act-1993-0-47•Pennsylvania Act 1993-47 — CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR 1993-1994 - ENACTMENT
Pennsylvania Act 1993-47 — CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR 1993-1994 - ENACTMENT
act-1993-0-471993 Pa. Act 47Law
Act text
| CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR 1993-1994 - ENACTMENT | ||
|---|---|---|
| Act of Jul. 2, 1993, P.L. 265, No. 47 | Cl. 86 |
Session of 1993
No. 1993-47
SB 1098
A SUPPLEMENT
To the act of June 28, 1993 (P.L.134, No.31), entitled "An act providing for the capital budget for the fiscal year 1993-1994," itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, flood control projects and redevelopment assistance projects to be constructed or acquired or assisted by the Department of General Services, the Department of Environmental Resources, the Department of Community Affairs or the Department of Transportation, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed or acquired or assisted by the Department of General Services, the Department of Environmental Resources, the Department of Community Affairs or the Department of Transportation; stating the estimated useful life of the projects; authorizing certain waivers; making appropriations; and making repeals.
The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:
Section 1. Short title.
This act shall be known and may be cited as the Capital Budget Project Itemization Act for 1993-1994.
Section 2. Total authorizations.
(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $1,319,669,000.
(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $31,070,000.
(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt shall be $296,344,000.
(d) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 6 and to be constructed by the Department of Environmental Resources, its successors or assigns, and to be financed by the incurring of debt shall be $82,850,000.
(e) Redevelopment assistance.--The total authorization for the additional capital projects in the category of redevelopment assistance projects itemized in section 7 for capital grants by the Department of Community Affairs, its successors or assigns, and to be financed by the incurring of debt shall be $485,173,000.
Section 3. Itemization of public improvement projects.
Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
| Total | |
|---|---|
| Project | |
| Project | Allocation |
| (1) Department of Corrections | $38,694,000 |
| (i) State Correctional Institution - Cambridge Springs | |
| (A) Life safety code improvements | 2,458,000 |
| (Base Project Allocation - $2,048,000) (Design and Contingencies - $410,000) | |
| (B) Improvements to the water line from the water plant to the existing tank | 590,000 |
| (Base Project Allocation - $500,000) (Design and Contingencies - $90,000) | |
| (C) Construction of a 500,000-gallon water storage tank | 367,000 |
| (Base Project Allocation - $250,000) (Land Allocation - $37,000) (Design and Contingencies - $80,000) | |
| (D) Replacement of sewer line from the Cambridge Springs Correctional Facility to the sewer plant | 350,000 |
| (Base Project Allocation - $300,000) (Design and Contingencies - $50,000) | |
| (E) Improvements to the water filtration plant | 402,000 |
| (Base Project Allocation - $350,000) (Design and Contingencies - $52,000) | |
| (F) Increase of hydraulic capacity of sewage treatment plant to eliminate discharge into French Creek | 978,000 |
| (Base Project Allocation - $850,000) (Design and Contingencies - $128,000) | |
| (ii) State Correctional Institution - Camp Hill | |
| (A) Improved accessibility for the handicapped | 604,000 |
| (Base Project Allocation - $503,000) (Design and Contingencies - $101,000) | |
| (iii) State Correctional Institution - Clearfield | |
| (A) Construction of sewage system for facility | 2,000,000 |
| (iv) State Correctional Institution - Dallas | |
| (A) Asbestos abatement | 364,000 |
| (Base Project Allocation - $303,000) (Design and Contingencies - $61,000) | |
| (B) Sewage treatment plant improvements | 828,000 |
| (Base Project Allocation - $690,000) (Design and Contingencies - $138,000) | |
| (C) Improved accessibility for the handicapped | 530,000 |
| (Base Project Allocation - $442,000) (Design and Contingencies - $88,000) | |
| (v) State Correctional Institution - Frackville | |
| (A) Addition to education building | 910,000 |
| (Base Project Allocation - $758,000) (Design and Contingencies - $152,000) | |
| (B) Addition to treatment building | 697,000 |
| (Base Project Allocation - $581,000) (Design and Contingencies - $116,000) | |
| (vi) State Correctional Institution - Graterford | |
| (A) Expand/upgrade main electrical substation | 5,454,000 |
| (Base Project Allocation - $4,545,000) (Design and Contingencies - $909,000) | |
| (B) Exterior improvements to cell blocks | 1,615,000 |
| (Base Project Allocation - $1,346,000) (Design and Contingencies - $269,000) | |
| (vii) State Correctional Institution - Greensburg | |
| (A) Expansion of support facilities | 4,150,000 |
| (Base Project Allocation - $3,458,000) (Design and Contingencies - $692,000) | |
| (viii) State Correctional Institution - Huntingdon | |
| (A) Elevator for infirmary | 178,000 |
| (Base Project Allocation - $148,000) (Design and Contingencies - $30,000) | |
| (B) Additional funds for DGS 572-18 - life safety code improvements | 4,846,000 |
| (Base Project Allocation - $4,038,000) (Design and Contingencies - $808,000) | |
| (C) Additional funds for DGS 572-15 - boiler plant improvements | 1,371,000 |
| (Base Project Allocation - $1,371,000) | |
| (ix) State Correctional Institution - Mercer | |
| (A) Water tank | 960,000 |
| (Base Project Allocation - $800,000) (Design and Contingencies - $160,000) | |
| (B) Sewage treatment plant improvements | 250,000 |
| (Base Project Allocation - $208,000) (Design and Contingencies - $42,000) | |
| (x) State Correctional Institution - Muncy | |
| (A) Addition to freezer storeroom | 540,000 |
| (Base Project Allocation - $450,000) (Design and Contingencies - $90,000) | |
| (B) Combination garage, maintenance shop and warehouse | 1,552,000 |
| (Base Project Allocation - $1,293,000) (Design and Contingencies - $259,000) | |
| (C) Upgrade electrical distribution system | 930,000 |
| (Base Project Allocation - $775,000) (Design and Contingencies - $155,000) | |
| (D) Improved accessibility for the handicapped | 497,000 |
| (Base Project Allocation - $414,000) (Design and Contingencies - $83,000) | |
| (xi) State Correctional Institution - Retreat | |
| (A) Fire alarm system replacement | 1,079,000 |
| (Base Project Allocation - $899,000) (Design and Contingencies - $180,000) | |
| (B) Warehouse | 1,890,000 |
| (Base Project Allocation - $1,575,000) (Design and Contingencies - $315,000) | |
| (C) Additional funds for DGS 1575-3 - rehabilitate entrance bridge | 1,764,000 |
| (Base Project Allocation - $1,470,000) (Design and Contingencies - $294,000) | |
| (xii) State Correctional Institution - Waymart | |
| (A) Sewer line improvements | 540,000 |
| (Base Project Allocation - $450,000) (Design and Contingencies - $90,000) | |
| (2) Department of Education | $543,468,000 |
| (i) The Pennsylvania State University | |
| (A) University Park Campus | |
| (I) Chemistry Building construction | 52,500,000 |
| (II) Improvements and expansion of infrastructure - Phase I | 5,250,000 |
| (III) Water system improvements | 10,000,000 |
| (IV) Classroom building - Phase II | 10,500,000 |
| (V) Renovation of and addition to Ferguson Building | 8,570,000 |
| (VI) Academic support services complex - Phase I | 15,750,000 |
| (VII) Conversion of electrical engineering - East Building | 3,990,000 |
| (VIII) Chilled water distribution system for West Campus - Phase II | 12,730,000 |
| (IX) Renovation of Sparks Building | 5,220,000 |
| (X) Renovate and construct addition to Support Services Facilities | 6,930,000 |
| (XI) Expansion and improvements to Telecommunications Infrastructure | 15,000,000 |
| (XII) New electrical distribution system DGS 800-217, to provide electrical service to the Convocation Events Center and existing academic research facilities | 2,583,000 |
| (XIII) Construction of a new Engineering Research Center - Phase I | 32,750,000 |
