 240.11Ac1-4(a)(8).
    \199\ Section 240.11Ac1-4(c)(5). See also, Amendments to the 
Quote Rule discussion on accessibility at section III.B.2.c.iii., 
infra. Additionally, a specialist or OTC market maker may be 
relieved of its display obligation if it delivers the customer limit 
order to an exchange or association sponsored system that complies 
with the new alternative in the Quote Rule. Section 240.11Ac1-
4(c)(5).
---------------------------------------------------------------------------

    The Commission notes that this exception to the Display Rule 
maintains the benefits, including increased transparency, provided to 
customer limit orders under the rule. The

[[Page 48306]]

exception ensures that customer limit orders will have equivalent 
public disclosure whether they are sent to an ECN that complies with 
the alternative or displayed directly in a specialist's or OTC market 
maker's quote.200
---------------------------------------------------------------------------

    \200\ An OTC market maker or specialist choosing to enter 
customer limit orders for display through an ECN must still evaluate 
whether the customer order is likely to obtain best execution 
through display in that ECN. See section III.C.2., infra.
---------------------------------------------------------------------------

    The sixth exception applies to a limit order that is delivered to 
another exchange member or OTC market maker that complies with the 
display requirements of the rule with respect to that order.201 
For example, a market maker that receives a limit order subject to the 
display requirement under the rule may immediately send the order to 
another market maker in the security if the other market maker will 
display the order in accordance with this rule.202
---------------------------------------------------------------------------

    \201\ Section 240.11Ac1-4(c)(6).
    \202\ One commenter believes that the rule should require a 
specialist or OTC market maker to obtain assurances that a 
customer's limit order will be displayed in accordance with the rule 
before such an order is sent. MJT Letter. But see PSE Letter; 
Salomon Letter. As noted earlier, the Commission believes that it is 
best left to a firm's compliance department to decide on the 
necessary assurances that the order will be displayed in conformance 
with the rule.
---------------------------------------------------------------------------

    The seventh exception applies to ``all-or-none limit orders.'' An 
``all-or-none limit order'' is an order accompanied by the customer's 
instruction that the order is to be executed in its entirety or not at 
all.203 Although this exception was not included in the proposed 
rule, the Commission believes that exempting all-or-none limit orders 
is necessary to avoid operational difficulties regarding partial 
executions at the public quote.204 In this regard, all-or-none 
limit orders typically are not displayed in the exchange markets 
today.205 The Commission believes, therefore, that this exception 
is consistent with the goals and objectives of the Display Rule.
---------------------------------------------------------------------------

    \203\ See, e.g., NYSE Rule 13.
    \204\ For example, if an all or none order to buy 1,000 shares 
at 10\1/4\ were displayed in the quote and represented the NBBO, a 
subsequent market order to sell 500 shares could not be matched 
against the all or none order.
    \205\ See, e.g., NYSE Rule 13.
---------------------------------------------------------------------------

    Finally, a new provision has been included that enables the 
Commission to exempt, conditionally or unconditionally, any 
transactions that it may determine are not encompassed within the 
purposes of the Display Rule. The Commission believes that this 
exemptive authority provides flexibility in applying the Display 
Rule.206
---------------------------------------------------------------------------

    \206\ Section 240.11Ac1-4(d).
---------------------------------------------------------------------------

d. Effective Date and Phase-In
    The Display Rule will become effective on January 10, 1997. As of 
this date, the Display Rule will apply to exchange-traded securities. 
Moreover, this date will mark the beginning of the first phase-in for 
Nasdaq securities. As of this date, the Display Rule will apply to the 
1,000 Nasdaq securities with the highest average daily trading volume 
in the previous quarter.
    The second phase-in date will be on March 28, 1997. From this date 
forward, the Display Rule will apply to the next 1,500 Nasdaq 
securities with the highest average daily trading volume over the 
previous quarter.207
---------------------------------------------------------------------------

    \207\ Any security already covered by the rule will not be 
included as part of the calculation of the securities to be included 
in any subsequent group. Therefore, if a security is included as one 
of the 1,000 securities in the first group, such security will not 
be counted as one of the next 1,500 securities in the second group 
(even if such security's average daily trading volume over the 
previous calendar quarter would otherwise place it in the second 
group).
---------------------------------------------------------------------------

    The third phase-in date will be on June 30, 1997. From this date 
forward, the Display Rule will apply to the next 2,000 Nasdaq 
securities with the highest average daily trading volume over the 
previous quarter.
    The final phase-in date will be on August 28, 1997. From this date 
forward, the Display Rule will apply to all remaining Nasdaq 
securities.
    Although the Commission believes that the Display Rule should apply 
equally to exchange-traded and non-exchange-traded securities, the 
Commission understands that the Display Rule will more significantly 
impact current order handling procedures for Nasdaq securities in light 
of existing practices in that market. The phase-in period will allow 
the Commission to monitor the effects of the Display Rule on successive 
groups of Nasdaq securities while ensuring that all covered securities 
receive the benefits of the display requirement within one year of the 
Display Rule's adoption.

B. Amendments to the Quote Rule

1. Background
    Public quotation reporting for equity securities is governed by the 
Commission's Quote Rule,208 as well as by exchange and NASD rules. 
These rules require registered exchanges and securities associations to 
file quotation reporting plans with the Commission that provide for the 
collection and transmission of quotation information on a real-time 
basis for securities covered by the Quote Rule.209 Market makers 
and exchange specialists communicate their quotes to the NASD or to an 
exchange pursuant to these plans and the NASD and exchanges in turn 
make this information available to vendors for dissemination to the 
public.210
---------------------------------------------------------------------------

    \208\ 17 CFR 240.11Ac1-1. See also Securities Exchange Act 
Release No. 14415 (January 26, 1978), 43 FR 4342 (February 1, 1978) 
(``Quote Rule Adopting Release'').
    \209\ Rule 11Ac1-1(b)(1), 17 CFR 240.11Ac1-1(b)(1) 
(dissemination requirements for exchanges and associations).
    \210\ Rule 11Ac1-2, 17 CFR 240.11Ac1-2 (``Vendor Display Rule'') 
requires vendors of market information to display quotation 
information in a non-discriminatory manner.
---------------------------------------------------------------------------

    The Quote Rule requires the collection and public dissemination of 
the best bid, best offer, and size for each market quoting any security 
covered by the Quote Rule, as well as the consolidation of those 
markets' quotations and public dissemination of the national 
``consolidated'' best bid and offer (``NBBO'').211 These 
quotations must be firm, and a market maker or specialist generally is 
obligated to execute an order at a price at least as favorable as its 
published bid or offer up to the size of its published bid or 
offer.212 Broker-dealers covered by the Quote Rule, including 
dealers trading listed securities in the OTC market (i.e., third market 
makers), must supply quotations to their exchange or association for 
dissemination to quotation vendors.
---------------------------------------------------------------------------

    \211\ Rule 11Ac1-1(b)(1), 17 CFR 240.11Ac1-1(b)(1). Pursuant to 
the Quote Rule and the Joint Consolidated Quotation Plan (``CQS 
Plan''), the inside quotations collected and calculated by the 
exchanges and Nasdaq for exchange-listed securities are consolidated 
and disseminated to vendors by SIAC, the exclusive processor for 
consolidated quotations in listed securities. Similarly, Nasdaq is 
the exclusive processor for quotations in Nasdaq National Market 
(``Nasdaq NMS'') securities. Nasdaq collects and consolidates inside 
quotations furnished by OTC market makers and by exchanges pursuant 
to a Joint Self-Regulatory Organization Plan that provides for 
exchange trading of Nasdaq securities. Nasdaq then disseminates to 
vendors the inside bid and offer in Nasdaq NMS securities, and 
disseminates to various subscribers more specific information 
concerning the individual market maker and exchange quotes in each 
Nasdaq security. The terms ``consolidated quote'' and ``publicly 
available quotation,'' when used with respect to information 
disseminated by exchanges and Nasdaq via their exclusive processors, 
refer to the quotes that SIAC or Nasdaq furnishes to vendors for 
dissemination to the public. The terms ``public quote'' or 
``publicly available quote,'' when used with respect to a specialist 
or market maker, refer to the bid and offer that the specialist or 
market maker has furnished to its exchange or association for 
inclusion in the consolidated quote. The term ``public quotation 
system'' refers to this entire structure through which SROs collect 
quotations from market participants, and the exclusive processors 
collect, process, and disseminate those quotations to vendors.
    \212\ Rule 11Ac1-1(c)(1), 17 CFR 240.11Ac1-1(c)(1). This is 
referred to as the broker-dealer's ``firmness'' requirement.
---------------------------------------------------------------------------

    The 1975 Amendments identified the need for a prompt, accurate and 
reliable

[[Page 48307]]

central quotation reporting system.213 The Quote Rule, in 
particular, was designed to facilitate the NMS by requiring specialists 
and market makers publishing quotes to provide these quotes to a 
central system so they could be made available to the public. Congress 
considered the public availability of quotation information to be 
critical to fair and competitive markets because published quotations 
provide investors, their brokers, and other market participants with 
essential information about the condition of the market. This 
information assists investors in making investment decisions and in 
finding the best market for a security, while making it possible for 
investors to evaluate the quality of their executions.
---------------------------------------------------------------------------

    \213\ Senate Report, supra note 31. Cf. H.R. Rep. No. 229, 94th 
Cong., 1st Sess. 29 (1975) (``Conference Report'') (noting that the 
conference committee adopted the Senate's provisions on the NMS with 
minor revisions).
---------------------------------------------------------------------------

    Since the 1975 Amendments and the adoption of the Quote Rule, there 
have been dramatic changes in the markets and the technologies used by 
market participants. To ensure that the Quote Rule keeps pace with the 
evolution of the securities markets and continues to ensure the public 
availability of accurate, reliable, and comprehensive quotation 
information, the Commission has determined that certain amendments to 
the Quote Rule are necessary and appropriate in furtherance of the 
objectives of the Exchange Act.
    The Commission proposed an amendment to the Quote Rule to require 
specialists and market makers to reflect in their public quotes any 
better priced orders they place in certain systems that are not 
currently integrated into the NMS. In particular, the ECN amendment is 
intended to incorporate within the public quotes any better priced 
orders broadly displayed by market makers and specialists through ECNs. 
This amendment is being adopted with modifications to address concerns 
raised by some commenters. Specifically, in order to provide 
specialists and market makers with an alternative method to meet the 
ECN display requirement, the Commission is adopting an alternative 
suggested in the proposing release that deems a specialist or market 
maker in compliance with the ECN amendment if the ECN provides the best 
prices entered into the ECN by market makers or specialists for each 
covered security to an exchange or association for inclusion in the 
public quotation system and provides access to those prices equivalent 
to the access currently available to other quotes published by the 
exchange or association. In addition, the Commission is amending the 
Quote Rule to expand the categories of securities covered by certain 
existing Quote Rule provisions. The quotation requirements that 
previously applied to substantial specialists and market makers in only 
certain exchange-listed securities now will apply to substantial 
specialists and market makers in all exchange-listed securities. 
Further, certain Quote Rule provisions that previously applied to 
market makers electing to quote particular Nasdaq securities now will 
apply to market makers electing to quote any Nasdaq security. The 
Commission is adopting these amendments substantially as proposed, 
along with minor technical amendments to the Quote Rule that are 
discussed more fully below.
2. Public Dissemination of Market Maker and Specialist Prices in ECNs
a. Basis for the ECN Amendment
    Over 20 years ago, the Commission noted that an essential purpose 
for the establishment of the NMS was ``to make information on prices, 
volume, and quotes for securities in all markets available to all 
investors, so that buyers and sellers of securities, wherever located, 
can make informed investment decisions and not pay more than the lowest 
price at which someone is willing to sell, or not sell for less than 
the highest price a buyer is prepared to offer.'' 214 At the time, 
the lack of consolidated quote information made it difficult to 
ascertain the different prices that were often available in the various 
markets for a particular security. This lack of transparency as to the 
best prices among competing markets was widely recognized as preventing 
investors and their brokers from ascertaining accurate trading interest 
for a security and obtaining the best prices for their orders.215 
To address these concerns, Congress directed the Commission to 
facilitate the creation of a national market system that would link the 
various markets trading a security. The price and quotation 
transparency resulting from the Commission's ensuing NMS initiatives 
has produced extremely liquid, successful, and, in most cases, 
competitive markets.
---------------------------------------------------------------------------

    \214\ Securities and Exchange Commission, Statement of the 
Securities and Exchange Commission on the Future Structure of the 
Securities Markets (February 2, 1972) (``Future Structure 
Statement'') at 9-10, 37 FR 5286, 5287 (February 4, 1972) (emphasis 
added). See also Securities and Exchange Commission, Policy 
Statement of the Securities and Exchange Commission on the Structure 
of a Central Market System (1973) at 25-28.
    \215\ See Senate Report, supra note 31.
---------------------------------------------------------------------------

    As discussed in the Proposing Release, the Commission for many 
years has been concerned that the development of so-called ``hidden 
markets,'' in which a market maker or specialist publishes quotations 
at prices superior to the quotation information it disseminates on a 
general basis, impedes these NMS objectives.216 Over the course of 
the last decade, certain trading systems that allow market makers and 
specialists to widely disseminate significant trading interest to 
certain market participants without making this trading interest 
available to the public market at large have become significant markets 
in their own right. Although offering benefits to some market 
participants, widespread participation in these hidden markets has 
reduced the completeness and value of publicly available quotations 
contrary to the purposes of the NMS. Because these systems are not 
registered as exchanges or associations, they are currently not 
required to integrate into the public quote the prices at which their 
subscribers, including subscribing market makers and specialists, are 
willing to trade.217 The use of these systems by market makers and 
specialists to quote prices not incorporated into the NMS has resulted 
in fragmented and incomplete dissemination of quotation information.
---------------------------------------------------------------------------

    \216\ See Proposing Release at 4.
    \217\ Certain ECNs may be registered with the Commission as 
broker-dealers and indeed perform various brokerage functions. 
Nevertheless, the Commission recognizes that in providing a 
mechanism by which system subscribers can (1) broadcast prices to 
other system subscribers and (2) trade with one another at those 
prices, these systems also function as securities markets.
---------------------------------------------------------------------------

    Certain markets, in particular ECNs that allow subscribers 218 
to enter priced orders that are widely disseminated to third parties 
219 and permit such orders to be executed in whole or in part 
through the system, communicate orders that are closely analogous to 
quotations. These ECNs, in effect, allow market makers and specialists 
to display different prices to different market participants.
---------------------------------------------------------------------------

    \218\ ECN subscribers may include institutional investors, 
broker-dealers, and market makers. ECNs provide their services to 
subscribers for a fee or commission equivalent. Some ECNs (such as 
SelectNet) have been available only to broker-dealers and not to 
investors generally.
    \219\ ''Third parties'' in this context refers to subscribers or 
any other entities (such as customers of subscribers) that receive 
information from the ECN concerning any priced order entered into 
the ECN by another subscriber.
---------------------------------------------------------------------------

    Although these ECNs can facilitate the execution of their 
subscribers' orders and allow institutions to participate

[[Page 48308]]

directly in price discovery, the display of better prices privately in 
ECNs reduces the reliability and completeness of consolidated 
quotations, the accuracy of which continues to be an essential element 
of the NMS. These private markets have resulted in fragmented 
quotations and a reduction in the reliability of public quotations as 
an accurate indicator of market makers' and specialists' best prices, 
the identical situation that prompted Congress to adopt the NMS 
amendments in 1975. The unavailability of full market maker and 
specialist quotation information prevents investors and their brokers 
from ascertaining the true trading interest for a security, and 
obtaining the best price for market orders, and prevents investors from 
monitoring the efforts of their brokerage firms to obtain best 
execution for their orders.
    The Commission's analysis of the trading activity in these ECNs has 
produced clear evidence of the existence of a two-tiered market in 
which market makers routinely trade at one price with retail customers 
and at better prices with ECN subscribers.220 For example, 
analysis of trading activity in the two most significant ECNs in the 
Nasdaq market, Instinet and SelectNet, reveals that approximately 85% 
of the bids and offers displayed by market makers in Instinet and 90% 
of the bids and offers displayed on SelectNet were at better prices 
than those posted publicly on Nasdaq.221 Furthermore, 
approximately 77% of the trades executed on Instinet and 60% of the 
trades executed on SelectNet occurred at prices between the Nasdaq best 
bid and offer. Market makers participated on at least one side of 
approximately 90% of the trades in these ECNs. The trading activity in 
Instinet, which comprised approximately 17% of trades and 15% of the 
volume in Nasdaq securities, represents a significant portion of the 
overall market for Nasdaq securities.222
---------------------------------------------------------------------------

    \220\ For example, a market maker with a public offer 
constituting the best public offer of 20\3/4\ might offer to sell 
shares in an ECN at 20\5/8\. If the market maker did not change its 
public offer to reflect this improved selling price, public 
customers buying from the market maker would pay the higher price of 
20\3/4\ for the security because they do not have access to the 
market maker's price in the ECN.
    \221\ The Commission's analysis is based on Instinet and 
SelectNet data for the months April through June 1994. See 21(a) 
Report at notes 48-52 and accompanying text and Appendix at notes 
18-28 and accompanying text.
    \222\ More trading volume now occurs on Instinet than on any of 
the organized U.S. stock markets other than the NYSE and Nasdaq. In 
1994, trading volume on Instinet totalled approximately 10.8 billion 
shares with an approximate dollar volume of $282 billion. In 
comparison, Nasdaq traded approximately 74 billion shares, with an 
approximate dollar volume of $1,449 billion. Id. at note 50 and 
accompanying text.
---------------------------------------------------------------------------

    The Commission's recent investigation into various trading 
practices in Nasdaq stocks revealed that the existence of this two-
tiered market facilitated the maintenance of wide spreads on Nasdaq. As 
discussed in the 21(a) Report, Nasdaq market makers engaged in a 
widespread course of conduct that resulted in artificially wide spreads 
in a large percentage of Nasdaq stocks. The maintenance of wide spreads 
was made possible at least in part by the fact that ECNs like Instinet 
and SelectNet did not affect the prices at which market makers traded 
with the general public, thus allowing market makers to attract trading 
interest at prices inside the spread without adjusting their Nasdaq 
quotes. Integrating the better prices market makers quote in ECNs 
should significantly limit the types of uncompetitive practices 
identified in the investigation without limiting the usefulness of 
these systems as efficient alternative mechanisms for negotiating 
transactions.
    The Commission firmly believes that all investors should have an 
opportunity to have their orders filled at the best prices made 
available by market makers. Consistent with Congress's goals for a NMS, 
these opportunities must be made available to all customers, not just 
those customers who, due to size or sophistication, may avail 
themselves of prices in ECNs not currently linked with the public 
quotation system. The vast majority of investors may not be aware of 
the better prices widely disseminated by market makers or specialists 
through ECNs and many do not have the ability to route their orders 
directly or indirectly to such systems. As a result, many customers, 
both institutional and retail, do not always obtain the benefit of the 
better prices entered by a market maker or a specialist into an ECN.
    Brokers frequently use the consolidated quote as the benchmark for 
automated execution of customer orders and for the starting point in 
negotiating execution prices with institutional investors.223 
Consolidated quotations in listed stocks are provided by CQS to 
vendors, who then provide this information to the public. In approving 
the CQS as the mechanism to serve this vital function, the Commission 
stressed that it would expect broker-dealers to take into account 
pricing information made available through the CQS in fulfilling their 
best execution obligations.224 Similarly, for OTC securities, 
Nasdaq disseminates to market makers, vendors, and investors multiple 
market maker quotations, and a ``best'' bid and offer derived from 
these quotations. As broker-dealers and markets have developed 
automated order-routing and order execution systems, they have relied 
on these consolidated quotes in pricing and executing customer orders 
routed through their systems.225 Including the prices entered into 
ECNs by market makers and specialists in the consolidated quotation 
will help broker-dealers using these automated systems to provide their 
customers' orders with improved executions, and will improve 
institutions' ability to ascertain true market prices.
---------------------------------------------------------------------------

    \223\ Some commenters argue that the ECN amendment focuses on 
expanding the availability of these systems to small investors, and 
ignores the fact that small investors already benefit from these 
systems in that institutional subscribers in ECNs primarily 
represent the collective interests of small investors, e.g., through 
mutual funds and 401(k) plans. See, e.g., CALpers Letter; Dillon 
Letter; Instinet Letter; LJR Letter; Northern Trust Letter; SIA 
Letter; STAIC Letter. The objectives of the ECN amendment, however, 
are not limited to improving market transparency and accessibility 
for small investors. Comprehensive and transparent information about 
market conditions is critical to efficient and competitive markets 
for all investors, whether retail or institutional. Indeed, while 
large institutional investors often have access to ECNs, the public 
quotes nevertheless frequently serve as a benchmark for their 
negotiations with market makers. In any event, while retail 
investors directly account for a significantly smaller percentage of 
trading volume than institutional investors, they still account for 
half of the direct equity investment in U.S. markets. NYSE 1995 Fact 
Book at 57. The Commission recognizes that direct retail 
participation provides critical liquidity and therefore limited 
access and transparency to the best prices available undermines the 
efficiency of our markets and jeopardizes public confidence in their 
fairness.
    \224\ See Securities Exchange Act Release No. 15009 (July 28, 
1978), 43 FR 34851 (declaring the CQS Plan temporarily effective); 
Securities Exchange Act Release No. 16518 (Jan. 22, 1980), 45 FR 
6521 (permanently approving the CQS Plan).
    \225\ See discussion of best execution principles, infra section 
III.C.2.
---------------------------------------------------------------------------

    In light of the stated fundamental purposes of the 1975 Amendments 
and clear evidence of a two-tiered market, the Commission believes it 
is imperative to amend the Quote Rule to ensure the public 
dissemination of accurate quotes that represent the best prices that 
market makers and specialists widely disseminate. Thus, the ECN 
amendment is intended to integrate into the public quote the prices of 
market makers and specialists that are now widely disseminated to ECN 
subscribers but are not available to the rest of the market.226
---------------------------------------------------------------------------

    \226\ Several commenters characterize ECNs as ``wholesale'' 
markets, and argue that the ECN rule would require market makers to 
trade with retail customers at wholesale prices. See, e.g., Davis 
Letter; Instinet Letter; LJR Letter; Merrill Letter. The Commission 
notes that market makers are compensated by the spread between their 
bid and offer prices, and nothing in the ECN rule prevents market 
makers from buying at the bid from one customer and selling at the 
offer to another.

---------------------------------------------------------------------------

[[Page 48309]]

    Most commenters support the Commission's goal of improving the 
quality of quotation information made available to the public, although 
many raise questions, discussed below, about the proposal. In 
particular, and as discussed below, some commenters expressed concern 
about the potential impact of the rule on benefits provided to the 
market as a whole by ECNs. Upon review of the comments received, the 
Commission has determined that it is appropriate to adopt the proposed 
ECN amendment. Furthermore, in response to the concerns noted, and to 
facilitate compliance with the ECN amendment, the Commission has 
included the ECN display alternative that permits a market maker or 
specialist to comply with the amendment through an ECN that meets two 
conditions. First, the ECN into which the market maker or specialist 
enters its order must ensure that the best prices market makers and 
specialists have entered therein are communicated to the public 
quotation system. Second, the ECN must provide brokers and dealers 
access to orders entered by market makers and specialists into the ECN, 
so brokers and dealers that do not subscribe to the ECN can trade with 
those orders. The ECN display alternative therefore allows a market 
maker or specialist to comply with the ECN amendment directly by 
changing its quote, or alternatively by using an ECN that meets the 
above two conditions.
    As discussed above, the Commission expects the SROs to work 
expeditiously with ECNs that wish to avail themselves of the ECN 
display alternative to develop rules or understandings of general 
applicability. The Commission is prepared to act as necessary to ensure 
implementation of the ECN display alternative prior to the effective 
date of the Quote Rule.
b. Response to Comments 227
---------------------------------------------------------------------------

    \227\ This section includes a discussion of the principal 
arguments advanced by the commenters. A more detailed discussion of 
the comments is provided in the Summary of Comments.
---------------------------------------------------------------------------

    The Commission solicited comment on whether the proposed amendment 
achieves the goals of deterring fragmented markets and promoting 
improved quotations. The Commission also invited comment on whether 
there are any feasible alternatives to the rule, and on possible 
business or economic justifications for permitting market makers and 
specialists to publish prices in ECNs that differ from their public 
quotations. The Commission requested comment on the competitive effects 
of the proposal on existing ECNs, subscribers, and users.228 In 
addition, the Commission solicited comment on alternatives to the 
proposal that would minimize any negative effects, yet still achieve 
the Commission's goals. The Commission specifically asked whether ECNs 
should, as an alternative, furnish market makers' and specialists' best 
prices to the applicable exchange or association for further 
dissemination, and provide access to those prices through some form of 
linkage.229
---------------------------------------------------------------------------

    \228\ The Commission also specifically solicited comment on 
whether exceptions to the rule would be appropriate, particularly if 
a customer requests that the market maker refrain from publicly 
disseminating its order. The Commission also solicited comment on 
whether market makers should be required to disseminate publicly the 
full size of orders placed in ECNs. The Commission received only 
minimal response to these questions, which is discussed in the 
Summary of Comments.
    \229\ See Proposing Release at 28-29.
---------------------------------------------------------------------------

i. General Comments
    The Commission received numerous comments on the ECN proposal. Many 
commenters support the proposal as an important initiative designed to 
further investor protection by improving publicly available quotation 
information and assuring best execution of customer orders.230 
Some commenters recognize that a number of brokers and dealers have 
adopted the practice of placing superior priced orders in ECNs without 
including these better prices in their public quotes.231 These 
commenters agree that the Commission should be concerned that some 
retail investors may have neither knowledge nor access to the best 
available prices under these circumstances.232 They voice general 
support for the rule, and recommend one or more mechanisms 233 by 
which the Commission could ensure that public quotes contain the best 
prices otherwise widely disseminated by market makers and specialists.
---------------------------------------------------------------------------

    \230\ See, e.g., DOJ Letter; Lehman Letter; Madoff Letter; Amex 
Letter; NASD Letter.
    \231\ See, e.g., Amex Letter; DOJ Letter; Madoff Letter; RPM 
Letter.
    \232\ See, e.g., Letter from Gerri Detweiler, Policy Director, 
National Counsel of Individual Investors, to Jonathan G. Katz, 
Secretary, SEC, dated January 22, 1996 (``NCII Letter''); Goldman 
Sachs Letter; PaineWebber Letter; SIA Letter; Madoff Letter; Lehman 
Letter; DOJ Letter.
    \233\ See discussion of alternative approaches, infra at section 
III.B.2.b.iv.
---------------------------------------------------------------------------

ii. Impact on ECNs, Market Makers and Specialists, and Institutions
    Some commenters express concern that the amendment could negatively 
impact services provided by ECNs and caution the Commission not to 
diminish the benefits provided by ECNs to the market as a whole. Some 
commenters argue that, under the proposal, market makers and 
specialists that use ECNs would lose the anonymity that these 
commenters believe is crucial to successfully execute large trades for 
institutional investors.234 Some commenters anticipate the 
adoption of the ECN amendment prompting a potential decline in the use 
of certain ECNs.235 In addition, some commenters contend that this 
amendment, because of the impact on ECNs and their subscribers, will 
lead to a loss of liquidity in both ECNs and the public markets 
236 and to a decline in the variety of available trading options 
which could be detrimental to all investors.237 Other commenters 
argue that the proposal would effectively double the risk of a 
specialist or market maker that enters orders into an ECN because the 
specialist or market maker could be simultaneously responsible for 
multiple executions based on its disseminated quote as well as its ECN 
order.238 Moreover, at least one commenter argues that quotes, 
bids, offers, and orders have historically had different meanings and 
that the proposal's treatment of priced orders as quotes confuses the 
essence of the terms, thereby resulting in inadvertent anti-competitive 
effects.239 Some commenters also argue that the better prices 
frequently available in ECNs reflect the lower costs of doing business 
in those systems, and therefore, it would be inappropriate to require 
market

[[Page 48310]]

makers and specialists to match their ECN prices in their public 
quotes.240
---------------------------------------------------------------------------

    \234\ See AZX Letter; Instinet Letter; ICI Letter; Investors 
Research Letter; NASD Letter; Ruane Letter; STAIC Letter; Letter 
from Edward G. Shufro, Partner, Shufro, Rose & Ehrman, to Jonathan 
G. Katz, Secretary, SEC (``Shufro Letter''); Sutro Letter.
    \235\ See Goldman Sachs Letter; STA Letter; AZX Letter; Instinet 
Letter; Schwartz and Wood Letter; Ruane Letter.
    \236\ See DOJ Letter; STA Letter; Alex. Brown Letter; Letter 
from Jeffrey L. Davis, Economists Incorporated, to Jonathan G. Katz, 
Secretary, SEC, dated October 25, 1995 (``Davis Letter''); Dillon 
Letter; Instinet Letter; Merrill Letter. (citing the ``deleterious 
effects concerning liquidating inventory and replacing necessary 
capital'' at pp. 7-8); Schwartz and Wood Letter; Letter from Mary 
Kay Wright, Second Vice President and Senior Equity Trader, The 
Northern Trust Company, to Jonathan G. Katz, Secretary, SEC, dated 
February 28, 1996 (``Northern Trust Letter'').
    \237\ See Letter from Anthony R. Gray, Chairman and CIO, STI 
Capital Management, to Jonathan G. Katz, Secretary, SEC, dated 
February 12, 1996 (``STI Capital Letter''); Ruane Letter; DOJ 
Letter; and LJR Letter.
    \238\ See, e.g., Merrill Letter.
    \239\ See Instinet Letter. Instinet also bases much of its 
arguments on its regulatory identification as a broker-dealer. 
Instinet argues that the proposal targets its ECN operations for 
treatment different from other broker-dealers. The Commission notes 
that Instinet (and similar systems) provides to its customers ECN 
services that are significantly different from the services provided 
by other broker-dealers to their customers. Specifically, Instinet, 
without discretion, publicizes subscriber orders and enables other 
subscribers to trade with these orders at their stated price.
    \240\ See, e.g., Dillon Letter; HHG Letter; LJR Letter; Merrill 
Letter; STA Letter; Goldman Sachs Letter.
    There appear to be counter arguments. For example, there is no 
reason to suppose that adverse selection costs--that is, the risks 
of trading with an informed trader--are any lower in ECNs, whose 
subscribers typically can include market makers, other broker-
dealers, institutional money managers, hedge funds, momentum 
traders, and options market makers. Second, because traders can more 
easily mask their identities and thus their trading motives in ECNs 
than in the primary market, informed traders may prefer to trade in 
ECNs. These higher information asymmetries would be expected to lead 
to higher, rather than lower, trading costs. Finally, ECNs often 
impose transactions charges that may not otherwise be incurred by 
dealers trading in the primary market.
    Furthermore, it does not appear that the better prices available 
in ECNs can be explained by differences in the size of orders and 
transactions given that the average order size and trade size in one 
ECN (Instinet) is substantially similar to the average size of 
quotes and trades in the primary market. In any event, the 
Commission generally would not expect larger size orders to receive 
better prices in view of the considerable literature suggesting that 
in equities markets, larger orders tend to get worse prices because 
of the risk of trading with an informed trader. See, e.g., David 
Easley and Maureen O'Hara, 19 J. Fin. Econ. 69, (No. 1, September 
1987).
---------------------------------------------------------------------------

    The Commission agrees with commenters that ECNs provide certain 
valuable benefits to their subscribers. It also recognizes the benefits 
competing systems bring to the market as a whole, particularly systems 
that take advantage of new technologies to offer improved trading 
opportunities. The Commission, therefore, has adopted an alternative 
method of compliance with the ECN requirement discussed in the 
proposing release to reduce the amendment's potential impact on 
existing ECNs and their subscribers, and to maintain incentives and 
opportunities for new ECNs to enter the marketplace.241 The 
Commission continues to believe it is important that the best prices of 
orders entered into these markets by market makers and specialists are 
properly integrated into the public market so that all market 
participants can benefit from the price discovery taking place within 
these markets.
---------------------------------------------------------------------------

    \241\ The Commission believes that although the ECN amendment 
may marginally reduce the incentive of some subscribers to 
participate in an ECN, on the whole the effect on ECNs should not be 
so significant as to affect their viability. Moreover, given the 
availability of the ECN display alternative, which is designed to 
minimize any potentially detrimental effects of the rule on ECNs, 
the Commission believes that the benefits of the amendment to 
investors of publicizing the better prices entered by market makers 
and specialists outweigh the limited likely costs to ECNs. Many of 
the comments received that addressed the ECN proposal raised concern 
about the importance of preserving the anonymity offered by these 
systems. See, e.g., Alex. Brown Letter; AZX Letter; Dillon Letter; 
Estep Letter; ICI Letter; Instinet Letter; NASD Letter.
---------------------------------------------------------------------------

    In its comment letter, the NASD stated its view that the proposal 
could discourage market makers' use of ECNs because a market maker 
placing an order in an ECN at a better price would have to 
simultaneously change its quote, thereby telegraphing its interest. In 
proposing a solution to this situation, the NASD specifically referred 
to the ECN alternative noting ``* * * this problem can be addressed 
without discouraging market maker use of ECNs through the approach 
suggested by the Commission as a possible alternative, i.e., by 
reflecting the better ECN prices in the inside market display, rather 
than in individual quotes.'' 242
---------------------------------------------------------------------------

    \242\ NASD Letter at 14.
---------------------------------------------------------------------------

    In response to the concerns raised by the NASD and other 
commenters, the ECN display alternative is designed to preserve the 
benefits associated with the anonymity that some ECNs currently offer 
to subscribing market makers and specialists and their 
customers.243 This alternative will ensure that the best prices of 
market makers and specialists are publicly disseminated and that non-
ECN-subscribing brokers and dealers can trade with the ECN orders 
represented by those prices. Under the display alternative, the best 
prices and sizes of orders entered into an ECN by specialists and 
market makers would be publicly disseminated while the specialists and 
market makers themselves would remain anonymous. This alternative not 
only preserves anonymity, but also eliminates the risk that a market 
maker or specialist could be exposed to multiple executions at the ECN 
price.244
---------------------------------------------------------------------------

    \243\ The Commission recognizes that in certain securities, 
specific market makers or specialists may be viewed as price leaders 
for those securities. Therefore, if the market knows that one of 
those firms has changed its quote, other market makers or 
specialists are likely to follow that price change and frustrate the 
first's firms ability to obtain an execution at the improved price. 
The ability to place an anonymous order in an ECN allows the firm to 
change its price without triggering corresponding price changes from 
other market makers or specialists and thereby increases its 
potential to obtain an execution at the improved price.
    \244\ Certain commenters fear that, as originally proposed, the 
amendment would have an adverse impact on institutional investors 
which currently subscribe to ECNs. These commenters appeared to 
believe that the ECN amendment would seriously harm ECNs, and thus 
harm institutional users. See, e.g., ICI Letter; Ruane Letter. The 
Commission does not believe that the amendments will significantly 
interfere with the operations of ECNs. Moreover, the Commission 
believes that as adopted, particularly with the addition of the ECN 
display alternative, ECNs will continue to be able to provide 
services to institutional investors of similar value to those they 
provide today. The Commission also believes that the benefits of the 
amendments, including increased market maker competition and 
decreased fragmentation, will flow to all investors, institutional 
as well as retail. See 21(a) Report.
---------------------------------------------------------------------------

    The ECN amendment, as proposed, sought to minimize the potential 
impact on market makers, specialists, and ECNs by requiring a market 
maker or specialist to display in its public quote only the size 
required by its exchange or association, rather than the actual size of 
any order the firm places into an ECN. This part of the amendment is 
being adopted as proposed for orders for the accounts of market makers 
and specialists. However, for customers' orders entered into an ECN by 
a market maker or specialist that are smaller than the quote size 
required by the market maker's or specialist's exchange or association, 
the Commission has amended the rule to allow market makers and 
specialists to display only the customer's order size.245 The 
requirement to display no more than the required size for market 
makers' and specialists' own orders should reduce any disincentives to 
use ECNs that could otherwise result from the ECN amendment, and 
responds to the concern that disclosure of the full size of the order 
in the market maker's or specialist's quote could impede its ability to 
execute the order.246 Moreover, permitting the display of customer 
orders of less than the minimum quote size should reduce the potential 
burden on a specialist or market maker of having to publish a public 
quote for more than the customer's order size when the customer's order 
is for less than the minimum quotation size required by the 
specialist's or market maker's exchange or association.
---------------------------------------------------------------------------

    \245\ As discussed supra in footnote 144, SROs may wish to allow 
market makers or specialists to quote in sizes smaller than the 
minimum quotation increment when the quote represents a customer 
limit order.
    \246\ The Commission received several comments that support this 
aspect of the proposal. See, e.g., Lehman Letter; and Smith Barney 
Letter. These commenters believe that display of full size in a 
market maker's quote could impair the quality of an execution 
obtained for a customer because the display in the public quotation 
system is broader than the display in the ECN.
---------------------------------------------------------------------------

    Market makers and specialists who avail themselves of the ECN 
display alternative will be required to furnish to the public quotation 
system the full size of the best buy and sell orders they enter into 
the ECN. The Commission believes that the display of full size by the 
ECN will help inform the public market of the true trading interest 
entered by specialists and market makers, without impeding the 
execution of these orders by disclosing the identity of the specialist 
or market maker placing the order. Under the ECN display alternative, 
the market maker or specialist will be able to continue to represent 
the order on an anonymous basis both in the ECN and in the public

[[Page 48311]]

quote, substantially reducing any negative impact of the amendment on 
ECN users.
    Where the order entered by the market maker or specialist is on 
behalf of a customer, the display of full size under the ECN display 
alternative is consistent with the requirement under the Display Rule, 
which requires market makers and specialists to display the full size 
of their customer limit orders. Therefore, the full size of customer 
limit orders will be displayed whether the specialist or market maker 
displays the order itself or enters the order into an ECN complying 
with the ECN display alternative.247
---------------------------------------------------------------------------

    \247\ The Commission notes that the exceptions under the Display 
Rule for limit orders of block size and for limit orders that a 
customer has asked not to be displayed will not apply to customer 
limit orders entered by a market maker or specialist into an ECN. If 
entered into an ECN, these orders must either be reflected in the 
market maker's or specialist's own quote or displayed via the ECN 
alternative. As discussed previously, the Commission believes that a 
customer should have discretion to permit a market maker or 
specialist to handle its limit order without public display, and 
large limit orders should not be required to be displayed unless the 
customer makes a request. However, the Commission does not believe 
these orders should be withheld from public display if they are 
being displayed in an ECN. The Commission believes that if these 
orders, when handled by market makers or specialists, are displayed 
widely through an ECN to the ECN's subscribers, then they should 
also be displayed to the public generally. Moreover, limiting 
display to only one market would be inconsistent with Congress's 
goal for a NMS in which trading interest in disparate markets would 
be consolidated and publicly disseminated.
---------------------------------------------------------------------------

    The Commission believes that the concerns expressed by some 
commenters about a potential loss of liquidity resulting from the 
proposal have been substantially addressed by the alternative adopted 
today. Because this alternative preserves the anonymity some ECNs 
afford to the users of their systems, the proposal maintains incentives 
for subscribers to continue participating in such systems. In fact, a 
market maker or specialist, who presumably wants its orders executed at 
prices it is widely displaying through the ECN, should benefit from 
attracting greater trading interest by having the prices of its orders 
displayed to the entire market.
    Finally, under the proposal, priced orders of institutions and 
other non-market makers entered directly into ECNs would not be 
required to be reflected in the public quote. Some commenters 
criticized the proposal because it did not require the inclusion of all 
better priced orders in the public quote. This result, however, is 
consistent with existing quotation principles. Institutional bids, 
offers, and orders handled independent of a market maker historically 
have been outside the scope of the Quote Rule, and the Commission's 
proposal was not intended to expand the scope of the Quote Rule in this 
respect.248 Furthermore, the Commission believes that, although 
institutional investors' direct orders in ECNs provide valuable 
liquidity, the amendments will substantially strengthen the public 
quotation system by publishing orders entered by market makers and 
specialists without creating new requirements for orders not controlled 
by market makers or specialists.249 Nevertheless, the Commission 
will continue to monitor closely issues involving the display of prices 
published by institutions in light of the Quote Rule and its 
objectives.
---------------------------------------------------------------------------

    \248\ The fact that ECNs will continue to contain institutional 
investors' orders priced better than the public quotes will provide 
another incentive for market participants to continue to participate 
in those systems.
    \249\ The Commission notes that, as described in the 
Commission's 21(a) Report, institutions trading with dealers or 
others accounted for less than 20% of trades in one ECN (Instinet). 
See Appendix to the 21(a) Report at A-11.
---------------------------------------------------------------------------

iii. Technology and Innovation
    Some commenters predict that the proposal may have a chilling 
effect on technological innovation, primarily because the proposal 
applies only to ECNs and not to all available communication 
technologies that may be used for disseminating interest to buy and 
sell a particular number of shares at a specified price.250 Some 
commenters argue that the proposal is anti-competitive and otherwise 
antithetical to the purposes of the Exchange Act because it will deter 
future technological advances in automated trading environments by 
favoring less automated trading methods (e.g., telephone 
transactions).251
---------------------------------------------------------------------------

    \250\ See DOJ Letter; SIA Letter; Instinet Letter; Schwab 
Letter; STI Capital Letter; Sutro Letter.
    \251\ See, e.g., Instinet letter.
---------------------------------------------------------------------------

    The Commission is cognizant of the importance of the continued 
development of innovative trading systems and services. New 
technologies have expanded the ways in which investors' buying and 
selling interest can be brought together and have fostered additional 
competition in the securities markets. The Commission believes that 
this competition should be encouraged. Nonetheless, to promote 
competition, efficiency, and transparency in the securities markets, 
and insure the integrity of publicly available information, the 
Commission believes it is appropriate to set minimum standards that 
apply to the entry of the functional equivalent of quotations by market 
makers and specialists in trading systems.252 Indeed, consistent 
with the Commission's experience with previous NMS initiatives,253 
these minimum standards will permit and foster the development of new 
technologies that improve the public availability of trading 
information, while discouraging practices that are inconsistent with 
the purposes of the 1975 Amendments. The Commission believes that the 
Quote Rule as amended will not unduly diminish the beneficial services 
provided by existing ECNs, nor will it stifle the development of new 
trading technologies or new ECNs.
---------------------------------------------------------------------------

    \252\ The Commission notes that the focus of the proposal is not 
on any particular system or systems but, rather, on the types of 
orders that are the fundamental equivalent of quotations, and the 
fragmented market that results when the prices of these orders are 
not integrated into publicly available quotations.
    \253\ See Simon and Colby, supra note 58. The Commission also 
notes the growth in technologies over the past twenty years, 
including broker-dealer and exchange automated execution systems, 
that clearly rely on, and were facilitated by, successful operation 
of NMS and joint industry initiatives such as the Quote Rule, CTA, 
and the ITS Plan.
---------------------------------------------------------------------------

iv. Alternative Approaches
    In the Proposing Release, the Commission suggested alternatives to 
the proposal, and solicited comment on these alternatives. The 
Commission also invited commenters to suggest possible alternatives. 
The Commission specifically asked whether it should require ECNs to 
furnish prices to the applicable exchange or association for public 
dissemination and to provide some access, such as a linkage, to the 
prices in the ECN.254 A number of commenters supported this 
approach.
---------------------------------------------------------------------------

    \254\ See Proposing Release and e.g., NASD Letter.
---------------------------------------------------------------------------

    The NASD recommended, as an alternative to the proposed rule, that 
the better ECN price be reflected in the inside market, rather than in 
individual quotes. Under the alternative described by the NASD, an ECN 
would report its best market maker or specialist inside prices to the 
SRO that is the primary market in the security. The NASD also 
recognizes that more assured access to orders in the ECNs would be 
necessary under this option.255 Similarly, one commenter agreed 
that the inside market available to the public should reflect the best 
bid and offer prices whether in a market maker's quote or in a market 
maker's order on an ECN. The Commenter suggested that this could be 
accomplished by requiring quotations in ECNs to be made part of the 
public quotation and by separately identifying the ECN into which the 
order is entered rather than the market maker that

[[Page 48312]]

placed the order.256 Finally, certain commenters state that 
expanding ITS to include orders entered into ECNs would be a better 
alternative to the proposal.257
---------------------------------------------------------------------------

    \255\ See NASD Letter.
    \256\ Morgan Stanley Letter. See also, PaineWebber Letter 
(recommending that priced orders in ECNs be included in the NBBO).
    \257\ See, e.g., STAIC Letter; ICI Letter.
---------------------------------------------------------------------------

    The Commission believes that the ECN display alternative adopted 
today is consistent with these suggested alternatives and will minimize 
many of the asserted negative effects of the rule. The adopted 
provision provides an alternative to an ECN that disseminates 
specialists' and market makers' best prices to the public quotation 
system. Thus, the amendment enables a market maker or specialist to 
comply with the Quote Rule either directly by sending to its exchange 
or association the prices of orders it places into ECNs that improve 
the market maker's or specialist's public quote, or indirectly by using 
an ECN that transmits the best prices entered therein by market makers 
and specialists for publication in the public quotation system.
    The ECN display alternative is consistent with the alternative 
recommended by the NASD because the adopted provision enables the 
specialists' or market makers' best prices in ECNs to be consolidated 
with the exchange's or association's best prices for dissemination 
within the consolidated quotes. In addition, the adopted amendment 
requires the ECNs to provide an equivalent means of access to those 
best prices.
    The Commission recognizes that this alternative may reduce the 
content of information that is publicly available because under the ECN 
display alternative, the identity of the market maker or specialist 
that entered the better priced order in the ECN will be 
withheld.258 The Commission believes this result is justified 
because the inside prices and full sizes of orders entered by market 
makers and specialists will be in the public quotation system to inform 
the entire market of these prices and ECNs will provide equivalent 
access to those prices. Moreover, the Commission believes the benefits 
of facilitating the use of ECNs, by permitting the continued anonymity 
of market makers and specialists, more than offset the reduced 
information available on the identity of a particular market maker or 
specialist.
---------------------------------------------------------------------------

    \258\ The Commission also notes that under the alternative, a 
specialist or market maker that puts an order into an ECN that is 
priced better than that specialist's or market maker's public quote, 
but is not the best priced quote from any specialist or market maker 
in the ECN, will not have its better priced order reflected in the 
public quote. The prices will be displayed, however, if the better 
price in the ECN is executed or withdrawn and the lower specialist's 
or market maker's priced quote then becomes the best priced quote.
---------------------------------------------------------------------------

    As an alternative to the ECN amendment, certain commenters 
suggested that enforcement of best execution principles would be 
sufficient to protect public investors.259 As discussed in more 
detail in section III.C.2., the Commission does not believe this is a 
practical alternative because ECNs do not provide broker-dealers with 
automated links and thus may not be reasonably available for the 
handling of retail orders on an automated basis. Furthermore, investors 
and their brokers cannot efficiently ascertain if they have received 
the best prices for their orders if publicly available prices do not 
reflect the best prices at which specialists and market makers are 
willing to trade. Under these circumstances, providing customers the 
best executions available can be achieved most effectively by ensuring 
that the consolidated quotes systematically include the better prices 
that market makers and specialists have entered into an ECN.
---------------------------------------------------------------------------

    \259\ See, e.g., Instinet Letter.
---------------------------------------------------------------------------

    Finally, certain commenters argue that, as an alternative to 
adopting the ECN proposal, the Commission should defer any action until 
further study is completed on the use of ECNs because the Proposing 
Release provides insufficient data regarding whether customers 
currently get the best available price, or market maker and specialist 
use of ECNs results in harm to customers.260 The Commission has 
determined to go forward with the amendments now because of compelling 
concerns presented by two-tiered markets. Many of the commenters to the 
proposed rules also recognize these concerns. Furthermore, as part of 
its recently concluded Nasdaq investigation, the Commission has 
conducted an extensive analysis since the proposals were published that 
supports the Commission's proposal and clearly evidences the existence 
of a ``two-tiered'' market in which customer orders are executed at 
publicly available prices inferior to prices contemporaneously 
available in existing ECNs.261 Moreover, Commission data shows 
that the pricing opportunities available in at least two ECNs (Instinet 
and SelectNet) are not limited to block trades, but extend to smaller 
orders executed in the system.262 The Commission believes, 
therefore, that further study is not necessary to address a structural 
disparity in market information that disadvantages investors who lack 
access to ECNs.
---------------------------------------------------------------------------

    \260\ See, e.g., Instinet Letter, asserting that the Commission 
should obtain and study data on this matter and that, absent such 
data, adoption of the proposed amendment is unwarranted.
    \261\ As discussed previously, the Commission believes the data 
it has reviewed supports the need for prompt adoption of the ECN 
amendment to the Quote Rule. See supra notes 222 and 223, and 
accompanying text. Given the strong evidence that investors would 
benefit from public dissemination of the hidden prices that are 
broadly disseminated to subscribers in these systems, the Commission 
believes that it is appropriate to adopt the amendments to the Quote 
Rule.
    \262\ As noted above, the Appendix to the 21(a) Report states 
that average trade size for Nasdaq NMS securities on Instinet was 
approximately 1,600 shares for the period studied, while the average 
trade size generally in the securities was approximately 1,900 
shares. See Appendix to the 21(a) Report at A-8.
---------------------------------------------------------------------------

c. Operation of the Rule Amendment
i. Definition of the Term ``Electronic Communications Network''
    The proposed amendment did not specifically define the term 
``electronic communications network.'' The Commission did state, 
however, that priced orders that market makers and specialists enter 
into certain ECNs are bids and offers for the purposes of the Quote 
Rule.263 The proposal applied to systems that widely disseminate 
priced orders to third parties and permit such orders to be executed 
against in whole or in part. The Commission further explained that the 
term ``electronic communications network'' was intended to include 
continuous auction trading systems, but was not intended to include 
crossing systems or broker-dealer internal order routing systems.
---------------------------------------------------------------------------

    \263\ As a result, relevant provisions of the Quote Rule, such 
as the obligation on exchanges and associations to disseminate 
quotes, and the firmness requirement placed on a market maker or 
specialist who furnishes the quotes, become operative with respect 
to a security when a market maker or specialist enters an order for 
that security into an ECN. See section III.B.2.c.v., infra.
---------------------------------------------------------------------------

    Several commenters suggested the need for a definition of the term 
``electronic communications network.'' 264 The Commission agrees 
that it is appropriate to define the term in the Quote Rule and has 
decided to adopt a definition that reflects the fundamental 
characteristics of an ECN as discussed in the Proposing Release.
---------------------------------------------------------------------------

    \264\ See Goldman Sachs Letter; Instinet Letter; Schwab Letter. 
In addition, one commenter argues that ECNs should include SRO stock 
crossing systems and all non-market-maker broker-dealers. NYSE 
Letter.
---------------------------------------------------------------------------

    As discussed earlier, the objective of the ECN amendment is to 
incorporate within the consolidated public quote firm prices quoted by 
market makers and specialists in securities markets that widely 
disseminate those prices but are not registered as exchanges or 
associations and thus are not integrated

[[Page 48313]]

into the NMS. Therefore, the Commission has defined the term ``ECN'' as 
an electronic system that widely disseminates to third parties 265 
orders entered therein by a market maker or specialist, and permits 
such orders to be executed against in whole or in part. The definition 
specifically excludes any system that crosses multiple orders at one or 
more specified times at a single price set by the system and that does 
not allow orders to be crossed or executed against directly by 
participants outside of such times. This exclusion is consistent with 
statements made in the Proposing Release that it was not the 
Commission's intention to cover crossing systems because these systems 
do not communicate to multiple market participants the prices at which 
system subscribers are willing to trade. Rather, the excluded crossing 
systems themselves establish an internal trading price for subscribers 
on an episodic basis.266
---------------------------------------------------------------------------

    \265\ The Commission intends the term ``third parties'' to refer 
to subscribers to the ECN, other than the ECN and the market maker 
or specialist that is entering its priced order into the ECN. The 
ECN also may disseminate to others, including non-subscribers.
    \266\ The Commission notes that broker-dealers that publish 
quotes through a vendor are already covered by the rule.
---------------------------------------------------------------------------

    The ECN definition also excludes any system operated by, or on 
behalf of, a market maker or specialist that executes customer orders 
primarily for its own account as principal, other than as riskless 
principal. This exclusion is intended to ensure that, as discussed in 
the Proposing Release, internal broker-dealer order routing systems in 
which the market maker trades primarily with customer orders on a 
principal basis are not ECNs within the scope of the amendment. The 
exclusion would not except from the ECN definition systems that involve 
multiple market makers or specialists competing as principal in a 
security or that cross multiple market maker and customer orders.
    Furthermore, the Commission believes the definition should be read 
broadly to include systems that match orders internally and deliver the 
matched order to some other market for execution. Thus, the term 
``permits such orders to be executed against'' should not be read to 
exclude systems where a narrow technical reading of ``executed'' is the 
only reason that the system would not fall within the ECN definition. 
For example, if a system puts buy orders and sell orders together for 
execution, completes all necessary elements of the trade, and then 
sends the matched pair to an exchange or association merely to print 
the terms of the trade on the Consolidated Tape, the system would be an 
ECN.
ii. ``Priced Orders'' in ECNs
    Under this definition, the Commission intends to include in the 
public quotation system firm prices for securities entered by market 
makers or specialists, whether such firm prices are labeled as 
``quotes'' or ``orders.'' The Commission believes that priced orders 
entered by market makers or specialists into ECNs where the orders are 
widely disseminated and executable are the functional equivalent of 
market maker or specialist quotations, and like quotations, play a key 
role in the price discovery process. The Commission thus believes that 
these ``quotation-equivalents'' should be made part of the public 
quote.
    Although some commenters argue that priced orders entered into ECNs 
are more closely parallel to prices communicated over the telephone to 
other market makers than to market quotes, the Commission recognizes a 
fundamental distinction between limited communication of price in 
bilateral telephone negotiations and broad exposure of firm prices to 
multiple participants in a market.267 Accordingly, prices 
communicated by telephone are excluded because these prices generally 
are not widely disseminated to other parties for execution. The rule 
also would not cover indications of interest that do not constitute 
firm prices.
---------------------------------------------------------------------------

    \267\ The Commission recognizes that market makers and 
specialists may be willing to trade with certain customers at 
better, negotiated prices, such as when market makers negotiate with 
customers over the telephone. In contrast, however, the prices 
quoted by market makers and specialists in ECNs are widely 
disseminated to market participants. In adopting the ECN amendment, 
the Commission is reaffirming the NMS principle that prices 
advertised in one market must be integrated into the national 
market--that is, the consolidated public quote.
---------------------------------------------------------------------------

    In this connection, the Commission intended the term ``priced 
order,'' which is deemed under the ECN amendment to be a bid or offer, 
to encompass commitments to buy or sell a security at a particular 
price for a particular number of shares. The Commission also does not 
intend the term ``priced orders'' to include interest to buy or sell a 
security where price or the number of shares is not specified to system 
subscribers, unless the price or size is otherwise understood as part 
of the system's operation.268 The ECN amendment would, however, 
include priced orders entered into an ECN by a market maker or 
specialist that are visible only to some system subscribers if these 
orders can be executed agai
FR Doc. 96-23210 Order Execution Obligations
nst in the ECN. The ECN amendment is 
intended to require the public display of priced orders entered into 
ECNs by market makers and specialists where these priced orders are 
similar to quotations. Accordingly, the Commission does not intend the 
ECN amendment to apply to a priced order that is entered into an ECN by 
a market maker or specialist merely in order to execute against an 
existing order visible in the ECN, and not entered to elicit other 
buying or selling interest. If, however, the order entered by the 
market maker or specialist does not in fact execute immediately in full 
against an existing order but rather is itself disseminated as an open 
order in the ECN, the market maker or specialist must comply with the 
requirements of the ECN amendment with respect to the order.
---------------------------------------------------------------------------

    \268\ The definition of an ECN specifically excludes any system 
that crosses multiple orders at one or more specified times at a 
single price set by the ECN (by algorithm or by any derivative 
pricing mechanism) and does not allow orders to be crossed or 
executed against directly by subscribers outside of such times. See 
11Ac1-1(a)(8).
---------------------------------------------------------------------------

    In order to ensure that customers consistently receive the benefit 
of better prices entered into ECNs, a market maker or specialist 
entering an all-or-none or minimum size order for its own account into 
an ECN would be required to include this price in its public quote, or 
disseminate the price via the ECN display alternative, and thereby 
publicly display the order for the full number of shares for execution 
in whole or in part. Although the execution of an all-or-none order is 
typically conditioned on execution of the entire size of the order, the 
Commission believes that allowing market makers to avoid public display 
of an unconditional quote when using this type of order could seriously 
undermine the purposes of the rule.269 The rule will permit, 
however, a market maker or specialist to enter an all-or-none customer 
order into an ECN without requiring public display of the quote for 
that order where the customer specifically requests that the order be 
executed on an all-or-none basis. This latter provision accommodates 
the desire of some customers to trade only at a specific size 
associated with a specific price.
---------------------------------------------------------------------------

    \269\ All-or-none and minimum size orders are rarely used by 
market makers and specialists in ECNs and are prohibited from being 
included in the public quotes by the registered exchanges and 
Nasdaq.
---------------------------------------------------------------------------

iii. ECN Display Alternative
    Pursuant to the amendment as adopted, a priced order entered by a 
market maker or specialist into an ECN that widely disseminates the 
order is deemed to be a bid or offer for the

[[Page 48314]]

purposes of the market maker's or specialist's quotation reporting 
obligations under the Quote Rule. As a result, specialists and market 
makers are required to include such orders in the bids and offers they 
communicate to their exchange or association for inclusion in the 
published quotations made available by the exchange or 
association.270
---------------------------------------------------------------------------

    \270\ An OTC market maker that places priced orders for 
execution into any ECN will in effect be making an election to 
communicate quotations to its association bids, offers and quotation 
sizes in the security. See 11Ac1-1(a)(25)(ii)(B).
---------------------------------------------------------------------------

    As discussed above, in response to the concerns of some commenters, 
the adopted amendment includes an alternative to the specialist or 
market maker itself revising its public quotation to reflect its better 
priced order entered in an ECN. This alternative allows the ECN to act 
as an intermediary in communicating to the public quotation system the 
best price and size of orders for each security that have been entered 
into the ECN by a specialist or market maker. To communicate the 
quotations publicly, the ECN must submit the best price entered by a 
specialist or market maker to an exchange or association, or to a 
securities information processor acting on behalf of one or more 
exchanges or associations.
    The alternative reduces the impact of the amendment on specialists 
and market makers because they have a choice regarding how to comply 
with their obligation. This alternative also reduces the impact of the 
amendment on ECNs by offering these systems an opportunity to provide 
additional services to their subscribers, and creating an opportunity 
to generate additional order flow from non-subscribers. At the same 
time, more accurate prices are provided through public quotation 
systems than are currently available.
    Under this alternative, consistent with the goals of the initial 
proposal, the ECN must comply with two conditions. First, the ECN must 
provide the best prices and sizes that market makers or specialists 
have entered in the ECN to the public quotation system for inclusion in 
the consolidated quotation. The market maker or specialist responsible 
for the price does not have to be identified.271 The ECN must, 
however, at a minimum, publicly identify itself as the originating 
system for these prices. Accordingly, if a market maker puts an order 
that improves the NBBO into an ECN and the ECN disseminates that price 
to the public quotation system, the disseminated price must either be 
identified as originating from the market maker or from the ECN.
---------------------------------------------------------------------------

    \271\ An ECN that does not offer the option of anonymity to its 
subscribers could choose to include the identity of the market maker 
or specialist with the prices furnished to the SRO for public 
dissemination. As discussed below, the ECN also must provide access 
to these prices.
---------------------------------------------------------------------------

    Second, the ECN must provide non-subscriber brokers and dealers 
with a means of access to those prices entered in the ECN by market 
makers and specialists. This access must be equivalent to the access 
that would have been available for the relevant security if these 
prices had been published in the market makers' or specialists' 
quotation.272 The extent and form of this access will depend on 
the form(s) of access available in the market to which the ECN supplies 
the bids and offers for public dissemination.273
---------------------------------------------------------------------------

    \272\ For access to be ``equivalent'', the ECN must enable non-
subscribing broker-dealers to execute against the ECN's published 
best price to the same extent as would be possible had that best 
price been reflected in the public quote of a specialist or market 
maker. The ECN, however, may impose charges for access to its 
system, similar to the communications and systems charges imposed by 
various markets, if not structured to discourage access by non-
subscriber broker-dealers.
    \273\ The extent and form of the access will not necessarily be 
the same as the access available in the market to which the 
specialist or market maker would otherwise supply its bid and 
offers.
---------------------------------------------------------------------------

    For example, market makers in Nasdaq NMS and SmallCap securities 
typically can be reached through the telephone and through the NASD's 
Small Order Execution System. Therefore, an ECN that chooses, pursuant 
to the alternative, to act as an intermediary for its market maker and 
specialist subscribers for Nasdaq NMS and Smallcap securities would 
have to be prepared to receive and execute telephone orders from 
broker-dealers against those market makers' and specialists' orders 
entered in the ECN. The ECN will have to execute these orders promptly 
at the prices the market makers and specialists have entered into the 
ECN. In addition, because a market maker with the best price in a 
Nasdaq NMS security is subject to SOES executions, this equivalent 
access condition would require the ECN to provide broker-dealers who 
use SOES with equivalent automated access to the best priced market 
maker orders in the ECN. This could be accomplished either through an 
electronic linkage to SOES or by other means agreed upon with the NASD. 
For example, the ECN could supply the NASD with an identifier for the 
market maker who entered the best priced order, which the NASD could 
use in assigning SOES executions to that market maker.274
---------------------------------------------------------------------------

    \274\ As discussed supra section II., the NASD has proposed a 
new facility, NAqcess, which, as part of its proposed services, 
would widely disseminate priced orders for execution in whole or in 
part. Supra note 45. As proposed, Naqcess would publish its best 
prices in the Nasdaq quotation system stream and would be accessible 
to all NASD members for order entry and execution against those 
orders. Thus, NAqcess, as proposed, would appear to make prices 
entered by market makers into NAqcess available, and provide 
equivalent access under the alternative. Therefore, a market maker 
that entered its best priced order into NAqcess would comply with 
the requirements of the ECN amendment without reflecting the order 
in the market maker's own quote. Moreover, a market maker that 
entered an order into another ECN at a price better than its quote 
could satisfy the requirements of the ECN amendment by entering an 
order reflecting this price into NAqcess, even if the other ECN does 
not directly provide the price to the public quotation system, 
because this use of NAqcess, as proposed, would meet the 
requirements of the amendment. Similarly, an ECN availing itself of 
the ECN display alternative could provide prices directly to 
NAqcess. The ECN and the NASD also could develop mechanisms to 
ensure public anonymity of market makers that use ECNs, while 
providing to the NASD the identity of the market makers that are at 
the inside quote solely for the purpose of direct order-routing 
between NAqcess and the market maker.
---------------------------------------------------------------------------

    Similarly, in exchange-listed securities, the degree of access that 
the ECN must offer would depend on the current access that the market 
receiving the information from the ECN offers to broker-dealers in the 
relevant type of security. If the ECN communicates prices for exchange-
listed securities to an exchange, the specialist or market maker orders 
in the ECN must be accessible to broker-dealers in the same manner as 
quotes on that exchange. This access would include any automated 
execution features offered to broker-dealers by the exchange. The ECN 
must provide to the exchange, or to the exchange specialist in each 
security, access to the market maker or specialist orders in the ECN. 
Such access must provide broker-dealers with the ability to enter and 
obtain executions for their orders at least as promptly as that 
exchange offers to its own members through its order-routing and 
execution systems. Because the ITS Plan applies to exchange-trading of 
listed securities, orders received from other markets through ITS must 
have the same ability to trade with ECN orders whose prices are 
displayed through the exchange as they have with the exchange's own 
quotations. For instance, if the exchange specialist typically receives 
incoming ITS commitments and executes them manually, the ECN must at a 
minimum enable the incoming ITS commitment to be manually entered into 
the ECN for execution.
    If the ECN instead provides orders in exchange-listed securities to 
the NASD for inclusion in the public quotation system, the orders must 
be as accessible to broker-dealers as the quotes published by third 
market makers in

[[Page 48315]]

exchange-listed securities. At a minimum, these prices must be included 
as part of the third market quotation display and identified as 
originating from a named market maker or from a named ECN. For non-Rule 
19c-3 securities, broker-dealers must be able to contact the ECN by 
telephone and have an order promptly entered into the ECN for 
execution. For Rule 19c-3 securities, the ECN also must be accessible 
through the ITS/CAES linkage, operated by the NASD, in the same manner 
as other third market maker quotes in those securities.275
---------------------------------------------------------------------------

    \275\ As discussed below concerning expansion of the ITS/CAES 
linkage, currently non-Rule 19c-3 securities may not be traded via 
the ITS/CAES linkage.
---------------------------------------------------------------------------

    Under the ECN display alternative, the ECN must furnish to an 
exchange or association the full size associated with the best priced 
orders placed in the ECN by market makers and specialists to buy and to 
sell a security. This full size requirement under the alternative is 
intended to give the public information about the depth of the market 
at the ECN prices, while maintaining the anonymity of market makers and 
specialists. For example, if an ECN is furnishing quotation information 
to Nasdaq under this alternative, and a market maker enters a 4,000-
share order into the ECN at a price that is better than other market 
maker or specialist prices for that security in the ECN, the ECN will 
be required to provide Nasdaq that price and size of 4,000 shares as a 
quotation for public dissemination. If 2,500 shares of this order is 
executed, the ECN must display the remaining 1,500 shares. If two 
market makers enter 4,000-share orders for a security at the same 
price, which is the best price in the ECN for that security, the ECN is 
required to show all 8,000 shares publicly. In contrast, if a market 
maker enters a 100-share order for a Nasdaq security at the best price 
in the ECN for that security, the alternative requires the ECN to 
furnish the price for only 100 shares, even though NASD rules require 
Nasdaq market makers to display no less than 1000, 500, or 200 shares 
in Nasdaq, depending on the characteristics of that security.
    The Commission recognizes that the means of providing equivalent 
access will vary for different markets, and that ECNs operating under 
the ECN display alternative that currently do not provide access to 
their systems to non-subscribers will have to develop methods to 
provide this access. Meeting this requirement may be achieved in a 
variety of ways, including a linkage between ECNs and one or more of 
the SROs. The Commission believes an SRO that accepts the prices 
provided by an ECN for publication should be authorized to impose 
reasonable rules related to the public dissemination of those prices 
upon market makers and specialists who avail themselves of this 
alternative. The rules an SRO imposes in this regard, however, may not 
establish standards for the dissemination of these prices that are more 
burdensome for market makers and specialists using ECNs than the SRO 
rules that apply to quotations delivered directly to the SRO by 
specialists and market makers.
    The Commission looks forward to working closely with all market 
participants to effect the necessary market developments to ensure that 
this alternative method of compliance with the Quote Rule is made 
possible. In order to ensure prompt implementation of the necessary 
changes before the effective date of the rule amendments, the 
Commission requests each SRO, individually or jointly as signatories to 
the CQS Plan, to notify the Commission in writing by October 28, 1996 
regarding its willingness and its plan to afford ECNs the opportunity 
to communicate, for inclusion in the public quotation system, the 
prices of market makers and specialists.
    In order to implement the changes to the Quote Rule under new 
subsection (c)(5), the prices sent to an ECN by market makers and 
specialists will have to be displayed in the public quotations 
disseminated by SROs, and order routing or access linkages will have to 
be in place. After hearing from the SROs, the Commission will determine 
whether it will be necessary to use its authority under Section 
11A(a)(3)(B) of the Exchange Act to require the SROs to act jointly to 
provide means to accomplish these objectives.
iv. Minimum Price Variations
    In the Proposing Release the Commission recognized that there may 
be different minimum price variations in any given security between the 
SROs providing a market for the security and ECNs through which the 
security is also traded. Currently most exchange-listed securities tend 
to be quoted and traded with a minimum price variation of \1/8\ point 
or \1/16\ point.276 Nasdaq securities can be publicly reported in 
variations as low as \1/64\, and can be quoted in minimum variations as 
low as \1/32\, depending on the price at which the security 
trades.277 Some ECNs allow priced orders in variations as low as 
\1/256\; other systems provide for orders priced in decimals as small 
as one cent.
---------------------------------------------------------------------------

    \276\ NYSE Rule 62 provides that bids or offers in stocks 
selling above one dollar per share may not be made at a variation of 
less than one-eighth of a dollar or twelve and a half cents; Amex 
Rule 127 allows for one-sixteenth spreads for stocks priced under 
ten dollars, and one-eighth spreads for stocks priced ten dollars 
and over.
    \277\ The NASD does not have a minimum variation policy for 
Nasdaq stocks. Nasdaq, however, is designed to process quotes and 
trades in particular minimum variations.
---------------------------------------------------------------------------

    Most commenters did not address the issue of ECN minimum price 
variations. Some commenters that did address the issue, however, 
recommended that the ECN quote be rounded for public dissemination 
either downward from or upward to better prices in increments of \1/16\ 
or smaller.278 Other commenters recommended rounding in 
decimals,279 while still others strongly opposed the use of 
decimals.280 One commenter asserted that non-standard increments 
(i.e., increments not approved by the primary market for the relevant 
security) should be prohibited in non-primary markets.281 To 
address situations where the priced order in an ECN is at a non-
standard increment, the Commission has determined that it is 
appropriate to interpret the ECN amendment to allow market makers and 
specialists to comply with the amendment (either individually or 
through the ECN) by rounding up or down to the nearest fraction 
accepted by the market disseminating the quote provided by the 
ECN.282 The Commission believes, however, that rounding is 
appropriate only if the rounded public quotes are accompanied by an 
identifier that marks the quote as rounded.283 Market makers, 
specialists, and ECNs will be permitted to round the prices of ECN buy 
orders

[[Page 48316]]

down to the nearest quote increment, and round the prices of ECN sell 
orders up to the nearest increment. For example, under this 
interpretation, if a market maker or specialist enters a priced buy 
order into an ECN at 10\5/16\ and the market receiving the price from 
the ECN for dissemination has a minimum quote increment of \1/8\, a bid 
of 10\1/4\ will be displayed in the public market and identified as a 
rounded price. This result reflects an SRO rule that prohibits 
dissemination of quotes in \1/16\ variations. If the market maker or 
specialist already is bidding publicly at 10\1/4\ when it enters the 
10\5/16\ buy order in an ECN, the market maker or specialist publishing 
a quote must reflect the ECN order by identifying its 10\1/4\ bid as 
rounded.
---------------------------------------------------------------------------

    \278\ See, e.g., NASD Letter; Lehman Letter; Instinet Letter.
    \279\ See, e.g., Letter from Leslie M. Marx, Assistant Professor 
of Economics and Management, and Eugene Kandel, William E. Simon 
Graduate School of Business Administration, University of Rochester, 
to Commissioner Steven Wallman, SEC, dated November 27, 1995 (``Marx 
and Kandel Letter''), concluding that the markets should move toward 
decimal pricing.
    \280\ See CHX Letter.
    \281\ See Madoff Letter.
    \282\ The Commission believes this alternative is preferable to 
imposing particular trading increments on the markets. At the same 
time, however, this alternative will provide the markets with an 
incentive to voluntarily move towards finer trading increments.
    \283\ In order to facilitate compliance with the rule, it will 
be necessary for SROs to provide a means for rounded prices to 
include a ``rounded'' identifier that makes clear that a better 
price is available in the ECN. The Commission notes that SROs, and 
the public quotation system, may not currently have such a field 
available for identifying quotations as rounded. The Commission, 
therefore, requests that the SROs work jointly to modify the public 
quotation system to ensure that specialists, market makers, and ECNs 
that are disseminating rounded prices have the ability to 
distinguish those rounded quotes.
---------------------------------------------------------------------------

    In addition, market makers and specialists entering orders into 
ECNs that are reflected at rounded prices in the public quote will be 
expected to give their customers an execution at the superior non-
rounded price. Thus, the market maker or specialist quoting a rounded 
price of 10\1/4\ to reflect a 10\5/16\ buy order must give a customer 
sell order an execution at 10\5/16\ up to the published size. 
Similarly, an ECN providing market maker or specialist prices pursuant 
to the rounding alternative must execute an incoming order at the non-
rounded price. The Commission recognizes that it may not be feasible 
for market makers or specialists that have not entered the rounded 
order into an ECN to determine, in an efficient manner, the actual 
price of the better order in the ECN. This may particularly be true 
with respect to market makers or specialists operating automated 
execution systems. The Commission believes that it is appropriate in 
such instances for such market makers and specialists that did not 
enter the rounded order to execute orders at the displayed rounded 
price.284
---------------------------------------------------------------------------

    \284\ See also, section III.C.2. for a discussion of best 
execution, infra.
---------------------------------------------------------------------------

    The Commission recognizes that this interpretation will allow 
prices in ECNs that are denominated in non-standard quotation 
increments not to be fully displayed, but believes this interpretation 
is appropriate to accommodate ECN prices in the existing public 
quotation system without imposing uniform trading increments.285 
The rounding identifier will inform investors that a better price is 
behind the rounded quote. Thus, even though the actual price cannot be 
readily displayed, investors will be aware of, and will be able to 
obtain, the better price in the ECN or from the market maker or 
specialist.
---------------------------------------------------------------------------

    \285\ If primary markets in the future allow narrower quotation 
increments, these ECN prices between the existing quotation 
increments could be more accurately displayed in the public quote.
---------------------------------------------------------------------------

v. Effect on the Voluntary Aspect of the Quote Rule
    If an OTC market maker uses an ECN that does not rely on the 
alternative of communicating that market maker's best prices to the 
public quotation system, then the market maker must publish in its own 
quote that better priced order entered into the ECN. Once a market 
maker publishes a quote through its association to reflect a priced 
order it entered into an ECN, pursuant to Rule 11Ac-1(c)(5)(i)(A), it 
will be deemed to have elected to publish quotations in that 
security,286 and will therefore be subject to the quotation 
provisions of the Quote Rule. Moreover, pursuant to certain existing 
SRO rules,287 withdrawal of that quotation after the ECN order has 
been executed or withdrawn prevents the market maker from immediately 
reinstating quotes in that security.288 As a practical matter, 
once electing to quote, a withdrawal then precludes the market maker 
from continuing to enter priced orders for the security in an ECN 
because of the SRO prohibition on re-entering quotes after withdrawal.
---------------------------------------------------------------------------

    \286\ 17 CFR 240.11Ac1-1(b)(5), as amended. See also, 17 CFR 
240.11Ac1-1(a)(25), 17 CFR 240.11Ac1-1(c)(4)(ii), and 11Ac1-
1(c)(5)(ii), as amended, acting jointly to ensure that OTC market 
makers publish quotations pursuant to the Quote Rule in securities 
they trade via ECNs.
    \287\ See NASD Manual, Marketplace Rules, Rule 4600 et. seq., 
Nasdaq Market Maker Requirements (requiring members to maintain 
continuous two-sided quotations in the Nasdaq securities for which 
they are registered as market makers). See also, ITS Plan, Section 
6(A)(i)(B), Furnishing Quotations (requiring each ITS Participant to 
furnish the current bid-asked quotation emanating from its floor or, 
in the case of the NASD, the best bid and offer emanating from ITS/
CAES market makers in eligible securities). Unexcused withdrawal of 
quotations violates these NASD rules and ITS provisions.
    \288\ This will be true even if the market maker traded less 
than 1% of the share volume in the security in the previous quarter 
because the 1% threshold of the Quote Rule for mandatory quotes 
would not exempt the market maker from disseminating quotes once the 
market maker has ``elected'' to quote the security by using the ECN.
---------------------------------------------------------------------------

    The Commission solicited comment on this aspect of the ECN 
proposal. Although most commenters were silent concerning this issue, 
certain comments indicate confusion as to the effect on market makers 
who currently use ECNs but who do not voluntarily quote under the 
existing Quote Rule.289 The Commission, therefore, reiterates that 
the combined operation of the ECN amendment and SRO rules may require a 
market maker or specialist who enters an order into an ECN that does 
not rely on the ECN display alternative, and publishes a quote 
reflecting that price, to continue to publish quotes in the public 
market regardless of the number of shares traded by the market maker or 
specialist in the security during the previous quarter.
---------------------------------------------------------------------------

    \289\ See, e.g., Madoff Letter; Instinet Letter. In its comment 
letter, Instinet notes that some market makers that make a 
continuous market in a security, but do not normally publish 
quotations in that security, will now be required to disseminate 
quotations for that security if the market maker places a priced 
order for that security on an ECN. The Commission recognizes this 
result, but notes the ECN display alternative of allowing such 
market makers to continue to place orders in a security into an ECN 
without having to directly publish quotes in that security.
---------------------------------------------------------------------------

    In determining whether a market participant will be required to 
publish quotes after entering orders in an ECN, the Commission notes 
that, with respect to any given security, the quote rule requirements 
only apply if the market participant falls within the definition of the 
term ``OTC market maker'' for that security. To be an OTC market maker, 
the participant must hold itself out as willing both to buy and sell on 
a regular or continuous basis.290
---------------------------------------------------------------------------

    \290\ Rule 11Ac1-1(a)(8), as amended.
---------------------------------------------------------------------------

    The ``OTC market maker'' definition is not intended to capture 
subscribers who enter orders into ECNs on one side of the market to 
limit or offset their risk, such as options market makers who use ECNs 
to hedge their positions in the securities underlying the options they 
trade. They would not be required to publish public quotes in a 
security simply because they had entered an order for the security into 
an ECN, unless they regularly or continuously hold themselves out as 
willing to buy and sell the security. An entity that holds itself out 
via contract, marketing, or other communications with its customers, as 
being willing both to buy and sell a specific security on a regular or 
continuous basis would be an ``OTC market maker'' for the security. 
This latter market maker's entry of a superior priced order into an ECN 
for a security that itself does not publish quotes would compel the 
market maker to publish a quote and potentially, depending on SRO 
rules, trigger on-going quotation obligations.
vi. Exemptive Relief
    Finally, the Commission is amending Section (d) of the Quote Rule 
concerning exemptive relief. Under that section, the Commission 
previously could exempt from the provisions of the Quote Rule, either 
conditionally or on specified terms and conditions, any responsible 
broker or dealer (which now will include a specialist or market

[[Page 48317]]

maker under the ECN amendment), exchange, or association if the 
Commission determined that such an exemption was consistent with the 
public interest, the protection of investors and the removal of 
impediments to and perfection of an NMS. The Commission is adding a 
provision allowing it to exempt an ECN from the definition in the rule. 
The Commission did not solicit comment on expanding its authority to 
grant exemptive relief in this manner. The Commission believes, 
however, that the added exemptive authority is appropriate because it 
provides flexibility in applying the ECN amendment.
3. Amendments to the Quote Rule Concerning Definitions
a. Introduction
    In the Proposing Release the Commission proposed to expand the 
Quote Rule's existing requirements to include quotation information 
from broker-dealers that, while internalizing order flow, hold 
themselves out as willing to buy and sell on a regular or continuous 
basis. This expansion of the Quote Rule would be accomplished by 
amending the definition of OTC market maker. The Proposing Release also 
recommended that quotation requirements be imposed on substantial 
broker-dealers in non-Rule 19c-3 securities by amending the definition 
of subject security, and on broker-dealers in Nasdaq SmallCap 
securities by amending the definition of covered security.291 In 
putting forward this proposal, the Commission noted that some dealers 
quote on a selective basis, choosing not to display quotes for 
securities that they actively trade because these securities are 
subject only to the voluntary quote provisions of the Quote Rule.
---------------------------------------------------------------------------

    \291\ OTC market makers and specialists are not required by the 
Quote Rule to provide continuous two-sided quotations for any Nasdaq 
security. As amended, an OTC market maker or specialist may make an 
election, pursuant to paragraph (b)(5)(i) of the Quote Rule, to 
collect, process, and make available quotations for Nasdaq NMS or 
Nasdaq SmallCap securities. The Commission is soliciting comment on 
a proposed amendment which would require continuous two-sided 
quotations from OTC market makers and specialists responsible for 
more than 1% of the aggregate transaction volume for a Nasdaq 
security. See Companion Release.
---------------------------------------------------------------------------

    The amendments adopted by the Commission today are substantially 
the same as those proposed.292 The Commission believes these 
amendments will benefit investors by improving price discovery and 
liquidity, and increasing competition between OTC market makers and 
specialists. The Commission further believes that these amendments are 
in keeping with Congress's directive that the Commission use its 
rulemaking authority to remove impediments to competition.
---------------------------------------------------------------------------