| (XIV) Renovations to Schwab Auditorium | 3,150,000 |
| (XV) Construction of addition to Computer Building | 9,650,000 |
| (XVI) Construction of a new centralized Biological Laboratory | 11,025,000 |
| (XVII) Construction of new library | 20,000,000 |
| (XVIII) Renovation of Osmond Laboratory | 28,000,000 |
| (XIX) Academic Support Services Complex - Phase II | 15,000,000 |
| (XX) Construction of addition to Mitchell Building | 4,400,000 |
| (XXI) Construction of addition to Carnegie Building | 4,000,000 |
| (XXII) Construction of new library for College of Education | 5,000,000 |
| (B) Allentown Campus | |
| (I) Construction of library | 2,750,000 |
| (II) Construct multipurpose building | 2,020,000 |
| (Base Project Allocation - $1,500,000) (Design and Contingencies - $120,000) (Furniture and Equipment - $400,000) | |
| (C) Altoona Campus | |
| (I) Construct multistory Classroom Building | 4,620,000 |
| (II) Construction of new maintenance building | 1,050,000 |
| (D) Berks Campus | |
| (I) Construct Academic Building | 4,390,000 |
| (E) Behrend College, Erie | |
| (I) Improvements and expansion of utility systems | 18,240,000 |
| (F) Harrisburg Campus (Capital College) | |
| (I) Renovation to utility systems | 11,580,000 |
| (G) Fayette Campus | |
| (I) Improvements and expansion of utility systems | 2,760,000 |
| (II) Renovations and addition to Gymnasium Building | 1,500,000 |
| (III) Construction of a biomedical technology center | 4,400,000 |
| (Base Project Allocation - $3,667,000) (Design and Contingencies - $733,000) | |
| (H) Hazleton Campus | |
| (I) Construction of new library and classroom building | 2,600,000 |
| (Base Project Allocation - $2,600,000) | |
| (II) Construction of new maintenance building | 1,050,000 |
| (I) Hershey Medical Center | |
| (I) Construction of a new Nursing Education Facility | 6,895,000 |
| (J) Mont Alto Campus | |
| (I) Renovation of General Studies Building | 3,000,000 |
| (K) Worthington Scranton Campus | |
| (I) New construction of classroom, laboratory, conference and communications center | 3,990,000 |
| (L) York Campus | |
| (I) Construct library addition and auditorium and classroom building | 11,320,000 |
| (II) Construct new Maintenance Building | 1,100,000 |
| (M) Pennsylvania College of Technology - Williamsport | |
| (I) Construction of new diesel center | 2,000,000 |
| (II) Construction of an Academic/Library Building | 8,000,000 |
| (N) All Locations | |
| (I) Alterations of facilities for compliance with Federal law, the Americans with Disabilities Act | 20,000,000 |
| (ii) Montgomery County Community College - West Campus | |
| (A) Acquisition of property, construction of new building and parking lot for a new approved branch campus of Montgomery County Community College to serve the western portion of the service area | 12,983,000 |
| (Base Project Allocation - $11,190,000) (Land Allocation - $240,000) (Design and Contingencies - $1,553,000) | |
| (iii) University of Pittsburgh | |
| (A) Bradford Campus | |
| (I) Fine Arts Building | 12,300,000 |
| (Base Project Allocation - $12,000,000) (Land Allocation - $300,000) | |
| (II) Frame-Westerberg Commons Expansion | 7,500,000 |
| (Base Project Allocation - $7,500,000) | |
| (III) Sports Center Expansion | 6,000,000 |
| (Base Project Allocation - $6,000,000) | |
| (IV) Maintenance Building | 1,800,000 |
| (Base Project Allocation - $1,800,000) | |
| (V) Construction of academic building classrooms, offices, laboratories | 2,600,000 |
| (Base Project Allocation - $2,600,000) | |
| (iv) Reading Area Community College | |
| (A) Construction of learning resource center and humanities center | 5,000,000 |
| (B) Renovation of former East Shore Office Building into classrooms | 2,300,000 |
| (v) Temple University | |
| (A) Library and Learning Resources Center - H.S.C. Campus | 16,400,000 |
| (Base Construction Allocation - $13,660,000) (Design and Contingencies - $2,740,000) | |
| (B) Renovations to Beury Hall DGS 1104-03 - Main Campus | 8,640,000 |
| (Base Construction Allocation - $7,200,000) (Design and Contingencies - $1,440,000) | |
| (C) Renovations to Barton Hall DGS 1104-01 - Main Campus | 10,624,000 |
| (Base Construction Allocation - $8,853,000) (Design and Contingencies - $1,771,000) | |
| (D) Paley Library Expansion | 18,100,000 |
| (Base Construction Allocation - $15,083,000) (Design and Contingencies - $3,017,000) | |
| (E) Renovations to Bio-Life Sciences Building DGS 1104-11 - Main Campus | 18,700,000 |
| (Base Construction Allocation - $15,583,000) (Design and Contingencies - $3,117,000) | |
| (F) Renovations to Dental School-Health Sciences Center Facility - Phase IV - H.S.C. Campus | 14,800,000 |
| (Base Construction Allocation - $12,333,000) (Design and Contingencies - $2,467,000) | |
| (G) Landscape Architecture and Horticulture Education Center - Ambler Campus | 5,460,000 |
| (Base Construction Allocation - $4,550,000) (Design and Contingencies - $910,000) | |
| (H) Construction of Temple pediatric Unit as part of Temple-Shriners project on North Broad Street | 2,000,000 |
| (Base Construction Allocation - $2,000,000) | |
| (I) Renovation of Mitten Hall, including Fire and Life Safety Improvements | 1,128,000 |
| (Base Construction Allocation - $940,000) (Design and Contingencies - $188,000) | |
| (J) Renovation of Curtis Hall for Mathematics Learning Center | 870,000 |
| (Base Construction Allocation - $725,000) (Design and Contingencies - $145,000) | |
| (vi) Allegheny County Community College | |
| (A) Construction of Braddock branch | 1,000,000 |
| (3) Pennsylvania Emergency Management Agency | $1,044,000 |
| (i) Western Area Emergency Operations Center | |
| (A) ((A) repealed June 25, 1999, P.L.237, No.35) | |
| (ii) State Fire Academy | |
| (A) Convert former State Police facility to classroom building | 500,000 |
| (Base Project Allocation - $417,000) (Design and Contingencies - $83,000) | |
| (4) Department of Environmental Resources | $38,150,000 |
| (i) Quehanna Wild Area | |
| (A) Remediation of radioactive materials | 5,201,000 |
| (Base Project Allocation - $4,334,000) (Design and Contingencies - $867,000) | |
| (ii) State Forest District Number 1 | |
| (A) FM radio system | 404,000 |
| (Base Project Allocation - $337,000) (Design and Contingencies - $67,000) | |
| (iii) State Forest District Number 15 | |
| (A) FM radio system | 404,000 |
| (Base Project Allocation - $337,000) (Design and Contingencies - $67,000) | |
| (B) Capping and revegetating of Thompson-Hollow Landfill | 2,000,000 |
| (Base Project Allocation - $2,000,000) | |
| (iv) State Forest District Number 18 | |
| (A) FM radio system | 404,000 |
| (Base Project Allocation - $337,000) (Design and Contingencies - $67,000) | |
| (v) State Forest District Number 19 | |
| (A) FM radio system | 404,000 |
| (Base Project Allocation - $337,000) (Design and Contingencies - $67,000) | |
| (vi) State Forest District Number 5 | |
| (A) Rehabilitate forest roads | 334,000 |
| (Base Project Allocation - $278,000) (Design and Contingencies - $56,000) | |
| (vii) State Forest District Number 7 | |
| (A) Rehabilitate forest roads | 334,000 |
| (Base Project Allocation - $278,000) (Design and Contingencies - $56,000) | |
| (viii) State Forest District Number 10 | |
| (A) Rehabilitate forest roads | 334,000 |
| (Base Project Allocation - $278,000) (Design and Contingencies - $56,000) | |
| (ix) Nescopeck State Park | |
| (A) Development of recreational facility | 5,400,000 |
| (Base Project Allocation - $5,400,000) | |
| (x) Sinnemahoning State Park | |
| (A) Additional funds for DGS 104-4 - service gate, conduit and spillway improvements at the George B. Stevenson Dam | 1,300,000 |
| (Base Project Allocation - $1,083,000) (Design and Contingencies - $217,000) | |
| (xi) Little Buffalo State Park | |
| (A) Construction of an arts building | 80,000 |
| (Base Project Allocation - $80,000) | |
| (B) Construction of a permanent performance pavilion. The pavilion is to be constructed using native wood, where possible, and be designed to complement local terrain and other park buildings | 105,000 |
| (xii) Pymatuning State Park | |
| (A) Phase II Boat Livery Rehabilitation, Espyville, including dock system installation, breakwall protection, paved parking, site lighting, boat launch installation and landscaping | 800,000 |