    \292\ The only substantive difference between the amendments as 
adopted today and as proposed is the definition of the term ``OTC 
market maker.'' The definition as proposed read ``* * * sell to a 
customer * * *'' but has been modified to read ``* * * sell to its 
customers * * *.'' Rule 11Ac1-1(a)(13), 17 CFR 240.11Ac1-1(a)(13). 
See infra note 308.
    In addition to the amendments discussed in detail herein, the 
Commission is making technical, non-substantive amendments to the 
Quote Rule. The terms ``association'', ``revised bid or offer'', and 
``revised quotation size'' will be separately defined in the rule. 
The definition of ``exchange-traded security'' has been revised to 
exclude OTC securities traded on an exchange pursuant to unlisted 
trading privileges. The definition of ``plan processor'' has been 
amended to reflect the appropriate cross-reference. The definition 
of ``principal market'' has been removed from the Quote Rule because 
it is no longer applicable. In addition, the definitions have been 
arranged in alphabetical order.
    Paragraph (b)(1)(i) of the rule has been reorganized to 
separately set forth the exclusions in subparagraphs (A) and (B). 
Paragraph (b)(1)(iii) has been eliminated and the substance of the 
provision has been incorporated into paragraphs (b)(1)(i) and 
(b)(1)(ii).
    The Commission is also amending the definition of the term 
``reported security'' as it appears in Rule 11A3-1(a)(4). The 
amendment alters the form but not the meaning of the term or its 
application. The amendment will make the term consistent with the 
definition of ``reported security'' in the Quote Rule.
    The amendments to Rule 11Ac1-1(a) are being adopted 
prospectively. Outstanding Quote Rule interpretations and no-action 
letters continue to be operative, to the extent that the positions 
taken therein are not materially in conflict with the amendments 
adopted today. Persons seeking clarification regarding the status of 
outstanding no-action letters should contact the Office of Market 
Supervision, Division of Market Regulation, Securities and Exchange 
Commission.
---------------------------------------------------------------------------

b. Basis for Amendments to Rule 11Ac1-1(a)
i. Amendment to 11Ac1-1(a)(25) (Definition of a ``Subject Security'')
    The Commission is amending the Quote Rule's definition of subject 
security to require continuous two-sided quotations from OTC market 
makers and exchanges that are responsible for more than 1% of the 
volume in a non-Rule 19c-3 security. The Commission believes that this 
amendment removes an impediment to competition that exists under the 
current rule. Broker-dealers that held themselves out as willing to buy 
and sell non-Rule 19c-3 securities on a regular or continuous basis 
were not previously required to disseminate quotation information 
unless they transacted the largest percentage of the aggregate trading 
volume in a particular security. Consequently, regardless of the volume 
transacted by other exchanges or OTC market makers, the primary market, 
which was the market responsible for transacting the largest percentage 
of the aggregate trading volume, was the only market participant 
required to disseminate quotations in these securities.293
---------------------------------------------------------------------------

    \293\ An OTC market maker or specialist, although not the 
principal market for a listed security, could elect to disseminate 
quotes for the security. Under the amended 11Ac1-1(a)(25) an OTC 
market maker or specialist may still elect to disseminate quotations 
if it is responsible for 1% or less of the volume in that security.
---------------------------------------------------------------------------

    As noted in the Proposing Release, third market trading in non-Rule 
19c-3 securities has increased considerably since the Quote Rule was 
last amended.294 Third market trading in Rule 19c-3 securities now 
accounts for a greater number of stocks and a more substantial 
percentage of U.S. trading volume than it did when the Commission 
initially established disparate regulatory treatment under the Quote 
Rule for Rule 19c-3 securities and non-Rule 19c-3 securities.295 
In view of the growth of third market trading volume, the Commission 
believes that requiring all broker-dealers trading more than 1% of the 
volume in a listed security to publish quotations will provide more 
accurate and comprehensive quotation information for non-Rule 19c-3 
securities.
---------------------------------------------------------------------------

    \294\ Third market maker trading interest is more concentrated 
in non-Rule 19c-3 securities, as evidenced by the fact that the 
percentage of third market quotes in non-Rule 19c-3 securities (36%) 
is greater than that for Rule 19c-3 securities (28%). See 
Fragmentation vs. Consolidation of Securities Trading: Evidence of 
the Operation of Rule 19c-3, Office of Economic Analysis, SEC, at 5 
(March 29, 1995) (``Fragmentation vs. Consolidation'').
    \295\ Third market trading volume has grown, at least in part, 
because the universe of securities subject to Rule 19c-3 has 
increased considerably. For example, nearly 60% of the stocks listed 
on the NYSE are subject to Rule 19c-3, accounting for approximately 
48% of the total NYSE volume. See Fragmentation vs. Consolidation at 
4-5.
---------------------------------------------------------------------------

    The Commission believes that disparate regulatory requirements for 
Rule 19c-3 and non-Rule 19c-3 securities can no longer be justified by 
differences in the trading of the two types of securities. Moreover, 
the Commission finds that differences in regulatory treatment have 
impaired transparency. Because of the growth of third market trading in 
non-Rule 19c-3 securities, the absence of quotes revealing the 
substantial third market makers in a security and the prices they are 
prepared to publicly quote results in the consolidated quotations in 
the security being incomplete.296 The Commission therefore 
believes that significant dealers in non-Rule 19c-3 securities should 
become subject to the same standards required for trading

[[Page 48318]]

Rule 19c-3 securities.297 As a result of this amendment, market 
participants will have more complete information about significant OTC 
market makers and specialists in a security and the prices at which 
they are willing to trade. The majority of commenters who addressed the 
amendment to Rule 11Ac1-1(a)(25) endorse the Commission's proposal to 
end the disparity between Rule 19c-3 securities and non-Rule 19c-3 
securities, noting that there is no basis for continuing to draw a 
regulatory distinction between Rule 19c-3 and non-Rule 19c-3 
securities, and that the extension of the Quote Rule will provide 
meaningful information about significant market makers in listed 
securities.298 One commenter asserts that requiring quotations 
from all significant OTC market makers will succeed in improving the 
quality of the NMS for all listed securities while at the same time 
leveling the playing field for all market makers.299
---------------------------------------------------------------------------

    \296\ See, e.g., supra note 294.
    \297\ OTC market makers that trade a significant volume in non-
Rule 19c-3 securities have not been subject to the same requirements 
as third market makers that meet the 1% threshold for Rule 19c-3 
securities. For example, an OTC market maker meeting the 1% 
threshold is required to quote in a Rule 19c-3 security and 
therefore must register as a CQS market maker with the NASD. NASD 
Manual, Rule 6320. CQS market makers are subject to the NASD's CQS 
market maker rules, which include firm and continuous two-sided 
quote obligations and mandatory participation in the ITS through 
Nasdaq's Computer Assisted Execution System. NASD Manual, Rules 6320 
and 6330.
    \298\ See, e.g., Amex Letter; Blume Letter; BSE Letter; CHX 
Letter; CSE Letter; NASD Letter; PSE Letter; Alex. Brown Letter; 
Schwab Letter; D.E. Shaw Letter; Dean Witter Letter; Lehman Letter; 
Madoff Letter; Merrill Letter; PaineWebber Letter; Salomon Letter; 
Smith Barney Letter; STA Letter.
    There were some commenters who did not support the extension of 
the Quote Rule's requirements to non-Rule 19c-3 securities. See, 
e.g., NYSE Letter; and Specialists Assoc. Letter, which note that 
the Commission, rather than expanding the Quote Rule to include non-
Rule 19c-3 securities, should re-examine the validity of Rule 19c-3. 
See, e.g., Letter from Alexander H. Slivka, Executive Vice-
President, National Securities Corporation, to Jonathan G. Katz, 
Secretary, SEC, dated October 25, 1995 (``NSC Letter''); Fahnestock 
Letter; Letter from Samuel Lieberman, President, Rothschild 
Lieberman Ltd., to Jonathan G. Katz, Secretary, SEC (``Rothschild 
Letter''); Letter from Mark T. DeFelice, Vice President, Roosevelt & 
Cross, Inc., to Jonathan G. Katz, SEC, dated January 24, 1996 
(``Roosevelt Letter''), which note that the extension of the 
quotation requirements to include non-Rule 19c-3, will have an 
impact on small firms. See infra note 307.
    \299\ Madoff Letter.
---------------------------------------------------------------------------

    Nevertheless, many commenters suggest modifications to the 1% 
volume threshold. Some commenters suggest that Nasdaq, on behalf of all 
third market makers, should be viewed as one market participant, and 
that once its volume exceeds 1% for a listed security, all OTC market 
makers in that security should be required to maintain continuous two-
sided quotations.300 Other commenters believe that the Commission 
should adopt a ``continuousness of execution'' standard rather than a 
rigid 1% volume threshold.301 This suggestion would require a 
dealer to quote if it executes orders on a regular or continuous basis, 
even if it accounts for less than 1% of the volume, while excluding 
from quotation requirements a dealer that executes a few large trades 
that account for more than 1% of the volume. The NYSE suggests an 
additional threshold, to be used in the alternative with the 1% of 
volume threshold.302 This alternative would have the effect of 
requiring public quotations from market makers who, while not 
accounting for more than 1% of the aggregate transaction volume, have 
an active retail business in small-sized trades.
---------------------------------------------------------------------------

    \300\ See PSE Letter; Specialists Assoc. Letter.
    A comparable alternative is to require quotations from all OTC 
market makers who account for more than 1% of the Nasdaq-reported 
volume in a security. See Investors Research Letter.
    In the same vein, two commenters suggest that once an OTC market 
maker or specialist displays a quotation in a listed security, it 
should be subject to the requirements of the rule. See BSE Letter; 
CSE Letter.
    The NYSE and CSE suggest further application of the rule to 
include brokers and their private trading systems. See NYSE Letter; 
CSE Letter.
    \301\ See CHX Letter; Fahnestock Letter; Jefferies Letter; 
Salomon Brothers Letter; STA Letter. See also Rothschild Letter.
    \302\ NYSE Letter. See also RPM Letter; Specialists Assoc. 
Letter.
---------------------------------------------------------------------------

    The Commission believes that extending the 1% threshold based on 
quarterly aggregate trading volume to non-Rule 19c-3 securities is a 
reasonable method to improve the scope of quotation information to 
include significant OTC market makers and specialists. This 1% 
threshold, currently in effect for Rule 19c-3 securities, has proved 
effective in supplying comprehensive quotation information to the 
market at large. Moreover, based on the increase in third market 
trading volume for these securities, the Commission does not believe 
this standard is unduly burdensome on OTC market makers or 
specialists.303 Rather, the Commission believes this threshold 
strikes a balance between requiring the dissemination of all quotation 
interest and accommodating those specialists and OTC market makers that 
are small entities. The Commission believes that OTC market makers and 
specialists that account for 1% or less of the aggregate volume are not 
active enough to justify the additional expense of providing continuous 
quotation display.304
---------------------------------------------------------------------------

    \303\ The Commission seeks to avoid imposing burdens on market 
participants that are not necessary to achieve the Quote Rule's 
objective of reliable public quotations from all significant markets 
in a security. The Commission notes that the 1% threshold for 
quotations in Rule 19c-3 securities has not impaired trading in 
these securities. Since the Quote Rule was amended, OTC market 
makers' volume in Rule 19c-3 securities has increased. See 
Fragmentation vs. Consolidation at 4-5. The Commission has no reason 
to believe that imposing mandatory quotations on specialists and OTC 
market makers that are responsible for more than 1% of the volume in 
a non-Rule 19c-3 security will affect market making in these 
securities.
    \304\ A few commenters expressed concern that the amendment to 
the Quote Rule would have a detrimental impact on small firms. See 
Fahnestock Letter; NSC Letter; Roosevelt Letter; Rothschild Letter. 
The Commission believes the requirement that a dealer must transact 
greater than 1% of the volume in a security before quotations are 
mandated prevents the rule from becoming unnecessarily burdensome on 
small firms. For example, a firm would not have to publish 
continuous two-sided quotations in AT&T unless it transacted more 
than 1% of the aggregate transaction volume, which the Commission 
considers more than modest volume.
---------------------------------------------------------------------------

    Similarly, the Commission believes that applying the 1% threshold 
to the total over-the-counter volume in a listed security would extend 
the quotation requirements to inactive market makers. The Commission 
questions whether the added quotation information would justify the 
added burden.305 The Commission also believes that reliance on 
something other than a numerical standard in this circumstance would 
lead to confusion in the marketplace. Accordingly, the Commission 
believes the ``greater than 1% aggregate trading volume'' threshold for 
mandatory quotations continues to be appropriate.
---------------------------------------------------------------------------

    \305\ In a related release issued today, the Commission is 
proposing an amendment that would require continuous two-sided 
quotations from OTC market makers and specialists provided that the 
OTC market maker or specialist is responsible for more than 1% of 
the aggregate transaction volume for a security included on the 
Nasdaq Stock Market. See Companion Release for a detailed discussion 
on the proposed amendment to the Quote Rule.
---------------------------------------------------------------------------

ii. Amendment to 11Ac1-1(a)(13) (Definition of an ``OTC Market Maker'')
    Amended Rule 11Ac1-1(a)(13) 306 revises the definition of 
``OTC market maker'' to include any dealer who holds itself out as 
willing to buy from and sell to its customers, or otherwise, a covered 
security for its own account on a regular or continuous basis otherwise 
than on an exchange in amounts of less than block size.307 
Accordingly, dealers that internalize customer order flow in particular 
stocks, by holding themselves out to customers as willing to buy and 
sell on an ongoing basis, would fall within the definition even though 
they may not hold themselves out to all other market participants. In 
addition, dealers

[[Page 48319]]

that hold themselves out to particular firms as willing to receive 
customer order flow, and execute those orders on a regular or 
continuous basis, also would fall within the definition of an OTC 
market maker.
---------------------------------------------------------------------------

    \306\ 17 CFR 240.11Ac1-1(a)(13).
    \307\ The definition, as proposed, read ``* * * sell to a 
customer * * * '' but has been modified to read ``* * * sell to its 
customers * * *. ''
---------------------------------------------------------------------------

    This change was in response to the requests of commenters for 
consistency in the definition of OTC market maker between proposed Rule 
11Ac1-1(a)(13) and proposed Rule 11Ac1-4(a)(9).See, e.g., NASD Letter. 
Additionally, the Commission stated in the Proposing Release that 
``[a]s in the past, broker-dealers will not be considered to be holding 
themselves out as regularly or continuously willing to buy or sell a 
security if they occasionally execute a trade as principal to 
accommodate a customer's request.'' Proposing Release at 24. The 
Commission believes the new language more accurately reflects that 
premise.
    Most commenters addressing this issue assert that it is appropriate 
to include in the definition of OTC market maker those dealers who 
internalize customer order flow because they believe that dealers that 
hold themselves out to their customers as willing to buy and sell 
securities on a continuous basis should be required to publish 
quotations.308 One commenter asserts that the amendment will 
broaden the definition of who should be required to provide 
transparency and liquidity to the NMS to include dealers that transact 
business with other firms' order flow and with their own customers, 
thus ensuring a minimum level of quotation commitment from those NMS 
participants vying for public order flow.309 Some commenters, 
however, advocate that more than internalization of order flow should 
be required before a dealer is deemed an OTC market maker. These 
commenters suggest the Commission adopt some form of a ``holding itself 
out'' standard, so that the rule would capture the quotations of 
professional liquidity providers but not dealers that occasionally 
accommodate a customer's request.310 Other commenters, deeming the 
definition too inclusive, suggest the Commission add an exception for 
broker-dealers that act solely as agents.311
---------------------------------------------------------------------------

    \308\ See Amex Letter; BSE Letter; CHX Letter; CSE Letter; D.E. 
Shaw Letter; Madoff Letter; NYSE Letter; PSE Letter; RPM Letter; SIA 
Letter; STA Letter.
    \309\ Madoff Letter.
    \310\ See NASD Letter; Jefferies Letter; SIA Letter; PaineWebber 
Letter; STA Letter. It should be noted that the amended definition 
includes a requirement that the broker-dealer hold itself out to, at 
a minimum, its customers on a regular and continuous basis in order 
to be an OTC market maker.
    \311\ See Fahnestock Letter; Salomon Brothers Letter; Rothschild 
Letter; Investors Research Letter.
---------------------------------------------------------------------------

    One commenter believes that excluding firms that transact primarily 
block size orders and therefore account for significant volume is 
inconsistent with the Commission's goals for increased 
transparency.312 However, several commenters note that block size 
orders are excluded from the existing definition of OTC market maker 
and argue strongly that it is consistent with the purposes of the rule 
to continue to exclude them.313
---------------------------------------------------------------------------

    \312\ Amex Letter.
    \313\ See Fahnestock Letter; Dillon Letter; Goldman Sachs 
Letter; Merrill Letter; Salomon Brothers Letter.
---------------------------------------------------------------------------

    The Commission believes that adoption of the amendment is warranted 
to ensure the availability of quotation information that accurately 
reflects the interests of all significant market participants. 
Increased transparency is fundamental to the fairness and efficiency of 
the securities markets. As noted in the Market 2000 Study, enhanced 
transparency helps link various market segments.314 Currently, a 
dealer can receive order flow from internalization or pre-existing 
order routing arrangements but avoid publishing quotations, even when 
it accounts for more than 1% of the volume in a non-Rule 19c-3 
security, because it is not currently deemed to be an OTC market 
maker.315 Allowing significant market makers that deal actively in 
securities without publicizing their activity or making available their 
prices undermines the NMS goal of transparency. The Commission believes 
that those dealers should be classified under the rule as market makers 
and be required to publicize their quotations so that investors may 
know of, and trade on similar terms with, those market makers.
---------------------------------------------------------------------------

    \314\ See Market 2000 Study at III-7.
    \315\ Although NASD rules require dealers who are registered as 
CQS market makers to provide quotations, registration is not 
mandated. A dealer in reported securities may elect to disseminate 
quotations by registering as a NASD market maker and 
``communicating'' its best bids and offers to the association by 
entering two-sided quotations in the Nasdaq System. See NASD Manual, 
Rule 4611.
---------------------------------------------------------------------------

    The Commission has considered commenters' suggestions regarding 
alternative definitions. In fact, in response to the suggestions of 
some commenters, the Commission has modified the proposed amendment to 
make clear that more than an isolated transaction is necessary before a 
dealer is designated an OTC market maker.
    The Commission, in regard to orders of block size, has determined 
to continue to exclude dealers that hold themselves out as only willing 
to deal in orders equal to or greater than 10,000 shares. Orders of 
block size are generally negotiated with the dealer and exposed upon 
execution. Block positioners usually do not maintain prices at which 
they are willing to buy and sell a particular security; rather, they 
make known their role of assisting in the purchase and sale of large 
positions in securities at some price. Consequently, these dealers do 
not function as typical dealers that maintain a regular or continuous 
price quote. The Commission has concluded that requiring quotations 
from these dealers would not provide useful price information and 
therefore a dealer that acts solely as a block positioner should remain 
excluded from the definition.
iii. Amendment to 11Ac1-1(a)(6) (Definition of a ``Covered Security'')
    As amended, Rule 11Ac1-1(a)(6) 316 defines ``covered 
security'' to include any security for which a transaction report, last 
sale data or quotation information is disseminated through an automated 
quotation system as described in Section 3(a)(51)(A)(ii) of the 
Exchange Act.317 This amendment would extend the Quote Rule 
provisions to OTC market makers and exchange specialists quoting in 
Nasdaq SmallCap securities.
---------------------------------------------------------------------------

    \316\ Rule 11Ac1-1(a)(6), 17 CFR 240.11Ac1-1(a)(6).
    \317\ 15 U.S.C. 78c(a)(51)(A)(ii).
---------------------------------------------------------------------------

    The Proposing Release noted that the Quote Rule presently does not 
reflect certain developments in the Nasdaq market, including the large 
number of securities included on the Nasdaq SmallCap market. Only one 
commenter addressed this amendment. That commenter, MJT, expressed 
strong support for the proposal, noting that it is both fair and 
equitable to apply the Quote Rule to Nasdaq SmallCap 
securities.318 The Commission believes it is appropriate to extend 
coverage of the Quote Rule to these securities in recognition of the 
development of a liquid trading market and increased investor demand 
for these securities. NASD rules concerning quotations already require 
firm quotations for both Nasdaq SmallCap securities and Nasdaq/National 
Market securities.319 Thus, the amendment simply extends coverage 
of the Quote Rule requirements to the same range of securities as

[[Page 48320]]

existing NASD firm quote requirements.320
---------------------------------------------------------------------------

    \318\ MJT Letter.
    \319\ See NASD Manual, Rule 4613.
    \320\ Section 11A(c)(1) of the Exchange Act grants the 
Commission the authority to prescribe, among other matters, rules 
and regulations to assure accurate and reliable quotations ``with 
respect to any security other than an exempted security.'' The 
Commission believes that extending the requirements of the Quote 
Rule to Nasdaq SmallCap securities will further these interests. No 
new costs should be imposed on market participants because the NASD 
rules concerning quotations already treat Nasdaq/National Market and 
SmallCap securities similarly.
---------------------------------------------------------------------------

c. Response to Other Specific Requests for Comments
    In addition to the Quote Rule amendments discussed above, the 
Proposing Release solicited comment on whether: (1) revisions are 
necessary to an NASD rule that restricts certain computer generated 
quotations; 321 and (2) whether the ITS linkage should be expanded 
to allow NASD CAES members access to the linkage in non-Rule 19c-3 
securities.
---------------------------------------------------------------------------

    \321\ NASD Manual, Rule 6330. The NASD, however, provides an 
automated quotation update capability (``auto-refresh'') as part of 
the Small Order Execution System which market makers may elect to 
use. Specifically, the quote of a market maker using auto-refresh 
will be automatically updated when the market maker exhausts its 
exposure limit in the NASD's Small Order Execution System.
---------------------------------------------------------------------------

i. Automatic Generation of Quotations
    Requiring active third market makers in non-Rule 19c-3 securities 
to quote also raises the issue of whether NASD members should continue 
to be prohibited from using computer systems to generate quotations 
automatically.322 Currently, exchange specialists may use 
automated mechanisms to track the NBBO in a security if they maintain a 
quotation size of no more than 100 shares.323 OTC market makers, 
however, are prohibited by NASD requirements from using automated 
quotation tracking systems.
---------------------------------------------------------------------------

    \322\ See supra note 288, concerning the impact of the ECN 
amendment to the 1% rule.
    \323\ The 100-share limitation follows the ITS Plan requirement 
that no ITS Participant may use an automated computer tracking 
system to generate quotes for more than 100 shares in any security 
the Participant trades through the ITS system.
---------------------------------------------------------------------------

    The Commission requested comment on whether computer generated 
quotations should be permitted if active third market makers are 
required to quote in non-Rule 19c-3 securities, and if so, under what 
conditions. Commenters in favor of lifting the NASD's automated 
quotation ban believe that worthwhile computer generated quotes should 
be permitted.324 For example, one commenter stresses that a ban on 
all computer generated quotations impedes technological innovation, 
protecting the franchise of inefficient market makers at the expense of 
the investing public. Moreover, the commenter asserts, given the same 
regulatory environment, there is no reason to believe that firms that 
make automated markets will quote away from the market any more than 
firms posting quotes manually.325
---------------------------------------------------------------------------

    \324\ See, e.g., BSE Letter; CSE Letter; D.E. Shaw Letter; 
Investors Research Letters; Lehman Letter; Madoff Letter; Merrill 
Letter; NSC Letter; NYSE Letter; Smith Barney Letter.
    \325\ D.E. Shaw Letter.
---------------------------------------------------------------------------

    Certain commenters, including the NASD, believe that the ban should 
continue in effect. In general, these commenters believe that lifting 
the ban could create systems capacity and data traffic problems, and 
result in useless quotations that are automatically maintained away 
from current market prices.326
---------------------------------------------------------------------------

    \326\ See, e.g., Dean Witter Letter; NASD Letter; PSE Letter; 
RPM Specialist Letter.
---------------------------------------------------------------------------

    Even commenters in favor of lifting the ban tend to believe that, 
while some types of computer generated quotes are appropriate, others, 
such as quotations automatically maintained away from the best market 
quotation, should not be permitted. The NASD, which generally favors 
the ban on automated quotes, believes it may be appropriate to revise 
its autoquote policy to permit a market maker to automatically update 
its quote to match either the best bid or best offer, provided 
liquidity is not withdrawn from the contra-side of the quotation. In 
this situation, the NASD believes a market maker will be exposed to an 
execution and will be genuinely contributing to market liquidity.
    The Commission believes that a total prohibition on the use of 
computer generated quotes is not appropriate. Such an approach 
excessively limits the use of sophisticated trading strategies that 
rely on automation in the quotation process for their success, and it 
also may act as a competitive disadvantage to market makers and 
specialists that would otherwise rely on technology to meet their 
quotation obligations more efficiently. In the latter instance, broad 
prohibitions on the use of computer generated quotes may cause some 
market makers and specialists to restrict the number of stocks in which 
they are willing to make markets.
    While the Commission recognizes traditional concerns related to the 
accessibility of computer generated quotes and the impact of such 
quotes on systems capacity, it believes that more can and should be 
done in this area. This is particularly true given the enhanced 
quotation obligations that will be imposed on some market participants 
under the revised Quote Rule. The Commission urges the NASD, ITS 
Participants,327 and other interested market participants to 
develop revised standards that would permit the use of computer 
generated quotes that contribute value to the market. Specifically, the 
Commission requests that the NASD and ITS Participants resolve this 
issue before the effective date of the Quote Rule amendments. In the 
absence of such progress, the Commission recognizes that it will 
consider invoking its own authority to address this issue.
---------------------------------------------------------------------------

    \327\ The ITS Plan also places certain restrictions on the use 
of computer generated quotes. See supra note 323. Given the 
technologies that have developed during the nearly 20 years that 
these ITS Plan restrictions have been in place, the Commission 
requests that the ITS Participants review these limitations and 
whether they continue to be appropriate, in whole or in part, and 
whether new limitations should replace the existing provisions or 
whether there should be any ITS Plan limitations on automated 
quotes.
---------------------------------------------------------------------------

ii. Expansion of ITS/CAES Access
    As discussed in the Proposing Release, the uniform application of 
the Quote Rule to all exchange-listed securities raises the issue of 
the disparate treatment of Rule 19c-3 and non-Rule 19c-3 securities 
under the ITS Plan. The Commission solicited comment on this disparate 
treatment. The same issue arises with the provision allowing the use of 
an ECN as an intermediary in communicating quotes to the public 
quotation system if equivalent access is provided.
    Currently, the ITS Plan provides access to the ITS System to any 
Participant in any Rule 19c-3 security in which the Participant 
disseminates continuous two-sided quotations, but excludes OTC market 
makers from ITS access for non-Rule 19c-3 securities. In the past, 
market makers in non-Rule 19c-3 securities were not subject to 
mandatory quote requirements. The amendments to the Quote Rule adopted 
today will subject OTC market makers and exchange specialists to the 
same quotation requirements for all exchange-listed securities.
    The Commission requested comment on whether the Quote Rule 
amendments justify an expansion of the linkage between ITS and the 
NASD's CAES interface to provide ITS access to and from any market 
maker for any exchange-listed security in which that market maker 
disseminates continuous two-sided quotations. Numerous commenters 
support expanding the linkage in this manner because they believe an 
expansion will enhance fair competition and increase opportunities

[[Page 48321]]

for best execution.328 Several commenters also assert that 
arguments previously made to exclude OTC market maker quotes in non-
Rule 19c-3 securities from ITS are no longer valid.329
---------------------------------------------------------------------------

    \328\ See, e.g. D.E. Shaw Letter; Investors Research Letter; 
Lehman Letter; NASD Letter; NSC Letter; Madoff Letter; Rothschild 
Letter; Schwab Letter; STA Letter.
    \329\ See, e.g., Madoff Letter.
---------------------------------------------------------------------------

    One commenter specifically argues that adoption of the Commission's 
proposals should end any objection to the NASD's full participation in 
ITS because the operation of the Quote Rule will reduce opportunities 
for OTC market makers to trade in ECNs while simultaneously availing 
themselves of the voluntary aspect of the Quote Rule, and therefore, 
will expand the imposition of NASD quotation requirements upon OTC 
market makers. These requirements, according to the commenter, are 
equal to those of any other market and add greater transparency and 
liquidity to the markets for exchange-listed securities as well as the 
NMS.330
---------------------------------------------------------------------------

    \330\ Id. Madoff states that the NASD now requires every OTC 
market maker to conform with NMS principles, respect all other NMS 
quotations in listed securities, and not trade through better quotes 
in the NMS. Madoff further notes that, in contrast, exchanges do not 
impose similar restrictions with respect to trading through off-
exchange quotations.
---------------------------------------------------------------------------

    Those commenters opposed to the expansion generally believe that 
the existing limitation on ITS access is justified in view of 
disparities in customer protections afforded by exchanges and exchange 
members when compared to customer protections mandated by NASD 
rules.331
---------------------------------------------------------------------------

    \331\ See Amex Letter; BSE Letter; CHX Letter; CSE Letter; PSE 
Letter; Specialists Assoc. Letter.
---------------------------------------------------------------------------

    The Commission recognizes that the expansion of ITS/CAES is a 
significant issue of concern to many market participants. The 
Commission therefore encourages a continuing dialogue among the ITS 
Participants to solve this issue on a timely basis and in a manner 
beneficial to the market as a whole.
d. Operation of the Rule With Amended Definitions
i. Amendment to 11Ac1-1(a)(25) (Definition of a ``Subject Security'')
    As a result of the amendment adopted today, OTC market makers and 
exchange specialists who hold themselves out as willing to buy and sell 
non-Rule 19c-3 securities on a regular or continuous basis, and that 
account for more than 1% of the quarterly aggregate trading volume, 
will be subject to the Quote Rule and required to make continuous two-
sided quotations available to the public, even if they have not 
previously elected to register as CQS market makers with the NASD. This 
amendment will close a significant gap in the quotation information 
that has been available heretofore to market participants and 
investors. In a parallel action, the Commission is proposing for 
comment an additional amendment to the Quote Rule.332 The 
Commission believes that the additional proposal, if adopted, would 
further improve transparency by providing investors with quotation 
information on Nasdaq securities from significant OTC market makers and 
specialists.
---------------------------------------------------------------------------

    \332\ See Companion Release.
---------------------------------------------------------------------------

ii. Amendment to 11Ac1-1(a)(13) (Definition of an ``OTC Market Maker'')
    The definition of OTC market maker now includes any dealer holding 
itself out as willing to transact business for its own account on a 
regular or continuous basis, whether it transacts exclusively with its 
own customers or with the customers of other dealers. Those dealers 
that hold themselves out to customers as willing to execute orders on a 
regular or continuous basis, whether by the internalization of customer 
order flow in particular stocks or through arrangements with particular 
firms to execute their customer order flow, now fall within the 
definition of OTC market maker. Therefore, obligations under the Quote 
Rule will now apply to dealers that internalize customer order flow or 
hold themselves out to particular firms as willing to execute their 
customer order flow, and that execute those orders on a regular or 
continuous basis. As in the past, broker-dealers will not be considered 
to be holding themselves out as regularly or continuously willing to 
buy or sell a security if they occasionally execute a trade as 
principal to accommodate a customer's request.
iii. Amendment to 11Ac1-1(a)(6) (Definition of a ``Covered Security'')
    The amendment extends the coverage of the Quote Rule to all Nasdaq 
securities where the rule had previously applied only to Nasdaq/
National Market securities. As noted previously, NASD rules already 
require a dealer that makes a market in a Nasdaq SmallCap security to 
provide quotations.333 The Commission, therefore, does not believe 
extending the Quote Rule to include securities covered by an existing 
NASD rule will result in additional burdens on OTC market makers. 
Although the definition of covered security has been amended to include 
Nasdaq SmallCap securities, an exchange specialist or OTC market maker 
still must make an election, pursuant to paragraphs (b)(5) (i) and 
(ii), respectively, of the Quote Rule.334 Accordingly, although 
the definition has been amended, an OTC market maker or specialist is 
not mandated by the Quote Rule to provide quotations on Nasdaq SmallCap 
securities. If, however, an exchange specialist or OTC market maker 
makes an election to make available quotations, the firmness 
obligations under paragraph (c) of the Quote Rule become operative.
---------------------------------------------------------------------------

    \333\ See NASD Rule 4613.
    \334\ 17 CFR 240.11Ac1-1(b)(5)(i)
---------------------------------------------------------------------------

e. Effective Date
    The amendments to Rule 11Ac1-1 adopted by the Commission today will 
become effective on January 10, 1997.

C. Price Improvement for Customer Market Orders

1. Proposed Rule
    In the Proposing Release, the Commission sought comment on a 
market-wide Price Improvement Rule for customer market orders. The 
proposed rule was designed to apply across exchange and OTC markets to 
promote the execution quality of orders by providing increased 
opportunities for customer orders to interact at better prices without 
the intervention of a dealer. The proposal included a non-exclusive 
safe harbor as one means by which a specialist or OTC market maker 
could be assured that an order received a sufficient opportunity for 
price improvement for purposes of the rule.
    The proposed rule was intended to encourage market participants to 
take advantage of current technologies and provide customer market 
orders with improved access to price improvement opportunities, 
regardless of where such orders are routed for execution. Although the 
proposed rule would have required specialists and OTC market makers to 
provide price improvement opportunities for customer orders, the 
Commission did not prescribe any particular method of achieving price 
improvement in recognition of the fact that competition can produce 
innovative price improvement mechanisms. The Commission proposed a non-
exclusive safe harbor, however, to provide certainty regarding one 
alternative by which a specialist or OTC market maker would be deemed 
to have satisfied its price improvement obligation.
    Under the safe harbor, a specialist or OTC market maker would have 
been deemed in compliance with the

[[Page 48322]]

proposed price improvement rule if it exposed, in its quote, a customer 
market order at an improved price and provided the customer with a 
guaranteed execution at the ``stop'' price.335 This procedure was 
designed to promote the interaction of exposed orders at prices better 
than the NBBO with orders or trading interest in other markets. The 
safe harbor also was intended to lead to increased competitio
FR Doc. 96-23210 Order Execution Obligations
n by 
encouraging specialists and OTC market makers to compete more actively 
for order flow on the basis of their published quotations. The 
Commission made clear, however, that the order exposure procedures set 
out in the proposed safe harbor neither would be mandatory, nor the 
exclusive means by which to satisfy the obligation to provide an 
opportunity for price improvement.
---------------------------------------------------------------------------

    \335\ The proposed safe harbor provided for an order to be 
``stopped'' at the national best bid (for a sell order) or offer 
(for a buy order) for the lesser of either the full size of the 
order, or the size associated with the national best bid (for a sell 
order) or offer (for a buy order).
---------------------------------------------------------------------------

    Many of the 145 commenters discussed the proposed Price Improvement 
Rule. The commenters raise numerous questions and concerns regarding 
the proposed rule. For example, some commenters claim that an absolute 
rule would reduce the broker-dealer's fiduciary obligation of best 
execution to an algorithm, eliminating the exercise of professional 
judgment in identifying price improvement opportunities.336 
Instead, the commenters argue that customers and market professionals 
should be able to use discretion in deciding when and how price 
improvement should be sought.337
---------------------------------------------------------------------------

    \336\ See, e.g., Goldman Sachs Letter; Jefferies Letter; Madoff 
Letter; Merrill Letter; NYSE Letter; PaineWebber Letter; PSE Letter.
    \337\ See, e.g., CSE Letter; Goldman Sachs Letter; Madoff 
Letter; Merrill Letter; NSC Letter; NYSE Letter; PSE Letter.
---------------------------------------------------------------------------

    In addition, several commenters are concerned that the proposed 
safe harbor would become the industry standard. These commenters 
believe that, although non-exclusive, the proposed safe harbor would 
dictate the minimum acceptable standard to follow, thereby stifling 
innovation and competition.338 Many commenters also are troubled 
by various technical aspects regarding the application of the safe 
harbor. For example, some commenters believe the 30-second exposure 
period would be insufficient to allow other market participants to 
respond to the exposed order, even with today's technology.339 
Other commenters are concerned with the mechanics of the ``stopping'' 
procedures.340 At least one commenter argues that the requirement 
to stop stock blurs the distinction between price guarantees and price 
improvement opportunities.341
---------------------------------------------------------------------------

    \338\ See, e.g., AZX Letter; Blume Letter; HHG Letter; Lehman 
Letter; Merrill Letter; Morgan Stanley Letter; NASD Letter; Salomon 
Letter; Schwab Letter; Smith Barney Letter; PaineWebber Letter; 
Ruane Letter.
    Some commenters believe their current operations would satisfy 
the rule and, therefore, they would not need to utilize the safe 
harbor procedures. See, e.g., Amex Letter; BSE Letter; CHX Letter; 
NYSE Letter; PSE Letter.
    \339\ See, e.g., Amex Letter; Blume Letter; BSE Letter; CHX 
Letter; CSE Letter; NYSE Letter; PSE Letter; Schwab Letter;. But 
see, e.g., Letter from Raymond E. Wooldridge, Chief Executive 
Officer, Southwest Securities, to Mr. Jonathan G. Katz, Secretary, 
SEC, dated January 9, 1996 (``Southwest Letter''); STANY Letter.
    \340\ See, e.g., Madoff Letter; MJT Letter; Smith Barney Letter.
    \341\ See Sutro Letter.
---------------------------------------------------------------------------

    The potential costs associated with the proposed rule also concern 
many commenters. They claim that necessary systems upgrades would be 
expensive.342 In addition, several commenters claim that the 
number of quotes generated as a result of the safe harbor would pose a 
serious threat to system capacity.343 Many commenters warn that 
the increased traffic would reduce trading efficiency, decrease 
transparency and increase overall risk.344 Some commenters also 
state that market price integrity would be reduced due to the 
proliferation of flickering, ephemeral quotations.345
---------------------------------------------------------------------------

    \342\ See, e.g., Blume Letter; Dean Witter Letter; Fahnestock 
Letter; Goldman Sachs Letter; LJR Letter; NASD Letter; PaineWebber 
Letter; Ruane Letter; Salomon Letter; Schwab II Letter; SIA Letter.
    \343\ See, e.g., Bear Stearns Letter; FIF Letter; Merrill 
Letter; PSE Letter; STANY Letter.
    \344\ See, e.g., Amex Letter; Bear Stearns Letter; Blume Letter; 
FIF Letter; LJR Letter; Madoff Letter; Merrill Letter; Morgan 
Stanley Letter; NASD Letter; PSE Letter; Salomon Letter; STA Letter; 
STANY Letter; Specialist Assoc. Letter.
    \345\ See, e.g., Dean Witter Letter; ICI Letter; Merrill Letter; 
Morgan Stanley Letter; NASD Letter; NYSE Letter; PSE Letter; Salomon 
Letter; Schwab II Letter; Specialist Assoc. Letter; STANY Letter.
---------------------------------------------------------------------------

    A common suggestion from the commenters is that the Commission not 
adopt the proposed rule prior to evaluating the effects of the other 
initiatives contained in the proposal.346 Some commenters believe 
that the amendments to the Quote Rule and the proposed Limit Order 
Display Rule should act to narrow spreads by eliciting the true market 
for a given security, thereby decreasing the utility and necessity of 
seeking better prices for customer orders. According to these 
commenters, if such results are achieved through the other initiatives, 
the potential costs and significant market operations changes 
associated with the proposed Price Improvement Rule would far outweigh 
any potential benefit.
---------------------------------------------------------------------------

    \346\ See, e.g., Bear Stearns Letter; Dean Witter Letter; DOJ 
Letter; Goldman Sachs Letter; Lehman Letter; Madoff Letter; Morgan 
Stanley Letter; NASD Letter; NSC Letter; Schwab II Letter; SIA 
Letter; Sutro Letter.
---------------------------------------------------------------------------

    Although the Commission continues to believe that the opportunity 
for price improvement can contribute to providing customer orders with 
enhanced executions, the Commission has determined to defer action on 
the proposed Price Improvement Rule for the present time. The 
Commission believes that the other initiatives adopted today will 
greatly improve the price discovery process and the opportunity for 
customer orders to receive enhanced execution prices. These initiatives 
should act to narrow spreads by making available to all market 
participants the true buying and selling interest in a given security. 
The Commission believes, therefore, that the most appropriate course of 
action is to monitor the operation of the initiatives adopted today, 
and assess their impact on spreads, the quality of markets, and the 
quality of executions. This assessment will enable the Commission to 
better determine the need for further Commission action regarding 
specific price improvement obligations.
2. Best Execution Obligations
    The proposed Price Improvement Rule was designed to complement the 
long-standing duties of broker-dealers to seek to obtain best execution 
of their customer orders; the Commission did not intend for the 
proposed rule to modify this existing best execution 
obligation.347 Therefore, the Commission's decision to defer 
consideration of the proposed rule in no way should be taken as an 
indication that the duty of best execution has been altered.
---------------------------------------------------------------------------

    \347\ Proposing Release at 49.
---------------------------------------------------------------------------

    A broker-dealer's duty of best execution derives from common law 
agency principles and fiduciary obligations, and is incorporated both 
in SRO rules and, through judicial and Commission decisions, in the 
antifraud provisions of the federal securities laws.348 This duty 
of best execution requires a broker-dealer to seek the most favorable 
terms reasonably available under the circumstances for a customer's 
transaction.349 The scope of this duty of best execution must 
evolve as changes occur in the market that give rise to improved 
executions for customer orders, including

[[Page 48323]]

opportunities to trade at more advantageous prices. As these changes 
occur, broker-dealers' procedures for seeking to obtain best execution 
for customer orders also must be modified to consider price 
opportunities that become ``reasonably available.'' 350
---------------------------------------------------------------------------

    \348\ See Market 2000 Study, Study V at V-1, 2 and sources cited 
therein.
    \349\ See Market 2000 Concept Release, supra note 10; Market 
2000 Study, Study V.
    \350\ Proposing Release at 7-10.
---------------------------------------------------------------------------

    In the past the Commission has recognized the practical necessity 
of automating the handling of small orders, and has indicated that 
automated routing or execution of customer orders is not necessarily 
inconsistent with best execution.351 At the same time, the 
Commission has emphasized that best execution obligations require that 
broker-dealers routing orders for automatic execution must periodically 
assess the quality of competing markets to assure that order flow is 
directed to markets providing the most beneficial terms for their 
customers' orders.352 While in the past quote-based executions in 
OTC securities were generally recognized as satisfying best execution 
obligations, the development of efficient new facilities has altered 
what broker dealers must consider in seeking best execution of customer 
orders.353 The Commission thus noted the importance of the 
opportunity for price improvement as a factor in best execution, 
speaking in the context of aggregate order handling decisions for both 
listed and OTC stocks.354 Therefore, the Commission believes that 
routing order flow for automated execution, or internally executing 
order flow on an automated basis, at the best bid or offer quotation, 
would not necessarily satisfy a broker-dealer's duty of best execution 
for small orders in listed and OTC securities.355
---------------------------------------------------------------------------

    \351\ Id. at 8.
    \352\ Payment for Order Flow Release, supra note 23, at n. 30 
and accompanying text; See Securities Exchange Act Release No. 37046 
(March 29, 1996), 61 FR 15322 (April 5, 1996) (``CSE Approval 
Order''); Securities Exchange Act Release No. 37045 (March 29, 
1996), 61 FR 15318 (April 5, 1996) (``BSE Approval Order'').
    \353\ Proposing Release at 10.
    \354\ Id.; see also Payment for Order Flow Release, supra note 
23 at text accompanying notes 31-33. See CSE Approval Order, supra 
note 352; BSE Approval Order, supra note 352.
    \355\ Proposing Release at 9-10; see also note 360 and 
accompanying text (factors relevant to best execution).
---------------------------------------------------------------------------

    Both the rule and the amendments adopted today should further 
improve a broker-dealer's ability to obtain improved executions for 
customer orders. These changes will enhance the public quote by 
including in the public quotation system many superior prices not 
currently reflected there. The ECN amendment is intended to publicize 
superior market maker ECN prices in the public quote, which should make 
these prices more easily accessible. Similarly, the Display Rule will 
include more customer prices in the public quote through requiring the 
display of customer limit orders.
    Nonetheless, various markets and market makers may continue to 
provide opportunities for executions at prices superior to the enhanced 
national best bid and offer for their customer orders.356 For 
example, some markets or market makers may continue to offer price 
improvement opportunities, based on internal order flow or execution 
algorithms. The Commission believes that broker-dealers deciding where 
to route or execute small customer orders in listed or OTC securities 
must carefully evaluate the extent to which this order flow would be 
afforded better terms if executed in a market or with a market maker 
offering price improvement opportunities. In conducting the requisite 
evaluation of its internal order handling procedures, a broker-dealer 
must regularly and rigorously examine execution quality likely to be 
obtained from the different markets or market makers trading a 
security.357 If different markets may be more suitable for 
different types of orders or particular securities, the broker-dealer 
will also need to consider such factors.
---------------------------------------------------------------------------

    \356\ Id.
    \357\ CSE Approval Order, 61 FR at 15329. ``Price improvement'' 
in this context is defined as the difference between execution price 
and the best quotes prevailing in the market at the time the order 
arrived at the market or market maker. Any evaluation of price 
improvement opportunities would have to consider not only the extent 
to which orders are executed at prices better than the prevailing 
quotes, but also the extent to which orders are executed at inferior 
prices.
---------------------------------------------------------------------------

    Where material differences exist between the price improvement 
opportunities offered by markets or market makers, these differences 
must be taken into account by the broker-dealer. Similarly, in 
evaluating its procedures for handling limit orders, the broker-dealer 
must take into account any material differences in execution quality ( 
e.g., the likelihood of execution) among the various markets or market 
centers to which limit orders may be routed. The traditional non-price 
factors affecting the cost or efficiency of executions also should 
continue to be considered; 358 however, broker-dealers must not 
allow an order routing inducement, such as payment for order flow or 
the opportunity to trade with that order as principal, to interfere 
with its duty of best execution.359 Of course, as the Commission 
has previously noted, in light of a broker-dealer's obligation to 
assess the quality of the markets to which it routes packaged order 
flow absent specific instructions from customers, the Commission does 
not believe that a broker-dealer violates its best execution obligation 
merely because it receives payment for order flow or trades as 
principal with customer orders.360
---------------------------------------------------------------------------

    \358\ See Market 2000 Study, Study V at V-2, 3.
    \359\ Payment for Order Flow Release, supra note 23.
    \360\ Id.
---------------------------------------------------------------------------

    Prices superior to the public quote may at times be available in 
ECNs, even after adoption of the ECN amendment, based, for example, on 
orders of institutional participants and others not covered by the ECN 
amendment. Superior prices also may be available in other systems not 
classified as ECNs. As the Commission noted in the Proposing Release in 
September, 1995, and reiterates today, where reliable, superior prices 
are readily accessible in such systems, broker-dealers should consider 
these prices in making decisions regarding the routing of customer 
orders.361 The Commission recognizes that many of these systems 
are less accessible and involve higher costs for broker-dealers than 
the public markets. In addition, in many cases it is not currently 
feasible to efficiently obtain price information from these systems or 
link to these systems on an automated basis. The Commission is not 
suggesting that broker-dealers must engage in manual handling of small 
orders if necessary to access these systems.362 Nonetheless, the 
Commission believes that because technology is rapidly making these 
systems more accessible, broker-dealers must regularly evaluate whether 
prices or other benefits offered by these systems are reasonably 
available for purposes of seeking best execution of these customer 
orders. For example, if an ECN provides an automated link that makes it 
cost effective for a broker-dealer to access these systems for its 
retail orders on an automated basis, the broker-dealer must take the 
prices and other relevant costs in that system into account in handling 
these customer orders.
---------------------------------------------------------------------------

    \361\ Proposing Release at 10.
    \362\ The Commission has recognized that it may be impractical, 
both in terms of time and expense, for a broker that handles a large 
volume of orders to determine individually where to route each order 
it received. Proposing Release at 8.
---------------------------------------------------------------------------

    Pursuant to the Display Rule, most customer limit orders at 
superior prices will be required to be displayed and

[[Page 48324]]

included in the public quote.363 The display of a limit order by a 
market maker directly affects its responsibilities in handling other 
customer orders. The Commission has long said that broker-dealers must 
consider quotation information contained in the public quotation system 
in seeking best execution of customer orders.364 In executing 
customer market orders, a market maker must give no less consideration 
to the price of its own displayed customer limit order than any other 
public quotation price. Therefore, under the new Display Rule, a market 
maker that has displayed a customer limit order would be expected to 
provide an offsetting customer market order an execution at that limit 
price at least up to the size of the limit order.
---------------------------------------------------------------------------

    \363\ The Commission notes that the NASD's interpretation 
prohibiting market makers from trading ahead of customer limit 
orders applies both to displayed and nondisplayed customer limit 
orders held by the market maker. See NASD Conduct Rule IM 2110-2 
(Trading Ahead of Customer Limit Orders).
    \364\ See Quote Rule Adopting Release, supra note 208.
---------------------------------------------------------------------------

    In addition, the Commission notes that currently, some market 
makers that hold a customer limit order on one side of the market, 
priced better than the market maker's own quote, and a customer market 
order on the other side of the market, will execute both orders as 
principal rather than crossing the two orders. As a result, the market 
order customer receives the best bid and offer rather than receiving 
the benefit of a better limit order price. In light of the increased 
opportunities for price improvement now available and the rules the 
Commission is adopting today, the Commission believes that going 
forward this practice is no longer appropriate given the broker-
dealer's obligation, as part of its duty of best execution, to its 
market order customer.365
---------------------------------------------------------------------------

    \365\ Cf., NASD Notice to Members 96-10 (February, 1996) at 43; 
NASD Notice to Members 95-67 (August, 1995) at 417.
---------------------------------------------------------------------------

    In conclusion, although the Commission has determined for the 
present to defer final action on the proposed Price Improvement Rule, 
the Commission's adoption of the Display Rule and the Quote Rule 
amendments should substantially improve public quotations. Moreover, 
the Commission firmly believes that broker-dealers, when deciding where 
to route or execute customer orders, must carefully consider and 
evaluate opportunities for obtaining improved executions.

IV. Authority

    As discussed above, the 1975 Act Amendments to the Exchange Act set 
forth Congress' goals for a national market system. Several commenters 
argue that the proposed rules violate Congress's direction that the 
Commission facilitate the establishment of, rather than design, a 
national market system.366 Many of these comments were directed at 
the proposed Price Improvement Rule and in particular the proposed 
price improvement safe harbor. The Commission today is deferring action 
on that rule proposal. To the extent that the comments relate to the 
rule and amendments adopted today, however, they reflect a fundamental 
misunderstanding regarding the purpose of the rules and the 
Commission's role in facilitating a national market system.
---------------------------------------------------------------------------

    \366\ See, e.g., ABA Letter; Fahnestock Letter; HHG Letter; LJR 
Letter; NSC Letter; PaineWebber Letter; RPM Letter; Ruane Letter; 
SIA Letter.
---------------------------------------------------------------------------

    The Commission's adoption of these rules is fully consistent with 
the role that Congress envisioned in 1975 for the Commission. 
Congress's direction to the Commission to ``facilitate'' the 
establishment of a national market system for securities that 
implemented Congressionally enumerated objectives was not intended as a 
limitation on the Commission's authority but rather was ``designed to 
provide maximum flexibility to the Commission and the securities 
industry in giving specific content to the general concept of the 
national market system.'' 367 Congress granted the Commission 
broad rulemaking authority over the national market system and market 
participants and this grant of specific rulemaking authority was not 
conditioned on the expectation that the Commission refrain from using 
it.
---------------------------------------------------------------------------

    \367\ Conference Report, supra note 213, at 92. See Senate 
Report, supra note 31, at 8-9 (``the sounder approach appeared * * * 
to be to establish a statutory scheme clearly granting the 
Commission broad authority to oversee the implementation, operation, 
and regulation of the national market system and at the same time to 
charging it with the clear responsibility to assure that the system 
develops and operates in accordance with Congressional determined 
goals and objectives.''). The Conference Committee report on the 
1975 Act Amendments indicates that the conferees adopted with minor 
revisions the Senate's provisions concerning the national market 
system. Conference Report, supra note 213, at 92.
---------------------------------------------------------------------------

    Although Congress expressed a preference that where possible the 
national market system evolve through the interplay of competitive 
forces, it recognized that ``competition may not be sufficient'' and 
that in such cases, the Commission should act ``promptly and 
effectively to insure that the essential mechanisms of an integrated 
secondary trading system [be] put into place * * *.'' 368 Congress 
specifically identified in 1975 some of the concerns addressed today 
and the Commission has examined these issues on several occasions over 
the intervening years in response to evolving market conditions and 
technologies. In view of the caution and deliberation with which the 
Commission has proceeded over the past 21 years, its actions today 
cannot fairly be viewed as arresting natural competitive forces, but 
rather should be regarded as an attempt to foster efficiency and 
redress shortcomings in the national market system that have developed 
since then, or that the securities industry on its own has been unable 
to resolve over this time.
---------------------------------------------------------------------------

    \368\ Conference Report, supra note 213 at 92.
---------------------------------------------------------------------------

    The subject matter of these rule and rule amendments is an area of 
the national market system in which Congress itself recognized that the 
Commission's expertise and authority were paramount. Indeed, Section 
11A was specifically enacted to eliminate ``arguments about the SEC's 
authority'' in this area. For that reason, the Commission was given 
``pervasive rulemaking power'' with respect to the business of 
collecting, processing, or publishing information relating to 
quotations for and transactions in securities.369 The rules 
adopted today implement Congress' goals as to dissemination of trading 
information: ``to insure the availability of prompt and accurate 
trading information, to assure that these communications networks are 
not controlled or dominated by any particular market center, to 
guarantee fair access to such systems by all brokers, dealers and 
investors, and to prevent any competitive restriction on their 
operation not justified by the purposes of the Exchange Act.'' 370
---------------------------------------------------------------------------

    \369\ Conference Report, supra note 213, at 93.
    \370\ Senate Report, supra note 31.
---------------------------------------------------------------------------

    It bears noting that the standards adopted by the Commission today 
are intended to allow markets to adapt and evolve in meeting the 
objectives of the national market system; the rules establish 
performance standards but do not dictate market structure. With regard 
to the Quote Rule, the rules do not determine how non-Rule 19c-3 market 
makers may make markets or how electronic communications networks may 
operate. Non-Rule 19c-3 market makers are free to operate as they 
please so long as they report their quotations to the extent they 
execute a certain level of volume in a security. Likewise, market 
makers and specialists may place priced orders in ECNs of many 
different designs as long as they change their quotes to reflect the 
orders in the ECN or the ECNs publicly report the quotes and provide 
access to such

[[Page 48325]]

priced orders. With regard to the Limit Order Display Rule, the rule 
does not seek to create a central limit order book or central limit 
order file. Broker-dealers are free to satisfy the rule in several 
different ways, so long as the result is that customer limit orders 
priced at or better than the NBBO are publicly displayed.
    Some commenters also argue that the proposed rules are contrary to 
Congress' direction to assure fair competition between auction and 
dealer markets as structures for the trading of securities 371 and 
inappropriately introduce auction market principles into dealer 
markets. Although requiring display of superior-priced customer limit 
orders could be viewed as an auction market principle, such a 
requirement does not supplant the basic features of a dealer market or 
undermine competition between the exchange and OTC markets. Congress 
clearly intended that dealer markets would benefit from use of some 
auction market principles 372 and the 1975 Amendments specifically 
announce as a goal of the national market system that customer orders 
be able to interact without the intervention of a dealer to the extent 
that such a goal is consistent with other national market system 
objectives.373 At a minimum, where feasible, customer limit orders 
should have a meaningful opportunity to interact with customer market 
orders.374
---------------------------------------------------------------------------

    \371\ See, e.g., Goldman Sachs Letter; Jefferies Letter; Merrill 
Lynch Letter; RPM Letter; Schwab I Letter; Schwartz & Wood Letter; 
SIA Letter; Specialist Assoc. Letter; see also Exchange Act Section 
11A(a)(1)(C)(ii), 15 U.S.C. 78k-1(a)(1)(C)(ii).
    \372\ Senate Report, supra note 31, at 16.
    \373\ Exchange Act Section 11A(a)(1)(C)(v).
    \374\ Exchange Act Section 11A(a)(1)(C)(v).
---------------------------------------------------------------------------

    One of the main benefits contemplated by Congress was that the 
national market system would enable investors in dealer markets to 
execute against another limit order or market order at a better price 
than currently being quoted by a dealer for his own account.375 
Display of superior-priced limit orders would permit investors to 
compete in some cases with market makers and specialists, thereby 
increasing the competitiveness of dealer markets in these securities 
and enhancing the quality of customer limit order execution. Display of 
customer limit orders, however, would not compromise the essential 
features of dealer markets. In the absence of any superior-priced 
customer limit orders, dealers would continue to compete for market 
orders at their published quotations and would be able to execute 
against customer limit orders that would otherwise prevent the market 
maker from trading with a market order. Further, the widespread use by 
OTC dealers of ECNs to trade at prices better than the dealers' 
published quotes is of such recent vintage that it can hardly be viewed 
as a necessary part of a dealer market structure.376
---------------------------------------------------------------------------

    \375\ Senate Report supra note 31, at 16.
    \376\ While the rule and rule amendments adopted today function 
as an integrated response to the problems the Commission has 
identified in the implementation of a NMS, each separately advances 
the Congressional goals of market efficiency, fair competition, 
transparency, and best execution, and accordingly the Commission 
intends that they be treated as severable for purposes of review.
---------------------------------------------------------------------------

V. Summary of Final Regulatory Flexibility Act Analysis

    This following discussion summarizes the Commission's analysis of 
the rules adopted today under the Regulatory Flexibility Act. A 
complete final copy of the Final Regulatory Flexibility Act is 
available in the Public File.
    The rules adopted today by the Commission are intended to allow 
markets to adapt and evolve in meeting the objectives of the national 
market system. In this regard, the rules establish performance 
standards but do not dictate market structure. The Quote Rule does not 
dictate how market makers or specialists that trade non-Rule 19c-3 
securities may conduct their market making activities or how ECNs may 
service their subscribers. Market makers will be able to continue their 
regular market making activities so long as they report their 
quotations if they trade more than 1% of the transaction volume in a 
security. Likewise, market makers and specialists may place priced 
orders in ECNs of many different designs as long as they change their 
quotes to reflect better priced orders they have entered in ECNs or, 
alternatively, such ECNs provide for the public reporting of these 
prices and provide access to such priced orders. Moreover, broker-
dealers are free to satisfy the Display Rule in several different ways, 
so long as the result is that customer limit orders priced at or better 
than the NBBO are publicly displayed in accordance with the rule.

A. Display Rule

    The Commission considered several significant alternatives to Rule 
11Ac1-4 consistent with the Rule's objectives and designed to minimize 
the impact of the rule on small entities. The Commission solicited 
comment on, among other things: (i) Whether the display requirement 
should be based on a de minimis threshold; (ii) the classes of 
securities to which the Rule should apply; (iii) whether to permit 
limit orders to be delivered to an exchange- or association-sponsored 
system that displays limit orders in accordance with the rule; and (iv) 
whether to permit limit orders to be delivered to an ECN or a PTS. The 
Commission believes that the rule as adopted imposes a smaller burden 
upon small brokers and dealers than do other alternatives considered.
    The Commission believes that the ability of brokers and dealers to 
send a limit order to another party or system that will display that 
order provides all brokers and dealers, including small brokers and 
dealers, with the greatest possible flexibility to satisfy the NMS 
objectives embodied in the rule in the most economical manner. In this 
regard, the Commission decided to expand one of the exceptions to the 
display requirement that will permit market makers to comply with the 
rule by delivering customer limit orders to an ECN that complies with 
the ECN amendment to the Quote Rule. Furthermore, the Commission added 
a new exemptive provision that enables the Commission to exempt any 
responsible broker or dealer, ECN, exchange, or association from the 
requirements of the Display Rule.
    The Commission considered allowing display of a representative size 
of a limit order rather than the full size, but concluded that display 
of the full size will provide the most accurate picture of the depth of 
the market at a particular price. The Commission does not believe that 
it is practicable to exempt small entities from the Display Rule 
because to do so would be inconsistent with the Commission's statutory 
mandate to protect investors. In that regard, the Commission believes 
that the pricing and size conventions documented in the 21(a) Report 
referenced above make it imperative that the requirements of the 
Display Rule apply to all market participants with equal force. The 
Commission notes that any exception for small brokers and dealers could 
create an incentive for Nasdaq market makers to create special market 
making subsidiaries qualifying as small broker-dealers which would be 
free to engage in the anti-competitive practices identified in the 
21(a) Report.

B. Quote Rule

    Allowing market makers that deal actively in securities without 
publicizing their activity or making available their prices undermines 
the NMS goal of transparency. The Commission believes that those 
dealers should be recognized as market makers and their quotations 
publicized so that investors may know of, and trade on similar terms 
with, those market makers. Therefore, the definition of OTC

[[Page 48326]]

market maker now includes any dealer holding itself out as willing to 
transact business for its own account on a regular or continuous basis, 
whether it transacts exclusively with its own customers or with the 
customers of other dealers. Thus, those dealers that internalize 
customer order flow in particular stocks or through arrangements with 
other firms to execute that order flow, now fall within the definition 
of OTC market maker and are subject to the obligations under the Quote 
Rule. As in the past, broker-dealers will not be considered to be 
holding themselves out as regularly or continuously willing to buy or 
sell a security if they occasionally execute a trade as principal to 
accommodate a customer's request. In response to the suggestions of 
some commenters, the Commission has modified the amendment to make 
clear that more than one isolated transaction is necessary before a 
dealer is designated an OTC market maker.
    In addition, the Commission believes that extending the 1% 
threshold based on quarterly aggregate trading volume to non-Rule 19c-3 
securities is a reasonable method to improve the scope of quotation 
information to include significant OTC market makers and specialists. 
This 1% threshold, currently in effect for Rule 19c-3 securities, has 
proved effective in supplying comprehensive quotation information to 
the market at large. Moreover, based on the increase in third market 
trading volume for these securities, the Commission does not believe 
this standard is unduly burdensome on OTC market makers. Rather, the 
Commission believes this threshold strikes a balance between requiring 
the dissemination of all quotation interest and accommodating those 
specialists and OTC market makers that may be small entities. The 
Commission believes that OTC market makers and specialists that account 
for 1% or less of the aggregate volume are not active enough to justify 
the additional expense of providing continuous quotation display. 
Accordingly, the Commission believes the ``greater than 1% aggregate 
trading volume'' threshold for mandatory quotations continues to be 
appropriate. To limit a possible inconsistency in the treatment of 
exchange-listed and Nasdaq securities, the Commission today is 
proposing that the 1% test be extended from all exchange-listed 
securities to all Nasdaq-listed securities.
    The Commission considered several significant alternatives to the 
proposed amendments to the Quote Rule consistent with the Rule's 
objectives and designed to minimize the impact of the amendments on 
small entities. The Commission solicited comment on numerous 
alternatives to the amendments proposed to ensure that investors 
receive consolidated quotations that truly reflect the best prices 
available for a security. The Commission solicited comment on, among 
other issues: (i) Whether the Commission should require SROs to amend 
their rules to permit computer-generated quotations; (ii) whether there 
existed alternatives to the ECN proposal that minimized certain 
consequences of the rule while assuring public dissemination of the 
best priced orders in such systems; (iii) whether there should be 
exceptions to the ECN proposal and under what circumstances; and (iv) 
whether the objectives of the Quote Rule and the ECN amendment could be 
achieved by allowing ECNs to furnish prices to the applicable SRO, 
while providing access to the prices in their ECN. The Commission 
believes that the amendments as adopted impose a smaller burden upon 
small brokers and dealers than does any other alternative considered.
    In recognition of the concerns raised by some commenters, the ECN 
display alternative is designed to preserve the benefits associated 
with the anonymity that certain ECNs currently offer to subscribing 
market makers and specialists. This alternative also ensures that the 
best market maker and specialist prices in the ECN are publicly 
disseminated and that non-subscribing brokers and dealers may trade 
with the orders represented by those prices. Under the display 
alternative, the price of a specialist's or market maker's order 
entered into an ECN would be publicly disseminated while the specialist 
or market maker remains anonymous. This alternative not only preserves 
anonymity, but also eliminates the risk that a market maker or 
specialist may be exposed to multiple executions at the ECN price. With 
the addition of the alternative, the ECN amendment permits the display 
of the best price either in the specialist's or market maker's quote or 
through an ECN that provides for the dissemination of the best market 
maker and specialist prices entered into the ECN.
    The Commission also notes that the ECN display alternative reduces 
the compliance burden on broker-dealers, including small entities, by 
permitting specialists and market makers to comply with the ECN 
amendment if the ECN into which the market maker's order is entered 
ensures that the best market maker prices entered therein are 
communicated to an exchange, association or securities information 
processor and the ECN provides a means for brokers and dealers to trade 
with the orders market makers and specialists put in the ECN.
    The Commission recognizes that the ECN display alternative may 
reduce the content of information that is publicly available because 
under this alternative, the identity of the market maker or specialist 
that entered the better priced order in the ECN will be withheld. The 
Commission believes this result is justified because the inside prices 
and full sizes of orders entered by market makers and specialists will 
be in the public quotation system to inform the entire market of these 
prices and ECNs will provide equivalent access to those prices. 
Moreover, the Commission believes the benefits of facilitating the use 
of ECNs, by permitting the continued anonymity of market makers and 
specialists, more than offset the reduced information available on the 
identity of a particular market maker or specialist.
    The Commission believes the data it has reviewed supports the need 
for prompt adoption of the ECN amendment to the Quote Rule. As 
discussed more fully in the Appendix to the 21(a) Report, an analysis 
of data for April through June 1994 shows that approximately 85% of 
bids and offers displayed by market makers on Instinet and 90% of bids 
and offers displayed on SelectNet (an ECN sponsored by the NASD) were 
at better prices than those disseminated to the public via Nasdaq. In 
addition, approximately 77% of trades executed on Instinet and 60% of 
trades executed on SelectNet were at prices superior to the Nasdaq 
inside spread. Given this strong evidence that investors would benefit 
from public dissemination of these hidden prices that are broadly 
disseminated to subscribers in these systems, the Commission believes 
that it is appropriate to adopt the amendments to the Quote Rule.
    The Commission does not believe that it is practicable to exempt 
small entities from the Quote Rule amendments because to do so would be 
inconsistent with the Commission's statutory mandate to protect 
investors. In this regard, the Commission notes the clear evidence of a 
two-tiered market, in which market makers routinely trade at one price 
with customers and at better prices with ECN participants. The 
Commission believes that it is imperative to further the long-standing 
objectives of the 1975 Amendments to ensure reliable and accurate 
quotes by making these prices available to the public. The Commission 
believes that any exception for small brokers and

[[Page 48327]]

dealers could create an incentive for Nasdaq market makers to create 
special market making subsidiaries qualifying as small broker-dealers 
which would be free to engage in the anti-competitive practices 
identified in the 21(a) Report.
    A final copy of the Final Regulatory Flexibility Act analysis is 
available in the Public File.

VI. Paperwork Reduction Act

    As set forth in the Proposing Release,377 the proposed 
amendments to Rule 11Ac1-1 and proposed Rule 11Ac1-4 contain 
collections of information within the meaning of the Paperwork 
Reduction Act (``PRA''). Accordingly, proposed amendments to Rule 
11Ac1-1 and proposed Rule 11Ac1-4 were submitted to the Office of 
Management and Budget (``OMB'') for review pursuant to Section 3507 of 
the PRA (44 U.S.C. 3507), and were approved by OMB which assigned the 
following control numbers: Amendments to Rule 11Ac1-1, control number 
3235-0461; Rule 11Ac1-4, control number 3235-0462. An agency may not 
conduct or sponsor, and a person is not required to respond to, a 
collection of information unless it displays a valid OMB control 
number. This is the final notice regarding the collection of 
information under Rule 11Ac1-4, the Display Rule. A new notice 
regarding the collections of information under Rule 11Ac1-1, the Quote 
Rule, may be found in the Companion Release (published elsewhere in the 
Federal Register today) which proposes an additional amendment to the 
Quote Rule. The PRA section in the preamble of the Companion Release 
provides new estimates of the burden in responding to the collections 
of information under the Quote Rule as a whole.
---------------------------------------------------------------------------

    \377\ Proposing Release at 70.
---------------------------------------------------------------------------

    The reporting requirement in Rule 11Ac1-4 is found in 17 CFR 
240.11Ac1-4. The collection of information is mandatory and responses 
are not confidential. The respondents are OTC market makers, as defined 
under the rule. (Although exchange specialists are also required to 
follow the rule, as noted in the Proposing Release the Commission does 
not anticipate any significant additional burden on exchange 
specialists in light of current exchange order handling practices.) The 
Rule requires market makers to change their published quotation to 
reflect the price and/or size of a customer limit order that would 
improve their published bid or offer or otherwise ensure that such 
limit order is displayed. The burden on market makers will depend on 
the extent and variety of their market-making activities and their 
choice of the various compliance options offered by the regulations. 
The ability of market makers to utilize facilities of national 
securities exchanges, registered national securities associations, and 
ECNs to comply with the reporting requirement should ease the 
compliance burden. The proposed rule would have permitted market makers 
to execute a limit order or send a limit order to another market maker 
or exchange or association facility that would ensure display of such 
orders in lieu of the market makers' own display. Rule 11Ac1-4 as 
adopted maintains these alternatives and also permits respondents to 
send a limit order to an ECN meeting certain criteria. The information 
reported will be displayed to all persons who have access to a 
quotation montage as that term is defined in 17 CFR 240.11Ac1-2(a)(16).
    The Commission carefully considered comments received from the NASD 
and SIA concerning the Commission's burden estimates.378 The NASD 
stated that the Commission underestimated the number of limit orders to 
be displayed per trading day, given the NASD's view that Rule 11Ac1-4 
will lead to increased limit order exposure. After considering the 
NASD's comment, and based upon further review of the market data, the 
Commission is revising its burden estimate for Rule 11Ac1-4 as follows. 
There are approximately 570 respondents. Each respondent on average 
will respond to the collection of information 42,000 times per year, 
based on a 252 trading day year. The total time burden for each 
respondent per year is estimated to be 35 hours, based on an estimate 
of 3 seconds per response (i.e., the time it takes to update a quote to 
reflect a limit order, or to transmit the order for display 
elsewhere).379 The total annual aggregate burden for all 
respondents is estimated to be 19,950 hours.
---------------------------------------------------------------------------

    \378\ The SIA noted that they join in the concerns expressed by 
the NASD that the Commission's estimates under the PRA are too low, 
and need to be revised and extended to include the proposed safe 
harbor under Rule 11Ac1-5. SIA Letter at 4. As noted above, the 
Commission is not adopting the Price Improvement Rule at this time.
    \379\ The NASD commented that it believes the PRA burden 
estimate should include the time market makers spend analyzing 
market trends and following quotation and last sale information. The 
Commission has determined not to revise its burden estimate based on 
this comment, because market makers otherwise engage in such 
activities apart from the collection of information requirement. For 
example, market makers are already required to monitor the markets 
to ensure that they do not trade ahead of customer limit orders.
---------------------------------------------------------------------------

VII. Effects on Competition

    Section 23(a)(2) of the Exchange Act 380 requires the 
Commission to consider the anti-competitive effects of any rules it 
adopts thereunder, and to balance them against the benefits that 
further the purposes of the Act. As discussed above, several commenters 
raised concerns regarding the competitive implications of the order 
handling proposals.381 The foregoing discussion contains extensive 
analysis of the competitive effects of both the rule and rule 
amendments; this section summarizes the Commission's conclusions. The 
Commission has considered the proposals in light of the comments and 
the standard embodied in Section 23(a)(2) and has concluded any burdens 
on competition imposed by the Display Rule and the amendments to the 
Quote Rule are necessary and appropriate in furtherance of the purposes 
of the Exchange Act, in particular, the purposes of Section 11A.
---------------------------------------------------------------------------

    \380\ 15 U.S.C. 78w(a)(2).
    \381\ See ABA Letter; HHG Letter; NASD Letter.
---------------------------------------------------------------------------

    The Commission notes that the primary burden imposed by the Display 
Rule will be to require exchange specialists and OTC market makers to 
ensure that customer limit orders improving their quotes are displayed. 
The Commission believes that if systems upgrades are necessary, those 
systems upgrades reflect one-time charges. The Commission also notes 
that ensuring public dissemination of limit orders enhances market 
transparency, increases pricing efficiency, and quote-based 
competition, and permits investors' orders to interact with all 
available market interest. Moreover, the limit order display rule will 
provide an opportunity for investors to compete directly in the market. 
This additional competition should limit certain anticompetitive 
practices identified in the 21(a) Report and discussed supra. For the 
reasons discussed above, the Commission does not believe the Display 
Rule will have a significantly different effect on wholesale and retail 
market makers.382 The Commission notes that the Antitrust Division 
of the U.S. Department of Justice similarly concluded that the Display 
Rule will promote competition and will thereby benefit the investing 
public.
---------------------------------------------------------------------------

    \382\ See supra note 124 and accompanying text.
---------------------------------------------------------------------------

    Similarly, the Commission notes that the primary burden imposed by 
the ECN Amendment to the Quote Rule will be to require exchange 
specialists and OTC market makers to add personnel or upgrade systems 
to ensure that their quotes reflect priced orders entered into those 
ECNs that do not disseminate

[[Page 48328]]

order information to the relevant exchange or association. The 
Commission believes that such systems upgrades reflect one-time 
charges. The Commission believes that the ECN amendment to the Quote 
Rule will impose only limited competitive burdens on ECNs. ECNs which 
have attributes that differentiate them from other types of electronic 
order routing and order execution systems, will have a choice whether 
to disseminate order information to the relevant exchanges or 
association. While choosing this alternative will result in some system 
costs, the Commission believes that the alternative will provide ECNs 
with additional business opportunities, including increased order flow. 
The ECN amendment should allow ECNs to function as valuable facilities 
for their subscribers, and should not harm ECNs significantly in their 
competition with other order execution systems.383 The Commission 
also notes that ensuring public dissemination of market makers' and 
specialists' priced orders entered into ECNs enhances market 
transparency, pricing efficiency, price competition, and allows 
investors' orders to interact with all available market interest.
---------------------------------------------------------------------------

    \383\ Although the Antitrust Division of the U.S. Department of 
Justice expressed concerns about the effects of the ECN amendment as 
originally proposed, the Commission believes that with the quote 
dissemination alternative, the amendment will not impose any 
unnecessary or inappropriate burdens on competition.
---------------------------------------------------------------------------

    Finally, with respect to the amendments extending the Mandatory 
Quote Rule to non-Rule 19c-3 securities, the primary burden imposed 
will be to require certain brokers and dealers to register as CQS 
market makers and make continuous two-sided quotes available to the 
public. The Commission believes that the benefit to the investing 
public of ensuring that available market interest is disseminated to 
the public will enhance competition by facilitating the routing of 
investor orders to the market center displaying the best quotation for 
a security. The Commission believes that the added transparency 
resulting from the amendment outweighs any burden to competition that 
may be imposed.

List of Subjects in 17 CFR Part 240

    Broker-dealers, Confidential business information, Reporting and 
recordkeeping requirements, and Securities.

Text of the Rules

    For the reasons set out in the preamble, the Commission amends Part 
240 of Chapter II of Title 17 of the Code of Federal Regulation as 
follows:

PART 240--GENERAL RULES AND REGULATIONS, SECURITIES EXCHANGE ACT OF 
1934

    1. The general authority citation for Part 240 is revised to read 
as follows:

    Authority: 15 U.S.C. 77c, 77d, 77g, 77j, 77s, 77eee, 77ggg, 
77nnn, 77sss, 77ttt, 78c, 78d, 78f, 78i, 78j, 78k, 78k-1, 78l, 78m, 
78n, 78o, 78p, 78q, 78s, 78w, 78x, 78ll(d), 79q, 79t, 80a-20, 80a-
23, 80a-29, 80a-37, 80b-3, 80b-4 and 80b-11, unless otherwise noted.
* * * * *
    2. Section 240.11Aa3-1 is amended by revising paragraph (a)(4) to 
read as follows:

Sec. 240.11Aa3-1  Dissemination of transaction reports and last sale 
data with respect to transactions in reported securities.

    (a) Definitions. * * *
    (4) The term reported security shall mean any security or class of 
securities for which transaction reports are collected, processed and 
made available pursuant to an effective transaction reporting plan.
* * * * *
    3. Section 240.11Ac1-1 is revised to read as follows:

Sec. 240.11Ac1-1  Dissemination of quotations.

    (a) Definitions. For the purposes of this section:
    (1) The term aggregate quotation size shall mean the sum of the 
quotation sizes of all responsible brokers or dealers who have 
communicated on any exchange bids or offers for a covered security at 
the same price.
    (2) The term association shall mean any association of brokers and 
dealers registered pursuant to Section 15A of the Act (15 U.S.C. 78o-
3).
    (3) The terms best bid and best offer shall mean the highest priced 
bid and the lowest priced offer.
    (4) The terms bid and offer shall mean the bid price and the offer 
price communicated by an exchange member or OTC market maker to any 
broker or dealer, or to any customer, at which it is willing to buy or 
sell one or more round lots of a covered security, as either principal 
or agent, but shall not include indications of interest.
    (5) The term consolidated system shall mean the consolidated 
transaction reporting system.
    (6) The term covered security shall mean any reported security and 
any other security for which a transaction report, last sale data or 
quotation information is disseminated through an automated quotation 
system as described in Section 3(a)(51)(A)(ii) of the Act (15 U.S.C. 
78c(a)(51)(A)(ii)).
    (7) The term effective transaction reporting plan shall have the 
meaning provided in Sec. 240.11Aa3-1(a)(3).
    (8) The term electronic communications network, for the purposes of 
Sec. 240.11Ac1-1(c)(5), shall mean any electronic system that widely 
disseminates to third parties orders entered therein by an exchange 
market maker or OTC market maker, and permits such orders to be 
executed against in whole or in part; except that the term electronic 
communications network shall not include:
    (i) Any system that crosses multiple orders at one or more 
specified times at a single price set by the ECN (by algorithm or by 
any derivative pricing mechanism) and does not allow orders to be 
crossed or executed against directly by participants outside of such 
times; or
    (ii) Any system operated by, or on behalf of, an OTC market maker 
or exchange market maker that executes customer orders primarily 
against the account of such market maker as principal, other than 
riskless principal.
    (9) The term exchange market maker shall mean any member of a 
national securities exchange (``exchange'') who is registered as a 
specialist or market maker pursuant to the rules of such exchange.
    (10) The term exchange-traded security shall mean any covered 
security or class of covered securities listed and registered, or 
admitted to unlisted trading privileges, on an exchange; provided, 
however, That securities not listed on any exchange that are traded 
pursuant to unlisted trading privileges are excluded.
    (11) The term make available, when used with respect to bids, 
offers, quotation sizes and aggregate quotation sizes supplied to 
quotation vendors by an exchange or association, shall mean to provide 
circuit connections at the premises of the exchange or association 
supplying such data, or at a common location determined by mutual 
agreement of the exchanges and associations, for the delivery of such 
data to quotation vendors.
    (12) The term odd-lot shall mean an order for the purchase or sale 
of a covered security in an amount less than a round lot.
    (13) The term OTC market maker shall mean any dealer who holds 
itself out as being willing to buy from and sell to its customers, or 
otherwise, a covered security for its own account on a regular or 
continuous basis otherwise than on an exchange in amounts of less than 
block size.

[[Page 48329]]

    (14) The term plan processor shall have the meaning provided in 
Sec. 240.11Aa3-2(a)(7).
    (15) The term published aggregate quotation size shall mean the 
aggregate quotation size calculated by an exchange and displayed by a 
quotation vendor on a terminal or other display device at the time an 
order is presented for execution to a responsible broker or dealer.
    (16) The terms published bid and published offer shall mean the bid 
or offer of a responsible broker or dealer for a covered security 
communicated by it to its exchange or association pursuant to this 
section and displayed by a quotation vendor on a terminal or other 
display device at the time an order is presented for execution to such 
responsible broker or dealer.
    (17) The term published quotation size shall mean the quotation 
size of a responsible broker or dealer communicated by it to its 
exchange or association pursuant to this section and displayed by a 
quotation vendor on a terminal or other display device at the time an 
order is presented for execution to such responsible broker or dealer.
    (18) The term quotation size, when used with respect to a 
responsible broker's or dealer's bid or offer for a covered security, 
shall mean:
    (i) The number of shares (or units of trading) of that covered 
security which such responsible broker or dealer has specified, for 
purposes of dissemination to quotation vendors, that it is willing to 
buy at the bid price or sell at the offer price comprising its bid or 
offer, as either principal or agent; or
    (ii) In the event such responsible broker or dealer has not so 
specified, a normal unit of trading for that covered security.
    (19) The term quotation vendor shall mean any securities 
information processor engaged in the business of disseminating to 
brokers, dealers or investors on a real-time basis, bids and offers 
made available pursuant to this section, whether distributed through an 
electronic communications network or displayed on a terminal or other 
display device.
    (20) The term reported security shall mean any security or class of 
securities for which transaction reports are collected, processed and 
made available pursuant to an effective transaction reporting plan.
    (21) The term responsible broker or dealer shall mean:
    (i) When used with respect to bids or offers communicated on an 
exchange, any member of such exchange who communicates to another 
member on such exchange, at the location (or locations) designated by 
such exchange for trading in a covered security, a bid or offer for 
such covered security, as either principal or agent; provided, however, 
That, in the event two or more members of an exchange have communicated 
on such exchange bids or offers for a covered security at the same 
price, each such member shall be considered a ``responsible broker or 
dealer'' for that bid or offer, subject to the rules of priority and 
precedence then in effect on that exchange; and further provided, That 
for a bid or offer which is transmitted from one member of an exchange 
to another member who undertakes to represent such bid or offer on such 
exchange as agent, only the last member who undertakes to represent 
such bid or offer as agent shall be considered the ``responsible broker 
or dealer'' for that bid or offer; and
    (ii) When used with respect to bids and offers communicated by a 
member of an association to another broker or dealer or to a customer 
otherwise than on an exchange, the member communicating the bid or 
offer (regardless of whether such bid or offer is for its own account 
or on behalf of another person).
    (22) The term revised bid or offer shall mean a market maker's bid 
or offer which supersedes its published bid or published offer.
    (23) The term revised quotation size shall mean a market maker's 
quotation size which supersedes its published quotation size.
    (24) The term specified persons, when used in connection with any 
notification required to be provided pursuant to paragraph (b)(3) of 
this section and any election (or withdrawal thereof) permitted under 
paragraph (b)(5) of this section, shall mean:
    (i) Each quotation vendor;
    (ii) Each plan processor; and
    (iii) The processor for the Options Price Reporting Authority (in 
the case of a notification for a subject security which is a class of 
securities underlying options admitted to trading on any exchange).
    (25) The term subject security shall mean:
    (i) With respect to an exchange:
    (A) Any exchange-traded security other than a security for which 
the executed volume of such exchange, during the most recent calendar 
quarter, comprised one percent or less of the aggregate trading volume 
for such security as reported in the consolidated system; and
    (B) Any other covered security for which such exchange has in 
effect an election, pursuant to paragraph (b)(5)(i) of this section, to 
collect, process, and make available to quotation vendors, bids, 
offers, quotation sizes, and aggregate quotation sizes communicated on 
such exchange; and
    (ii) With respect to a member of an association:
    (A) Any exchange-traded security for which such member acts in the 
capacity of an OTC market maker unless the executed volume of such 
member, during the most recent calendar quarter, comprised one percent 
or less of the aggregate trading volume for such security as reported 
in the consolidated system; and
    (B) Any other covered security for which such member acts in the 
capacity of an OTC market maker and has in effect an election, pursuant 
to paragraph (b)(5)(ii) of this section, to communicate to its 
association bids, offers and quotation sizes for the purpose of making 
such bids, offers and quotation sizes available to quotation vendors.
    (b) Dissemination requirements for exchanges and associations. (1) 
Every exchange and association shall establish and maintain procedures 
and mechanisms for collecting bids, offers, quotation sizes and 
aggregate quotation sizes from responsible brokers or dealers who are 
members of such exchange or association, processing such bids, offers 
and sizes, and making such bids, offers and sizes available to 
quotation vendors, as follows:
    (i) Each exchange shall at all times such exchange is open for 
trading, collect, process and make available to quotation vendors the 
best bid, the best offer, and aggregate quotation sizes for each 
subject security listed or admitted to unlisted trading privileges 
which is communicated on any exchange by any responsible broker or 
dealer, but shall not include:
    (A) Any bid or offer executed immediately after communication and 
any bid or offer communicated by a responsible broker or dealer other 
than an exchange market maker which is cancelled or withdrawn if not 
executed immediately after communication; and
    (B) Any bid or offer communicated during a period when trading in 
that security has been suspended or halted, or prior to the 
commencement of trading in that security on any trading day, on that 
exchange.
    (ii) Each association shall, at all times that last sale 
information with respect to reported securities is reported pursuant to 
an effective transaction reporting plan, collect, process and make 
available to quotation vendors the best bid, best offer, and quotation 
sizes communicated otherwise than on an exchange by each member of such 
association acting in the capacity of an

[[Page 48330]]

OTC market maker for each subject security and the identity of that 
member (excluding any bid or offer executed immediately after 
communication), except during any period when over-the-counter trading 
in that security has been suspended.
    (2) Each exchange shall, with respect to each published bid and 
published offer representing a bid or offer of a member for a subject 
security, establish and maintain procedures for ascertaining and 
disclosing to other members of that exchange, upon presentation of 
orders sought to be executed by them in reliance upon paragraph (c)(2) 
of this section, the identity of the responsible broker or dealer who 
made such bid or offer and the quotation size associated with it.
    (3)(i) If, at any time an exchange is open for trading, such 
exchange determines, pursuant to rules approved by the Securities and 
Exchange Commission pursuant to section 19(b)(2) of the Act (15 U.S.C. 
78s(b)(2)), that the level of trading activities or the existence of 
unusual market conditions is such that the exchange is incapable of 
collecting, processing, and making available to quotation vendors the 
data for a subject security required to be made available pursuant to 
paragraph (b)(1) of this section in a manner that accurately reflects 
the current state of the market on such exchange, such exchange shall 
immediately notify all specified persons of that determination. Upon 
such notification, responsible brokers or dealers that are members of 
that exchange shall be relieved of their obligation under paragraph 
(c)(2) of this section and such exchange shall be relieved of its 
obligations under paragraphs (b) (1) and (2) of this section for that 
security: provided, however, That such exchange will continue, to the 
maximum extent practicable under the circumstances, to collect, 
process, and make available to quotation vendors data for that security 
in accordance with paragraph (b)(1) of this section.
    (ii) During any period an exchange, or any responsible broker or 
dealer that is a member of that exchange, is relieved of any obligation 
imposed by this section for any subject security by virtue of a 
notification made pursuant to paragraph (b)(3)(i) of this section, such 
exchange shall monitor the activity or conditions which formed the 
basis for such notification and shall immediately renotify all 
specified persons when that exchange is once again capable of 
collecting, processing, and making available to quotation vendors the 
data for that security required to be made available pursuant to 
paragraph (b)(1) of this section in a manner that accurately reflects 
the current state of the market on such exchange. Upon such 
renotification, any exchange or responsible broker or dealer which had 
been relieved of any obligation imposed by this section as a 
consequence of the prior notification shall again be subject to such 
obligation.
    (4) Nothing in this section shall preclude any exchange or 
association from making available to quotation vendors indications of 
interest or bids and offers for a subject security at any time such 
exchange or association is not required to do so pursuant to paragraph 
(b)(1) of this section.
    (5)(i) Any exchange may make an election for purposes of paragraph 
(a)(25)(i)(B) of this section for any covered security, by collecting, 
processing, and making available bids, offers, quotation sizes, and 
aggregate quotation sizes in that security; except that for any covered 
security previously listed or admitted to unlisted trading privileges 
on only one exchange and not traded by any OTC market maker, such 
election shall be made by notifying all specified persons, and shall be 
effective at the opening of trading on the business day following 
notification.
    (ii) Any member of an association acting in the capacity of an OTC 
market maker may make an election for purposes of paragraph 
(a)(25)(ii)(B) of this section for any covered security, by 
communicating to its association bids, offers, and quotation sizes in 
that security; except that for any other covered security listed or 
admitted to unlisted trading privileges on only one exchange and not 
traded by any other OTC market maker, such election shall be made by 
notifying its association and all specified persons, and shall be 
effective at the opening of trading on the business day following 
notification.
    (iii) The election of an exchange or member of an association for 
any covered security pursuant to this paragraph (b)(5) shall cease to 
be in effect if such exchange or member ceases to make available or 
communicate bids, offers, and quotation sizes in such security.
    (c) Obligations of responsible brokers and dealers. (1) Each 
responsible broker or dealer shall promptly communicate to its exchange 
or association, pursuant to the procedures established by that exchange 
or association, its best bids, best offers, and quotation sizes for any 
subject security.
    (2) Subject to the provisions of paragraph (c)(3) of this section, 
each responsible broker or dealer shall be obligated to execute any 
order to buy or sell a subject security, other than an odd-lot order, 
presented to it by another broker or dealer, or any other person 
belonging to a category of persons with whom such responsible broker or 
dealer customarily deals, at a price at least as favorable to such 
buyer or seller as the responsible broker's or dealer's published bid 
or published offer (exclusive of any commission, commission equivalent 
or differential customarily charged by such responsible broker or 
dealer in connection with execution of any such order) in any amount up 
to its published quotation size.
    (3)(i) No responsible broker or dealer shall be obligated to 
execute a transaction for any subject security as provided in paragraph 
(c)(2) of this section to purchase or sell that subject security in an 
amount greater than such revised quotation if:
    (A) Prior to the presentation of an order for the purchase or sale 
of a subject security, a responsible broker or dealer has communicated 
to its exchange or association, pursuant to paragraph (c)(1) of this 
section, a revised quotation size; or
    (B) At the time an order for the purchase or sale of a subject 
security is presented, a responsible broker or dealer is in the process 
of effecting a transaction in such subject security, and immediately 
after the completion of such transaction, it communicates to its 
exchange or association a revised quotation size, such responsible 
broker or dealer shall not be obligated by paragraph (c)(2) of this 
section to purchase or sell that subject security in an amount greater 
than such revised quotation size.
    (ii) No responsible broker or dealer shall be obligated to execute 
a transaction for any subject security as provided in paragraph (c)(2) 
of this section if:
    (A) Before the order sought to be executed is presented, such 
responsible broker or dealer has communicated to its exchange or 
association pursuant to paragraph (c)(1) of this section, a revised bid 
or offer; or
    (B) At the time the order sought to be executed is presented, such 
responsible broker or dealer is in the process of effecting a 
transaction in such subject security, and, immediately after the 
completion of such transaction, such responsible broker or dealer 
communicates to its exchange or association pursuant to paragraph 
(c)(1) of this section, a revised bid or offer; provided, however, That 
such responsible broker or dealer shall nonetheless be obligated to 
execute any such order in such subject security as provided in 
paragraph (c)(2) of this section at its revised bid or offer in any

[[Page 48331]]

amount up to its published quotation size or revised quotation size.
    (4) Subject to the provisions of paragraph (b)(4) of this section:
    (i) No exchange or OTC market maker may make available, disseminate 
or otherwise communicate to any quotation vendor, directly or 
indirectly, for display on a terminal or other display device any bid, 
offer, quotation size, or aggregate quotation size for any covered 
security which is not a subject security with respect to such exchange 
or OTC market maker; and
    (ii) No quotation vendor may disseminate or display on a terminal 
or other display device any bid, offer, quotation size, or aggregate 
quotation size from any exchange or OTC market maker for any covered 
security which is not a subject security with respect to such exchange 
or OTC market maker.
    (5)(i) Entry of any priced order for a covered security by an 
exchange market maker or OTC market maker in that security into an 
electronic communications network that widely disseminates such order 
shall be deemed to be:
    (A) A bid or offer under this section, to be communicated to the 
market maker's exchange or association pursuant to paragraph (c) of 
this section for at least the minimum quotation size that is required 
by the rules of the market maker's exchange or association if the 
priced order is for the account of a market maker, or the actual size 
of the order up to the minimum quotation size required if the priced 
order is for the account of a customer; and
    (B) A communication of a bid or offer to a quotation vendor for 
display on a display device for purposes of paragraph (c)(4) of this 
section.
    (ii) An exchange market maker or OTC market maker that has entered 
a priced order for a covered security into an electronic communications 
network that widely disseminates such order shall be deemed to be in 
compliance with paragraph (c)(5)(i)(A) of this section if the 
electronic communications network:
    (A) Provides to an exchange or association (or an exclusive 
processor acting on behalf of one or more exchanges or associations) 
the prices and sizes of the orders at the highest buy price and the 
lowest sell price for such security entered in, and widely disseminated 
by, the electronic communications network by exchange market makers and 
OTC market makers for the covered security, and such prices and sizes 
are included in the quotation data made available by the exchange, 
association, or exclusive processor to quotation vendors pursuant to 
this section; and
    (B) Provides, to any broker or dealer, the ability to effect a 
transaction with a priced order widely disseminated by the electronic 
communications network entered therein by an exchange market maker or 
OTC market maker that is:
    (1) Equivalent to the ability of any broker or dealer to effect a 
transaction with an exchange market maker or OTC market maker pursuant 
to the rules of the exchange or association to which the electronic 
communications network supplies such bids and offers; and
    (2) At the price of the highest priced buy order or lowest priced 
sell order, or better, for the lesser of the cumulative size of such 
priced orders entered therein by exchange market makers or OTC market 
makers at such price, or the size of the execution sought by the broker 
or dealer, for the covered security.
    (d) Exemptions. The Commission may exempt from the provisions of 
this section, either unconditionally or on specified terms and 
conditions, any responsible broker or dealer, electronic communications 
network, exchange, or association if the Commission determines that 
such exemption is consistent with the public interest, the protection 
of investors and the removal of impediments to and perfection of the 
mechanism of a national market system.
    4. Section 240.11Ac1-4 is added to read as follows:

Sec. 240.11Ac1-4  Display of customer limit orders.

    (a) Definitions. For purposes of this section:
    (1) The term association shall mean any association of brokers and 
dealers registered pursuant to Section 15A of the Act (15 U.S.C. 78o-
3).
    (2) The terms best bid and best offer shall have the meaning 
provided in Sec. 240.11Ac1-1(a)(3).
    (3) The terms bid and offer shall have the meaning provided in 
Sec. 240.11Ac1-1(a)(4).
    (4) The term block size shall mean any order:
    (i) Of at least 10,000 shares; or
    (ii) For a quantity of stock having a market value of at least 
$200,000.
    (5) The term covered security shall mean any ``reported security'' 
and any other security for which a transaction report, last sale data 
or quotation information is disseminated through an automated quotation 
system as described in section 3(a)(51)(A)(ii) of the Act (15 U.S.C. 
78c(a)(51)(A)(ii)).
    (6) The term customer limit order shall mean an order to buy or 
sell a covered security at a specified price that is not for the 
account of either a broker or dealer; provided, however, That the term 
customer limit order shall include an order transmitted by a broker or 
dealer on behalf of a customer.
    (7) The term electronic communications network shall have the 
meaning provided in Sec. 240.11Ac1-1(a)(8).
    (8) The term exchange-traded security shall have the meaning 
provided in Sec. 240.11Ac1-1(a)(10).
    (9) The term OTC market maker shall mean any dealer who holds 
itself out as being willing to buy from and sell to its customers, or 
otherwise, a covered security for its own account on a regular or 
continuous basis otherwise than on a national securities exchange in 
amounts of less than block size.
    (10) The term reported security shall have the meaning provided in 
Sec. 240.11Ac1-1(a)(20).
    (b) Specialists and OTC market makers. For all covered securities:
    (1) Each member of an exchange that is registered by that exchange 
as a specialist, or is authorized by that exchange to perform functions 
substantially similar to that of a specialist, shall publish 
immediately a bid or offer that reflects:
    (i) The price and the full size of each customer limit order held 
by the specialist that is at a price that would improve the bid or 
offer of such specialist in such security; and
    (ii) The full size of each customer limit order held by the 
specialist that:
    (A) Is priced equal to the bid or offer of such specialist for such 
security;
    (B) Is priced equal to the national best bid or offer; and
    (C) Represents more than a de minimis change in relation to the 
size associated with the specialist's bid or offer.
    (2) Each registered broker or dealer that acts as an OTC market 
maker shall publish immediately a bid or offer that reflects:
    (i) The price and the full size of each customer limit order held 
by the OTC market maker that is at a price that would improve the bid 
or offer of such OTC market maker in such security; and
    (ii) The full size of each customer limit order held by the OTC 
market maker that:
    (A) Is priced equal to the bid or offer of such OTC market maker 
for such security;
    (B) Is priced equal to the national best bid or offer; and
    (C) Represents more than a de minimis change in relation to the 
size associated with the OTC market maker's bid or offer.

[[Page 48332]]

    (c) Exceptions. The requirements in paragraph (b) of this section 
shall not apply to any customer limit order:
    (1) That is executed upon receipt of the order.
    (2) That is placed by a customer who expressly requests, either at 
the time that the order is placed or prior thereto pursuant to an 
individually negotiated agreement with respect to such customer's 
orders, that the order not be displayed.
    (3) That is an odd-lot order.
    (4) That is a block size order, unless a customer placing such 
order requests that the order be displayed.
    (5) That is delivered immediately upon receipt to an exchange or 
association-sponsored system, or an electronic communications network 
that complies with the requirements of Sec. 240.11Ac1-1(c)(5)(ii) with 
respect to that order.
    (6) That is delivered immediately upon receipt to another exchange 
member or OTC market maker that complies with the requirements of this 
section with respect to that order.
    (7) That is an ``all or none'' order.
    (d) Exemptions. The Commission may exempt from the provisions of 
this section, either unconditionally or on specified terms and 
conditions, any responsible broker or dealer, electronic communications 
network, exchange, or association if the Commission determines that 
such exemption is consistent with the public interest, the protection 
of investors and the removal of impediments to and perfection of the 
mechanism of a national market system.

    Dated: September 6, 1996.

    By the Commission.
Margaret H. McFarland,
Deputy Secretary.
[FR Doc. 96-23210 Filed 9-11-96; 8:45 am]
BILLING CODE 8010-01-P

Complete official Federal Register PDF

FR Doc. 96-23163 Certifications and Exemptions Under the International Regulations for Preventing Collisions at Sea, 1972
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48070-48071]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23163]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Navy

32 CFR Part 706

Certifications and Exemptions Under the International Regulations 
for Preventing Collisions at Sea, 1972

AGENCY: Department of the Navy, DOD.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of the Navy is amending its certifications and 
exemptions under the International Regulations for Preventing 
Collisions at Sea, 1972 (72 COLREGS), to reflect that the Deputy 
Assistant Judge Advocate General (Admiralty) of the Navy has determined 
that USS FALCON (MHC 59) is a vessel of the Navy which, due to its 
special construction and purpose, cannot fully comply with certain 
provisions of the 72 COLREGS without interfering with its special 
functions as a naval ship. The intended effect of this rule is to warn 
mariners in waters where 72 COLREGS apply.

EFFECTIVE DATE: August 21, 1996.

FOR FURTHER INFORMATION CONTACT: Captain R. R. Pixa, JAGC, U.S. Navy, 
Admiralty Counsel, Office of the Judge Advocate General, Navy 
Department, 200 Stovall Street, Alexandria, Virginia, 22332-2400. 
Telephone Number: (703) 325-9744.

SUPPLEMENTARY INFORMATION: Pursuant to the authority granted in 33 
U.S.C. 1605, the Department of the Navy amends 32 CFR Part 706. This 
amendment provides notice that the Deputy Assistant Judge Advocate 
General (Admiralty) of the Navy, under authority delegated by the 
Secretary of the Navy, has certified that USS FALCON (MHC 59) is a 
vessel of the Navy which, due to its special construction and purpose, 
cannot fully comply with the following specific provisions of 72 
COLREGS without interfering with its special function as a naval ship: 
Rule 27(f), pertaining to the display of all-round lights by a vessel 
engaged in mineclearance operations; and Annex I, paragraph 9(b), 
prescribing that all-round lights be located as not to be obscured by 
masts, topmasts or structures within angular sectors of more than six 
degrees. The Deputy Assistant Judge Advocate General (Admiralty) of the 
Navy has also certified that the lights involved are located in closest 
possible compliance with the applicable 72 COLREGS requirements.
    Moreover, it has been determined, in accordance with 32 CFR Parts 
296 and 701, that publication of this amendment for public comment 
prior to adoption is impracticable, unnecessary, and contrary to public 
interest since it is based on technical findings that the placement of 
lights on this vessel in a manner differently from that prescribed 
herein will adversely affect the vessel's ability to perform its 
military functions.

List of Subjects in 32 CFR Part 706

    Marine safety, Navigation (water), and Vessels.

    Accordingly, 32 CFR part 706 is amended as follows:

PART 706--[AMENDED]

    1. The authority citation for 32 CFR part 706 continues to read:

    Authority: 33 U.S.C. 1605.

    2. Section 706.2 is amended by adding the following entry for USS 
FALCON to Table Four, paragraph 18:

Sec. 706.2  Certifications of the Secretary of the Navy under Executive 
Order 11964 and 33 U.S.C. 1605.

* * * * *
Table Four
* * * * *
    18. * * *

----------------------------------------------------------------------------------------------------------------
                                                               Obscured angles relative to ship's heading       
            Vessel                      Number         ---------------------------------------------------------
                                                                    Port                         STBD           
----------------------------------------------------------------------------------------------------------------
                                                                                                                
*                  *                  *                  *                  *                  *                
                                                        *                                                       
USS FALCON....................  MHC 59................  65.0 deg. to 75.6 deg......  284.1 deg. to 294.6 deg.   
----------------------------------------------------------------------------------------------------------------

[[Page 48071]]

* * * * *
    Dated: August 21, 1996.
R.R. Pixa,
Captain, JAGC, U.S. Navy, Deputy Assistant Judge Advocate General 
(Admiralty).
[FR Doc. 96-23163 Filed 9-11-96; 8:45 am]
BILLING CODE 3810-FF-P

Complete official Federal Register PDF

FR Doc. 96-22951 Airworthiness Directives; Fairchild Aircraft SA226 and SA227 Series Airplanes
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48066-48069]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-22951]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 96-CE-10-AD; Amendment 39-9753; AD 96-19-05]
RIN 2120-AA64

Airworthiness Directives; Fairchild Aircraft SA226 and SA227 
Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; request for comments.

-----------------------------------------------------------------------

[[Page 48067]]

SUMMARY: This amendment supersedes Airworthiness Directive (AD) 95-19-
07, which currently requires the following on Fairchild Aircraft SA226 
and SA227 series airplanes equipped with certain main landing gear 
(MLG) and nose landing gear (NLG): repetitively inspecting, using 
ultrasonic methods, the left-hand and right-hand MLG yokes and the NLG 
yokes for stress corrosion cracking, and, if any cracked yokes are 
found that exceed certain limits, replacing either the cracked yoke, 
the yoke/cylinder combination, or the affected MLG or NLG assembly. 
This action also supersedes priority letter AD 95-19-07 R1, which was 
issued to incorporate revised service information. Reports of landing 
gear failures on the affected airplanes prompted the original AD 
action. This action requires the same inspections, but requires 
replacing any MLG and NLG assembly with any cracks instead of allowing 
flight until certain crack limits are exceeded. The inability to 
determine or predict crack growth on areas where stress corrosion 
occurs on primary structure with a single-load path (MLG and NLG 
assemblies are considered such structure) prompted this action. The 
actions specified by this AD are intended to prevent MLG or NLG failure 
caused by stress corrosion cracking in the yokes, which could result in 
loss of control of the airplane during landing operations.

DATES: Effective October 1, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of October 1, 1996.
    Comments for inclusion in the Rules Docket must be received on or 
before November 7, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Central Region, Office of the Assistant Chief 
Counsel, Attention: Rules Docket No. 96-CE-10-AD, Room 1558, 601 E. 
12th Street, Kansas City, Missouri 64106.
    Service information that applies to this AD may be obtained from 
Fairchild Aircraft, P.O. Box 790490, San Antonio, Texas 78279-0490; 
telephone (210) 824-9421. This information may also be examined at the 
FAA, Central Region, Office of the Assistant Chief Counsel, Attention: 
Rules Docket 96-CE-10-AD, Room 1558, 601 E. 12th Street, Kansas City, 
Missouri 64106; or at the Office of the Federal Register, 800 North 
Capitol Street, NW., suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Mr. Hung Viet Nguyen, Aerospace 
Engineer, FAA, Airplane Certification Office, 2601 Meacham Boulevard, 
Fort Worth, Texas 76193-0150; telephone (817) 222-5155; facsimile (817) 
222-5960.

SUPPLEMENTARY INFORMATION:

Events Leading to the Issuance of AD 95-19-07

    Several reports of main landing gear (MLG) and nose landing gear 
(NLG) failure on Fairchild Aircraft SA226 and SA227 series airplanes 
prompted the FAA to issue Airworthiness Directive (AD) 95-19-07, 
Amendment 39-9369 (60 FR 47687, September 14, 1995). AD 95-19-07 
required the following on Fairchild Aircraft SA226 and SA227 series 
airplanes equipped with certain MLG and NLG: repetitively inspecting, 
using ultrasonic methods, the left-hand and right-hand MLG yokes and 
the NLG yokes for stress corrosion cracking, and, if any cracked yokes 
are found that exceed certain limits, replacing either the cracked 
yoke, the yoke/cylinder combination, or the affected MLG or NLG 
assembly. Accomplishment of the inspections required by AD 95-19-07 was 
required in accordance with Fairchild Service Bulletin (SB) 226-32-065, 
Fairchild SB 227-32-039, or Fairchild SB CC7-32-007, all Issued: August 
16, 1995, as applicable.
    The airplanes in the above-referenced incidents are equipped with 
at least one part number (P/N) OAS5453 MLG assembly and P/N OAS5451 NLG 
assembly. Metallurgical analysis of the yokes of the right-hand and 
left-hand MLG assemblies and NLG assemblies on several of these 
airplanes revealed that the failure was initiated by stress corrosion 
cracking of the yokes.

Explanation of the Relevant Service Information

    The service bulletins incorporated into AD 95-19-07 contain some 
incorrect procedures that could prevent an owner/operator from 
correctly accomplishing the actions required by that AD. For this 
reason, Fairchild Aircraft revised SB 226-32-065, SB 227-32-039, and SB 
CC7-32-007, each of which incorporates the following effective pages 
and revision levels:

------------------------------------------------------------------------
              Effective pages                          SB date          
------------------------------------------------------------------------
1, 5, and 8...............................  Revised: September 28, 1995.
2, 3, 4, 6, 7, and 9......................  Issued: August 16, 1995.    
------------------------------------------------------------------------

These service bulletins specify improved procedures for ultrasonically 
inspecting the left-hand and right-hand Ozone Industries, Inc. MLG yoke 
(reference: MLG assembly P/N OAS5453, all dash numbers up to and 
including -19), and Ozone Industries, Inc. NLG yoke (reference: NLG 
assembly P/N OAS5451, all dash number up to and including -17), on 
Fairchild Aircraft SA226 and SA227 series airplanes.

The Need to Revise AD 95-19-07

    The FAA determined that the revised service information should be 
incorporated into AD 95-19-07 to allow for proper inspection of the MLG 
and NLG yokes of the affected airplanes, and issued priority letter AD 
95-19-07 R1 to prevent MLG or NLG failure caused by stress corrosion 
cracks in the yokes, which could result in loss of control of the 
airplane during landing operations. The priority letter revised AD 95-
19-07 by (1) retaining the repetitive inspections and possible 
replacement required by AD 95-19-07; and (2) incorporating the revised 
service bulletins to require accomplishment of the actions in 
accordance with corrected and clarified procedures.

Reason for This Action

    After in-depth analysis, the FAA has established a policy to not 
allow airplane operation when known cracks exist in primary structure 
(MLG and NLG assemblies are considered such structure). The FAA makes 
allowances on this policy to account for parts availability provided 
analysis shows that an interim, acceptable level of safety can be 
maintained through a short-term, repetitive inspection program.
    For this reason, the FAA has determined that the crack limits in 
priority letter AD 95-19-07 R1 and AD 95-19-07, Amendment 39-9369, 
should be eliminated and that AD action should be taken to require 
immediate replacement of any cracked MLG or NLG assembly. Because 
analysis shows that a repetitive inspection program can provide an 
interim acceptable level of safety, the FAA will allow a grace period 
for those owners/operators with airplanes where a crack is found in the 
MLG or NLG yoke during the initial inspection required by this action.

Explanation of the Provisions of This AD

    Since an unsafe condition has been identified that is likely to 
exist or develop in other Fairchild Aircraft SA226 and SA227 series 
airplanes of the same type design, this AD supersedes both priority 
letter AD 95-19-07 R1 and AD 95-19-07, Amendment 39-9369, with a new AD 
that retains the requirement of repetitively inspecting, using 
ultrasonic methods, the left-hand and right-hand MLG yokes and the NLG 
yokes for stress corrosion cracking, and

[[Page 48068]]

requires replacing either the cracked yoke, the yoke/cylinder 
combination, or the affected MLG or NLG assembly, if any crack is 
found. Accomplishment of the required inspections is in accordance with 
Fairchild SB 226-32-065, Fairchild SB 227-32-039, or Fairchild SB CC7-
32-007, as applicable. Each of these service bulletins incorporates the 
following effective pages and revision levels:

------------------------------------------------------------------------
              Effective pages                          SB date          
------------------------------------------------------------------------
1, 5, and 8...............................  Revised: September 28, 1995.
2, 3, 4, 6, 7, and 9......................  Issued: August 16, 1995.    
------------------------------------------------------------------------

Accomplishment of the replacement is in accordance with the applicable 
maintenance manual.
    Since a situation exists (possible loss of control of the airplane 
during landing operations) that requires the immediate adoption of this 
regulation, it is found that notice and opportunity for public prior 
comment hereon are impracticable, and that good cause exists for making 
this amendment effective in less than 30 days.

Compliance Time Criteria

    The compliance time of this AD is presented in both calendar time 
and hours time-in-service (TIS). Cracking of certain MLG yokes and NLG 
yokes on the affected airplanes is caused by stress corrosion, which 
starts as a result of high local stress (in the area where the piston 
was shrink fitted to the yoke) incurred through operation. Corrosion 
can then develop regardless of whether the airplane is in flight or on 
the ground. The cracks may not be noticed initially as a result of the 
stress loads, but could then progress as a result of corrosion. The 
stress incurred during flight operations or temperature changes could 
then cause rapid crack growth. In order to ensure that these stress 
corrosion cracks do not go undetected, a compliance time of specific 
hours TIS and calendar time (whichever occurs first) is utilized.

Comments Invited

    Although this action is in the form of a final rule that involves 
requirements affecting immediate flight safety and, thus, was not 
preceded by notice and opportunity to comment, comments are invited on 
this rule. Interested persons are invited to comment on this rule by 
submitting such written data, views, or arguments as they may desire. 
Communications should identify the Rules Docket number and be submitted 
in triplicate to the address specified above. All communications 
received on or before the closing date for comments will be considered, 
and this rule may be amended in light of the comments received. Factual 
information that supports the commenter's ideas and suggestions is 
extremely helpful in evaluating the effectiveness of the AD action and 
determining whether additional rulemaking action would be needed.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the rule that might 
suggest a need to modify the rule. All comments submitted will be 
available, both before and after the closing date for comments, in the 
Rules Docket for examination by interested persons. A report that 
summarizes each FAA-public contact concerned with the substance of this 
AD will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this rule must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket No. 96-CE-10-AD.'' The postcard will be date stamped and 
returned to the commenter.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    The FAA has determined that this regulation is an emergency 
regulation that must be issued immediately to correct an unsafe 
condition in aircraft, and is not a ``significant regulatory action'' 
under Executive Order 12866. It has been determined further that this 
action involves an emergency regulation under DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979). If it is determined 
that this emergency regulation otherwise would be significant under DOT 
Regulatory Policies and Procedures, a final regulatory evaluation will 
be prepared and placed in the Rules Docket (otherwise, an evaluation is 
not required). A copy of it, if filed, may be obtained from the Rules 
Docket.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing Airworthiness Directive 
(AD) 95-19-07, Amendment 39-9369 (60 FR 47687, September 14, 1995), and 
by adding a new AD to read as follows:

96-19-05  Fairchild Aircraft: Amendment 39-9753, Docket No. 96-CE-
10-AD. Supersedes both AD 95-19-07, Amendment 39-9369, and priority 
letter AD 95-19-07 R1.

    Applicability: Models SA226-T, SA226-AT, SA226-TC, SA226-T(B), 
SA227-AC, SA227-AT, SA227-BC, SA227-TT, SA227-CC, and SA227-DC 
airplanes (all serial numbers), certificated in any category, that 
are equipped with one or more of the following:
    1. Ozone Industries, Inc. main landing gear (MLG) yoke 
(reference: MLG assembly part number OAS5453, all dash numbers up to 
and including -19); or
    2. Ozone Industries, Inc. nose landing gear (NLG) yoke 
(reference: NLG assembly part number OAS5451, all dash numbers up to 
and including -17).

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (g) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it. Compliance: Required initially as follows and thereafter 
as indicated in the body of this AD:
    1. Within the next 100 hours time-in-service (TIS) after the 
effective date of this AD or within the next 3 months after the 
effective date of this AD, whichever occurs first; and
    2. Upon the installation of one of the affected MLG or NLG 
assemblies or yokes.
    To prevent MLG or NLG failure caused by stress corrosion cracks 
in the yokes, which could result in loss of control of the airplane 
during landing operations, accomplish the following:

[[Page 48069]]

    (a) Inspect, using ultrasonic methods, both sides of the left-
hand and right-hand MLG and NLG yokes for stress corrosion cracking 
in accordance with the ACCOMPLISHMENT INSTRUCTIONS section of 
Fairchild Service Bulletin (SB) 226-32-065, Fairchild SB 227-32-039, 
or Fairchild SB CC7-32-007, as applicable. Each of these service 
bulletins incorporates the following effective pages and revision 
levels:

------------------------------------------------------------------------
              Effective pages                          SB date          
------------------------------------------------------------------------
1, 5, and 8...............................  Revised: September 28, 1995.
2, 3, 4, 6, 7, and 9......................  Issued: August 16, 1995.    
------------------------------------------------------------------------

    (b) If no cracks are found during the initial inspection 
required by paragraph (a) of this AD, accomplish the following:
    (1) Prior to further flight after the initial inspection 
required by this AD, clean the MLG and NLG yoke and piston in 
accordance with FIGURE 2 of the service bulletins referenced in this 
AD, unless already accomplished;
    (2) Prior to further flight after the initial inspection 
required by this AD, apply a small bead of Products Research and 
Chemical Corporation PR-1422 or PR-1435 sealant to the MLG and NLG 
yoke as shown in FIGURE 2 of the service bulletins referenced in 
this AD, and as described in the SA226/227 Series Service Repair 
Manual, Chapter 51-30-03, Standard Practices--Sealing, unless 
already accomplished; and
    (3) Reinspect the MLG and NLG yokes at intervals not to exceed 
2,500 hours TIS or 12 months, whichever occurs first, provided no 
cracks are found. If cracks are found, prior to further flight, 
replace the cracked part with a new or serviceable part in 
accordance with the applicable maintenance manual, and accomplish 
the cleaning of and sealant application to the MLG and NLG yoke and 
piston as specified in paragraphs (b)(1) and (b)(2) of this AD. The 
replacement may be accomplished by replacing the cracked yoke, the 
total gear assembly, or the yoke/cylinder combination.
    (c) If a crack is found during the initial inspection of this 
AD, replace the cracked part with a new or serviceable part in 
accordance with the applicable maintenance manual, and accomplish 
the cleaning of and sealant application to the MLG and NLG yoke and 
piston as specified in paragraphs (b)(1) and (b)(2) of this AD. The 
replacement may be accomplished by replacing the cracked yoke, the 
total gear assembly, or the yoke/cylinder combination. Replace any 
cracked part in accordance with the following schedule:
    (1) With a crack found with a length more than 1.5 inches in 
length: PRIOR TO FURTHER FLIGHT;
    (2) With a crack found with a length more than 1 inch but not 
more than 1.5 inches: WITHIN THE NEXT 300 HOURS TIS AFTER THE 
INITIAL INSPECTION REQUIRED BY THIS AD OR WITHIN THE NEXT 60 DAYS 
AFTER THE INITIAL INSPECTION REQUIRED BY THIS AD, WHICHEVER OCCURS 
FIRST;
    (3) With a crack found with a length more than .75 inch but not 
more than 1 inch: WITHIN THE NEXT 400 HOURS TIS AFTER THE INITIAL 
INSPECTION REQUIRED BY THIS AD OR WITHIN THE NEXT 80 DAYS AFTER THE 
INITIAL INSPECTION REQUIRED BY THIS AD, WHICHEVER OCCURS FIRST;
    (4) With a crack found with a length more than .50 inch but not 
more than .75 inch: WITHIN THE NEXT 500 HOURS TIS AFTER THE INITIAL 
INSPECTION REQUIRED BY THIS AD OR WITHIN THE NEXT 100 DAYS AFTER THE 
INITIAL INSPECTION REQUIRED BY THIS AD, WHICHEVER OCCURS FIRST; and
    (5) With a crack found with a length less than 0.50 inch: WITHIN 
THE NEXT 600 HOURS TIS AFTER THE INITIAL INSPECTION REQUIRED BY THIS 
AD OR WITHIN THE NEXT 120 DAYS AFTER THE INITIAL INSPECTION REQUIRED 
BY THIS AD, WHICHEVER OCCURS FIRST.
    (d) Replacing a MLG or NLG yoke with either Ozone Industries, 
Inc. MLG yoke (reference: MLG assembly part number OAS5453, all dash 
numbers up to and including--19), or Ozone Industries, Inc. NLG yoke 
(reference: NLG assembly part number OAS5451, all dash numbers up to 
and including--17) re-establishes the effectivity of this AD.
    (1) Repetitive inspections are required upon installation and at 
intervals not to exceed 2,500 hours TIS or 12 months, whichever 
occurs first, provided no cracks are found.
    (2) If cracks are found, prior to further flight, replace the 
cracked part with a new or serviceable part in accordance with the 
applicable maintenance manual, and accomplish the cleaning of and 
sealant application to the MLG and NLG yoke and piston as specified 
in paragraphs (b)(1) and (b)(2) of this AD. The replacement may be 
accomplished by replacing the cracked yoke, the total gear assembly, 
or the yoke/cylinder combination.
    (3) The crack limit replacement compliance times specified in 
paragraph (c) of this AD only apply when cracks are found during the 
initial inspection required by this AD. If any crack of any length 
is found during a subsequent (any repetitive) inspection, the part 
must be replaced PRIOR TO FURTHER FLIGHT.
    (e) The MLG and NLG yokes to which this AD applies are 
manufactured by Ozone Industries, Inc. Replacing these yokes with 
approved parts, other than the following Ozone Industries, Inc. MLG 
and NLG yokes eliminates the repetitive inspection requirements of 
this AD:
    (1) Ozone Industries, Inc. MLG yoke (reference: MLG assembly 
part number OAS5453, all dash numbers up to and including--19).
    (2) Ozone Industries, Inc. NLG yoke (reference: NLG assembly 
part number OAS5451, all dash numbers up to and including--17).
    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (g) An alternative method of compliance or adjustment of the 
compliance time that provides an equivalent level of safety may be 
approved by the Manager, Airplane Certification Office (ACO), FAA, 
2601 Meacham Boulevard, Fort Worth, Texas 76193-0150. The request 
shall be forwarded through an appropriate FAA Maintenance Inspector, 
who may add comments and then send it to the Manager, Fort Worth 
ACO. Alternative methods of compliance approved in accordance with 
either priority letter AD 95-19-07 R1 or AD 95-19-07, Amendment 39-
9369 (both superseded by this action), are not considered approved 
as alternative methods of compliance with this AD.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Fort Worth ACO.

    (h) The inspections required by this AD shall be done in 
accordance with Fairchild Service Bulletin 226-32-065, Fairchild 
Service Bulletin 227-32-039, or Fairchild Service Bulletin CC7-32-
007, as applicable. Each of these service bulletins incorporates the 
following effective pages and revision levels:

------------------------------------------------------------------------
              Effective pages                          SB date          
------------------------------------------------------------------------
1, 5, and 8...............................  Revised: September 28, 1995.
2, 3, 4, 6, 7, and 9......................  Issued: August 16, 1995.    
------------------------------------------------------------------------

This incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Copies may be obtained from Fairchild Aircraft, P.O. Box 790490, 
San Antonio, Texas 78279-0490. Copies may be inspected at the FAA, 
Central Region, Office of the Assistant Chief Counsel, Room 1558, 
601 E. 12th Street, Kansas City, Missouri, or at the Office of the 
Federal Register, 800 North Capitol Street, NW, suite 700, 
Washington, DC.
    (i) This amendment (39-9753) supersedes AD 95-19-07, Amendment 
39-9369, and priority letter AD 95-19-07 R1.
    (j) This amendment (39-9753)1 becomes effective on October 1, 
1996.

    Issued in Kansas City, Missouri, on September 3, 1996.
Henry A. Armstrong,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-22951 Filed 9-11-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
[Federal Register Volume 61, Number 178 (Thursday, September 12, 1996)]
[Rules and Regulations]
[Pages 48208-48288]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-22781]

[[Page 48207]]

_______________________________________________________________________

Part II

Environmental Protection Agency

_______________________________________________________________________

40 CFR Parts 9 and 63

National Emission Standards for Hazardous Air Pollutant Emissions: 
Group IV Polymers and Resins; Final Rule

Federal Register / Vol. 61, No. 178 / Thursday, September 12, 1996 / 
Rules and Regulations

[[Page 48208]]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 9 and 63

[AD-FRL-5508-6]
RIN 2060-AE37

National Emissions Standards for Hazardous Air Pollutant 
Emissions: Group IV Polymers and Resins

AGENCY: U.S. Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action promulgates national emission standards for 
hazardous air pollutants (NESHAP) from existing and new plant sites 
that emit organic hazardous air pollutants (HAP) identified on the 
EPA's list of 189 HAP. The organic HAP are emitted during the 
manufacture of one or more of the following Group IV polymers and 
resins: acrylonitrile butadiene styrene resin (ABS), styrene 
acrylonitrile resin (SAN), methyl methacrylate acrylonitrile butadiene 
styrene resin (MABS), methyl methacrylate butadiene styrene resin 
(MBS), polystyrene resin, poly (ethylene terephthalate) resin (PET), 
and nitrile resin.
    In the production of thermoplastics, a variety of organic HAP are 
used as monomers or are created as by-products. Some of these organic 
HAP are considered to be mutagens and carcinogens, and all can cause 
reversible or irreversible toxic effects following exposure. The 
potential toxic effects include eye, nose, throat, and skin irritation; 
liver and kidney toxicity, and neurotoxicity. There effects can range 
from mild to severe. The standards are estimated to reduce organic HAP 
emissions from existing affected sources by 3,550 megagrams per year 
(Mg/yr).
    The intent of this rule is to protect the public by requiring the 
maximum degree of reduction in emissions of organic HAP from new and 
existing major sources. The emissions reductions achieved by these 
standards, when combined with the emission reductions achieved by other 
similar standards, will achieve the primary goal of the Clean Air Act 
(Act) as amended in 1990.

EFFECTIVE DATE: September 12, 1996. See the Supplementary Information 
section concerning judicial review.

ADDRESSES: Docket. Docket No. A-92-45, containing information 
considered by the EPA in development of the promulgated standards, is 
available for public inspection between 8 a.m. and 5:30 p.m., Monday 
through Friday at the following address in room M-1500, Waterside Mall 
(ground floor) U.S. Environmental Protection Agency, Air and Radiation 
Docket and Information Center (MC-6102), 401 M Street SW., Washington, 
DC 20460; telephone: (202) 260-7549. A reasonable fee may be charged 
for copying docket materials.

FOR FURTHER INFORMATION CONTACT: For information concerning 
applicability and rule determinations contact:
    Region I--Greg Roscoe, Air Programs Compliance, Branch Chief, U.S. 
EPA, Region I, SEA, JFK Federal Building, Boston, MA 02203, (617) 565-
3221.
    Region II--Kenneth Eng, Air Compliance Branch Chief, U.S. EPA, 
Region II, 290 Broadway, New York, NY 10007-1866, (212) 637-4000.
    Region III--Bernard Turlinski, Air Enforcement Branch Chief, U.S. 
EPA, Region III, 3AT10, 841 Chestnut Building, Philadelphia, PA 19107, 
(205) 597-3989.
    Region IV--Jewell A. Harper, Air Enforcement Branch, U.S. EPA, 
Region IV, 345 Courtland Street, N.E., Atlanta, GA 30365, (404) 347-
2904.
    Region V--George T. Czerniak, Jr., Air Enforcement Branch Chief, 
U.S. EPA, Region V, 5AE-26, 77 West Jackson Street, Chicago, IL 60604, 
(312) 353-2088.
    Region VI--John R. Hepola, Air Enforcement Branch Chief, U.S. EPA, 
Region VI, 1445 Ross Avenue, Suite 1200, Dallas, TX 75202-2733, (214) 
665-7220.
    Region VII--Donald Toensing, Chief, Air Permitting and Compliance 
Branch, U.S. EPA, Region VII, 726 Minnesota Avenue, Kansas City, KS 
66101, (913) 551-7446.
    Region VIII--Douglas M. Skie, Air and Technical Operations Branch 
Chief, U.S. EPA, Region VIII, 999 18th Street, Suite 500, Denver, CO 
80202-2466, (303) 312-6432.
    Region IX--Colleen W. McKaughan, Air Compliance Branch Chief, U.S. 
EPA, Region IX, 75 Hawthorne Street, San Francisco, CA 94105, (415) 
744-1198.
    Region X--Air and Radiation Branch Chief, U.S. EPA, Region X, AT-
092, 1200 Sixth Avenue, Seattle, WA 98101, (206) 533-1152.
    For information concerning the analyses performed in developing 
this rule, contact Mr. Robert Rosensteel at (919) 541-5410, organic 
Chemicals Group, Emission Standards Division (MD-13), U.S. 
Environmental Protection Agency, Research Triangle Park, North Carolina 
27711.

SUPPLEMENTARY INFORMATION:

Regulated Entities

    Entities potentially regulated by this action are those facilities 
which manufacture one or more of the 7 thermoplastic products 
identified in the rule and listed below:

------------------------------------------------------------------------
             Category                  Examples of regulated entities   
------------------------------------------------------------------------
Industry.........................  Facilities which manufacture         
                                    acrylonitrile butadiene styrene     
                                    resin, styrene acrylonitrile resin, 
                                    methyl methacrylate acrylonitrile   
                                    butadiene styrene resin, methyl     
                                    methacrylate butadiene styrene      
                                    resin, polystyrene resin, poly      
                                    (ethylene terephthalate) resin, or  
                                    nitrile resin.                      
------------------------------------------------------------------------

    This table is not intended to be exhaustive, but rather provides a 
guide for readers regarding entities likely to be regulated by this 
action. To determine whether your facility is regulated by this action, 
you should carefully examine the applicability criteria in Sec. 63.1310 
of the rule. If you have questions regarding the applicability of this 
action to a particular entity, consult one of the persons listed in the 
preceding FOR FURTHER INFORMATION CONTACT section.

Response to Comment Document

    The response to comment document for the promulgated standards 
contains: (1) A summary of all the public comments made on the proposed 
rule and the Administrator's response to the comments; and (2) A 
summary of the changes made to the rule since proposal. The document 
may be obtained from the U.S. EPA Library (MD-35), Research Triangle 
Park, North Carolina 27711, telephone (919) 541-2777; or from the 
National Technical Information Services, 5285 Port Royal Road, 
Springfield, Virginia 22151, telephone (703) 487-4650. Please refer to 
``Hazardous Air Pollutant Emissions from Process Units in the 
Thermoplastics Manufacturing Industry--Basis and Purpose Document for 
Final Standards, Summary of Public Comments and Responses'' [EPA-453/R-
96-001b; May 1996]. This document is also available for downloading 
from the Technology Transfer Network. The Technology Transfer Network 
is one of the EPA's electronic bulletin boards. The Technology Transfer 
Network provides information and technology exchange in various areas 
of air pollution control. The service is free except for the cost of a 
phone call. Dial (919) 541-5472 for up to a 14,400 bps modem. If more 
information on the Technology Transfer Network is needed, call the HELP 
line at (919) 541-5384.

Previous Background Documents

    The following is a listing of background documents pertaining to 
this rulemaking. The complete title,

[[Page 48209]]

EPA publication number, publication date, docket number, and the 
abbreviated descriptive title used to refer to the document throughout 
this notice are included.
    (1) Hazardous Air Pollutant Emissions from Process Units in the 
Thermoplastics Manufacturing Industry--Supplementary Information 
Document for Proposed Standards. EPA-453/R-95-003a. March 1995. Docket 
item A-92-45: II-A-9. Supplementary Information Document.
    (2) Hazardous Air Pollutant Emissions from Process Units in the 
Thermoplastics Manufacturing Industry--Basis and Purpose Document for 
Proposed Standards. EPA-453/R-95-004a. March 1995. Docket item A-92-45: 
II-A-10. Basis and Purpose Document for Proposed Standards.

Judicial Review

    National emission standards for organic HAP for Group IV polymers 
and resins were proposed in the Federal Register (FR) on March 29, 1995 
(60 FR 16090). This Federal Register action announces the EPA's final 
decision on the rule. Under section 307(b)(1) of the Act, judicial 
review of the final rule is available only by filing a petition for 
review in the U.S. Court of Appeals for the District of Columbia 
Circuit within 60 days of today's publication of this final rule. Under 
section 307(b)(2) of the Act, the requirements that are the subject of 
today's notice may not be challenged later in civil or criminal 
proceedings brought by the EPA to enforce these requirements.
    The following outline is provided to aid in reading the preamble to 
the final rule.

I. Background
II. Summary of Considerations Made in Developing These Standards
    A. Purpose of Standards
    B. Technical Basis of Regulation
    C. Stakeholder and Public Participation
III. Summary of Promulgated Standards
    A. Storage Vessel Provisions
    B. Process Vent Provisions
    C. Heat Exchange Provisions
    D. Process Contact Cooling Tower Provisions
    E. Wastewater Provisions
    F. Equipment Leak Provisions
    G. Emissions Averaging Provisions
    H. Compliance and Performance Test Provisions and Monitoring 
Requirements
    I. Recordkeeping and Reporting Provisions
IV. Summary of Impacts
V. Significant Comments and Changes to the Proposed Standards
    A. Applicability Provisions and Definitions
    B. Continuous Process Vent Provisions
    C. Batch Process Vent Provisions
    D. Wastewater Provisions
    E. Process Contact Cooling Tower Provisions
    F. Equipment Leak Provisions
    G. Emissions Averaging Provisions
    H. Compliance and Performance Test Provisions and Monitoring 
Requirements
    I. Recordkeeping and Reporting
VI. Administrative Requirements
    A. Docket
    B. Executive Order 12866
    C. Paperwork Reduction Act
    D. Regulatory Flexibility Act
    E. Unfunded Mandates

I. Background

    Section 112(b) of the Act lists 1989 HAP and directs the EPA to 
develop standards to control all major sources and some area sources 
emitting HAP. On July 16, 1992, the EPA published a list of major and 
area source categories for which NESHAP are to be promulgated (57 FR 
3156). Six of the seven source categories regulated by this rule were 
included on that list as major source categories. The other source 
category, nitrile resins production, has since been added to the source 
category list. On December 3, 1993, the EPA published a schedule for 
promulgating standards for the listed major and area source categories 
(58 FR 83941). Standards for these seven major source categories were 
proposed on March 29, 1995, under this rulemaking.

II. Summary of Considerations Made in Developing These Standards

A. Purpose of Standards

    The Act was created in part ``to protect and enhance the quality of 
the nation's air resources so as to promote the public health and 
welfare and the productive capacity of its population [the Act, section 
101(b)(1)]. Title I of the Act establishes a control technology-based 
program to reduce stationary source emissions of HAP. The goal of the 
section 112(d) Maximum Achievable Control Technology standards (MACT) 
is to apply such control technology to reduce emissions and thereby 
reduce the hazard of pollutants emitted from stationary sources.
    The Act strategy avoids dependence on a detailed and comprehensive 
risk assessment hampered by (but not limited to) the following caveats, 
as prerequisites for control of air toxics: (1) Some of the HAP emitted 
from stationary sources are unknown; and (2) Many of the HAP with 
emissions information have incomplete data in which to describe health 
hazard. In addition, these standards are not ``significant'' as defined 
by Executive Order 12866, and a specific benefits analysis is not 
required. Because of these issues, a detailed and intensive risk 
assessment of potential effects from the organic HAP emitted from 
stationary sources is not included in this rulemaking.
    The EPA does recognize that the degree of adverse effects to health 
resulting from the most significant emissions identified can range from 
mild to severe. The extent to which the effects could be experienced is 
dependent upon the ambient concentrations and exposure time. The latter 
is further influenced by source-specific characteristics such as 
emission rates and local meteorological conditions. Human variability 
factors also influence the degree to which effects to health occur: 
genetics, age, pre-existing health conditions, and lifestyle.
    The organic HAP listed in section 112(b)(1) of the Act emitted by 
the thermoplastic facilities covered by these standards include 
styrene, acrylonitrile, butadiene, ethylene glycol, methanol, 
acetaldehyde, and dioxane. Available emission date gathered, in 
conjunction with development of these MACT standards, show that these 
organic HAP are those which have the potential for reduction by the 
implementation of the standard.
    Some of the effects of the pollutants whose emissions are reduced 
by these standards include central nervous system effects (e.g., 
drowsiness, dizziness, headaches, impairment of vision, peripheral 
nervous system effects expressed as numbness of the extremities, 
fatigue, and coma and death at lethal levels), respiratory irritation 
expressed as labored breathing and impaired lung function, eye 
irritation, reproductive and developmental effects, gastrointestinal 
effects, blood effects (e.g., anemia and leukocytosis), and liver and 
kidney toxicity. In addition, butadiene exposure to humans has been 
associated with increased risk of cardiovascular disease and effects on 
the blood. In regard to carcinogenicity, some of the organic HAP 
controlled under these standards are either probable (i.e., 
acetaldehyde, dioxane, acrylonitrile, and butadiene) or possible (i.e., 
styrene) human carcinogens.
    These standards will result in a minimum organic HAP emission 
reduction of 3,550 Mg/yr for existing affected sources and 6,870 Mg/yr 
for new affected sources. The majority of the organic HAP regulated by 
these standards are also volatile organic compounds (VOC). In reducing 
emissions of organic HAP, emissions of VOC are also reduced. No other 
criteria pollutant ambient levels will be affected by these standards. 
The emission reductions achieved by these standards, when combined with 
the emission

[[Page 48210]]

reductions achieved by other standards mandated by the Act, will 
achieve the primary goal of the Clean Air Act.

B. Technical Basis of Regulation

    National emission standards for sources of HAP established under 
section 112(d) of the Act reflect MACT:

    * * * the maximum degree of reduction in emissions of the HAP * 
* * that the Administrator, taking into consideration the cost of 
achieving such emission reduction, and any nonair quality health and 
environmental impacts and energy requirements, determines is 
achievable for new or existing sources in the category or 
subcategory to which such emission standard applies * * * [42 U.S.C. 
Sec. 7412(d)(2)].

    The amended Clean Air Act contains requirements for the development 
of regulatory alternatives for sources of HAP emissions. The statute 
requires the standards to reflect the maximum degree of reduction in 
emissions of HAP that is achievable for new or existing sources. This 
control level is referred to as MACT. The amended Clean Air Act also 
provides guidance on determining the least stringent level allowed for 
a MACT standard; this level is termed the ``MACT floor.''
    For new sources, the standards for a source category or subcategory 
``shall not be less stringent than the emission control that is 
achieved in practice by the best controlled similar source, as 
determined by the Administrator'' [section 112(d)(3) of the Act]. 
Existing source standards shall be no less stringent than the average 
emission limitation achieved by the best performing 12 percent of the 
existing sources for source categories and subcategories with 30 or 
more sources or the average emission limitation achieved by the best 
performing 5 sources for source categories or subcategories with fewer 
than 30 sources [section 12(d)(3) of the Act]. These two minimum levels 
of control define the MACT floor for new and existing sources.
    Two interpretations have been evaluated by the EPA for representing 
the MACT floor for existing sources. One interpretation is that the 
MACT floor is represented by the 88th percentile source. The second 
interpretation is that the MACT floor is represented by the ``average 
emission limitation achieved'' by the best performing sources, where 
the ``average'' is based on a measure of central tendency, such as the 
arithmetic mean, median, or mode. This latter interpretation is 
referred to as the ``higher floor interpretation.'' In a June 6, 1994 
Federal Register notice [59 FR 29196], the EPA presented its 
interpretation of the statutory language concerning the MACT floor for 
existing sources. Based on a review of the statute, legislative 
history, and public comments, the EPA believes that the ``higher floor 
interpretation'' is a better reading of the statutory language. The 
determination of the MACT floor for existing sources under the proposed 
and final rule followed the ``higher floor interpretation.''
    The regulatory alternatives considered in the development of this 
rule, including those regulatory alternatives selected as standards for 
new and existing affected sources, are based on process and emissions 
data received from the existing plant sites known by the EPA to be in 
operation.
    Regulatory alternatives more stringent than the MACT floor were 
selected when they were judged to be reasonable ``taking into 
consideration the cost of achieving such emission reduction, and any 
nonair quality health and environmental impacts, and energy 
requirements'' (42 U.S.C. Sec. 7412(d)(2)).
    Potential regulatory alternatives were developed based on the 
Hazardous Organic NESHAP (HON) (i.e., subparts F, G, H, and I of 40 CFR 
part 63), the Polymer Manufacturing New Source Performance Standards 
(NSPS) (subpart DDD of 40 CFR part 60), and the Batch Processes 
Alternative Control Techniques (ACT) document [EPA 453/R-93-017; 
November 1993]. The HON was selected as a basis for regulatory 
alternatives because: (1) the characteristics of the emissions from 
storage vessels, continuous process vents, equipment leaks, and 
wastewater at Group IV thermoplastic facilities are similar or 
identical to those addressed by the HON; and (2) The levels of control 
required under the HON were already determined through extensive 
analyses to be reasonable from a cost and impact perspective.
    The Polymer Manufacturing NSPS, which covers certain process 
emissions at polystyrene and PET facilities using a continuous process, 
and cooling tower emissions at PET facilities, was selected for the 
same basic reasons as the HON. Although the Polymer Manufacturing NSPS 
was developed under section 111 of the Clean Air Act and was targeted 
to control VOC emissions, the requirements for setting standards under 
section 111 are very similar to the requirements under section 112 of 
the Clean Air Act Amendments of 1990, and all of the organic HAP 
identified from polystyrene and PET affected sources are also VOC.
    Finally, the Batch Processes ACT was selected to identify 
regulatory alternatives for batch process vents, which are not 
addressed by either the HON or Polymer Manufacturing NSPS. As with the 
Polymer Manufacturing NSPS, the Batch Processes ACT addresses the 
control of VOC emissions, and all of the organic HAP identified for the 
Group IV thermoplastics facilities are also VOC. Unlike the HON and 
Polymer Manufacturing NSPS, the Batch Processes ACT is not a regulation 
and, therefore, does not specify a level of control that must be met. 
Instead, the Batch Processes ACT provides information on emissions 
estimation techniques and potential levels of control and their 
environmental, energy, and cost impacts. Based on the review of the 
Batch Processes ACT, the EPA selected a level of control equivalent to 
90 percent reduction for batch process vents. This level of control was 
selected for regulatory analysis purposes.

C. Stakeholder and Public Participation

    In the development of these standards, numerous representatives of 
the thermoplastics industry were consulted. Industry representatives 
have included trade associations and thermoplastic producers responding 
to section 114 questionnaires and information collection requests 
(ICR). Representatives from other interested EPA offices, Regional 
offices, and State environmental agency personnel, participated in the 
regulatory development process as members of the Work Group. The Work 
Group is involved in the regulatory development process, and is given 
opportunities to review and comment on the standards before proposal 
and promulgation. Therefore, the EPA believes that the implication to 
order EPA offices and programs has been adequately considered during 
the development of these standards. In addition, the EPA has met with 
members of industry concerning these standards. Finally, industry 
representatives, regulatory authorities, and environmental groups had 
the opportunity to comment on the proposed standards and to provide 
additional information during the public comment period that followed 
the proposal.
    The standards were proposed in the Federal Register on March 29, 
1995 (60 FR 16090). The preamble to the proposed standards described 
the rationale for the proposed standards. Public comments were 
solicited at the time of proposal. To provide interested persons the 
opportunity for oral presentation of data, views, or arguments 
concerning the proposed standards, a public hearing was offered at 
proposal. However, the public did not request a hearing and, therefore, 
one

[[Page 48211]]

was not held. The public comment period was from March 29, 1995 to May 
30, 1995. Twenty-seven comment letters were received. Commenters 
included industry representatives and State agencies. The comments were 
carefully considered, and changes were made in the proposed standards 
when determined by the EPA to be appropriate. A detailed discussion of 
these comments and responses can be found in the Basis and Purpose 
Document for Final Standards (EPA-453/R-96-001b; May 1996), which is 
referenced in the ADDRESSES section of this preamble. The summary of 
comments and responses in the Basis and Purpose Document for the Final 
Standards (EPA-453/R-96-001b; May 1996) serves as the basis for the 
revisions that have been made to the standards between proposal and 
promulgation. Section V of this preamble discusses these major changes.

III. Summary of Promulgated Standards

    Emissions of specific organic HAP from the following types of 
emission points (i.e., emission source types) are being covered by the 
final standards: Storage vessels, continuous process vents, batch 
process vents, equipment leaks, wastewater operations, heat exchange 
systems, and some process contact cooling towers associated with the 
manufacture of PET. The organic HAP emitted and required to be 
controlled by these standards vary by subcategory. Each of the nineteen 
thermoplastic products constitutes a separate subcategory (i.e., 
affected source) that is regulated by these standards.
    The existing affected source is defined as each group of one or 
more TPPUs that manufacture the same thermoplastic product as their 
primary product, and (1) are located at a major source plant site, (2) 
are not exempt, and (3) are not part of a new affected source. This 
means that each plant site will have only one existing affected source 
in any given subcategory.
    New affected sources are created under various circumstances. If a 
plant site with an existing affected source producing thermoplastic A 
as its primary product constructs a new TPPU also producing 
thermoplastic A as its primary product, the new TPPU is a new affected 
source if the new TPPU has the potential to emit more than 10 tons per 
year of a single HAP or 25 tons per year of all HAP. In this situation, 
the plant site would have an existing affected source producing 
thermoplastic A and a new affected source producing thermoplastic A. 
Each subsequent new TPPU with potential HAP emissions above major 
source levels (i.e., 10/25 tons per year) would be a separate new 
affected source. New affected sources are also created when a TPPU is 
constructed at a major source plant site where the thermoplastic 
product was not previously produced, with no regard to the potential 
HAP emissions from the TPPU. This approach to defining new affected 
source was selected in order to make this subpart more consistent with 
the HON.
    Another instance where a new affected source is created is if a new 
TPPU is constructed at a new plant site (i.e., green field site) that 
will be a major source. The final manner in which a new affected source 
is created is when an existing affected source undergoes 
reconstruction, thus making the previously existing affected source 
subject to new source standards.
    This standard differs from the HON, however, in that it applies to 
multiple source categories. Thus, unlike the HON, a newly added TPPU at 
a facility is covered by this rule even if that TPPU is in a different 
source category from the existing TPPUs at the facility. It is the 
EPA's position that the addition of a process unit in a different 
source category is a new source and must meet the requirements for new 
sources even though the TPPU has the potential to emit less than 10 
tons per year of a single HAP or 25 tons per year of all HAP. Indeed, 
if a source covered by another MACT standard (i.e., a different source 
category) were built at a HON facility, that source would be subject to 
new source requirements under that MACT standard.
    Also, each affected source includes the following emission points 
and equipment that are associated with each group of TPPU: (1) Each 
wastewater stream; (2) each wastewater operation; (3) each heat 
exchange system; (4) each process contact cooling tower used in the 
manufacture of PET that is associated with a new affected source; and 
(5) each process contact cooling tower used in the manufacture of PET 
using a continuous terephthalic acid high viscosity multiple end 
finisher process that is associated with an existing affected source.
    With relatively few exceptions, the final standards for storage 
vessels, continuous process vents, equipment leaks, wastewater streams, 
and heat exchange systems are the same as those promulgated for the 
corresponding types of emission points at facilities subject to the 
HON. As shown in Tables 1 and 2, some subcategories have requirements 
that differ from the HON; these cases are designated by ``MACT Floor.'' 
These different requirements are specified in the final standards.
    As in the HON, if an emission point within an affected source meets 
the applicability criteria and is required to be controlled under the 
standards, it is referred to as a Group 1 emission point. If an 
emission point within the affected source is not required to apply 
controls, it is referred to as a Group 2 emission point.

 Table 1.-- Summary of Final Standards for Existing Affected Sources in Relationship to the HON, the Polymer Manufacturing NSPS, and the Batch Processes
                                                                           Act                                                                          
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   Type of emission point                                               
                                  ----------------------------------------------------------------------------------------------------------------------
           Subcategory                                                                                                                  Heat exchange   
                                     Storage  vessels             Process vents              Equipment leaks         Wastewater            systems      
--------------------------------------------------------------------------------------------------------------------------------------------------------
ABS, continuous emulsion.........  HON................  HON..............................  HON................  HON................  HON.               
ABS, continuous mass.............  HON................  Continous process vents: HON       HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or complaint flare.                                                                  
ABS, batch emulsion..............  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
ABS, batch suspension............  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
ABS, latex.......................  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  

[[Page 48212]]

                                                                                                                                                        
MABS.............................  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
MBS..............................  HON................  Continuous process vents: MACT     HON................  HON................  HON.               
                                                         floor batch process vents: 90                                                                  
                                                         percent reduction or compliant                                                                 
                                                         flare.                                                                                         
SAN, continuous..................  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
SAN, batch.......................  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
ASA/AMSAN........................  MACT floor.........  MACT floor.......................  HON................  No control.........  HON.               
Polystyrene, continuous..........  MACT floor.........  Continuous process vents from      HON................  HON................  HON.               
                                                         material recovery sections: same                                                               
                                                         as polymer manufacturing NSPS                                                                  
                                                         other continuous process vents:                                                                
                                                         HON batch process vents: 90                                                                    
                                                         percent reduction or compliant                                                                 
                                                         flare.                                                                                         
Polystyrene, batch...............  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
Expandable polystyrene...........  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
PET-TPA, continuous..............  HON................  Continuous process vents from raw  HON................  HON................  HON.               
                                                         material preparation and                                                                       
                                                         polymerization reaction                                                                        
                                                         sections: same as polymer                                                                      
                                                         manufacturing NSPS other                                                                       
                                                         continuous process vents: HON                                                                  
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
PET-TPA continuous high viscosity  HON................  Continuous process vents from raw  No control.........  HON................  HON.               
 multiple end finisher.                                  material preparation and                                                                       
                                                         polymerization reaction                                                                        
                                                         sections: same as polymer                                                                      
                                                         manufacturing NSPS other                                                                       
                                                         continuous process vents: HON                                                                  
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
PET-TPA, batch-DMT, batch........  HON................  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
PET-DMT, continuous..............  HON................  Continuous process vents from      HON................  HON................  HON.               
                                                         material recovery and                                                                          
                                                         polymerization reaction                                                                        
                                                         sections: same as polymer                                                                      
                                                         manufacturing NSPS other                                                                       
                                                         continuous process vents: HON                                                                  
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
Nitrile..........................  MACT floor.........  Continuous process vents: HON      HON................  HON................  HON.               
                                                         batch process vents: 90 percent                                                                
                                                         reduction or compliant flare.                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
ASA/AMSAN = acrylonitrile styrene acrylate resin/alpha methyl styrene acrylonitrile resin.                                                              
TPA = terephthalic acid.                                                                                                                                
DMT = dimethyl terephthalate.                                                                                                                           

 Table. 2.--Summary of Final Standards for New Affected Sources in Relationship to the HON, the Polymer Manufacturing NSPS, and the Batch Processes Act 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   Type of emission point                                               
                                   ---------------------------------------------------------------------------------------------------------------------
            Subcategory                 Storage                             Equipment                   Heat exchange                                   
                                        vessels         Process vents         leaks        Wastewater      systems       Process contact cooling towers 
--------------------------------------------------------------------------------------------------------------------------------------------------------
ABS, continuous emulsion..........  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
ABS, continuous mass..............  Regulatory      Continuous process    HON..........  HON..........  HON..........  NA.                              
                                     alternative 2   vents: HON batch                                                                                   
                                     \1\.            process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
ABS, batch emulsion...............  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
ABS, batch suspension.............  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             

[[Page 48213]]

                                                                                                                                                        
ABS, Latex........................  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
MABS..............................  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
MBS...............................  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
SAN, continuous...................  MACT floor....  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
SAN, batch........................  HON...........  MACT floor..........  HON..........  No control...  HON..........  NA.                              
ASA/AMSAN.........................  MACT floor....  MACT floor..........  HON..........  No control...  HON..........  NA.                              
Polystyrene, continuous...........  MACT floor....  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents from material                                                                                
                                                     recovery sections:                                                                                 
                                                     same as polymer                                                                                    
                                                     manufacturing NSPS,                                                                                
                                                     other continuous                                                                                   
                                                     process vents: HON                                                                                 
                                                     batch process                                                                                      
                                                     vents: 90 percent                                                                                  
                                                     reduction or a                                                                                     
                                                     compliant flare.                                                                                   
Polystyrene, batch................  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
Expandable polystyrene............  HON...........  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
PET-TPA, continuous...............  HON...........  Continuous process    HON..........  HON..........  HON..........  No contact condenser effluent    
                                                     vents from raw                                                     associated with a vacuum system 
                                                     material                                                           shall go to a process contact   
                                                     preparation and                                                    cooling tower.                  
                                                     polymerization                                                                                     
                                                     reaction sections:                                                                                 
                                                     same as Polymer                                                                                    
                                                     Manufacturing NSPS                                                                                 
                                                     other continuous                                                                                   
                                                     process vents: HON                                                                                 
                                                     batch process                                                                                      
                                                     vents: 90 percent                                                                                  
                                                     reduction or a                                                                                     
                                                     compliant flare.                                                                                   
PET-TPA, continuous multiple end    HON...........  Continuous process    No control...  HON..........  HON..........  No contact condenser effluent    
 finisher.                                           vents from raw                                                     associated with a vacuum system 
                                                     material                                                           shall go to a process contact   
                                                     preparation and                                                    cooling tower.                  
                                                     polymerization                                                                                     
                                                     reaction sections:                                                                                 
                                                     same as Polymer                                                                                    
                                                     Manufacturing NSPS                                                                                 
                                                     other continuous                                                                                   
                                                     process vents: HON                                                                                 
                                                     batch process                                                                                      
                                                     vents: 90 percent                                                                                  
                                                     reduction or a                                                                                     
                                                     compliant flare.                                                                                   
PET-TPA, batch....................  HON...........  Continuous process    HON..........  HON..........  HON..........  No contact condenser effluent    
-DMT, batch.......................                   vents: HON batch                                                   associated with a vacuum system 
                                                     process vents: 90                                                  shall go to a process contact   
                                                     percent reduction                                                  cooling tower.                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             

[[Page 48214]]

                                                                                                                                                        
PET-DMT, continuous...............  HON...........  Continuous process    HON..........  HON..........  HON..........  No contact condenser effluent    
                                                     vents from material                                                associated with a vacuum system 
                                                     recovery and                                                       shall go to a process contact   
                                                     polymerization                                                     cooling tower.                  
                                                     reaction sections:                                                                                 
                                                     same as polymer                                                                                    
                                                     manufacturing NSPS                                                                                 
                                                     other continuous                                                                                   
                                                     process vents: HON                                                                                 
                                                     batch process                                                                                      
                                                     vents: 90 percent                                                                                  
                                                     reduction or a                                                                                     
                                                     compliant flare.                                                                                   
Nitrile...........................  MACT floor....  Continuous process    HON..........  HON..........  HON..........  NA.                              
                                                     vents: HON batch                                                                                   
                                                     process vents: 90                                                                                  
                                                     percent reduction                                                                                  
                                                     or a compliant                                                                                     
                                                     flare.                                                                                             
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ The final standard is stringent than the MACT floor, which is more stringent than the HON.                                                          
NA = Not applicable, not part of affected source.                                                                                                       
ASA/AMSAN = acrylonitrile styrene acrylate resin/alpha methyl styrene acrylonitrile resin.                                                              
TPA = terephthalic acid.                                                                                                                                
DMT = dimethyl terephthalate.                                                                                                                           

A. Storage Vessel Provisions

    The standards require owners and operators to first determine 
whether or not a storage vessel is required to be controlled. For those 
storage vessels determined to require control, the standards specify 
the appropriate level of control.
    For most existing and new storage vessels, the criteria for 
determining which storage vessels must be controlled are identical to 
the criteria in the HON storage vessel provisions and are based on 
storage vessel capacity and vapor pressure of the stored material. 
Typically, applicability criteria are different for existing and new 
affected sources.
    For most storage vessels, the level of control required is either 
technical modification to the tank (e.g., the installation of an 
internal floating roof) or the use of a closed vent system and control 
device that is generally required to achieve at least 95 percent 
emission reduction.

    Note: This is the same level of control as required under the 
HON.

    As shown in Tables 1 and 2, some subcategories also have 
requirements that differ from the HON. These requirements are specified 
in the final standards. For those subcategories not applying the HON 
level of control, the level of control varies depending on the 
subcategory. For example, the standards may require 90 or 98 percent 
emission reduction, as opposed to the 95 percent emission reduction 
required by the HON. Finally, to simplify the final rule, some 
chemicals with extremely low vapor pressure (e.g., ethylene glycol) 
have been exempted from the storage vessel provisions.

B. Process Vent Provisions

    Similar to the standards for storage vessels, the standards for 
process vents require owners and operators to first determine whether 
or not a process vent, or set of process vents, requires control and, 
if so, then specifies the level of control required. The standards 
regulate both continuous and batch process vents.
    Except for certain PET and polystyrene continuous process vents, 
the group status of a continuous process vent is determined by 
comparing the total resource effectiveness (TRE) value for each 
continuous process vent to a TRE value. The TRE value is a reflection 
of the cost effectiveness of controlling an individual continuous 
process vent. There are different TRE coefficients for continuous 
process vents depending on whether the affected source is new or 
existing. The TRE equations for new and existing continuous process 
vents differ because the standards for new affected sources are more 
stringent than the standards for existing affected sources. With one 
exception, continuous process vents with TRE values of 1.0 or less are 
Group 1 continuous process vents. For continuous process vents at 
existing MBS facilities, the TRE value for each continuous process vent 
is compared to a TRE value of 3.7. The proposed and final standards 
refer to the procedures in the HON for determination of the TRE value.
    For continuous process vents associated with the material recovery 
section from existing PET affected sources using a continuous dimethyl 
terephthalate (DMT) process, the set of continuous process vents are 
designated as Group 1 continuous process vents if the combined 
uncontrolled emission rate is greater than the threshold emission rate. 
For other sets of continuous process vents associated with the raw 
material preparation section or polymerization reaction section at 
existing and new polystyrene and PET facilities, there are no 
applicability criteria. These sets of continuous process vents are 
considered to be Group 1 and must meet the specified emission limits. 
Continuous process vents associated with the material recovery section 
at new PET affected sources using a continuous DMT process are also 
designated as Group 1 and must meet the specified emission limits.
    The group determination procedure for batch process vents differs 
from the procedure used for continuous process vents. First, the 
estimated annual emissions for an individual batch process vent are 
entered into the flow rate regression equation and a calculated flow 
rate is determined. Second, the actual flow rate for the batch process 
vent is compared to the calculated flow rate. If the actual flow rate 
is less than the calculated flow rate, then the batch process vent is 
designated as Group 1 and control is required. The batch process vent 
group determination procedure is the same for existing and new batch 
process vents.

[[Page 48215]]

    There are exceptions to the procedures described above. For new SAN 
affected sources using a batch process, the standards require an 
overall emission reduction of 84 percent from all process vents (i.e., 
continuous and batch process vents), and a group determination is not 
required. For new and existing acrylonitrile styrene acrylate resin/
alpha methyl styrene acrylonitrile resin (ASA/AMSAN) affected sources, 
the standards require that emissions from all process vents (i.e., 
continuous and batch process vents) be controlled by 98 percent, and a 
group determination is not required.
    Another exception concerns a batch process vent that is combined 
with a continuous process vent prior to a control or recovery device. 
Said batch process vent is not required to comply with the batch 
process vent provisions if there are no emissions to the atmosphere up 
until the point the batch process vent is combined with the continuous 
process vent. The combined vent stream would be required to comply with 
the continuous process vent provisions. The presence of a batch process 
vent in a continuous process vent emission stream would necessitate 
that all applicability tests and performance tests be conducted while 
the batch process vent is emitting (i.e., maximum operating conditions 
for the combined vent stream).
    The level of control required for most continuous process vents is 
the same as the level of control required by the HON: 98 percent 
emission reduction or an organic HAP concentration limit of 20 ppmv. If 
a flare is used, it must meet the design and operating requirements of 
Sec. 63.11(b) of subpart A of 40 CFR part 63. Exceptions to this level 
of control are described in the following paragraphs.
    For continuous process vents associated with material recovery 
sections at polystyrene affected sources using a continuous process, 
raw material preparation sections and polymerization reaction sections 
at PET affected sources using a continuous terephthalic acid (TPA) 
process, and material recovery sections and polymerization reaction 
sections at PET affected sources using a continuous DMT process, the 
standards require continuous process vents associated with these 
process sections to meet emission limits expressed as kilogram organic 
HAP per megagram of product. Depending on the process section, the 
standards provide several compliance options including limiting the 
outlet gas temperature from each final condenser or reducing emissions 
from each process section by 98 weight percent or to an organic HAP 
concentration limit of 20 ppmv. These are the same control requirements 
as specified in the Polymer Manufacturing NSPS, which serve as the 
basis for these specific provisions.
    For batch process vents, the standards require Group 1 batch 
process vents to achieve emission reductions of 90 percent or greater 
for the batch cycle.
    There are three subcategories where the standards are based on the 
MACT floor. These subcategories are existing MBS affected sources, 
existing and new ASA/AMSAN affected sources, and new SAN affected 
sources using a batch process. As described earlier, the applicability 
criteria and level of control differ from the HON for all three 
subcategories.
    For existing MBS affected sources, the standards require continuous 
process vents at affected sources to either: (1) meet an emission limit 
of 0.000590 kilogram of emissions per megagram of product for all 
continuous process vents associated with the affected source; or (2) 
control emissions from continuous process vents with a TRE of 3.7 or 
less by 98 percent. The development of the MACT floor level of control 
and applicability criteria for MBS existing affected sources is 
documented in Docket Item II-B-21 of A-92-45 and in the Supplementary 
Information Document (SID) for Proposed Standards [EPA-453/R-95-003a; 
March 1995].
    For both existing and new ASA/AMSAN affected sources, the standards 
require all continuous and batch process vents to achieve emission 
reductions of 98 percent.
    For new SAN affected sources using a batch process, the standards 
require an overall emission reduction of 84 percent for all process 
vent emissions.

C. Heat Exchange Provisions

    The standards apply to each heat exchange system that is associated 
with the affected source. The standards require a monitoring program to 
detect leakage of organic HAP from the process into the cooling water. 
The standards refer to the monitoring program in the HON.

D. Process Contact Cooling Tower Provisions

    The standards require that owners or operators of new affected 
sources manufacturing PET not send contact condenser effluent 
associated with a vacuum system to a process contact cooling tower. For 
existing PET affected sources using a continuous TPA high viscosity 
multiple end finisher process, the owner or operator is required to 
keep the concentration of ethylene glycol in the process contact 
cooling tower water to 4 percent or less by weight provided the TPPU is 
or has become subject to 40 CFR part 60, subpart DDD. Process contact 
cooling towers at existing PET affected sources using other processes 
(e.g., DMT process) are not regulated.

    Note: The standards treat the contact condenser effluent at 
existing affected sources as wastewater.

E. Wastewater Provisions

    Except for ASA/AMSAN affected sources, the standards require owners 
and operators to comply with the wastewater provisions in the HON. 
Owners and operators are required to make a group determination for 
each wastewater stream based on the applicability criteria in the HON: 
flow rate and organic HAP concentration. The level of control required 
for Group 1 wastewater streams is dependent upon the organic HAP 
constituents in the wastewater stream. The standards do not require 
control of wastewater emissions from existing or new ASA/AMSAN affected 
sources.
    The standards also require owners and operators to comply with the 
maintenance wastewater requirements in Sec. 63.105 of subpart F of this 
part. These provisions require owners and operators to include a 
description of procedures for managing wastewaters generated during 
maintenance in their start-up, shutdown, and malfunction plan.

F. Equipment Leak Provisions

    Except for one subcategory, both existing and new affected sources 
are required to comply with the equipment leak standards specified in 
subpart H of 40 CFR part 63. For PET affected sources using a 
continuous TPA high viscosity multiple end finisher process, the final 
rule does not require an equipment leak program. The final rule also 
exempts from the equipment leak standards any PET TPPU in which all of 
the components are either in vacuum service or in heavy liquid service.
    In general, subpart H requires owners and operators to implement a 
leak detection and repair (LDAR) program, including various work 
practice and equipment standards. The subpart H standards are 
applicable to equipment in volatile HAP service for 300 or more hours 
per year (hr/yr). The standards define ``in volatile HAP service'' as 
being in contact with or containing process fluid that contains a total 
of 5 percent or more total HAP. Equipment subject to the standards are: 
valves, pumps, compressors, connectors, pressure relief devices, open-
ended

[[Page 48216]]

valves or lines, sampling connection systems, instrumentation systems, 
agitators, and closed-vent systems and control devices.
    A few differences 
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
to the subpart H standards are contained in the 
final rule. These differences include: exempting indications of liquids 
dripping from bleed ports on pumps and agitators at facilities 
producing polystyrene resins from the definition of a leak; not 
requiring the submittal of an Initial Notification; and allowing 150 
days, rather than 90 days, to submit the Notification of Compliance 
Status. In addition, PET facilities are not required to provide a list 
of identification numbers for components in heavy liquid service, 
pressure relief devices in liquid service, and instrumentation systems. 
The final rule also clarifies that for these components the presence of 
a leak is to be determined exclusively through the use of visual, 
audible, olfactory, or any other detection methods, but that Method 21 
is not to be used. Finally, bottoms receivers and surge control vessels 
are not regulated under the equipment leak provisions, but instead are 
regulated as storage vessels.
    Affected sources subject to this rule currently complying with the 
NESHAP for Certain Processes Subject to the Negotiated Regulation for 
Equipment Leaks [40 CFR part 63, subpart I] or with the equipment leak 
provisions in Sec. 60.562-2 of 40 CFR part 60, subpart DDD, are 
required to continue to comply with subpart I or subpart DDD, as 
applicable, until the compliance date of the final rule, at which point 
in time they must comply with this rule and are no longer subject to 
subpart I and subpart DDD. Further, affected sources complying with 
subpart I through a quality improvement program are allowed to continue 
these programs without interruption as part of complying with this 
rule. In other words, becoming subject to this rule does not restart or 
reset the ``compliance clock'' as it relates to reduced burden earned 
through a quality improvement program.

 G. Emissions Averaging Provisions

    The EPA is allowing emissions averaging among continuous process 
vents, batch process vents, aggregate batch vent streams, storage 
vessels, and wastewater streams, within an existing affected source. 
New affected sources are not allowed to use emissions averaging. 
Emissions averaging is not allowed between subcategories; it is only 
allowed between emission points within the same affected source. Under 
emissions averaging, a system of ``credits'' and ``debits'' is used to 
determine whether an affected source is achieving the required emission 
reductions. Twenty emission points per plant site are allowed in the 
emissions averaging plan submitted for the plant site, with an 
additional 5 emission points allowed if pollution prevention measures 
are used.