| (B) Phase II Boat Livery Rehabilitation, Jamestown, including dock system installation, shoreline bulkhead installation, paved parking, site lighting, boat launch installation and landscaping | 700,000 |
| (xiii) Gifford Pinchot State Park | |
| (A) Construction of swimming pool complex consisting of bathhouses, concession stand, parking facilities and an 18,800 square foot pool | 6,900,000 |
| (Base Project Allocation - $5,300,000) (Design and Contingencies - $1,600,000) | |
| (xiv) Delaware State Park | |
| (A) Rehabilitation of historic aqueduct over Tohickon Creek, using timber | 1,500,000 |
| (xv) Schuylkill Canal | |
| (A) Restoration and maintenance | 200,000 |
| (xvi) Baldwin Borough | |
| (A) Additional funds for correction of flood problems at Lick Run Creek | 832,000 |
| (Base Project Allocation - $560,000) (Design and Contingencies - $272,000) | |
| (xvii) Curwensville Borough | |
| (A) Expansion of docking area and improvements to facilities for Curwensville Dam | 1,000,000 |
| (xviii) Clearfield Borough | |
| (A) Restoration of bank along Little Susquehanna Creek | 1,000,000 |
| (xix) Gulich Township | |
| (A) Improvements to Janesville Dam | 500,000 |
| (xx) Bigler Township | |
| (A) Restoration of Little Muddy Run | 1,000,000 |
| (xxi) Coolbaugh Township, Monroe County | |
| (A) Acquisition, including a building, and renovation of the Pocono Arts and Exhibition Center | 6,694,000 |
| (Base Project Allocation - $2,631,000) (Land Allocation - $3,800,000) (Design and Contingencies - $263,000) | |
| (xxii) Montgomery County | |
| (A) Reconstruction of the MarlBorough Township Dam on Unami Creek | 100,000 |
| (B) Reconstruction of dam on the creek between Perkiomen and Skippack | 120,000 |
| (xxiii) Bucks County | |
| (A) To stabilize 2,000 lineal feet of serious bank erosion on the East Branch of the Perkiomen Creek, Sellersville side, as required | 100,000 |
| (5) Department of General Services | $58,850,000 |
| (i) Capitol Complex | |
| (A) Waterproofing of Main Capitol Building | 24,960,000 |
| (Base Project Allocation - $20,800,000) (Design and Contingencies - $4,160,000) | |
| (B) Expansion of central air conditioning system to Main Capitol Building | 7,488,000 |
| (Base Project Allocation - $6,240,000) (Design and Contingencies - $1,248,000) | |
| (ii) Reading State Office Building | |
| (A) Heating, ventilation and air conditioning improvements | 343,000 |
| (Base Project Allocation - $286,000) (Design and Contingencies - $57,000) | |
| (iii) Former Byberry Hospital site | |
| (A) Site demolition and environmental remediation of site | 20,000,000 |
| (Base Project Allocation - $20,000,000) | |
| (B) Renovate Furey-Ellis Auditorium | 1,000,000 |
| (C) Renovate laundry building for community recreation center | 500,000 |
| (iv) Diagnostic and Rehabilitation Center - Philadelphia | |
| (A) Improvements and renovations | 559,000 |
| (v) State Record Center - Harrisburg | |
| (A) Construction of addition to and renovation of existing facility | 2,400,000 |
| (Base Project Allocation - $2,000,000) (Design and Contingencies - $400,000) | |
| (B) Purchase and installation of shelving | 1,600,000 |
| (Base Project Allocation - $1,400,000) (Design and Contingencies - $200,000) | |
| (6) Historical and Museum Commission | $12,141,000 |
| (i) Butler Industrial Museum | |
| (A) Building and site improvement | 500,000 |
| (Base Project Allocation - $415,000) (Design and Contingencies - $85,000) | |
| (ii) Conrad Weiser Homestead | |
| (A) Building renovations | 520,000 |
| (Base Project Allocation - $433,000) (Design and Contingencies - $87,000) | |
| (iii) Cornwall Iron Furnace | |
| (A) Orientation exhibit area | 748,000 |
| (Base Project Allocation - $623,000) (Design and Contingencies - $125,000) | |
| (iv) Drake Well Museum | |
| (A) Construction of storage area | 312,000 |
| (Base Project Allocation - $260,000) (Design and Contingencies - $52,000) | |
| (v) Eckley Miners' Village | |
| (A) Additional funds for restoration and preservation of select miners' houses - Phase II | 2,400,000 |
| (Base Project Allocation - $2,000,000) (Design and Contingencies - $400,000) | |
| (B) Restoration of outbuildings associated with buildings | 180,000 |
| (Base Project Allocation - $150,000) (Design and Contingencies - $30,000) | |
| (vi) Ephrata Cloister | |
| (A) Building and site improvements | 1,068,000 |
| (Base Project Allocation - $890,000) (Design and Contingencies - $178,000) | |
| (vii) Landis Valley Museum | |
| (A) Building and site improvements | 1,337,000 |
| (Base Project Allocation - $1,114,000) (Design and Contingencies - $223,000) | |
| (viii) McCoy House | |
| (A) Restoration and improvements | 156,000 |
| (Base Project Allocation - $130,000) (Design and Contingencies - $26,000) | |
| (ix) Muhlenberg House | 450,000 |
| (Base Project Allocation - $400,000) (Design and Contingencies - $50,000) | |
| (x) Old Economy Village | |
| (A) Restoration and preservation of Great House | 540,000 |
| (Base Project Allocation - $450,000) (Design and Contingencies - $90,000) | |
| (B) Rehabilitation of George Rapp House | 650,000 |
| (xi) Pennsbury Manor | |
| (A) Building and site improvements | 214,000 |
| (Base Project Allocation - $178,000) (Design and Contingencies - $36,000) | |
| (xii) Pennsylvania Military Museum | |
| (A) Visitor center | 1,429,000 |
| (Base Project Allocation - $1,191,000) (Design and Contingencies - $238,000) | |
| (xiii) Thomas Hughes House | |
| (A) Restoration and improvements | 520,000 |
| (Base Project Allocation - $433,000) (Design and Contingencies - $87,000) | |
| (xiv) Washington Crossing Historic Park | |
| (A) Orientation exhibit | 533,000 |
| (Base Project Allocation - $444,000) (Design and Contingencies - $89,000) | |
| (xv) The Highlands, Ft. Washington, Pa. | |
| (A) Restoration and maintenance | 100,000 |
| (xvi) Schuylkill County | |
| (A) Anthracite Museum of Mining, construct a multiuse auditorium/community room | 484,000 |
| (Base Project Allocation - $421,000) (Design and Contingencies - $63,000) | |
| (7) Department of Military Affairs | $14,585,000 |
| (i) Fort Indiantown Gap Armory | |
| (A) Additional funds for project number DGS 960-17 - new armory building | 1,454,000 |
| (Base Project Allocation - $1,212,000) (Design and Contingencies - $242,000) | |
| (ii) Scranton organizational maintenance shop | |
| (A) Purchase of land for new shop | 171,000 |
| (Land Allocation - $171,000) | |
| (iii) Spring City Armory | |
| (A) Installation of steam boiler | 412,000 |
| (Base Project Allocation - $343,000) (Design and Contingencies - $69,000) | |
| (iv) Southeastern Pennsylvania Veterans Center | |
| (A) Construction of addition to Horizon Building for use as a dietary facility | 1,348,000 |
| (Base Project Allocation - $1,123,000) (Design and Contingencies - $225,000) | |
| (v) Philadelphia | |
| (A) Construction of a new veterans' home in Philadelphia | 7,500,000 |
| (vi) Training Site | |
| (A) ((A) repealed Oct. 10, 1997, P.L.392, No.47) | |
| (8) Department of Public Welfare | $31,864,000 |
| (i) Loysville Youth Development Center | |
| (A) Security fencing | 262,000 |
| (Base Project Allocation - $218,000) (Design and Contingencies - $44,000) | |
| (ii) Allentown State Hospital | |
| (A) Renovate patient areas in main building group | 1,909,000 |
| (Base Project Allocation - $1,591,000) (Design and Contingencies - $318,000) | |
| (B) Heating, ventilation and air conditioning in patient areas of main building | 3,744,000 |
| (Base Project Allocation - $3,120,000) (Design and Contingencies - $624,000) | |
| (iii) Clarks Summit State Hospital | |
| (A) Upgrade electrical switch gear | 698,000 |
| (Base Project Allocation - $582,000) (Design and Contingencies - $116,000) | |
| (B) Install privacy partitions in Hilltop West Building | 1,273,000 |
| (Base Project Allocation - $1,061,000) (Design and Contingencies - $212,000) | |
| (C) Boiler renovation | 1,872,000 |
| (Base Project Allocation - $1,560,000) (Design and Contingencies - $312,000) | |
| (iv) Danville State Hospital | |
| (A) Exterior improvements to Block Building | 1,909,000 |
| (Base Project Allocation - $1,591,000) (Design and Contingencies - $318,000) | |