H. Compliance and Performance Test Provisions and Monitoring 
Requirements

    Compliance and performance test provisions and monitoring 
requirements contained in the standards are very similar to those found 
in the HON. Each type of emission point included in the standards is 
discussed briefly in the following paragraphs. Significant differences 
from the continuous parameter monitoring requirements found in the HON 
are discussed in Section 8.
1. Storage Vessels
    Monitoring and compliance provisions for storage vessel 
improvements include periodic visual inspections of vessels, roof 
seals, and fittings, as well as internal inspections. If a control 
device is used, the owner or operator must identify the appropriate 
monitoring procedures to be followed in order to demonstrate 
compliance. Monitoring parameters and procedures for many of the 
control devices likely to be used are identified in the standards. 
Reports and records of inspections, repairs, and other information 
necessary to determine compliance are also required by the standards.
2. Continuous Process Vents
    The standards for continuous process vents require the owner or 
operator to either calculate a TRE index value to determine the group 
status of each continuous process vent or to comply with the control 
requirements. The TRE index value is determined after the last recovery 
device in the process or prior to venting to the atmosphere. The TRE 
calculation involves an emissions test or engineering assessment and 
use of the TRE equations specified in the standards.
    Performance test provisions are included for Group 1 continuous 
process vents to verify that control or recovery devices achieve the 
required performance. Monitoring provisions necessary to demonstrate 
compliance are also included in the standards.
    Compliance provisions for continuous process vents at polystyrene 
and PET affected sources are included in the standards. For owners or 
operators electing to comply with a kilogram organic HAP per megagram 
of product emission limit, procedures to demonstrate compliance are 
provided.
3. Batch Process Vents
    Similar to the provisions for continuous process vents, there is a 
procedure for determining the group status of batch process vents. This 
procedure is based on annual emissions and annual average flow rate of 
the batch process vent. Equations for estimating and procedures for 
measuring annual emissions and annual average flow rates are provided 
in the standards. The use of engineering assessment is also allowed 
under certain circumstances.
    Performance test provisions are included for Group 1 batch process 
vents to verify that control devices achieve the required performance. 
Monitoring provisions necessary to demonstrate compliance are also 
included in the standard.
    For Group 2 batch process vents, the standard requires owners and 
operators to establish a batch cycle limitation. The batch cycle 
limitation restricts the number and type of batch cycles that can be 
accomplished per year. This enforceable limitation ensures that a Group 
2 batch process vent does not become a Group 1 batch process vent as a 
result of running more batch cycles than anticipated when the group 
determination was made. The determination of the batch cycle limitation 
is not tied to any previous production amounts. As affected source may 
set the batch cycle limitation at any level it desires as long as the 
batch process vent remains a Group 2 batch process vent. Alternatively, 
an owner or operator may declare any Group 2 batch process vent to be a 
Group 1 batch process vent. In such cases, control of the batch process 
vent is required.
    Procedures are included in the standards to demonstrate compliance 
with the requirement to reduce overall process vent emissions (i.e., 
continuous and batch process vents) by 84 percent for new SAN affected 
sources using a batch process.
4. Heat Exchange Systems
    Monitoring of cooling water is required to detect leaks in heat 
exchange systems. If a leak is detected, the heat exchange system must 
be repaired.
5. Process Contact Cooling Towers
    Owners and operators of new affected sources manufacturing PET are 
prohibited from sending contact condenser effluent associated with a 
vacuum system to a process contact

[[Page 48217]]

cooling tower. Owners and operators of existing PET affected sources 
using a TPA continuous high viscosity multiple end finisher process are 
required to monitor ethylene glycol concentration in the cooling tower 
water and to ensure that the levels do not exceed 4 percent by weight. 
Procedures for sampling cooling tower water and measuring the ethylene 
glycol concentration are included in the standards.
6. Wastewater
    For demonstrating compliance with the various requirements, the 
standards allow the owners or operators to either conduct performance 
tests or to document compliance using engineering calculations. 
Appropriate compliance and monitoring provisions are included in the 
standards.
7. Equipment Leaks
    Except for certain components at PET affected sources, the final 
rule retains the use of Method 21 to detect leaks. Method 21 requires a 
portable organic vapor analyzer to monitor for leaks from equipment in 
use. A ``leak'' is a concentration specified in the regulation for the 
type of equipment being monitored and is based on the instrument 
response to methane (i.e., the calibration gas) in air. The rule allows 
the use of engineering assessment to determine that equipment is not in 
organic HAP service. If there is disagreement between an owner or 
operator and the Administrator, the rule specifies that Method 18 or 
Method 25A be used to determine the organic HAP or total organic 
compounds (TOC) content of a process stream. To test for leaks in a 
batch system, test procedures using either a gas or a liquid for 
pressure testing the batch system are specified.
8. Continuous Parameter Monitoring
    The final standards require owners or operators to establish 
parameter monitoring levels. The standards provide the owner or 
operator the flexibility to establish the levels based on site-specific 
information. Site-specific levels can best accommodate variation in 
emission point characteristics and control device designs. Three 
procedures for establishing these levels are provided in the final 
standards. They are based on performance tests; performance tests, 
engineering assessments, and/or manufacturer's recommendations; and 
engineering assessments and/or manufacturer's recommendations. While 
the establishment of a level based solely on performance tests is 
preapproved by the Administrator, values determined using the last two 
procedures, which may or may not use the results of performance tests, 
must be approved by the Administrator for each individual case.
    The final standards require the availability of at least 75 percent 
of monitoring data to constitute a valid days worth of data for 
continuous and batch process vents. Failure to have a valid day's worth 
of monitoring data is considered an excursion. The criteria for 
determining a valid day's or hour's worth of data are provided in the 
standards.
    A certain number of excused excursions have been allowed in the 
final standards; these provisions are the same as the provisions in the 
HON. The standards allow a maximum of 6 excused excursions for the 
first semiannual reporting period, decreasing by 1 excursion each 
semiannual reporting period. Starting with the sixth semiannual 
reporting period (i.e., the end of the third year of compliance) and 
thereafter, one excused excursion is allowed each semiannual reporting 
period. As is always the case, a State has the discretion to impose 
more stringent requirements than the requirements of NESHAP and other 
federal requirements and could choose not to allow the excused 
excursion provisions contained in these standards.

I. Recordkeeping and Reporting Provisions

    The standards require owners or operators of affected sources to 
maintain required records and reports for a period of at least 5 years. 
The final standards require that the following reports be submitted, as 
applicable: (1) Precompliance Report, (2) Emissions Averaging Plan, (3) 
Notification of Compliance Status, (4) Periodic Reports, and (5) other 
reports (e.g., notifications of storage vessel internal inspections).
    Specific recordkeeping and reporting requirements are specified in 
each section that addresses an individual emission point (e.g., 63.1321 
for batch process vents). The recordkeeping and reporting provisions 
related to the affected source as a whole (e.g., Notification of 
Compliance Status) are found in Sec. 63.1335. Requirements found in an 
individual emission point section and the requirements in Sec. 63.1335 
are complementary. For example, Sec. 63.1326 requires an owner or 
operator to record the batch cycle limitation for each Group 2 batch 
process vent. Sec. 63.1327 goes on to require the owner or operator to 
submit this information in the Notification of Compliance Status, as 
specified in Sec. 63.1335. Finally, Sec. 63.1335 requires submittal of 
the information specified in Sec. 63.1327.

IV. Summary of Impacts

    This section presents impacts resulting from the control of organic 
HAP emissions under these standards. Because many organic HAP are also 
VOC, a reduction in VOC emissions will also result from controls 
imposed by the standards. The standards are estimated to reduce organic 
HAP emissions from all existing affected sources by 3,520 Mg/yr from a 
baseline level of 18,120 Mg/yr. For new affected sources, the standards 
are estimated to reduce organic HAP emissions by 6,870 Mg/yr from a 
baseline level of 11,610 Mg/yr. At baseline, the EPA found that many 
affected sources already had some controls in place. These standards 
generally achieve an emission reduction by meeting the MACT floor level 
of control. [Note: Costs and other impacts are not considered when the 
selected standard is based on the MACT floor.] In some cases, these 
standards achieve additional emission reduction, beyond the floor, that 
was determined to be cost effective.
    Under the final standards, energy use is expected to increase by 
approximately 29,800 barrels of oil per year for existing affected 
sources and 43,600 barrels of oil per year for new affected sources. 
The emissions of secondary air pollutants associated with this energy 
increase are 70 Mg/yr for existing affected sources and 80 Mg/yr for 
new affected sources. At the same time, energy credits attributable to 
the prevention of organic HAP emissions from equipment leaks are 
approximately 7,000 barrels of oil per year for existing affected 
sources and 3,800 barrels of oil per year for new affected sources. 
This results in a net increase in energy usage equivalent to 
approximately 22,500 barrels of oil per year for existing affected 
sources and 39,700 barrels of oil per year for new affected sources.
    These figures are related to the control of process vents, 
wastewater operations, and equipment leaks. Energy impacts related to 
storage vessels were not estimated because many storage vessels would 
be controlled through the use of internal floating roofs which do not 
have any associated energy impacts. Data are not available for the EPA 
to estimate energy impacts for the elimination of emissions from 
process contact cooling towers for new PET affected sources or the 
control of ethylene glycol concentration in the process contact cooling 
tower water for existing PET affected sources using a continuous TPA 
high viscosity multiple end finisher process.

[[Page 48218]]

    Cost impacts include the capital costs of new control equipment, 
the cost of energy (i.e., supplemental fuel, steam, and electricity) 
required to operate control equipment, operation and maintenance costs, 
and the cost savings generated by reducing the loss of valuable product 
in the form of emissions. Also, cost impacts include the costs of 
monitoring, recordkeeping, and reporting associated with the standards.
    Under the standards, it is estimated that total capital costs for 
existing affected sources would be $10.7 million (1989 dollars), and 
total annual costs would be $3.3 million (1989 dollars) per year. Total 
capital costs for new affected sources would be $6.5 million (1989 
dollars), and total annual costs would generate a savings of $5.2 
million (1989 dollars) per year. It is expected that the actual 
compliance cost impacts of the standard would be less than presented 
because of the potential to use common control devices, upgrade 
existing control devices, use other less expensive control 
technologies, implement pollution prevention technologies, or use 
emissions averaging. Because the effect of such practices is highly 
site-specific and data were unavailable to estimate how often the lower 
cost compliance practices would be utilized, it is not possible to 
quantify the amount by which actual compliance costs would be reduced.
    The economic impact analysis for the selected regulatory 
alternatives at proposal showed that the estimated price increases for 
the affected chemicals ranged from 0.1 percent for nitrile to 2.8 
percent for SAN. Estimated decreases in output ranged from 0.1 percent 
for polystyrene to 4.6 percent for SAN. Net annual exports (i.e., 
exports minus imports) were predicted to decrease by an average of 2.5 
percent. These impacts were judged, at proposal, to be acceptable. 
Because estimated costs of the final standards have decreased, the 
economic impacts determined at proposal will decrease as well. 
Therefore, the EPA finds the economic impacts associated with the final 
standards are less than at proposal and are judged to be acceptable.

V. Significant Comments and Changes to the Proposed Standards

    In response to comments received on the proposed standards, changes 
have been made to the final standards. While several of these changes 
are clarifications designed to make the EPA's intent clearer, a number 
of them are significant changes to the requirements of the proposed 
standards. A summary of the substantive comments and/or changes made 
since the proposal are described in the following sections. The 
rationale for these changes and detailed responses to public comments 
are included in the Basis and Purpose Document for the Final Standards 
[EPA-453/R-96-001b; May 1996]. Additional information on the final 
standards is contained in the docket for this rulemaking (see ADDRESSES 
section of this preamble).

A. Applicability Provisions and Definitions

1. Designation of Affected Source and the Definition of TPPU
    Commenters expressed confusion about the definitions of ``affected 
source'' and ``TPPU'' in the proposed standards. The EPA reviewed both 
definitions and agreed that they needed clarification. In response, the 
EPA has revised the language describing ``affected source'' and 
``TPPU'' for the final standards.
    The definition of ``affected source'' included in Sec. 63.502 of 
the proposed standards was revised and the definition now references 
Sec. 63.1310(a) of the final rule, and Sec. 63.1310(a) describes the 
affected source. The provisions in Sec. 63.1310(a), which at proposal 
were in Sec. 63.500(a) and defined applicability in terms of the 
existence of one or more TPPUs, have been revised to define 
applicability in terms of the affected source. As part of this 
revision, the provisions in proposed Sec. 63.500(b), which described 
the affected source, were removed. [Note: In the proposed standards, 
the definition of TPPU attempted to describe all the equipment and 
operations that would be included in an affected source. In the final 
standards, the description of what the affected source includes is 
contained in Sec. 63.1310(a).]
    As discussed in section II, an existing affected source is defined 
as each group of one or more TPPUs that manufacture the same 
thermoplastic product as their primary product, and (1) are located at 
a major source plant site, (2) are not exempt, and (3) are not part of 
a new affected source. A new affected source can be a single TPPU 
located at major source plant site or a group of TPPUs that manufacture 
the same thermoplastic product as their primary product at a major 
source plant site. The situations when a new affected source are 
created are discussed under A.3 of this section.
    The affected source also includes the following emission points and 
equipment that are associated with each group of TPPU: (1) each 
wastewater stream; (2) each wastewater operation; (3) each heat 
exchange system; (4) each process contact cooling tower used in the 
manufacture of PET that is associated with a new affected source; and 
(5) each process contact cooling tower used in the manufacture of PET 
using a continuous terephthalic acid high viscosity multiple end 
finisher process that is associated with an existing affected source.
    For the final standards, the number of existing affected sources 
present at a plant site will equal the number of thermoplastic products 
manufactured at that plant site. A plant site manufacturing 3 different 
thermoplastic products has 3 existing affected sources.

    Note: Each different thermoplastic product represents a 
different subcategory, and each subcategory comprises a separate 
existing affected source.

    The number of existing affected sources at a plant site could range 
from 1 to 19.
    The definition of TPPU was revised and now includes a list of the 
collection of equipment that comprises a TPPU. This equipment includes 
process vents from process vessels, storage vessels, and equipment 
subject to the equipment leaks provisions. Because wastewater streams, 
wastewater operations, heat exchange systems, and process contact 
cooling towers are equipment that are often used by more than one TPPU, 
these items are not included as part of the definition of TPPU. 
Instead, said items are included in the definition of affected source. 
Because the portion of each wastewater stream attributable to an 
individual TPPU can be determined, each wastewater stream can be 
associated with an affected source. On the other hand, wastewater 
operations may service wastewater streams associated with more than one 
affected source, just as heat exchange systems and PET process contact 
cooling towers could service multiple affected sources. Therefore, for 
wastewater operations, heat exchange systems, and PET process contact 
cooling towers, the final rule requires that said emission points and 
equipment are subject to all applicable requirements associated with 
each affected source that said emission points and equipment may 
service. In a simple example, a heat exchange system is associated with 
two affected sources that are both subject to the final rule. The owner 
or operator must comply with the provisions for heat exchange systems 
contained in the final rule. In a more complex example, a piece of 
wastewater operations equipment services wastewater streams from two 
affected sources subject to the final rule and from one source subject 
to the HON.

[[Page 48219]]

This piece of wastewater operations equipment must comply with both the 
final rule and the HON.
2. Definition of Organic HAP
    Numerous commenters recommended that the EPA restrict the list of 
organic HAP in the final standards to those that are used or are 
present in significant quantities at TPPUs or those that are listed in 
the HON, subpart F. Table 2. The EPA agreed with the commenters 
suggestion that a table providing a listing of the specific organic HAP 
expected to be regulated for each subcategory covered by the standards 
should be added to the final standards. Therefore, the definition of 
organic HAP was revised to specify those organic HAP that are known to 
be used or present in significant quantities for each subcategory, 
thereby restricting the organic HAP regulated by the final standards. 
This list is provided in Table 2 of the final standards.
    The revised definition of organic HAP was developed using available 
process description information received from industry and gathered 
from available literature. Because there may be additional organic HAP 
present at an affected source, the final standards require owners or 
operators to identify the presence of any additional organic HAP based 
on the following criteria: (1) the organic HAP is knowingly introduced 
into the manufacturing process other than as an impurity, or has been 
or will be reported under any Federal or State program, such as Title V 
or the Emergency Planning and Community Right-To-Know Act (EPCRA) 
Section 311, 312, or 313; and (2) the organic HAP is listed in Table 2 
of subpart F.
3. Determining New Source Status
    The EPA received comments regarding the procedure for determining 
if new or existing source requirements would apply to a particular 
TPPU. In response to those comments, the EPA has revised the provisions 
in the final standards.
    Under the final standards, new affected sources are created under 
each of the following four situations: (1) if a plant site with an 
existing affected source producing a thermoplastic product as its 
primary product constructs a new TPPU also producing the same 
thermoplastic product as its primary product, the new TPPU is a new 
affected source if the new TPPU has the potential to emit more than 10 
tons per year of a single HAP or 25 tons per year of all HAP; (2) when 
a TPPU is constructed at a major source plant site where the 
thermoplastic product was not previously produced as the primary 
product of an existing affected source; (3) if a new TPPU is 
constructed at a new plant site (i.e., green field site) that will be a 
major source; and (4) when an existing affected source undergoes 
reconstruction, thus making the previously existing affected source 
subject to new source standards.
    These revisions reflect the EPA's intent that new source 
requirements apply if the added TPPU has the potential to emit major 
quantities, as in the HON, or the added TPPU is a new affected source. 
The HON applied to only one source category, and it was not possible to 
add a process unit subject to the HON that was in a new source 
category. Therefore, the only differentiation to be made under the HON 
was between process units emitting major quantities of organic HAP and 
those not emitting major quantities of organic HAP. On the other hand, 
the thermoplastics standards apply to multiple source categories/
subcategories, and it is possible to add a TPPU subject to the 
thermoplastics standards that is in a new source category/subcategory. 
For this reason, if a TPPU is added to an existing plant site and said 
TPPU manufactures a thermoplastic product as its primary product not 
previously produced at the plant site as the primary product of an 
existing affected source, that TPPU, regardless of emissions, is a new 
affected source at that plant site.
4. Solid State PET Processes
    Commenters contended that all PET solid state polymerization units, 
including collocated units, should be exempted from regulation. They 
stated that PET solid state polymerization units are a vastly different 
technology than DMT and TPA processes and have different emission 
characteristics. The EPA has concluded that PET solid state processes 
are distinct from DMT or TPA processes. The EPA did not collect data on 
PET solid state processes, and it was not possible to conduct the 
required analyses for regulating PET solid state processes. Therefore, 
the final standards do not regulate these processes. However, these 
processes may be regulated in a future standard.
5. Flexible Operation Units
    The flexible operation unit provisions included in the proposed 
standards, which were modelled after the HON, have been retained in the 
final standards. Under these provisions, an owner or operator of a 
process unit that is designed and operated as a flexible operation unit 
will commit to being subject to this rule or not being subject to this 
rule based on a five-year projection of products to be manufactured and 
production quantities.
    These provisions were modified to provide clarification of the 
EPA's intent and flexibility in complying with the provisions. Under 
the final rule, once an owner or operator commits to being subject to 
this rule, there are two options for complying. Under the first option, 
an owner or operator shall determine the group status (i.e., Group 1 or 
Group 2) of each emission point based on the production of the expected 
primary product (i.e., the thermoplastic product that convinced the 
owner or operator to commit to being subject to this rule). Once the 
group status of each emission point is determined, the owner or 
operator shall comply with the applicable emission standards for the 
primary product at all times, regardless of what product is being 
manufactured. Under the second option, an owner or operator shall 
determine the group status of each emission point each time a different 
product is being manufactured, regardless of whether or not said 
product is a thermoplastic product. Then, for each Group 1 emission 
point, the owner or operator shall comply with the applicable standards 
for the primary product. The EPA recognizes that neither option is an 
ideal situation. Under the first option, an owner or operator may find 
themselves operating a control device to control a Group 1 emission 
point that has none to negligible emissions when a different product is 
being manufactured. Under the second option, an owner or operator may 
find themselves performing multiple group determinations. Again, the 
EPA recognizes that neither option is an ideal situation, but believes 
the tradeoff between these inconveniences and flipping in and out of 
separate MACT standards is worthwhile.
    As part of demonstrating compliance with the rule, an owner or 
operator required to operate a control device must establish parameter 
monitoring levels and conduct monitoring. Under either compliance 
option discussed above an owner or operator must establish parameter 
monitoring levels to reflect the manufacture of different products. 
These provisions allow an owner or operator to demonstrate that the 
parameter monitoring levels established for the primary product are 
appropriate for the manufacture of other products. If this is not the 
case, the provisions require that unique parameter monitoring levels be 
established.

[[Page 48220]]

6. Coordination With Other Clean Air Act Requirements
    At proposal, the EPA has proposed to amend subpart DDD of 40 CFR 
part 60 by removing all references to polystyrene and PET facilities. 
This action was being taken because the proposed thermoplastics 
standards would supersede the requirements in subpart DDD for 
polystyrene and PET affected sources after the compliance date of the 
thermoplastics standards. Commenters also suggested that subpart I of 
40 CFR part 63 be amended by removing all references to MBS and MABS 
affected sources after the compliance date of the thermoplastics 
standards. Other commenters requested that the EPA further clarify that 
after the compliance date of the thermoplastics standards, affected 
sources will no longer be subject to certain NSPS.
    The EPA clarified the relationship between the thermoplastics 
standards and existing applicable standards in Sec. 63.1311 of the 
final rule. The final rule was revised to state that affected sources 
subject to both the thermoplastics standards and another subpart are to 
comply with the provisions of the thermoplastic standards only after 
the compliance date for the thermoplastic standards, for those 
standards listed in Sec. 63.1311 (g) through (l) of the final rule. 
Further, after the compliance date for these standards, these affected 
sources will no longer be subject to the other subparts. The EPA 
determined that a clear understanding can be provided in these 
standards without making modifications to other subparts. Thus, the 
proposed amendments to subpart DDD were not made as part of the final 
rulemaking, nor were the suggested amendments made to subpart I. For 
subpart DDD, the language in the final rule is more specific than for 
the other subparts. Because subpart DDD regulates multiple emission 
points (i.e., process vents, equipment leaks, and process contact 
cooling towers), the EPA needed to consider if it was desired or 
necessary to continue requiring portions of subpart DDD to apply. In 
fact, it is necessary to leave the provisions for controlling the 
ethylene glycol concentration in process contact cooling towers for the 
PET TPA continuous high viscosity multiple end finisher subcategory 
intact. This is because the provisions in the thermoplastics rule for 
the degree of control required for emissions from process contact 
cooling towers for this subcategory depend on whether or not an 
existing affected source is subject or becomes subject to subpart DDD 
for this emission point.

B. Continuous Process Vent Provisions

1. Reorganization of the Standards To Distinguish Between Continuous 
Process Vents Subject to Provisions From the HON and Continuous Process 
Vents Subject to Provisions Adapted From the Polymer Manufacturing NSPS
    To better distinguish between the various requirements for 
continuous process vents, the proposed standards were reorganized. In 
the final standards, separate sections of the rule apply to the 
following subcategories: those required to comply with subpart G of the 
HON and those producing PET or polystyrene using a continuous process. 
In the final standards, Sec. 63.1315 references subpart G; Sec. 63.1316 
through Sec. 63.1320 apply to select continuous process vents at 
affected sources producing polystyrene and PET using a continuous 
process. Further, because not all process vents at affected sources 
producing polystyrene and PET using a continuous process are subject to 
Sec. 63.1316 through Sec. 63.1320, the provisions of Sec. 63.1316 
designate which process vents are subject to Sec. 63.1316 through 
Sec. 63.1320, which are subject to Sec. 63.1315 (i.e., the HON), and 
which are subject to Sec. 63.1321 (i.e., the batch process vent 
provisions). This reorganization is one way the EPA changed the 
standards to reduce complexity and eliminate potential confusion.
2. Applicability of the Polymer Manufacturing NSPS Adapted Provisions 
to the Collection of Process Sections at an Affected Source
    Commenters stated that the regulatory construction of the proposed 
standards implied that the process vent emission limits adapted from 
the Polymer Manufacturing NSPS [proposed Sec. 63.505 (b) and (c)] apply 
to each collection of material recovery sections, raw material 
preparation sections, and polymerization sections, respectively, within 
an affected source and not to each individual process section (e.g., 
material recovery section), as under the Polymer Manufacturing NSPS.
    At proposal, the EPA has intended for each individual process 
section to meet the emission limits in proposed Sec. 63.505 (b) and 
(c), as applicable. However, since proposal, the EPA has determined 
that revising the proposed standards to allow each collection of 
process sections within an affected source to meet the applicable 
emission limit would simplify compliance while achieving the same 
emission reductions. Therefore, the final standards apply the emission 
limits adapted from the Polymer Manufacturing NSPS to each collection 
of material recovery sections, raw material preparation sections, or 
polymerization reaction sections, as appropriate, within an affected 
source.
3. Clarification of Compliance Demonstration Provisions for Final 
Condenser Temperature Limits
    Commenters suggested modifying the provisions adapted from the 
Polymer Manufacturing NSPS that provide for a demonstration of 
compliance by limiting the final condenser outlet temperature. 
Commenters explained that the reporting provisions in the Polymer 
Manufacturing NSPS state that the temperature limit is only exceeded 
when the average condenser outlet temperature for a 3-hour period is 
more than 6  deg.C above (i.e., warmer) the average operating 
temperature established during the most recent performance test at 
which compliance was demonstrated. Commenters requested that the final 
standards incorporate those monitoring, test method, and recordkeeping 
and reporting requirements from the Polymer Manufacturing NSPS that 
provide this flexibility (i.e, the six degree window).
    The EPA intended for the proposed standards to be equivalent to the 
Polymer Manufacturing NSPS in this regard and have revised the final 
standards to provide the desired flexibility (i.e., the six degree 
window). In addition, the EPA has disassociated the six degree window 
from the results of the performance test and has instead associated it 
with the applicable temperature limit in the standard. The final 
standards allow all owners or operators complying with the final 
condenser operating temperature limits to be 6  deg.C warmer than the 
applicable temperature limit for the 3-hour averages. The EPA 
considered that the proposed provisions did not achieve an even-handed 
implementation of the requirements because some affected sources would 
be allowed to have 3-hour averages at warmer temperatures than others 
because their performance test results indicated a temperature closer 
to the applicable temperature limit.

C. Batch Process Vent Provisions

1. Exemption of Certain Batch Process Vents
    Commenters supported the use of cutoffs for the group status 
determination for batch process vents as found in proposed Sec. 63.506-
2(d). Specifically, commenters agreed that low annual organic HAP 
emissions and low flow rate cutoffs are suitable. Commenters explained 
that batch

[[Page 48221]]

processes are, by nature, suited to low volume production and the 
manufacture of specialty products, and as such, low flow, low emitting 
process vents are likely in batch operations.
    These provisions were retained in the final rule with one 
exception. The EPA removed the requirement to determine the volatility 
class (i.e., low, medium, or high) for batch process vents. As a 
result, there is a single minimum emission level cutoff in the final 
provisions of Sec. 63.1323(d). In addition, the EPA chose to add a 
minimum emission level of 225 kilograms per year (kg/yr) to the 
definition of batch process vent. This modification made the batch 
process vent more consistent with the continuous process vent 
provisions which have a minimum organic HAP concentration level as part 
of the definition of continuous process vent. An emission point with 
emissions equal to or less than 225 kg/yr is not considered a batch 
process vent. At proposal, the 225 kg/yr level was part of the batch 
process vent group determination procedures; Group 2 batch process 
vents with annual emissions less than 225 kg/yr were subject to 
reporting requirements related to process changes.
2. Revisions to Group Determination Procedures
    Commenters suggested changing the group determination provisions to 
only utilize emissions data from a TPPU's primary product. In addition, 
it was requested that batch process vent group determinations be 
performed on an annual basis instead of for every process change. 
Commenters stated that the proposed group determination provisions were 
considerably more complex than the continuous process vent group 
determination provisions. Commenters felt that, not only did the batch 
process vent group determination provisions require an owner or 
operator to obtain emissions data for every product that it 
manufactured, but even the most minor process changes (i.e., 
lengthening cycle times, altering process temperatures and pressures, 
etc.) triggered the need for a new group determination to be performed. 
Given the inherent process variability associated with batch 
operations, commenters contended that it would be very difficult to 
perform a group determination. Furthermore, because batch units often 
need to implement sudden process changes in response to customer 
demands, the proposed provisions could potentially require repeating 
the group determination exercise several times in a single year. 
Commenters explained that such a situation would not only serve to 
complicate a batch unit's compliance status, but could also adversely 
impact its ability to remain competitive in the marketplace.
    Four issues related to the group determination procedures were 
reviewed by the EPA: (1) a request to perform the group determination 
on the primary product, (2) a request to perform the group 
determination on an annual basis, (3) an objection that the group 
determination procedures require a new group determination to be made 
whenever minor process changes occur, and (4) an objection to the 
requirement to perform the group determination when a sudden process 
change is required.
    The EPA has considered the request to perform the group 
determination on the primary product and agrees that this would provide 
acceptable results from an environmental perspective while simplifying 
the compliance requirements for and improving the enforceability of the 
batch process vent standards. The final rule contains provisions 
allowing the owner or operator of an affected source to perform the 
group determination for batch process vents based on annualized 
production of a single product. To ensure protection to the 
environment, the final rule specifies that the highest organic HAP 
emitting product must be used when determining the group status based 
on a single product.
    In addressing the request that the group determination be required 
on an annual basis instead of for every process change, the EPA 
believes the proposed rule was clear on this point. The proposed rule 
required that emissions and average flow rate be determined on an 
annual basis and describe how to account for the production of 
different products throughout the year. In this way, the group 
determination is done on an annual basis and can account for expected 
changes in the product being produced. The final rule does not reflect 
any changes related to this specific issue.
    The third issue raised was an objection to the requirement that a 
new group determination be performed whenever minor process changes 
occur (e.g., lengthening cycle times, altering process temperatures and 
pressures, etc.). The proposed rule addressed the issue of minor 
process changes as they affect Group 2 batch process vents. If a 
process change affecting a Group 2 batch process vent occurs, a group 
determination must be made. However, the group determination provisions 
state that ``changes that are within the range on which the original 
group determination was based'' are not considered process changes. 
This allows an owner or operator to perform the initial group 
determination considering the potential for minor process changes. The 
EPA believes that the proposed provisions were clear that minor process 
changes (i.e., variations in operating conditions) do not require that 
a new group determination be performed. Addressing this concern as it 
relates to Group 1 batch process vents, the proposed provisions do not 
require a redetermination of group status for Group 1 batch process 
vents under any circumstances. Therefore, if minor process changes were 
to occur, the owner or operator would not be required to perform 
another group determination. The final rule does not reflect any 
changes related to this specific issue.
    The fourth issue raised was an objection to the requirement to 
perform a new group determination when a sudden process change is 
required. In light of the third issue raised, EPA interpreted ``sudden 
process change'' to potentially mean (1) that a new product is being 
made, (2) that the same product is being made in a fundamentally 
different way (e.g., with different raw materials), or (3) that the 
same mix of products is being made but in a different proportion. In 
the first two cases, the EPA desires and intends that a new group 
determination be made. In the third case, the owner or operator has the 
flexibility to consider this situation when performing the initial 
group determination. If this situation was not considered, then a new 
group determination would be required. The EPA feels that these types 
of process changes warrant a new group determination to ensure that the 
emission standards are being met. The final rule does not reflect any 
changes related to this specific issue.
3. Emissions Testing and Performance Testing
    Commenters requested that more flexibility should be allowed in 
designing an emissions testing scheme for batch process vents. 
Commenters cited an example, provided as part of the proposed 
definition of batch emission episode, where the charging of a vessel 
and the heating of the same vessel are considered two distinct batch 
emission episodes. In this example, the definition of batch emission 
episode would necessitate that separate emissions measurements be made 
for the charging and the heating of the vessel. This would require that 
a large number of samples be taken to characterize processes that have

[[Page 48222]]

multiple, short duration process steps. Commenters felt that the 
flexibility to test the emissions from several steps as a single batch 
emission episode would reduce testing costs without jeopardizing the 
quality of the emissions data. It was suggested that three or more 
batch cycles could be tested to obtain a representative average 
emission rate for the batch cycle.
    After consideration of this comment, the EPA chose to leave the 
provisions related to emissions testing of batch process vents 
unchanged as they relate to this specific comment. The EPA felt 
adequate data were not presented to warrant changing these provisions. 
However, the emissions testing provisions in Sec. 63.1323(b) and 
Sec. 63.1325(c) have been modified to provide flexibility and reduce 
the burden of testing, while continuing to ensure that results are 
satisfactory for applicability determinations and performance tests. 
The final provisions allow an owner or operator to test just a portion 
of the batch emission episode selected to be controlled when the owner 
or operator can demonstrate that emissions during the period to be 
tested represent emissions for the entire batch emission episode or are 
greater than the average emission rate for the batch emission episode.
4. Flow Rate Estimation Procedures
    Commenters asserted that the equations and test methods for 
calculating annual average flow rate in the proposed rule were not 
warranted. Commenters felt that the volumetric flow rate testing 
methods and the requirement to measure flow every 15 minutes specified 
in proposed Sec. 63.506-2(e) were overly burdensome and would not 
always provide representative measurements. It was suggested that 
average flow rates for a batch emission episode are better defined by 
calculations of displacement volumes with respect to the durations of 
the displacement episodes or by other more simplified methods.
    The EPA agrees that there are more simplified and potentially more 
accurate techniques for estimating flow rate for batch process vents. 
The final rule contains provisions that allow engineering assessment, 
as well as testing, to be used for estimating flow rate.
5. Emissions Estimation Procedures
    Commenters recommended removing the emissions estimation equations 
in proposed Sec. 63.506-2(b) from the rule. Commenters recommended that 
measurements or engineering estimates be allowed in place of the 
equations. It was felt the emissions estimation equations would not 
allow the flexibility necessary to account for differences in process 
technologies and operating methods.
    Commenters also supported the provisions that allowed owners or 
operators to use direct measurement or engineering assessment to 
estimate emissions in cases where the emissions estimation equations 
are inappropriate for a particular type of operation or where, speaking 
to direct measurement, a more refined estimate of emissions is 
necessary. However, commenters objected to the requirement to 
demonstrate that the emissions estimation equations and direct 
measurement methods are not appropriate before engineering assessment 
can be used.
    In response to the first issue raised, the emissions estimation 
equations have been retained in the final rule. The EPA found noting in 
the public comments that would warrant removing these procedures.
    In response to the second issue, the EPA believes the data required 
to use the emissions estimation equations should be obtainable with 
reasonable effort. Further, specific comments regarding the inaccuracy 
or inappropriateness of the equations were not made. Given this, the 
EPA favors a more consistent estimation technique which is provided by 
the use of the emissions estimation equations, and the final rule 
requires the owner or operator to demonstrate that the emissions 
estimation equations are inappropriate before the use of engineering 
assessment is allowed.
    However, independent of the comments provided, the EPA has 
concluded that direct measurement of emissions may prove to be 
difficult and may or may not provide an increased assurance of accuracy 
over the use of engineering assessment. Therefore, if an owner or 
operator can demonstrate that the emissions estimation equations are 
not appropriate, the final provisions allow the use of either direct 
measurement or engineering assessment.
6. Other Changes Resulting From EPA Review
    In addition to changes made to the proposed rule as a result of 
public comment, changes were made as a result of EPA independently 
reviewing the rule between proposal and promulgation. Because the batch 
process vent provisions included in the rule are among the EPA's first 
attempts to regulate batch process vents, the EPA felt an ongoing, 
independent review of these provisions after proposal was warranted. 
Changes resulting from this review are listed below:
    (1) Allow applicability determinations and compliance 
demonstrations (i.e., performance tests) to be based on TOC or organic 
HAP. Allow the use of Method 25A to compliment the use of TOC as a 
potential basis for applicability determinations and compliance 
demonstrations.
    (2) Allow the establishment of parameter monitoring levels to be 
based on performance tests or a combination of performance tests and 
engineering assessment (discussed in more depth in Section H, 
Monitoring). To accommodate this change, modifications to the batch 
process vent testing provisions were required.
    (3) Add provisions specifying how the batch cycle limitation is to 
be determined.
    (4) Change the reporting requirement for batch cycle limitation 
records from quarterly to annually.
    These changes are discussed in the paragraphs below.
    In the final rule, the EPA has allowed the use of TOC as the basis 
for applicability and compliance demonstrations (i.e., performance 
tests) as an alternative to organic HAP. The EPA has done this to 
provide flexibility to the regulated community and to reduce the 
overall burden of the rule. The EPA considered the impacts of allowing 
TOC to serve as a surrogate for organic HAP in applicability and 
compliance demonstrations and did not find any negative impacts. 
Further, allowing the use of Method 25A as a complement to the use of 
TOC as a surrogate to organic HAP reduces the burden of implementing 
the final rule with little to no adverse impact on the measurement of 
pollutants in the regulated batch process vents. To the best of the 
EPA's knowledge, the batch process vents regulated by this rule are 
predominantly organic HAP. Also, with one exception (i.e., ethylene 
glycol), the regulated organic HAP, which are listed in the definition 
of organic HAP found in the final rule, have response factors to Method 
25A adequate to ensure satisfactory measurement of TOC in the batch 
process vents. For certain emission points where the EPA considered the 
presence of ethylene glycol and its corresponding poor response factor 
to call into question the results that would be obtained using Method 
25A, the use of Method 25A is not allowed. For all other emission 
points, the EPA has allowed the use of TOC for applicability and 
compliance demonstrations as an alternative to organic HAP in the final 
rule.

[[Page 48223]]

    In the final rule, the EPA allows the establishment of parameter 
monitoring levels to be based on either performance tests, as in the 
proposed rule, or a combination of performance tests, engineering 
assessment, and manufacturer's recommendations. This change affects all 
emission points which are required to establish parameter monitoring 
levels, including batch process vents. The rationale for this change is 
discussed in detail in Section H, monitoring, of this document. For 
batch process vents, this change in the procedures for establishing 
parameter monitoring levels necessitated changes to the performance 
test provisions. When an owner or operator chooses to establish 
parameter monitoring levels based exclusively on performance tests, the 
final rule directs that the performance test must include the entire 
batch emission episode selected to be controlled. As discussed earlier, 
an owner or operator may choose to control just a portion of a batch 
emission episode; in such a scenario, the performance test must include 
the entire portion of the batch emission episode selected to be 
controlled. Alternatively, when an owner or operator chooses to 
establish parameter monitoring levels based on a combination of 
performance tests, engineering assessment, and manufacturer's 
recommendations, the final rule allows an owner or operator to test 
either the entire batch emission episode, or portion thereof, selected 
to be controlled or to test only the entire batch emission episode, or 
portion thereof, selected to be controlled.

    Note: The flexibility to test a period of the batch emission 
episode that is less than the entire batch emission episode, or 
portion thereof, selected to be controlled is discussed earlier in 
this section.

    The final rule includes provisions specifying how the batch cycle 
limitation, required for Group 2 batch process vents, is to be 
established. The EPA felt that the proposed rule was ambiguous 
concerning the establishment of the batch cycle limitation and added 
these provisions to make the rule complete. The added provisions 
provide additional description of the purpose of the batch cycle 
limitation and describe what documentation is required as part of 
establishing the batch cycle limitation.
    In the final rule, the EPA changed the requirement for reporting 
the number and type of batch cycles accomplished for a Group 2 batch 
process vent from quarterly to annually. The EPA felt that quarterly 
reporting was unwarranted given that the compliance requirement (i.e., 
the batch cycle limitation) was on an annual basis.

D. Wastewater Provisions

1. Steam Stripping Styrene-Containing Wastewater Streams
    Numerous commenters claimed that the selection of steam stripping 
as the basis of the standards for the treatment of styrene-containing 
wastewater streams was inappropriate due to polymerization problems. 
The EPA acknowledges that steam stripping styrene-containing 
wastewaters may prove to be impractical in some cases due to issues 
raised by the commenters. However, steam stripping is not required by 
the standards. Both the proposed and final wastewater provisions 
provide several options for complying with the standards. If the owner 
or operator judges steam stripping to be impractical for their process, 
one of the other wastewater compliance options may be used. The EPA 
considers one of these compliance options, the use of enclosed sewers 
to a biological treatment operation unit, a favorable option because 
styrene is highly biodegradable. Further, because the organic HAP 
emitted from the subcategories regulated by this rule are highly 
biodegradable, the EPA has determined that it is not necessary to 
require affected sources to demonstrate that 95 percent of the mass of 
organic HAP listed in Table 9 of the HON are removed when using a 
biological treatment unit, as required by the HON. Therefore, the final 
thermoplastic rule does not require an owner or operator to make this 
demonstration.
2. Elimination of Regulations Pertaining to Wastewater From Polystyrene 
Affected Sources
    In addition to considering the comments made concerning the 
impracticality of steam stripping styrene-containing wastewaters, the 
EPA evaluated the need to regulate wastewater from polystyrene affected 
sources. Because the water solubility of styrene is limited to 
approximately 300 ppm and styrene is the only known organic HAP emitted 
during the production of polystyrene, it is not possible for a 
wastewater stream that only contains styrene to meet the Group 1 
applicability criteria (i.e., 1,000 ppm minimum concentration). 
Therefore, because, to the best of EPA's knowledge, there can be no 
Group 1 wastewater streams at a polystyrene affected source, the final 
standards do not regulate wastewater from this subcategory.

E. Process Contact Cooling Tower Provisions

1. Ethylene Glycol Jet Retrofit for PET Existing Affected Sources
    Commenters disagreed with the EPA's position that ethylene glycol 
jets are the vacuum systems technology of choice for a retrofit 
application and with the EPA determination that ethylene glycol jets 
are cost effective. Commenters contended that the EPA had failed to 
consider numerous costs factors and design considerations.

    Note: While the proposed standards did not require the use of 
ethylene glycol jets, they were the technology on which the 
prohibition of process contact cooling towers was based.

    Based on the data available at proposal, the costs and emission 
reductions achievable through the use of ethylene glycol jets in 
retrofit situations were acceptable. The EPA knew that the proposed 
standards for ethylene glycol jets were based on limited data and 
limited knowledge obtained from one manufacturer of PET. The EPA took 
special effort to make this clear and to solicit comments on the 
installation and operation of ethylene glycol jets in the preamble to 
the proposed standards (see pages 16104 and 16107 of the preamble). 
Based on the comments provided, the EPA agrees that ethylene glycol 
jets are not a suitable retrofit technology for existing affected 
sources, either technically or economically, for meeting the provisions 
of the proposed standards that prohibit the use of process contact 
cooling towers. These comments are presented and discussed in detail in 
the Basis and Purpose Document for the Final Standards [EPA-453/R-96-
001b; May 1996].
    As explained in chapter 6.0 of the Basis and Purpose Document for 
the Final Standards [EPA-453/R-96-001b; May 1996], steam jet vacuum 
systems can be used to create a vacuum on the process vessels, contact 
condensers can be used to condense steam, and the contact condenser 
effluent can be recirculated to the process contact cooling tower. In 
the process contact cooling tower, stripping and drift may occur, 
resulting in organic HAP emissions to the atmosphere. Volatilization of 
organic HAP from the vacuum system may also occur. The following 
paragraphs describe some of the public comments on this issue and the 
EPA's responses.
    Given that the EPA was convinced by the commenters' arguments that 
ethylene glycol jets are not a suitable retrofit technology for 
existing affected sources, the EPA considered alternate

[[Page 48224]]

options for controlling emissions from the vacuum system. Both volatile 
organic HAP (VOHAP) and ethylene glycol are emitted from the vacuum 
system, and the EPA chose to approach each of these emissions 
separately.
    To address VOHAP emissions from the vacuum system at existing 
sources, the final standards treat the contact condenser effluent as 
wastewater and apply the same provisions to it as are applied to 
process wastewater. Contact condenser effluent is considered process 
wastewater based on the proposed wastewater provisions, and without any 
special provisions or specific mention, the wastewater provisions will 
apply. The EPA judged that treating the contact condenser effluent 
prior to any significant opportunity for volatilization protects the 
environment. Further, the HON wastewater provisions, which are the 
basis for the wastewater provisions in the proposed and final 
standards, have been judged to be environmentally effective and cost 
effective overall. Therefore, it the wasetwater provisions deem a 
wasterwater stream to be Group 2 (i.e., not requiring control), that 
means it is not cost effective to control any VOHAP that may be 
contained in that wastewater stream.
    Addressing emissions from the process contact cooling tower was 
more complex.

    Note: The HON did not specifically address process contact 
cooling towers because they are not used extensively in the 
synthetic organic chemical manufacturing industry (SOCMI).

    Given that the emissions of VOHAP would be dealt with through the 
use of the wastewater provisions at existing affected sources, the key 
issue related to cooling towers became the emissions of ethylene 
glycol. Between proposal and promulgation, the EPA spent considerable 
effort gathering information on PET vacuum systems and their emissions. 
Much of this effort focused on emissions from the cooling towers, 
specifically emissions of ethylene glycol. In addition to gathering 
information on emissions, the EPA investigated control options aimed at 
reducing emissions of ethylene glycol from cooling towers. Possible 
control options, not considering ethylene glycol jets, included 
treating a slipstream of the cooling tower water to reduce the 
concentration of ethylene glycol or installing a large heat exchanger 
to isolate the cooling tower from the process. None of these control 
options were shown to be cost effective. All of the factors discussed 
above have led the EPA to conclude that, with one exception discussed 
below, specific provisions for controlling emissions from process 
contact cooling towers are not warranted for existing affected sources. 
Instead, the EPA is requiring that the wastewater provisions be applied 
to all vacuum system wastewater.
    The one exception where it was found to be cost effective to 
control emissions from existing process contact cooling towers was for 
affected sources manufacturing PET using a continuous TPA high 
viscosity multiple end finisher process. Based on industry reported 
emissions, total ethylene glycol emissions for all PET subcategories 
are approximately 340 Mg/yr, and approximately 230 Mg/yr are being 
emitted from the single plant site that is part of this subcategory. 
This subcategory is required to keep the concentration of ethylene 
glycol in the process contact cooling tower water to 4 percent by 
weight or less.
    As at proposal, the final standards require that owners or 
operators of new affected sources manufacturing PET not send contact 
condenser effluent associated with a vacuum system to a process contact 
cooling tower.
2. Vacuum System Wastewater
    Many commenters objected to the proposed provision designating all 
contact condenser effluent as Group 1 wastewater streams. Commenters 
stated that the EPA had not provided adequate rationale explaining why 
the standards for contact condenser effluent were more stringent than 
the standards for other wastewater streams. Because the automatic 
designation of contact condenser effluent as Group 1 wastewater was 
done in an effort to make the use of noncontact condensers within 
steam-based vacuum systems equivalent to ethylene glycol jets, and that 
need no longer exists for existing affected sources, there is no longer 
a need or justification to designate all contact condenser effluent 
from existing PET affected sources as Group 1 wastewater. As a result, 
the EPA has changed the final standards to implement the group 
determination procedure (i.e., Group 1 or Group 2) for contact 
condenser effluent from existing PET affected sources.
    On the other hand, the final standards continue to prohibit the use 
of process contact cooling towers for new PET affected sources.

    Note: This requirement is equivalent to the MACT floor.

    However, the provisions designating all contact condenser effluent 
streams from new PET affected sources as Group 1 wastewater have been 
dropped from the final standards. Like existing PET affected sources, 
the final standards implement the group determination procedure for 
contact condenser effluent from new PET affected sources. As described 
earlier, the purpose for designating all contact condenser effluent 
streams as Group 1 wastewater was to ensure equivalency between the use 
of ethylene glycol jets and the use of noncontact condensers. At the 
time of proposal, the EPA considered ethylene glycol jets to be 
pollution free because there was no wastewater stream produced. The 
automatic designation of all contact condenser effluent as Group 1 
wastewater was meant to address the absence of wastewater when ethylene 
glycol jet systems are used. Since proposal, the EPA has come to 
understand that the use of ethylene glycol jets does not eliminate 
emissions because the additional loading to the glycol recovery unit 
can create additional emissions from process vents or wastewater 
streams or both.
    Realizing that ethylene glycol jets are not pollution free, the EPA 
considered the additional emissions at the glycol recovery unit when 
ethylene glycol jets are used and the emissions from the contact 
condenser effluent when noncontact condensers are used.

    Note: The use of ethylene glycol jets would still achieve more 
control than using steam jets and subjecting the contact condenser 
effluent to the wastewater provisions.

    In either case, an equivalent quantity of VOHAP is introduced to 
the vacuum system from the process. Process vents and wastewater 
streams at the glycol recovery unit are subject to the appropriate 
provisions of the standards. For example, a wastewater stream at the 
glycol recovery unit would be subject to a group determination and, 
based on the results, would be controlled if required. The EPA judged 
that to require the same action for the contact condenser effluent from 
noncontact condensers would ensure equivalency between a new affected 
source using ethylene glycol jets and one using noncontact condensers.

F. Equipment Leak Provisions

1. Polystyrene
    A number of commenters stated that the EPA had overestimated the 
emissions from equipment leaks at polystyrene affected sources in 
general and, in particular, from components containing styrene as the 
organic HAP. The commenters claimed that the use of the average SOCMI 
emission factors to estimate emissions was inappropriate because the 
vapor pressure of styrene at typical operating conditions in

[[Page 48225]]

polystyrene affected sources equates to a concentration of less than 
10,000 ppm and no leaks would be detected using a leak definition of 
10,000 ppm. The commenters also stated that the effect of using the 
average SOCMI emission factors was to justify the HON equipment leak 
program (i.e., subpart H) and that, if the EPA used a more realistic 
estimate of emissions (e.g., the emission factor for components with 
concentrations less than 10,000 ppm), a re-evaluation of the costs and 
emission reductions would likely result in a conclusion that the HON is 
not cost effective. The commenters recommended that if any program was 
to be implemented for polystyrene affected sources and especially for 
components in styrene service, it should either be a visual-only 
program or, at most, a program based on a State Reasonably Achievable 
Control Technology (RACT) program.
    In response to these comments, the EPA re-evaluated the analysis 
that served as the basis for proposing the equipment leak provisions 
from the HON for polystyrene and other styrene-based resin affected 
sources.

    Note: The results of this re-evaluation are contained in Item 
IV-B-2, Docket A-92-45.

    In re-evaluating that analysis, the EPA determined the MACT floor 
for each subcategory. Because a MACT floor was determined to exist and 
the Clean Air Act does not allow the EPA to set a standard less 
stringent than the MACT floor, the EPA determined that some standard 
must be set for these subcategories.
    The EPA agrees with the commenters that the average SOCMI emission 
factors are likely to overestimate emissions from components containing 
or contacting styrene. Therefore, the EPA lowered the emission factors 
used to estimate the emissions from these components. The EPA also 
adjusted leak rate factors based on additional data and comments from 
the industry. Adjustments to the emission factors and leak rates had 
the effect of reducing both the overall emission estimates and the 
emission reductions associated with the current industry programs, the 
MACT floor programs, and the HON program.
    In addition, the EPA re-evaluated the costing program used to 
estimate the costs for the various equipment leak programs. Errors were 
discovered in the costing program. The net effect of correcting these 
errors was to lower the estimated costs for all of the various 
equipment leak programs. The incremental differences between the 
various programs decreased as well, but not by as much as the overall 
costs.
    To determine whether or not the subpart H provisions were cost 
effective, the EPA examined the incremental costs and emission 
reductions between the HON program and the MACT floor program for each 
of the subcategories.

    [Note: In the original analysis, the EPA examined the cost 
between the HON program and each facility's specific current 
program.]

    Based on the incremental differences between the HON and the MACT 
floor programs, the EPA determined that the HON requirements are cost 
effective for each of the styrene-based resin subcategories, including 
the three polystyrene subcategories. Therefore, the EPA has retained 
the HON requirements in the final rule.
2. PET
    Many commenters objected to the imposition of the HON equipment 
leak requirements on PET affected sources, especially those using the 
TPA process. These commenters stated that, due to the preponderance of 
components in heavy liquid service, no program should be imposed or, if 
a program is required, it should simply be a visual-only program. Some 
of the commenters referred to the rationale in the development of the 
Polymer Manufacturing NSPS [40 CFR part 60, subpart DDD], which 
exempted PET affected sources using a continuous TPA process from 
equipment leak regulation.
    As was done for the styrene-based resin subcategories, the EPA re-
evaluated the emission estimates and cost estimates for all of the PET 
subcategories. The results of this re-evaluation are found in Item IV-
B-3, Docket A-92-45. The following actions were taken as part of the 
re-evaluation. First, the EPA lowered the emission factors used to 
estimate emissions from components in heavy liquid service to take into 
account the properties of ethylene glycol. Second, the EPA limited the 
re-evaluation of costs and emission reductions to only those facilities 
that provided specific component profiles (i.e., component counts and 
types of service). The results of the re-evaluation showed that, except 
for one PET subcategory, the HON requirements are cost effective. Thus, 
the final rule retains, for the most part, the HON requirements for the 
PET subcategories.

    Note: Modifications to the HON requirements are discussed below.

    The re-evaluation of the proposed equipment leak provisions showed 
that the provisions were not cost effective for PET affected sources 
using a continuous TPA high viscosity multiple end finisher process. 
Thus, this subcategory, which currently contains only one affected 
source, is exempt from the equipment leak requirements in the final 
rule.
    With regard to exempting PET affected sources altogether based on 
the exemption contained in the Polymer Manufacturing NSPS, the EPA does 
not agree with the commenters. During the development of the Polymer 
Manufacturing NSPS, information available to the EPA indicated that all 
components at PET TPA continuous facilities were in heavy liquid 
service. Information provided by the industry during the development of 
this rulemaking, however, shows the presence of components in gas/vapor 
service and in light liquid service at some PET TPA facilities. The 
decision to require an equipment leak program for this rulemaking is 
based on this newer information. However, the EPA continues to agree 
that, if a PET TPPU consists solely of components in heavy liquid 
service, or in vacuum service, then said TPPU should be exempt from the 
equipment leak standards. The final rule contains this provision.
    Many commenters were concerned about the recordkeeping and 
reporting requirements, especially for PET TPA affected sources where 
the vast majority of components are in heavy liquid service. While the 
EPA believes the original requirements were the minimum required to 
ensure compliance with the overall program, the EPA has reduced the 
burden of the recordkeeping and reporting requirements for these 
subcategories in light of the preponderance of components in heavy 
liquid service. The most significant change is the elimination of the 
requirement to initially list the identification numbers of components 
in heavy liquid service.
    Finally, several commenters expressed concern with the use of 
Method 21 to detect leaks from components in ethylene glycol (i.e., 
heavy liquid) service, stating in part that Method 21 would not detect 
an ethylene glycol leak based on the properties of ethylene glycol and 
the operating conditions of the process. The EPA agrees that Method 21 
is inappropriate for determining ethylene glycol leaks where the 
leaking component is in heavy liquid service. However, Sec. 63.169 of 
subpart H does not require the use of Method 21; it is one of two 
alternatives for determining the presence of leaks from components in 
heavy liquid service. The other alternative is to use a sensory-based 
detection method. The final rule has been revised to clarify that leaks 
are to be determined exclusively through the use of visual, audible,

[[Page 48226]]

olfactory, and any other detection methods; Method 21 is not to be used 
to determine leaks from components in heavy liquid service at PET 
facilities.

G. Emissions Averaging Provisions

1. Number of Emission Points Allowed in Emissions Averaging
    Numerous commenters requested that the number of emission points 
allowed in an emissions average be increased to 20 points from the 5 
points allowed at proposal. If pollution prevention measures are used, 
commenters requested that an additional 5 emission points be allowed 
from the 3 emission points allowed at proposal. The commenters stated 
that this would be consistent with the HON.
    In response to comments and to be more consistent with the HON and 
the proposed Group I Polymers and Resins NESHAP, the number of emission 
points allowed in emissions averaging at a plant site has been 
increased to 20 po
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
ints, with an additional 5 points allowed if 
pollution prevention measures are used. These values (i.e., 20/25) are 
the maximum allowed for all emissions averages at a plant site, 
regardless of the number of affected sources present at a plant site or 
the number of emissions averaging programs implemented.
2. Including Batch Process Vents in Emissions Averaging
    Several commenters requested that batch process vents be included 
in the emissions averaging provisions. The EPA had not allowed 
emissions averaging of batch process vents at proposal. The proposal 
preamble stated that the accuracy and consistency of emissions 
estimates needed for emissions averaging were considered to be greater 
than those needed for applicability determinations. However, upon 
review, the EPA has determined that having the same procedures to 
estimate emissions for applicability determinations and emissions 
averaging is reasonable. The final standards allow emissions averaging 
of existing batch process vents as well as aggregate batch vent 
streams.

H. Compliance and Performance Test Provisions and Monitoring 
Requirements

1. Excused Excursions
    Many commenters requested that the proposed standards allow excused 
excursions in the same way that the HON allows excused excursions. In 
the final standards, the EPA included provisions to excuse a certain 
number of excursions for each reporting period. These provisions are 
identical to the HON provisions. The decision to include excused 
excursion provisions was based on data and information presented in 
public comments received on the proposed standards and received during 
industry meetings held after proposal. The commenters contended that by 
not allowing excused excursions in these standards, the EPA has made 
these standards more stringent than the HON, which the proposed 
standards and the costs of the proposed standards were modelled after. 
The commenters requested that the EPA justify the increased cost of 
imposing the more stringent ``no excused excursion'' provisions. The 
EPA agreed with the commenters that not allowing excused excursions 
could impose significant additional capital and operating costs on the 
affected source for only negligible corresponding reductions in air 
emissions. As is always the case, a State has the discretion to impose 
more stringent requirements than the requirements of NESHAP and other 
federal requirements and could choose not to allow the excused 
excursion provisions contained in these standards.
    The EPA considered the number of excused excursions that would be 
most appropriate for these standards and determined that the number of 
excursions allowed in the HON is reasonable. Therefore, the final 
standards allow a maximum of 6 excused excursions for the first 
semiannual reporting period, decreasing by 1 excursion each semiannual 
reporting period. Starting with the sixth semiannual reporting period 
(i.e., the end of the third year of compliance) and thereafter, 
affected sources are allowed one excused excursion per semiannual 
reporting period.
2. Parameter Monitoring Levels
    Commenters requested that more flexibility be permitted for 
establishing compliance levels for parameter monitoring. The commenters 
asked the EPA to allow the use of the HON range concept, which 
recognizes that a process or control device operates properly over a 
range of conditions.
    The EPA revised the requirements for establishing parameter 
monitoring levels to incorporate the concepts included in the HON range 
concept.

    Note: The final standards continue to use the term level.

    Under the final rule, the owner or operator can choose between 
three procedures for establishing parameter monitoring levels. By 
providing the flexibility to establish parameter monitoring levels 
based on one of the three procedures, site-specific levels can be 
chosen which best accommodate variation in emission point 
characteristics and control device designs. These three procedures for 
establishing parameter monitoring levels are based on: (1) performance 
tests; (2) performance tests, engineering assessments, and/or 
manufacturer's recommendations; and (3) engineering assessments and/or 
manufacturer's recommendations. The establishment of a parameter 
monitoring level based solely on performance tests is preapproved by 
the Administrator; however, parameter monitoring values determined 
using the last two procedures, which may or may not use the results of 
performance tests, must be approved by the Administrator for each 
individual case.
3. Other Changes Resulting from EPA Review
    In addition to changes made to the proposed rule as a result of 
public comment, changes were made as a result of EPA independently 
reviewing the rule between proposal and promulgation. In the final 
rule, the EPA has allowed the use of TOC, minus methane and ethane, as 
the basis for compliance demonstrations (i.e., performance tests) as an 
alternative to organic HAP for continuous process vents, batch process 
vents, storage vessels, and wastewater streams.

    Note: The term ``TOC,'' as used in the remainder of this discussion 
and as defined in the final rule, denotes ``TOC, minus methane and 
ethane.''

    The final rule also allows the use of TOC as an alternate basis for 
applicability determinations for batch process vents; TOC is not 
allowed as an alternate basis for applicability determinations for 
continuous process vents. In addition, the final rule allows the use of 
Method 25A to measure TOC in these instances were TOC serves as an 
alternative basis for compliance demonstrations or applicability 
determinations.
    These changes were made to provide flexibility to the regulated 
community and to reduce the overall burden of the rule. The EPA 
considered the impacts of allowing TOC to serve as a surrogate for 
organic HAP in compliance demonstrations and did not find any adverse 
impacts. Further, in allowing the use of Method 25A as a complement to 
the use of TOC as a surrogate to organic HAP, the EPA judged that the 
burden of implementing the final rule would be reduced with no adverse 
impacts.

[[Page 48227]]

    As proposed, the provisions concerning applicability determinations 
and compliance demonstrations allowed an owner or operator to measure 
total organic HAP or TOC; however, the proposed rule required Method 18 
for measurement of organic compounds in both cases. In light of this, 
the major difference between the proposed and final rule is the 
flexibility to use Method 25A in measuring TOC. In deciding to allow 
the use of Method 25A, the EPA considered the composition of the 
emission streams and considered provisions that could be implemented to 
safeguard against inappropriate uses of Method 25A. To the best of the 
EPA's knowledge, the emission streams regulated by this rule are 
predominantly organic HAP. Also, with one exception (i.e., ethylene 
glycol), the regulated organic HAP, which are listed in the definition 
of organic HAP found in the final rule, have response factors to Method 
25A adequate to ensure satisfactory emissions measurements. To 
safeguard against inadequate emissions measurements that might result 
from the inappropriate use of Method 25A, the final rule specifies the 
calibration gas to be used (i.e., the organic HAP representing the 
largest percent by volume) and what is an acceptable response for the 
calibration gas (i.e., 20 times the standard deviation of the response 
from the zero calibration gas).
    In considering the use of TOC as an alternate basis for 
applicability determinations, and the complementary use of Method 25A 
to measure TOC, the EPA evaluated applicability determinations for 
continuous process vents and batch process vents.

    [Note: The applicability determination procedures for storage 
vessels and wastewater streams do not use airborne organic HAP 
concentration values. Therefore, the use of Method 25A for these 
emission points is not applicable.]

    The applicability determination procedure for continuous process 
vents (i.e., the TRE equation) requires an owner or operator to 
estimate the concentration and emission rate for both organic HAP and 
TOC. Because both of these values are required and were the basis for 
the original TRE analysis, the EPA judged that it was inappropriate to 
use TOC as an alternate basis to organic HAP for the applicability 
determinations for continuous process vents. On the other hand, the 
original analysis for batch process vents (i.e., the Batch Processes 
ACT) was based on the control of TOC; thus, the EPA considered the use 
of TOC as an alternate basis for the applicability determinations for 
batch process vents to be satisfactory.

I. Recordkeeping and Reporting

    Several commenters stated that the recordkeeping and reporting 
requirements of the proposed standards were extremely burdensome. These 
commenters requested that the EPA reduce unnecessary recordkeeping and 
reporting requirements in the final standards. Commenters requested 
that the frequency with which records must be retained be reduced. The 
commenters also contended that records should only be required if an 
excursion has occurred. The commenters contended that records showing 
compliance with the standards were unnecessary.
    The EPA has made every effort to reduce the recordkeeping 
requirements of the final thermoplastics rule. The EPA recognizes that 
unnecessary recordkeeping and reporting requirements would burden both 
the affected source and EPA enforcement agencies.
    The EPA reviewed the recordkeeping required by the proposed rule 
and has made reductions in the amount of information that is required 
to be recorded. The final rule has been changed to require recording 
and retention of hourly average values of continuously monitored 
values. The proposal required that 15-minute averages be calculated and 
recorded. Under the proposal, if the daily average value was above the 
minimum or below the maximum established parameter monitoring levels 
(i.e., excess emissions occurred), the 15-minute values had to be 
retained; if the daily average value did not exceed the established 
parameter monitoring level, the 15-minute values could be converted to 
hourly averages, and the hourly averages could be retained instead of 
the 15-minute averages. Upon reconsideration, the EPA found that hourly 
average values provide a sufficient record to support the calculation 
of the daily average value. Therefore, to reduce the recordkeeping 
burden, the rule has been changed to specify that only hourly averages 
must be calculated and recorded. The rule no longer requires 
calculating or recording of 15-minute average values.
    For emission points where continuous parameter monitoring is 
required, the value of the parameter must still be measured at least 
once every 15 minutes, but only the hourly average must be calculated 
and recorded. Many facilities already have computerized systems and 
monitor parameters more frequently than once every 15 minutes for 
process control purposes. The 15-minute monitoring frequency is 
consistent with the General Provisions and previous NSPS and NESHAP for 
emission points from similar industries.
    In addition, the EPA added provisions [Sec. 63.1335(h)] that allow 
an owner or operator to implement a reduced recordkeeping program 
provided that certain criteria related to the monitoring system and the 
performance of the process, as it relates to maintaining compliance 
with the monitoring provisions, are met. Under these provisions it is 
possible for an owner or operator to retain only daily average values 
or, after a period of 6 consecutive months without an excursion, to 
retain no daily records.
    The EPA believes that the recordkeeping requirements of the final 
rule are necessary to show compliance. The EPA will continue to require 
owners or operators to keep records, regardless of whether there was an 
excursion or not. These records are necessary to prove compliance when 
no excursion has occurred and are used to determine the severity of a 
violation, and, thus, how much of a penalty should be assessed once an 
excursion has occurred.
    The EPA has made every effort to reduce the reporting requirements 
of the final rule. The EPA reviewed each report required at proposal, 
and determined that two of these reports, the Initial Notification and 
the Implementation Plan, contained many requirements that were 
duplicative with the existing operating permit program. For this 
reason, the EPA has removed the requirements for the Initial 
Notification and Implementation Plan from the final rule.
    The EPA considers the recordkeeping and reporting requirements of 
the final rule to be the minimum necessary to ensure compliance.
    Upon further review, the EPA decided to add a new report, the 
Precompliance Report, to the final rule to allow the owner or operator 
of an affected source to request an extension of compliance or to 
request approval to use alternative monitoring parameters, alternative 
continuous monitoring or recordkeeping, or alternative controls. At 
proposal, these items were submitted in the Implementation Plan. 
Overall, these changes, deleting the Initial Notification and the 
Implementation Plan and adding the Precompliance Report, result in a 
reduction of the reporting burden for the affected source.

[[Page 48228]]

VI. Administration Requirements

A. Docket

    The docket is an organized and complete file of all the information 
submitted to or otherwise considered by the EPA in the development of 
the final standards. The principal purposes of the docket are:
    (1) To allow interested parties to readily identify and locate 
documents so that they can intelligently and effectively participate in 
the rulemaking process; and
    (2) To serve as the record in case of judicial review, except for 
interagency review materials as provided for in section 307(d)(7)(A).

B. Executive Order 12866

    Under Executive Order 12866 [58 FR 5173, October 4, 1993], the EPA 
must determine whether the regulatory action is ``significant'' and 
therefore subject to Office of Management and Budget (OMB) review and 
the requirements of the Executive Order. The Executive Order defines 
``significant regulatory action'' as one that is likely to result in 
standards that may:
    (1) Have an annual effect on the economy of $100 million or more or 
adversely affect, in a material way, the economy, a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety, or State, local, or tribal governments or 
communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlement, grants, 
user fees, or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    Pursuant to the terms of the Executive Order, the OMB has notified 
the EPA that it considers that a ``significant regulatory action'' 
within the meaning of the Executive Order. The EPA submitted this 
action to the OMB for review. Changes made in response to suggestions 
or recommendations from the OMB were documented and included in the 
public record.

C. Paperwork Reduction Act

    The information collection requirements for this NESHAP have been 
submitted for approval to the OMB under the Paperwork Reduction Act, 44 
U.S.C. 3501 et seq. An Information Collection Request (ICR) document 
has been prepared by the EPA (ICR. No. 1737.01), and a copy may be 
obtained from Sandy Farmer, OPPE Regulatory Information Division 
(2137), U.S. Environmental Protection Agency, 401 M Street, S.W., 
Washington, DC 20460, or by calling (202) 260-2740.
    The public recordkeeping and reporting burden for this collection 
of information is estimated to average approximately 4,000 hours per 
respondent, at approximately 1,000 hours per response for 4 responses 
each, for each of the first 3 years following promulgation of the rule. 
These estimates include time for reviewing instructions, searching 
existing data sources, gathering and maintaining the data needed, and 
completing the reviewing the collection of information.
    Sent comments regarding the recordkeeping and reporting burden 
estimate or any other aspect of this collection of information, 
including suggestions for reducing this burden, to Chief, Information 
Policy Branch (2137), U.S. Environmental Protection Agency, 401 M 
Street, S.W., Washington, DC 20460; and to the Office of Information 
and Regulatory Affairs, Office of Management and Budget, Washington, DC 
20503, marked ``Attention: Desk Officer for EPA.''

D. Regulatory Flexibility Act.

    The Regulatory Flexibility Act (RFA) (Pub. L. 96-354, September 19, 
1980) requires Federal agencies to give special consideration to the 
impact of regulation on small businesses. The RFA specifies that a 
final regulatory flexibility analysis must be prepared if a final 
regulation will have a significant economic impact on a substantial 
number of small entities. To determine whether a final RFA is required, 
a screening analysis, otherwise known as an initial RFA, is necessary.
    Regulatory impacts are considered significant if:
    (1) Annual compliance costs increase total costs of production by 
more than 5 percent, or
    (2) Annual compliance costs as a percent of sales are at least 20 
percent (percentage points) higher for small entities, or
    (3) Capital cost of compliance represent a significant portion of 
capital available to small entities, or
    (4) The requirements of the regulation are likely to result in 
closures of small entities.
    A ``substantial number'' of small entities is generally considered 
to be more than 20 percent of the small entities in the affected 
industry.
    Consistent with Small Business Administration (SBA) size standards, 
a thermoplastic producing firm is classified as a small entity if it 
has less than 750 employees and is unaffiliated with a larger entity. 
Based upon this criterion, only one firm, an MBS producer, employs less 
than 750 workers.
    Data were available to examine two of the criteria; these were the 
potential for closure, and comparison of compliance costs as a 
percentage of sales.
    For criterion one, the affected source is not expected to fall at 
risk of closure from the regulations, thus this criterion is not met. 
Also, the compliance costs were only 0.001 percent of total sales for 
the affected source, and this does not meet criterion two. Because the 
economics analysis lead to the conclusion that not MBS facilities at 
risk of closure, this criterion is not met.
    In conclusion, and pursuant to section 605(b) of the RFA, the 
Administrator certifies that these standards will not have a 
significant economic impact on a substantial number of small entities. 
The basis for this certification is that the economic impacts for small 
entities do not meet or exceed the criteria in the Guidelines to the 
Regulatory Flexibility Act of 1980, as shown above. Further information 
on the initial RFA is available in the background information package 
(see SUPPLEMENTARY INFORMATION section).

E. Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA)

    The SBREFA Subtitle D requires more rigorous regulatory flexibility 
analyses. It also requires the EPA to undertake a small entity 
stakeholder process involving the Small Business Administration (SBA) 
and the OMB prior to proposing a rule for which a regulatory 
flexibility analysis is required. In addition, it subjects agency 
compliance with many aspects of the amended Regulatory Flexibility Act 
(RFA) to judicial rule. Subtitle D of the SBREFA takes effect to 
rulemakings proposed as of June 28, 1996. Therefore, it does not apply 
to this rulemaking.
    Subtitle E of SBREFA establishes opportunity for Congress to review 
and potentially disapprove nonmajor rules promulgated on or after March 
29, 1996. With limited exceptions, it provides that no rule promulgated 
on or after March 29, 1996, may take effect until it is submitted to 
Congress and the Comptroller General along with specified supporting 
documentation. Different requirements apply to major rules. This rule, 
which is nonmajor, is being submitted to Congress in accordance with 
these requirements.

[[Page 48229]]

F. Unfunded Mandates

    Under section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, the EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final standards that include a Federal mandate that may result in 
estimated costs to State, local, or tribal governments in the 
aggregate, or to the private sector, of $100 million or more. Under 
section 205, the EPA must select the most cost effective and least 
burdensome alternative that achieves the objectives of the standards 
and is consistent with statutory requirements. Section 203 requires the 
EPA to establish a plan for informing and advising any small 
governments that may be significantly or uniquely impacted by the 
standards.
    The EPA has determined that the final standards do not include a 
Federal mandate that may result in estimated costs of $100 million or 
more to either State, local, or tribal governments in the aggregate, or 
to the private sector. Therefore, the requirements of the Unfunded 
Mandates Act do not apply to this section.

List of Subjects

40 CFR Part 9

    Reporting and recordkeeping requirements.

40 CFR Part 63

    Air pollution control, Hazardous substances, Reporting and 
recordkeeping requirements.

    Dated: May 15, 1996.
Carol M. Browner,
Administrator.
    For the reasons set out in the preamble, parts 9 and 63 of title 
40, chapter I of the Code of Federal Regulations are amended as 
follows:

PART 9--[AMENDED]

    1. The authority citation for part 9 continues to read as follows:

    Authority: 7 U.S.C. 135 et seq., 136-136y; 15 U.S.C. 2001, 2003, 
2005, 2006, 2601-2671; 21 U.S.C. 331j, 346a, 348; 31 U.S.C. 9701; 33 
U.S.C. 1251 et seq., 1311, 1313d, 1314, 1318, 1321, 1326, 1330, 
1342, 1344, 1345 (d) and (e), 1361; E.O. 11735, 38 FR 21243, 3 CFR, 
1971-1975 Comp. p. 973; 42 U.S.C. 241, 242b, 243, 246, 300f, 300g, 
300g-1, 300g-2, 300g-3, 300g-4, 300g-5, 300g-6, 300j-1, 300j-2, 
300j-3, 300j-4, 300j-9, 1857 et seq., 6901-6992k, 7401-7671q, 7542, 
9601-9657, 11023, 11048.

    2. Section 9.1 is amended by adding the new entries to the table 
under the indicated heading in numerical order to read as follows:

Sec. 9.1  OMB approvals under the Paperwork Reduction Act.

* * * * *

------------------------------------------------------------------------
                                                             OMB control
                      40 CFR citation                            No.    
------------------------------------------------------------------------
                                                                        
                  *        *        *        *        *                 
   National Emission Standards for Hazardous Air Pollutants for Source  
                             Categories \3\                             
                                                                        
63.1311....................................................    2060-0351
63.1314....................................................    2060-0351
63.1315....................................................    2060-0351
63.1319....................................................    2060-0351
63.1320....................................................    2060-0351
63.1325-1332...............................................    2060-0351
63.1335....................................................    2060-0351
------------------------------------------------------------------------
\3\ The ICRs referenced in this section of the table encompass the      
  applicable general provisions contained in 40 CFR part 63, subpart A, 
  which are not independent information collection requirements.        

* * * * *

PART 63--NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS 
FOR SOURCE CATEGORIES

    1. The authority citation for part 63 continues to read as follows:

    Authority: 42 U.S.C. 7401, et seq.

    2. Part 63 is amended by adding subpart JJJ to read as follows:
Subpart JJJ--National Emission Standards for Hazardous Air Pollutant 
Emissions: Group IV Polymers and Resins
Secs.
63.1310  Applicability and designation of affected sources.
63.1311  Compliance schedule and relationship to existing applicable 
rules.
63.1312  Definitions.
63.1313  Emission standards.
63.1314  Storage vessel provisions.
63.1315  Continuous process vents provisions.
63.1316  PET and polystyrene continuous process affected sources--
emissions control provisions.
63.1317  PET and polystyrene continuous process affected sources--
monitoring provisions.
63.1318  PET and polystyrene continuous process affected sources--
testing and compliance demonstration provisions.
63.1319  PET and polystyrene continuous process affected sources--
recordkeeping provisions.
63.1320  PET and polystyrene continuous process affected sources--
reporting provisions.
63.1321  Batch process vents provisions.
63.1322  Batch process vents--reference control technology.
63.1323  Batch process vents--methods and procedures for group 
determination.
63.1324  Batch process vents--monitoring provisions.
63.1325  Batch process vents--performance test methods and 
procedures to determine compliance.
63.1326  Batch process vents--recordkeeping provisions.
63.1327  Batch process vents--reporting provisions.
63.1328  Heat exchange systems provisions.
63.1329  Process contact cooling towers provisions.
63.1330  Wastewater provisions.
63.1331  Equipment leak provisions.
63.1332  Emissions averaging provisions.
63.1333  Additional test methods and procedures.
63.1334  Parameter monitoring levels and excursions.
63.1335  General recordkeeping and reporting provisions.

Subpart JJJ--National Emission Standards for Hazardous Air 
Pollutant Emissions: Group IV Polymers and Resins

Sec. 63.1310  Applicability and designation of affected sources.

    (a) Definition of affected source. The provisions of this subpart 
apply to each affected source. An affected source is either an existing 
affected source or a new affected source. Existing affected source is 
defined in paragraph (a)(6) of this section, and new affected source is 
defined in paragraph (a)(7) of this section. The affected source also 
includes the emission points and equipment specified in paragraphs 
(a)(1) through (a)(5) of this section that are associated with each 
group of TPPU.
    (1) Each wastewater stream.
    (2) Each wastewater operation.
    (3) Each heat exchange system.
    (4) Each process contact cooling tower used in the manufacture of 
PET that is associated with a new affected source.
    (5) Each process contact cooling tower used in the manufacture of 
PET using a continuous terephthalic acid high viscosity multiple end 
finisher process that is associated with an existing affected source.
    (6) Except as specified in paragraphs (b) through (d) of this 
section, an existing affected source is defined as each group of one or 
more thermoplastic product process units (TPPUs) that is not part of a 
new affected source as defined in paragraph (a)(7) of this section, 
that is manufacturing the same primary product, where each TPPU uses as 
a reactant, or uses as a process solvent, or produces as a by-product 
or co-product any organic hazardous air pollutant (organic HAP), and 
that is located at a plant site that is a major source.
    (7) Except as specified in paragraphs (b) through (d) of this 
section, a new affected source is defined as a source meeting the 
criteria of paragraph (a)(7)(i), (a)(7)(ii), or (a)(7)(iii) of this 
section:

[[Page 48230]]

    (i) At a plant site previously without HAP emissions points, each 
group of one or more TPPUs manufacturing the same primary product that 
is part of a major source on which construction commenced after March 
29, 1995;
    (ii) A TPPU meeting the criteria in paragraph (i)(1)(i) of this 
section; or
    (iii) A reconstructed affected source meeting the criteria in 
paragraph (i)(2)(i) of this section.
    (b) TPPUs exempted from the affected source. For a TPPU to be 
excluded from the designation of affected source due to the fact that 
it does not use as a reactant, or use as a process solvent, or produce 
as a by-product or co-product any organic HAP, the owner or operator 
shall comply with the requirements of paragraph (b)(1) of this section 
and shall comply with the requirements of paragraph (b)(2) of this 
section if requested to do so by the Administrator.
    (1) Retain information, data, and analysis used to document the 
basis for the determination that the TPPU does not use as a reactant or 
use as a process solvent, or manufacture as a by-product or a co-
product any organic HAP. Types of information that could document this 
determination include, but are not limited to, records of chemicals 
purchased for the process, analyses of process stream composition, or 
engineering calculations.
    (2) When requested by the Administrator, demonstrate that the TPPU 
does not use as a reactant, or use as a process solvent, or manufacture 
as a by-product or co-product any organic HAP.
    (c) Emission points exempted from the affected source. The affected 
source does not include the emission points listed in paragraphs (c)(1) 
through (c)(6) of this section:
    (1) Stormwater from segregated sewers;
    (2) Water from fire-fighting and deluge systems in segregated 
sewers;
    (3) Spills;
    (4) Water from safety showers;
    (5) Vessels and equipment storing and/or handling material that 
contain no organic HAP and/or organic HAP as impurities only; and
    (6) Equipment that is intended to operate in organic HAP service 
for less than 300 hours during the calendar year.
    (d) Processes exempted from the affected source. The processes 
specified in paragraphs (d)(1) through (d)(5) of this section are 
exempted from the affected source:
    (1) Research and development facilities;
    (2) Polymerization processes occurring in a mold;
    (3) Processes which manufacture binder systems containing a 
thermoplastic product for paints, coatings, or adhesives;
    (4) Finishing processes including equipment such as compounding 
units, spinning units, drawing units, extruding units, and other 
finishing steps; and
    (5) Solid state polymerization processes.
    (e) Applicability determination of nonthermoplastic equipment 
included in a TPPU producing a thermoplastic product. If a polymer that 
is not subject to this subpart is produced within the equipment (i.e., 
collocated) making up a TPPU and at least 50 percent of said polymer is 
used in the production of a thermoplastic product manufactured by said 
TPPU, the unit operations involved in the production of said polymer 
are considered part of the TPPU and are subject to this rule except as 
specified in this paragraph (e). If said unit operations are subject to 
another MACT standard regulating the same emission points, said unit 
operations are not subject to this subpart.
    (f) Primary product determination and applicability. The primary 
product of a process unit shall be determined according to the 
procedures specified in paragraphs (f)(1) through (f)(2) of this 
section. Paragraphs (f)(3) through (f)(4) of this section describe 
whether or not a process unit is subject to this subpart. Paragraphs 
(f)(5) through (f)(7) of this section discuss compliance for those 
TPPUs operated as flexible operation units, as specified in paragraph 
(f)(2) of this section.
    (1) If a process unit only manufactures one product, then that 
product shall represent the primary product of the process unit.
    (2) If a process unit is designed and operated as a flexible 
operation unit, the primary product shall be determined as specified in 
paragraphs (f)(2)(i) or (f)(2)(ii) of this section based on the 
anticipated operations for the 5 years following September 12, 1996 for 
existing affected sources and for the first 5 years after initial 
start-up for new affected sources.
    (i) If the flexible operation unit will manufacture one product for 
the greatest operating time over the five year period, then that 
product shall represent the primary product of the flexible operation 
unit.
    (ii) If the flexible operation unit will manufacture multiple 
products equally based on operating time, then the product with the 
greatest production on a mass basis over the five year period shall 
represent the primary product of the flexible operation unit.
    (3) If the primary product of a process unit is a thermoplastic 
product, then said process unit is considered a TPPU. If said TPPU 
meets all the criteria of paragraph (a) of this section, it is either 
an affected source or is part of an affected source comprised of other 
TPPU subject to this rule at the same plant site with the same primary 
product. The status of a process unit as a TPPU and as an affected 
source or part of an affected source shall not change regardless of 
what products are produced in the future by said TPPU, with the 
exception noted in paragraph (f)(3)(i) of this section.
    (i) If a process unit terminates the production of all 
thermoplastic products and does not anticipate the production of any 
thermoplastic product in the future, the process unit is no longer a 
TPPU and is not subject to this rule after notification is made as 
specified in paragraph (f)(3)(ii) of this section.
    (ii) The owner or operator of a process unit that wishes to remove 
the TPPU designation from the process unit, as specified in paragraph 
(f)(3)(i) of this section, shall notify the Administrator. This 
notification shall be accompanied by rationale for why it is 
anticipated that no thermoplastic products will be produced in the 
process unit in the future.
    (iii) If a process unit meeting the criteria of paragraph (f)(3)(i) 
of this section begins the production of a thermoplastic product in the 
future, the owner or operator shall use the procedures in paragraph 
(f)(4)(i) of this section to determine if the process unit is re-
designated as a TPPU.
    (4) If the primary product of a process unit is not a thermoplastic 
product, then said process unit is not an affected source nor is it 
part of any affected source subject to this rule. Said process unit is 
not subject to this rule at any time, regardless of what product is 
being produced. The status of a process unit as not being a TPPU, and 
therefore not an affected source nor part of an affected source subject 
to this subpart, shall not change regardless of what products are 
produced in the future by said TPPU, with the exception noted in 
paragraph (f)(4)(i) of this section.
    (i) If, at any time beginning September 12, 2001, the owner or 
operator determines that a thermoplastic product is the primary product 
for the process unit based on actual production data for any preceding 
consecutive five-year period, then the process unit shall be designated 
as a TPPU. If said TPPU meets all the criteria of paragraph (a) of this 
section and is not subject to another subpart of 40 CFR part 63, it is 
either an affected source or part of an affected source and shall be 
subject to this rule.
    (ii) If a process unit meets the criteria of paragraph (f)(4)(i) of 
this section, the

[[Page 48231]]

owner or operator shall notify the Administrator within 6 months of 
making this determination. The TPPU, as the entire affected source or 
part of an affected source, shall be in compliance with the provisions 
of this rule within 3 years from the date of such notification.
    (iii) If a process unit is re-designated as a TPPU but does not 
meet all the criteria of paragraph (a) of this section, the owner or 
operator shall notify the Administrator within 6 months of making this 
determination. Said notification shall include documentation justifying 
the TPPU's status as not being an affected source or not being part of 
an affected source.
    (5) Once the primary product of a process unit has been determined 
to be a thermoplastic product and it has been determined that all the 
criteria of paragraph (a) of this section are met for said TPPU, the 
owner or operator of the affected source shall comply with the 
standards for the primary product. Owners or operators of flexible 
operation units shall comply with the standards for the primary product 
as specified in either paragraph (f)(5)(i) or (f)(5)(ii) of this 
section, except as specified in paragraph (f)(5)(iii) of this section.
    (i) Each owner or operator shall determine the group status of each 
emission point that is part of said flexible operation unit based on 
emission point characteristics when the primary product is being 
manufactured. Based on this finding, the owner or operator shall comply 
with the applicable standards for the primary product for each emission 
point, as appropriate, at all times, regardless of what product is 
being produced.
    (ii) Alternatively, each owner or operator shall determine the 
group status of each emission point that is part of said flexible 
operation unit based on the emission point characteristics when each 
product produced by the flexible operation unit is manufactured, 
regardless of whether said product is a thermoplastic product or not. 
Based on these findings, the owner or operator shall comply with the 
applicable standards for the primary product for each emission point, 
as appropriate, regardless of what product is being produced.