| (B) Install elevator in hospital building | 727,000 |
| (Base Project Allocation - $606,000) (Design and Contingencies - $121,000) | |
| (v) Harrisburg State Hospital | |
| (A) Renovate Building Number 12 | 726,000 |
| (Base Project Allocation - $605,000) (Design and Contingencies - $121,000) | |
| (B) Electrical renovation in Building Number 23 | 317,000 |
| (Base Project Allocation - $264,000) (Design and Contingencies - $53,000) | |
| (vi) Haverford State Hospital | |
| (A) Upgrade heating, ventilation and air conditioning in Building Number 4 | 437,000 |
| (Base Project Allocation - $364,000) (Design and Contingencies - $73,000) | |
| (vii) Mayview State Hospital | |
| (A) Upgrade primary electrical feeders | 269,000 |
| (Base Project Allocation - $224,000) (Design and Contingencies - $45,000) | |
| (B) Ventilation and air conditioning in Temple Center I | 1,248,000 |
| (Base Project Allocation - $1,040,000) (Design and Contingencies - $208,000) | |
| (C) Ventilation and air conditioning in Temple Center II | 1,248,000 |
| (Base Project Allocation - $1,040,000) (Design and Contingencies - $208,000) | |
| (D) Replace elevators in Dixon Building | 290,000 |
| (Base Project Allocation - $242,000) (Design and Contingencies - $48,000) | |
| (E) Boiler renovation | 3,120,000 |
| (Base Project Allocation - $2,600,000) (Design and Contingencies - $520,000) | |
| (viii) Norristown State Hospital | |
| (A) Renovation of Building Number 51 | 936,000 |
| (Base Project Allocation - $780,000) (Design and Contingencies - $156,000) | |
| (ix) South Mountain Restoration Center | |
| (A) Upgrade utility service for forensic unit | 571,000 |
| (Base Project Allocation - $476,000) (Design and Contingencies - $95,000) | |
| (x) Wernersville State Hospital | |
| (A) Consolidate kitchen into Building Number 14 | 1,018,000 |
| (Base Project Allocation - $848,000) (Design and Contingencies - $170,000) | |
| (xi) Ebensburg Center | |
| (A) Renovate Unit V | 707,000 |
| (Base Project Allocation - $589,000) (Design and Contingencies - $118,000) | |
| (B) Replacement of main steam line | 624,000 |
| (Base Project Allocation - $520,000) (Design and Contingencies - $104,000) | |
| (xii) Hamburg Center | |
| (A) Upgrade steam and condensate systems | 835,000 |
| (Base Project Allocation - $696,000) (Design and Contingencies - $139,000) | |
| (B) Renovate restroom and bathing areas in Pine Complex and Dogwood West | 1,285,000 |
| (Base Project Allocation - $1,071,000) (Design and Contingencies - $214,000) | |
| (xiii) Laurelton Center | |
| (A) Air condition and upgrade windows in McClure Hall | 382,000 |
| (Base Project Allocation - $318,000) (Design and Contingencies - $64,000) | |
| (xiv) Polk Center | |
| (A) Heating and ventilating improvements in Terrace Building | 1,400,000 |
| (Base Project Allocation - $1,167,000) (Design and Contingencies - $233,000) | |
| (B) Air conditioning and windows in Southside Building | 905,000 |
| (Base Project Allocation - $754,000) (Design and Contingencies - $151,000) | |
| (xv) Selinsgrove Center | |
| (A) Install new heating and cooling system in Building Number 15 | 458,000 |
| (Base Project Allocation - $382,000) (Design and Contingencies - $76,000) | |
| (B) Renovate main electrical substation | 382,000 |
| (Base Project Allocation - $318,000) (Design and Contingencies - $64,000) | |
| (C) Bath area renovation in Unit VII, Building Numbers 5 and 7 | 374,000 |
| (Base Project Allocation - $312,000) (Design and Contingencies - $62,000) | |
| (D) Renovation of bath area in Unit 4, Building Numbers 22, 23, 24 and 25 | 499,000 |
| (Base Project Allocation - $416,000) (Design and Contingencies - $83,000) | |
| (xvi) Western Center | |
| (A) Renovate bathrooms in Cedar Lodge, Building Number 3 | 720,000 |
| (Base Project Allocation - $600,000) (Design and Contingencies - $120,000) | |
| (xvii) White Haven Center | |
| (A) Renovate Pocono Hall | 719,000 |
| (Base Project Allocation - $599,000) (Design and Contingencies - $120,000) | |
| (9) Department of Transportation | $134,650,000 |
| (i) City of Philadelphia | |
| (A) North Broad Street streetscape | 3,150,000 |
| (B) South Broad Street streetscape | 1,400,000 |
| (C) Purchase of two helicopters for police department | 2,600,000 |
| (ii) Port of Philadelphia | |
| (A) Tioga Marine Terminal - general improvements | 13,650,000 |
| (B) Improvements to Piers 70, 80 and 80 Annex | 2,500,000 |
| (C) Improvements to Piers 82 and 84 | 6,750,000 |
| (D) Improvements to Piers 96 and 98 Annex | 5,600,000 |
| (E) Parker Avenue Marine Terminal - general improvements | 4,000,000 |
| (F) Property acquisition and facility construction | 80,000,000 |
| (G) Basic infrastructure maintenance and improvements | 15,000,000 |
| (10) Pennsylvania State Police | $2,659,000 |
| (i) Lycoming County Station | |
| (A) Construction of annex building and renovation of headquarters complex | 2,659,000 |
| (Base Project Allocation - $2,216,000) (Design and Contingencies - $443,000) | |
| (11) State System of Higher Education | $443,564,000 |
| (i) Bloomsburg State University | |
| (A) Addition to Hartline Science | 7,648,000 |
| (Base Construction Allocation - $6,373,000) (Design and Contingencies - $1,275,000) | |
| (B) Renovation of Ben Franklin Building | 4,312,000 |
| (Base Construction Allocation - $3,593,000) (Design and Contingencies - $719,000) | |
| (C) Renovation of Navy Hall | 5,381,000 |
| (Base Construction Allocation - $4,484,000) (Design and Contingencies - $897,000) | |
| (D) Renovation of Bakeless Center | 4,862,000 |
| (Base Construction Allocation - $4,052,000) (Design and Contingencies - $810,000) | |
| (E) Construction of parking areas | 1,386,000 |
| (Base Construction Allocation - $1,155,000) (Design and Contingencies - $231,000) | |
| (ii) California State University | |
| (A) Renovation of Old Main | 5,831,000 |
| (Base Construction Allocation - $4,859,000) (Design and Contingencies - $972,000) | |
| (B) Renovation of Old Industrial Arts Building | 3,296,000 |
| (Base Construction Allocation - $2,747,000) (Design and Contingencies - $549,000) | |
| (C) Construction of central stores/maintenance facility | 2,053,000 |
| (Base Construction Allocation - $1,711,000) (Design and Contingencies - $342,000) | |
| (D) Renovation of Vulcan Hall | 1,145,000 |
| (Base Construction Allocation - $954,000) (Design and Contingencies - $191,000) | |
| (iii) Cheyney University of Pennsylvania | |
| (A) Rehabilitation and improvements to the Urban Education Development Research and Retreat Center | 3,500,000 |
| (iv) Clarion State University | |
| (A) Addition to Carrier Hall | 1,403,000 |
| (Base Construction Allocation - $1,169,000) (Design and Contingencies - $234,000) | |
| (B) Oil City Campus | |
| (I) Construction of Carlson Library | 14,353,000 |
| (Base Project Allocation - $14,353,000) | |
| (II) Renovation of Pierce Science Center | 6,436,000 |
| (Base Project Allocation - $6,436,000) | |
| (v) East Stroudsburg State University | |
| (A) Supplemental 405-49, renovation of Gessner Science | 900,000 |
| (B) Renovation of Koehler Field House | 5,987,000 |
| (Base Construction Allocation - $4,989,000) (Design and Contingencies - $998,000) | |
| (C) Renovation of auditorium | 1,674,000 |
| (Base Construction Allocation - $1,395,000) (Design and Contingencies - $279,000) | |
| (D) Construction of physics and computer science facility | 14,391,000 |
| (Base Construction Allocation - $10,384,000) (Design and Contingencies - $2,077,000) (Land Allocation - $1,930,000) | |
| (E) Renovation of ROTC & Upward Bound Building | 163,000 |
| (Base Construction Allocation - $136,000) (Design and Contingencies - $27,000) | |
| (F) Addition/renovation instructional complex and stadium | 5,232,000 |
| (Base Construction Allocation - $4,360,000) (Design and Contingencies - $872,000) | |
| (G) Construction of instructional complex for physical education | 5,312,000 |
| (Base Construction Allocation - $4,427,000) (Design and Contingencies - $885,000) | |
| (H) Construction of maintenance building and garage | 6,520,000 |
| (Base Construction Allocation - $5,433,000) (Design and Contingencies - $1,087,000) | |
| (I) Construction of parking areas | 815,000 |
| (Base Construction Allocation - $679,000) (Design and Contingencies - $136,000) | |