    Note: Under this scenario it is possible that the group status, 
and therefore the requirement to achieve emission reductions, for an 
emission point may change depending on the product being produced.

    (iii) Whenever a flexible operation unit manufactures a product 
that meets the criteria of paragraph (b) of this section (i.e., does 
not use or produce any organic HAP), all activities associated with the 
manufacture of said product shall be exempt from the requirements of 
this rule, to include the operation and monitoring of control or 
recovery devices.
    (6) The determination of the primary product for a process unit, to 
include the determination of applicability of this subpart to process 
units that are designed and operated as flexible operation units, shall 
be reported in the Notification of Compliance Status required by 
Sec. 63.1335(e)(5) when the primary product is determined to be a 
thermoplastic product. The Notification of Compliance Status shall 
include the information specified in either paragraph (f)(6)(i) or 
(f)(6)(ii) of this section. If the primary product is determined to be 
something other than a thermoplastic product, the owner or operator 
shall retain information, data, and analysis used to document the basis 
for the determination that the primary product is not a thermoplastic 
product.
    (i) If the TPPU manufactures only one thermoplastic product, 
identification of said thermoplastic product.
    (ii) If the TPPU is designed and operated as a flexible operation 
unit, the information specified in paragraphs (f)(6)(ii)(A) through 
(f)(6)(ii)(C) of this section, as appropriate.
    (A) Identification of the primary product.
    (B) Information concerning operating time and/or production mass 
for each product that was used to make the determination of the primary 
product under paragraph (f)(2)(i) or (f)(2)(ii) of this section.
    (C) Identification of which compliance option, either paragraph 
(f)(5)(i) or (f)(5)(ii) of this section, has been selected by the owner 
or operator.
    (7) To demonstrate compliance with the rule during those periods 
when a flexible operation unit that is subject to this subpart is 
producing a product other than a thermoplastic product or is producing 
a thermoplastic product that is not the primary product, the owner or 
operator shall comply with either paragraphs (f)(7)(i) through 
(f)(7)(ii) or paragraph (f)(7)(iii) of this section.
    (i) Establish parameter monitoring levels, as specified in 
Sec. 63.1334, for those emission points designated as Group 1, as 
appropriate.
    (ii) Submit the parameter monitoring levels developed under 
paragraph (f)(7)(i) of this section and the basis for them in the 
Notification of Compliance Status report as specified in 
Sec. 63.1335(e)(5).
    (iii) Demonstrate that the parameter monitoring levels established 
for the primary product are also appropriate for those periods when 
products other than the primary product are being produced. Material 
demonstrating this finding shall be submitted in the Notification of 
Compliance Status report as specified in Sec. 63.1335(e)(5).
    (g) Storage vessel ownership determination. The owner or operator 
shall follow the procedures specified in paragraphs (g)(1) through 
(g)(8) of this section to determine to which process unit a storage 
vessel shall belong.
    (1) If a storage vessel is already subject to another subpart of 40 
CFR part 63 on September 12, 1996, said storage vessel shall belong to 
the process unit subject to the other subpart.
    (2) If a storage vessel is dedicated to a single process unit, the 
storage vessel shall belong to that process unit.
    (3) If a storage vessel is shared among process units, then the 
storage vessel shall belong to that process unit located on the same 
plant site as the storage vessel that has the greatest input into or 
output from the storage vessel (i.e., said process unit has the 
predominant use of the storage vessel).
    (4) If predominant use cannot be determined for a storage vessel 
that is shared among process units and if one of those process units is 
a TPPU subject to this subpart, the storage vessel shall belong to said 
TPPU.
    (5) If predominant use cannot be determined for a storage vessel 
that is shared among process units and if more than one of the process 
units are TPPUs that have different primary products and that are 
subject to this subpart, then the owner or operator shall assign the 
storage vessel to any one of the said TPPUs.
    (6) If the predominant use of a storage vessel varies from year to 
year, then predominant use shall be determined based on the utilization 
that occurred during the year preceding September 12, 1996 or based on 
the expected utilization for the 5 years following September 12, 1996 
for existing affected sources, whichever is more representative of the 
expected operations for said storage vessel, and based on the first 5 
years after initial start-up for new affected sources. The 
determination of predominant use shall be reported in the Notification 
of Compliance Status required by Sec. 63.1335(e)(5). If the predominant 
use changes, the redetermination of predominant use shall be reported 
in the next Periodic Report.
    (7) If the storage vessel begins receiving material from (or 
sending material to) another process unit; or ceasing to receive 
material from (or send material to) a process unit; or if the

[[Page 48232]]

applicability of this subpart to a storage vessel has been determined 
according to the provisions of paragraphs (g)(1) through (g)(6) of this 
section and there is a significant change in the use of the storage 
vessel that could reasonably change the predominant use, the owner or 
operator shall reevaluate the applicability of this subpart to the 
storage vessel.
    (8) Where a storage vessel is located at a major source that 
includes one or more process units which place material into, or 
receive materials from the storage vessel, but the storage vessel is 
located in a tank farm, the applicability of this subpart shall be 
determined according to the provisions in paragraphs (g)(8)(i) through 
(g)(8)(iv) of this section.
    (i) The storage vessel may only be assigned to a process unit that 
utilizes the storage vessel and does not have an intervening storage 
vessel for that product (or raw materials, as appropriate). With 
respect to any process unit, an intervening storage vessel means a 
storage vessel connected by hard-piping to the process unit and to the 
storage vessel in the tank farm so that product or raw material 
entering or leaving the process unit flows into (or from) the 
intervening storage vessel and does not flow directly into (or from) 
the storage vessel in the tank farm.
    (ii) If there is no process unit at the major source that meets the 
criteria of paragraph (g)(8)(i) of this section with respect to a 
storage vessel, this subpart does not apply to the storage vessel.
    (iii) If there is only one process unit at the major source that 
meets the criteria of paragraph (g)(8)(i) of this section with respect 
to a storage vessel, the storage vessel shall be assigned to that 
process unit.
    (iv) If there are two or more process units at the major source 
that meet the criteria of paragraph (g)(8)(i) of this section with 
respect to a storage vessel, the storage vessel shall be assigned to 
one of those process units according to the provisions of paragraph 
(g)(7) of this section. The predominant use shall be determined among 
only those thermoplastic product process units that meet the criteria 
of paragraph (g)(8)(i) of this section.
    (h) Recovery operation equipment ownership determination. The owner 
or operator shall follow the procedures specified in paragraphs (h)(1) 
through (h)(7) of this section to determine to which process unit 
recovery operation equipment shall belong.
    (1) If recovery operation equipment is already subject to another 
subpart of 40 CFR part 63 on September 12, 1996, said recovery 
operation equipment shall belong to the process unit subject to the 
other subpart.
    (2) If recovery operation equipment is used exclusively by a single 
process unit, the recovery operation shall belong to that process unit.
    (3) If recovery operation equipment is shared among process units, 
then the recovery operation equipment shall belong to that process unit 
located on the same plant site as the recovery operation equipment that 
has the greatest input into or output from the recovery operation 
equipment (i.e., said process unit has the predominant use of the 
recovery operation equipment).
    (4) If predominant use cannot be determined for recovery operation 
equipment that is shared among process units and if one of those 
process units is a TPPU subject to this subpart, the recovery operation 
equipment shall belong to said TPPU.
    (5) If predominant use cannot be determined for recovery operation 
equipment that is shared among process units and if more than one of 
the process units are TPPUs that have different primary products and 
that are subject to this subpart, then the owner or operator shall 
assign the recovery operation equipment to any one of said TPPUs.
    (6) If the predominant use of recovery operation equipment varies 
from year to year, then predominant use shall be determined based on 
the utilization that occurred during the year preceding September 12, 
1996 or based on the expected utilization for the 5 years following 
September 12, 1996 for existing affected sources, whichever is the more 
representative of the expected operations for said recovery operations 
equipment, and based on the first 5 years after initial start-up for 
new affected sources. This determination shall be reported in the 
Notification of Compliance Status required by Sec. 63.1335(e)(5). If 
the predominant use changes, the redetermination of predominant use 
shall be reported in the next Periodic Report.
    (7) If there is an unexpected change in the utilization of recovery 
operation equipment that could reasonably change the predominant use, 
the owner or operator shall redetermine to which process unit the 
recovery operation belongs by reperforming the procedures specified in 
paragraphs (h)(2) through (h)(6) of this section.
    (i) Changes or additions to plant sites. The provisions of 
paragraphs (i)(1) through (i)(4) of this section apply to owners or 
operators that change or add to their plant site or affected source. 
Paragraph (i)(5) of this section provides examples of what are and are 
not considered process changes for purposes of paragraph (i) of this 
section.
    (1) Adding a TPPU to a plant site. The provisions of paragraphs 
(i)(1)(i) through (i)(1)(ii) of this section apply to owners or 
operators that add TPPUs to a plant site.
    (i) If a TPPU is added to a plant site, said addition shall be a 
new affected source and shall be subject to the requirements for a new 
affected source in this subpart upon initial start-up or by September 
12, 1996, whichever is later, if said addition meets the criteria 
specified in paragraphs (i)(1)(i)(A) through (i)(1)(i)(B) and either 
(i)(1)(i)(C) or (i)(1)(i)(D) of this section:
    (A) Said addition meets the definition of construction in 
Sec. 63.2;
    (B) Such construction commenced after March 29, 1995; and
    (C) Said addition has the potential to emit 10 tons per year or 
more of any HAP or 25 tons per year or more of any combination of HAP, 
and the primary product of said addition is currently produced at the 
plant site as the primary product of an affected source; or
    (D) The primary product of said addition is not currently produced 
at the plant site as the primary product of an affected source and the 
plant site meets, or after the addition is completed will meet, the 
definition of major source.
    (ii) If a TPPU is added to a plant site, said addition shall be 
subject to the requirements for an existing affected source in this 
subpart upon initial start-up or by 3 years after September 12, 1996, 
whichever is later, if said addition does not meet the criteria 
specified in paragraph (i)(1)(i) of this section and the plant site 
meets, or after the addition is completed will meet, the definition of 
major source.
    (2) Adding emission points or making process changes to existing 
affected sources. The provisions of paragraphs (i)(2)(i) through 
(i)(2)(ii) of this section apply to owners or operators that add 
emission points or make process changes to an existing affected source.
    (i) If any process change is made or emission point is added to an 
existing affected source, or if a process change creating one or more 
additional Group 1 emission point(s) is made to an existing affected 
source, said affected source shall be a new affected source and shall 
be subject to the requirements for a new affected source in this 
subpart upon initial start-up or by September 12, 1996, whichever is 
later, if said process change or addition meets the criteria specified 
in paragraphs (i)(2)(i)(A) through (i)(2)(i)(B) of this section:

[[Page 48233]]

    (A) Said process change or addition meets the definition of 
reconstruction in Sec. 63.2; and
    (B) Such reconstruction commenced after March 29, 1995.
    (ii) If any process change is made or emission point is added to an 
existing affected source, or if a process change creating one or more 
additional Group 1 emission point(s) is made to an existing affected 
source and said process change or addition does not meet the criteria 
specified in paragraphs (i)(2)(i)(A) through (i)(2)(i)(B) of this 
section, the resulting emission point(s) shall be subject to the 
requirements for an existing affected source in this subpart. Said 
emission point(s) shall be in compliance upon initial start-up or by 3 
years after September 12, 1996, whichever is later, unless the owner or 
operator demonstrates to the Administrator that achieving compliance 
will take longer than making said process change or addition. If this 
demonstration is made to the Administrator's satisfaction, the owner or 
operator shall follow the procedures in paragraphs (i)(2)(iii)(A) 
through (i)(2)(iii)(C) of this section to establish a compliance date.
    (iii) To establish a compliance date for an emission point or 
points specified in paragraph (i)(2)(ii) of this section, the 
procedures specified in paragraphs (i)(2)(iii)(A) through 
(i)(2)(iii)(C) of this section shall be followed.
    (A) The owner or operator shall submit to the Administrator for 
approval a compliance schedule, along with a justification for the 
schedule.
    (B) The compliance schedule shall be submitted within 180 days 
after the process change or addition is made or the information 
regarding said change or addition is known to the owner or operator, 
unless the compliance schedule has been previously submitted to the 
permitting authority. The compliance schedule may be submitted in the 
next Periodic Report if the process change or addition is made after 
the date the Notification of Compliance Status report is due.
    (C) The Administrator shall approve the compliance schedule or 
request changes within 120 calendar days of receipt of the compliance 
schedule and justification.
    (3) Existing source requirements for Group 2 emission points that 
become Group 1 emission points. If a process change or addition that 
does not meet the criteria in paragraph (i)(1) or (i)(2) of this 
section is made to an existing plant site or existing affected source, 
and the change causes a Group 2 emission point to become a Group 1 
emission point, for said emission point, the owner or operator shall 
comply with the requirements of this subpart for existing Group 1 
emission points. Compliance shall be achieved as expeditiously as 
practicable, but in no event later than 3 years after said emission 
point becomes a Group 1 emission point.
    (4) Existing source requirements for some emission points that 
become subject to the requirements of subpart H of this part. If a 
compressor becomes subject to Sec. 63.164, the owner or operator shall 
be in compliance upon initial start-up or by 3 years after September 
12, 1996, whichever is later, unless the owner or operator demonstrates 
to the Administrator that achieving compliance will take longer than 
making the change. If this demonstration is made to the Administrator's 
satisfaction, the owner or operator shall follow the procedures in 
paragraphs (i)(2)(iii)(A) through (i)(2)(iii)(C) of this section to 
establish a compliance date.
    (5) Determining what are and are not process changes. For purposes 
of paragraph (i) of this section, examples of process changes include, 
but are not limited to, changes in production capacity, feedstock type, 
or catalyst type, or whenever there is a replacement, removal, or the 
addition of recovery equipment. For purposes of paragraph (i) of this 
section, process changes do not include: process upsets, unintentional 
temporary process changes, and changes that are within the equipment 
configuration and operating conditions documented in the Notification 
of Compliance Status report required by Sec. 63.1335(e)(5).
    (j) Applicability of this subpart except during periods of start-
up, shutdown, and malfunction. Each provision set forth in this subpart 
or referred to in this subpart shall apply at all times except during 
periods of start-up, shutdown, and malfunction if the start-up, 
shutdown, or malfunction precludes the ability of a particular emission 
point of an affected source to comply with one or more specific 
provisions to which it is subject. Start-up, shutdown, and malfunction 
is defined in Sec. 63.1312 for all emission points except equipment 
leaks subject to subpart H of this part, which shall follow the 
provisions for periods of start-up, malfunction, and process unit 
shutdown, as defined in Sec. 63.161. Only then shall an emission point 
not be required to comply with all applicable provisions of this 
subpart.

Sec. 63.1311  Compliance schedule and relationship to existing 
applicable rules.

    (a) Affected sources are required to achieve compliance on or 
before the dates specified in paragraphs (b) through (d) of this 
section. Paragraph (e) of this section provides information on 
requesting compliance extensions. Paragraphs (f) through (l) of this 
section discuss the relationship of this subpart to subpart A of this 
part and to other applicable rules. Where an override of another 
authority of the Act is indicated in this subpart, only compliance with 
the provisions of this subpart is required. Paragraph (m) of this 
section specifies the meaning of time periods.
    (b) New affected sources that commence construction or 
reconstruction after March 29, 1995 shall be in compliance with this 
subpart upon initial start-up or September 12, 1996, whichever is 
later, as provided in Sec. 63.6(b).
    (c) Existing affected sources shall be in compliance with this 
subpart (except for Sec. 63.1331 for which compliance is covered by 
paragraph (d) of this section) no later than 3 years after September 
12, 1996, as provided in Sec. 63.6(c), unless an extension has been 
granted as specified in paragraph (e) of this section.
    (d) Except as provided for in paragraphs (d)(1) through (d)(5) of 
this section, existing affected sources shall be in compliance with 
Sec. 63.1331 no later than March 12, 1997 unless a request for a 
compliance extension is granted pursuant to Section 112(i)(3)(B) of the 
Act, as discussed in Sec. 63.182(a)(6).
    (1) Compliance with the compressor provisions of Sec. 63.164 shall 
occur no later than September 12, 1997 for any compressor meeting one 
or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iii) of 
this section if the work can be accomplished without a process unit 
shutdown, as defined in Sec. 63.161:
    (i) The seal system will be replaced;
    (ii) A barrier fluid system will be installed; or
    (iii) A new barrier fluid will be utilized which requires changes 
to the existing barrier fluid system.
    (2) Compliance with the compressor provisions of Sec. 63.164 shall 
occur no later than February 12, 1998 for any compressor meeting all 
the criteria in paragraphs (d)(2)(i) through (d)(2)(ii) of this 
section:
    (i) The compressor meets one or more of the criteria specified in 
paragraphs (d)(1)(i)(A) through (d)(1)(i)(B) of this section:
    (A) The work can be accomplished without a process unit shutdown as 
defined in Sec. 63.161; or
    (B) The additional time is actually necessary due to the 
unavailability of parts beyond the control of the owner or operator.
    (ii) The owner or operator submits the request for a compliance 
extension to the Environmental Protection Agency

[[Page 48234]]

(EPA) Regional Office at the addresses listed in Sec. 63.13 no later 
than 45 calendar days before March 12, 1997. The request for a 
compliance extension shall contain the information specified in 
Sec. 63.6(i)(6)(i) (A), (B), and (D). Unless the EPA Regional Office 
objects to the request for a compliance extension within 30 calendar 
days after receipt of the request, the request shall be deemed 
approved.
    (3) If compliance with the compressor provisions of Sec. 63.164 
cannot reasonably be achieved without a process unit shutdown, as 
defined in Sec. 63.161, the owner or operator shall achieve compliance 
no later than September 14, 1998. The owner or operator who elects to 
use this provision shall submit a request for a compliance extension in 
accordance with the requirements of paragraph (d)(2)(ii) of this 
section.
    (4) If compliance with the compressor provisions of Sec. 63.164 
cannot be achieved without replacing the compressor or recasting the 
distance piece, the owner or operator shall achieve compliance no later 
than September 13, 1999. The owner or operator who elects to use this 
provision shall submit a request for a compliance extension in 
accordance with the requirements of paragraph (d)(2)(ii) of this 
section.
    (5) Compliance with the provisions of Sec. 63.170 shall occur no 
later than September 13, 1999.
    (e) Pursuant to section 112(i)(3)(B) of the Act, an owner or 
operator may request an extension allowing the existing source up to 1 
additional year to comply with section 112(d) standards. For purposes 
of this subpart, a request for an extension shall be submitted to the 
operating permit authority as part of the operating permit application 
or to the Administrator as a separate submittal or as part of the 
Precompliance Report. Requests for extensions shall be submitted no 
later than the date the Precompliance Report is required to be 
submitted in Sec. 63.1335(e)(3)(i). The dates specified in Sec. 63.6(i) 
for submittal of requests for extensions shall not apply to this 
subpart.
    (1) A request for an extension of compliance shall include the data 
described in Sec. 63.6(i)(6)(i) (A),(B), and (D).
    (2) The requirements in Sec. 63.6(i)(8) through Sec. 63.6(i)(14) 
shall govern the review and approval of requests for extensions of 
compliance with this subpart.
    (f) Table 1 of this subpart specifies the provisions of subpart A 
of this part that apply and those that do not apply to owners and 
operators of affected sources subject to this subpart.
    (g)(1) After the compliance dates specified in this section, an 
affected source subject to this subpart that is also subject to the 
provisions of subpart I of this part, is required to comply only with 
the provisions of this subpart. After the compliance dates specified in 
this section, said affected source shall no longer be subject to 
subpart I of this part.
    (2) Said affected sources that elected to comply with subpart I of 
this part through a quality improvement program, as specified in 
Sec. 63.175 or Sec. 63.176 or both, may elect to continue these 
programs without interruption as a means of complying with this 
subpart. In other words, becoming subject to this subpart does not 
restart or reset the ``compliance clock'' as it relates to reduced 
burden earned through a quality improvement program.
    (h) After the compliance dates specified in this section, a storage 
vessel that belongs to an affected source subject to this subpart that 
is also subject to the provisions of 40 CFR part 60, subpart Kb, is 
required to comply only with the provisions of this subpart. After the 
compliance dates specified in this section, said storage vessel shall 
no longer be subject to 40 CFR part 60, subpart Kb.
    (i)(1) Except as provided in paragraph (i)(2) of this section, 
after the compliance dates specified in this section, affected sources 
producing PET using a continuous terephthalic acid process, producing 
PET using a continuous dimethyl terephthalate process, or producing 
polystyrene resin using a continuous process subject to this subpart 
that are also subject to the provisions of 40 CFR part 60, subpart DDD, 
are required to comply only with the provisions of this subpart. After 
the compliance dates specified in this section, said sources shall no 
longer be subject to 40 CFR part 60, subpart DDD.
    (2) Existing affected sources producing PET using a continuous 
terephthalic acid high viscosity multiple end finisher process shall 
continue to be subject to 40 CFR 60.562-1(c)(2)(ii)(C). Once said 
affected source becomes subject to and achieves compliance with 
Sec. 63.1329(c) of this subpart, said affected source is no longer 
subject to the provisions of 40 CFR part 60, subpart DDD.
    (j) Affected sources subject to this subpart that are also subject 
to the provisions of subpart Q of this part shall comply with both 
subparts.
    (k) After the compliance dates specified in this section, an 
affected source subject to this subpart that is also subject to the 
provisions of 40 CFR part 60, subpart VV, is required to comply only 
with the provisions of this subpart. After the compliance dates 
specified in this section, said source shall no longer be subject to 40 
CFR part 60, subpart VV.
    (l) After the compliance dates specified in this section, a 
distillation operation that belongs to an affected source subject to 
this subpart that is also subject to the provisions of 40 CFR part 60, 
subpart NNN, is required to comply only with the provisions of this 
subpart. After the compliance dates specified in this section, said 
distillation operation shall no longer be subject to 40 CFR part 60, 
subpart NNN.
    (m) All terms in this subpart that define a period of time for 
completion of required tasks (e.g., weekly, monthly, quarterly, 
annual), unless specified otherwise in the section or subsection that 
imposes the requirement, refer to the standard calendar periods.
    (1) Notwithstanding time periods specified in this subpart for 
completion of required tasks, such time periods may be changed by 
mutual agreement between the owner or operator and the Administrator, 
as specified in subpart A of this part (e.g., a period could begin on 
the compliance date or another date, rather than on the first day of 
the standard calendar period). For each time period that is changed by 
agreement, the revised period shall remain in effect until it is 
changed. A new request is not necessary for each recurring period.
    (2) Where the period specified for compliance is a standard 
calendar period, if the initial compliance date occurs after the 
beginning of the period, compliance shall be required according to the 
schedule specified in paragraphs (m)(i) or (m)(ii) of this section, as 
appropriate.
    (i) Compliance shall be required before the end of the standard 
calendar period within which the compliance deadline occurs, if there 
remain at least 3 days for tasks that must be performed weekly, at 
least 2 weeks for tasks that must be performed monthly, at least 1 
month for tasks that must be performed each quarter, or at least 3 
months for tasks that must be performed annually; or
    (ii) In all other cases, compliance shall be required before the 
end of the first full standard calendar period after the period within 
which the initial compliance deadline occurs.
    (3) In all instances where a provision of this subpart requires 
completion of a task during each multiple successive period, an owner 
or operator may perform the required task at any time during the 
specified period, provided

[[Page 48235]]

that the task is conducted at a reasonable interval after completion of 
the task during the previous period.

Sec. 63.1312  Definitions.

    (a) The following terms used in this subpart shall have the meaning 
given them in Sec. 63.2, Sec. 63.101, Sec. 63.111, and Sec. 63.161 as 
specified after each term:
Act (Sec. 63.2)
Administrator (Sec. 63.2)
Automated monitoring and recording system (Sec. 63.111)
Average concentration (Sec. 63.111)
Boiler (Sec. 63.111)
Bottoms receiver (Sec. 63.161)
By compound (Sec. 63.111)
By-product (Sec. 63.101)
Car-seal (Sec. 63.111)
Chemical manufacturing process unit (Sec. 63.101)
Closed-vent system (Sec. 63.111)
Co-product (Sec. 63.101)
Combustion device (Sec. 63.111)
Commenced (Sec. 63.2)
Compliance date (Sec. 63.2)
Compliance schedule (Sec. 63.2)
Connector (Sec. 63.161)
Construction (Sec. 63.2)
Continuous monitoring system (Sec. 63.2)
Continuous record (Sec. 63.111)
Continuous recorder (Sec. 63.111)
Cover (Sec. 63.111)
Distillation unit (Sec. 63.111)
Emission standard (Sec. 63.2)
Emissions averaging (Sec. 63.2)
EPA (Sec. 63.2)
Equipment (Sec. 63.161)
Equipment leak (Sec. 63.101)
Existing source (Sec. 63.2)
External floating roof (Sec. 63.111)
Fill (Sec. 63.111)
Fixed roof (Sec. 63.111)
Flame zone (Sec. 63.111)
Flexible operation unit (Sec. 63.101)
Floating roof (Sec. 63.111)
Flow indicator (Sec. 63.111)
Group 1 wastewater streams (Sec. 63.111)
Group 2 wastewater streams (Sec. 63.111)
Halogens and hydrogen halides (Sec. 63.111)
Hazardous air pollutant (Sec. 63.2)
Impurity (Sec. 63.101)
In organic hazardous air pollutant service (Sec. 63.161)
Incinerator (Sec. 63.111)
Instrumentation system (Sec. 63.161)
Internal floating roof (Sec. 63.111)
Lesser quantity (Sec. 63.2)
Major source (Sec. 63.2)
Malfunction (Sec. 63.2)
Mass flow rate (Sec. 63.111)
Maximum true vapor pressure (Sec. 63.111)
New source (Sec. 63.2)
Open-ended valve or line (Sec. 63.161)
Operating permit (Sec. 63.101)
Organic HAP service (Sec. 63.161)
Organic monitoring device (Sec. 63.111)
Owner or operator (Sec. 63.2)
Performance evaluation (Sec. 63.2)
Performance test (Sec. 63.2)
Permitting authority (Sec. 63.2)
Plant site (Sec. 63.101)
Point of generation (Sec. 63.111)
Potential to emit (Sec. 63.2)
Primary fuel (Sec. 63.111)
Process heater (Sec. 63.111)
Process unit shutdown (Sec. 63.161)
Process wastewater (Sec. 63.101)
Process wastewater stream (Sec. 63.111)
Product separator (Sec. 63.111)
Reactor (Sec. 63.111)
Reconstruction (Sec. 63.2)
Recovery device (Sec. 63.111)
Reference control technology for process vents (Sec. 63.111)
Reference control technology for storage vessels (Sec. 63.111)
Reference control technology for wastewater (Sec. 63.111)
Relief valve (Sec. 63.111)
Research and development facility (Sec. 63.101)
Residual (Sec. 63.111)
Run (Sec. 63.2)
Secondary fuel (Sec. 63.111)
Sensor (Sec. 63.161)
Shutdown (Sec. 63.2)
Specific gravity monitoring device (Sec. 63.111)
Start-up (Sec. 63.2)
Start-up, shutdown, and malfunction plan (Sec. 63.101)
State (Sec. 63.2)
Surge control vessel (Sec. 63.161)
Temperature monitoring device (Sec. 63.111)
Test method (Sec. 63.2)
Total resource effectiveness index value (Sec. 63.111)
Treatment process (Sec. 63.111)
Unit operation (Sec. 63.101)
Visible emission (Sec. 63.2)
Waste management unit (Sec. 63.111)
Wastewater (Sec. 63.101)
Wastewater stream (Sec. 63.111)

    (b) All other terms used in this subpart shall have the meaning 
given them in this section. If a term is defined in Secs. 63.2, 63.101, 
63.111, or 63.161 and in this section, it shall have the meaning given 
in this section for purposes of this subpart.
    Acrylonitrile butadiene styrene latex resin (ABS latex) means ABS 
produced through an emulsion process, however the product is not 
coagulated or dried as typically occurs in an emulsion process.
    Acrylonitrile butadiene styrene resin (ABS) means styrenic 
terpolymers consisting primarily of acrylonitrile, 1,3-butadiene, and 
styrene monomer units. ABS is usually composed of a styrene-
acrylonitrile copolymer continuous phase with dispersed butadiene 
derived rubber.
    Acrylonitrile styrene acrylate resin (ASA) means a resin formed 
using acrylic ester-based elastomers to impact-modify styrene 
acrylonitrile resin matrices.
    Aggregate batch vent stream means a gaseous emission stream 
containing only the exhausts from two or more batch process vents that 
are ducted together before being routed to a control device that is in 
continuous operation.
    Affected source is defined in Sec. 63.1310(a).
    Alpha methyl styrene acrylonitrile resin (AMSAN) means copolymers 
consisting primarily of alpha methyl styrene and acrylonitrile.
    Average flow rate, as used in conjunction with wastewater 
provisions, is determined by the specifications in Sec. 63.144(c); or, 
as used in conjunction with batch process vent provisions, is 
determined by the specifications in Sec. 63.1323(e).
    Batch cycle means the operational step or steps, from start to 
finish, that occur as part of a batch unit operation. Batch cycle 
limitation means an enforceable restriction on the number of batch 
cycles that can be performed in a year for an individual batch process 
vent.
    Batch emission episode means a discrete emission venting episode 
associated with a single batch unit operation. Multiple batch emission 
episodes may occur from a single batch unit operation.
    Batch process means a discontinuous process involving the bulk 
movement of material through sequential manufacturing steps. Mass, 
temperature, concentration, and other properties of the process vary 
with time. Addition of raw material and withdrawal of product do not 
typically occur simultaneously in a batch process. For the purposes of 
this subpart, a process producing polymers is characterized as 
continuous or batch based on the operation of the polymerization 
reactors.
    Batch process vent means a point of emission from a batch unit 
operation having a gaseous emission stream with annual organic HAP 
emissions greater than 225 kilograms per year. Batch process vents 
exclude relief valve discharges and leaks from equipment regulated 
under Sec. 63.1331.
    Batch unit operation means a unit operation operated in a batch 
process mode.
    Compounding unit means a unit operation which blends, melts, and 
resolidifies solid polymers for the purpose of incorporating additives, 
colorants, or stabilizers into the final thermoplastic product. A unit 
operation whose primary purpose is to remove residual monomers from 
polymers is not a compounding unit.

[[Page 48236]]

    Continuous process means a process where the inputs and outputs 
flow continuously through sequential manufacturing steps throughout the 
duration of the process. Continuous processes typically approach 
steady-state conditions. Continuous processes typically involve the 
simultaneous addition of raw material and withdrawal of product. For 
the purposes of this subpart, a process producing polymers is 
characterized as continuous or batch based on the operation of the 
polymerization reactors.
    Continuous process vent means a point of emission from a continuous 
unit operation within an affected source having a gaseous emission 
stream containing greater than 0.005 weight percent total organic HAP. 
Continuous process vents exclude relief valve discharges and leaks from 
equipment regulated under Sec. 63.1331.
    Continuous unit operation means a unit operation operated in a 
continuous process mode.
    Control device is defined in Sec. 63.111, except that the term 
``process vents'' shall be replaced with the term ``continuous process 
vents subject to Sec. 63.1315'' for the purpose of this subpart.
    Drawing unit means a unit operation which converts polymer into a 
different shape by melting or mixing the polymer and then pulling it 
through an orifice to create a continuously extruded product.
    Emission point means an individual continuous process vent, batch 
process vent, storage vessel, wastewat
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
er stream, equipment leak, heat 
exchange system, or process contact cooling tower.
    Emulsion process means a process carried out with the reactants in 
an emulsified form (e.g., polymerization reaction).
    Expandable polystyrene resin (EPS) means a polystyrene bead to 
which a blowing agent has been added using either an in-situ suspension 
process or a post-impregnation suspension process.
    Extruding unit means a unit operation which converts polymer into a 
different shape by melting or mixing the polymer and then forcing it 
through an orifice to create a continuously extruded product.
    Group 1 batch process vent means a batch process vent releasing 
annual organic HAP emissions greater than the level specified in 
Sec. 63.1323(d) and with a cutoff flow rate, calculated in accordance 
with Sec. 63.1323(f), greater than or equal to the annual average flow 
rate.
    Group 2 batch process vent means a batch process vent that does not 
fall within the definition of a Group 1 batch process vent.
    Group 1 continuous process vent means a continuous process vent 
releasing a gaseous emission stream that has a total resource 
effectiveness index value, calculated according to Sec. 63.115, less 
than or equal to 1.0 unless the continuous process vent is associated 
with existing thermoplastic product process units that produce methyl 
methacrylate butadiene styrene resin, then said vent falls within the 
Group 1 definition if the released emission stream has a total resource 
effectiveness index value less than or equal to 3.7.
    Group 2 continuous process vent means a continuous process vent 
that does not fall within the definition of a Group 1 continuous 
process vent.
    Group 1 storage vessel means a storage vessel at an existing 
affected source that meets the applicability criteria specified in 
Table 2 or Table 3 of this subpart, or a storage vessel at a new 
affected source that meets the applicability criteria specified in 
Table 4 or Table 5 of this subpart.
    Group 2 storage vessel means a storage vessel that does not fall 
within the definition of a Group 1 storage vessel.
    Halogenated aggregate batch vent stream means an aggregate batch 
vent stream determined to have a total mass emission rate of halogen 
atoms contained in organic compounds of 3,750 kilograms per year or 
greater determined by the procedures specified in Sec. 63.1323(h).
    Halogenated batch process vent means a batch process vent 
determined to have a mass emission rate of halogen atoms contained in 
organic compounds of 3,750 kilograms per year or greater determined by 
the procedures specified in Sec. 63.1323(h).
    Halogenated continuous process vent means a continuous process vent 
determined to have a mass emission rate of halogen atoms contained in 
organic compounds of 0.45 kilograms per hour or greater determined by 
the procedures specified in Sec. 63.115(d)(2)(v).
    Heat exchange system means any cooling tower system or once-through 
cooling water system (e.g., river or pond water) designed and operated 
to not allow contact between the cooling medium and process fluid or 
gases (i.e., a noncontact system). A heat exchange system can include 
more than one heat exchanger and can include recirculating or once-
through cooling systems.
    Maintenance wastewater means wastewater generated by the draining 
of process fluid from components in the TPPU into an individual drain 
system prior to or during maintenance activities. Maintenance 
wastewater can be generated during planned and unplanned shutdowns and 
during periods not associated with a shutdown. Examples of activities 
that can generate maintenance wastewater include descaling of heat 
exchanger tubing bundles, cleaning distillation column traps, draining 
of low legs and high point bleeds, draining of pumps into an individual 
drain system, reactor and equipment washdown, and draining of portions 
of the TPPU for repair.
    Mass process means a process carried out through the use of thermal 
energy (e.g., polymerization reaction). Mass processes do not utilize 
emulsifying or suspending agents, but can utilize catalysts or other 
additives.
    Material recovery section means the equipment that recovers 
unreacted or by-product materials from any process section for return 
to the TPPU, off-site purification or treatment, or sale. Equipment 
used to store recovered materials are not included. Equipment designed 
to separate unreacted or by-product material from the polymer product 
are to be included in this process section, provided that at the time 
of initial compliance some of the material is recovered for reuse in 
the process, off-site purification or treatment, or sale. Otherwise, 
such equipment are to be assigned to one of the other process sections, 
as appropriate. If equipment are used to recover unreacted or by-
product material and return it directly to the same piece of process 
equipment from which it was emitted, then said recovery equipment are 
considered part of the process section that contains the process 
equipment. On the other hand, if equipment are used to recover 
unreacted or by-product material and return it to a different piece of 
process equipment in the same process section, said recovery equipment 
are considered part of a material recovery section. Equipment that 
treats recovered materials are to be included in this process section, 
but equipment that also treats raw materials are not to be included in 
this process section. The latter equipment are to be included in the 
raw materials preparation section. Equipment used for the on-site 
recovery of ethylene glycol from PET plants, however, are not included 
in the material recovery section; they are to be included in the 
polymerization reaction section. Equipment used for the on-site 
recovery of ethylene glycol and other materials (e.g., methanol) from 
PET plants are not included in the material recovery section; these 
equipment are to be included in the polymerization reaction section.
    Methyl methacrylate acrylonitrile butadiene styrene resin (MABS) 
means

[[Page 48237]]

styrenic polymers containing methyl methacrylate, acrylonitrile, 
butadiene, and styrene. MABS is prepared by dissolving or dispersing 
polybutadiene rubber in a mixture of methyl methacrylate-acrylonitrile-
styrene and butadiene monomer. The graft polymerization is carried out 
by a bulk or a suspension process.
    Methyl methacrylate butadiene styrene resin (MBS) means styrenic 
polymers containing methyl methacrylate, butadiene, and styrene. 
Production of MBS is achieved using an emulsion process in which methyl 
methacrylate and styrene are grafted onto a styrene-butadiene rubber.
    Nitrile resin means a resin produced through the polymerization of 
acrylonitrile, methyl acrylate, and butadiene latex using an emulsion 
process.
    Organic hazardous air pollutant(s) (organic HAP) means one or more 
of the chemicals listed in Table 6 of this subpart or any other 
chemical which is:
    (1) Knowingly introduced into the manufacturing process other than 
as an impurity, or has been or will be reported under any Federal or 
State program, such as Title V or the Emergency Planning and Community 
Right-To-Know Act section 311, 312, or 313; and
    (2) Listed in Table 2 of subpart F of this part.
    PET using a dimethyl terephthalate process means the manufacturing 
of PET based on the esterification of dimethyl terephthalate with 
ethylene glycol to form the intermediate monomer bis-(2-hydroxyethyl)-
terephthalate that is subsequently polymerized to form PET.
    PET using a terephthalic acid process means the manufacturing of 
PET based on the esterification reaction of terephthalic acid with 
ethylene glycol to form the intermediate monomer bis-(2-hydroxyethyl)-
terephthalate that is subsequently polymerized to form PET.
    Poly(ethylene terephthalate) resin (PET) means a polymer or 
copolymer comprised of at least 50 percent bis-(2-hydroxyethyl)-
terephthalate by weight.
    Polymerization reaction section means the equipment designed to 
cause monomer(s) to react to form polymers, including equipment 
designed primarily to cause the formation of short polymer chains 
(e.g., oligomers or low polymers), but not including equipment designed 
to prepare raw materials for polymerization (e.g., esterification 
vessels). For the purposes of these standards, the polymerization 
reaction section begins with the equipment used to transfer the 
materials from the raw materials preparation section and ends with the 
last vessel in which polymerization occurs. Equipment used for the on-
site recovery of ethylene glycol from PET plants, however, are included 
in this process section, rather than in the material recovery process 
section.
    Polystyrene resin means a thermoplastic polymer or copolymer 
comprised of at least 80 percent styrene or para-methylstyrene by 
weight.
    Primary product is defined in and determined by the procedures 
specified in Sec. 63.1310(f).
    Process contact cooling tower system means a cooling tower system 
that is designed and operated to allow contact between the cooling 
medium and process fluid or gases.
    Process section means the equipment designed to accomplish a 
general but well-defined task in polymers production. Process sections 
include, but are not limited to, raw materials preparation, 
polymerization reaction, and material recovery. A process section may 
be dedicated to a single TPPU or common to more than one TPPU.
    Process unit means a collection of equipment assembled and 
connected by pipes or ducts to process raw materials and to manufacture 
a product.
    Process vent means a point of emission from a unit operation having 
a gaseous emission stream. Typical process vents include condenser 
vents, dryer vents, vacuum pumps, steam ejectors, and atmospheric vents 
from reactors and other process vessels, but do not include pressure 
relief valves.
    Product means a compound or material which is manufactured by a 
process unit. By-products, isolated intermediates, impurities, wastes, 
and trace contaminants are not considered products.
    Raw materials preparation section means the equipment at a polymer 
manufacturing plant designed to prepare raw materials, such as monomers 
and solvents, for polymerization. For the purposes of these standards, 
this process section begins with the equipment used to transfer raw 
materials from storage and/or the equipment used to transfer recovered 
material from the material recovery process sections, and ends with the 
last piece of equipment that prepares the material for polymerization. 
The raw materials preparation section may include equipment that is 
used to purify, dry, or otherwise treat raw materials or raw and 
recovered materials together; to activate catalysts; and to promote 
esterification including the formation of some short polymer chains 
(oligomers). The raw materials preparation section does not include 
equipment that is designed primarily to accomplish the formation of 
oligomers, the treatment of recovered materials alone, or the storage 
of raw materials.
    Recovery operations equipment means the equipment used to separate 
the components of process streams. Recovery operations equipment 
includes distillation unit, condensers, etc. Equipment used for 
wastewater treatment shall not be considered recovery operations 
equipment.
    Solid state polymerization unit means a unit operation which, 
through the application of heat, furthers the polymerization (i.e., 
increases the intrinsic viscosity) of polymer chips.
    Steady-state conditions means that all variables (temperatures, 
pressures, volumes, flow rates, etc.) in a process do not vary 
significantly with time; minor fluctuations about constant mean values 
can occur.
    Storage vessel means a tank or other vessel that is used to store 
liquids that contain one or more organic HAP and that has been 
assigned, according to the procedures in Sec. 63.1310(g), to a TPPU 
that is subject to this subpart. Storage vessels do not include:
    (1) vessels permanently attached to motor vehicles such as trucks, 
railcars, barges, or ships;
    (2) pressure vessels designed to operate in excess of 204.9 
kilopascals and without breathing or working losses to the atmosphere;
    (3) vessels with capacities smaller than 38 cubic meters;
    (4) vessels and equipment storing and/or handling material that 
contains no organic HAP and/or organic HAP as impurities only; and
    (5) wastewater storage tanks.
    Styrene acrylonitrile resin (SAN) means copolymers consisting 
primarily of styrene and acrylonitrile monomer units.
    Suspension process means a process carried out with the reactants 
in a state of suspension, typically achieved through the use of water 
and/or suspending agents (e.g., polymerization reaction).
    Thermoplastic product means one of the following types of products:
    (1) ABS latex;
    (2) ABS using a batch emulsion process;
    (3) ABS using a batch suspension process;
    (4) ABS using a continuous emulsion process;
    (5) ABS using a continuous mass process;
    (6) ASA/AMSAN;
    (7) EPS;
    (8) MABS;
    (9) MBS;

[[Page 48238]]

    (10) nitrile resin;
    (11) PET using a batch dimethyl terephthalate process;
    (12) PET using a batch terephthalic acid process;
    (13) PET using a continuous dimethyl terephthalate process;
    (14) PET using a continuous terephthalic acid process;
    (15) PET using a continuous terephthalic acid high viscosity 
multiple end finisher process;
    (16) polystyrene resin using a batch process;
    (17) polystyrene resin using a continuous process;
    (18) SAN using a batch process; or
    (19) SAN using a continuous process.
    Thermoplastic product process unit (TPPU) means a collection of 
equipment assembled and connected by process pipes or ducts, excluding 
gas, sanitary sewage, water (i.e., not wastewater), and steam 
connections, used to process raw materials and to manufacture a 
thermoplastic product as its primary product. This collection of 
equipment includes process vents from process vessels; storage vessels, 
as determined in Sec. 63.1310(g); and the equipment (i.e., pumps, 
compressors, agitators, pressure relief devices, sampling connection 
systems, open-ended valves or lines, valves, connectors, and 
instrumentation systems that are associated with the thermoplastic 
product process unit) that are subject to the equipment leak provisions 
as specified in Sec. 63.1331.
    Total organic compounds (TOC) means those compounds excluding 
methane and ethane measured according to the procedures of Method 18 or 
Method 25A, 40 CFR part 60, appendix A.
    Year means any consecutive 12-month period or 365 rolling days. For 
the purposes of emissions averaging, the term year applies to any 12-
month period selected by the facility and defined in its Emissions 
Averaging Plan. For the purposes of batch cycle limitations, the term 
year applies to the 12-month period defined by the facility in its 
Notification of Compliance Status.

Sec. 63.1313  Emission standards.

    (a) Except as allowed under paragraphs (b) and (c) of this section, 
the owner or operator of an existing or new affected source shall 
comply with the provisions in:
    (1) Section 63.1314 for storage vessels;
    (2) Sections 63.1315 or 63.1316 through 63.1320, as appropriate, 
for continuous process vents;
    (3) Section 63.1321 for batch process vents;
    (4) Section 63.1328 for heat exchange systems;
    (5) Section 63.1329 for process contact cooling towers;
    (6) Section 63.1330 for wastewater;
    (7) Section 63.1331 for equipment leaks;
    (8) Section 63.1333 for additional test methods and procedures;
    (9) Section 63.1334 for parameter monitoring levels and excursions; 
and
    (10) Section 63.1335 for general recordkeeping and reporting 
requirements.
    (b) Instead of complying with Secs. 63.1314, 63.1315, 63.1316 
through 63.1320, 63.1321, and 63.1330, the owner or operator of an 
existing affected source may elect to control any or all of the storage 
vessels, batch process vents, continuous process vents, and wastewater 
streams within the affected source to different levels using an 
emissions averaging compliance approach that uses the procedures 
specified in Sec. 63.1332. An owner or operator electing to use 
emissions averaging must still comply with the provisions of 
Secs. 63.1314, 63.1315, 63.1316 through 63.1320, 63.1321, and 63.1330 
for affected source emission points not included in the emissions 
average.
    (c) A State may decide not to allow the use of the emissions 
averaging compliance approach specified in paragraph (b) of this 
section.

Sec. 63.1314  Storage vessel provisions.

    (a) This section applies to each storage vessel that belongs to an 
affected source, as determined by Sec. 63.1310(g). Except as provided 
in paragraphs (b) through (d) of this section, the owner or operator of 
said storage vessels shall comply with the requirements of Secs. 63.119 
through 63.123 and 63.148, with the differences noted in paragraphs 
(a)(1) through (a)(16) of this section for the purposes of this 
subpart.
    (1) When the term ``storage vessel'' is used in Secs. 63.119 
through 63.123 and 63.148, the definition of this term in Sec. 63.1312 
shall apply for the purposes of this subpart.
    (2) When the term ``Group 1 storage vessel'' is used in 
Secs. 63.119 through 63.123 and 63.148, the definition of this term in 
Sec. 63.1312 shall apply for the purposes of this subpart.
    (3) When the term ``Group 2 storage vessel'' is used in 
Secs. 63.119 through 63.123 and 63.148, the definition of this term in 
Sec. 63.1312 shall apply for the purposes of this subpart.
    (4) When the emissions averaging provisions of Sec. 63.150 are 
referred to in Secs. 63.119 and 63.123, the emissions averaging 
provisions contained in Sec. 63.1332 shall apply for the purposes of 
this subpart.
    (5) When December 31, 1992, is referred to in Sec. 63.119, March 
29, 1995 shall apply instead, for the purposes of this subpart.
    (6) When April 22, 1994, is referred to in Sec. 63.119, September 
12, 1996 shall apply instead, for the purposes of this subpart.
    (7) Each owner or operator shall comply with this paragraph (a)(7) 
instead of Sec. 63.120(d)(1)(ii) for the purposes of this subpart. If 
the control device used to comply with this section is also used to 
comply with Secs. 63.1315 through 63.1330, the performance test 
required for these sections is acceptable for demonstrating compliance 
with Sec. 63.119(e) for the purposes of this subpart. The owner or 
operator is not required to prepare a design evaluation for the control 
device as described in Sec. 63.120(d)(1)(i) for the purposes of this 
subpart if the performance test meets the criteria specified in 
Sec. 63.120 (d)(1)(ii)(A) and (d)(1)(ii)(B).
    (8) When the term ``operating range'' is used in Sec. 63.120(d)(3), 
the term ``level'' shall apply instead, for the purposes of this 
subpart. This level shall be established using the procedures specified 
in Sec. 63.1334.
    (9) When the Notification of Compliance Status requirements 
contained in Sec. 63.152(b) are referred to in Secs. 63.120, 63.122, 
and 63.123, the Notification of Compliance Status requirements 
contained in Sec. 63.1335(e)(5) shall apply for the purposes of this 
subpart.
    (10) When the Periodic Report requirements contained in 
Sec. 63.152(c) are referred to in Secs. 63.120, 63.122, and 63.123, the 
Periodic Report requirements contained in Sec. 63.1335(e)(6) shall 
apply for the purposes of this subpart.
    (11) When other reports as required in Sec. 63.152(d) are referred 
to in Sec. 63.122, the reporting requirements contained in 
Sec. 63.1335(e)(7) shall apply for the purposes of this subpart.
    (12) When the Implementation Plan requirements contained in 
Sec. 63.151(c) are referred to in Sec. 63.120 and Sec. 63.122, the 
owner or operator of an affected source subject to this subpart need 
not comply for the purposes of this subpart.
    (13) When the Initial Notification Plan requirements contained in 
Sec. 63.151(b) are referred to in Sec. 63.122, the owner or operator of 
an affected source subject to this subpart need not comply for the 
purposes of this subpart.
    (14) When the determination of equivalence criteria in 
Sec. 63.102(b) is referred to in Sec. 63.121(a), the provisions in 
Sec. 63.6(g) shall apply for the purposes of this subpart.

[[Page 48239]]

    (15) When a performance test is required under the provisions of 
Sec. 63.120(d)(1)(ii), the use of Method 18 or Method 25A, 40 CFR part 
60, appendix A is allowed for the purposes of this subpart. The use of 
Method 25A, 40 CFR part 60, appendix A shall comply with paragraphs 
(a)(15)(i) and (a)(15)(ii) of this section.
    (i) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (ii) The use of Method 25A, 40 CFR part 60, appendix A is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (16) The compliance date for storage vessels at affected sources 
subject to the provisions of this section is specified in Sec. 63.1311.
    (b) Owners or operators of Group 1 storage vessels that belong to a 
new affected source producing SAN using a continuous process shall 
control emissions to the levels indicated in paragraphs (b)(1) and 
(b)(2) of this section.
    (1) For storage vessels with capacities greater than or equal to 
2,271 cubic meters (m\3\) containing a liquid mixture having a vapor 
pressure greater than or equal to 0.5 kilopascal (kPa) but less than 
0.7 kPa, emissions shall be controlled by at least 90 percent relative 
to uncontrolled emissions.
    (2) For storage vessels with capacities less than 151 m3 
containing a liquid mixture having a vapor pressure greater than or 
equal to 10 kPa, emissions shall be controlled by at least 98 percent 
relative to uncontrolled emissions.
    (c) Owners or operators of Group 1 storage vessels that belong to a 
new or existing affected source producing ASA/AMSAN shall control 
emissions by at least 98 percent relative to uncontrolled emissions.
    (d) The provisions of this subpart do not apply to storage vessels 
containing ethylene glycol at existing or new affected sources and 
storage vessels containing styrene at existing affected sources.

Sec. 63.1315  Continuous process vents provisions.

    (a) Except as provided in paragraphs (b) through (d) of this 
section, the owner or operator of continuous process vents shall comply 
with the requirements of Secs. 63.113 through 63.118, with the 
differences noted in paragraphs (a)(1) through (a)(15) of this section 
for the purposes of this subpart.
    (1) When the term ``process vent'' is used in Secs. 63.113 through 
63.118, apply the term ``continuous process vent,'' and the definition 
of this term in Sec. 63.1312 shall apply for the purposes of this 
subpart.
    (2) When the term ``Group 1 process vent'' is used in Secs. 63.113 
through 63.118, apply the term ``Group 1 continuous process vent,'' and 
the definition of this term in Sec. 63.1312 shall apply for the 
purposes of this subpart.
    (3) When the term ``Group 2 process vent'' is used in Secs. 63.113 
through 63.118, apply the term ``Group 2 continuous process vent,'' and 
the definition of this term in Sec. 63.1312 shall apply for the 
purposes of this subpart.
    (4) When December 31, 1992, (i.e., subpart G of this part proposal 
date) is referred to in Sec. 63.113, apply the date March 29, 1995 
(i.e., proposal date for this subpart) for the purposes of this 
subpart.
    (5) When Sec. 63.151(f), alternative monitoring parameters, and 
Sec. 63.152(e), submission of an operating permit, are referred to in 
Secs. 63.114(c) and 63.117(e), Sec. 63.1335(f), alternative monitoring 
parameters, and Sec. 63.1335(e)(8), submission of an operating permit, 
respectively, shall apply for the purposes of this subpart.
    (6) When the Notification of Compliance Status requirements 
contained in Sec. 63.152(b) are referred to in Secs. 63.114, 63.117, 
and 63.118, the Notification of Compliance Status requirements 
contained in Sec. 63.1335(e)(5) shall apply for the purposes of this 
subpart.
    (7) When the Periodic Report requirements contained in 
Sec. 63.152(c) are referred to in Secs. 63.117 and 63.118, the Periodic 
Report requirements contained in Sec. 63.1335(e)(6) shall apply for the 
purposes of this subpart.
    (8) When the definition of excursion in Sec. 63.152(c)(2)(ii)(A) is 
referred to in Sec. 63.118(f)(2), the definition of excursion in 
Sec. 63.1334(f) of this subpart shall apply for the purposes of this 
subpart.
    (9) Owners and operators shall comply with Sec. 63.1334, parameter 
monitoring levels and excursions, instead of Sec. 63.114(e) for the 
purposes of this subpart. When the term ``range'' is used in 
Secs. 63.117 and 63.118, the term ``level'' shall be used instead for 
the purposes of this subpart. This level is determined in accordance 
with Sec. 63.1334.
    (10) If a batch process vent is combined with a continuous process 
vent prior to being routed to a control device, the combined vent 
stream shall comply with either paragraph (a)(10)(i) or (a)(10)(ii) of 
this section, as appropriate.
    (i) If the continuous process vent is a Group 1 continuous process 
vent, the combined vent stream shall comply with all requirements for a 
Group 1 continuous process vent stream in Secs. 63.113 through 63.118, 
with the differences noted in paragraphs (a)(1) through (a)(9) of this 
section, for the purposes of this subpart.
    (ii) If the continuous process vent is a Group 2 continuous process 
vent, the total resource effectiveness (TRE) index value for the 
combined vent stream shall be calculated at the exit of any recovery 
device and prior to the control device at maximum representative 
operating conditions. For combined vent streams containing continuous 
and batch process vents, the maximum representative operating 
conditions shall be during periods when batch emission episodes are 
venting to the control device, resulting in the highest concentration 
of organic HAP in the combined vent stream.
    (11) If a batch process vent is combined with a continuous process 
vent prior to being routed to a recovery device, the TRE index value 
for the combined vent stream shall be calculated at the exit of the 
recovery device at maximum representative operating conditions for the 
purposes of this subpart. For combined vent streams containing 
continuous and batch process vents, the maximum representative 
operating conditions shall be during periods when batch emission 
episodes are venting to the recovery device, resulting in the highest 
concentration of organic HAP in the combined vent stream.
    (12) When reports of process changes are required under Sec. 63.118 
(g), (h), (i), and (j), paragraphs (a)(12)(i) through (a)(12)(iv) of 
this section shall apply for the purposes of this subpart.
    (i) For the purposes of this subpart, whenever a process change, as 
defined in Sec. 63.115(e), is made that causes a Group 2 continuous 
process vent to become a Group 1 continuous process vent, the owner or 
operator shall submit a report within 180 operating days after the 
process change is made or the information regarding the process change 
is known to the owner or operator. This report may be included in the 
next Periodic Report, as specified in Sec. 63.1335(e)(6)(iii)(D)(2). 
The following information shall be submitted:
    (A) A description of the process change; and
    (B) A schedule for compliance with the provisions of this subpart, 
as required under Sec. 63.1335(e)(6)(iii)(D)(2).

[[Page 48240]]

    (ii) Whenever a process change, as defined in Sec. 63.115(e), is 
made that causes a Group 2 process vent with a TRE greater than 4.0 to 
become a Group 2 process vent with a TRE less than 4.0, the owner or 
operator shall submit a report within 180 operating days after the 
process change is made or the information regarding the process change 
is known to the owner or operator. This report may be included in the 
next Periodic Report, as specified in Sec. 63.1335(e)(6)(iii)(D)(2). 
The following information shall be submitted:
    (A) A description of the process change; and
    (B) A schedule for compliance with the provisions of this subpart, 
as required under Sec. 63.1335(e)(6)(iii)(D)(2).
    (iii) Whenever a process change, as defined in Sec. 63.115(e), is 
made that causes a Group 2 process vent with a flow rate less than 
0.005 standard cubic meter per minute to become a Group 2 process vent 
with a flow rate of 0.005 standard cubic meter per minute or greater 
and a TRE index value less than or equal to 4.0, the owner or operator 
shall submit a report within 180 operating days after the process 
change is made or the information regarding the process change is known 
to the owner or operator. This report may be included in the next 
Periodic Report, as specified in Sec. 63.1335(e)(6)(iii)(D)(2). The 
following information shall be submitted:
    (A) A description of the process change; and
    (B) A schedule for compliance with the provisions of this subpart, 
as required under Sec. 63.1335(e)(6)(iii)(D)(2).
    (iv) Whenever a process change, as defined in Sec. 63.115(e), is 
made that causes a Group 2 process vent with an organic HAP 
concentration less than 50 parts per million by volume to become a 
Group 2 process vent with an organic HAP concentration of 50 parts per 
million by volume or greater and a TRE index value less than or equal 
to 4.0, the owner or operator shall submit a report within 180 
operating days after the process change is made or the information 
regarding the process change is known to the owner or operator. This 
report may be included in the next Periodic Report, as specified in 
Sec. 63.1335(e)(6)(iii)(D)(2). The following information shall be 
submitted:
    (A) A description of the process change; and
    (B) A schedule for compliance with the provisions of this subpart, 
as required under Sec. 63.1335(e)(6)(iii)(D)(2).
    (13) When the provisions of Sec. 63.116 (c)(3) and (c)(4) specify 
that Method 18, 40 CFR part 60, appendix A shall be used, Method 18 or 
Method 25A, 40 CFR part 60, appendix A may be used for the purposes of 
this subpart. The use of Method 25A, 40 CFR part 60, appendix A shall 
comply with paragraphs (a)(13)(i) and (a)(13)(ii) of this section.
    (i) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (ii) The use of Method 25A, 40 CFR part 60, appendix A is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (14) When the provisions of Sec. 63.116(b) identify conditions 
under which a performance test is not required, for purposes of this 
subpart, the exemption in paragraph (a)(14)(i) shall also apply. 
Further, if a performance test meeting the conditions specified in 
paragraph (a)(14)(ii) of this section has been conducted by the owner 
or operator, the results of said performance test may be submitted and 
a performance test, as required by this section, is not required.
    (i) An incinerator burning hazardous waste for which the owner or 
operator complies with the requirements of 40 CFR part 264, subpart O.
    (ii) Performance tests done for other subparts in 40 CFR part 60 or 
part 63 where total organic HAP or TOC was measured, provided the owner 
or operator can demonstrate that operating conditions for the process 
and control or recovery device during the performance test are 
representative of current operating conditions.
    (15) The compliance date for continuous process vents subject to 
the provisions of this section is specified in Sec. 63.1311.
    (b) Existing affected sources producing MBS shall comply with 
either paragraph (b)(1) or (b)(2) of this section.
    (1) Comply with paragraph (a) of this section, as specified in 
paragraphs (b)(1)(i) and (b)(1)(ii).
    (i) As specified in Sec. 63.1312, Group 1 continuous process vents 
at MBS existing affected sources are those with a total resource 
effectiveness value less than or equal to 3.7.
    (ii) When complying with this paragraph (b), the term ``TRE of 
4.0'', or related terms indicating a TRE value of 4.0, referred to in 
Sec. 63.113 through Sec. 63.118 shall be replaced with ``TRE of 6.7,'' 
for the purposes of this subpart. The TRE range of 3.7 to 6.7 for 
continuous process vents at existing affected sources producing MBS 
corresponds to the TRE range of 1.0 to 4.0 for other continuous process 
vents, as it applies to monitoring, recordkeeping, and reporting.
    (2) Not allow organic HAP emissions from the collection of 
continuous process vents at the affected source to be greater than 
0.000590 kg organic HAP/Mg of product. Compliance with this paragraph 
(b)(2) shall be determined using the procedures specified in 
Sec. 63.1333(b).
    (c) New affected sources producing SAN using a batch process shall 
comply with the applicable requirements in Sec. 63.1321.
    (d) Affected sources producing PET or polystyrene using a 
continuous process are subject to the emissions control provisions of 
Sec. 63.1316, the monitoring provisions of Sec. 63.1317, the testing 
and compliance demonstration provisions of Sec. 63.1318, the 
recordkeeping provisions of Sec. 63.1319, and the reporting provisions 
of Sec. 63.1320.

Sec. 63.1316  PET and polystyrene continuous process affected sources--
emissions control provisions.

    (a) The owner or operator of an affected source producing PET using 
a continuous process shall comply with paragraph (b) of this section. 
The owner or operator of an affected source producing polystyrene using 
a continuous process shall comply with paragraph (c) of this section.
    (b) Each owner or operator of an affected source producing PET 
using a continuous process shall comply with the requirements specified 
in paragraphs (b)(1) or (b)(2) of this section, as appropriate, and not 
with any of the requirements specified in 40 CFR part 60, subpart DDD. 
Compliance can be based on either organic HAP or TOC.
    (1) Each owner or operator of an affected source producing PET 
using a continuous dimethyl terephthalate process shall comply with 
paragraphs (b)(1)(i) through (b)(1)(iv) of this section.
    (i) For existing affected sources with organic HAP emissions from 
continuous process vents in the collection of material recovery 
sections (i.e., methanol recovery) within the affected source greater 
than 0.12 kg organic HAP/Mg of product, as determined by the procedure 
specified in Sec. 63.1318(b) and for all new affected sources, limit 
organic HAP emissions from continuous process vents in the collection 
of material recovery sections within the affected source by complying 
with one of the following:
    (A) Not allow emissions to be greater than 0.018 kg organic HAP/Mg 
of product; or

[[Page 48241]]

    (B) Not allow the outlet gas stream temperature from each final 
condenser in a material recovery section to exceed +3 deg. C (+37 deg. 
F).
    (ii) Limit organic HAP emissions from the continuous process vents 
in the collection of polymerization reaction sections within the 
affected source (including emissions from any equipment used to further 
recover ethylene glycol, but excluding emissions from process contact 
cooling towers) to 0.02 kg organic HAP/Mg of product or less.
    (iii) Limit organic HAP emissions from continuous process vents not 
included in a material recovery section, as specified in paragraph 
(b)(1)(i) of this section, or not included in a polymerization reaction 
section, as specified in paragraph (b)(1)(ii) of this section, by 
complying with Sec. 63.1315.
    (iv) Limit organic HAP emissions from all batch process vents by 
complying with Sec. 63.1321.
    (2) Each owner or operator of an affected source producing PET 
using a continuous terephthalic acid process shall comply with 
paragraphs (b)(2)(i) through (b)(2)(iv) of this section.
    (i) Limit organic HAP emissions from the continuous process vents 
associated with the esterification vessels in the collection of raw 
materials preparation sections within the affected source to 0.04 kg 
organic HAP/Mg of product or less. Limit organic HAP emissions 
associated with other continuous process vents in the collection of raw 
materials preparation sections within the affected source by complying 
with Sec. 63.1315.
    (ii) Limit organic HAP emissions from the continuous process vents 
in the collection of polymerization reaction sections within the 
affected source (including emissions from any equipment used to further 
recover ethylene glycol, but excluding emissions from process contact 
cooling towers) to 0.02 kg organic HAP/Mg of product or less.
    (iii) Limit organic HAP emissions from continuous process vents not 
included in a raw materials preparation section, as specified in 
paragraphs (b)(2)(i) of this section, or not included in a 
polymerization reaction section, as specified in paragraph (b)(2)(ii) 
of this section, by complying with Sec. 63.1315.
    (iv) Limit organic HAP emissions from all batch process vents by 
complying with Sec. 63.1321.
    (c) Each owner or operator of an affected source producing 
polystyrene resin using a continuous process shall comply with the 
requirements specified in paragraphs (c)(1) through (c)(3) of this 
section, as appropriate, and not with any of the requirements specified 
in 40 CFR part 60, subpart DDD. Compliance can be based on either 
organic HAP or TOC.
    (1) Limit organic HAP emissions from continuous process vents in 
the collection of material recovery sections within the affected source 
by complying with one of the following:
    (i) Not allow emissions to be greater than 0.0036 kg organic HAP/Mg 
of product;
    (ii) Not allow the outlet gas stream temperature from each final 
condenser in a material recovery section to exceed -25 deg.C 
(-13 deg.F); or
    (iii) Comply with one of the following:
    (A) Reduce emissions by 98 weight percent or to a concentration of 
20 parts per million by volume (ppmv) on a dry basis, whichever is less 
stringent. If an owner or operator elects to comply with the 20 ppmv 
standard, the concentration shall include a correction to 3 percent 
oxygen only when supplemental combustion air is used to combust the 
emissions;
    (B) Combust the emissions in a boiler or process heater with a 
design heat input capacity of 150 million Btu/hr or greater by 
introducing the emissions into the flame zone of the boiler or process 
heater; or
    (C) Combust the emissions in a flare that complies with the 
requirements of Sec. 63.11(b).
    (2) Limit organic HAP emissions from continuous process vents not 
included in a material recovery section, as specified in paragraph 
(c)(1)(i) of this section, by complying with Sec. 63.1315.
    (3) Limit organic HAP emissions from all batch process vents by 
complying with Sec. 63.1321.

Sec. 63.1317   PET and polystyrene continuous process affected 
sources--monitoring provisions.

    Continuous process vents using a control or recovery device to 
comply with Sec. 63.1316 shall comply with the applicable monitoring 
provisions specified for continuous process vents in Sec. 63.1315(a), 
except as specified in paragraphs (a) and (b) of this section.
    (a) For the purposes of paragraph (a) of this section, owners or 
operators shall ignore references to group determinations (i.e., total 
resource effectiveness) and are not required to comply with 
Sec. 63.113.
    (b) The monitoring period for condenser exit temperature when 
complying with Sec. 63.1316(b)(1)(i)(B) or Sec. 63.1316(c)(1)(ii) shall 
be each consecutive 3-hour continuous period (e.g., 6 am to 9 am, 9 am 
to 12 pm). Each owner or operator shall designate said monitoring 
period in the Notification of Compliance Status required by 
Sec. 63.1335(e)(5).

Sec. 63.1318   PET and polystyrene continuous process affected 
sources--testing and compliance demonstration provisions.

    (a) Except as specified in paragraphs (b) through (d) of this 
section, continuous process vents using a control or recovery device to 
comply with Sec. 63.1316 shall comply with the applicable testing and 
compliance provisions for continuous process vents specified in 
Sec. 63.1315, except that, for the purposes of this paragraph (a), 
owners or operators shall ignore references to group determination 
(i.e., total resource effectiveness) and are not required to comply 
with Sec. 63.113.
    (b) PET Affected Sources Using a Dimethyl Terephthalate Process--
Applicability Determination Procedure. Owners or operators shall 
calculate organic HAP emissions from the collection of material 
recovery sections at an existing affected source producing PET using a 
continuous dimethyl terephthalate process to determine whether 
Sec. 63.1316(a)(1)(i) is applicable using the procedures specified in 
either paragraph (b)(1) or (b)(2) of this section.
    (1) Use Equation 1 of this subpart to determine mass emissions per 
mass product as specified in paragraphs (b)(1)(i) and (b)(1)(ii) of 
this section.
[GRAPHIC] [TIFF OMITTED] TR12SE96.000

where:

ER=Emission rate of total organic HAP or TOC, kg/Mg product.
Ei=Emission rate of total organic HAP or TOC in continuous process 
vent i, kg/hr.
Pp=The rate of polymer produced, kg/hr.
n=Number of continuous process vents in the collection of material 
recovery sections at the affected source.
0.001=Conversion factor, kg to Mg.

    (i) The mass emission rate for each continuous process vent, 
Ei, shall be determined according to the procedures specified in 
Sec. 63.116(c)(4). The sampling site for determining whether 
Sec. 63.1316(a)(1)(i) is applicable shall be before any add-on control 
devices (i.e., those required by regulation) and after those recovery 
devices installed as part of operating the material recovery section. 
When the provisions of Sec. 63.116(c)(4) specify that Method 18, 40 CFR 
part 60, appendix A shall be used, Method 18 or Method 25A, 40 CFR part 
60, appendix A may be used for the purposes of this subpart. The use of

[[Page 48242]]

Method 25A, 40 CFR part 60, appendix A shall comply with paragraphs 
(b)(1)(i)(A) and (b)(1)(i)(B) of this section.
    (A) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (B) The use of Method 25A, 40 CFR part 60, appendix A is acceptable 
if the response from the high-level calibration gas is at least 20 
times the standard deviation of the response from the zero calibration 
gas when the instrument is zeroed on the most sensitive scale.
    (ii) The rate of polymer produced, Pp (kg/hr), shall be 
determined by dividing the weight (kg) of polymer pulled from the 
process line during the performance test by the number of hours taken 
to perform the performance test. The weight of polymer pulled shall be 
determined by direct measurement or by an alternate methodology, such 
as materials balance. If an alternate methodology is used, a 
description of the methodology, including all procedures, data, and 
assumptions shall be submitted as part of the Notification of 
Compliance Status required by Sec. 63.1335(e)(5).
    (2) Use engineering assessment, as described in 
Sec. 63.1323(b)(6)(i), to demonstrate that mass emissions per mass 
product are less than or equal to 0.07 kg organic HAP/Mg product. If 
engineering assessment shows that mass emissions per mass product are 
greater than 0.07 kg organic HAP/Mg product and the owner or operator 
wishes to demonstrate that mass emissions per mass product are less 
than the threshold emission rate of 0.12 kg organic HAP/Mg product, the 
owner or operator shall use the procedures specified in paragraph 
(b)(1) of this section.
    (c) Compliance with Mass Emissions per Mass Product Standards. 
Owners or operators complying with Sec. 63.1316 (b)(1)(i)(A), 
(b)(1)(ii), (b)(2)(i), (b)(2)(ii), and (c)(1)(i) shall demonstrate 
compliance with the mass emissions per mass product requirements using 
the procedures specified in paragraph (b)(1) of this section, except 
that the sampling site specified in paragraph (b)(1)(i) of this section 
shall be at the outlet of the last control or recovery device.
    (d) Compliance with Temperature Limits for Final Condensers. Owners 
or operators complying with Sec. 63.1316(b)(1)(i)(B) or 
Sec. 63.1316(c)(1)(ii) shall perform an initial performance test as 
specified in paragraph (d)(1) of this section to demonstrate initial 
compliance with the temperature limit requirements and shall 
demonstrate continuous compliance as specified in paragraph (d)(2) of 
this section.
    (1) Using the temperature monitoring device specified by the 
applicable monitoring provisions specified for continuous process vents 
in Sec. 63.1315, an average exit temperature shall be determined based 
on the average exit temperature for three performance tests. The 
average exit temperature for each 3-hour performance test shall be 
based on measurements taken at least every 15 minutes for 3 hours of 
continuous operation under maximum representative operating conditions 
for the process. For emissions streams containing continuous and batch 
process vents, the maximum representative operating conditions shall be 
during periods when batch emission episodes are venting to the control 
device resulting in the highest concentration of organic HAP in the 
emissions stream.
    (2) As specified in Sec. 63.1317(b), continuous compliance shall be 
determined based on an average exit temperature determined for each 
consecutive 3-hour continuous period. Each 3-hour period where the 
average exit temperature is more than 6  deg.C (10  deg.F) above the 
applicable specified temperature limit shall be considered an 
exceedance of the monitoring provisions.

Sec. 63.1319  PET and polystyrene continuous process affected sources--
recordkeeping provisions.

    (a) Except as specified in paragraphs (b) and (c) of this section, 
owners or operators using a control or recovery device to comply with 
Sec. 63.1316 shall comply with the applicable recordkeeping provisions 
specified in Sec. 63.1315, except that, for the purposes of this 
paragraph (a), owners or operators shall ignore references to group 
determinations (i.e., total resource effectiveness) and are not 
required to comply with Sec. 63.113.
    (b) Records Demonstrating Compliance With the Applicability 
Determination Procedure for PET Affected Sources Using a Dimethyl 
Terephthalate Process. Each owner or operator, as appropriate, shall 
keep the following data, as appropriate, up-to-date and readily 
accessible:
    (1) Results of the mass emissions per mass product calculation 
specified in Sec. 63.1318(b).
    (2) If complying with Sec. 63.1316 by demonstrating that mass 
emissions per mass product are less than or equal to the level 
specified in Sec. 63.1316(a)(1)(i), the information specified in 
paragraphs (b)(2)(i) and (b)(2)(ii) of this section.
    (i) Each process operation variable (e.g., pressure, temperature, 
type of catalyst) that may result in an increase in the mass emissions 
per mass product should said variable be changed.
    (ii) Records of any change in process operation that increases the 
mass emissions per mass product.
    (c) Records Demonstrating Compliance with Temperature Limits for 
Final Condensers. Owners or operators of continuous process vents 
complying with Sec. 63.1316(b)(1)(i)(B) or Sec. 63.1316(c)(1)(ii) shall 
keep the following data, as appropriate, up-to-date and readily 
accessible:
    (1) Records of monitoring data as specified in Sec. 63.1315, except 
that the monitoring period shall be each consecutive 3-hour continuous 
period.
    (2) Results of the performance test specified in Sec. 63.1318(d)(1) 
and any other performance test that may be subsequently required.

Sec. 63.1320  PET and polystyrene continuous process affected sources--
reporting provisions.

    (a) Except as specified in paragraphs (b) and (c) of this section, 
owners and operators using a control or recovery device to comply with 
Sec. 63.1316 shall comply with the applicable reporting provisions 
specified in Sec. 63.1315, except that, for the purposes of this 
paragraph (a), owners or operators shall ignore references to group 
determinations (i.e., total resource effectiveness) and are not 
required to comply with Sec. 63.113.
    (b) Reporting for PET Affected Sources Using a Dimethyl 
Terephthalate Process. Each owner or operator complying with 
Sec. 63.1316 by demonstrating that mass emissions per mass product are 
less than or equal to the level specified in Sec. 63.1316(a)(1)(i) 
shall comply with paragraphs (b)(1) through (b)(3) of this section.
    (1) Include the information specified in Sec. 63.1319(b)(2)(ii) in 
each Periodic Report, required by Sec. 63.1335(e)(6), as appropriate.
    (2) Include the information specified in Sec. 63.1319 (b)(1) or 
(b)(2) in the Notification of Compliance Status, required by 
Sec. 63.1335(e)(5), for the initial determination and in the 
appropriate Periodic Report, required by Sec. 63.1335(e)(6), for any 
subsequent determinations that may be required.
    (3) Whenever a process change, as defined in Sec. 63.115(e), is 
made that causes emissions from continuous process vents in the 
collection of material recovery sections (i.e., methanol recovery) 
within the affected source to be greater than 0.12 kg organic HAP/Mg of 
product, the owner or operator shall submit a report within

[[Page 48243]]

180 operating days after the process change is made or the information 
regarding the process change is known to the owner or operator. This 
report may be included in the next Periodic Report as specified in 
Sec. 63.1335(e)(6)(iii)(D)(2). The following information shall be 
submitted:
    (i) A description of the process change; and
    (ii) A schedule for compliance with the provisions of this subpart, 
as required under Sec. 63.1335(e)(6)(iii(D)(2).
    (c) Reporting for Affected Sources Complying With Temperature 
Limits for Final Condensers. Each owner or operator complying with 
Sec. 63.1316(b)(1)(i)(B) or Sec. 63.1316(c)(1)(ii) shall comply with 
paragraphs (c)(1) and (c)(2) of this section.
    (1) Report periods when the 3-hour average exit temperature is more 
than 6 deg. C (10 deg. F) above the applicable specified temperature 
limit in each Periodic Report, required by Sec. 63.1335(e)(6), as 
appropriate.
    (2) Include the information specified in Sec. 63.1319(c)(2) in the 
Notification of Compliance Status, required by Sec. 63.1335(e)(5), for 
the initial performance test and in the appropriate Periodic Report, 
required by Sec. 63.1335(e)(6), for any subsequent performance tests 
that may be required.
    (3) Include the information specified in Sec. 63.1317(b) in the 
Notification of Compliance Status, required by Sec. 63.1335(e)(5).

Sec. 63.1321  Batch process vents provisions.

    (a) Batch process vents. Except as specified in paragraphs (b) and 
(c) of this section, owners and operators of new and existing affected 
sources with batch process vents shall comply with the requirements in 
Secs. 63.1322 through 63.1327. The batch process vent group status 
shall be determined in accordance with Sec. 63.1323. Batch process 
vents classified as Group 1 shall comply with the reference control 
technology requirements for Group 1 batch process vents in 
Sec. 63.1322, the monitoring requirements in Sec. 63.1324, the 
performance test methods and procedures to determine compliance 
requirements in Sec. 63.1325, the recordkeeping requirements in 
Sec. 63.1326, and the reporting requirements in Sec. 63.1327. All Group 
2 batch process vents shall comply with the applicable reference 
control technology requirements in Sec. 63.1322, the recordkeeping 
requirements in Sec. 63.1326, and the reporting requirements in 
Sec. 63.1327.
    (b) New SAN batch affected sources. Owners and operators of new SAN 
affected sources using a batch process shall comply with the 
requirements of Sec. 63.1322 through Sec. 63.1327 for batch process 
vents and aggregate batch vent streams except as specified in 
paragraphs (b)(1) through (b)(2) of this section. For continuous 
process vents, owners and operators shall comply with the requirements 
of Sec. 63.1322 through Sec. 63.1327 except as specified in paragraph 
(b)(3) of this section.
    (1) For batch process vents, the determination of group status 
(i.e., Group 1/Group 2) under Sec. 63.1323 is not required.
    (2) For batch process vents and aggregate batch vent streams, the 
control requirements for individual batch process vents or aggregate 
batch vent streams (e.g., 90 percent emission reduction) as specified 
in Sec. 63.1322(a)(1), (a)(2), (b)(1), and (b)(2) shall not apply.
    (3) Continuous process vents using a control or recovery device to 
comply with Sec. 63.1322(a)(3) are subject to the applicable 
requirements in Sec. 63.1315(a), as appropriate, except as specified in 
paragraphs (b)(3)(i) and (b)(3)(ii) of this section.
    (i) Said continuous process vents are not subject to the group 
determination procedures of Sec. 63.115 for the purposes of this 
subpart.
    (ii) Said continuous process vents are not subject to the reference 
control technology provisions of Sec. 63.113 for the purposes of this 
subpart.
    (c) Aggregate batch vent streams. Aggregate batch vent streams, as 
defined in Sec. 63.1312, are subject to the control requirements for 
individual batch process vents, as specified in Sec. 63.1322(b), as 
well as the monitoring, testing, recordkeeping, and reporting 
requirements specified in Sec. 63.1324 through Sec. 63.1327.