| (vi) Edinboro State University | |
| (A) Renovation of McComb Field House bleachers | 864,000 |
| (Base Construction Allocation - $720,000) (Design and Contingencies - $144,000) | |
| (B) Rehabilitation of campus drainage | 610,000 |
| (Base Construction Allocation - $508,000) (Design and Contingencies - $102,000) | |
| (C) Renovation of Memorial Auditorium | 1,560,000 |
| (Base Construction Allocation - $1,300,000) (Design and Contingencies - $260,000) | |
| (D) Renovation of Loveland Hall | 2,027,000 |
| (Base Construction Allocation - $1,689,000) (Design and Contingencies - $338,000) | |
| (E) Construction of maintenance/storage facility | 5,851,000 |
| (Base Construction Allocation - $4,876,000) (Design and Contingencies - $975,000) | |
| (F) Addition to McComb Field House | 5,044,000 |
| (Base Construction Allocation - $4,203,000) (Design and Contingencies - $841,000) | |
| (G) Replacement of White Hall | 839,000 |
| (Base Construction Allocation - $699,000) (Design and Contingencies - $140,000) | |
| (H) Construction of new classroom building | 6,854,000 |
| (Base Construction Allocation - $5,711,000) (Design and Contingencies - $1,143,000) | |
| (vii) Indiana State University | |
| (A) Rehabilitation of Miller Stadium | 6,682,000 |
| (Base Construction Allocation - $5,568,000) (Design and Contingencies - $1,114,000) | |
| (B) Renovation of Stabley Library | 5,843,000 |
| (Base Construction Allocation - $4,869,000) (Design and Contingencies - $974,000) | |
| (C) Renovation of Elcher Hall | 2,405,000 |
| (Base Construction Allocation - $2,004,000) (Design and Contingencies - $401,000) | |
| (D) Addition/renovation of Ackerman Hall | 6,046,000 |
| (Base Construction Allocation - $5,038,000) (Design and Contingencies - $1,008,000) | |
| (E) Addition/renovation of Cogswell Hall | 6,925,000 |
| (Base Construction Allocation - $5,771,000) (Design and Contingencies - $1,154,000) | |
| (F) Renovation of Keith Hall | 9,307,000 |
| (Base Construction Allocation - $7,756,000) (Design and Contingencies - $1,551,000) | |
| (G) Renovation of Sutton Hall | 13,621,000 |
| (Base Construction Allocation - $11,351,000) (Design and Contingencies - $2,270,000) | |
| (H) Renovation of Leonard Hall | 7,189,000 |
| (Base Construction Allocation - $5,991,000) (Design and Contingencies - $1,198,000) | |
| (I) Addition/renovation Fisher Auditorium | 9,289,000 |
| (Base Construction Allocation - $7,741,000) (Design and Contingencies - $1,548,000) | |
| (J) Renovation of Wilson Hall | 3,007,000 |
| (Base Construction Allocation - $2,506,000) (Design and Contingencies - $501,000) | |
| (K) Construction of new parking facilities | 5,125,000 |
| (Base Construction Allocation - $4,271,000) (Design and Contingencies - $854,000) | |
| (L) Construction of behavioral science classroom building | 15,950,000 |
| (Base Construction Allocation - $11,146,000) (Design and Contingencies - $2,229,000) (Land Allocation - $2,575,000) | |
| (viii) Kutztown State University | |
| (A) Construction of College of Business Building | 7,084,000 |
| (Base Construction Allocation - $5,903,000) (Design and Contingencies - $1,181,000) | |
| (B) Construction of Communications Design Building | 5,622,000 |
| (Base Construction Allocation - $4,685,000) (Design and Contingencies - $937,000) | |
| (C) Addition to maintenance building and garage | 2,849,000 |
| (Base Construction Allocation - $2,374,000) (Design and Contingencies - $475,000) | |
| (D) Addition and renovation to science building | 9,907,000 |
| (Base Construction Allocation - $8,256,000) (Design and Contingencies - $1,651,000) | |
| (ix) Lock Haven State University | |
| (A) Renovation of Rogers Gym | 2,954,000 |
| (Base Construction Allocation - $2,462,000) (Design and Contingencies - $492,000) | |
| (B) Additional funds for DGS 409-54 | 500,000 |
| (C) Purchase and renovation of Army Reserve Center for use as Clearfield Branch Campus Building | 850,000 |
| (Base Project Allocation - $750,000) (Design and Contingencies - $100,000) | |
| (D) Land acquisition for and construction of Clearfield Center of Lock Haven University | 10,000,000 |
| (E) Acquisition and construction of south parking facility | 860,000 |
| (Base Project Allocation - $300,000) (Land Allocation - $500,000) (Design and Contingencies - $60,000) | |
| (F) Additional funds for DGS 409-53 - Ulmer Hall | 821,000 |
| (Base Project Allocation - $684,000) (Design and Contingencies - $137,000) | |
| (G) Additional funds for DGS 409-52 - Jack Stadium, Phase III | 600,000 |
| (Base Project Allocation - $500,000) (Design and Contingencies - $100,000) | |
| (x) Mansfield State University | |
| (A) Addition to Grant Science - Phase III | 3,715,000 |
| (Base Construction Allocation - $3,096,000) (Design and Contingencies - $619,000) | |
| (xi) Millersville State University | |
| (A) Addition to McComsey Hall | 7,840,000 |
| (Base Construction Allocation - $6,533,000) (Design and Contingencies - $1,307,000) | |
| (B) Construction of instructional arts complex | 17,945,000 |
| (Base Construction Allocation - $14,954,000) (Design and Contingencies - $2,991,000) | |
| (C) Construction of parking areas | 2,150,000 |
| (Base Construction Allocation - $1,792,000) (Design and Contingencies - $358,000) | |
| (xii) Shippensburg State University | |
| (A) Renovation of athletic service facility | 895,000 |
| (Base Construction Allocation - $746,000) (Design and Contingencies - $149,000) | |
| (B) Renovation of Gilbert and Stewart Halls | 4,255,000 |
| (Base Construction Allocation - $3,546,000) (Design and Contingencies - $709,000) | |
| (C) Construction of instructional arts facility | 16,483,000 |
| (Base Construction Allocation - $16,483,000) | |
| (D) Addition to Lehman Library | 9,034,000 |
| (Base Construction Allocation - $7,528,000) (Design and Contingencies - $1,506,000) | |
| (E) Construction of central services/receiving facility | 1,231,000 |
| (Base Construction Allocation - $1,026,000) (Design and Contingencies - $205,000) | |
| (F) Construction of roadways and parking | 3,708,000 |
| (Base Construction Allocation - $3,090,000) (Design and Contingencies - $618,000) | |
| (G) Renovation of Franklin Science Center | 10,494,000 |
| (Base Construction Allocation - $8,745,000) (Design and Contingencies - $1,749,000) | |
| (H) Addition and renovation of Memorial Auditorium | 9,332,000 |
| (Base Construction Allocation - $7,777,000) (Design and Contingencies - $1,555,000) | |
| (I) Renovation of Shippen Hall | 4,622,000 |
| (Base Construction Allocation - $3,852,000) (Design and Contingencies - $770,000) | |
| (xiii) Slippery Rock State University | |
| (A) Renovation of Vincent Science Building | 17,422,000 |
| (Base Construction Allocation - $14,518,000) (Design and Contingencies - $2,904,000) | |
| (B) Renovation of McKay Educational Building | 8,232,000 |
| (Base Construction Allocation - $6,860,000) (Design and Contingencies - $1,372,000) | |
| (C) Renovation of Morrow Field House | 12,666,000 |
| (Base Construction Allocation - $10,555,000) (Design and Contingencies - $2,111,000) | |
| (D) Reconstruction of roadways/parking | 3,220,000 |
| (Base Construction Allocation - $2,683,000) (Design and Contingencies - $537,000) | |
| (E) Construction of health professionals building | 7,800,000 |
| (Base Construction Allocation - $6,500,000) (Design and Contingencies - $1,300,000) | |
| (xiv) West Chester State University | |
| (A) Renovation of McCoy Center | 577,000 |
| (Base Construction Allocation - $464,000) (Design and Contingencies - $113,000) | |
| (B) Construction of arts complex | 20,300,000 |
| (Base Construction Allocation - $16,997,000) (Design and Contingencies - $3,303,000) | |
| (C) Renovation of Old Library | 3,046,000 |
| (Base Construction Allocation - $2,538,000) (Design and Contingencies - $508,000) | |
| (D) Addition and renovation to Mitchell Hall | 8,287,000 |
| (Base Construction Allocation - $6,906,000) (Design and Contingencies - $1,381,000) | |
| (xv) State System of Higher Education | |
| (A) Asbestos abatement - Phase II | 10,625,000 |
| (Base Construction Allocation - $8,854,000) (Design and Contingencies - $1,771,000) |
Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.
Section 4. Itemization of furniture and equipment projects.
Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
| Total | |
|---|---|
| Project | |
| Project | Allocation |
| (1) Department of Education | $28,970,000 |
| (i) Thaddeus Stevens State School of Technology | |
| (A) Original furniture and equipment for DGS 417-18 - Learning Resource Center | 462,000 |
| (ii) Lincoln University | |
| (A) Original furniture and equipment for DGS 1101-22 - Living-Learning Center | 1,853,000 |
| (iii) The Pennsylvania State University | |
| (A) Original furniture and equipment for Agriculture Instruction Center DGS 800-204 - Berks Campus | 850,000 |
| (B) Original furniture and equipment for the utility systems expansion and improvements - Berks Campus | 140,000 |
| (C) Original furniture and equipment for the Academic Building - Berks Campus | 420,000 |
| (D) Original furniture and equipment for classroom building DGS 800-208 - Delaware Campus | 620,000 |
| (E) Original furniture and equipment for the Academic Support Services Building - Dubois Campus | 150,000 |
| (F) Original furniture and equipment for multipurpose facility for student activities DGS 800-220 - Behrend College, Erie | 1,550,000 |
| (G) Original furniture and equipment for the utility systems improvement - Behrend College, Erie | 870,000 |
| (H) Original furniture and equipment for the renovation of the Reed Building and Carriage House - Behrend College, Erie | 225,000 |
| (I) Original furniture and equipment for the Library and classroom building - Capital College, Harrisburg | 1,650,000 |
| (J) Original furniture and equipment for multi-purpose technological cultural "Southwest Institute" support regional socioeconomic development DGS 800-209 - Fayette Campus | 620,000 |
| (K) Original furniture and equipment for Agriculture Sci Classroom Lab Building DGS 800-210 - Fayette Campus | 460,000 |
| (L) Original furniture and equipment for the utility systems improvements - Fayette Campus | 130,000 |
| (M) Original furniture and equipment for Academic Building DGS 800-212 - New Kensington Campus | 260,000 |
| (N) Original furniture and equipment for the water, electrical and telecommunications systems - Mont Alto Campus | 165,000 |
| (O) Original furniture and equipment for the renovations of Conklin Hall, the Wiestling Building and the General Studies Building - Mont Alto Campus | 670,000 |
| (P) Original furniture and equipment for the expansion of the HUB/Paul Robeson Cultural Center - University Park Campus | 2,000,000 |
| (Q) Original furniture and equipment for the new Chemistry Building - University Park Campus | 6,000,000 |
| (R) Original furniture and equipment for the improvements and expansion of the Utility System - University Park Campus | 1,700,000 |
| (S) Original furniture and equipment for the renovations of and additions to four buildings - University Park Campus | 2,600,000 |
| (T) Original furniture and equipment for the classroom building - Phase I - University Park Campus | 1,000,000 |
| (U) Original furniture and equipment for the Academic Support Services Complex - Phase I - University Park Campus | 1,500,000 |
| (V) Original furniture and equipment for the Library addition and Auditorium - York Campus | 1,075,000 |
| (iv) Montgomery County Community College - West Campus | |
| (A) Furniture and equipment | 2,000,000 |
| (2) Department of Environmental Resources | $104,000 |
| (i) Raccoon Creek State Park | |
| (A) Original furniture and equipment for DGS 146-7 - park improvements | 104,000 |
| (3) State System of Higher Education | $1,996,000 |
| (i) California University | |
| (A) Original furniture and equipment - Dixon Hall - DGS 402-5 | 684,000 |
| (ii) Edinboro University | |
| (A) Original furniture and equipment - Loveland Hall - DGS 406-47 | 30,000 |
| (B) Original furniture and equipment - Cooper Science - DGS 406-51 | 234,000 |
| (iii) Kutztown University | |
| (A) Original furniture and equipment - athletic facility - DGS 408-54 | 280,000 |
| (iv) Mansfield University | |
| (A) Original furniture and equipment - Belknap/Retan - DGS 410-49 | 768,000 |
Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:
| Total | |
|---|---|
| Project | |
| Project | Allocation |
| (1) Beaver County Transit Authority | |
| (i) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 303,000 |
| (2) Bedford County Air Industrial Authority, Bedford County | |
| (i) Improvements to facility | 300,000 |
| (Base Project Allocation - $250,000) (Design and Contingencies - $50,000) | |
| (3) Berks Area Reading Transportation Authority | |
| (i) Construction of a downtown transportation center | 533,000 |
| (ii) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 298,000 |
| (iii) Fiscal Year 1993 associated capital items | 44,000 |
| (iv) Compress Natural Gas (CNG) bus procurement and related equipment | 266,000 |
| (4) Blair County Airport Authority, Blair County | |
| (i) Access road, parking lot and terminal expansion | 2,600,000 |
| (Base Project Allocation - $2,000,000) (Design and Contingencies - $600,000) | |
| (5) Bradford Regional Airport | |
| (i) Parallel taxiway for Runway 1432 | 2,500,000 |
| (6) Cambria County Transit Authority | |
| (i) Fuel dispensing equipment | 46,000 |
| (ii) Air circulation equipment | 42,000 |
| (iii) Garage roof | 10,000 |
| (iv) Garage expansion | 25,000 |
| (v) Storm water system | 10,000 |
| (vi) Floor replacement | 34,000 |
| (vii) Building repairs | 5,000 |
| (viii) Inclined plane fare collection equipment | 4,000 |
| (ix) Bus replacements | 400,000 |
| (x) Accessible vans (2) | 9,000 |
| (xi) Bus wash/water recycler | 6,000 |
| (xii) Road safety vehicle | 4,000 |
| (xiii) Inclined plane crosswalk | 21,000 |
| (7) Capital Area Transit | |
| (i) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 536,000 |
| (ii) Facility renovations and purchase of ten shelters | 116,000 |
| (iii) Purchase of various size transit vehicles, spare parts and related equipment | 377,000 |
| (8) Centre Area Transportation Authority | |
| (i) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 729,000 |
| (ii) Bus replacement (16 vehicles) | 534,000 |
| (iii) Construction of CNG fueling station | 300,000 |
| (iv) Office, shop, bus and capital maintenance items | 42,000 |
| (v) Update, replace and expand bus signage and passenger shelters | 22,000 |
| (vi) Equip fixed routes buses with bicycle racks | 5,000 |
| (vii) Acquisition of two lift-equipped paratransit vehicles | 34,000 |
| (viii) Service vehicle replacement | 13,000 |
| (9) Chambersburg Area Transit | |
| (i) Purchase of trackless trolleys and related equipment | 83,000 |
| (10) City of Philadelphia | |
| (i) Initial construction of Erie Avenue Subway | 377,000 |
| (ii) Light-rail transit upgrade | 1,374,000 |
| (iii) Construction of Eastwick Station | 1,050,000 |
| (iv) Chestnut Street Transitway extension | 4,067,000 |
| (11) Delaware River Port Authority | |
| (i) Modifications to two Philadelphia stations | 1,000,000 |
| (12) Dubois-Jefferson County Airport | |
| (i) Paving taxiway parallel to Runway 7 | 300,000 |
| (ii) De-icing pad | 10,000 |
| (iii) State Route 830 terminal area relocation | 19,000 |
| (iv) Resurface Runway 25 | 63,000 |
| (v) Snow removal equipment and storage building | 8,000 |
| (13) Elk County | |
| (i) ATA-Area Transportation Authority | 50,000 |
| (A) Compressed natural gas compression station and conversion of vehicles | |
| (Base Project Allocation - $50,000) | |
| (14) Endless Mountains Transportation Authority | |
| (i) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 42,000 |
| (15) Erie Metropolitan Transit Authority | |
| (i) Replacement of buses and rehabilitation of transit facilities | 421,000 |
| (ii) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 218,000 |
| (iii) Fiscal Year 1992-1993 Section 9 Program of Projects, including facility rehabilitation, renovations and acquisition of equipment | 13,000 |
| (iv) Fiscal Year 1993-1994 Section 9 Program of Projects, including replacement buses, and facility rehabilitation and renovations | 129,000 |
| (v) Fiscal Year Federal Transit Administration 1993 Section 3 Erie Peach Street Corridor Intermodal Surface Transportation Project | 848,000 |
| (16) Transportation Assistance Projects | |
| (i) Lackawanna County Transit Authority county projects, including, but not limited to, purchase of transit vehicles, improvements to transit facility, service vehicle replacement and office, shop, bus and capital maintenance items and vehicle renovations | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (17) Lehigh and Northampton Transportation Authority | |
| (i) Purchase of replacement buses | 500,000 |
| (ii) Purchase five community service transit buses | 130,000 |
| (iii) Purchase ten vans/minibuses for special service division - Metro Plus | 55,000 |