Sec. 63.1322  Batch process vents--reference control technology.

    (a) Batch process vents. The owner or operator of a Group 1 batch 
process vent, as determined using the procedures in Sec. 63.1323, shall 
comply with the requirements of either paragraph (a)(1) or (a)(2) of 
this section, except as provided for in paragraph (a)(3) of this 
section. Compliance can be based on either organic HAP or TOC.
    (1) For each batch process vent, reduce organic HAP emissions using 
a flare.
    (i) The flare shall comply with the requirements of Sec. 63.11(b).
    (ii) Halogenated batch process vents, as defined in Sec. 63.1312, 
shall not be vented to a flare.
    (2) For each batch process vent, reduce organic HAP emissions for 
the batch cycle by 90 weight percent using a control device. Owners or 
operators may achieve compliance with this paragraph (a)(2) through the 
control of selected batch emission episodes or the control of portions 
of selected batch emission episodes. Documentation demonstrating how 
the 90 weight percent emission reduction is achieved is required by 
Sec. 63.1325(c)(2).
    (3) The owner or operator of a new affected source producing SAN 
using a batch process shall reduce organic HAP emissions from the 
collection of batch process vents, aggregate batch vent streams, and 
continuous process vents by 84 weight percent. Compliance with this 
paragraph (a)(3) shall be demonstrated using the procedures specified 
in Sec. 63.1333(c).
    (b) Aggregate batch vent streams. The owner or operator of an 
aggregate batch vent stream that contains one or more Group 1 batch 
process vents shall comply with the requirements of either paragraph 
(b)(1) or (b)(2) of this section, except as provided for in paragraph 
(b)(3) of this section. Compliance can be based on either organic HAP 
or TOC.
    (1) For each aggregate batch vent stream, reduce organic HAP 
emissions using a flare.
    (i) The flare shall comply with the requirements of Sec. 63.11(b).
    (ii) Halogenated aggregate batch vent streams, as defined in 
Sec. 63.1312, shall not be vented to a flare.
    (2) For each aggregate batch vent stream, reduce organic HAP 
emissions by 90 weight percent on a continuous basis using a control 
device.
    (3) The owner or operator of a new affected source producing SAN 
using a batch process shall comply with paragraph (a)(3) of this 
section.
    (c) Halogenated emissions. Halogenated Group 1 batch process vents, 
halogenated aggregate batch vent streams, and halogenated continuous 
process vents that are combusted as part of complying with paragraph 
(a)(2), (a)(3), (b)(2), or (b)(3) of this section, as appropriate, 
shall be controlled according to either paragraph (c)(1) or (c)(2) of 
this section.
    (1) If a combustion device is used to comply with paragraph (a)(2), 
(a)(3), (b)(2), or (b)(3) of this section for a halogenated batch 
process vent, halogenated aggregate batch vent stream, or halogenated 
continuous process vent, said emissions shall be ducted from the 
combustion device to an additional control device that reduces overall 
emissions of hydrogen halides and halogens by 99 percent before said 
emissions are discharged to the atmosphere.
    (2) A control device may be used to reduce the halogen atom mass 
emission

[[Page 48244]]

rate of said emissions to less than 3,750 kg/yr for batch process vents 
or aggregate batch vent streams and to less than 0.45 kilograms per 
hour for continuous process vents prior to venting to any combustion 
control device, and thus make the batch process vent, aggregate batch 
vent stream, or continuous process vent nonhalogenated. The 
nonhalogenated batch process vent, aggregate batch vent stream, or 
continuous process vent must then comply with the requirements of 
either paragraph (a) or (b) of this section, as appropriate.
    (d) If a boiler or process heater is used to comply with the 
percent reduction requirement specified in paragraph (a)(2), (a)(3), 
(b)(2), or (b)(3) of this section, the batch process vent, aggregate 
batch vent stream, or continuous process vent shall be introduced into 
the flame zone of such a device.
    (e) Combination of batch process vents or aggregate batch vent 
streams with continuous process vents. A batch process vent or 
aggregate batch vent stream combined with a continuous process vent is 
not subject to the provisions of Secs. 63.1323 through 63.1327, 
providing the requirements of paragraphs (e)(1), (e)(2), and either 
(e)(3) or (e)(4) of this section are met.
    (1) The batch process vent or aggregate batch vent stream is 
combined with a continuous process vent prior to routing the continuous 
process vent to a control or recovery device. In this paragraph (e)(1), 
the definitions of control device and recovery device as they relate to 
continuous process vents shall be used.
    (2) The only emissions to the atmosphere from the batch process 
vent or aggregate batch vent stream prior to being combined with the 
continuous process vent are from equipment subject to and in compliance 
with Sec. 63.1331.
    (3) If the batch process vent or aggregate batch vent stream is 
combined with a continuous process vent prior to being routed to a 
control device, the combined vent stream shall comply with the 
requirements in Sec. 63.1315(a)(10). In this paragraph (e)(3), the 
definition of control device as it relates to continuous process vents 
shall be used.
    (4) If the batch process vent or aggregate batch vent stream is 
combined with a continuous process vent prior to being routed to a 
recovery device, the combined vent stream shall comply with the 
requirements in Sec. 63.1315(a)(11). In this paragraph (e)(4), the 
definition of recovery device as it relates to continuous process vents 
shall be used.
    (f) Group 2 batch process vents with annual emissions greater than 
or equal to the level specified in Sec. 63.1323(d). The owner or 
operator of a Group 2 batch process vent with annual emissions greater 
than or equal to the level specified in Sec. 63.1323(d) shall comply 
with the provisions of (f)(1) and (f)(2) of this section.
    (1) Establish a batch cycle limitation that ensures the Group 2 
batch process vent does not become a Group 1 batch process vent.
    (2) Comply with the recordkeeping requirements in 
Sec. 63.1326(d)(2), and the reporting requirements in Sec. 63.1327 
(a)(3) and (b).
    (g) Group 2 batch process vents with annual emissions less than the 
level specified in Sec. 63.1323(d). The owner or operator of a Group 2 
batch process vent with annual emissions less than the level specified 
in Sec. 63.1323(d) shall comply with either paragraphs (g)(1) and 
(g)(2) of this section or with paragraphs (f)(1) and (f)(2) of this 
section.
    (1) Establish a batch cycle limitation that ensures emissions do 
not exceed the level specified in Sec. 63.1323(d).
    (2) Comply with the recordkeeping requirements in 
Sec. 63.1326(d)(1), and the reporting requirements in Sec. 63.1327 
(a)(2), (b), and (c).

Sec. 63.1323  Batch process vents--methods and procedures for group 
determination.

    (a) General requirements. Except as provided in paragraph (a)(3) of 
this section and in Sec. 63.1321(b)(1), the owner or operator of batch 
process vents at affected sources shall determine the group status of 
each batch process vent in accordance with the provisions of this 
section. This determination may be based on either organic HAP or TOC 
emissions.
    (1) The procedures specified in paragraphs (b) through (h) of this 
section shall be followed for the expected mix of products for a given 
batch process vent, as specified in paragraph (a)(1)(i) of this 
section, or for the worst-case HAP emitting product, as specified in 
paragraphs (a)(1)(ii) through (a)(1)(iv) of this section. ``Worst-case 
HAP emitting product'' is defined in paragraph (a)(1)(iii) of this 
section.
    (i) If an owner or operator chooses to follow the procedures 
specified in paragraphs (b) through (h) of this section for the 
expected mix of products, an identification of the different products 
and the number of batch cycles accomplished for each is required as 
part of the group determination documentation, as specified in 
Sec. 63.1326(a)(1).
    (ii) If an owner or operator chooses to follow the procedures 
specified in paragraphs (b) through (h) of this section for the worst-
case HAP emitting product, documentation identifying the worst-case HAP 
emitting product is required as part of the group determination 
documentation, as specified in Sec. 63.1326(a)(1).
    (iii) Except as specified in paragraph (a)(1)(iii)(B) of this 
section, the worst-case HAP emitting product is as defined in paragraph 
(a)(1)(iii)(A) of this section.
    (A) The worst-case HAP emitting product is the one with the highest 
mass emission rate (kg organic HAP per hour) averaged over the entire 
time period of the batch cycle.
    (B) Alternatively, when one product is produced more than 75 
percent of the time, accounts for more than 75 percent of the annual 
mass of product, and the owner or operator can show that the mass 
emission rate (kg organic HAP per hour) averaged over the entire time 
period of the batch cycle can reasonably be expected to be similar to 
the mass emission rate for other products having emissions from the 
same batch process vent, said product may be considered the worst-case 
HAP emitting product.
    (C) An owner or operator shall determine the worst-case HAP 
emitting product for a batch process vent as specified in paragraphs 
(a)(1)(iii)(C)(1) through (a)(1)(iii)(C)(3) of this section.
    (1) The emissions per batch emission episode shall be determined 
using any of the procedures specified in paragraph (b) of this section. 
The mass emission rate (kg organic HAP per hour) averaged over the 
entire time period of the batch cycle shall be determined by summing 
the emissions for each batch emission episode making up a complete 
batch cycle and dividing by the total duration in hours of the batch 
cycle.
    (2) To determine the worst-case HAP emitting product as specified 
under paragraph (a)(1)(iii)(A) of this section, the mass emission rate 
for each product shall be determined and compared.
    (3) To determine the worst-case HAP emitting product as specified 
under paragraph (a)(1)(iii)(B) of this section, the mass emission rate 
for the product meeting the time and mass criteria of paragraph 
(a)(1)(iii)(B) of this section shall be determined, and the owner or 
operator shall provide adequate information to demonstrate that the 
mass emission rate for said product is similar to the mass emission 
rates for the other products having emissions from the same batch 
process vent. In addition, the owner or operator shall provide 
information demonstrating that the selected product meets the time and

[[Page 48245]]

mass criteria of paragraph (a)(1)(iii)(B) of this section.
    (iv) The annual production of the worst-case HAP emitting product 
shall be determined by ratioing the production time of said product up 
to a 12 month period of actual production. It is not necessary to ratio 
up to a maximum production rate (i.e., 8,760 hours per year at maximum 
design production).
    (2) The annual uncontrolled organic HAP or TOC emissions and 
average flow rate shall be determined at the exit from the batch unit 
operation. For the purposes of these determinations, the primary 
condenser operating as a reflux condenser on a distillation column, the 
primary condenser recovering monomer or solvent from a batch stripping 
operation, and the primary condenser recovering monomer or solvent from 
a batch distillation operation shall be considered part of the batch 
unit operation. All other devices that recover or oxidize organic HAP 
or TOC vapors shall be considered control devices as defined in 
Sec. 63.1312.
    (3) The owner or operator of a batch process vent complying with 
the flare provisions in Sec. 63.1322(a)(1) or Sec. 63.1322(b)(1) or 
routing the batch process vent to a control device to comply with the 
requirements in Sec. 63.1322(a)(2) or Sec. 63.1322(b)(2) is not 
required to perform the batch process vent group determination 
described in this section, but shall comply with all requirements 
applicable to Group 1 batch process vents for said batch process vent.
    (b) Determination of annual emissions. The owner or operator shall 
calculate annual uncontrolled TOC or organic HAP emissions for each 
batch process vent using the methods described in paragraphs (b)(1) 
through (b)(8) of this section. Paragraphs (b)(1) through (b)(4) of 
this section present procedures that can be used to calculate the 
emissions from individual batch emission episodes. Emissions from batch 
processes involving multicomponent systems are to be calculated using 
the procedures in paragraphs (b)(1) through (b)(4) of this section. 
Individual HAP partial pressures in multicomponent systems shall be 
determined by the following methods: If the components are miscible in 
one another, use Raoult's law to calculate the partial pressures; if 
the solution is a dilute aqueous mixture use Henry's law constants to 
calculate partial pressures; if Raoult's law or Henry's law are not 
appropriate (or available) use experimentally obtained activity 
coefficients, Henry's law constants, or solubility data; if Raoult's 
law or Henry's law are not appropriate use models, such as the group-
contribution models, to predict activity coefficients; and if Raoult's 
law or Henry's law are not appropriate assume the components of the 
system behave independently and use the summation of all vapor 
pressures from the HAP's as the total HAP partial pressure. Chemical 
property data can be obtained from standard reference texts. Paragraph 
(b)(5) of this section describes how direct measurement can be used to 
estimate emissions. If the owner or operator can demonstrate that the 
procedures in paragraphs (b)(1) through (b)(4) of this section are not 
appropriate to estimate emissions from a batch emission episode, 
emissions may be estimated using engineering assessment, as described 
in paragraph (b)(6) of this section. Owners or operators are not 
required to demonstrate that direct measurement is not appropriate 
before utilizing engineering assessment. Paragraph (b)(6)(ii) of this 
section describes how an owner or operator shall demonstrate that the 
procedures in paragraphs (b)(1) through (b)(4) of this section are not 
appropriate. Emissions from a batch cycle shall be calculated in 
accordance with paragraph (b)(7) of this section, and annual emissions 
from the batch process vent shall be calculated in accordance with 
paragraph (b)(8) of this section.
    (1) TOC or organic HAP emissions from the purging of an empty 
vessel shall be calculated using Equation 2 of this subpart. Equation 2 
of this subpart does not take into account evaporation of any residual 
liquid in the vessel.
[GRAPHIC] [TIFF OMITTED] TR12SE96.001

where:

Eepisode=Emissions, kg/episode.
Vves=Volume of vessel, m3.
P=TOC or total organic HAP partial pressure, kPa.
MWwavg=Weighted average molecular weight of TOC or organic HAP in 
vapor, determined in accordance with paragraph (b)(4)(iii) of this 
section, kg/kmol.
R=Ideal gas constant, 8.314 m3bulletkPa/kmolbulletK.
T=Temperature of vessel vapor space, K.
m=Number of volumes of purge gas used.

    (2) TOC or organic HAP emissions from the purging of a filled 
vessel shall be calculated using Equation 3 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.002

where:

Eepisode=Emissions, kg/episode.
y=Saturated mole fraction of all TOC or organic HAP in vapor phase.
Vdr=Volumetric gas displacement rate, m3/min.
P=Pressure in vessel vapor space, kPa.
MWwavg=Weighted average molecular weight of TOC or organic HAP in 
vapor, determined in accordance with paragraph (b)(4)(iii) of this 
section, kg/kmol.
R=Ideal gas constant, 8.314 m3bulletkPa/kmolbulletK.
T=Temperature of vessel vapor space, K.
Pi=Vapor pressure of TOC or individual organic HAP i, kPa.
xi=Mole fraction of TOC or organic HAP i in the liquid.
n=Number of
    organic HAP in stream.

[[Page 48246]]

    Note: Summation not required if TOC emissions are being 
estimated.

Tm=Minutes/episode.

    (3) Emissions from vapor displacement due to transfer of material 
into or out of a vessel shall be calculated using Equation 4 of this 
subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.003

where:

Eepisode=Emissions, kg/episode.
y=Saturated mole fraction of all TOC or organic HAP in vapor phase.
V=Volume of gas displaced from the vessel, m3.
P=Pressure in vessel vapor space, kPa.
MWwavg=Weighted average molecular weight of TOC or organic HAP in 
vapor, determined in accordance with paragraph (b)(4)(i)(D) of this 
section, kg/kmol.
R=Ideal gas constant, 8.314 m3bulletkPa/kmolbulletK.
T=Temperature of vessel vapor space, K.

    (4) Emissions caused by the heating of a vessel shall be calculated 
using the procedures in either paragraphs (b)(4)(i), (b)(4)(ii), or 
(b)(4)(iii) of this section, as appropriate.
    (i) If the final temperature to which the vessel contents is heated 
is lower than 50 K below the boiling point of the HAP in the vessel, 
then emissions shall be calculated using the equations in paragraphs 
(b)(4)(i)(A) through (b)(4)(i)(D) of this section.
    (A) Emissions caused by heating of a vessel shall be calculated 
using Equation 5 of this subpart. The assumptions made for this 
calculation are atmospheric pressure of 760 millimeters of mercury (mm 
Hg) and the displaced gas is always saturated with volatile organic 
compounds (VOC) vapor in equilibrium with the liquid mixture.
[GRAPHIC] [TIFF OMITTED] TR12SE96.004

where:

Eepisode=Emissions, kg/episode.
(Pi)T1, (Pi)T2=Partial pressure (kPa) of TOC or each organic 
HAP i in the vessel headspace at initial (T1) and final (T2) 
temperature.
n=Number of organic HAP in stream. Note: Summation not required if TOC 
emissions are being estimated.
trianglen=Number of kilogram-moles (kg-moles) of gas displaced, 
determined in accordance with paragraph (b)(4)(i)(B) of this section.
101.325=Constant, kPa.
MWwavg=Weighted average molecular weight of TOC or organic HAP in 
vapor, determined in accordance with paragraph (b)(4)(i)(D) of this 
section, kg/kmol.

    (B) The moles of gas displaced, trianglen, is calculated using 
Equation 6 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.005

where:

trianglen=Number of kg-moles of gas displaced.
Vfs=Volume of free space in the vessel, m3.
R=Ideal gas constant, 8.314 m3bulletkPa/kmolbulletK.
Pa1=Initial noncondensible gas pressure in the vessel, kPa.
Pa2=Final noncondensible gas pressure, kPa.
T1=Initial temperature of vessel, K.
T2=Final temperature of vessel, K.

    (C) The initial and final pressure of the noncondensible gas in the 
vessel shall be calculated using Equation 7 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.006

where:

Pa=Initial or final partial pressure of noncondensible gas in the 
vessel headspace, kPa.
101.325=Constant, kPa.
(Pi)T=Partial pressure of TOC or each organic HAP i in the vessel 
headspace, kPa, at the initial or final temperature (T1 or T2).
n=Number of organic HAP in stream.

    Note: Summation not required if TOC emissions are being 
estimated.

    (D) The weighted average molecular weight of TOC or organic HAP in 
the displaced gas, MWwavg, shall be calculated using Equation 8 of 
this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.007

where:

C=TOC or organic HAP component
n=Number of TOC or organic HAP components in stream.

    (ii) If the vessel contents are heated to a temperature greater 
than 50 K below the boiling point, then emissions from

[[Page 48247]]

the heating of a vessel shall be calculated as the sum of the emissions 
calculated in accordance with paragraphs (b)(4)(ii)(A) and 
(b)(4)(ii)(B) of this section.
    (A) For the interval from the initial temperature to the 
temperature 50 K below the boiling point, emissions shall be calculated 
using Equation 5 of this subpart, where T2 is the temperature 50 K 
below the boiling point.
    (B
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
) For the interval from the temperature 50 K below the boiling 
point to the final temperature, emissions shall be calculated as the 
summation of emissions for each 5 K increment, where the emissions for 
each increment shall be calculated using Equation 5 of this subpart.
    (1) If the final temperature of the heatup is lower than 5 K below 
the boiling point, the final temperature for the last increment shall 
be the final temperature for the heatup, even if the last increment is 
less than 5 K.
    (2) If the final temperature of the heatup is higher than 5 K below 
the boiling point, the final temperature for the last increment shall 
be the temperature 5 K below the boiling point, even if the last 
increment is less than 5 K.
    (3) If the vessel contents are heated to the boiling point and the 
vessel is not operating with a condenser, the final temperature for the 
final increment shall be the temperature 5 K below the boiling point, 
even if the last increment is less than 5 K.
    (iii) If the vessel is operating with a condenser, and the vessel 
contents are heated to the boiling point, the primary condenser, as 
specified in paragraph (a)(2) of this section, is considered part of 
the process. Emissions shall be calculated as the sum of emissions 
calculated using Equation 5 of this subpart, which calculates emissions 
due to heating the vessel contents to the temperature of the gas 
existing the condenser, and emissions calculated using Equation 4 of 
this subpart, which calculates emissions due to the displacement of the 
remaining saturated noncondensible gas in the vessel. The final 
temperature in Equation 5 of this subpart shall be set equal to the 
exit gas temperature of the condenser. Equation 4 of this subpart shall 
be used as written below in Equation 4a of this subpart, using free 
space volume, and T is set equal to the condenser exit gas temperature.
[GRAPHIC] [TIFF OMITTED] TR12SE96.008

where:

Eepisode=Emissions, kg/episode.
y=Saturated mole fraction of all TOC or organic HAP in vapor phase.
Vfs=Volume of the free space in the vessel, m3.
P=Pressure in vessel vapor space, kPa.
MWwavg=Weighted average molecular weight of TOC or organic HAP in 
vapor, determined in accordance with paragraph (b)(4)(i)(D) of this 
section, kg/kmol.
R=Ideal gas constant, 8.314 m3bulletkPa/kmolbulletK.
T=Temperature of condenser exit stream, K.

    (5) The owner or operator may estimate annual emissions for a batch 
emission episode by direct measurement. If direct measurement is used, 
the owner or operator shall either perform a test for the duration of a 
representative batch emission episode or perform a test during only 
those periods of the batch emission episode for which the emission rate 
for the entire episode can be determined or for which the emissions are 
greater than the average emission rate of the batch emission episode. 
The owner or operator choosing either of these options must develop an 
emission profile for the entire batch emission episode, based on either 
process knowledge or test data collected, to demonstrate that test 
periods are representative. Examples of information that could 
constitute process knowledge include calculations based on material 
balances and process stoichiometry. Previous test results may be used 
provided the results are still relevant to the current batch process 
vent conditions. Performance tests shall follow the procedures 
specified in paragraphs (b)(5)(i) through (b)(5)(iii) of this section. 
The procedures in either paragraph (b)(5)(iv) or (b)(5)(v) of this 
section shall be used to calculate the emissions per batch emission 
episode.
    (i) Method 1 or 1A, 40 CFR part 60, appendix A as appropriate, 
shall be used for selection of the sampling sites if the flow measuring 
device is a pitot tube. No traverse is necessary when Method 2A or 2D, 
40 CFR part 60, appendix A is used to determine gas stream volumetric 
flow rate.
    (ii) Gas stream volumetric flow rate and/or average flow rate shall 
be determined as specified in paragraph (e) of this section.
    (iii) Method 18 or Method 25A, 40 CFR part 60, appendix A, shall be 
used to determine the concentration of TOC or organic HAP, as 
appropriate. Alternatively, any other method or data that has been 
validated according to the applicable procedures in Method 301 of 
appendix A of this part may be used. The use of Method 25A, 40 CFR part 
60, appendix A shall comply with paragraphs (b)(5)(iii)(A) and 
(b)(5)(iii)(B) of this section.
    (A) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (B) The use of Method 25A, 40 CFR part 60, appendix A is acceptable 
if the response from the high-level calibration gas is at least 20 
times the standard deviation of the response from the zero calibration 
gas when the instrument is zeroed on the most sensitive scale.
    (iv) If an integrated sample is taken over the entire batch 
emission episode to determine TOC or average total organic HAP 
concentration, emissions shall be calculated using Equation 9 of this 
subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.009

where:

Eepisode=Emissions, kg/episode.
K=Constant, 2.494  x  10-6 (ppmv)-1 (gm-mole/scm) (kg/gm) 
(min/hr), where standard temperature is 20  deg.C.
Cj=Average concentration of TOC or sample organic HAP component j 
of the gas stream, dry basis, ppmv.
Mj=Molecular weight of TOC or sample organic HAP component j of 
the gas stream, gm/gm-mole.
AFR=Average flow rate of gas stream, dry basis, scmm.
Th=Hours/episode.
n=Number of organic HAP in stream.

    Note: Summation not required if TOC emissions are being 
estimated using a TOC concentration measured using Method 25A, 40 
CFR part 60, appendix A.

[[Page 48248]]

    (v) If grab samples are taken to determine TOC or average total 
organic HAP concentration, emissions shall be calculated according to 
paragraphs (b)(5)(v)(A) and (b)(5)(v)(B) of this section.
    (A) For each measurement point, the emission rate shall be 
calculated using Equation 10 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.010

where:

Epoint=Emission rate for individual measurement point, kg/hr.
K=Constant, 2.494  x  10-6 (ppmv)-1 (gm-mole/scm) (kg/gm) (min/
hr), where standard temperature is 20  deg.C.
Cj=Concentration of TOC or sample organic HAP component j of the 
gas stream, dry basis, ppmv.
Mj=Molecular weight of TOC or sample organic HAP component j of 
the gas stream, gm/gm-mole.
FR=Flow rate of gas stream for the measurement point, dry basis, scmm.
n=Number of organic HAP in stream.

    Note: Summation not required if TOC emissions are being 
estimated using a TOC concentration measured using Method 25A, 40 
CFR part 60, appendix A.

    (B) The emissions per batch emission episode shall be calculated 
using Equation 11 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.011

where:

Eepisode=Emissions, kg/episode.
DUR=Duration of the batch emission episode, hr/episode.
Ei=Emissions for measurement point i, kg/hr.
n=Number of measurements.

    (6) If the owner or operator can demonstrate that the methods in 
paragraphs (b)(1) through (b)(4) of this section are not appropriate to 
estimate emissions for a batch emissions episode, the owner or operator 
may use engineering assessment to estimate emissions as specified in 
paragraphs (b)(6)(i) and (b)(6)(ii) of this section. All data, 
assumptions, and procedures used in an engineering assessment shall be 
documented.
    (i) Engineering assessment includes, but is not limited to, the 
following:
    (A) Previous test results, provided the tests are representative of 
current operating practices;
    (B) Bench-scale or pilot-scale test data representative of the 
process under representative operating conditions;
    (C) Flow rate, TOC emission rate, or organic HAP emission rate 
specified or implied within a permit limit applicable to the batch 
process vent; and
    (D) Design analysis based on accepted chemical engineering 
principles, measurable process parameters, or physical or chemical laws 
or properties. Examples of analytical methods include, but are not 
limited to:
    (1) Use of material balances;
    (2) Estimation of flow rate based on physical equipment design such 
as pump or blower capacities; and
    (3) Estimation of TOC or organic HAP concentrations based on 
saturation conditions.
    (ii) The emissions estimation equations in paragraphs (b)(1) 
through (b)(4) of this section shall be considered inappropriate for 
estimating emissions for a given batch emissions episode if one or more 
of the criteria in paragraphs (b)(6)(ii)(A) through (b)(6)(ii)(B) of 
this section are met.
    (A) Previous test data are available that show a greater than 20 
percent discrepancy between the test value and the estimated value.
    (B) The owner or operator can demonstrate to the Administrator that 
the emissions estimation equations are not appropriate for a given 
batch emissions episode.
    (C) Data or other information supporting a finding that the 
emissions estimation equations are inappropriate as specified under 
paragraph (b)(6)(ii)(A) of this section shall be reported in the 
Notification of Compliance Status, as required in Sec. 63.1335(e)(5).
    (D) Data or other information supporting a finding that the 
emissions estimation equations are inappropriate as specified under 
paragraph (b)(6)(ii)(B) of this section shall be reported in the 
Precompliance Report, as required in Sec. 63.1335(e)(3).
    (7) For each batch process vent, the TOC or organic HAP emissions 
associated with a single batch cycle shall be calculated using Equation 
12 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.012

where:

where:

Ecycle=Emissions for an individual batch cycle, kg/batch cycle
Eepisode i=Emissions from batch emission episode i, kg/episode
n=Number of batch emission episodes for the batch cycle

    (8) Annual TOC or organic HAP emissions from a batch process vent 
shall be calculated using Equation 13 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.013

where:

AE=Annual emissions from a batch process vent, kg/yr.
Ni=Number of type i batch cycles performed annually, cycles/year
Ecycle i=Emissions from the batch process vent associated with a 
single type i batch cycle, as determined in paragraph (b)(7) of this 
section, kg/batch cycle
n=Number of different types of batch cycles that cause the emission of 
TOC or organic HAP from the batch process vent

    (c) (Reserved)
    (d) Minimum emission level exemption. A batch process vent with 
annual emissions less than 11,800 kg/yr is considered a Group 2 batch 
process vent and the owner or operator of said batch process vent shall 
comply with the requirements in Sec. 63.1322 (f) or (g). The owner or 
operator of said batch process vent is not required to comply with the 
provisions in paragraphs (e) through (g) of this section.
    (e) Determination of average flow rate. The owner or operator shall 
determine the average flow rate for each batch emission episode in 
accordance with one of the procedures provided in paragraphs (e)(1) 
through (e)(2) of this section. The annual average flow rate for a 
batch process vent shall be calculated as specified in paragraph (e)(3) 
of this section.
    (1) Determination of the average flow rate for a batch emission 
episode by direct measurement shall be made using the procedures 
specified in paragraphs (e)(1)(i) through (e)(1)(iii) of this section.
    (i) The volumetric flow rate for a batch emission episode, in 
standard cubic meters per minute (scmm) at 20 deg. C, shall be 
determined using Method 2, 2A, 2C, or 2D, 40 CFR part 60, appendix A, 
as appropriate.
    (ii) The volumetric flow rate of a representative batch emission 
episode shall be measured every 15 minutes.
    (iii) The average flow rate for a batch emission episode shall be 
calculated using Equation 14 of this subpart.

[[Page 48249]]

[GRAPHIC] [TIFF OMITTED] TR12SE96.014

where:

AFRepisode = Average flow rate for the batch emission episode, 
scmm.
FRi = Flow rate for individual measurement i, scmm.
n = Number of flow rate measurements taken during the batch emission 
episode.

    (2) The average flow rate for a batch emission episode may be 
determined by engineering assessment, as defined in paragraph (b)(6)(i) 
of this section. All data, assumptions, and procedures used shall be 
documented.
    (3) The annual average flow rate for a batch process vent shall be 
calculated using Equation 15 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.015

where:

AFR = Annual average flow rate for the batch process vent, scmm.
DURi = Duration of type i batch emission episodes annually, hrs/
yr.
AFRepisode, i = Average flow rate for type i batch emission 
episode, scmm.
n = Number of types of batch emission episodes venting from the batch 
process vent.

    (f) Determination of cutoff flow rate. For each batch process vent, 
the owner or operator shall calculate the cutoff flow rate using 
Equation 16 of this subpart.

CFR = (0.00437) (AE)-51.6 [Eq. 16]

where:

CFR = Cutoff flow rate, scmm.
AE = Annual TOC or organic HAP emissions, as determined in paragraph 
(b)(8) of this section, kg/yr.

    (g) Group 1/Group 2 status determination. The owner or operator 
shall compare the cutoff flow rate, calculated in accordance with 
paragraph (f) of this section, with the annual average flow rate, 
determined in accordance with paragraph (e)(4) of this section. The 
group determination status for each batch process vent shall be made 
using the criteria specified in paragraphs (g)(1) and (g)(2) of this 
section.
    (1) If the cutoff flow rate is greater than or equal to the annual 
average flow rate of the stream, the batch process vent is classified 
as a Group 1 batch process vent.
    (2) If the cutoff flow rate is less than the annual average flow 
rate of the stream, the batch process vent is classified as a Group 2 
batch process vent.
    (h) Determination of halogenation status. To determine whether a 
batch process vent or an aggregate batch vent stream is halogenated, 
the annual mass emission rate of halogen atoms contained in organic 
compounds shall be calculated using the procedures specified in 
paragraphs (h)(1) through (h)(3) of this section.
    (1) The concentration of each organic compound containing halogen 
atoms (ppmv, by compound) for each batch emission episode shall be 
determined based on any one of the following procedures:
    (i) Process knowledge that no halogens or hydrogen halides are 
present in the process may be used to demonstrate that a batch emission 
episode is nonhalogenated. Halogens or hydrogen halides that are 
unintentionally introduced into the process shall not be considered in 
making a finding that a batch emission episode is nonhalogenated.
    (ii) Engineering assessment as discussed in paragraph (b)(6)(i) of 
this section.
    (iii) Concentration of organic compounds containing halogens and 
hydrogen halides as measured by Method 26 or 26A, 40 CFR part 60, 
appendix A.
    (iv) Any other method or data that has been validated according to 
the applicable procedures in Method 301 of appendix A of this part.
    (2) The annual mass emissions of halogen atoms for a batch process 
vent shall be calculated using Equation 17 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.016

where:

Ehalogen = Mass of halogen atoms, dry basis, kg/yr.
K = Constant, 0.022 (ppmv)-1 (kg-mole per scm) (minute/yr), where 
standard temperature is 20 deg.C.
AFR = Annual average flow rate of the batch process vent, determined 
according to paragraph (e) of this section, scmm.
Mj, i = Molecular weight of halogen atom i in compound j, kg/kg-
mole.
Lj, i = Number of atoms of halogen i in compound j.
n = Number of halogenated compounds j in the batch process vent.
m = Number of different halogens i in each compound j of the batch 
process vent.
Cavgj = Average annual concentration of halogenated compound j in 
the batch process vent as determined by using Equation 18 of this 
subpart, dry basis, ppmv.
[GRAPHIC] [TIFF OMITTED] TR12SE96.017

where:

DURi = Duration of type i batch emission episodes annually, hrs/
yr.
Ci = Average concentration of halogenated compound j in type i 
batch emission episode, ppmv.
n = Number of types of batch emission episodes venting from the batch 
process vent.

    (3) The annual mass emissions of halogen atoms for an aggregate 
batch vent stream shall be the sum of the annual mass emissions of 
halogen atoms for all batch process vents included in the aggregate 
batch vent stream.
    (i) Process changes affecting Group 2 batch process vents. Whenever 
process changes, as described in paragraph (i)(1)

[[Page 48250]]

of this section, are made that affect one or more Group 2 batch process 
vents, the owner or operator shall comply with paragraphs (i) (2) and 
(3) of this section.
    (1) Examples of process changes include, but are not limited to, 
changes in production capacity, production rate, feedstock type, or 
catalyst type; or whenever there is replacement, removal, or 
modification of recovery equipment considered part of the batch unit 
operation as specified in paragraph (a)(2) of this section. An increase 
in the annual number of batch cycles beyond the batch cycle limitation 
constitutes a process change. For purposes of this paragraph (i), 
process changes do not include: process upsets; unintentional, 
temporary process changes; and changes that are within the margin of 
variation on which the original group determination was based.
    (2) For each batch process vent affected by a process change, the 
owner or operator shall redetermine the group status by repeating the 
procedures specified in paragraphs (b) through (g) of this section, as 
applicable; alternatively, engineering assessment, as described in 
paragraph (b)(6)(i) of this section, can be used to determine the 
effects of the process change.
    (3) Based on the results from paragraph (i)(2) of this section, 
owners or operators shall comply with either paragraph (i)(3) (i), 
(ii), or (iii) of this section.
    (i) If the redetermination described in paragraph (i)(2) of this 
section indicates that a Group 2 batch process vent has become a Group 
1 batch process vent as a result of the process change, the owner or 
operator shall submit a report as specified in Sec. 63.1327(b) and 
shall comply with the Group 1 provisions in Sec. 63.1322 through 
Sec. 63.1327 in accordance with the compliance schedule described in 
Sec. 63.1335(e)(6)(iii)(D)(2).
    (ii) If the redetermination described in paragraph (i)(2) of this 
section indicates that a Group 2 batch process vent with annual 
emissions less than the level specified in paragraph (d) of this 
section, that is in compliance with Sec. 63.1322(g), now has annual 
emissions greater than or equal to the level specified in paragraph (d) 
of this section but remains a Group 2 batch process vent, the owner or 
operator shall submit a report as specified in Sec. 63.1327(c) and 
shall comply with Sec. 63.1322(f) in accordance with the compliance 
schedule required by Sec. 63.1335(e)(6)(iii)(D)(2).
    (iii) If the redetermination described in paragraph (i)(2) of this 
section indicates no change in group status or no change in the 
relation of annual emissions to the levels specified in paragraph (d) 
of this section, the owner or operator is not required to submit a 
report, as described in Sec. 63.1327(e).
    (j) Process changes to new SAN affected sources using a batch 
process. Whenever process changes, as described in paragraph (j)(1) of 
this section, are made to a new affected source producing SAN using a 
batch process, the owner or operator shall comply with paragraphs (j) 
(2) and (3) of this section.
    (1) Examples of process changes include, but are not limited to, 
changes in production capacity, production rate, feedstock type, or 
catalyst type; replacement, removal, or addition of recovery equipment 
considered part of a batch unit operation, as specified in paragraph 
(a)(1) of this section; replacement, removal, or addition of control 
equipment associated with a continuous or batch process vent or an 
aggregate batch vent stream. For purposes of this paragraph (j)(1), 
process changes do not include process upsets or unintentional, 
temporary process changes.
    (2) The owner or operator shall redetermine the percent emission 
reduction achieved using the procedures specified in Sec. 63.1333(c). 
If engineering assessment, as described in paragraph (b)(6)(i) of this 
section, can demonstrate that the process change did not cause the 
percent emission reduction to decrease, it may be used in lieu of 
redetermining the percent reduction using the procedures specified in 
Sec. 63.1333(c).
    (3) Where the redetermined percent reduction is less than 84 
percent, the owner or operator shall submit a report as specified in 
Sec. 63.1327(d) and shall comply with Sec. 63.1322(a)(3) and all 
associated provisions in accordance with the compliance schedule 
described in Sec. 63.1335(e)(6)(iii)(D)(2).

Sec. 63.1324  Batch process vents--monitoring provisions.

    (a) General requirements. Each owner or operator of a batch process 
vent or aggregate batch vent stream that uses a control device to 
comply with the requirements in Sec. 63.1322(a) or Sec. 63.1322(b), 
shall install the monitoring equipment specified in paragraph (c) of 
this section.
    (1) This monitoring equipment shall be in operation at all times 
when batch emission episodes, or portions thereof, that the owner or 
operator has selected to control are vented to the control device, or 
at all times when an aggregate batch vent stream is vented to the 
control device.
    (2) The owner or operator shall operate control devices such that 
monitored parameters remain above the minimum level or below the 
maximum level, as appropriate, established as specified in paragraph 
(f) of this section.
    (b) Continuous process vents. Each owner or operator of a 
continuous process vent that uses a control device or recovery device 
to comply with the requirements in Sec. 63.1322(a)(3) shall comply with 
the applicable requirements of Sec. 63.1315(a) as specified in 
Sec. 63.1321(b).
    (c) Batch process vent and aggregate batch vent stream monitoring 
parameters. The monitoring equipment specified in paragraphs (c)(1) 
through (c)(8) of this section shall be installed as specified in 
paragraph (a) of this section. The parameters to be monitored are 
specified in Table 7 of this subpart.
    (1) Where an incinerator is used, a temperature monitoring device 
equipped with a continuous recorder is required.
    (i) Where an incinerator other than a catalytic incinerator is 
used, the temperature monitoring device shall be installed in the 
firebox or in the ductwork immediately downstream of the firebox in a 
position before any substantial heat exchange occurs.
    (ii) Where a catalytic incinerator is used, temperature monitoring 
devices shall be installed in the gas stream immediately before and 
after the catalyst bed.
    (2) Where a flare is used, a device (including but not limited to a 
thermocouple, ultra-violet beam sensor, or infrared sensor) capable of 
continuously detecting the presence of a pilot flame is required.
    (3) Where a boiler or process heater of less than 44 megawatts 
design heat input capacity is used, a temperature monitoring device in 
the firebox equipped with a continuous recorder is required. Any boiler 
or process heater in which all batch process vents or aggregate batch 
vent streams are introduced with the primary fuel or are used as the 
primary fuel is exempt from this requirement.
    (4) Where a scrubber is used with an incinerator, boiler, or 
process heater in concert with the combustion of halogenated batch 
process vents or halogenated aggregate batch vent streams, the 
following monitoring equipment is required for the scrubber.
    (i) A pH monitoring device equipped with a continuous recorder to 
monitor the pH of the scrubber effluent.
    (ii) A flow meter equipped with a continuous recorder shall be 
located at the scrubber influent to monitor the scrubber liquid flow 
rate.
    (5) Where an absorber is used, a scrubbing liquid temperature

[[Page 48251]]

monitoring device and a specific gravity monitoring device are 
required, each equipped with a continuous recorder.
    (6) Where a condenser is used, a condenser exit temperature 
(product side) monitoring device equipped with a continuous recorder is 
required.
    (7) Where a carbon adsorber is used, an integrating regeneration 
stream flow monitoring device having an accuracy of 10 
percent, capable of recording the total regeneration stream mass flow 
for each regeneration cycle; and a carbon bed temperature monitoring 
device, capable of recording the carbon bed temperature after each 
regeneration and within 15 minutes of completing any cooling cycle are 
required.
    (8) As an alternate to paragraphs (c)(5) through (c)(7) of this 
section, the owner or operator may install an organic monitoring device 
equipped with a continuous recorder.
    (d) Alternative monitoring parameters. An owner or operator of a 
batch process vent or aggregate batch vent stream may request approval 
to monitor parameters other than those required by paragraph (c) of 
this section. The request shall be submitted according to the 
procedures specified in Sec. 63.1335(f). Approval shall be requested if 
the owner or operator:
    (1) Uses a control device other than those included in paragraph 
(c) of this section; or
    (2) Uses one of the control devices included in paragraph (c) of 
this section, but seeks to monitor a parameter other than those 
specified in Table 7 of this subpart and paragraph (c) of this section.
    (e) Monitoring of bypass lines. Owners or operators of a batch 
process vent or aggregate batch vent stream using a vent system that 
contains bypass lines that could divert emissions away from a control 
device used to comply with Sec. 63.1322(a) or Sec. 63.1322(b) shall 
comply with either paragraph (d)(1), (d)(2), or (d)(3) of this section. 
Equipment such as low leg drains, high point bleeds, analyzer vents, 
open-ended valves or lines, and pressure relief valves needed for 
safety purposes are not subject to this paragraph (e).
    (1) Properly install, maintain, and operate a flow indicator that 
takes a reading at least once every 15 minutes. Records shall be 
generated as specified in Sec. 63.1326(e)(3). The flow indicator shall 
be installed at the entrance to any bypass line that could divert 
emissions away from the control device and to the atmosphere; or
    (2) Secure the bypass line valve in the non-diverting position with 
a car-seal or a lock-and-key type configuration. A visual inspection of 
the seal or closure mechanism shall be performed at least once every 
month to ensure that the valve is maintained in the non-diverting 
position and emissions are not diverted through the bypass line. 
Records shall be generated as specified in Sec. 63.1326(e)(4).
    (3) Continuously monitor the bypass line valve position using 
computer monitoring and record any periods when the position of the 
bypass line valve has changed as specified in Sec. 63.1326(e)(4).
    (f) Establishment of parameter monitoring levels. Parameter 
monitoring levels for batch process vents and aggregate batch vent 
streams shall be established as specified in paragraphs (f)(1) through 
(f)(3) of this section. For continuous process vents complying with 
Sec. 63.1322(a)(3), parameter monitoring levels shall be established as 
specified in Sec. 63.1315(a), except as specified in paragraph (f)(4) 
of this section.
    (1) For each parameter monitored under paragraph (c) of this 
section, the owner or operator shall establish a level, defined as 
either a maximum or minimum operating parameter as denoted in Table 8 
of this subpart, that indicates proper operation of the control device. 
The level shall be established in accordance with the procedures 
specified in Sec. 63.1334.
    (i) For batch process vents using a control device to comply with 
Sec. 63.1322(a)(2), the established level shall reflect the control 
efficiency established as part of the initial compliance demonstration 
specified in Sec. 63.1325(c)(2).
    (ii) For aggregate batch vent streams using a control device to 
comply with Sec. 63.1322(b)(2), the established level shall reflect the 
control efficiency requirement specified in Sec. 63.1322(b)(2).
    (iii) For batch process vents and aggregate batch vent streams 
using a control device to comply with Sec. 63.1322(a)(3), the 
established level shall reflect the control efficiency established as 
part of the initial compliance demonstration specified in 
Sec. 63.1325(f)(4).
    (2) The established level, along with supporting documentation, 
shall be submitted in the Notification of Compliance Status or the 
operating permit application as required in Sec. 63.1335(e)(5) or 
Sec. 63.1335(e)(8), respectively.
    (3) The operating day shall be defined as part of establishing the 
parameter monitoring level and shall be submitted with the information 
in paragraph (f)(2) of this section. The definition of operating day 
shall specify the times at which an operating day begins and ends. The 
operating day shall not exceed 24 hours.
    (4) For continuous process vents using a control or recovery device 
to comply with Sec. 63.1322(a)(3), the established level shall reflect 
the control efficiency established as part of the initial compliance 
demonstration specified in Sec. 63.1325(f)(4).

Sec. 63.1325  Batch process vents--performance test methods and 
procedures to determine compliance.

    (a) Use of a flare. When a flare is used to comply with 
Secs. 63.1322 (a)(1), (a)(3), (b)(1), or (b)(3), the owner or operator 
shall comply with the flare provisions in Sec. 63.11(b).
    (b) Exceptions to performance tests. An owner or operator is not 
required to conduct a performance test when a control device specified 
in paragraphs (b)(1) through (b)(5) of this section is used to comply 
with Sec. 63.1322 (a)(2) or (a)(3). Further, if a performance test 
meeting the conditions specified in paragraph (b)(6) of this section 
has been conducted by the owner or operator, the results of said 
performance test may be submitted and a performance test, as required 
by this section, is not required.
    (1) A boiler or process heater with a design heat input capacity of 
44 megawatts or greater.
    (2) A boiler or process heater where the vent stream is introduced 
with the primary fuel or is used as the primary fuel.
    (3) A control device for which a performance test was conducted for 
determining compliance with a New Source Performance Standard (NSPS) 
and the test was conducted using the same procedures specified in this 
section and no process changes have been made since the test. Recovery 
devices used for controlling emissions from continuous process vents 
complying with Sec. 63.1322(a)(3) are also eligible for the exemption 
described in this paragraph (b)(3).
    (4) A boiler or process heater burning hazardous waste for which 
the owner or operator:
    (i) Has been issued a final permit under 40 CFR part 270 and 
complies with the requirements of 40 CFR part 266, subpart H; or
    (ii) Has certified compliance with the interim status requirements 
of 40 CFR part 266, subpart H.
    (5) An incinerator burning hazardous waste for which the owner or 
operator complies with the requirements of 40 CFR part 264, subpart O.
    (6) Performance tests done for other subparts in 40 CFR part 60 or 
part 63 where total organic HAP or TOC was measured, provided the owner 
or

[[Page 48252]]

operator can demonstrate that operating conditions for the process and 
control device during the performance test are representative of 
current operating conditions.
    (c) Batch process vent testing and procedures for compliance with 
Sec. 63.1322(a)(2). Except as provided in paragraph (b) of this 
section, an owner or operator using a control device to comply with 
Sec. 63.1322(a)(2) shall conduct a performance test using the 
procedures specified in paragraph (c)(1) of this section in order to 
determine the control efficiency of the control device. An owner or 
operator shall determine the percent reduction for the batch cycle 
using the control efficiency of the control device as specified in 
paragraphs (c)(2)(i) through (c)(2)(iii) of this section and the 
procedures specified in paragraph (c)(2) of this section. Compliance 
may be based on either total organic HAP or TOC. For purposes of this 
paragraph (c) and all paragraphs that are part of this paragraph (c), 
the term ``batch emission episode'' shall have the meaning ``period of 
the batch emission episode selected for control,'' which may be the 
entire batch emission episode or may only be a portion of the batch 
emission episode.
    (1) Performance tests shall be conducted as specified in paragraphs 
(c)(1)(i) through (c)(1)(v) of this section.
    (i) Except as specified in paragraph (c)(1)(i)(A) of this section, 
a test shall be performed for the entire period of each batch emission 
episode in the batch cycle that the owner or operator selects to 
control as part of achieving the required 90 percent emission reduction 
for the batch cycle specified in Sec. 63.1322(a)(2). Only one test is 
required for each batch emission episode selected by the owner or 
operator for control. The owner or operator shall follow the procedures 
listed in paragraphs (c)(1)(i)(B) through (c)(1)(i)(D) of this section.
    (A) Alternatively, an owner or operator may choose to test only 
those periods of the batch emission episode during which the emission 
rate for the entire episode can be determined or during which the 
emissions are greater than the average emission rate of the batch 
emission episode. The owner or operator choosing either of these 
options must develop an emission profile for the entire batch emission 
episode, based on either process knowledge or test data collected, to 
demonstrate that test periods are representative. Examples of 
information that could constitute process knowledge include 
calculations based on material balances and process stoichiometry. 
Previous test results may be used provided the results are still 
relevant to the current batch process vent conditions.
    (B) Method 1 or 1A, 40 CFR part 60, appendix A, as appropriate, 
shall be used for selection of the sampling sites if the flow measuring 
device is a pitot tube. No traverse is necessary when Method 2A or 2D, 
40 CFR part 60, appendix A is used to determine gas stream volumetric 
flow rate. Inlet sampling sites shall be located as specified in 
paragraphs (c)(1)(i)(B)(1) and (c)(1)(i)(B)(2) of this section. Outlet 
sampling sites shall be located at the outlet of the control device 
prior to release to the atmosphere.
    (1) The control device inlet sampling site shall be located at the 
exit from the batch unit operation before any control device. 
Sec. 63.1323(a)(2) describes those recovery devices considered part of 
the unit operation. Inlet sampling sites would be after these specified 
recovery devices.
    (2) If a batch process vent is introduced with the combustion air 
or as a secondary fuel into a boiler or process heater with a design 
capacity less than 44 megawatts, selection of the location of the inlet 
sampling sites shall ensure the measurement of total organic HAP or TOC 
(minus methane and ethane) concentrations in all batch process vents 
and primary and secondary fuels introduced into the boiler or process 
heater.
    (C) Gas stream volumetric flow rate and/or average flow rate shall 
be determined as specified in Sec. 63.1323(e).
    (D) Method 18 or Method 25A, 40 CFR part 60, appendix A shall be 
used to determine the concentration of organic HAP or TOC, as 
appropriate. Alternatively, any other method or data that has been 
validated according to the applicable procedures in Method 301 of 
appendix A of this part may be used. The use of Method 25A, 40 CFR part 
60, appendix A shall comply with paragraphs (c)(1)(i)(D)(1) and 
(c)(1)(i)(D)(2) of this section.
    (1) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (2) The use of Method 25A, 40 CFR part 60, appendix A is acceptable 
if the response from the high-level calibration gas is at least 20 
times the standard deviation of the response from the zero calibration 
gas when the instrument is zeroed on the most sensitive scale.
    (ii) If an integrated sample is taken over the entire test period 
to determine TOC or average total organic HAP concentration, emissions 
per batch emission episode shall be calculated using Equations 19 and 
20 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.018

      
    [GRAPHIC] [TIFF OMITTED] TR12SE96.019
    
where:

Eepisode = Inlet or outlet emissions, kg/episode.
K = Constant, 2.494 x 10-6 (ppmv)-1 (gm-mole/scm) (kg/gm) 
(min/hr), where standard temperature is 20 deg.C.
Cj = Average inlet or outlet concentration of TOC or sample 
component j of the gas stream for the batch emission episode, dry 
basis, ppmv.
Mj = Molecular weight of TOC or sample component j of the gas 
stream, gm/gm-mole.

[[Page 48253]]

AFR = Average inlet or outlet flow rate of gas stream for the batch 
emission episode, dry basis, scmm.
Th = Hours/episode
n = Number of organic HAP in stream.

    Note: Summation not required if TOC emissions are being 
estimated using a TOC concentration measured using Method 25A, 40 
CFR part 60, appendix A.

    (iii) If grab samples are taken to determine TOC or total organic 
HAP concentration, emissions shall be calculated according to 
paragraphs (c)(1)(iii) (A) and (B) of this section.
    (A) For each measurement point, the emission rates shall be 
calculated using Equations 21 and 22 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.020

      
    [GRAPHIC] [TIFF OMITTED] TR12SE96.021
    
where:

Epoint = Inlet or outlet emission rate for the measurement point, 
kg/hr.
K = Constant, 2.494 x 10-6 (ppmv)-1 (gm-mole/scm) (kg/gm) 
(min/hr), where standard temperature is 20 deg.C.
Cj = Inlet or outlet concentration of TOC or sample organic HAP 
component j of the gas stream, dry basis, ppmv.
Mj = Molecular weight of TOC or sample organic HAP component j of 
the gas stream, gm/gm-mole.
FR = Inlet or outlet flow rate of gas stream for the measurement point, 
dry basis, scmm.
n = Number of organic HAP in stream.

    Note: Summation not required if TOC emissions are being 
estimated using a TOC concentration measured using Method 25A, 40 
CFR part 60, appendix A.

    (B) The emissions per batch emission episode shall be calculated 
using Equations 23 and 24 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.022

      
    [GRAPHIC] [TIFF OMITTED] TR12SE96.023
    
where:

Eepisode = Inlet or outlet emissions, kg/episode.
DUR = Duration of the batch emission episode, hr/episode.
Epoint, i = Inlet or outlet emissions for measurement point i, kg/
hr.
n = Number of measurements.

    (iv) The control efficiency for the control device shall be 
calculated using Equation 25 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.024

where:

R = Control efficiency of control device, percent.
Einlet = Mass rate of TOC or total organic HAP for batch emission 
episode i at the inlet to the control device as calculated under 
paragraph (c)(1)(ii) or (c)(1)(iii) of this section, kg/hr.
Eoutlet = Mass rate of TOC or total organic HAP for batch emission 
episode i at the outlet of the control device, as calculated under 
paragraph (c)(1)(ii) or (c)(1)(iii) of this section, kg/hr.
n = Number of batch emission episodes in the batch cycle selected to be 
controlled.

    (v) If the batch process vent entering a boiler or process heater 
with a design capacity less than 44 megawatts is introduced with the 
combustion air or as a secondary fuel, the weight-percent reduction of 
total organic HAP or TOC across the device shall be determined by 
comparing the TOC or total organic HAP

[[Page 48254]]

in all combusted batch process vents and primary and secondary fuels 
with the TOC or total organic HAP exiting the combustion device, 
respectively.
    (2) The percent reduction for the batch cycle shall be determined 
using Equation 26 of this subpart and the control device efficiencies 
specified in paragraphs (c)(2)(i) through (c)(2)(iii) of this section. 
All information used to calculate the batch cycle percent reduction, 
including a definition of the batch cycle identifying all batch 
emission episodes, must be recorded as specified in Sec. 63.1326(b)(2). 
This information shall include identification of those batch emission 
episodes, or portions thereof, selected for control.
[GRAPHIC] [TIFF OMITTED] TR12SE96.025

where:

PR = Percent reduction
Eunc = Mass rate of TOC or total organic HAP for uncontrolled 
batch emission episode i, kg/hr.
Einlet,con = Mass rate of TOC or total organic HAP for controlled 
batch emission episode i at the inlet to the control device, kg/hr.
R = Control efficiency of control device as specified in paragraphs 
(c)(2) (i) through (c) (2)(iii) of this section.
n = Number of uncontrolled batch emission episodes, controlled batch 
emission episodes, and control devices. The value of n is not 
necessarily the same for these three items.

    (i) If a performance test is required by paragraph (c) of this 
section, the control efficiency of the control device shall be as 
determined in paragraph (c)(1)(iv) of this section.
    (ii) If a performance test is not required by paragraph (c) of this 
section for a combustion control device, as specified in paragraph (b) 
of this section, the control efficiency shall be 98 percent. The 
control efficiency for a flare shall be 98 percent.
    (iii) If a performance test is not required by paragraph (c) of 
this section for a noncombustion control device, the control efficiency 
shall be determined by the owner or operator based on engineering 
assessment.
    (d) Batch process vent and aggregate batch vent stream testing for 
compliance with Sec. 63.1322(c) [halogenated emission streams]. An 
owner or operator controlling halogenated emissions in compliance with 
Sec. 63.1322(c) shall conduct a performance test to determine 
compliance with the control efficiency specified in Sec. 63.1322(c)(1) 
or the emission limit specified in Sec. 63.1322(c)(2) for hydrogen 
halides and halogens.
    (1) Sampling sites shall be located at the inlet and outlet of the 
scrubber or other control device used to reduce halogen emissions in 
complying with Sec. 63.1322(c)(1) or at the outlet of the control 
device used to reduce halogen emissions in complying with 
Sec. 63.1322(c)(2).
    (2) The mass emissions of each hydrogen halide and halogen compound 
for the batch cycle or aggregate batch vent stream shall be calculated 
from the measured concentrations and the gas stream flow rate(s) 
determined by the procedures specified in paragraphs (d)(2)(i) and 
(d)(2)(ii) of this section except as specified in paragraph (d)(5) of 
this section.
    (i) Method 26 or Method 26A, 40 CFR part 60, appendix A, shall be 
used to determine the concentration, in Mg per dry scm, of total 
hydrogen halides and halogens present in the emissions stream.
    (ii) Gas stream volumetric flow rate and/or average flow rate shall 
be determined as specified in Sec. 63.1323(e).
    (3) To determine compliance with the percent reduction specified in 
Sec. 63.1322(c)(1), the mass emissions for any hydrogen halides and 
halogens present at the inlet of the scrubber or other control device 
shall be summed together. The mass emissions of any hydrogen halides or 
halogens present at the outlet of the scrubber or other control device 
shall be summed together. Percent reduction shall be determined by 
subtracting the outlet mass emissions from the inlet mass emissions and 
then dividing the result by the inlet mass emissions.
    (4) To determine compliance with the emission limit specified in 
Sec. 63.1322(c)(2), the annual mass emissions for any hydrogen halides 
and halogens present at the outlet of the control device and prior to 
any combustion device shall be summed together and compared to the 
emission limit specified in Sec. 63.1322(c)(2).
    (5) The owner or operator may use any other method to demonstrate 
compliance if the method or data has been validated according to the 
applicable procedures of Method 301 of appendix A of this part.
    (e) Aggregate batch vent stream testing for compliance with 
Sec. 63.1322 (b)(2) or (b)(3). Owners or operators of aggregate batch 
vent streams complying with Sec. 63.1322 (b)(2) or (b)(3) shall conduct 
a performance test using the performance testing procedures for 
continuous process vents in Sec. 63.116(c). For the purposes of this 
subpart, when the provisions of Sec. 63.116(c) specify that Method 18, 
40 CFR part 60, appendix A, shall be used, Method 18 or Method 25A, 40 
CFR part 60, appendix A, may be used. The use of Method 25A, 40 CFR 
part 60, appendix A, shall comply with paragraphs (e)(1) and (e)(2) of 
this section.
    (1) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A, shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (2) The use of Method 25A, 40 CFR part 60, appendix A, is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (f) Compliance with Sec. 63.1322(a)(3) [new SAN batch affected 
sources]. Except as provided in paragraph (b) of this section, an owner 
or operator using a control or recovery device to comply with the 
percent reduction requirement in Sec. 63.1322(a)(3) shall conduct 
performance tests as specified in either paragraph (f)(1), (f)(2), or 
(f)(3) of this section, as applicable. Compliance with 
Sec. 63.1322(a)(3) shall be determined as specified in paragraph (f)(4) 
of this section.
    (1) For batch process vents, performance tests shall be conducted 
using the procedures specified in paragraph (c) of this section, except 
that the owner or operator is not required to determine the percent 
reduction for the batch cycle as specified in paragraph (c)(2) of this 
section.
    (2) For continuous process vents, performance tests shall be 
conducted as required by the applicable requirements

[[Page 48255]]

of Sec. 63.1315(a) as specified in Sec. 63.1321(b).
    (3) For aggregate batch vent streams, performance tests shall be 
conducted as specified in paragraph (e) of this section.
    (4) Compliance with the percent reduction requirement of 
Sec. 63.1322(a)(3) shall be demonstrated using the procedures specified 
in Sec. 63.1333(c) and the control device efficiencies specified in 
either paragraph (f)(4)(i) or (f)(4)(ii) of this section. Emissions for 
uncontrolled continuous process vents and aggregate batch vent streams 
shall be determined based on the direct measurement procedures 
specified in paragraph (f)(2) and (f)(3) of this section, respectively, 
or based on engineering assessment, as specified in 
Sec. 63.1323(b)(6)(i). At the discretion of the owner or operator, 
emissions for uncontrolled batch process vents shall be determined 
based on any of the procedures in Sec. 63.1323(b).
    (i) For noncombustion devices, the control efficiency shall be as 
determined by the performance test required by paragraph (f)(1), 
(f)(2), or (f)(3) of this section. Alternatively, if a performance test 
is not required by paragraph (c) of this section, the control 
efficiency shall be determined by the owner or operator based on 
engineering assessment.
    (ii) For combustion devices, the control efficiency shall be as 
determined by the performance test required by paragraph (f)(1), 
(f)(2), or (f)(3) of this section. Alternatively, if a performance test 
is not required, the control efficiency shall be 98 percent. The 
control efficiency for a flare shall be 98 percent.
    (g) Batch cycle limitation. The batch cycle limitation required by 
Sec. 63.1322 (f) and (g) shall be established as specified in paragraph 
(g)(1) of this section and shall include the elements specified in 
paragraph (g)(2) of this section.
    (1) The batch cycle limitation shall be determined by the owner or 
operator such that annual emissions for the batch process vent remain 
less than the level specified in Sec. 63.1323(d) when complying with 
Sec. 63.1322(g). Alternatively, when complying with Sec. 63.1322(f), 
the batch cycle limitation shall ensure that annual emissions remain at 
a level such that said batch process vent remains a Group 2 batch 
process vent, given the actual annual flow rate for said batch process 
vent determined according to the procedures specified in 
Sec. 63.1323(e). The batch cycle limitation shall be determined using 
the same basis, as described in Sec. 63.1323(a)(1), used to make the 
group determination (i.e., expected mix of products or worst-case HAP 
emitting product). The establishment of the batch cycle limitation is 
not dependent upon any past production or activity level.
    (i) If the expected mix of products serves as the basis for the 
batch cycle limitation, the batch cycle limitation shall be determined 
such that any foreseeable combination of products which the owner or 
operator desires the flexibility to manufacture shall be allowed. 
Combinations of products not accounted for in the documentation 
required by paragraph (g)(2)(iv) of this section shall not be allowed 
within the restrictions of the batch cycle limitation.
    (ii) If, for a batch process vent with more than one product, a 
single worst-case HAP emitting product serves as the basis for the 
batch cycle limitation, the batch cycle limitation shall be determined 
such that the maximum number of batch cycles the owner or operator 
desires the flexibility to accomplish, using the worst-case HAP 
emitting product and ensuring that the batch process vent remains a 
Group 2 batch process vent or that emissions remain less than the level 
specified in Sec. 63.1323(d), shall be allowed. This value shall be the 
total number of batch cycles allowed within the restrictions of the 
batch cycle limitation regardless of which products are manufactured.
    (2) Documentation supporting the establishment of the batch cycle 
limitation shall include the information specified in paragraphs 
(g)(2)(i) through (g)(2)(v) of this section, as appropriate.
    (i) Identification that the purpose of the batch cycle limitation 
is to comply with Sec. 63.1322 (f)(1) or (g)(1).
    (ii) Identification that the batch cycle limitation is based on a 
single worst-case HAP emitting product or on the expected mix of 
products for said batch process vent as allowed under 
Sec. 63.1323(a)(1).
    (iii) Definition of operating year for purposes of determining 
compliance with the batch cycle limitation.
    (iv) If the batch cycle limitation is based on a single worst-case 
HAP emitting product, documentation specified in Sec. 63.1323 
(a)(1)(ii) through (a)(1)(iv), as appropriate, describing how the 
single product meets the requirements for worst-case HAP emitting 
product and the number of batch cycles allowed under the batch cycle 
limitation.
    (v) If the batch cycle limitation is based on the expected mix of 
products, the owner or operator shall provide documentation that 
describes as many scenarios for differing mixes of products (i.e., how 
many batch cycles for each product) that the owner or operator desires 
the flexibility to accomplish. Alternatively, the owner or operator 
shall provide a description of the relationship among the mix of 
products that will allow a determination of compliance with the batch 
cycle limitation under an infinite number of scenarios. For example, if 
a batch process vent has two products, each product has the same flow 
rate and emits for the same amount of time, and product No. 1 has twice 
the emissions as product No. 2, the relationship describing an infinite 
number of scenarios would be that the owner or operator can accomplish 
two batch cycles of product No. 2 for each batch cycle of product No. 1 
within the restriction of the batch cycle limitation.

Sec. 63.1326  Batch process vents--recordkeeping provisions.

    (a) Group determination records for batch process vents. Except as 
provided in paragraphs (a)(7) through (a)(9) of this section, each 
owner or operator of an affected source shall maintain the records 
specified in paragraphs (a)(1) through (a)(6) of this section for each 
batch process vent subject to the group determination procedures of 
Sec. 63.1323. Except for paragraph (a)(1) of this section, the records 
required by this paragraph (a) are restricted to the information 
developed and used to make the group determination under 
Sec. 63.1323(b) through Sec. 63.1323(g), as appropriate. The 
information required by paragraph (a)(1) of this section is required 
for all batch process vents subject to the group determination 
procedures of Sec. 63.1323. If an owner or operator did not need to 
develop certain information (e.g., annual average flow rate) to 
determine the group status, this paragraph (a) does not require that 
additional information be developed.
    (1) An identification of each unique product that has emissions 
from one or more batch emission episodes venting from the batch process 
vent.
    (2) A description of, and an emission estimate for, each batch 
emission episode, and the total emissions associated with one batch 
cycle for each unique product identified in paragraph (a)(1) of this 
section that was considered in making the group determination under 
Sec. 63.1323.
    (3) Total annual uncontrolled TOC or organic HAP emissions, 
determined at the exit from the batch unit operation before any control 
device, determined in accordance with Sec. 63.1323(b).
    (i) For Group 2 batch process vents, said emissions shall be 
determined at the batch cycle limitation.
    (ii) For Group 1 batch process vents, said emissions shall be those 
used to determine the group status of the batch process vent.

[[Page 48256]]

    (4) The annual average flow rate for the batch process vent, 
determined in accordance with Sec. 63.1323(e).
    (5) The cutoff flow rate, determined in accordance with 
Sec. 63.1323(f).
    (6) The results of the batch process vent group determination, 
conducted in accordance with Sec. 63.1323(g).
    (7) If a batch process vent is in compliance with Sec. 63.1322 (a) 
or (b) and the control device is operating at all times when batch 
emission episodes are venting from the batch process vent, none of the 
records in paragraphs (a)(1) through (a)(6) of this section are 
required.
    (8) If a batch process vent is in compliance with Sec. 63.1322 (a) 
or (b), but the control device is operated only during selected batch 
emission episodes, only the records in paragraphs (a)(1) through (a)(3) 
of this section are required.
    (9) If the total annual emissions from the batch process vent are 
less than the appropriate level specified in Sec. 63.1323(d), only the 
records in paragraphs (a)(1) through (a)(3) of this section are 
required.
    (b) Compliance demonstration records. Each owner or operator of a 
batch process vent or aggregate batch vent stream complying with 
Sec. 63.1322 (a) or (b), shall keep the following records, as 
applicable, up-to-date and readily accessible:
    (1) The annual mass emissions of halogen atoms in the batch process 
vent or aggregate batch vent stream determined according to the 
procedures specified in Sec. 63.1323(h);
    (2) If a batch process vent is in compliance with 
Sec. 63.1322(a)(2), records documenting the batch cycle percent 
reduction as specified in Sec. 63.1325(c)(2); and
    (3) When using a flare to comply with Sec. 63.1322 (a)(1), (a)(3), 
(b)(1), or (b)(3):
    (i) The flare design (i.e., steam-assisted, air-assisted or non-
assisted);
    (ii) All visible emission readings, heat content determinations, 
flow rate measurements, and exit velocity determinations made during 
the compliance determination required by Sec. 63.1325(a); and
    (iii) All periods during the compliance determination required by 
Sec. 63.1325(a) when the pilot flame is absent.
    (4) The following information when using a control device to 
achieve compliance with Sec. 63.1322 (a)(2), (a)(3), (b)(2), or (b)(3):
    (i) For an incinerator or non-combustion control device, the 
percent reduction of organic HAP or TOC achieved, as determined using 
the procedures specified in Sec. 63.1325(c) for batch process vents and 
Sec. 63.1325(e) for aggregate batch vent streams;
    (ii) For a boiler or process heater, a description of the location 
at which the vent stream is introduced into the boiler or process 
heater;
    (iii) For a boiler or process heater with a design heat input 
capacity of less than 44 megawatts and where the vent stream is 
introduced with combustion air or used as a secondary fuel and is not 
mixed with the primary fuel, the percent reduction of organic HAP or 
TOC achieved, as determined using the procedures specified in 
Sec. 63.1325(c) for batch process vents and Sec. 63.1325(e) for 
aggregate batch vent streams; and
    (iv) For a scrubber or other control device following a combustion 
device to control halogenated batch process vents or halogenated 
aggregate batch vent streams, the percent reduction of total hydrogen 
halides and halogens as determined under Sec. 63.1325(d)(3) or the 
emission limit determined under Sec. 63.1325(d)(4).
    (c) Establishment of parameter monitoring level records. For each 
parameter monitored according to Sec. 63.1324(c) and Table 7 of this 
subpart, or for alternate parameters and/or parameters for alternate 
control devices monitored according to Sec. 63.1327(f) as allowed under 
Sec. 63.1324(d), maintain documentation showing the establishment of 
the level that indicates proper operation of the control device as 
required by Sec. 63.1324(f) for parameters specified in Sec. 63.1324(c) 
and as required by Sec. 63.1335(e) for alternate parameters. Said 
documentation shall include the parameter monitoring data used to 
establish the level.
    (d) Group 2 batch process vent continuous compliance records. The 
owner or operator of a Group 2 batch process vent shall comply with 
either paragraph (d)(1) or (d)(2) of this section, as appropriate.
    (1) The owner or operator of a Group 2 batch process vent complying 
with Sec. 63.1322(g) shall keep the following records up-to-date and 
readily accessible:
    (i) Records designating the established batch cycle limitation 
required by Sec. 63.1322(g)(1) and specified in Sec. 63.1325(g).
    (ii) Records specifying the number and type of batch cycles 
accomplished for each three month period.
    (2) The owner or operator of a Group 2 batch process vent complying 
with Sec. 63.1322(f) shall keep the following records up-to-date and 
readily accessible:
    (i) Records designating the established batch cycle limitation 
required by Sec. 63.1322(f)(1) and specified in Sec. 63.1325(g).
    (ii) Records specifying the number and type of batch cycles 
accomplished for each three month period.
    (e) Controlled batch process vent continuous compliance records. 
Each owner or operator of a batch process vent that uses a control 
device to comply with Sec. 63.1322(a) shall keep the following records, 
as applicable, up-to-date and readily accessible:
    (1) Continuous records of the equipment operating parameters 
specified to be monitored under Sec. 63.1324(c) as applicable, and 
listed in Table 7 of this subpart, or specified by the Administrator in 
accordance with Sec. 63.1327(f) as allowed under Sec. 63.1324(d). Said 
records shall be kept as specified under Sec. 63.1335(d), except as 
specified in paragraphs (e)(1)(i) and (e)(1)(ii) of this section.
    (i) For flares, the records specified in Table 7 of this subpart 
shall be kept rather than averages.
    (ii) For carbon adsorbers, the records specified in Table 7 of this 
subpart shall be kept rather than averages.
    (2) Records of the batch cycle daily average value of each 
continuously monitored parameter, except as provided in paragraph 
(e)(2)(iii) of this section, as calculated using the procedures 
specified in paragraphs (e)(2)(i) through (e)(2)(ii) of this section.
    (i) The batch cycle daily average shall be calculated as the 
average of all parameter values measured for an operating day during 
those batch emission episodes, or portions thereof, in the batch cycle 
that the owner or operator has selected to control.
    (ii) Monitoring data recorded during periods of monitoring system 
breakdowns, repairs, calibration checks, and zero (low-level) and high-
level adjustments shall not be included in computing the batch cycle 
daily averages.
    (iii) If all recorded values for a monitored parameter during an 
operating day are above the minimum or below the maximum level 
established in accordance with Sec. 63.1324(f), the owner or operator 
may record that all values were above the minimum or below the maximum 
level established rather than calculating and recording a batch cycle 
daily average for that operating day.
    (3) Hourly records of whether the flow indicator for bypass lines 
specified in Sec. 63.1324(e)(1) was operating and whether a diversion 
was detected at any time during the hour. Also, records of the times of 
all periods when the vent is diverted from the control device or the 
flow indicator specified in Sec. 63.1324(e)(1) is not operating.

[[Page 48257]]

    (4) Where a seal or closure mechanism is used to comply with 
Sec. 63.1324(e)(2) or where computer monitoring of the position of the 
bypass valve is used to comply with Sec. 63.1324(e)(3), hourly records 
of flow are not required.
    (i) For compliance with Sec. 63.1324(e)(2), the owner or operator 
shall record whether the monthly visual inspection of the seals or 
closure mechanisms has been done, and shall record the occurrence of 
all periods when the seal mechanism is broken, the bypass line valve 
position has changed, or the key for a lock-and-key type configuration 
has been checked out, and records of any car-seal that has broken.
    (ii) For compliance with Sec. 63.1324(e)(3), the owner or operator 
shall record the times of all periods when the bypass line valve 
position has changed.
    (5) Records specifying the times and duration of periods of 
monitoring system breakdowns, repairs, calibration checks, and zero 
(low-level) and high-level adjustments. In addition, records specifying 
any other periods of process or control device operation when monitors 
are not operating.
    (f) Aggregate batch vent stream continuous compliance records. In 
addition to the records specified in paragraphs (b) and (c) of this 
section, each owner or operator of an aggregate batch vent stream using 
a control device to comply with Sec. 63.1322(b) shall keep records in 
accordance with the requirements for continuous process vents in 
Sec. 63.118 (a) and (b), as applicable and as appropriate, except that 
when complying with Sec. 63.118(b), owners or operators shall disregard 
statements concerning TRE index values for the purposes of this 
subpart.

Sec. 63.1327  Batch process vents--reporting requirements.

    (a) The owner or operator of a batch process vent or aggregate 
batch vent stream at an affected source shall submit the information 
specified in paragraphs (a)(1) through (a)(4) of this section, as 
appropriate, as part of the Notification of Compliance Status specified 
in Sec. 63.1335(e)(5).
    (1) For each batch process vent complying Sec. 63.1322(a) and each 
aggregate batch vent stream complying Sec. 63.1322(b), the information 
specified in Sec. 63.1326 (b) and (c), as applicable.
    (2) For each Group 2 batch process vent with annual emissions less 
than the level specified in Sec. 63.1323(d), the information specified 
in Sec. 63.1326(d)(1)(i).
    (3) For each Group 2 batch process vent with annual emissions 
greater than or equal to the level specified in Sec. 63.1323(d), the 
information specified in Sec. 63.1326(d)(2)(i).
    (4) For each batch process vent subject to the group determination 
procedures, the information specified in Sec. 63.1326(a), as 
appropriate.
    (b) Whenever a process change, as defined in Sec. 63.1323(i)(1), is 
made that causes a Group 2 batch process vent to become a Group 1 batch 
process vent, the owner or operator shall submit a report within 180 
operating days after the process change is made or the information 
regarding the process change is known to the owner or operator. This 
report may be included in the next Periodic Report, as specified in 
Sec. 63.1335(e)(6)(iii)(D)(2). The following information shall be 
submitted:
    (1) A description of the process change; and
    (2) A schedule for compliance with the provisions of Sec. 63.1322 
(a) or (b), as appropriate, as required under 
Sec. 63.1335(e)(6)(iii)(D)(2).
    (c) Whenever a process change, as defined in Sec. 63.1323(i)(1), is 
made that causes a Group 2 batch process vent with annual emissions 
less than the level specified in Sec. 63.1323(d) that is in compliance 
with Sec. 63.1322(g) to have annual emissions greater than or equal to 
the level specified in Sec. 63.1323(d) but remains a Group 2 batch 
process vent, the owner or operator shall submit a report within 180 
operating days after the process change is made or the information 
regarding the process change is known to the owner or operator. This 
report may be included in the next Periodic Report, as specified in 
Sec. 63.1335(e)(6)(iii)(D)(2). The following information shall be 
submitted:
    (1) A description of the process change;
    (2) The results of the redetermination of the annual emissions, 
average flow rate, and cutoff flow rate required under Sec. 63.1323(i) 
and recorded under Sec. 63.1326 (a)(3) through (a)(5); and
    (3) The batch cycle limitation determined in accordance with 
Sec. 63.1322(f)(1).
    (d) Whenever a process change, as defined in Sec. 63.1323(j)(1), is 
made that causes the percent reduction for all process vents at a new 
SAN affected source using a batch process to be less than 84 percent, 
the owner or operator shall submit a report within 180 operating days 
after the process change is made or the information regarding the 
process change is known to the owner or operator. This report may be 
included in the next Periodic Report, as specified in 
Sec. 63.1335(e)(6)(iii)(D)(2). The following information shall be 
submitted:
    (1) A description of the process change; and
    (2) A schedule for compliance with the provisions of 
Sec. 63.1322(a)(3), as required under Sec. 63.1335(e)(6)(iii)(D)(2).
    (e) The owner or operator is not required to submit a report of a 
process change if one of the conditions specified in paragraphs (e)(1) 
and (e)(2) of this section is met.
    (1) The process change does not meet the description of a process 
change in Sec. 63.1323 (i) or (j).
    (2) The redetermined group status remains Group 2 for an individual 
batch process vent with annual emissions greater than or equal to the 
level specified in Sec. 63.1323(d), a Group 2 batch process vent with 
annual emissions less than the level specified in Sec. 63.1323(d) 
complying with Sec. 63.1322(g) continues to have emissions less than 
the level specified in Sec. 63.1323(d), or the achieved emission 
reduction remains at 84 percent or greater for new SAN affected sources 
using a batch process.
    (f) If an owner or operator uses a control device other than those 
specified in Sec. 63.1324(c) and listed in Table 7 of this subpart or 
requests approval to monitor a parameter other than those specified 
Sec. 63.1324(c) and listed in Table 7 of this subpart, the owner or 
operator shall submit a description of planned reporting and 
recordkeeping procedures, as specified in Sec. 63.1335(f), as part of 
the Precompliance Report required under Sec. 63.1335(e)(3). The 
Administrator will specify appropriate reporting and recordkeeping 
requirements as part of the review of the Precompliance Report.
    (g) Owners or operators complying with Sec. 63.1324(e), shall 
comply with paragraph (g)(1) or (g)(2) of this section, as appropriate.
    (1) Reports of the times of all periods recorded under 
Sec. 63.1326(e)(3) when the batch process vent is diverted from the 
control device through a bypass line.
    (2) Reports of all occurrences recorded under Sec. 63.1326(e)(4) in 
which the seal mechanism is broken, the bypass line valve position has 
changed, or the key to unlock the bypass line valve was checked out.

Sec. 63.1328  Heat exchange systems provisions.

    (a) This section applies to each affected source with the exception 
of each process contact cooling tower that is associated with an 
affected source manufacturing PET. The owner or operator of said 
affected source shall comply with Sec. 63.104, with the differences 
noted in paragraphs (b)

[[Page 48258]]

through (d) of this section, for the purposes of this subpart.
    (b) When the Periodic Report requirements contained in 
Sec. 63.152(c) are referred to in Sec. 63.104(b), the Periodic Report 
requirements contained in Sec. 63.1335(e)(6) shall apply for the 
purposes of this subpart.
    (c) When an owner or operator invokes the delay of repair 
provisions as specified in Sec. 63.104(b)(3), the information required 
by Sec. 63.104 (b)(4)(i) through (b)(4)(v) shall be included in the 
next semi-annual Periodic Report required under Sec. 63.1335(e)(6), for 
the purposes of this subpart. If the leak remains unrepaired, the 
information shall also be submitted in each subsequent Periodic Report, 
until the repair of the leak is reported.
    (d) The compliance date for heat exchange systems subject to the 
provisions of this section is specified in Sec. 63.1311.

Sec. 63.1329  Process contact cooling towers provisions.