| (18) Luzerne County Transportation Authority | |
| (i) Maintenance area improvements and purchase of office equipment | 39,000 |
| (ii) Purchase of transit vehicles | 450,000 |
| (iii) Improvements to facilities | 250,000 |
| (Base Project Allocation - $220,000) (Design and Contingencies - $30,000) | |
| (19) Area Transportation Authority of North Central Pennsylvania | |
| (i) Purchase of heavy-duty vehicles and equipment | 605,000 |
| (20) Port Authority of Allegheny County | |
| (i) Bus procurement and related equipment and facilities | 13,600,000 |
| (ii) Fiscal Year 1994 fixed guideway modernization | 4,000,000 |
| (iii) Fiscal Year 1994 Section 9 Program of Projects | 4,000,000 |
| (iv) Fiscal Year 1993-1994 vehicle overhaul | 2,000,000 |
| (v) Discretionary fixed guideway projects | 1,100,000 |
| (21) Southeastern Pennsylvania Transportation Authority | |
| (i) Section 9 Program | 9,160,000 |
| (ii) Fixed Guideway Program | 5,334,000 |
| (iii) Substation improvements | 209,000 |
| (iv) Additional funds for the construction of bus maintenance facility | 3,208,000 |
| (v) Rehabilitation of North Philadelphia Station | 521,000 |
| (vi) Fiscal Year 1992-1993 Infrastructure Safety and Renewal Program | 20,000,000 |
| (vii) Fiscal Year 1993-1994 Vehicle Overhaul Program | 35,000,000 |
| (viii) Fiscal Year 1993-1994 Infrastructure Safety and Renewal Program | 20,000,000 |
| (ix) Fiscal Year 1993 Section 3 Fixed Guideway Program of Projects - additional | 2,000,000 |
| (x) Frankford elevated reconstruction - Fiscal Year 1994 requirement | 8,334,000 |
| (xi) Butler and Grange Substation Modernization - additional | 167,000 |
| (xii) For construction of an intrasuburban transit line from Downingtown, Chester County, to Morrisville, Bucks County | 16,000,000 |
| (22) St. Marys Airport | |
| (i) Runway reconstruction Phase I and access road relocation | 750,000 |
| (ii) Runway reconstruction Phase II | 750,000 |
| (iii) Runway extension - 700 feet | 500,000 |
| (iv) Instrument Landing System | 150,000 |
| (23) Westmoreland County Transit Authority | |
| (i) Bus replacement | 267,000 |
| (ii) Purchase of handicapped-accessible vans | 23,000 |
| (24) Williamsport Bureau of Transportation | |
| (i) Purchase buses and spare parts | 275,000 |
| (ii) Purchase of transit vehicles and related equipment from Consolidated Bus Procurement Project | 36,000 |
| (25) York Area Transportation Authority | |
| (i) Purchase of buses, fareboxes and radios | 280,000 |
| (26) Class 4 rural public transportation systems | |
| (i) Projects, including, but not limited to, purchase of vehicles, vehicle overhaul, purchase of facilities, facility renovations, other capital equipment and associated capital items for Fiscal Year 1993-1994 | 2,250,000 |
| (27) Class 3 public transportation systems | |
| (i) Projects, including, but not limited to, purchase of vehicles, vehicle overhaul, purchase of facilities, facility renovations, other capital equipment and associated capital items for Fiscal Year 1993-1994 | 4,500,000 |
| (28) Reading Regional Airport, Berks County | |
| (i) Replacement of HVAC system in passenger terminal building | 500,000 |
| (Base Project Allocation - $450,000) (Design and Contingencies - $50,000) | |
| (ii) Removal of storage tanks during property cleanup | 250,000 |
| (iii) Demolition of Hangar 501 | 300,000 |
| (29) Indiana County Airport, Indiana County | |
| (i) Airport improvements, including, but not limited to, runway improvements and resurfacing, ramp and taxiway improvements and resurfacing, hangar construction and improvements, marking and lighting projects and aviation development as defined in 74 Pa.C.S. Pt. III (relating to aviation) | 2,231,000 |
| (Base Project Allocation - $2,231,000) | |
| (30) Clearfield - Lawrence Airport Authority | |
| (i) Improvements to airport facility | 2,000,000 |
| (31) Rostraver Airport - Westmoreland County | |
| (i) Runway extension | 2,000,000 |
| (ii) Construction of new hangar | 300,000 |
| (iii) Expansion of equipment building to new terminal | 200,000 |
| (b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows: | |
| Total | |
| Project | |
| Project | Allocation |
| (1) Blair County | |
| (i) Morrison's Cove Railroad Company | |
| (A) Replacement track and rebuild switches and grade crossings | 128,000 |
| (2) Bucks County | |
| (i) Morrisville Transportation Center | |
| (A) Construction of transportation center | 25,000,000 |
| (3) Butler County | |
| (i) Buffalo and Pittsburgh Railroad | |
| (A) Butler to Bruin main line track road crossing and bridge work rehabilitation | 1,625,000 |
| (4) Centre County | |
| (i) Nittany and Bald Eagle Railroad | |
| (A) Rail replacement between Milepost 34 and Milepost 40 | 1,200,000 |
| (5) Clarion County | |
| (i) Mountain Laurel Railroad Company | |
| (A) Rehabilitation of track | 3,500,000 |
| (ii) Shannon Transport, Incorporated | |
| (A) Track rehabilitation, construction and upgrade | 528,000 |
| (iii) Conrail or successor in interest | |
| (A) Rehabilitate low-grade rail line between Lawsonham, Clarion County, and Driftwood, Cameron County, and Clarion Secondary between Piny, Clarion County, and Brookville, Jefferson County | 7,000,000 |
| (6) Columbia County | |
| (i) North Shore Railroad | |
| (A) Rail replacement between Milepost 191 and Milepost 199 | 1,440,000 |
| (7) Crawford County | |
| (i) Southern Tier Rail Coalition | |
| (A) Purchase of Conrail line between Hornell, New York, and Meadville | 20,000,000 |
| (8) Cumberland County | |
| (i) Cumberland Valley Railroad | |
| (A) Purchase of Cumberland Valley Railroad Bridge | 40,000 |
| (9) Erie County | |
| (i) East Erie Commercial Railroad | |
| (A) Track replacement | 471,000 |
| (10) Fayette County | |
| (i) LaBelle Processing Plant | |
| (A) Upgrade and relocate leased Conrail track and construct clean coal storage area and high-speed loadout in Brownsville | 3,920,000 |
| (ii) Greater Uniontown Industrial Fund | |
| (A) Capital acquisition and rehabilitation of CSX Transportation, Inc., FM&P subdivision between Smithfield and Greene Junction and connecting trackage to Connellsville | 4,000,000 |
| (11) Luzerne County | |
| (i) Canadian Pacific Rail System/Delaware and Hudson Railway Company, Inc., or their successor in interest | |
| (A) Upgrade track, bridges and other facilities between Dupont in Luzerne County and Sunbury in Northumberland County, including design, engineering and all other associated costs | 5,500,000 |
| (ii) East Mahoney and Hazleton Railroad | |
| (A) Rehabilitation of Jeddo Tunnel | 450,000 |
| (iii) Greater Wilkes-Barre Partnership, Inc. | |
| (A) Construction of rail spur | 221,000 |
| (iv) Pocono Northeast Railway, Inc. | |
| (A) Rehabilitation of Susquehanna River bridge | 504,000 |
| (12) Montgomery County | |
| (i) Southeastern Pennsylvania Transportation Authority | |
| (A) Repair and restoration and feasibility study for developing a comprehensive plan for utilization of the Stony Creek railroad for freight and mass transportation purposes between Norristown Borough and Lansdale Borough | 500,000 |
| (Base Project Allocation - $500,000) | |
| (13) Montour County | |
| (i) SEDA-COG Joint Rail Authority | |
| (A) Replacement of tracks | 720,000 |
| (14) Schuylkill County | |
| (i) Reading, Blue Mountain and Northern Railroad | |
| (A) Rehabilitate Delano Township Bridge | 50,000 |
| (15) Warren County | |
| (i) Pennsylvania Department of Transportation | |
| (A) Track removal and restoration of right-of-way | 600,000 |
| (16) York County | |
| (i) Yorkrail, Incorporated | |
| (A) Track replacement and right-of-way improvements | 771,000 |
| (ii) Maryland and Pennsylvania Railroad | |
| (A) Rehabilitation and renovation of West Branch | 657,000 |
| (17) Buffalo and Pittsburgh Railroad Rehabilitation Project | |
| (i) Buffalo and Pittsburgh Railroad, Inc. | |
| (A) Additional funds for rehabilitation of various mainline segments of Buffalo and Pittsburgh Railroad to Class III and/or Class II standards | 11,755,000 |
| (B) Johnsonburg Bypass rail connection between Buffalo and Pittsburgh Railroad and the Allegheny and Eastern Railroad | 3,000,000 |
| (18) Pittsburgh and Shawmut Railroad | |
| (i) DuBois Bypass rail construction | |
| (A) Construct Mosgrove connection between Pittsburgh and Shawmut Railroad and Buffalo and Pittsburgh Railroad | 2,000,000 |
| (B) Tunnel clearance project on five tunnels to increase clearance to 20 feet 8 inches | 3,000,000 |
| (19) Department of Transportation | |
| (i) Acquisition of trainsets | |
| (A) ((A) repealed Oct. 10, 1997, P.L.392, No.47) |
Compiler's Note: The voters approved the incurring of indebtedness of $50,000,000 at the municipal election held on November 2, 1993.