    (a) This section applies to each new affected source that 
manufactures PET and each existing affected source that manufactures 
PET using a continuous terephthalic acid high viscosity multiple end 
finisher process. The owner or operator a new affected source shall 
comply with paragraph (b) of this section. The owner or operator of an 
existing affected source that manufactures PET using a continuous 
terephthalic acid high viscosity multiple end finisher process shall 
comply with paragraph (c) of this section. The compliance data for 
process contact cooling towers subject to the provisions of this 
section is specified in Sec. 63.1311.
    (b) New affected source requirements. The owner or operator of a 
new affected source subject to this section shall comply with 
paragraphs (b)(1) through (b)(2) of this section.
    (1) The owner or operator of a new affected source subject to this 
section shall not send contact condenser effluent associated with a 
vacuum system to a process contact cooling tower.
    (2) The owner or operator of a new affected source subject to this 
section shall indicate in the Notification of Compliance Status, as 
required in Sec. 63.1335(e)(5), that contact condenser effluent 
associated with vacuum systems is not sent to process contact cooling 
towers.
    (c) Existing affected source requirements. The owner or operator of 
an existing affected source subject to this section who manufactures 
PET using a continuous terephthalic acid high viscosity multiple end 
finisher process, and who is subject or becomes subject to 40 CFR part 
60, subpart DDD, shall maintain an ethylene glycol concentration in the 
cooling tower at or below 4.0 percent by weight averaged on a daily 
basis over a rolling 14-day period of operating days. Compliance with 
this paragraph (c) shall be determined as specified in paragraphs 
(c)(1) through (c)(4) of this section.
    (1) To determine the ethylene glycol concentration, owners or 
operators shall follow the procedures specified in 40 CFR 60.564(j)(1), 
except as provided in paragraph (c)(2) of this section.
    (i) At least one sample per operating day shall be collected using 
the procedures specified in 40 CFR 60.564(j)(1)(i). An average ethylene 
glycol concentration by weight shall be calculated on a daily basis 
over a rolling 14-day period of operating days. Each daily average 
ethylene glycol concentration so calculated constitutes a performance 
test. Exceedance of the standard during the reduced testing program 
specified in paragraph (b)(1)(ii) of this section is a violation of 
these standards.
    (ii) The owner or operator may elect to reduce the sampling program 
to any 14 consecutive day period once every two calendar months, if at 
least seventeen consecutive 14-day rolling average concentrations 
immediately preceding the reduced sampling program are each less than 
1.2 weight percent ethylene glycol. If the average concentration 
obtained over the 14 day sampling during the reduced test period 
exceeds the upper 95 percent confidence interval calculated from the 
most recent test results in which no one 14-day average exceeded 1.2 
weight percent ethylene glycol, then the owner or operator shall 
reinstitute a daily sampling program. The 95 percent confidence 
interval shall be calculated as specified in paragraph (b)(1)(iii) of 
this section. A reduced program may be reinstituted if the requirements 
specified in this paragraph (c)(1)(ii) are met.
    (iii) The upper 95 percent confidence interval shall be calculated 
using the Equation 27 of this subpart:
[GRAPHIC] [TIFF OMITTED] TR12SE96.026

where:

Xi = daily ethylene glycol concentration for each day used to 
calculate each 14-day rolling average used in test results to justify 
implementing the reduced testing program.
n = number of ethylene glycol concentrations.

    (2) Measuring an alternative parameter, such as carbon oxygen 
demand or biological oxygen demand, that is demonstrated to be directly 
proportional to the ethylene glycol concentration shall be allowed. 
Such parameter shall be measur
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
ed during the initial 14-day performance 
test during which the facility is shown to be in compliance with the 
ethylene glycol concentration standard whereby the ethylene glycol 
concentration is determined using the procedures described in paragraph 
(b)(1) of this section. The alternative parameter shall be measured on 
a daily basis and the average value of the alternative parameter shall 
be calculated on a daily basis over a rolling 14-day period of 
operating days. Each daily average value of the alternative parameter 
constitutes a performance test.
    (3) During each performance test, daily measurement and daily 
average 14-day rolling averages of the ethylene glycol concentration in 
the cooling tower water shall be recorded. For the initial performance 
test, these records shall be submitted in the Notification of 
Compliance Status report.
    (4) All periods when the 14-day rolling average exceeds the 
standard shall be reported in the Periodic Report.

Sec. 63.1330  Wastewater provisions.

    (a) The owner or operator of each affected source shall comply with 
the requirements of Secs. 63.131 through 63.148, with the differences 
noted in paragraphs (a)(1) through (a)(12) of this section for the 
purposes of this subpart.
    (1) When the determination of equivalence criteria in 
Sec. 63.102(b) is referred to in Secs. 63.132, 63.133, and 63.137, the 
provisions in Sec. 63.6(g) shall apply.

[[Page 48259]]

    (2) When the storage tank requirements contained in Secs. 63.119 
through 63.123 are referred to in Secs. 63.132 through 63.148, 
Secs. 63.119 through 63.123 are applicable, with the exception of the 
differences referred to in Sec. 63.1314, for the purposes of this 
subpart.
    (3) When the owner or operator requests to use alternatives to the 
continuous operating parameter monitoring and recordkeeping provisions 
referred to in Sec. 63.151(g), or the owner or operator submits an 
operating permit application instead of an Implementation Plan as 
specified in Sec. 63.152(e), as referred to in Sec. 63.146(a)(3), 
Sec. 63.1335(g) and Sec. 63.1335(e)(8), respectively, shall apply for 
the purposes of this subpart.
    (4) When the Notification of Compliance Status requirements 
contained in Sec. 63.152(b) are referred to in Secs. 63.146 and 63.147, 
the Notification of Compliance Status requirements contained in 
Sec. 63.1335(e)(5) shall apply for the purposes of this subpart.
    (5) When the Periodic Report requirements contained in 
Sec. 63.152(c) are referred to in Secs. 63.146 and 63.147, the Periodic 
Report requirements contained in Sec. 63.1335(e)(6) shall apply for the 
purposes of this subpart.
    (6) When the Initial Notification Plan requirements in 
Sec. 63.151(b) are referred to in Sec. 63.146, the owner or operator of 
an affected source subject to this subpart need not comply for the 
purposes of this subpart.
    (7) When the Implementation Plan requirements contained in 
Sec. 63.151 are referred to in Sec. 63.146, the owner or operator of an 
affected source subject to this subpart need not comply for the 
purposes of this subpart.
    (8) When the term ``range'' is used in Sec. 63.143(f), the term 
``level'' shall be used instead for the purposes of this subpart. This 
level shall be determined using the procedures specified in 
Sec. 63.1334.
    (9) For the purposes of this subpart, owners or operators are not 
required to comply with the provisions of Sec. 63.138(e)(2) which 
specify that owners or operators shall demonstrate that 95 percent of 
the mass of HAP, as listed in Table 9 of subpart G of this part, is 
removed from the wastewater stream or combination of wastewater streams 
by the procedure specified in Sec. 63.145(i) for a biological treatment 
unit.
    (10) For the purposes of this subpart, owners or operators are not 
required to comply with the provisions of Sec. 63.138(j)(3) which 
specify that owners or operators shall use the procedures specified in 
appendix C of this part to demonstrate compliance when using a 
biological treatment unit.
    (11) When the provisions of Sec. 63.139(c)(1)(ii) or the provisions 
of Sec. 63.145(e)(2)(ii)(B) specify that Method 18, 40 CFR part 60, 
appendix A, shall be used, Method 18 or Method 25A, 40 CFR part 60, 
appendix A, may be used for the purposes of this subpart. The use of 
Method 25A, 40 CFR part 60, appendix A, shall comply with paragraphs 
(a)(11)(i) and (a)(11)(ii) of this section.
    (i) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A, shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (ii) The use of Method 25A, 40 CFR part 60, appendix A, is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (12) The compliance date for the affected source subject to the 
provisions of this section is specified in Sec. 63.1311.
    (b) For each affected source, the owner or operator shall comply 
with the requirements for maintenance wastewater in Sec. 63.105, except 
that when Sec. 63.105(a) refers to ``organic HAPs,'' the definition of 
organic HAP in Sec. 63.1312 shall apply for the purposes of this 
subpart.

Sec. 63.1331  Equipment leak provisions.

    (a) Except as provided for in paragraphs (b) and (c) of this 
section, the owner or operator of each affected source shall comply 
with the requirements of subpart H of this part, with the differences 
noted in paragraphs (a)(1) through (a)(9) of this section.
    (1) For an affected source producing polystyrene resin, the 
indications of liquids dripping, as defined in subpart H of this part, 
from bleed ports in pumps and agitator seals in light liquid service 
shall not be considered to be a leak. For purposes of this subpart, a 
``bleed port'' is a technologically-required feature of the pump or 
seal whereby polymer fluid used to provide lubrication and/or cooling 
of the pump or agitator shaft exits the pump, thereby resulting in a 
visible dripping of fluid.
    (2) The compliance date for the equipment leak provisions contained 
in this section is provided in Sec. 63.1311.
    (3) Owners and operators of an affected source subject to this 
subpart are not required to submit the Initial Notification required by 
Sec. 63.182(a)(1) and Sec. 63.182(b).
    (4) The Notification of Compliance Status required by paragraphs 
Sec. 63.182(a)(2) and Sec. 63.182(c) shall be submitted within 150 days 
(rather than 90 days) of the applicable compliance date specified in 
Sec. 63.1311 for the equipment leak provisions. Said notification can 
be submitted as part of the Notification of Compliance Status required 
by Sec. 63.1335(e)(5).
    (5) The Periodic Reports required by Sec. 63.182(a)(3) and 
Sec. 63.182(d) may be submitted as part of the Periodic Reports 
required by Sec. 63.1335(e)(6).
    (6) For an affected source producing PET, an owner or operator 
shall comply with the requirements of paragraphs (a)(6)(i) and 
(a)(6)(ii) of this section instead of with the requirements of 
Sec. 63.169 for pumps, valves, connectors, and agitators in heavy 
liquid service; pressure relief devices in light liquid or heavy liquid 
service; and instrumentation systems.
    (i) A leak is determined to be detected if there is evidence of a 
potential leak found by visual, audible, olfactory, or any other 
detection method except that Method 21, 40 CFR part 60, appendix A 
shall not be used to determine if a leak is detected.
    (ii)(A) When a leak is detected, it shall be repaired as soon as 
practicable, but not later than 15 calendar days after it is detected, 
except as provided in Sec. 63.171.
    (B) The first attempt at repair shall be made no later than 5 
calendar days after each leak is detected.
    (C) Repaired shall mean that the visual, audible, olfactory, or 
other indications of a leak have been eliminated; that no bubbles are 
observed at potential leak sites during a leak check using soap 
solution; or that the system will hold a test pressure.
    (7) For each affected source producing PET, an owner or operator is 
not required to develop an initial list of identification numbers for 
the equipment identified in paragraph (a)(6) of this section (i.e., 
pumps, valves, connectors, and agitators in heavy liquid service; 
pressure relief devices in light liquid or heavy liquid service; and 
instrumentation systems) as would otherwise be required under 
Sec. 63.181(b)(1)(i).
    (8) When the provisions of subpart H of this part specify that 
Method 18, 40 CFR part 60, appendix A, shall be used, Method 18 or 
Method 25A, 40 CFR part 60, appendix A, may be used for the purposes of 
this subpart. The use of Method 25A, 40 CFR part 60, appendix A, shall 
comply with paragraphs (a)(8)(i) and (a)(8)(ii) of this section.
    (i) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A, shall be the single organic HAP representing 
the largest percent by volume of the emissions.

[[Page 48260]]

    (ii) The use of Method 25A, 40 CFR part 60, appendix A, is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (9) For purposes of this subpart, bottoms receivers and surge 
control vessels are not considered equipment for purposes of this 
section and are not subject to the requirements of subpart H of this 
part.
    (b) The provisions of this section do not apply to each TPPU 
producing PET using a process other than a continuous terephthalic acid 
(TPA) high viscosity multiple end finisher process that is part of an 
affected source if all of the components in the TPPU are either in 
vacuum service or in heavy liquid service.
    (1) Owners and operators of a TPPU exempted under paragraph (b) of 
this section shall retain at the facility information, data, and 
analyses used to demonstrate that all of the components in the exempted 
TPPU are either in vacuum service or in heavy liquid service. Such 
documentation shall include an analysis or demonstration that the 
process fluids do not meet the criteria of ``in light liquid service'' 
or ``in gas or vapor service.'' Examples of information that could 
document this include, but are not limited to, records of chemicals 
purchased for the process, analyses of process stream composition, 
engineering calculations, or process knowledge.
    (2) If changes occur at a TPPU exempted under paragraph (b) of this 
section such that all of the components in the TPPU are no longer 
either in vacuum service or in heavy liquid service (e.g., by either 
process changes or the addition of new components), the owner or 
operator shall comply with the provisions of this section for all of 
the components at the TPPU. The owner or operator shall submit a report 
within 180 days after the process change is made or the information 
regarding the process change is known to the owner or operator. This 
report may be included in the next Periodic Report, as specified in 
paragraph (a)(5) of this section. The following information shall be 
submitted:
    (i) A description of the process change; and
    (ii) A schedule for compliance with the provisions of 
Sec. 63.1331(a), as specified in paragraphs (b)(2)(ii)(A) and 
(b)(2)(ii)(B) of this section.
    (A) The owner or operator shall submit to the Administrator for 
approval a compliance schedule and a justification for the schedule.
    (B) The Administrator shall approve the compliance schedule or 
request changes within 120 operating days of receipt of the compliance 
schedule and justification.
    (c) The provisions of this section do not apply to each affected 
source producing PET using a continuous TPA high viscosity multiple end 
finisher process.

Sec. 63.1332  Emissions averaging provisions.

    (a) This section applies to owners or operators of existing 
affected sources who seek to comply with Sec. 63.1313(b) by using 
emissions averaging rather than following the provisions of 
Secs. 63.1314, 63.1315, 63.1316 through 63.1320, 63.1321, and 63.1330.
    (1) The following emission point limitations apply to the use of 
these provisions:
    (i) All emission points included in an emissions average shall be 
from the same affected source. There may be an emissions average for 
each affected source located at a plant site.
    (ii)(A) If a plant site has only one affected source for which 
emissions averaging is being used to demonstrate compliance, the number 
of emission points allowed in the emissions average for said affected 
source is limited to twenty. This number may be increased by up to five 
additional emission points if pollution prevention measures are used to 
control five or more of the emission points included in the emissions 
average.
    (B) If a plant site has two or more affected sources for which 
emissions averaging is being used to demonstrate compliance, the number 
of emission points allowed in the emissions averages for said affected 
sources is limited to twenty. This number may be increased by up to 
five additional emission points if pollution prevention measures are 
used to control five or more of the emission points included in the 
emissions averages.
    (2) Compliance with the provisions of this section can be based on 
either organic HAP or TOC.
    (3) For the purposes of these provisions, whenever Method 18, 40 
CFR part 60, appendix A is specified within the paragraphs of this 
section or is specified by reference through provisions outside this 
section, Method 18 or Method 25A, 40 CFR part 60, appendix A may be 
used. The use of Method 25A, 40 CFR part 60, appendix A shall comply 
with paragraphs (a)(3)(i) and (a)(3)(ii) of this section.
    (i) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A shall be the single organic HAP representing 
the largest percent by volume of the emissions.
    (ii) The use of Method 25A, 40 CFR part 60, appendix A is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (b) Unless an operating permit application has been submitted, the 
owner or operator shall develop and submit for approval an Emissions 
Averaging Plan containing all of the information required in 
Sec. 63.1335(e)(4) for all emission points to be included in an 
emissions average.
    (c) Paragraphs (c)(1) through (c)(5) of this section describe the 
emission points that can be used to generate emissions averaging 
credits if control was applied after November 15, 1990, and if 
sufficient information is available to determine the appropriate value 
of credits for the emission point. Paragraph (c)(6) of this section 
discusses the use of pollution prevention in generating emissions 
averaging credits.
    (1) Storage vessels, batch process vents, aggregate batch vent 
streams, continuous process vents subject to Sec. 63.1315, and process 
wastewater streams that are determined to be Group 2 emission points. 
The term ``continuous process vents subject to Sec. 63.1315'' includes 
continuous process vents subject to Sec. 63.1316 (b)(1)(iii), 
(b)(2)(iii), and (c)(2), which reference Sec. 63.1315.
    (2) Continuous process vents located in the collection of material 
recovery sections within the affected source at an existing affected 
source producing PET using a continuous dimethyl terephthalate process 
subject to Sec. 63.1316(b)(1)(i) where the uncontrolled organic HAP 
emissions from said continuous process vents are equal to or less than 
0.12 kg organic HAP per Mg of product. These continuous process vents 
shall be considered Group 2 emission points for the purposes of this 
section.
    (3) Storage vessels, continuous process vents subject to 
Sec. 63.1315, and process wastewater streams that are determined to be 
Group 1 emission points and that are controlled by a technology that 
the Administrator or permitting authority agrees has a higher nominal 
efficiency than the reference control technology. Information on the 
nominal efficiencies for such technologies must be submitted and 
approved as provided in paragraph (i) of this section.
    (4) Batch process vents and aggregate batch vent streams that are 
determined to be Group 1 emission points and that

[[Page 48261]]

are controlled to a level more stringent than the applicable standard.
    (5) Continuous process vents subject to Sec. 63.1316 (b)(1)(i), 
(b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1) located in the collection 
of process sections within the affected source, as specified in 
paragraphs (c)(5)(i) through (c)(5)(ii) of this section. The continuous 
process vents identified in paragraphs (c)(5)(i) through (c)(5)(ii) of 
this section shall be considered to be Group 1 emission points for the 
purposes of this section.
    (i) Continuous process vents subject to Sec. 63.1316(b)(1)(i) 
located in the collection of material recovery sections within the 
affected source where the uncontrolled organic HAP emissions for said 
continuous process vents are greater than 0.12 kg organic HAP per Mg of 
product and said continuous process vents are controlled to a level 
more stringent than the applicable standard.
    (ii) Continuous process vents subject to Sec. 63.1316(b)(1)(ii), 
(b)(2)(i), (b)(2)(ii), or (c)(1) located in the collection of process 
sections within the affected source where the uncontrolled organic HAP 
emissions from said continuous process vents are controlled to a level 
more stringent than the applicable standard.
    (6) The percent reduction for any storage vessel, batch process 
vent, aggregate batch vent stream, continuous process vent, and process 
wastewater stream from which emissions are reduced by pollution 
prevention measures shall be determined using the procedures specified 
in paragraph (j) of this section.
    (i) For a Group 1 storage vessel, batch process vent, aggregate 
batch vent stream, continuous process vent, or process wastewater 
stream, the pollution prevention measure must reduce emissions more 
than if the applicable reference control technology or standard had 
been applied to the emission point instead of the pollution prevention 
measure, except as provided in paragraph (c)(6)(ii) of this section.
    (ii) If a pollution prevention measure is used in conjunction with 
other controls for a Group 1 storage vessel, batch process vent, 
aggregate batch vent stream, continuous process vent, or process 
wastewater stream, the pollution prevention measure alone does not have 
to reduce emissions more than the applicable reference control 
technology or standard, but the combination of the pollution prevention 
measure and other controls must reduce emissions more than if the 
applicable reference control technology or standard had been applied 
instead of the pollution prevention measure.
    (d) The following emission points cannot be used to generate 
emissions averaging credits:
    (1) Emission points already controlled on or before November 15, 
1990, cannot be used to generate credits unless the level of control is 
increased after November 15, 1990. In this case, credit will be allowed 
only for the increase in control after November 15, 1990.
    (2) Group 1 emission points, identified in paragraph (c)(3) of this 
section, that are controlled by a reference control technology cannot 
be used to generate credits unless the reference control technology has 
been approved for use in a different manner and a higher nominal 
efficiency has been assigned according to the procedures in paragraph 
(i) of this section.
    (3) Emission points for nonoperating TPPU cannot be used to 
generate credits. TPPU that are shutdown cannot be used to generate 
credits or debits.
    (4) Maintenance wastewater cannot be used to generate credits. 
Wastewater streams treated in biological treatment units cannot be used 
to generate credits. These two types of wastewater cannot be used to 
generate credits or debits. For the purposes of this section, the terms 
wastewater and wastewater stream are used to mean process wastewater.
    (5) Emission points controlled to comply with a State or Federal 
rule other than this subpart cannot be used to generate credits, unless 
the level of control has been increased after November 15, 1990, to a 
level above what is required by the other State or Federal rule. Only 
the control above what is required by the other State or Federal rule 
will be credited. However, if an emission point has been used to 
generate emissions averaging credit in an approved emissions average, 
and the emission point is subsequently made subject to a State or 
Federal rule other than this subpart, the emission point can continue 
to generate emissions averaging credit for the purpose of complying 
with the previously approved emissions average.
    (e) For all emission points included in an emissions average, the 
owner or operator shall perform the following tasks:
    (1) Calculate and record monthly debits for all Group 1 emission 
points that are controlled to a level less stringent than the reference 
control technology or standard for those emission points. Said Group 1 
emission points are identified in paragraphs (c)(3) through (c)(5) of 
this section. Equations in paragraph (g) of this section shall be used 
to calculate debits.
    (2) Calculate and record monthly credits for all Group 1 and Group 
2 emission points that are over-controlled to compensate for the 
debits. Equations in paragraph (h) of this section shall be used to 
calculate credits. Emission points and controls that meet the criteria 
of paragraph (c) of this section may be included in the credit 
calculation, whereas those described in paragraph (d) of this section 
shall not be included.
    (3) Demonstrate that annual credits calculated according to 
paragraph (h) of this section are greater than or equal to debits 
calculated for the same annual compliance period according to paragraph 
(g) of this section.
    (i) The owner or operator may choose to include more than the 
required number of credit-generating emission points in an emissions 
average in order to increase the likelihood of being in compliance.
    (ii) The initial demonstration in the Emissions Averaging Plan or 
operating permit application that credit-generating emission points 
will be capable of generating sufficient credits to offset the debits 
from the debit-generating emission points must be made under 
representative operating conditions. After the compliance date, actual 
operating data will be used for all debit and credit calculations.
    (4) Demonstrate that debits calculated for a quarterly (3-month) 
period according to paragraph (g) of this section are not more than 
1.30 times the credits for the same period calculated according to 
paragraph (h) of this section. Compliance for the quarter shall be 
determined based on the ratio of credits and debits from that quarter, 
with 30 percent more debits than credits allowed on a quarterly basis.
    (5) Record and report quarterly and annual credits and debits in 
the Periodic Reports as specified in Sec. 63.1335(e)(6). Every fourth 
Periodic Report shall include a certification of compliance with the 
emissions averaging provisions as required by 
Sec. 63.1335(e)(6)(vi)(D)(2).
    (f) Debits and credits shall be calculated in accordance with the 
methods and procedures specified in paragraphs (g) and (h) of this 
section, respectively, and shall not include emissions during the 
following periods:
    (1) Emissions during periods of start-up, shutdown, and 
malfunction, as described in the Start-up, Shutdown, and Malfunction 
Plan.
    (2) Emissions during periods of monitoring excursions, as defined 
in Sec. 63.1334(d). For these periods, the calculation of monthly 
credits and debits shall be adjusted as specified in

[[Page 48262]]

paragraphs (f)(2)(i) through (f)(2)(iii) of this section.
    (i) No credits would be assigned to the credit-generating emission 
point.
    (ii) Maximum debits would be assigned to the debit-generating 
emission point.
    (iii) The owner or operator may demonstrate to the Administrator 
that full or partial credits or debits should be assigned using the 
procedures in paragraph (l) of this section.
    (g) Debits are generated by the difference between the actual 
emissions from a Group 1 emission point that is uncontrolled or is 
controlled to a level less stringent than the applicable reference 
control technology or standard and the emissions allowed for the Group 
1 emission point. Said Group 1 emission points are identified in 
paragraphs (c)(3) through (c)(5) of this section. Debits shall be 
calculated as follows:
    (1) Source-wide debits shall be calculated using Equation 28 of 
this subpart. Debits and all terms of Equation 28 of this subpart are 
in units of megagrams per month.
[GRAPHIC] [TIFF OMITTED] TR12SE96.027

where:

ECPViACTUAL=Emissions from each Group 1 continuous process vent i 
subject to Sec. 63.1315 that is uncontrolled or is controlled to a 
level less stringent than the applicable reference control technology. 
ECPViACTUAL is calculated according to paragraph (g)(2) of this 
section.
(0.02)ECPViu=Emissions from each Group 1 continuous process vent i 
subject to Sec. 63.1315 if the applicable reference control technology 
had been applied to the uncontrolled emissions. ECPViu is 
calculated according to paragraph (g)(2) of this section.
ECPVSjACTUAL=Emissions from Group 1 continuous process vents 
subject to Sec. 63.1316 (b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), 
or (c)(1) located in the collection of process sections j within the 
affected source that are uncontrolled or controlled to a level less 
stringent than the applicable standard. ECPVSjACTUAL is calculated 
according to paragraph (g)(3) of this section.
ECPVSjSTD=Emissions from Group 1 continuous process vents subject 
to Sec. 63.1316 (b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1) 
located in the collection of process sections j within the affected 
source if the applicable standard had been applied to the uncontrolled 
emissions. ECPVSjSTD is calculated according to paragraph (g)(3) 
of this section.
ESiACTUAL=Emissions from each Group 1 storage vessel i that is 
uncontrolled or is controlled to a level less stringent than the 
applicable reference control technology or standard. ESiACTUAL is 
calculated according to paragraph (g)(4) of this section.
(BL)ESiu=Emissions from each Group 1 storage vessel i if the 
applicable reference control technology or standard had been applied to 
the uncontrolled emissions. ESiu is calculated according to 
paragraph (g)(4) of this section. For calculating emissions, BL=0.05 
for each Group 1 storage vessel i subject to Sec. 63.1314(a); and 
BL=0.02 for each storage vessel i subject to Sec. 63.1314(c).
EWWiACTUAL=Emissions from each Group 1 wastewater stream i that is 
uncontrolled or is controlled to a level less stringent than the 
applicable reference control technology. EWWiACTUAL is calculated 
according to paragraph (g)(5) of this section.
EWWic=Emissions from each Group 1 wastewater stream i if the 
reference control technology had been applied to the uncontrolled 
emissions. EWWic is calculated according to paragraph (g)(5) of 
this section.
EBPViACTUAL=Emissions from each Group 1 batch process vent i that 
is uncontrolled or is controlled to a level less stringent than the 
applicable reference control technology. EBPViiACTUAL is 
calculated according to paragraph (g)(6) of this section.
(0.10)EBPViu=Emissions from each Group 1 batch process vent i if 
the applicable reference control technology had been applied to the 
uncontrolled emissions. EBPViu is calculated according to 
paragraph (g)(6) of this section.
EABViACTUAL=Emissions from each Group 1 aggregate batch vent 
stream i that is uncontrolled or is controlled to a level less 
stringent than the applicable reference control technology. 
EBPViiACTUAL is calculated according to paragraph (g)(7) of this 
section.
(0.10)EABViu=Emissions from each Group 1 aggregate batch vent 
stream i if the applicable reference control technology had been 
applied to the uncontrolled emissions. EBPViu is calculated 
according to paragraph (g)(7) of this section.
n=The number of emission points being included in the emissions 
average.

    (2) Emissions from continuous process vents subject to Sec. 63.1315 
shall be calculated as follows:
    (i) For purposes of determining continuous process vent stream flow 
rate, organic HAP concentrations, and temperature, the sampling site 
shall be after the final product recovery device, if any recovery 
devices are present; before any control device (for continuous process 
vents, recovery devices shall not be considered control devices); and 
before discharge to the atmosphere. Method 1 or 1A, 40 CFR

[[Page 48263]]

part 60, appendix A, shall be used for selection of the sampling site.
    (ii) ECPViu for each continuous process vent i shall be 
calculated using Equation 29 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.028

where:

ECPViu=Uncontrolled continuous process vent emission rate from 
continuous process vent i, megagrams per month.
Q=Vent stream flow rate, dry standard cubic meters per minute, measured 
using Method 2, 2A, 2C, or 2D, 40 CFR part 60, appendix A, as 
appropriate.
h=Monthly hours of operation during which positive flow is present in 
the continuous process vent, hours per month.
Cj=Concentration, parts per million by volume, dry basis, of organic 
HAP j as measured by Method 18, 40 CFR part 60, appendix A.
Mj=Molecular weight of organic HAP j, gram per gram-mole.
n=Number of organic HAP in stream.

    (A) The values of Q and Cj shall be determined during a performance 
test conducted under representative operating conditions. The values of 
Q and Cj shall be established in the Notification of Compliance Status 
and must be updated as provided in paragraph (g)(2)(ii)(B) of this 
section.
    (B) If there is a change in capacity utilization other than a 
change in monthly operating hours, or if any other change is made to 
the process or product recovery equipment or operation such that the 
previously measured values of Q and Cj are no longer representative, a 
new performance test shall be conducted to determine new representative 
values of Q and Cj. These new values shall be used to calculate debits 
and credits from the time of the change forward, and the new values 
shall be reported in the next Periodic Report.
    (iii) The following procedures and equations shall be used to 
calculate ECPViACTUAL:
    (A) If the continuous process vent is not controlled by a control 
device or pollution prevention measure, ECPViACTUAL=ECPViu, 
where ECPViu is calculated according to the procedures in 
paragraphs (g)(2)(i) and (g)(2)(ii) of this section.
    (B) If the continuous process vent is controlled using a control 
device or a pollution prevention measure achieving less than 98 percent 
reduction, calculate ECPViACTUAL using Equation 30 of this 
subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.029

    (1) The percent reduction shall be measured according to the 
procedures in Sec. 63.116 if a combustion control device is used. For a 
flare meeting the criteria in Sec. 63.116(a), or a boiler or process 
heater meeting the criteria in Sec. 63.116(b), the percent reduction 
shall be 98 percent. If a noncombustion control device is used, percent 
reduction shall be demonstrated by a performance test at the inlet and 
outlet of the device, or, if testing is not feasible, by a control 
design evaluation and documented engineering calculations.
    (2) For determining debits from Group 1 continuous process vents, 
product recovery devices shall not be considered control devices and 
cannot be assigned a percent reduction in calculating ECPViACTUAL. 
The sampling site for measurement of uncontrolled emissions is after 
the final product recovery device. However, as provided in 
Sec. 63.113(a)(3), a Group 1 continuous process vent may add sufficient 
product recovery to raise the TRE index value above 1.0 or, for Group 1 
continuous process vents at an existing affected source producing MBS, 
above 3.7, thereby becoming a Group 2 continuous process vent. Such a 
continuous process vent would not be a Group 1 continuous process vent 
and would, therefore, not be included in determining debits under this 
paragraph (g)(2)(iii)(B)(2).
    (3) Procedures for calculating the percent reduction of pollution 
prevention measures are specified in paragraph (j) of this section.
    (3) Emissions from continuous process vents located in the 
collection of process sections within the affected source subject to 
Sec. 63.1316 (b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1) 
shall be calculated as follows:
    (i) The total organic HAP emissions from continuous process vents 
located in the collection of process sections j within the affected 
source, ECPVSjACTUAL, shall be calculated as follows. The 
procedures in paragraph (g)(2)(iii) of this section shall be used to 
determine the organic HAP emissions for each individual continuous 
process vent, except that paragraph (g)(2)(iii)(B)(2) of this section 
shall not apply and the sampling site shall be after those recovery 
devices installed as part of normal operation; before any add-on 
control devices (i.e., those required by regulation); and prior to 
discharge to the atmosphere. Then, individual continuous process vent 
emissions shall be summed to determine ECPVSjACTUAL.
    (ii)(A) ECPVSjstd shall be calculated using Equation 31 of this 
subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.030

where:

ECPVSjstd=Emissions if the applicable standard had been applied to 
the uncontrolled emissions, megagrams per month.
EFstd=0.000018 Mg organic HAP/Mg of product, if the collection of 
process sections within the affected source is subject to 
Sec. 63.1316(b)(1)(i).
    =0.00002 Mg organic HAP/Mg of product, if the collection of process 
sections within the affected source is subject to Sec. 63.1316 
(b)(1)(ii) or (b)(2)(ii).
    =0.00004 Mg organic HAP/Mg of product, if the collection of process 
sections within the affected source is subject to 
Sec. 63.1316(b)(2)(i).
    =0.0000036 Mg organic HAP/Mg of product, if the collection of 
process sections within the affected source is subject to 
Sec. 63.1316(c)(1).

[[Page 48264]]

PPj=Polymer produced, Mg/month, for the collection of process sections 
j within the affected source, as calculated according to paragraph 
(g)(3)(ii)(B) of this section.

    (B) The amount of polymer produced, Mg per month, for the 
collection of process sections j within the affected source shall be 
determined by determining the weight of polymer pulled from the process 
line(s) during a 30-day period. The polymer produced shall be 
determined by direct measurement or by an alternate methodology, such 
as materials balance. If an alternate methodology is used, a 
description of the methodology, including all procedures, data, and 
assumptions shall be submitted as part of the Emissions Averaging Plan 
required by Sec. 63.1335(e)(4).
    (C) Alternatively, ECPVSjstd for continuous process vents 
located in the collection of process sections within the affected 
source subject to Sec. 63.1316(c)(1) may be calculated using the 
procedures in paragraph (g)(2)(i) and (g)(2)(ii) of this section to 
determine the organic HAP emissions for each individual continuous 
process vent, except that the sampling site shall be after recovery 
devices installed as part of normal operation; before any add-on 
control devices (i.e., those required by regulation); and prior to 
discharge to the atmosphere. Then, individual continuous process vent 
emissions shall be summed and multiplied by 0.02 to determine 
ECPVSjstd.
    (4) Emissions from storage vessels shall be calculated using the 
procedures specified in Sec. 63.150(g)(3).
    (5) Emissions from wastewater streams shall be calculated using the 
procedures in Sec. 63.150(g)(5).
    (6) Emissions from batch process vents shall be calculated as 
follows:
    (i) EBPViu for each batch process vent i shall be calculated 
using the procedures specified in Sec. 63.1323(b).
    (ii) The following procedures and equations shall be used to 
determine EBPViACTUAL:
    (A) If the batch process vent is not controlled by a control device 
or pollution prevention measure, EBPViACTUAL=EBPViu, where 
EBPViu is calculated using the procedures in Sec. 63.1323(b).
    (B) If the batch process vent is controlled using a control device 
or a pollution prevention measure achieving less than 90 percent 
reduction for the batch cycle, calculate EBPViACTUAL using 
Equation 32 of this subpart, where percent reduction is for the batch 
cycle.
[GRAPHIC] [TIFF OMITTED] TR12SE96.031

    (1) The percent reduction for the batch cycle shall be calculated 
according to the procedures in Sec. 63.1325(c)(2).
    (2) The percent reduction for control devices shall be calculated 
according to the procedures in Sec. 63.1325 (c)(2)(i) through 
(c)(2)(iii).
    (3) The percent reduction of pollution prevention measures shall be 
calculated using the procedures specified in paragraph (j) of this 
section.
    (7) Emissions from aggregate batch vent streams shall be calculated 
as follows:
    (i) For purposes of determining aggregate batch vent stream flow 
rate, organic HAP concentrations, and temperature, the sampling site 
shall be before any control device and before discharge to the 
atmosphere. Method 1 or 1A, 40 CFR part 60, appendix A, shall be used 
for selection of the sampling site.
    (ii) EABViu for each aggregate batch vent stream i shall be 
calculated using Equation 33 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.032

where:

EABViu=Uncontrolled aggregate batch vent stream emission rate from 
aggregate batch vent stream i, megagrams per month.
Q=Vent stream flow rate, dry standard cubic meters per minute, measured 
using Method 2, 2A, 2C, or 2D, 40 CFR part 60, appendix A, as 
appropriate.
h=Monthly hours of operation during which positive flow is present from 
the aggregate batch vent stream, hours per month.
Cj=Concentration, parts per million by volume, dry basis, of 
organic HAP j as measured by Method 18, 40 CFR part 60, appendix A.
Mj=Molecular weight of organic HAP j, gram per gram-mole.
n=Number of organic HAP in the stream.

    (A) The values of Q and Cj shall be determined during a 
performance test conducted under representative operating conditions. 
The values of Q and Cj shall be established in the Notification of 
Compliance Status and must be updated as provided in paragraph 
(g)(7)(ii)(B) of this section.
    (B) If there is a change in capacity utilization other than a 
change in monthly operating hours, or if any other change is made to 
the process or product recovery equipment or operation such that the 
previously measured values of Q and Cj are no longer 
representative, a new performance test shall be conducted to determine 
new representative values of Q and Cj. These new values shall be 
used to calculate debits and credits from the time of the change 
forward, and the new values shall be reported in the next Periodic 
Report.
    (iii) The following procedures and equations shall be used to 
calculate EABViACTUAL:
    (A) If the aggregate batch vent stream is not controlled by a 
control device or pollution prevention measure, EABViACTUAL = 
EABViu, where EABViu is calculated according to the 
procedures in paragraphs (g)(7)(i) and (g)(7)(ii) of this section.
    (B) If the aggregate batch vent stream is controlled using a 
control device or a pollution prevention measure achieving less than 90 
percent reduction, calculate EABViACTUAL using Equation 34 of this 
subpart.

[[Page 48265]]

[GRAPHIC] [TIFF OMITTED] TR12SE96.033

    (1) The percent reduction for control devices shall be determined 
according to the procedures in Sec. 63.1325(e).
    (2) The percent reduction for pollution prevention measures shall 
be calculated according to the procedures specified in paragraph (j) of 
this section.
    (h) Credits are generated by the difference between emissions that 
are allowed for each Group 1 and Group 2 emission point and the actual 
emissions from that Group 1 or Group 2 emission point that has been 
controlled after November 15, 1990 to a level more stringent than what 
is required by this subpart or any other State or Federal rule or 
statute. Said Group 1 and Group 2 emission points are identified in 
paragraphs (c)(1) through (c)(5) of this section. Credits shall be 
calculated using Equation 35 of this subpart.
    (1) Sourcewide credits shall be calculated using Equation 35 of 
this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.034

Credits and all terms of Equation 35 of this subpart are in units of 
megagrams per month, the baseline date is November 15, 1990.
where:

D=Discount factor=0.9 for all credit generating emission points except 
those controlled by a pollution prevention measure; discount factor=1.0 
for each credit generating emission point controlled by a pollution 
prevention measure (i.e., no discount provided).
ECPV1iACTUAL=Emissions for each Group 1 continuous process vent i 
subject to Sec. 63.1315 that is controlled to a level more stringent 
than the reference control technology. ECPV1iACTUAL is calculated 
according to paragraph (h)(2) of this section.
(0.02)ECPV1iu=Emissions from each Group 1 continuous process vent 
i subject to Sec. 63.1315 if the applicable reference control 
technology had been applied to the uncontrolled emissions. ECPV1iu 
is calculated according to paragraph (h)(2) of this section.

[[Page 48266]]

ECPVS1jSTD=Emissions from Group 1 continuous process vents subject 
to Sec. 63.1316 (b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1) 
located in the collection of process sections j within the affected 
source if the applicable standard had been applied to the uncontrolled 
emissions. ECPVS1jSTD is calculated according to paragraph (h)(3) 
of this section.
ECPVS1jACTUAL=Emissions from Group 1 continuous process vents 
subject to Sec. 63.1316 (b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), 
or (c)(1) located in the collection of process sections j within the 
affected source that are controlled to a level more stringent than the 
applicable standard. ECPVS1jACTUAL is calculated according to 
paragraph (h)(3) of this section.
ECPV2iACTUAL=Emissions from each Group 2 continuous process vent i 
subject to Sec. 63.1315 that is controlled. ECPV2iACTUAL is 
calculated according to paragraph (h)(2) of this section.
ECPV2iBASE=Emissions from each Group 2 continuous process vent i 
subject to Sec. 63.1315 at the baseline date. ECPV2iBASE is 
calculated according to paragraph (h)(2) of this section.
ECPVS2jBASE=Emissions from Group 2 continuous process vents 
subject to Sec. 63.1316(b)(1)(i) located in the collection of material 
recovery sections j within the affected source at the baseline date. 
ECPVS2jBASE is calculated according to paragraph (h)(3) of this 
section.
ECPVS2jACTUAL=Emissions from Group 2 continuous process vents 
subject to Sec. 63.1316(b)(1)(i) located in the collection of material 
recovery sections j within the affected source that are controlled. 
ECPVS2jACTUAL is calculated according to paragraph (h)(3) of this 
section.
ES1iACTUAL=Emissions from each Group 1 storage vessel i that is 
controlled to a level more stringent than the applicable reference 
control technology or standard. ES1iACTUAL is calculated according 
to paragraph (h)(4) of this section.
(BL)ES1iu=Emissions from each Group 1 storage vessel i if the 
applicable reference control technology or standard had been applied to 
the uncontrolled emissions. ES1iu is calculated according to 
paragraph (h)(4) of this section. For calculating these emissions, 
BL=0.05 for each Group 1 storage vessel i subject to Sec. 63.1314(a); 
and BL=0.02 for each storage vessel i subject to Sec. 63.1314(c).
ES2iACTUAL=Emissions from each Group 2 storage vessel i that is 
controlled. ES2iACTUAL is calculated according to paragraph (h)(4) 
of this section.
ES2iBASE=Emissions from each Group 2 storage vessel i at the 
baseline date. ES2iBASE is calculated according to paragraph 
(h)(4) of this section.
EWW1iACTUAL=Emissions from each Group 1 wastewater stream i that 
is controlled to a level more stringent than the reference control 
technology. EWW1iACTUAL is calculated according to paragraph 
(h)(5) of this section.
EWW1ic=Emissions from each Group 1 wastewater stream i if the 
reference control technology had been applied to the uncontrolled 
emissions. EWW1ic is calculated according to paragraph (h)(5) of 
this section.
EWW2iACTUAL=Emissions from each Group 2 wastewater stream i that 
is controlled. EWW2iACTUAL is calculated according to paragraph 
(h)(5) of this section.
EWW2iBASE=Emissions from each Group 2 wastewater stream i at the 
baseline date. EWW2iBASE is calculated according to paragraph 
(h)(5) of this section.
(0.10)EBPV1iu=Emissions from each Group 1 batch process vent i if 
the applicable reference control technology had been applied to the 
uncontrolled emissions. EBPV1iu is calculated according to 
paragraph (h)(6) of this section.
EBPV1iACTUAL=Emissions from each Group 1 batch process vent i that 
is controlled to a level more stringent than the reference control 
technology. EBPV1iACTUAL is calculated according to paragraph 
(h)(6) of this section.
(0.10)EABV1iu=Emissions from each Group 1 aggregate batch vent 
stream i if the applicable reference control technology had been 
applied to the uncontrolled emissions. EABV1iu is calculated 
according to paragraph (h)(7) of this section.
EABV1iACTUAL=Emissions from each Group 1 aggregate batch vent 
stream i that is controlled to a level more stringent than the 
reference control technology. EABV1iACTUAL is calculated according 
to paragraph (h)(7) of this section.
EBPV2iBASE=Emissions from each Group 2 batch process vent i at the 
baseline date. EBPV2iBASE is calculated according to paragraph 
(h)(6) of this section.
EBPV2iACTUAL=Emissions from each Group 2 batch process vent i that 
is controlled. EBPV2iACTUAL is calculated according to paragraph 
(h)(6) of this section.
EABV2iBASE=Emissions from each Group 2 aggregate batch vent stream 
i at the baseline date. EABV2iBASE is calculated according to 
paragraph (h)(7) of this section.
EABV2iACTUAL=Emissions from each Group 2 aggregate batch vent 
stream i that is controlled. EABV2iACTUAL is calculated according 
to paragraph (h)(7) of this section.
n=Number of Group 1 emission points included in the emissions average. 
The value of n is not necessarily the same for continuous process 
vents, batch process vents, aggregate batch vent streams, storage 
vessels, wastewater streams, or the collection of process sections 
within the affected source.
m=Number of Group 2 emission points included in the emissions average. 
The value of m is not necessarily the same for continuous process 
vents, batch process vents, aggregate batch vent streams, storage 
vessels, wastewater streams, or the collection of process sections 
within the affected source.

    (i) Except as specified in paragraph (h)(1)(iv) of this section, 
for an emission point controlled using a reference control technology, 
the percent reduction for calculating credits shall be no greater than 
the nominal efficiency associated with the reference control 
technology, unless a higher nominal efficiency is assigned as specified 
in paragraph (h)(1)(ii) of this section.
    (ii) For an emission point controlled to a level more stringent 
than the reference control technology, the nominal efficiency for 
calculating credits shall be assigned as described in paragraph (i) of 
this section. A reference control technology may be approved for use in 
a different manner and assigned a higher nominal efficiency according 
to the procedures in paragraph (i) of this section.
    (iii) For an emission point controlled using a pollution prevention 
measure, the nominal efficiency for calculating credits shall be as 
determined as described in paragraph (j) of this section.
    (iv) For Group 1 and Group 2 batch process vents and Group 1 and 
Group 2 aggregate batch vent streams, the percent reduction for 
calculating credits shall be the percent reduction determined according 
to the procedures in paragraphs (h)(6)(ii) and (h)(6)(iii) of this 
section for batch process vents and paragraphs (h)(7)(ii) and 
(h)(7)(iii) of this section for aggregate batch vent streams.

[[Page 48267]]

    (2) Emissions from continuous process vents subject to Sec. 63.1315 
shall be determined as follows:
    (i) Uncontrolled emissions from Group 1 continuous process vents 
(ECPV1iu) shall be calculated according to the procedures and 
equation for ECPViu in paragraphs (g)(2)(i) and (g)(2)(ii) of this 
section.
    (ii) Actual emissions from Group 1 continuous process vents 
controlled using a technology with an approved nominal efficiency 
greater than 98 percent or a pollution prevention measure achieving 
greater than 98 percent emission reduction (ECPV1iACTUAL) shall be 
calculated using Equation 36 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.035

    (iii) The following procedures shall be used to calculate actual 
emissions from Group 2 continuous process vents (ECPV2iACTUAL):
    (A) For a Group 2 continuous process vent controlled by a control 
device, a recovery device applied as a pollution prevention project, or 
a pollution prevention measure, where the control achieves a percent 
reduction less than or equal to 98 percent reduction, use Equation 37 
of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.036

    (1) ECPV2iu shall be calculated according to the equations and 
procedures for ECPViu in paragraphs (g)(2)(i) and (g)(2)(ii) of 
this section, except as provided in paragraph (h)(2)(iii)(A)(3) of this 
section.
    (2) The percent reduction shall be calculated according to the 
procedures in paragraphs (g)(2)(iii)(B)(1) through (g)(2)(iii)(B)(3) of 
this section, except as provided in paragraph (h)(2)(iii)(A)(4) of this 
section.
    (3) If a recovery device was added as part of a pollution 
prevention project, ECPV2iu shall be calculated prior to that 
recovery device. The equation for ECPViu in paragraph (g)(2)(ii) 
of this section shall be used to calculate ECPV2iu; however, the 
sampling site for measurement of vent stream flow rate and organic HAP 
concentration shall be at the inlet of the recovery device.
    (4) If a recovery device was added as part of a pollution 
prevention project, the percent reduction shall be demonstrated by 
conducting a performance test at the inlet and outlet of that recovery 
device.
    (B) For a Group 2 continuous process vent controlled using a 
technology with an approved nominal efficiency greater than 98 percent 
or a pollution prevention measure achieving greater than 98 percent 
reduction, use Equation 38 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.037

    (iv) Emissions from Group 2 continuous process vents at baseline 
shall be calculated as follows:
    (A) If the continuous process vent was uncontrolled on November 15, 
1990, ECPV2iBASE=ECPV2iu and shall be calculated according to 
the procedures and equation for ECPViu in paragraphs (g)(2)(i) and 
(g)(2)(ii) of this section.
    (B) If the continuous process vent was controlled on November 15, 
1990, use Equation 39 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.038

    (1) ECPV2iu is calculated according to the procedures and 
equation for ECPViu in paragraphs (g)(2)(i) and (g)(2)(ii) of this 
section.
    (2) The percent reduction shall be calculated according to the 
procedures specified in paragraphs (g)(2)(iii)(B)(1) through 
(g)(2)(iii)(B)(3) of this section.
    (C) If a recovery device was added as part of a pollution 
prevention project initiated after November 15, 1990, 
ECPV2iBASE=ECPV2iu, where ECPV2iu is calculated 
according to paragraph (h)(2)(iii)(A)(3) of this section.
    (3) Emissions from continuous process vents subject to 
Sec. 63.1316(b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1) 
shall be determined as follows:
    (i) Emissions from Group 1 continuous process vents located in the 
collection of process sections j within the affected source if the 
applicable standard had been applied to the uncontrolled emissions 
(ECPVS1jstd) shall be calculated according to paragraph (g)(3)(ii) 
of this section.
    (ii) Actual emissions from Group 1 continuous process vents located 
in the collection of process sections j within the affected source 
controlled to a level more stringent than the applicable standard 
(ECPVS1jACTUAL) shall be calculated using the procedures in 
paragraphs (g)(3)(ii)(A) and (g)(3)(ii)(B) of this section, except that 
the actual emission level, Mg organic HAP/Mg of product, shall be used 
as EFstd in Equation 31 of this subpart. Further, 
ECPVS1jACTUAL for continuous process vents subject to 
Sec. 63.1316(c)(1) controlled in accordance with 
Sec. 63.1316(c)(1)(iii) shall be calculated using the procedures in 
paragraph

[[Page 48268]]

(h)(2)(ii) of this section for individual continuous process vents and 
then summing said emissions to get ECPVS1jACTUAL, except that the 
sampling site shall be after recovery devices installed as part of 
normal operation; before any add-on control devices (i.e., those 
required by regulation); and prior to discharge to the atmosphere.
    (iii) Actual emissions from Group 2 continuous process vents 
subject to Sec. 63.1316(b)(1)(i) located in the collection of material 
recovery sections j within the affected source (ECPVS2jACTUAL) 
shall be calculated using the procedures in paragraphs (g)(3)(ii)(A) 
and (g)(3)(ii)(B) of this section, except that the actual emission 
level, Mg organic HAP/Mg of product, shall be used as EFstd in 
Equation 31 of this subpart.
    (iv) Emissions from Group 2 continuous process vents subject to 
Sec. 63.1316(b)(1)(i) located in the collection of material recovery 
sections j within the affected source at baseline (ECPVS2jBASE) 
shall be calculated using the procedures in paragraphs (g)(3)(ii)(A) 
and (g)(3)(ii)(B) of this section, except that the actual emission 
level, Mg organic HAP/Mg of product, at baseline shall be used as 
EFstd in Equation 31 of this subpart.
    (4)(i) Emissions from storage vessels shall be calculated using the 
procedures specified in Sec. 63.150(h)(3).
    (ii) Actual emissions from Group 1 storage vessels at an existing 
affected source producing ASA/AMSAN subject to Sec. 63.1314(c) using a 
technology with an approved nominal efficiency greater than 98 percent 
or a pollution prevention measure achieving greater than 98 percent 
emission reduction shall be calculated using the procedures specified 
in Sec. 63.150(h)(3)(ii).
    (5) Emissions from wastewater streams shall be calculated using the 
procedures specified in Sec. 63.150(h)(5).
    (6) Emissions from batch process vents shall be determined as 
follows:
    (i) Uncontrolled emissions from Group 1 batch process vents 
(EBPV1iu) shall be calculated using the procedures 
Sec. 63.1323(b).
    (ii) Actual emissions from Group 1 batch process vents controlled 
to a level more stringent than the reference control technology 
(EBPV1iACTUAL) shall be calculated using Equation 40 of this 
subpart, where percent reduction is for the batch cycle.
[GRAPHIC] [TIFF OMITTED] TR12SE96.039

    (A) The percent reduction for the batch cycle shall be calculated 
according to the procedures in Sec. 63.1325(c)(2).
    (B) The percent reduction for control devices shall be determined 
according to the procedures in Sec. 63.1325(c)(2)(i) through 
(c)(2)(iii).
    (C) The percent reduction of pollution prevention measures shall be 
calculated using the procedures specified in paragraph (j) of this 
section.
    (iii) Actual emissions from Group 2 batch process vents 
(EBPV2iACTUAL) shall be calculated using Equation 41 of this 
subpart and the procedures in paragraphs (h)(6)(ii)(A) through 
(h)(6)(ii)(C) of this section. EBPV2iu shall be calculated using 
the procedures specified in Sec. 63.1323(b).
[GRAPHIC] [TIFF OMITTED] TR12SE96.040

    (iv) Emissions from Group 2 batch process vents at baseline 
(EBPV2iBASE) shall be calculated as follows:
    (A) If the batch process vent was uncontrolled on November 15, 
1990, EBPV2iBASE=EBPV2iu and shall be calculated using the 
procedures specified in Sec. 63.1323(b).
    (B) If the batch process vent was controlled on November 15, 1990, 
use Equation 42 of this subpart and the procedures in paragraphs 
(h)(6)(ii)(A) through (h)(6)(ii)(C) of this section. EBPV2iu shall 
be calculated using the procedures specified in Sec. 63.1323(b).
[GRAPHIC] [TIFF OMITTED] TR12SE96.041

    (7) Emissions from aggregate batch vent streams shall be determined 
as follows:
    (i) Uncontrolled emissions from Group 1 aggregate batch vent 
streams (EABV1iu) shall be calculated according to the procedures 
and equation for EABViu in paragraphs (g)(7)(i) and (g)(7)(ii) of 
this section.
    (ii) Actual emissions from Group 1 aggregate batch vent streams 
controlled to a level more stringent than the reference control 
technology (EABV1iACTUAL) shall be calculated using Equation 43 of 
this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.042

[[Page 48269]]

    (A) The percent reduction for control devices shall be determined 
according to the procedures in Sec. 63.1325(e).
    (B) The percent reduction of pollution prevention measures shall be 
calculated using the procedures specified in paragraph (j) of this 
section.
    (iii) Actual emissions from Group 2 aggregate batch vent streams 
(EABV2iACTUAL) shall be calculated using Equation 44 of this 
subpart and the procedures in paragraphs (h)(7)(ii)(A) through 
(h)(7)(ii)(B) of this section. EABV2iu shall be calculated 
according to the equations and procedures for EABViu in paragraphs 
(g)(7)(i) and (g)(7)(ii) of this section.
[GRAPHIC] [TIFF OMITTED] TR12SE96.043

    (iv) Emissions from Group 2 aggregate batch vent streams at 
baseline shall be calculated as follows:
    (A) If the aggregate batch vent stream was uncontrolled on November 
15, 1990, EABV2iBASE=EABV2iu and shall be calculated 
according to the procedures and equation for EABViu in paragraphs 
(g)(7)(i) and (g)(7)(ii) of this section.
    (B) If the aggregate batch vent stream was controlled on November 
15, 1990, use Equation 45 of this subpart and the procedures in 
paragraphs (h)(7)(ii)(A) through (h)(7)(ii)(B) of this section. 
EABV2iu shall be calculated according to the equations and 
procedures for EABViu in paragraphs (g)(7)(i) and (g)(7)(ii) of 
this section.
[GRAPHIC] [TIFF OMITTED] TR12SE96.044

    (i) The following procedures shall be followed to establish nominal 
efficiencies for emission controls for storage vessels, continuous 
process vents, and process wastewater streams. The procedures in 
paragraphs (i)(1) through (i)(6) of this section shall be followed for 
control technologies that are different in use or design from the 
reference control technologies and achieve greater percent reductions 
than the percent efficiencies assigned to the reference control 
technologies in Sec. 63.111.
    (1) In those cases where the owner or operator is seeking 
permission to take credit for use of a control technology that is 
different in use or design from the reference control technology, and 
the different control technology will be used in more than three 
applications at a single plant-site, the owner or operator shall submit 
the information specified in paragraphs (i)(1)(i) through (i)(1)(iv) of 
this section to the Director of the EPA Office of Air Quality Planning 
and Standards in writing:
    (i) Emission stream characteristics of each emission point to which 
the control technology is or will be applied including the kind of 
emission point, flow, organic HAP concentration, and all other stream 
characteristics necessary to design the control technology or determine 
its performance.
    (ii) Description of the control technology including design 
specifications.
    (iii) Documentation demonstrating to the Administrator's 
satisfaction the control efficiency of the control technology. This may 
include performance test data collected using an appropriate EPA Method 
or any other method validated according to Method 301 of appendix A of 
this part. If it is infeasible to obtain test data, documentation may 
include a design evaluation and calculations. The engineering basis of 
the calculation procedures and all inputs and assumptions made in the 
calculations shall be documented.
    (iv) A description of the parameter or parameters to be monitored 
to ensure that the control technology will be operated in conformance 
with its design and an explanation of the criteria used for selection 
of that parameter (or parameters).
    (2) The Administrator shall determine within 120 operating days 
whether an application presents sufficient information to determine 
nominal efficiency. The Administrator reserves the right to request 
specific data in addition to the items listed in paragraph (i)(1) of 
this section.
    (3) The Administrator shall determine within 120 operating days of 
the submittal of sufficient data whether a control technology shall 
have a nominal efficiency and the level of that nominal efficiency. If, 
in the Administrator's judgment, the control technology achieves a 
level of emission reduction greater than the reference control 
technology for a particular kind of emission point, the Administrator 
will publish a Federal Register notice establishing a nominal 
efficiency for the control technology.
    (4) The Administrator may grant permission to take emission credits 
for use of the control technology. The Administrator may also impose 
requirements that may be necessary to ensure operation and maintenance 
to achieve the specified nominal efficiency.
    (5) In those cases where the owner or operator is seeking 
permission to take credit for use of a control technology that is 
different in use or design from the reference control technology and 
the different control technology will be used in no more than three 
applications at a single plant site, the information listed in 
paragraphs (i)(1)(i) through (i)(1)(iv) of this section can be 
submitted to the permitting authority for the affected source for 
approval instead of the Administrator.
    (i) In these instances, use and conditions for use of the control 
technology can be approved by the permitting authority as part of an 
operating permit application or modification. The permitting authority 
shall follow the procedures specified in paragraphs (i)(2) through 
(i)(4) of this section except that, in these instances, a Federal 
Register notice is not required to establish the nominal efficiency for 
the different technology.
    (ii) If, in reviewing the application, the permitting authority 
believes the control technology has broad applicability for use by 
other affected sources, the permitting authority shall submit the 
information provided in the application to the Director of the EPA 
Office of Air Quality Planning and Standards. The Administrator shall

[[Page 48270]]

review the technology for broad applicability and may publish a Federal 
Register notice; however, this review shall not affect the permitting 
authority's approval of the nominal efficiency of the control 
technology for the specific application.
    (6) If, in reviewing an application for a control technology for an 
emission point, the Administrator or permitting authority determines 
the control technology is not different in use or design from the 
reference control technology, the Administrator or permitting authority 
shall deny the application.
    (j) The following procedures shall be used for calculating the 
efficiency (percent reduction) of pollution prevention measures for 
storage vessels, continuous process vents, batch process vents, 
aggregate batch vent streams, and wastewater streams:
    (1) A pollution prevention measure is any practice that meets the 
criteria of paragraphs (j)(1)(i) and (j)(1)(ii) of this section.
    (i) A pollution prevention measure is any practice that results in 
a lesser quantity of organic HAP emissions per unit of product released 
to the atmosphere prior to out-of-process recycling, treatment, or 
control of emissions, while the same product is produced.
    (ii) Pollution prevention measures may include: substitution of 
feedstocks that reduce organic HAP emissions; alterations to the 
production process to reduce the volume of materials released to the 
environment; equipment modifications; housekeeping measures; and in-
process recycling that returns waste materials directly to production 
as raw materials. Production cutbacks do not qualify as pollution 
prevention.
    (2) The emission reduction efficiency of pollution prevention 
measures implemented after November 15, 1990, can be used in 
calculating the actual emissions from an emission point in the debit 
and credit equations in paragraphs (g) and (h) of this section.
    (i) For pollution prevention measures, the percent reduction used 
in the equations in paragraphs (g)(2) through (g)(7) of this section 
and paragraphs (h)(2) through (h)(7) of this section is the percent 
difference between the monthly organic HAP emissions for each emission 
point after the pollution prevention measure for the most recent month 
versus monthly emissions from the same emission point before the 
pollution prevention measure, adjusted by the volume of product 
produced during the two monthly periods.
    (ii) Equation 46 of this subpart shall be used to calculate the 
percent reduction of a pollution prevention measure for each emission 
point.
[GRAPHIC] [TIFF OMITTED] TR12SE96.045

where:

Percent reduction=Efficiency of pollution prevention measure (percent 
organic HAP reduction).
EB=Monthly emissions before the pollution prevention measure, 
megagrams per month, determined as specified in paragraphs 
(j)(2)(ii)(A), (j)(2)(ii)(B), and (j)(2)(ii)(C) of this section.
Epp=Monthly emissions after the pollution prevention measure, 
megagrams per month, as determined for the most recent month, 
determined as specified in either paragraphs (j)(2)(ii)(D) or 
(j)(2)(ii)(E) of this section.
PB=Monthly production before the pollution prevention measure, 
megagrams per month, during the same period over which EB is 
calculated.
Ppp=Monthly production after the pollution prevention measure, 
megagrams per month, as determined for the most recent month.

    (A) The monthly emissions before the pollution prevention measure, 
EB, shall be determined in a manner consistent with the equations 
and procedures in paragraphs (g)(2) and (g)(3) of this section for 
continuous process vents, paragraph (g)(4) of this section for storage 
vessels, paragraph (g)(6) of this section for batch process vents, and 
paragraph (g)(7) of this section for aggregate batch vent streams.
    (B) For wastewater, EB shall be calculated using Equation 47 
of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.046

where:

n=Number of wastewater streams.
 QBi=Average flow rate for wastewater stream i before the 
pollution prevention measure, defined and determined according to 
Sec. 63.144(c)(3), liters per minute, before implementation of the 
pollution prevention measure.
HBi=Number of hours per month that wastewater stream i was 
discharged before the pollution prevention measure, hours per month.
s=Total number of organic HAP in wastewater stream i.
Fem=Fraction emitted of organic HAP m in wastewater from Table 9 
of subpart G of this part, dimensionless.
HAPBim=Average concentration of organic HAP m in wastewater stream 
i, defined and determined according to paragraph (g)(5)(i) of this 
section, before the pollution prevention measure, parts per million by 
weight, as measured before the implementation of the pollution measure.

    (C) If the pollution prevention measure was implemented prior to 
September 12, 1996 records may be used to determine EB.
    (D) The monthly emissions after the pollution prevention measure, 
Epp, may be determined during a performance test or by a design 
evaluation and documented engineering calculations. Once an emissions-
to-production ratio has been established, the ratio can be

[[Page 48271]]

used to estimate monthly emissions from monthly production records.
    (E) For wastewater, Epp shall be calculated using Equation 48 
of this subpart and n, Qppi, Hppi, s, Fem, and 
HAPppim are defined and determined as described in paragraph 
(j)(2)(ii)(B) of this section, except that Qppi, Hppi, and 
HAPppim shall be determined after the pollution prevention measure 
has been implemented.
[GRAPHIC] [TIFF OMITTED] TR12SE96.047

    (iii) All equations, calculations, test procedures, test results, 
and other information used to determine the percent reduction achieved 
by a pollution prevention measure for each emission point shall be 
fully documented.
    (iv) The same pollution prevention measure may reduce emissions 
from multiple emission points. In such cases, the percent reduction in 
emissions for each emission point must be calculated.
    (v) For the purposes of the equations in paragraphs (h)(2) through 
(h)(7) of this section used to calculate credits for emission points 
controlled more stringently than the reference control technology, the 
nominal efficiency of a pollution prevention measure is equivalent to 
the percent reduction of the pollution prevention measure. When a 
pollution prevention measure is used, the owner or operator of an 
affected source is not required to apply to the Administrator for a 
nominal efficiency and is not subject to paragraph (i) of this section.
    (k) The owner or operator must demonstrate that the emissions from 
the emission points proposed to be included in the emissions average 
will not result in greater hazard or, at the option of the 
Administrator, greater risk to human health or the environment than if 
the emission points were controlled according to the provisions in 
Secs. 63.1314, 63.1315, 63.1316 through 63.1320, 63.1321, and 63.1330.
    (1) This demonstration of hazard or risk equivalency shall be made 
to the satisfaction of the Administrator.
    (i) The Administrator may require owners and operators to use 
specific methodologies and procedures for making a hazard or risk 
determination.
    (ii) The demonstration and approval of hazard or risk equivalency 
shall be made according to any guidance that the Administrator makes 
available for use.
    (2) Owners and operators shall provide documentation demonstrating 
the hazard or risk equivalency of their proposed emissions average in 
their operating permit application or in their Emissions Averaging Plan 
if an operating permit application has not yet been submitted.
    (3) An Emissions Averaging Plan that does not demonstrate hazard or 
risk equivalency to the satisfaction of the Administrator shall not be 
approved. The Administrator may require such adjustments to the 
Emissions Averaging Plan as are necessary in order to ensure that the 
emissions average will not result in greater hazard or risk to human 
health or the environment than would result if the emission points were 
controlled according to Secs. 63.1314, 63.1315, 63.1316 through 
63.1320, 63.1321, and 63.1330.
    (4) A hazard or risk equivalency demonstration must:
    (i) Be a quantitative, bona fide chemical hazard or risk 
assessment;
    (ii) Account for differences in chemical hazard or risk to human 
health or the environment; and
    (iii) Meet any requirements set by the Administrator for such 
demonstrations.
    (l) For periods of parameter monitoring excursions, an owner or 
operator may request that the provisions of paragraphs (l)(1) through 
(l)(4) of this section be followed instead of the procedures in 
paragraphs (f)(3)(i) and (f)(3)(ii) of this section.
    (1) The owner or operator shall notify the Administrator of 
monitoring excursions in the Periodic Reports as required in 
Sec. 63.1335(e)(6).
    (2) The owner or operator shall demonstrate that other types of 
monitoring data or engineering calculations are appropriate to 
establish that the control device for the emission point was operating 
in such a fashion to warrant assigning full or partial credits and 
debits. This demonstration shall be made to the Administrator's 
satisfaction, and the Administrator may establish procedures of 
demonstrating compliance that are acceptable.
    (3) The owner or operator shall provide documentation of the 
excursion and the other type of monitoring data or engineering 
calculations to be used to demonstrate that the control device for the 
emission point was operating in such a fashion to warrant assigning 
full or partial credits and debits.
    (4) The Administrator may assign full or partial credit and debits 
upon review of the information provided.
    (m) For each emission point included in an emissions average, the 
owner or operator shall perform testing, monitoring, recordkeeping, and 
reporting equivalent to that required for Group 1 emission points 
complying with Secs. 63.1314, 63.1315, 63.1316 through 63.1320, 
63.1321, and 63.1330, as applicable. The specific requirements for 
continuous process vents, batch process vents, aggregate batch vent 
streams, storage vessels, and wastewater operations that are included 
in an emissions average for an affected source are identified in 
paragraphs (m)(1) through (m)(7) of this section.
    (1) For each continuous process vent subject to Sec. 63.1315 
equipped with a flare, incinerator, boiler, or process heater, as 
appropriate to the control technique:
    (i) Determine whether the continuous process vent is Group 1 or 
Group 2 according to the procedures specified in Sec. 63.1315;
    (ii) Conduct initial performance tests to determine percent 
reduction according to the procedures specified in Sec. 63.1315; and
    (iii) Monitor the operating parameters, keep records, and submit 
reports according to the proce
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
dures specified in Sec. 63.1315.
    (2) For each continuous process vent subject to Sec. 63.1315 
equipped with a carbon adsorber, absorber, or condenser but not 
equipped with a control device, as appropriate to the control 
technique:
    (i) Determine the flow rate, organic HAP concentration, and TRE 
index value according to the procedures specified in Sec. 63.1315; and
    (ii) Monitor the operating parameters, keep records, and submit 
reports according to the procedures specified in Sec. 63.1315.
    (3) For continuous process vents subject to Sec. 63.1316(b)(1)(i), 
(b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1):
    (i) Determine whether the emissions from the continuous process 
vents subject to Sec. 63.1316(b)(1)(i) located in the collection of 
material recovery sections within the affected source are greater than, 
equal to, or less than 0.12 kg organic HAP per Mg of product according 
to the procedures specified in Sec. 63.1318(b);

[[Page 48272]]

    (ii) Determine the emission rate, ERHAP, for each collection 
of process sections within the affected source according to the 
procedures specified in Sec. 63.1318(b); and
    (iv) Monitor the operating parameters, keep records, and submit 
reports according to the procedures specified in Sec. 63.1317, 
Sec. 63.1319, Sec. 63.1320.
    (4) For each storage vessel controlled with an internal floating 
roof, external roof, or a closed vent system with a control device, as 
appropriate to the control technique:
    (i) Perform the monitoring or inspection procedures according to 
the procedures specified in Sec. 63.1314;
    (ii) Perform the reporting and recordkeeping procedures according 
to the procedures specified in Sec. 63.1314; and
    (iii) For closed vent systems with control devices, conduct an 
initial design evaluation and submit an operating plan according to the 
procedures specified in Sec. 63.1314.
    (5) For wastewater emission points, as appropriate to the control 
technique:
    (i) For wastewater treatment processes, conduct tests according to 
the procedures specified in Sec. 63.1330;
    (ii) Conduct inspections and monitoring according to the procedures 
specified in Sec. 63.1330;
    (iii) Implement a recordkeeping program according to the procedures 
specified in Sec. 63.1330; and
    (iv) Implement a reporting program according to the procedures 
specified in Sec. 63.1330.
    (6) For each batch process vent and aggregate batch vent stream 
equipped with a control device, as appropriate to the control 
technique:
    (i) Determine whether the batch process vent or aggregate batch 
vent stream is Group 1 or Group 2 according to the procedures in 
Sec. 63.1323;
    (ii) Conduct performance tests according to the procedures 
specified in Sec. 63.1325;
    (iii) Conduct monitoring according to the procedures specified in 
Sec. 63.1324; and
    (iv) Perform the recordkeeping and reporting procedures according 
to the procedures specified in Secs. 63.1326 and 63.1327.
    (7) If an emission point in an emissions average is controlled 
using a pollution prevention measure or a device or technique for which 
no monitoring parameters or inspection procedures are required by 
Secs. 63.1314, 63.1315, 63.1316 through 63.1320, 63.1321, or 63.1330, 
the owner or operator shall submit the information specified in 
Sec. 63.1335(f) for alternate monitoring parameters or inspection 
procedures in the Emissions Averaging Plan or operating permit 
application.
    (n) Records of all information required to calculate emission 
debits and credits shall be retained for 5 years.
    (o) Precompliance Reports, Emission Averaging Plans, Notifications 
of Compliance Status, Periodic Reports, and other reports shall be 
submitted as required by Sec. 63.1335.

Sec. 63.1333   Additional test methods and procedures.

    (a) Performance testing shall be conducted in accordance with 
Sec. 63.7(a)(3), (d), (e), (g), and (h), with the exceptions specified 
in paragraphs (a)(1) through (a)(4) of this section and the additions 
specified in paragraphs (b) through (d) of this section. Sections 
63.1314 through 63.1330 also contain specific testing requirements.
    (1) Performance tests shall be conducted according to the 
provisions of Sec. 63.7(e), except that performance tests shall be 
conducted at maximum representative operating conditions for the 
process.
    (2) References in Sec. 63.7(g) to the Notification of Compliance 
Status requirements in Sec. 63.7(h) shall refer to the requirements in 
Sec. 63.1335(e)(5).
    (3) Because the site-specific test plans in Sec. 63.7(c)(3) are not 
required, Sec. 63.7(h)(4)(ii) is not applicable.
    (4) The owner or operator shall notify the Administrator of the 
intention to conduct a performance test at least 30 calendar days 
before the performance test is scheduled to allow the Administrator the 
opportunity to have an observer present during the test.
    (b) Each owner or operator of an existing affected source producing 
MBS complying with Sec. 63.1315(b)(2) shall determine compliance with 
the mass emission per mass product standard by using Equation 49 of 
this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.048

where:
ERMBS=Emission rate of organic HAP or TOC from continuous process 
vents, kg/Mg product.
Ei=Emission rate of organic HAP or TOC from continuous process 
vent i as calculated using the procedures specified in 
Sec. 63.116(c)(4), kg/month.
PPM=Amount of polymer produced in one month as determined by the 
procedures specified in Sec. 63.1318(b)(1)(ii), Mg/month.
n=Number of continuous process vents.

When determining Ei, when the provisions of Sec. 63.116(c)(4) 
specify that Method 18, 40 CFR part 60, appendix A, shall be used, 
Method 18 or Method 25A, 40 CFR part 60, appendix A, may be used for 
the purposes of this subpart. The use of Method 25A, 40 CFR part 60, 
appendix A, shall comply with paragraphs (b)(1) and (b)(2) of this 
section.
    (1) The organic HAP used as the calibration gas for Method 25A, 40 
CFR part 60, appendix A, shall be the single organic HAP representing 
the largest percent by volume.
    (2) The use of Method 25A, 40 CFR part 60, appendix A, is 
acceptable if the response from the high-level calibration gas is at 
least 20 times the standard deviation of the response from the zero 
calibration gas when the instrument is zeroed on the most sensitive 
scale.
    (c) The owner or operator of an affected source, complying with 
Sec. 63.1322(a)(3) shall determine compliance with the percent 
reduction requirement using Equation 50 of this subpart.
[GRAPHIC] [TIFF OMITTED] TR12SE96.049

where:

PR=Percent reduction
Hj=Number of operating hours in a year for control device j.
Ei=Mass rate of TOC or total organic HAP at the inlet of control 
device

[[Page 48273]]

j, calculated as specified in Sec. 63.1325(f), kg/hr. This value 
includes all continuous process vents, batch process vents, and 
aggregate batch vent streams routed to control device j.
Eo=Mass rate of TOC or total organic HAP at the outlet of control 
device j, calculated as specified in Sec. 63.1325(f), kg/hr.
Hk=Number of hours of operation during which positive flow is 
present in uncontrolled continuous process vent or aggregate batch vent 
stream k, hr/yr.
Eku=Mass rate of TOC or total organic HAP of uncontrolled 
continuous process vent or aggregate batch vent stream k, calculated as 
specified in Sec. 63.1325(f)(4), kg/hr.
AEunc=Mass rate of TOC or total organic HAP of uncontrolled batch 
process vent l, calculated as specified in Sec. 63.1325(f)(4), kg/yr.
n=Number of control devices, uncontrolled continuous process vents and 
aggregate batch vent streams, and uncontrolled batch process vents. The 
value of n is not necessarily the same for these three items.

    (d) Data shall be reduced in accordance with the EPA approved 
methods specified in the applicable subpart or, if other test methods 
are used, the data and methods shall be validated according to the 
protocol in Method 301 of appendix A of this part.

Sec. 63.1334  Parameter monitoring levels and excursions.

    (a) Establishment of parameter monitoring levels. The owner or 
operator of a control or recovery device that has one or more parameter 
monitoring level requirements specified under this subpart shall 
establish a maximum or minimum level for each measured parameter using 
the procedures specified in paragraph (b), (c), or (d) of this section. 
The procedures specified in paragraph (b) of this section have been 
approved by the Administrator. The procedures in paragraphs (c) and (d) 
of this section have not been approved by the Administrator and 
determination of the parameter monitoring level using the procedures in 
paragraph (c) or (d) of this section is subject to review and approval 
by the Administrator. Said determination and supporting documentation 
shall be included in the Precompliance Report, specified in 
Sec. 63.1335(e)(3).
    (1) The owner or operator shall operate control and recovery 
devices such that monitored parameters remain above the minimum 
established level or below the maximum established level.
    (2) As specified in Sec. 63.1335(e)(5) and Sec. 63.1335(e)(8), all 
established levels, along with their supporting documentation and the 
definition of an operating day, shall be approved as part of and 
incorporated into the Notification of Compliance Status or operating 
permit, respectively.
    (3) Nothing in this section shall be construed to allow a 
monitoring parameter excursion caused by an activity that violates 
other applicable provisions of subpart A, F, or G of this part.
    (b) Establishment of parameter monitoring levels based on 
performance tests. The procedures specified in paragraphs (b)(1) 
through (b)(3) of this section shall be used, as applicable, in 
establishing parameter monitoring levels. Level(s) established under 
this paragraph (b) shall be based on the parameter values measured 
during the performance test.
    (1) Storage tanks and wastewater. The maximum and/or minimum 
monitoring levels shall be based on the parameter values measured 
during the performance test, supplemented, if desired, by engineering 
assessments and/or manufacturer's recommendations.
    (2) Continuous process vents. During initial compliance testing, 
the appropriate parameter shall be continuously monitored during the 
required 1-hour runs. The monitoring level(s) shall then be established 
as the average of the maximum (or minimum) point values from the three 
test runs. The average of the maximum values shall be used when 
establishing a maximum level, and the average of the minimum values 
shall be used when establishing a minimum level.
    (3) Batch process vents. The monitoring level(s) shall be 
established using the procedures specified in paragraphs (b)(3)(i) 
through (b)(3)(ii) of this section, as appropriate. The procedures 
specified in this paragraph (b)(3) may only be used if the batch 
emission episodes, or portions thereof, selected to be controlled were 
tested, and monitoring data were collected, during the entire period in 
which emissions were vented to the control device, as specified in 
Sec. 63.1325(c)(1)(i). If the owner or operator chose to test only a 
portion of the batch emission episode, or portion thereof, selected to 
be controlled, as specified in Sec. 63.1325(c)(1)(i)(A), the procedures 
in paragraph (c) of this section must be used.
    (i) If more than one batch emission episode or more than one 
portion of a batch emission episode has been selected to be controlled, 
a single level for the batch cycle shall be calculated as follows:
    (A) During initial compliance testing, the appropriate parameter 
shall be monitored continuously at all times when batch emission 
episodes, or portions thereof, selected to be controlled are vented to 
the control device.
    (B) The average monitored parameter value shall be calculated for 
each batch emission episode, or portion thereof, in the batch cycle 
selected to be controlled. The average shall be based on all values 
measured during the required performance test.
    (C) If the level to be established is a maximum operating 
parameter, the level shall be defined as the minimum of the average 
parameter values of the batch emission episodes, or portions thereof, 
in the batch cycle selected to be controlled.
    (D) If the level to be established is a minimum operating 
parameter, the level shall be defined as the maximum of the average 
parameter values of the batch emission episodes, or portions thereof, 
in the batch cycle selected to be controlled.
    (E) Alternatively, an average monitored parameter value shall be 
calculated for the entire batch cycle based on all values measured 
during each batch emission episode, or portion thereof, selected to be 
controlled.
    (ii) Instead of establishing a single level for the batch cycle, as 
described in paragraph (b)(3)(i) of this section, an owner or operator 
may establish separate levels for each batch emission episode, or 
portion thereof, selected to be controlled. Each level shall be 
determined as specified in paragraphs (b)(3)(i)(A) and (b)(3)(i)(B) of 
this section.
    (iii) The batch cycle shall be defined in the Notification of 
Compliance Status, as specified in Sec. 63.1335(e)(5). Said definition 
shall include an identification of each batch emission episode and the 
information required to determine parameter monitoring compliance for 
partial batch cycles (i.e., when part of a batch cycle is accomplished 
during two different operating days).
    (4) Aggregate batch vent streams. For aggregate batch vent streams, 
the monitoring level shall be established in accordance with paragraph 
(b)(2) of this section.
    (c) Establishment of parameter monitoring levels based on 
performance tests, engineering assessments, and/or manufacturer's 
recommendations. As required in paragraph (a) of this section,

[[Page 48274]]

the information specified in paragraphs (c)(2) and (c)(3) of this 
section shall be provided in the Precompliance Report.
    (1) Parameter monitoring levels established under this paragraph 
(c) shall be based on the parameter values measured during the 
performance test supplemented by engineering assessments and 
manufacturer's recommendations. Performance testing is not required to 
be conducted over the entire range of expected parameter values.
    (2) The specific level of the monitored parameter(s) for each 
emission point.
    (3) The rationale for the specific level for each parameter for 
each emission point, including any data and calculations used to 
develop the level and a description of why the level indicates proper 
operation of the control or recovery device.
    (d) Establishment of parameter monitoring based on engineering 
assessments and/or manufacturer's recommendations. If a performance 
test is not required by this subpart for a control or recovery device, 
the maximum or minimum level may be based solely on engineering 
assessments and/or manufacturer's recommendations. As required in 
paragraph (a) of this section, the determined level and all supporting 
documentation shall be provided in the Precompliance Report.
    (e) Compliance determinations. The provisions of this paragraph (e) 
apply only to emission points and control or recovery devices for which 
continuous monitoring is required under this subpart.
    (1) The parameter monitoring data for storage vessels, process 
vents, process wastewater streams, and emission points included in 
emissions averages that are required to perform continuous monitoring 
shall be used to determine compliance for the monitored control or 
recovery devices.
    (2) Except as provided in paragraphs (e)(3) and (g) of this 
section, for each excursion, as defined in paragraph (f) of this 
section, the owner or operator shall be deemed out of compliance with 
the provisions of this subpart.
    (3) If the daily average value of a monitored parameter is above 
the maximum level or below the minimum level established, or if 
monitoring data cannot be collected during monitoring device 
calibration check or monitoring device malfunction, but the affected 
source is operated during the periods of start-up, shutdown, or 
malfunction in accordance with the affected source's Start-up, 
Shutdown, and Malfunction Plan, then the event shall not be considered 
a monitoring parameter excursion.
    (f) Parameter monitoring excursion definitions.
    (1) For storage vessels, continuous process vents, aggregate batch 
vent streams, and wastewater streams, an excursion means any of the 
three cases listed in paragraphs (f)(1)(i) through (f)(1)(iii) of this 
section. For a control or recovery device where multiple parameters are 
monitored, if one or more of the parameters meets the excursion 
criteria in paragraphs (f)(1)(i) through (f)(1)(iii) of this section, 
this is considered a single excursion for the control or recovery 
device.
    (i) When the daily average value of one or more monitored 
parameters is above the maximum level or below the minimum level 
established for the given parameters.
    (ii) When the period of control or recovery device operation is 4 
hours or greater in an operating day and monitoring data are 
insufficient, as defined in paragraph (f)(1)(iv) of this section, to 
constitute a valid hour of data for at least 75 percent of the 
operating hours.
    (iii) When the period of control or recovery device operation is 
less than 4 hours in an operating day and more than two of the hours 
during the period of operation do not constitute a valid hour of data 
due to insufficient monitoring data, as defined in paragraph (f)(1)(iv) 
of this section.
    (iv) Monitoring data are insufficient to constitute a valid hour of 
data, as used in paragraphs (f)(1)(ii) and (f)(1)(iii) of this section, 
if measured values are unavailable for any of the 15-minute periods 
within the hour. For data compression systems approved under 
Sec. 63.1335(g)(3), monitoring data are insufficient to calculate a 
valid hour of data if there are less than four data measurements made 
during the hour.
    (2) For batch process vents, an excursion means one of the two 
cases listed in paragraphs (f)(2)(i) and (f)(2)(ii) of this section. 
For a control device where multiple parameters are monitored, if one or 
more of the parameters meets the excursion criteria in either paragraph 
(f)(2)(i) or (f)(2)(ii) of this section, this is considered a single 
excursion for the control device.
    (i) When the batch cycle daily average value of one or more 
monitored parameters is above the maximum or below the minimum 
established level for the given parameters.
    (ii) When monitoring data are insufficient. Monitoring data shall 
be considered insufficient when measured values are not available for 
at least 75 percent of the 15-minute periods when batch emission 
episodes, or portions thereof, selected to be controlled are being 
vented to the control device during the operating day.
    (g) Excused excursions. A number of excused excursions shall be 
allowed for each control or recovery device for each semiannual period. 
The number of excused excursions for each semiannual period is 
specified in paragraphs (g)(1) through (g)(6) of this section. This 
paragraph (g) applies to affected sources required to submit Periodic 
Reports semiannually or quarterly. The first semiannual period is the 
6-month period starting the date the Notification of Compliance Status 
is due.
    (1) For the first semiannual period--six excused excursions.
    (2) For the second semiannual period--five excused excursions.
    (3) For the third semiannual period--four excused excursions.
    (4) For the fourth semiannual period--three excused excursions.
    (5) For the fifth semiannual period--two excused excursions.
    (6) For the sixth and all subsequent semiannual periods--one 
excused excursion.

Sec. 63.1335  General recordkeeping and reporting provisions.

    (a) Data retention. Each owner or operator of an affected source 
shall keep copies of all applicable records and reports required by 
this subpart for at least 5 years, unless otherwise specified in this 
subpart.
    (b) Requirements of subpart A of this part. The owner or operator 
of an affected source shall comply with the applicable recordkeeping 
and reporting requirements in subpart A of this part as specified in 
Table 1 of this subpart. These requirements include, but are not 
limited to, the requirements specified in paragraphs (b)(1) and (b)(2) 
of this section.
    (1) Start-up, shutdown, and malfunction plan. The owner or operator 
of an affected source shall develop and implement a written start-up, 
shutdown, and malfunction plan as specified in Sec. 63.6(e)(3). This 
plan shall describe, in detail, procedures for operating and 
maintaining the affected source during periods of start-up, shutdown, 
and malfunction and a program for corrective action for malfunctioning 
process and air pollution control equipment used to comply with this 
subpart. The affected source shall keep this plan onsite and shall 
incorporate it by reference into their operating permit. Records 
associated with the plan shall be kept as specified in paragraphs 
(b)(1)(i)(A) through (b)(1)(i)(D) of this section.

[[Page 48275]]

Reports related to the plan shall be submitted as specified in 
paragraph (b)(1)(ii) of this section.
    (i) Records of start-up, shutdown, and malfunction. The owner or 
operator shall keep the records specified in paragraphs (b)(1)(i)(A) 
through (b)(1)(i)(D) of this section.
    (A) Records of the occurrence and duration of each malfunction of 
air pollution control equipment or continuous monitoring systems used 
to comply with this subpart.
    (B) For each start-up, shutdown, or malfunction, a statement that 
the procedures specified in the affected source's start-up, shutdown, 
and malfunction plan were followed; alternatively, documentation of any 
actions taken that are not consistent with the plan.
    (C) For continuous monitoring systems used to comply with this 
subpart, records documenting the completion of calibration checks and 
maintenance of continuous monitoring systems that are specified in the 
manufacturer's instructions.
    (D) Records specified in paragraphs (b)(1)(i)(B) and (b)(1)(i)(C) 
of this section are not required if they pertain solely to Group 2 
emission points that are not included in an emissions average or to 
Group 2 continuous process vents subject to Sec. 63.1315(a) with a 
total resource effectiveness value greater than 4.0 or, for Group 2 
continuous process vents subject to Sec. 63.1315(b), with a total 
resource effectiveness value greater than 6.7.
    (ii) Reports of start-up, shutdown, and malfunction. For the 
purposes of this subpart, the semiannual start-up, shutdown, and 
malfunction reports shall be submitted on the same schedule as the 
Periodic Reports required under paragraph (e)(6) of this section 
instead of the schedule specified in Sec. 63.10(d)(5)(i). Said reports 
shall include the information specified in paragraphs (b)(1)(i)(A) 
through (b)(1)(i)(C) of this section and shall contain the name, title, 
and signature of the owner or operator or other responsible official 
who is certifying its accuracy.
    (2) Application for approval of construction or reconstruction. For 
new affected sources, each owner or operator shall comply with the 
provisions in Sec. 63.5 regarding construction and reconstruction, 
excluding the provisions specified in Sec. 63.5 (d)(1)(ii)(H), (d)(2), 
and (d)(3)(ii).
    (c) Requirements of subpart H of this part. Owners or operators of 
affected sources shall comply with the reporting and recordkeeping 
requirements in subpart H of this part, except as specified in 
Sec. 63.1331.
    (d) Recordkeeping and documentation. Owners or operators required 
to keep continuous records shall keep records as specified in 
paragraphs (d)(1) through (d)(8) of this section, unless an alternative 
recordkeeping system has been requested and approved as specified in 
paragraph (g) or (h) of this section. Documentation requirements are 
specified in paragraphs (d)(9) and (d)(10) of this section.
    (1) The monitoring system shall measure data values at least once 
every 15 minutes.
    (2) The owner or operator shall record either each measured data 
value or block average values for 1 hour or shorter periods calculated 
from all measured data values during each period. If values are 
measured more frequently than once per minute, a single value for each 
minute may be used to calculate the hourly (or shorter period) block 
average instead of all measured values. Owners or operators of batch 
process vents must record each measured data value.
    (3) Daily average (or batch cycle daily average) values of each 
continuously monitored parameter shall be calculated for each operating 
day as specified in paragraphs (d)(3)(i) through (d)(3)(ii) of this 
section, except as specified in paragraph (d)(6) of this section.
    (i) The daily average value or batch cycle daily average shall be 
calculated as the average of all parameter values recorded during the 
operating day. As specified in Sec. 63.1326(e)(2)(i), only parameter 
values measured during those batch emission episodes, or portions 
thereof, in the batch cycle that the owner or operator has chosen to 
control shall be used to calculate the average. The calculated average 
shall cover a 24-hour period if operation is continuous, or the number 
of hours of operation per operating day if operation is not continuous.
    (ii) The operating day shall be the period the owner or operator 
specifies in the operating permit or the Notification of Compliance 
Status. It may be from midnight to midnight or another 24-hour period.
    (4) Records required when out of compliance. If the daily average 
(or batch cycle daily average) value of a monitored parameter for a 
given operating day is below the minimum level or above the maximum 
level established in the Notification of Compliance Status or operating 
permit, the owner or operator shall retain the data recorded that 
operating day under paragraph (d)(2) of this section.
    (5) Records required when in compliance for daily average value or 
batch cycle daily average value. If the daily average (or batch cycle 
daily average) value of a monitored parameter for a given operating day 
is above the minimum level or below the maximum level established in 
the Notification of Compliance Status or operating permit, the owner or 
operator shall either:
    (i) Retain block average values for 1 hour or shorter periods for 
that operating day; or
    (ii) Retain the data recorded in paragraph (d)(2) of this section.
    (6) Records required when all recorded values are in compliance. If 
all recorded values for a monitored parameter during an operating day 
are above the minimum level or below the maximum level established in 
the Notification of Compliance Status or operating permit, the owner or 
operator may record that all values were above the minimum level or 
below the maximum level rather than calculating and recording a daily 
average (or batch cycle daily average) for that operating day. For 
these operating days, the records required in paragraph (d)(5) of this 
section shall also be retained for 5 years.
    (7) Monitoring data recorded during periods of monitoring system 
breakdowns, repairs, calibration checks, and zero (low-level) and high-
level adjustments shall not be included in any average computed under 
this subpart. Records shall be kept of the times and durations of all 
such periods.
    (8) In addition to the periods specified in paragraph (d)(7) of 
this section, records shall be kept of the times and durations of any 
other periods during process operation or control device operation when 
monitors are not operating. For batch process vents, this paragraph 
(d)(8) only applies during batch emission episodes, or portions 
thereof, that the owner or operator has selected to control.
    (9) For each TPPU that is not part of the affected source because 
it does not use as a reactant or process solvent, or produce as a by-
product or co-product any organic HAP, the owner or operator shall 
maintain the documentation specified in Sec. 63.1310(b)(1).
    (10) For each flexible operation unit in which the primary product 
is determined to be something other than a thermoplastic product, the 
owner or operator shall maintain the documentation specified in 
Sec. 63.1310(f)(6).
    (e) Reporting and notification.
    (1) In addition to the reports and notifications required by 
subparts A and H of this part, as specified in this

[[Page 48276]]

subpart, the owner or operator of an affected source shall prepare and 
submit the reports listed in paragraphs (e)(3) through (e)(8) of this 
section, as applicable.
    (2) All reports required under this subpart shall be sent to the 
Administrator at the addresses listed in Sec. 63.13. If acceptable to 
both the Administrator and the owner or operator of an affected source, 
reports may be submitted on electronic media.
    (3) Precompliance Report. Affected sources requesting an extension 
for compliance, or requesting approval to use alternative monitoring 
parameters, alternative continuous monitoring and recordkeeping, or 
alternative controls, shall submit a Precompliance Report according to 
the schedule described in paragraph (e)(3)(i) of this section. The 
Precompliance Report shall contain the information specified in 
paragraphs (e)(3)(ii) through (e)(3)(vi) of this section, as 
appropriate.
    (i) Submittal dates. The Precompliance Report shall be submitted to 
the Administrator no later than 12 months prior to the compliance date. 
For new affected sources, the Precompliance Report shall be submitted 
to the Administrator with the application for approval of construction 
or reconstruction required in paragraph (b)(2) of this section.
    (ii) A request for an extension for compliance must be submitted in 
the Precompliance Report, if it has not been submitted to the operating 
permit authority as part of the operating permit application. The 
request for a compliance extension will include the data outlined in 
Sec. 63.6(i)(6)(i) (A), (B), and (D), as required in 
Sec. 63.1311(e)(1).
    (iii) The alternative monitoring parameter information required in 
paragraph (f) of this section shall be submitted if, for any emission 
point, the owner or operator of an affected source seeks to comply 
through the use of a control technique other than those for which 
monitoring parameters are specified in this subpart or in subpart G of 
this part or seeks to comply by monitoring a different parameter than 
those specified in this subpart or in subpart G of this part.
    (iv) If the affected source seeks to comply using alternative 
continuous monitoring and recordkeeping as specified in paragraph (g) 
of this section, the information requested in paragraph (e)(3)(iv)(A) 
or (e)(3)(iv)(B) of this section must be submitted in the Precompliance 
Report.
    (A) The owner or operator must submit notification of the intent to 
use the provisions specified in paragraph (g) of this section; or
    (B) The owner or operator must submit a request for approval to use 
alternative continuous monitoring and recordkeeping provisions as 
specified in paragraph (g) of this section.
    (v) The owner or operator shall report the intent to use 
alternative controls to comply with the provisions of this subpart. 
Alternative controls must be deemed by the Administrator to be 
equivalent to the controls required by the standard, under the 
procedures outlined in Sec. 63.6(g).
    (vi) If an owner or operator demonstrates that the emissions 
estimation equations contained in Sec. 63.1323(b) are inappropriate as 
specified in Sec. 63.1323(b)(6)(ii)(B), the information required by 
Sec. 63.1323(b)(6)(ii)(D) shall be submitted.
    (vii) If an owner or operator establishes parameter monitoring 
levels according to the procedures contained in Sec. 63.1334 (c) or 
(d), the information specified by Sec. 63.1334 (c) or (d), as 
appropriate.
    (4) Emissions Averaging Plan. For all existing affected sources 
using emissions averaging, an Emissions Averaging Plan shall be 
submitted for approval according to the schedule and procedures 
described in paragraph (e)(4)(i) of this section. The Emissions 
Averaging Plan shall contain the information specified in paragraph 
(e)(4)(ii) of this section, unless the information required in 
paragraph (e)(4)(ii) of this section is submitted with an operating 
permit application. An owner or operator of an affected source who 
submits an operating permit application instead of an Emissions 
Averaging Plan shall submit the information specified in paragraph 
(e)(8) of this section. In addition, a supplement to the Emissions 
Averaging Plan, as required under paragraph (e)(4)(iii) of this 
section, is to be submitted whenever alternative controls or operating 
scenarios may be used to comply with this subpart. Updates to the 
Emissions Averaging Plan shall be submitted in accordance with 
paragraph (e)(4)(iv) of this section.
    (i) Submittal and approval. The Emissions Averaging Plan shall be 
submitted no later than 18 months prior to the compliance date, and it 
is subject to Administrator approval. The Administrator shall determine 
within 120 operating days whether the Emissions Averaging Plan 
submitted presents sufficient information. The Administrator shall 
either approve the Emissions Averaging Plan, request changes, or 
request that the owner or operator submit additional information. Once 
the Administrator receives sufficient information, the Administrator 
shall approve, disapprove, or request changes to the plan within 120 
operating days.
    (ii) Information required. The Emissions Averaging Plan shall 
contain the information listed in paragraphs (e)(4)(ii)(A) through 
(e)(4)(ii)(K) of this section for all emission points included in an 
emissions average.
    (A) The required information shall include the identification of 
all emission points in the planned emissions average and, where 
applicable, notation of whether each storage vessel, continuous process 
vent, batch process vent, aggregate batch vent stream, and process 
wastewater stream is a Group 1 or Group 2 emission point, as defined in 
Sec. 63.1312 or as designated under Sec. 63.1332 (c)(3) through (c)(5).
    (B) The required information shall include the projected emission 
debits and credits for each emission point and the sum for the emission 
points involved in the average calculated according to Sec. 63.1332. 
The projected credits must be greater than or equal to the projected 
debits, as required under Sec. 63.1332(e)(3).
    (C) The required information shall include the specific control 
technology or pollution prevention measure that will be used for each 
emission point included in the average and date of application or 
expected date of application.
    (D) The required information shall include the specific 
identification of each emission point affected by a pollution 
prevention measure. To be considered a pollution prevention measure, 
the criteria in Sec. 63.1332(j)(1) must be met. If the same pollution 
prevention measure reduces or eliminates emissions from multiple 
emission points in the average, the owner or operator must identify 
each of these emission points.
    (E) The required information shall include a statement that the 
compliance demonstration, monitoring, inspection, recordkeeping, and 
reporting provisions in Sec. 63.1332 (m), (n), and (o) that are 
applicable to each emission point in the emissions average will be 
implemented beginning on or before the date of compliance.
    (F) The required information shall include documentation of the 
data listed in paragraphs (e)(4)(ii)(F)(1) through (e)(4)(ii)(F)(5) of 
this section for each storage vessel and continuous process vent 
subject to Sec. 63.1315 included in the average.
    (1) The required documentation shall include the values of the 
parameters used to determine whether the emission point is Group 1 or 
Group 2. Where TRE index value is used for continuous

[[Page 48277]]

process vent group determination, the estimated or measured values of 
the parameters used in the TRE equation in Sec. 63.115(d) and the 
resulting TRE index value shall be submitted.
    (2) The required documentation shall include the estimated values 
of all parameters needed for input to the emission debit and credit 
calculations in Sec. 63.1332 (g) and (h). These parameter values shall 
be specified in the affected source's Emissions Averaging Plan (or 
operating permit) as enforceable operating conditions. Changes to these 
parameters must be reported as required by paragraph (e)(4)(iv) of this 
section.
    (3) The required documentation shall include the estimated percent 
reduction if a control technology achieving a lower percent reduction 
than the efficiency of the applicable reference control technology or 
standard is or will be applied to the emission point.
    (4) The required documentation shall include the anticipated 
nominal efficiency if a control technology achieving a greater percent 
emission reduction than the efficiency of the reference control 
technology is or will be applied to the emission point. The procedures 
in Sec. 63.1332(i) shall be followed to apply for a nominal efficiency.
    (5) The required documentation shall include the operating plan 
required by Sec. 63.1314, as specified in Sec. 63.122 (a)(2) and (b) 
for each storage vessel controlled with a closed-vent system with a 
control device other than a flare.
    (G) The information specified in paragraph (f) of this section 
shall be included in the Emissions Averaging Plan for:
    (1) Each continuous process vent subject to Sec. 63.1315 controlled 
by a pollution prevention measure or control technique for which 
monitoring parameters or inspection procedures are not specified in 
Sec. 63.114; and
    (2) Each storage vessel controlled by pollution prevention or a 
control technique other than an internal or external floating roof or a 
closed vent system with a control device.
    (H) The required information shall include documentation of the 
data listed in paragraphs (e)(4)(ii)(H)(1) through (e)(4)(ii)(H)(5) of 
this section for each collection of continuous process vents located in 
a process section within the affected source subject to Sec. 63.1316 
(b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), or (c)(1) included in the 
average.
    (1) For continuous process vents subject to Sec. 63.1316(b)(1)(i), 
the required documentation shall include the values of the parameters 
used to determine whether the emission point is Group 1 or Group 2. 
Continuous process vents subject to Sec. 63.1316 (b)(1)(ii), (b)(2)(i), 
(b)(2)(ii), or (c)(1) are considered Group 1 emission points for 
purposes of emissions averaging, as specified in Sec. 63.1332(c)(5).
    (2) The required documentation shall include the estimated values 
of all parameters needed for input to the emission debit and credit 
calculations in Sec. 63.1332 (g) and (h). These parameter values shall 
be specified in the affected source's Emissions Averaging Plan (or 
operating permit) as enforceable operating conditions. Changes to these 
parameters must be reported as required by paragraph (e)(4)(iv) of this 
section.
    (3) For process sections generating debits or credits by comparing 
actual emissions expressed as kg HAP emissions per Mg of product to the 
applicable standard, the required documentation shall include the 
actual emission level expressed as kg HAP emissions per Mg of product.
    (4) For process sections using combustion control devices, the 
required documentation shall include the estimated percent reduction if 
a control technology achieving a lower percent reduction than the 
efficiency of the applicable reference control technology or standard 
is or will be applied to the emission point.
    (5) For process sections using combustion control devices, the 
required documentation shall include the anticipated nominal efficiency 
if a control technology achieving a greater percent emission reduction 
than the efficiency of the reference control technology is or will be 
applied to the emission point. The procedures in Sec. 63.1332(i) shall 
be followed to apply for a nominal efficiency.
    (I) For each pollution prevention measure or control device used to 
reduce air emissions of organic HAP from each collection of continuous 
process vents located in a process section within the affected source 
subject to Sec. 63.1316 (b)(1)(i), (b)(1)(ii), (b)(2)(i), (b)(2)(ii), 
or (c)(1) and for which no monitoring parameters or inspection 
procedures are specified in Sec. 63.114, the information specified in 
paragraph (f) of this section, Alternative Monitoring Parameters, shall 
be included in the Emissions Averaging Plan.
    (J) The required information shall include documentation of the 
data listed in paragraphs (e)(4)(ii)(J)(1) through (e)(4)(ii)(J)(3) of 
this section for each batch process vent and aggregate batch vent 
stream included in the average.
    (1) The required documentation shall include the values of the 
parameters used to determine whether the emission point is Group 1 or 
Group 2.
    (2) The required documentation shall include the estimated values 
of all parameters needed for input to the emission debit and credit 
calculations in Sec. 63.1332 (g) and (h). These parameter values shall 
be specified in the affected source's Emissions Averaging Plan (or 
operating permit) as enforceable operating conditions. Changes to these 
parameters must be reported as required by paragraph (e)(4)(iv) of this 
section.
    (3) For batch process vents, the required documentation shall 
include the estimated percent reduction for the batch cycle. For 
aggregate batch vent streams, the required documentation shall include 
the estimated percent reduction achieved on a continuous basis.
    (K) For each pollution prevention measure or control device used to 
reduce air emissions of organic HAP from batch process vents or 
aggregate batch vent streams and for which no monitoring parameters or 
inspection procedures are specified in Sec. 63.1324, the information 
specified in paragraph (f) of this section, Alternative Monitoring 
Parameters, shall be included in the Emissions Averaging Plan.
    (L) The required information shall include documentation of the 
data listed in paragraphs (e)(4)(ii)(L)(1) through (e)(4)(ii)(L)(4) of 
this section for each process wastewater stream included in the 
average.
    (1) The required documentation shall include the data used to 
determine whether the wastewater stream is a Group 1 or Group 2 
wastewater stream and the information specified in Table 14b of subpart 
G of this part for wastewater streams at new and existing affected 
sources.
    (2) The required documentation shall include the estimated values 
of all parameters needed for input to the wastewater emission credit 
and debit calculations in Sec. 63.1332 (g) and (h). These parameter 
values shall be specified in the affected source's Emissions Averaging 
Plan (or operating permit) as enforceable operating conditions. Changes 
to these parameters must be reported as required by paragraph 
(e)(4)(iv) of this section.
    (3) The required documentation shall include the estimated percent 
reduction if:
    (i) A control technology that achieves an emission reduction less 
than or equal to the emission reduction that would otherwise have been 
achieved by a steam stripper designed to the specifications found in 
Sec. 63.138(g) is or

[[Page 48278]]

will be applied to the wastewater stream;
    (ii) A control technology achieving less than or equal to 95 
percent emission reduction is or will be applied to the vapor stream(s) 
vented and collected from the treatment processes; or
    (iii) A pollution prevention measure is or will be applied.
    (4) The required documentation shall include the anticipated 
nominal efficiency if the owner or operator plans to apply for a 
nominal efficiency under Sec. 63.1332(i). A nominal efficiency shall be 
applied for if:
    (i) A control technology that achieves an emission reduction 
greater than the emission reduction that would have been achieved by a 
steam stripper designed to the specifications found in Sec. 63.138(g), 
is or will be applied to the wastewater stream; or
    (ii) A control technology achieving greater than 95 percent 
emission reduction is or will be applied to the vapor stream(s) vented 
and collected from the treatment processes.
    (M) For each pollution prevention measure, treatment process, or 
control device used to reduce air emissions of organic HAP from 
wastewater and for which no monitoring parameters or inspection 
procedures are specified in Sec. 63.143, the information specified in 
paragraph (f) of this section, Alternative Monitoring Parameters, shall 
be included in the Emissions Averaging Plan.
    (N) The required information shall include documentation of the 
data required by Sec. 63.1332(k). The documentation must demonstrate 
that the emissions from the emission points proposed to be included in 
the average will not result in greater hazard or, at the option of the 
Administrator, greater risk to human health or the environment than if 
the emission points were not included in an emissions average.
    (iii) Supplement to Emissions Averaging Plan. The owner or operator 
required to prepare an Emissions Averaging Plan under paragraph (e)(4) 
of this section shall also prepare a supplement to the Emissions 
Averaging Plan for any alternative controls or operating scenarios that 
may be used to achieve compliance.
    (iv) Updates to Emissions Averaging Plan. The owner or operator of 
an affected source required to submit an Emissions Averaging Plan under 
paragraph (e)(4) of this section shall also submit written updates of 
the Emissions Averaging Plan to the Administrator for approval under 
the circumstances described in paragraphs (e)(4)(iv)(A) and 
(e)(4)(iv)(B) of this section unless the relevant information has been 
included and submitted in an operating permit application or amendment.
    (A) The owner or operator who plans to make a change listed in 
either paragraph (e)(4)(iv)(A)(1) or (e)(4)(iv)(A)(2) of this section 
shall submit an Emissions Averaging Plan update at least 120 operating 
days prior to making the change.
    (1) An Emissions Averaging Plan update shall be submitted whenever 
an owner or operator elects to achieve compliance with the emissions 
averaging provisions in Sec. 63.1332 by using a control technique other 
than that specified in the Emissions Averaging Plan or plans to monitor 
a different parameter or operate a control device in a manner other 
than that specified in the Emissions Averaging Plan.
    (2) An Emissions Averaging Plan update shall be submitted whenever 
an emission point or a TPPU is added to an existing affected source and 
is planned to be included in an emissions average, or whenever an 
emission point not included in the emissions average described in the 
Emissions Averaging Plan is to be added to an emissions average. The 
information in paragraph (e)(4) of this section shall be updated to 
include the additional emission point.
    (B) The owner or operator who has made a change as defined in 
paragraph (e)(4)(iv)(B)(1) or (e)(4)(iv)(B)(2) of this section shall 
submit an Emissions Averaging Plan update within 90 operating days 
after the information regarding the change is known to the affected 
source. The update may be submitted in the next quarterly periodic 
report if the change is made after the date the Notification of 
Compliance Status is due.
    (1) An Emissions Averaging Plan update shall be submitted whenever 
a process change is made such that the group status of any emission 
point in an emissions average changes.
    (2) An Emissions Averaging Plan update shall be submitted whenever 
a value of a parameter in the emission credit or debit equations in 
Sec. 63.1332 (g) or (h) changes such that it is below the minimum or 
above the maximum established level specified in the Emissions 
Averaging Plan and causes a decrease in the projected credits or an 
increase in the projected debits.
    (C) The Administrator shall approve or request changes to the 
Emissions Averaging Plan update within 120 operating days of receipt of 
sufficient information regarding the change for emission points 
included in emissions averages.
    (5) Notification of Compliance Status. For existing and new 
affected sources, a Notification of Compliance Status shall be 
submitted within 150 operating days after the compliance dates 
specified in Sec. 63.1311. The notification shall contain the 
information listed in paragraphs (e)(5)(i) through (e)(5)(viii) of this 
section.
    (i) The results of any emission point group determinations, process 
section applicability determinations, performance tests, inspections, 
continuous monitoring system performance evaluations, any other 
information used to demonstrate compliance, and any other information 
required to be included in the Notification of Compliance Status under 
Sec. 63.122 for storage vessels, Sec. 63.117 for continuous process 
vents, Sec. 63.146 for process wastewater, Sec. 63.1316 through 
Sec. 63.1320 for continuous process vents subject to Sec. 63.1316, 
Sec. 63.1327 for batch process vents, Sec. 63.1329 for process contact 
cooling towers, and Sec. 63.1332 for emission points included in an 
emissions average. In addition, each owner or operator shall comply 
with paragraph (e)(5)(i)(A) and (e)(5)(i)(B) of this section.
    (A) For performance tests, group determinations, and process 
section applicability determinations that are based on measurements, 
the Notification of Compliance Status shall include one complete test 
report, as described in paragraph (e)(5)(i)(B) of this section, for 
each test method used for a particular kind of emission point. For 
additional tests performed for the same kind of emission point using 
the same method, the results and any other required information shall 
be submitted, but a complete test report is not required.
    (B) A complete test report shall include a brief process 
description, sampling site description, description of sampling and 
analysis procedures and any modifications to standard procedures, 
quality assurance procedures, record of operating conditions during the 
test, record of preparation of standards, record of calibrations, raw 
data sheets for field sampling, raw data sheets for field and 
laboratory analyses, documentation of calculations, and any other 
information required by the test method.
    (ii) For each monitored parameter for which a maximum or minimum 
level is required to be established under Sec. 63.120(d)(3) for storage 
vessels, Sec. 63.114(e) for continuous process vents, Sec. 63.1324 for 
batch process vents and aggregate batch vent streams, Sec. 63.143(f) 
for process wastewater, Sec. 63.1332(m) for emission points in 
emissions averages,

[[Page 48279]]

paragraph (e)(8) or (f) of this section, the Notification of Compliance 
Status shall contain the information specified in paragraphs 
(e)(5)(ii)(A) through (e)(5)(ii)(D) of this section, unless this 
information has been established and provided in the operating permit.
    (A) The required information shall include the specific maximum or 
minimum level of the monitored parameter(s) for each emission point.
    (B) The required information shall include the rationale for the 
specific maximum or minimum level for each parameter for each emission 
point, including any data and calculations used to develop the level 
and a description of why the level indicates proper operation of the 
control device.
    (C) The required information shall include a definition of the 
affected source's operating day, as specified in paragraph (d)(3)(ii) 
of this section, for purposes of determining daily average values or 
batch cycle daily average values of monitored parameters.
    (D) For batch process vents, the required information shall include 
a definition of each batch cycle that requires the control of one or 
more batch emission episodes during the cycle, as specified in 
Sec. 63.1325(c)(2) and Sec. 63.1334(b)(3)(iii).
    (iii) For emission points included in an emissions average, the 
Notification of Compliance Status shall contain the values of all 
parameters needed for input to the emission credit and debit equations 
in Sec. 63.1332 (g) and (h), calculated or measured according to the 
procedures in Sec. 63.1332 (g) and (h), and the resulting calculation 
of credits and debits for the first quarter of the year. The first 
quarter begins on the compliance date specified.
    (iv) The determination of applicability for flexible operation 
units as specified in Sec. 63.1310(f)(6).
    (v) The parameter monitoring levels for flexible operation units, 
and the basis on which these levels were selected, or a demonstration 
that these levels are appropriate at all times, as specified in 
Sec. 63.1310(f)(7).
    (vi) The results for each predominant use determination for storage 
vessels belonging to an affected source subject to this subpart that is 
made under Sec. 63.1310(g)(6).
    (vii) The results for each predominant use determination for 
recovery operation equipment belonging to an affected source subject to 
this subpart that is made under Sec. 63.1310(h)(6).
    (viii) For owners or operators of Group 2 batch process vents 
establishing a batch cycle limitation as specified in Sec. 63.1325(g), 
the affected source's operating year for purposes of determining 
compliance with the batch cycle limitation.
    (6) Periodic Reports. For existing and new affected sources, each 
owner or operator shall submit Periodic Reports as specified in 
paragraphs (e)(6)(i) through (e)(6)(xi) of this section.
    (i) Except as specified in paragraphs (e)(6)(x) and (e)(6)(xi) of 
this section, a report containing the information in paragraph 
(e)(6)(ii) of this section or containing the information in paragraphs 
(e)(6)(iii) through (e)(6)(ix) of this section, as appropriate, shall 
be submitted semiannually no later than 60 operating days after the end 
of each 180 day period. The first report shall be submitted no later 
than 240 days after the date the Notification of Compliance Status is 
due and shall cover the 6-month period beginning on the date the 
Notification of Compliance Status is due. Subsequent reports shall 
cover each preceding 6-month period.
    (ii) If none of the compliance exceptions specified in paragraphs 
(e)(6)(iii) through (e)(6)(ix) of this section occurred during the 6-
month period, the Periodic Report required by paragraph (e)(6)(i) of 
this section shall be a statement that the affected source was in 
compliance for the preceding 6-month period and no activities specified 
in paragraphs (e)(6)(iii) through (e)(6)(ix) of this section occurred 
during the preceding 6-month period.
    (iii) For an owner or operator of an affected source complying with 
the provisions of Secs. 63.1314 through 63.1330 for any emission point 
or process section, Periodic Reports shall include:
    (A) All information specified in Sec. 63.122 for storage vessels; 
Secs. 63.117 and 63.118 and Sec. 63.1320 for continuous process vents, 
as applicable; Sec. 63.1327 for batch process vents and aggregate batch 
vent streams; Sec. 63.104 for heat exchange systems; and Sec. 63.146 
for process wastewater;
    (B) The daily average values or batch cycle daily average values of 
monitored parameters for both excused excursions, as defined in 
Sec. 63.1334(g), and unexcused excursions, as defined in 
Sec. 63.1334(f). For excursions caused by lack of monitoring data, the 
duration of periods when monitoring data were not collected shall be 
specified;
    (C) The periods when monitoring data were not collected shall be 
specified;
    (D) The information in paragraphs (e)(6)(iii)(D)(1) through 
(e)(6)(iii)(D)(3) of this section, as applicable:
    (1) Any supplements to the Emissions Averaging Plan, as required in 
paragraph (e)(4)(iii) of this section;
    (2) Notification if a process change is made such that the group 
status of any emission point changes. The information submitted shall 
include a compliance schedule, as specified in paragraphs 
(e)(6)(iii)(D)(2)(i) and (e)(6)(iii)(D)(2)(ii) of this section, for 
emission points that are added or that change from Group 2 to Group 1 
as specified in Sec. 63.1310(i)(2)(ii); for continuous process vents 
under the conditions listed in Sec. 63.1315(a)(12) or 
Sec. 63.1320(b)(3), as applicable; or for batch process vents under the 
conditions listed in Sec. 63.1327(b) or Sec. 63.1327(d). This 
information may be submitted in a separate report, as specified in 
Sec. 63.1315(a)(12), Sec. 63.1320(b)(3), Sec. 63.1327(b), or 
Sec. 63.1327(d); and
    (i) The owner or operator shall submit to the Administrator for 
approval a compliance schedule and a justification for the schedule.
    (ii) The Administrator shall approve the compliance schedule or 
request changes within 120 operating days of receipt of the compliance 
schedule and justification.
    (3) Notification if one or more emission point(s) or one or more 
TPPU is added to an affected source. The owner or operator shall submit 
the information contained in paragraphs (e)(6)(iii)(D)(3)(i) through 
(e)(6)(iii)(D)(3)(iii) of this section:
    (i) A description of the addition to the affected source;
    (ii) Notification of the group status of the additional emission 
point or all emission points in the TPPU; and
    (iii) A compliance schedule, as required under paragraph 
(e)(6)(iii)(D)(2) of this section.
    (E) The information in paragraph (b)(1)(ii) of this section for 
reports of start-up, shutdown, and malfunction.
    (iv) For each batch process vent with a batch cycle limitation, 
every second Periodic Report shall include the type and number of batch 
cycles accomplished during the preceding 12-month period and a 
statement that the batch process vent is either in or out of compliance 
with the batch cycle limitation.
    (v) If any performance tests are reported in a Periodic Report, the 
following information shall be included:
    (A) One complete test report shall be submitted for each test 
method used for a particular kind of emission point tested. A complete 
test report shall contain the information specified in paragraph 
(e)(5)(i)(B) of this section.
    (B) For additional tests performed for the same kind of emission 
point using the same method, results and any other information required 
shall be submitted, but a complete test report is not required.

[[Page 48280]]

    (vi) The Periodic Report shall include the results for each change 
made to a primary product determination for a thermoplastic product 
made under Sec. 63.1310(f)(6).
    (vii) The Periodic Report shall include the results for each change 
made to a predominant use determination for a storage vessel belonging 
to an affected source subject to this subpart that is made under 
Sec. 63.1310(g)(6).
    (viii) The Periodic Report shall include the results for each 
change made to a predominant use determination for recovery operation 
equipment belonging to an affected source subject to this subpart that 
is made under Sec. 63.1310(h)(6).
    (ix) The Periodic Report required by Sec. 63.1331(a)(5) may be 
submitted as part of the Periodic Report required by paragraph (e)(6) 
of this section.
    (x) The owner or operator of an affected source shall submit 
quarterly reports for all emission points included in an emissions 
average.
    (A) The quarterly reports shall be submitted no later than 60 
operating days after the end of each quarter. The first report shall be 
submitted with the Notification of Compliance Status no later than 150 
days after the compliance date.
    (B) The quarterly reports shall include the information specified 
in paragraphs (e)(6)(x)(B)(1) through (e)(6)(x)(B)(7) of this section 
for all emission points included in an emissions average.
    (1) The credits and debits calculated each month during the 
quarter;
    (2) A demonstration that debits calculated for the quarter are not 
more than 1.30 times the credits calculated for the quarter, as 
required under Sec. 63.1332(e)(4);
    (3) The values of any inputs to the debit and credit equations in 
Sec. 63.1332(g) and (h) that change from month to month during the 
quarter or that have changed since the previous quarter;
    (4) Results of any performance tests conducted during the reporting 
period including one complete report for each test method used for a 
particular kind of emission point as described in paragraph (e)(6)(v) 
of this section;
    (5) Reports of daily average (or batch cycle daily average) values 
of monitored parameters for excursions as defined in Sec. 63.1334(f);
    (6) For excursions caused by lack of monitoring data, the duration 
of periods when monitoring data were not collected shall be specified; 
and
    (7) Any other information the affected source is required to report 
under the operating permit or Emissions Averaging Plan for the affected 
source.
    (C) Sec. 63.1334 shall govern the use of monitoring data to 
determine compliance for Group 1 and Group 2 emission points included 
in emissions averages.
    (D) Every fourth quarterly report shall include the following:
    (1) A demonstration that annual credits are greater than or equal 
to annual debits as required by Sec. 63.1332(e)(3); and
    (2) A certification of compliance with all the emissions averaging 
provisions in Sec. 63.1332.
    (xi) The owner or operator of an affected source shall submit 
quarterly reports for particular emission points and process sections 
not included in an emissions average as specified in paragraphs 
(e)(6)(xi)(A) through (e)(6)(xi)(E) of this section.
    (A) If requested by the Administrator, the owner or operator of an 
affected source shall submit quarterly reports for a period of 1 year 
for an emission point or process section that is not included in an 
emissions average if either condition in paragraph (e)(6)(xi)(A)(1) or 
(e)(6)(xi)(A)(2) of this section is met.
    (1) An emission point has any excursions, as defined in 
Sec. 63.1334(f), for a semiannual reporting period.
    (2) A process section subject to Sec. 63.1316 is out of compliance 
with its applicable standard.
    (B) The quarterly reports shall include all information specified 
in paragraphs (e)(6)(iii) through (e)(6)(ix) of this section applicable 
to the emission point or process section for which quarterly reporting 
is required under paragraph (e)(6)(xi)(A) of this section. Information 
applicable to other emission points within the affected source shall be 
submitted in the semiannual reports required under paragraph (e)(6)(i) 
of this section.
    (C) Quarterly reports shall be submitted no later than 60 operating 
days after the end of each quarter.
    (D) After quarterly reports have been submitted for an emission 
point for 1 year, the owner or operator may return to semiannual 
reporting for the emission point or process section unless the 
Administrator requests the owner or operator to continue to submit 
quarterly reports.
    (E) Sec. 63.1334 shall govern the use of monitoring data to 
determine compliance for Group 1 emission points.
    (7) Other reports. Other reports shall be submitted as specified in 
paragraphs (e)(7)(i) through (e)(7)(ii) of this section.
    (i) For storage vessels, the notifications of inspections required 
by Sec. 63.1314 shall be submitted as specified in Sec. 63.122 (h)(1) 
and (h)(2).
    (ii) For owners or operators of affected sources required to 
request approval for a nominal control efficiency for use in 
calculating credits for an emissions average, the information specified 
in Sec. 63.1332(i) shall be submitted.
    (8) Operating permit. An owner or operator who submits an operating 
permit application instead of an Emissions Averaging Plan or a 
Precompliance Report shall submit the following information with the 
operating permit application:
    (i) The information specified in paragraph (e)(4) of this section 
for points included in an emissions average;
    (ii) The information specified in paragraph (e)(5) of this section, 
Notification of Compliance Status, as applicable; and
    (iii) The information specified in paragraph (e)(3) of this 
section, Precompliance Report, as applicable.
    (f) Alternative monitoring parameters. The owner or operator who 
has been directed by any section of this subpart to set unique 
monitoring parameters, or who requests approval to monitor a different 
parameter than those specified in Sec. 63.1314 for storage vessels, 
Sec. 63.1315 or 63.1317, as appropriate, for continuous process vents, 
Sec. 63.1321 for batch process vents and aggregate batch vent streams, 
or Sec. 63.1330 for wastewater shall submit the information specified 
in paragraphs (f)(1) through (f)(3) of this section in the 
Precompliance Report, as required by paragraph (e)(3) of this section. 
The owner or operator shall retain for a period of 5 years each record 
required by paragraphs (f)(1) through (f)(3) of this section.
    (1) The required information shall include a description of the 
parameter(s) to be monitored to ensure the recovery device, control 
device, or pollution prevention measure is operated in conformance with 
its design and achieves the specified emission limit, percent 
reduction, or nominal efficiency, and an explanation of the criteria 
used to select the parameter(s).
    (2) The required information shall include a description of the 
methods and procedures that will be used to demonstrate that the 
parameter indicates proper operation, the schedule for this 
demonstration, and a statement that the owner or operator will 
establish a level for the monitored parameter as part of the 
Notification of Compliance Status report required in paragraph (e)(5) 
of this section, unless this information has already been included in 
the operating permit application.
    (3) The required information shall include a description of the 
proposed

[[Page 48281]]

monitoring, recordkeeping, and reporting system, to include the 
frequency and content of monitoring, recordkeeping, and reporting. 
Further, the rationale for the proposed monitoring, recordkeeping, and 
reporting system shall be included if either condition in paragraph 
(f)(3)(i) or (f)(3)(ii) of this section is met:
    (i) If monitoring and recordkeeping is not continuous; or
    (ii) If reports of daily average values will not be included in 
Periodic Reports when the monitored parameter value is above the 
maximum level or below the minimum level as established in the 
operating permit or the Notification of Compliance Status.
    (g) Alternative continuous monitoring and recordkeeping. An owner 
or operator choosing not to implement the provisions listed in 
Sec. 63.1315 or 63.1317, as appropriate, for continuous process vents, 
Sec. 63.1321 for batch process vents and aggregate batch vent streams, 
Sec. 63.1314 for storage vessels, or Sec. 63.1330 for wastewater, may 
instead request approval to use alternative continuous monitoring and 
recordkeeping provisions according to the procedures specified in 
paragraphs (g)(1) through (g)(4) of this section. Requests shall be 
submitted in the Precompliance Report as specified in paragraph (e)(3) 
of this section, if not already included in the operating permit 
application, and shall contain the information specified in paragraphs 
(g)(2)(ii) and (g)(3)(ii) of this section, as applicable.
    (1) The provisions in Sec. 63.8(f)(5)(i) shall govern the review 
and approval of requests.
    (2) An owner or operator of an affected source that does not have 
an automated monitoring and recording system capable of measuring 
parameter values at least once every 15 minutes and that does not 
generate continuous records may request approval to use a nonautomated 
system with less frequent monitoring, in accordance with paragraphs 
(g)(2)(i) and (g)(2)(ii) of this section.
    (i) The requested system shall include manual reading and recording 
of the value of the relevant operating parameter no less frequently 
than once per hour. Daily average (or batch cycle daily average) values 
shall be calculated from these hourly values and recorded.
    (ii) The request shall contain:
    (A) A description of the planned monitoring and recordkeeping 
system;
    (B) Documentation that the affected source does not have an 
automated monitoring and recording system;
    (C) Justification for requesting an alternative monitoring and 
recordkeeping system; and
    (D) Demonstration to the Administrator's satisfaction that the 
proposed monitoring frequency is sufficient to represent control or 
recovery device operating conditions, considering typical variability 
of the specific process and control or recovery device operating 
parameter being monitored.
    (3) An owner or operator may request approval to use an automated 
data compression recording system that does not record monitored 
operating parameter values at a set frequency (for example, once every 
15 minutes) but records all values that meet set criteria for variation 
from previously recorded values, in accordance with paragraphs 
(g)(3)(i) and (g)(3)(ii) of this section.
    (i) The requested system shall be designed to:
    (A) Measure the operating parameter value at least once every 15 
minutes;
    (B) Except for the monitoring of batch process vents, calculate 
hourly average values each hour during periods of operation;
    (C) Record the date and time when monitors are turned off or on;
    (D) Recognize unchanging data that may indicate the monitor is not 
functioning properly, alert the operator, and record the incident;
    (E) Calculate daily average (or batch cycle daily average) values 
of the monitored operating parameter based on all measured data; and
    (F) If the daily average is not an excursion, as defined in 
Sec. 63.1334(f), the data for that operating day may be converted to 
hourly average values and the four or more individual records for each 
hour in the operating day may be discarded.
    (ii) The request shall contain:
    (A) A description of the monitoring system and data compression 
recording system, including the criteria used to determine which 
monitored values are recorded and retained;
    (B) The method for calculating daily averages and batch cycle daily 
averages; and
    (C) A demonstration that the system meets all criteria in paragraph 
(g)(3)(i) of this section.
    (4) An owner or operator may request approval to use other 
alternative monitoring systems according to the procedures specified in 
Sec. 63.8(f).
    (h) Reduced recordkeeping program. For any parameter with respect 
to any item of equipment, the owner or operator may implement the 
recordkeeping requirements specified in paragraph (h)(1) or (h)(2) of 
this section as alternatives to the provisions specified in 
Sec. 63.1314 for storage vessels, Sec. 63.1315 or 63.1317, as 
appropriate, for continuous process vents, Sec. 63.1321 for batch 
process vents and aggregate batch vent streams, or Sec. 63.1330 for 
wastewater. The owner or operator shall retain for a period of 5 years 
each record required by paragraph (h)(1) or (h)(2) of this section.
    (1) The owner or operator may retain only the daily average (or 
batch cycle daily average) value, and is not required to retain more 
frequent monitored operating parameter values, for a monitored 
parameter with respect to an item of equipment, if the requirements of 
paragraphs (h)(1)(i) through (h)(1)(vi) of this section are met. An 
owner or operator electing to comply with the requirements of paragraph 
(h)(1) of this section shall notify the Administrator in the 
Notification of Compliance Status or, if the Notification of Compliance 
Status has already been submitted, in the Periodic Report immediately 
preceding implementation of the requirements of paragraph (h)(1) of 
this section.
    (i) The monitoring system is capable of detecting unrealistic or 
impossible data during periods of operation other than start-ups, 
shutdowns, or malfunctions (e.g., a temperature reading of -200  deg.C 
on a boiler), and will alert the operator by alarm or other means. The 
owner or operator shall record the occurrence. All instances of the 
alarm or other alert in an operating day constitute a single 
occurrence.
    (ii) The monitoring system generates, updated at least hourly 
throughout each operating day, a running average of the monitoring 
values that have been obtained during that operating day, and the 
capability to observe this running average is readily available to the 
Administrator on-site during the operating day. The owner or operator 
shall record the occurrence of any period meeting the criteria in 
paragraphs (h)(1)(ii)(A) through (h)(1)(ii)(C) of this section. All 
instances in an operating day constitute a single occurrence.
    (A) The running average is above the maximum or below the minimum 
established limits;
    (B) The running average is based on at least six 1-hour periods; 
and
    (C) The running average reflects a period of operation other than a 
start-up, shutdown, or malfunction.
    (iii) The monitoring system is capable of detecting unchanging data 
during periods of operation other than start-ups, shutdowns, or 
malfunctions, except in circumstances where the presence of unchanging 
data is the expected

[[Page 48282]]

operating condition based on past experience (e.g., pH in some 
scrubbers), and will alert the operator by alarm or other means. The 
owner or operator shall record the occurrence. All instances of the 
alarm or other alert in an operating day constitute a single 
occurrence.
    (iv) The monitoring system will alert the owner or operator by an 
alarm, if the running average parameter value calculated under 
paragraph (h)(1)(ii) of this section reaches a set point that is 
appropriately related to the established limit for the parameter that 
is being monitored.
    (v) The owner or operator shall verify the proper functio
FR Doc. 96-22781 National Emissions Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins
ning of 
the monitoring system, including its ability to comply with the 
requirements of paragraph (h)(1) of this section, at the times 
specified in paragraphs (h)(1)(v)(A) through (h)(1)(v)(C). The owner or 
operator shall document that the required verifications occurred.
    (A) Upon initial installation.
    (B) Annually after initial installation.
    (C) After any change to the programming or equipment constituting 
the monitoring system, which might reasonably be expected to alter the 
monitoring system's ability to comply with the requirements of this 
section.
    (vi) The owner or operator shall retain the records identified in 
paragraphs (h)(1)(vi)(A) through (h)(1)(vi)(C) of this section.
    (A) Identification of each parameter, for each item of equipment, 
for which the owner or operator has elected to comply with the 
requirements of paragraph (h) of this section.
    (B) A description of the applicable monitoring system(s), and of 
how compliance will be achieved with each requirement of paragraphs 
(h)(1)(i) through (h)(1)(v) of this section. The description shall 
identify the location and format (e.g., on-line storage, log entries) 
for each required record. If the description changes, the owner or 
operator shall retain both the current and the most recent superseded 
description.
    (C) A description, and the date, of any change to the monitoring 
system that would reasonably be expected to affect its ability to 
comply with the requirements of paragraph (h)(1) of this section.
    (2) If an owner or operator has elected to implement the 
requirements of paragraph (h)(1) of this section for a monitored 
parameter with respect to an item of equipment and a period of 6 
consecutive months has passed without an excursion as defined in 
paragraph (h)(2)(iv) of this section, the owner or operator is no 
longer required to record the daily average (or batch cycle daily 
average) value for any operating day when the daily average (or batch 
cycle daily average) value is less than the maximum or greater than the 
minimum established limit. With approval by the Administrator, 
monitoring data generated prior to the compliance date of this subpart 
shall be credited toward the period of 6 consecutive months, if the 
parameter limit and the monitoring accomplished during the period prior 
to the compliance date was required and/or approved by the 
Administrator.
    (i) If the owner or operator elects not to retain the daily average 
(or batch cycle daily average) values, the owner or operator shall 
notify the Administrator in the next Periodic Report. The notification 
shall identify the parameter and unit of equipment.
    (ii) If, on any operating day after the owner or operator has 
ceased recording daily average (or batch cycle daily average) values as 
provided in paragraph (h)(2) of this section, there is an excursion as 
defined in paragraph (h)(2)(iv) of this section, the owner or operator 
shall immediately resume retaining the daily average (or batch cycle 
daily average) value for each operating day and shall notify the 
Administrator in the next Periodic Report. The owner or operator shall 
continue to retain each daily average (or batch cycle daily average) 
value until another period of 6 consecutive months has passed without 
an excursion as defined in paragraph (h)(2)(iv) of this section.
    (iii) The owner or operator shall retain the records specified in 
paragraphs (h)(1)(i), (h)(1)(ii), and (h)(1)(vi) of this section, for 
the duration specified in paragraph (h) of this section. For any 
calendar week, if compliance with paragraphs (h)(1)(i) through 
(h)(1)(iv) of this section does not result in retention of a record of 
at least one occurrence or measured parameter value, the owner or 
operator shall record and retain at least one parameter value during a 
period of operation other than a start-up, shutdown, or malfunction.
    (iv) For purposes of paragraph (h) of this section, an excursion 
means that the daily average (or batch cycle daily average) value of 
monitoring data for a parameter is greater than the maximum, or less 
than the minimum established value, except as provided in paragraphs 
(h)(2)(iv)(A) and (h)(2)(iv)(B) of this section.
    (A) The daily average (or batch cycle daily average) value during 
any start-up, shutdown, or malfunction shall not be considered an 
excursion for purposes of paragraph (h)(2) of this section, if the 
owner or operator follows the applicable provisions of the start-up, 
shutdown, and malfunction plan required by Sec. 63.6(e)(3).
    (B) An excused excursion, as described in Sec. 63.1334(g), shall 
not be considered an excursion for purposes of paragraph (h)(2) of this 
section.
Tables to Subpart JJJ of Part 63

                  Table 1.--Applicability of General Provisions to Subpart JJJ Affected Sources                 
----------------------------------------------------------------------------------------------------------------
                     Reference                         Applies to  subpart JJJ                Comment           
----------------------------------------------------------------------------------------------------------------
63.1(a)(1)........................................  Yes..........................  Sec.  63.1312 specifies      
                                                                                    definitions in addition to  
                                                                                    or that supersede           
                                                                                    definitions in Sec.  63.2.  
63.1(a)(2)-63.1(a)(3).............................  Yes.                                                        
63.1(a)(4)........................................  Yes..........................  Subpart JJJ (this table)     
                                                                                    specifies the applicability 
                                                                                    of each paragraph in subpart
                                                                                    A to subpart JJJ.           
63.1(a)(5)........................................  No...........................  Reserved.                    
63.1(a)(6)-63.1(a)(8).............................  Yes.                                                        
63.1(a)(9)........................................  No...........................  Reserved.                    
63.1(a)(10).......................................  No...........................  Subpart JJJ and other cross- 
                                                                                    referenced subparts specify 
                                                                                    calendar or operating day.  
63.1(a)(11).......................................  Yes.                                                        
63.1(a)(12)-63.1(a)(14)...........................  Yes.                                                        
63.1(b)(1)........................................  Yes..........................  Subpart JJJ (this table)     
                                                                                    specifies the applicability 
                                                                                    of each paragraph in subpart
                                                                                    A to subpart JJJ.           
63.1(b)(2)........................................  Yes.                                                        

[[Page 48283]]

                                                                                                                
63.1(b)(3)........................................  No...........................  Sec.  63.1310(b) provides    
                                                                                    documentation requirements  
                                                                                    for TPPUs not considered    
                                                                                    affected sources.           
63.1(c)(1)........................................  Yes..........................  Subpart JJJ (this table)     
                                                                                    specifies the applicability 
                                                                                    of each paragraph in subpart
                                                                                    A to subpart JJJ.           
63.1(c)(2)........................................  No...........................  Area sources are not subject 
                                                                                    to subpart JJJ.             
63.1(c)(3)........................................  No...........................  Reserved.                    
63.1(c)(4)........................................  Yes.                                                        
63.1(c)(5)........................................  Yes..........................  Except that affected sources 
                                                                                    are not required to submit  
                                                                                    notifications overridden by 
                                                                                    this table.                 
63.1(d)...........................................  No...........................  Reserved.                    
63.1(e)...........................................  Yes.                                                        
63.2..............................................  Yes..........................  Sec.  63.1312 specifies those
                                                                                    subpart A definitions that  
                                                                                    apply to subpart JJJ.       
63.3..............................................  Yes..........................  Subpart JJJ specifies those  
                                                                                    units of measure that apply 
                                                                                    to subpart JJJ.             
63.4(a)(1)-63.4(a)(3).............................  Yes.                                                        
63.4(a)(4)........................................  No...........................  Reserved.                    
63.4(a)(5)........................................  Yes.                                                        
63.4(b)...........................................  Yes.                                                        
63.4(c)...........................................  Yes.                                                        
63.5(a)...........................................  Yes.                                                        
63.5(b)(1)........................................  Yes.                                                        
63.5(b)(2)........................................  No...........................  Reserved.                    
63.5(b)(3)........................................  Yes.                                                        
63.5(b)(4)........................................  No...........................  Area sources are not subject 
                                                                                    to subpart JJJ.             
63.5(b)(5)........................................  Yes.                                                        
63.5(b)(6)........................................  No...........................  Sec.  63.1310(i) specifies   
                                                                                    requirements.               
63.5(c)...........................................  No...........................  Reserved.                    
63.5(d)(1)(i).....................................  No.                                                         
63.5(d)(1)(ii)....................................  Yes..........................  Except that for affected     
                                                                                    sources subject to subpart  
                                                                                    JJJ, emission estimates     
                                                                                    specified in Sec.           
                                                                                    63.5(d)(1)(ii)(H) are not   
                                                                                    required.                   
63.5(d)(1)(iii)...................................  Yes..........................  Except that Sec.             
                                                                                    63.1335(e)(5) specifies     
                                                                                    Notification of Compliance  
                                                                                    Status requirements.        
63.5(d)(2)........................................  No.                                                         
63.5(d)(3)........................................  Yes..........................  Except Sec.  63.5(d)(3)(ii)  
                                                                                    does not apply.             
63.5(d)(4)........................................  Yes.                                                        
63.5(e)...........................................  Yes.                                                        
63.5(f)(1)........................................  Yes.                                                        
63.5(f)(2)........................................  Yes..........................  Except that where Sec.       
                                                                                    63.5(d)(1) is referred to,  
                                                                                    Sec.  63.5(d)(1)(i) does not
                                                                                    apply.                      
63.6(a)...........................................  Yes.                                                        
63.6(b)(1)........................................  Yes.                                                        
63.6(b)(2)........................................  Yes.                                                        
63.6(b)(3)........................................  Yes.                                                        
63.6(b)(4)........................................  Yes.                                                        
63.6(b)(5)........................................  Yes.                                                        
63.6(b)(6)........................................  No...........................  Reserved.                    
63.6(b)(7)........................................  Yes.                                                        
63.6(c)(1)........................................  Yes..........................  Sec.  63.1311 specifies the  
                                                                                    compliance date.            
63.6(c)(2)........................................  Yes.                                                        
63.6(c)(3)........................................  No...........................  Reserved.                    
63.6(c)(4)........................................  No...........................  Reserved.                    
63.6(c)(5)........................................  Yes.                                                        
63.6(d)...........................................  No...........................  Reserved.                    
63.6(e)...........................................  Yes..........................  Except the plan, and any     
                                                                                    records or reports of start-
                                                                                    up, shutdown and malfunction
                                                                                    do not apply to Group 2     
                                                                                    emission points, unless they
                                                                                    are included in an emissions
                                                                                    average.                    
63.6(f)(1)........................................  Yes.                                                        
63.6(f)(2)........................................  Yes..........................  Except Sec.  63.7(c), as     
                                                                                    referred to in Sec.         
                                                                                    63.6(f)(2)(iii)(D), does not
                                                                                    apply.                      
63.6(f)(3)........................................  Yes.                                                        
63.6(g)...........................................  Yes.                                                        
63.6(h)...........................................  No...........................  Subpart JJJ does not require 
                                                                                    opacity and visible emission
                                                                                    standards.                  
63.6(i)...........................................  Yes..........................  Except for Sec.  63.6(i)(15),
                                                                                    which is reserved.          
63.6(j)...........................................  Yes.                                                        
63.7(a)(1)........................................  Yes.                                                        
63.7(a)(2)........................................  No...........................  Sec.  63.1335(e)(5) specifies
                                                                                    submittal dates.            
63.7(a)(3)........................................  Yes.                                                        
63.7(b)...........................................  No...........................  Sec.  63.1333(a)(4) specifies
                                                                                    notification requirements.  
63.7(c)...........................................  No.                                                         
63.7(d)...........................................  Yes.                                                        
63.7(e)...........................................  Yes..........................  Except that performance tests
                                                                                    must be conducted at maximum
                                                                                    representative operating    
                                                                                    conditions. In addition,    
                                                                                    some of the testing         
                                                                                    requirements specified in   
                                                                                    subpart JJJ are not         
                                                                                    consistent with Sec.        
                                                                                    63.7(e)(3).                 
63.7(f)...........................................  Yes.                                                        
63.7(g)...........................................  Yes..........................  Except that references to the
                                                                                    Notification of Compliance  
                                                                                    Status report in Sec.       
                                                                                    63.9(h) are replaced with   
                                                                                    the requirements in Sec.    
                                                                                    63.1335(e)(5).              

[[Page 48284]]

                                                                                                                
63.7(h)...........................................  Yes..........................  Except Sec.  63.7(h)(4)(ii)  
                                                                                    is not applicable, since the
                                                                                    site-specific test plans in 
                                                                                    Sec.  63.7(c)(3) are not    
                                                                                    required.                   
63.8(a)(1)........................................  Yes.                                                        
63.8(a)(2)........................................  No.                                                         
63.8(a)(3)........................................  No...........................  Reserved.                    
63.8(a)(4)........................................  Yes.                                                        
63.8(b)(1)........................................  Yes.                                                        
63.8(b)(2)........................................  No...........................  Subpart JJJ specifies        
                                                                                    locations to conduct        
                                                                                    monitoring.                 
63.8(b)(3).                                                                                                     
63.8(c)(1)(i).....................................  Yes.                                                        
63.8(c)(1)(ii)....................................  No.                                                         
63.8(c)(1)(iii)...................................  Yes.                                                        
63.8(c)(2)........................................  Yes.                                                        
63.8(c)(3)........................................  Yes.                                                        
63.8(c)(4)........................................  No...........................  Sec.  63.1334 specifies      
                                                                                    monitoring frequency.       
63.8(c)(5)-63.8(c)(8).............................  No.                                                         
63.8(d)...........................................  No.                                                         
63.8(e)...........................................  No.                                                         
63.8(f)(1)-63.8(f)(3).............................  Yes.                                                        
63.8(f)(4)(i).....................................  No...........................  Timeframe for submitting     
                                                                                    request is specified in Sec.
                                                                                     63.1335(e).                
63.8(f)(4)(ii)....................................  No.                                                         
63.8(f)(4)(iii)...................................  No.                                                         
63.8(f)(5)(i).....................................  Yes.                                                        
63.8(f)(5)(ii)....................................  No.                                                         
63.8(f)(5)(iii)...................................  Yes.                                                        
63.8(f)(6)........................................  No...........................  Subpart JJJ does not require 
                                                                                    continuous emission         
                                                                                    monitors.                   
63.8(g)...........................................  No...........................  Data reduction procedures    
                                                                                    specified in Sec.           
                                                                                    63.1335(d).                 
63.9(a)...........................................  Yes.                                                        
63.9(b)...........................................  No...........................  Subpart JJJ does not require 
                                                                                    an initial notification.    
63.9(c)...........................................  Yes.                                                        
63.9(d)...........................................  Yes.                                                        
63.9(e)...........................................  No.                                                         
63.9(f)...........................................  No...........................  Subpart JJJ does not require 
                                                                                    opacity and visible emission
                                                                                    standards.                  
63.9(g)...........................................  No.                                                         
63.9(h)...........................................  No...........................  Sec.  63.1335(e)(5) specifies
                                                                                    Notification of Compliance  
                                                                                    Status requirements.        
63.9(i)...........................................  Yes.                                                        
63.9(j)...........................................  No.                                                         
63.10(a)..........................................  Yes.                                                        
63.10(b)(1).......................................  Yes.                                                        
63.10(b)(2).......................................  Yes.                                                        
63.10(b)(3).......................................  No...........................  Sec.  63.1310(b) requires    
                                                                                    documentation of sources    
                                                                                    that are not affected       
                                                                                    sources.                    
63.10(c)..........................................  No...........................  Sec.  63.1335 specifies      
                                                                                    recordkeeping requirements. 
63.10(d)(1).......................................  Yes.                                                        
63.10(d)(2).......................................  No.                                                         
63.10(d)(3).......................................  No...........................  Subpart JJJ does not require 
                                                                                    opacity and visible emission
                                                                                    standards.                  
63.10(d)(4).......................................  Yes.                                                        
63.10(d)(5).......................................  Yes..........................  Except that reports required 
                                                                                    by Sec.  63.10(d)(5)(i) may 
                                                                                    be submitted at the same    
                                                                                    time as Periodic Reports    
                                                                                    specified in Sec.           
                                                                                    63.1335(e)(6). The start-up,
                                                                                    shutdown, and malfunction   
                                                                                    plan, and any records or    
                                                                                    reports of start-up,        
                                                                                    shutdown, and malfunction do
                                                                                    not apply to Group 2        
                                                                                    emission points unless they 
                                                                                    are included in an emissions
                                                                                    average.                    
63.10(e)..........................................  No.                                                         
63.10(f)..........................................  Yes.                                                        
63.10(d)(4).......................................  Yes.                                                        
63.12.............................................  Yes.                                                        
63.13.............................................  Yes.                                                        
63.14.............................................  Yes.                                                        
63.15.............................................  Yes.                                                        
----------------------------------------------------------------------------------------------------------------

     Table 2.--Group 1 Storage Vessels at Existing Affected Sources     
------------------------------------------------------------------------
                                                          Vapor pressure
             Vessel capacity (cubic meters)                      a      
                                                           (kilopascals)
------------------------------------------------------------------------
75  capacity < 151...........................  13.
                                                                       1
151  capacity................................  5.2
                                                                        
------------------------------------------------------------------------
a Maximum true vapor pressure of total organic HAP at storage           
  temperature.                                                          

[[Page 48285]]

       Table 3.--Group 1 Storage Vessels at Existing Affected Sources Producing the Listed Thermoplastics       
----------------------------------------------------------------------------------------------------------------
                                                                                                       Vapor    
           Thermoplastic                      Chemical a          Vessel capacity (cubic meters)    pressure b  
                                                                                                   (kilopascals)
----------------------------------------------------------------------------------------------------------------
ASA/AMSAN c........................  Styrene/acrylonitrile        3.78..........................            0.47
                                      mixture.                                                                  
                                     Acrylonitrile..............  75.7..........................            1.62
Polystyrene, continuous processes..  ...........................  38 and <75.7..................            14.2
                                                                  75.7..........................             1.9
Nitrile c..........................  Acrylonitrile..............   13.25........................            1.8 
----------------------------------------------------------------------------------------------------------------
a Vessel capacity and vapor pressure criteria are specific to the listed chemical. When chemical not listed     
  (i.e., --), vessel capacity and vapor pressure criteria apply to all chemicals regulated by this rule for a   
  given subcategory.                                                                                            
b Maximum true vapor pressure of total organic HAP at storage temperature.                                      
c The applicability criteria in Table 2 of this subpart shall be used for chemicals not specifically listed in  
  this table (i.e., Table 3).                                                                                   

        Table 4.--Group 1 Storage Vessels at New Affected Sources       
------------------------------------------------------------------------
                                                               Vapor    
             Vessel capacity (cubic meters)                 pressure a  
                                                           (kilopascals)
------------------------------------------------------------------------
38  capacity < 151...........................  13.
                                                                       1
151  capacity................................  0.7
                                                                        
------------------------------------------------------------------------
a Maximum true vapor pressure of total organic HAP at storage           
  temperature.                                                          

          Table 5.--Group 1 Storage Vessels at New Affected Sources Producing the Listed Thermoplastics         
----------------------------------------------------------------------------------------------------------------
                                                           Vessel capacity (cubic          Vapor pressure b     
          Thermoplastic                 Chemical a                meters)                   (kilopascals)       
----------------------------------------------------------------------------------------------------------------
ASA/AMSAN c......................  Styrene/             3.78............  0.47.           
                                    acrylonitrile                                                               
                                    mixture.                                                                    
                                   Acrylonitrile......  75.7............  1.62.           
SAN, continuous..................                       2,271...........  0.5vp<0.7.      
                                                        151.............  0.7vp
                                                                                      10.                       
                                                        30 and <151.....  vp10.           
                                                        151.............  vp10.           
Nitrile c........................  Acrylonitrile......  13.25...........  1.8.            
Polystyrene, continuous processes                       19.6 and <45.4..  vp7.48.         
                                                        45.4 and <109.8.  vp0.61.         
                                                        109.8...........  vp0.53.         
ABS, continuous mass.............  Styrene............  45.43...........  0.078.          
                                                        38 and <45.43...  vp13.1.         
                                                        45.43...........  vp0.53.         
----------------------------------------------------------------------------------------------------------------
a Vessel capacity and vapor pressure criteria are specific to the listed chemical. When chemical not listed     
  (i.e., --), vessel capacity and vapor pressure criteria apply to all chemicals regulated by this rule for a   
  given subcategory.                                                                                            
b Maximum true vapor pressure of total organic HAP at storage temperature.                                      
c The applicability criteria in Table 4 of this subpart shall be used for chemicals not specifically listed in  
  this table (i.e., Table 5).                                                                                   

                                      Table 6.--Known Organic Hazardous Air Pollutants From Thermoplastic Products                                      
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                      Organic HAP/chemical name (CAS No.)                               
                                                      --------------------------------------------------------------------------------------------------
          Thermoplastic product/subcategory                                              1,3                      Ethylene                              
                                                       Acetaldehyde  Acrylonitrile    Butadiene    1,4-Dioxane  Glycol (107-  Methanol (67- Styrene (100-
                                                         (75-07-0)     (107-13-1)    (106-99-0)    (123-91-1)       21-1)         56-1)         42-5)   
--------------------------------------------------------------------------------------------------------------------------------------------------------
ABS latex............................................  ............                 ............  ............  ............       
ABS using a batch emulsion process...................  ............                 ............  ............  ............       
ABS using a batch suspension process.................  ............                 ............  ............  ............       
ABS using a continuous emulsion process..............  ............                 ............  ............  ............       
ABS using a continuous mass process..................  ............                 ............  ............  ............       
ASA/AMSAN............................................  ............                 ............  ............  ............       
EPS..................................................  ............  .............  ............  ............  ............  ............       
MABS.................................................  ............                 ............  ............  ............       
MBS..................................................  ............  .............         ............  ............  ............       
Nitrile resin........................................  ............          ............  ............  ............  ............  ............
PET using a batch dimethyl terephthalate process.....         .............  ............                       ............
PET using a batch terephthalic acid process..........         .............  ............                ............  ............
PET using a continuous dimethyl terephthalate process         .............  ............                       ............
PET using a continuous terephthalic acid process.....         .............  ............                ............  ............

[[Page 48286]]

                                                                                                                                                        
PET using a continuous terephthalic acid high                                                                                                           
 viscosity multiple end finisher process.............         .............  ............                ............  ............
Polystyrene resin using a batch process..............  ............  .............  ............  ............  ............  ............       
Polystyrene resin using a continuous process.........  ............  .............  ............  ............  ............  ............       
SAN using a batch process............................  ............          ............  ............  ............  ............       
SAN using a continuous process.......................  ............          ............  ............  ............  ............       
--------------------------------------------------------------------------------------------------------------------------------------------------------
 AACAS No.=Chemical Abstract Service Number.                                                                                                            
 AAABS=Acrylonitrile butadiene styrene resin.                                                                                                           
 AAASA/AMSAN=Acrylonitrile styrene resin/alpha methyl styrene acrylonitrile resin.                                                                      
 AAEPS=expandable polystyrene resin.                                                                                                                    
 AAMABS=methyl methacrylate acrylonitrile butadiene styrene resin.                                                                                      
 AAPET=poly(ethylene terephthalate) resin.                                                                                                              
 AAAAN=styrene acrylonitrile resin.                                                                                                                     
 AAMBS=methyl methacrylate butadiene styrene resin.                                                                                                     

          Table 7.--Group 1 Batch Process Vents--Monitoring, Recordkeeping, and Reporting Requirements          
----------------------------------------------------------------------------------------------------------------
                                           Parameters to be       Recordkeeping and reporting requirements for  
            Control device                    monitored                       monitored parameters              
----------------------------------------------------------------------------------------------------------------
Thermal Incinerator..................  Firebox temperature a..  1. Continuous records as specified in Sec.      
                                                                 63.1326(e)(1).b                                
                                                                2. Record and report the average firebox        
                                                                 temperature measured during the performance    
                                                                 test--NCS.c                                    
                                                                3. Record the batch cycle daily average firebox 
                                                                 temperature as specified in Sec.               
                                                                 63.1326(e)(2).                                 
                                                                4. Report all batch cycle daily average         
                                                                 temperatures that are below the minimum        
                                                                 operating temperature established in the NCS or
                                                                 operating permit and all instances when        
                                                                 monitoring data are not collected--PR.d e      
Catalytic Incinerator................  Temperature upstream     1. Continuous records as specified in Sec.      
                                        and downstream of the    63.1326(e)(1).b                                
                                        catalyst bed.           2. Record and report the average upstream and   
                                                                 downstream temperatures and the average        
                                                                 temperature difference across the catalyst bed 
                                                                 measured during the performance test--NCS.c    
                                                                3. Record the batch cycle daily average upstream
                                                                 temperature and temperature difference across  
                                                                 catalyst bed as specified in Sec.              
                                                                 63.1326(e)(2).                                 
                                                                4. Report all batch cycle daily average upstream
                                                                 temperatures that are below the minimum        
                                                                 upstream temperature established in the NCS or 
                                                                 operating permit--PR.d e                       
                                                                5. Report all batch cycle daily average         
                                                                 temperature differences across the catalyst bed
                                                                 that are below the minimum difference          
                                                                 established in the NCS or operating permit--   
                                                                 PR.d e                                         
                                                                6. Report all instances when monitoring data are
                                                                 not collected.e                                
Boiler or Process Heater with a        Firebox temperature a..  1. Continuous records as specified in Sec.      
 design heat input capacity less than                            63.1326(e)(1).b                                
 44 megawatts and where the batch                               2. Record and report the average firebox        
 process vents or aggregate batch                                temperature measured during the performance    
 vent streams are not introduced with                            test--NCS.c                                    
 or used as the primary fuel.                                   3. Record the batch cycle daily average firebox 
                                                                 temperature as specified in Sec.               
                                                                 63.1326(e)(2).d                                
                                                                4. Report all batch cycle daily average         
                                                                 temperatures that are below the minimum        
                                                                 operating temperature established in the NCS or
                                                                 operating permit and all instances when        
                                                                 monitoring data are not collected--PR.d e      
Flare................................  Presence of a flame at   1. Hourly records of whether the monitor was    
                                        the pilot light.         continuously operating during batch emission   
                                                                 episodes, or portions thereof, selected for    
                                                                 control and whether the pilot flame was        
                                                                 continuously present during said periods.      
                                                                2. Record and report the presence of a flame at 
                                                                 the pilot light over the full period of the    
                                                                 compliance determination--NCS.c                
                                                                3. Record the times and durations of all periods
                                                                 during batch emission episodes, or portions    
                                                                 thereof, selected for control when a pilot     
                                                                 flame is absent or the monitor is not          
                                                                 operating.                                     
                                                                4. Report the times and durations of all periods
                                                                 during batch emission episodes, or portions    
                                                                 thereof, selected for control when all pilot   
                                                                 flames of a flare are absent--PR.d             

[[Page 48287]]

                                                                                                                
Scrubber for halogenated batch         pH of scrubber           1. Continuous records as specified in Sec.      
 process vents or aggregate batch       effluent, and.           63.1326(e)(1).b                                
 vent streams (Note: Controlled by a                            2. Record and report the average pH of the      
 combustion device other than a                                  scrubber effluent measured during the          
 flare).                                                         performance test--NCS.c                        
                                                                3. Record the batch cycle daily average pH of   
                                                                 the scrubber effluent as specified in Sec.     
                                                                 63.1326(e)(2).                                 
                                                                4. Report all batch cycle daily average pH      
                                                                 values of the scrubber effluent that are below 
                                                                 the minimum operating pH established in the NCS
                                                                 or operating permit and all instances when     
                                                                 monitoring data are not collected--PR.d e      
    Do...............................  Scrubber liquid flow     1. Continuous records as specified in Sec.      
                                        rate.                    63.1326(e)(1).b                                
                                                                2. Record and report the scrubber liquid flow   
                                                                 rate measured during the performance test--    
                                                                 NCS.c                                          
                                                                3. Record the batch cycle daily average scrubber
                                                                 liquid flow rate as specified in Sec.          
                                                                 63.1326(e)(2).                                 
                                                                4. Report all batch cycle daily average scrubber
                                                                 liquid flow rates that are below the minimum   
                                                                 flow rate established in the NCS or operating  
                                                                 permit and all instances when monitoring data  
                                                                 are not collected--PR.d e                      
Absorber f...........................  Exit temperature of the  1. Continuous records as specified in Sec.      
                                        absorbing liquid, and.   63.1326(e)(1).b                                
                                                                2. Record and report the average exit           
                                                                 temperature of the absorbing liquid measured   
                                                                 during the performance test--NCS.c             
                                                                3. Record the batch cycle daily average exit    
                                                                 temperature of the absorbing liquid as         
                                                                 specified in Sec.  63.1326(e)(2) for each batch
                                                                 cycle.                                         
                                                                4. Report all the batch cycle daily average exit
                                                                 temperatures of the absorbing liquid that are  
                                                                 below the minimum operating temperature        
                                                                 established in the NCS or operating permit and 
                                                                 all instances when monitoring data are not     
                                                                 collected--PR.d e                              
    Do...............................  Exit specific gravity    1. Continuous records as specified in Sec.      
                                        for the absorbing        63.1326(e)(1).b                                
                                        liquid.                 2. Record and report the average exit specific  
                                                                 gravity measured during the performance test-- 
                                                                 NCS.c                                          
                                                                3. Record the batch cycle daily average exit    
                                                                 specific gravity as specified in Sec.          
                                                                 63.1326(e)(2).                                 
                                                                4. Report all batch cycle daily average exit    
                                                                 specific gravity values that are below the     
                                                                 minimum operating temperature established in   
                                                                 the NCS or operating permit and all instances  
                                                                 when monitoring data are not collected--PR.d e 
Condenser f..........................  Exit (product side)      1. Continuous records as specified in Sec.      
                                        temperature.             63.1326(e)(1).b                                
                                                                2. Record and report the average exit           
                                                                 temperature measured during the performance    
                                                                 test--NCS.c                                    
                                                                3. Record the batch cycle daily average exit    
                                                                 temperature as specified in Sec.               
                                                                 63.1326(e)(2).                                 
                                                                4. Report all batch cycle daily average exit    
                                                                 temperatures that are above the maximum        
                                                                 operating temperature established in the NCS or
                                                                 operating permit and all instances when        
                                                                 monitoring data are not collected--PR.d e      
Carbon Adsorber f....................  Total regeneration       1. Record the total regeneration stream mass    
                                        stream mass flow         flow for each carbon bed regeneration cycle.   
                                        during carbon bed       2. Record and report the total regeneration     
                                        regeneration cycle(s),   stream mass flow during each carbon bed        
                                        and.                     regeneration cycle measured during the         
                                                                 performance test--NCS.c                        
                                                                3. Report all carbon bed regeneration cycles    
                                                                 when the total regeneration stream mass flow is
                                                                 above the maximum mass flow rate established in
                                                                 the NCS or operating permit--PR.d e            
    Do...............................  Temperature of the       1. Record the temperature of the carbon bed     
                                        carbon bed after         after each regeneration and within 15 minutes  
                                        regeneration and         of completing any cooling cycle(s).            
                                        within 15 minutes of    2. Record and report the temperature of the     
                                        completing any cooling   carbon bed after each regeneration and within  
                                        cycle(s).                15 minutes of completing any cooling cycles(s) 
                                                                 measured during the performance test--NCS.c    
                                                                3. Report all carbon bed regeneration cycles    
                                                                 when the temperature of the carbon bed after   
                                                                 regeneration, or within 15 minutes of          
                                                                 completing any cooling cycle(s), is above the  
                                                                 maximum temperature established in the NCS or  
                                                                 operating permit--PR.d e                       
All Control Devices..................  Presence of flow         1. Hourly records of whether the flow indicator 
                                        diverted to the          was operating during batch emission episodes,  
                                        atmosphere from the      or portions thereof, selected for control and  
                                        control device or.       whether flow was detected at any time during   
                                                                 said periods as specified in Sec.              
                                                                 63.1326(e)(3).                                 
                                                                2. Record and report the times and durations of 
                                                                 all periods during batch emission episodes, or 
                                                                 portions thereof, selected for control when    
                                                                 emissions are diverted through a bypass line or
                                                                 the flow indicator is not operating--PR.d      
    Do...............................  Monthly inspections of   1. Records that monthly inspections were        
                                        sealed valves.           performed as specified in Sec.                 
                                                                 63.1326(e)(4)(i).                              
                                                                2. Record and report all monthly inspections    
                                                                 that show the valves are not closed or the seal
                                                                 has been changed--PR.d                         

[[Page 48288]]

                                                                                                                
Absorber, Condenser, and Carbon        Concentration level or   1. Continuous records as specified in Sec.      
 Adsorber (as an alternative to the     reading indicated by     63.1326(e)(1).b                                
 requirements previously presented in   an organic monitoring   2. Record and report the average concentration  
 this table).                           device at the outlet     level or reading measured during the           
                                        of the control device.   performance test--NCS.c                        
                                                                3. Record the batch cycle daily average         
                                                                 concentration level or reading as specified in 
                                                                 Sec.  63.1326(e)(2).                           
                                                                4. Report all batch cycle daily average         
                                                                 concentration levels or readings that are above
                                                                 the maximum concentration or reading           
                                                                 established in the NCS or operating permit and 
                                                                 all instances when monitoring data are not     
                                                                 collected--PR.d e                              
----------------------------------------------------------------------------------------------------------------
a Monitor may be installed in the firebox or in the ductwork immediately downstream of the firebox before any   
  substantial heat exchange is encountered.                                                                     
b ``Continuous records'' is defined in Sec.  63.111.                                                            
c NCS = Notification of Compliance Status described in Sec.  63.1335(e)(5).                                     
d PR = Periodic Reports described in Sec.  63.1335(e)(6).                                                       
e The periodic reports shall include the duration of periods when monitoring data are not collected as specified
  in Sec.  63.1335(e)(6)(iii)(C).                                                                               
f Alternatively, these devices may comply with the organic monitoring device provisions listed at the end of    
  this table.                                                                                                   

 Table 8.--Operating Parameters for Which Levels Are Required to Be Established for Continuous and Batch Process
                                     Vents and Aggregate Batch Vent Streams                                     
----------------------------------------------------------------------------------------------------------------
                                                                                       Established operating    
                Device                         Parameters to be monitored                  parameter(s)         
----------------------------------------------------------------------------------------------------------------
Thermal incinerator...................  Firebox temperature.....................  Minimum temperature.          
Catalytic incinerator.................  Temperature upstream and downstream of    Minimum upstream temperature; 
                                         the catalyst bed.                         and minimum temperature      
                                                                                   difference across the        
                                                                                   catalyst bed.                
Boiler or process heater..............  Firebox temperature.....................  Minimum temperature.          
Scrubber for halogenated vents........  pH of scrubber effluent; and scrubber     Minimum pH; and minimum flow  
                                         liquid flow rate.                         rate.                        
Absorber..............................  Exit temperature of the absorbing         Minimum temperature; and      
                                         liquid; and exit specific gravity of      minimum specific gravity.    
                                         the absorbing liquid.                                                  
Condenser.............................  Exit temperature........................  Maximum temperature.          
Carbon absorber.......................  Total regeneration stream mass flow       Maximum mass flow; and maximum
                                         during carbon bed regeneration cycle;     temperature.                 
                                         and temperature of the carbon bed after                                
                                         regeneration (and within 15 minutes of                                 
                                         completing any cooling cycle(s)).                                      
Other devices (or as an alternate to    HAP concentration level or reading at     Maximum HAP concentration or  
 the requirements previously presented   outlet of device.                         reading.                     
 in this table)a.                                                                                               
----------------------------------------------------------------------------------------------------------------
a Concentration is measured instead of an operating parameter.                                                  

[FR Doc. 96-22781 Filed 9-11-96; 8:45 am]