Section 6. Itemization of flood control projects.
Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Resources, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:
| Total | |
|---|---|
| Project | |
| Project | Allocation |
| (1) Department of Environmental Resources | $82,850,000 |
| (i) Clearfield County | |
| (A) Tanners Run Flood Control Project - Curwensville Borough | 2,000,000 |
| (B) Flood control project for Beccaria Township, Coalport and Irvona Boroughs by BCI Authority | 2,000,000 |
| (ii) Delaware County | |
| (A) Ridley Park Borough, replacement of East Lake Dam | 400,000 |
| (iii) Lackawanna County | |
| (A) City of Scranton, including, but not limited to, property and land acquisition, design, construction and start-up flood control costs on the Lackawanna River and all streams within the City of Scranton, including existing flood control projects | 11,000,000 |
| (Base Project Allocation - $10,000,000) (Design and Contingencies - $1,000,000) | |
| (B) Borough of Taylor, including, but not limited to, property and land acquisition, design, construction and start-up costs of flood control and storm water projects | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (C) Borough of Dunmore, including, but not limited to, property and land acquisition, design, construction and start-up costs of flood control and storm water projects | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (D) Borough of Throop, including, but not limited to, property and land acquisition, design, construction and start-up costs of flood control and storm water projects | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (iv) Lebanon County | |
| (A) Flood control project located on Hazel Dyke between State Drive Bridge and Lincoln Avenue Bridge | 1,000,000 |
| (Base Project Allocation - $800,000) (Design and Contingencies - $200,000) | |
| (v) Luzerne County | |
| (A) Wyoming Valley flood protection | 45,000,000 |
| (B) Jenkins Township, Port Blanchard flood control project | 800,000 |
| (Base Project Allocation - $725,000) (Design and Contingencies - $75,000) | |
| (C) Construct Fabri-Dam on the Susquehanna River | 8,000,000 |
| (Design and Contingencies - $800,000) | |
| (D) Repair and renovation of Plymouth Borough pump stations and flood dams | 1,300,000 |
| (E) Repair and renovation of Hanover Township flood control pump stations | 1,450,000 |
Section 7. Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community Affairs, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:
| Total | |
|---|---|
| Project | |
| Project | Allocation |
| (1) Allegheny County | |
| (i) City of Pittsburgh | |
| (A) Acquisition and renovation of five additional properties at 500 Sampsonia Way for the Mattress Factory Art Institution | 500,000 |
| (Base Project Allocation - $500,000) | |
| (B) Feasibility study to evaluate construction of moving sidewalk to connect the City of Pittsburgh with the Northside | 500,000 |
| (Design and Contingencies - $500,000) | |
| (C) Lawrenceville Industrial Park Project - Phase II site development | 3,000,000 |
| (Base Project Allocation - $3,000,000) | |
| (D) Fifth and Forbes, infrastructure and public space improvements | 9,000,000 |
| (Base Project Allocation - $9,000,000) | |
| (E) Women's Research Institute, restoration of land and renovation and rehabilitation of buildings | 5,000,000 |
| (F) Carnegie Museum of Art for the Andy Warhol Museum | 6,000,000 |
| (G) Redevelopment of the Bank Center Building into a "Library Center" in downtown Pittsburgh | 1,000,000 |
| (H) Cultural District Development - Phase II | 17,750,000 |
| (I) Pittsburgh Regional History Center | 7,000,000 |
| (J) Federal/North Development | 3,000,000 |
| (K) Renovation and reconstruction of Pittsburgh Ballet Theatre | 1,000,000 |
| (L) Redevelopment of approximately 8.31 acres of riverfront property by South Side Riverfront Development | 3,000,000 |
| (M) Keystone Commons Development | 2,100,000 |
| (N) Rehabilitation and expansion of community center in Homewood-Brushton | 1,800,000 |
| (O) Regent Square Theatre Project | 200,000 |
| (P) Construction of multipurpose community center serving Lincoln, Lemington, Larimer and Belmar | 3,000,000 |
| (Q) Pittsburgh Children's Museum, renovations and building expansion | 5,000,000 |
| (R) Restoration, rehabilitation and construct parking for New Granada Theatre | 5,000,000 |
| (S) Pittsburgh Zoo, construction of an education complex | 250,000 |
| (Base Project Allocation - $250,000) | |
| (T) Phipps Conservatory, renovation of the Palm Court | 150,000 |
| (Base Project Allocation - $150,000) | |
| (U) National Aviary, renovations | 100,000 |
| (Base Project Allocation - $100,000) | |
| (V) Boys and Girls Club of Western Pennsylvania, renovation and construction of juvenile justice and youth development facilities | 2,500,000 |
| (Base Project Allocation - $2,500,000) | |
| (W) Rehabilitation and expansion of the MacIntosh and Hempfield Building for the Pittsburgh Filmmakers | 500,000 |
| (ii) City of Duquesne and City of McKeesport | |
| (A) Center City of Duquesne/McKeesport Industrial Center | 3,485,000 |
| (iii) Moon Township | |
| (A) Conversion of the abandoned terminal at the Greater Pittsburgh International Airport into an air and space museum | 10,000,000 |
| (iv) Borough of Wilkinsburg | |
| (A) Construction of multipurpose center serving Wilkinsburg | 3,000,000 |
| (v) City of McKeesport | |
| (A) McKees Point Marina and Park | 2,600,000 |
| (vi) Borough of Braddock | |
| (A) For additional construction of Braddock Industrial Park | 1,200,000 |
| (vii) Harrison Township | |
| (A) Natrona River and housing development project | 2,000,000 |
| (viii) Rankin Borough | |
| (A) Rankin Marina and fishing docks on Monongahela River | 500,000 |
| (ix) Swissvale, Rankin, Munhall and Homestead Boroughs | |
| (A) Steel Industry Heritage Center | 18,900,000 |
| (x) Millvale Borough | |
| (A) Replacement of potable water storage facility | 275,000 |
| (xi) Aspinwall Borough | |
| (A) Construction of potable water well for public consumption | 125,000 |
| (xii) County of Allegheny | |
| (A) Additional funds for Allegheny River Boulevard | 300,000 |
| (2) Bedford County | |
| (i) Bedford County Center | |
| (A) Construct facility | 1,000,000 |
| (3) Berks County | |
| (i) City of Reading | |
| (A) Repair and renovation of Reading Public Museum | 1,700,000 |
| (ii) Bern Township | |
| (A) Construction of new county juvenile detention facility | 3,500,000 |
| (iii) Berks County | |
| (A) Develop Allegheny Aqueduct Historical Park | 125,000 |
| (4) Blair County | |
| (i) Allegheny Ridge State Heritage Park | |
| (A) Altoona Railroaders Memorial Museum | 7,000,000 |
| (B) Altoona Discovery Center | 4,000,000 |
| (C) Fourteenth Street Park, Altoona | 1,500,000 |
| (D) Dudley House, Altoona | 500,000 |
| (E) Flatiron Building Visitor Center, Brownsville | 1,000,000 |
| (F) Braemer Cottage, Cresson | 500,000 |
| (G) Hollidaysburg Canal Park/Gateway | 3,000,000 |
| (H) Johnstown Discovery Center | 4,000,000 |
| (I) Wagner-Ritter House, Johnstown | 500,000 |
| (J) National Road Toll Houses | 3,000,000 |
| (K) Portage Gateway Center | 1,000,000 |
| (L) Scalp Level Power House | 8,000,000 |
| (M) Scalp Level Miner's House | 200,000 |
| (N) Arcadia Theater, Windber | 3,500,000 |
| (5) Bucks County | |
| (i) Middletown Township | |
| (A) Public Works Department, building addition | 121,000 |
| (B) Public Works substation and operation site | 169,000 |
| (C) Public Works Department, underground storage tank replacements | 320,000 |
| (D) Police Department building renovations | 130,000 |
| (E) Fire companies apparatus replacement and refurbishment plan | 1,700,000 |
| (F) Development of community park in northern area of township | 2,000,000 |
| (G) Beechwood Community Park development | 250,000 |
| (H) Twin Oaks Recreational Facility rehabilitation | 200,000 |
| (I) Mill Creek and Queen Anne Creek drainage improvements | 2,207,000 |
| (J) Langhorne Gables area drainage improvements | 451,000 |
| (ii) Bristol Township | |
| (A) Improvements to drainage and road surface in township | 2,000,000 |
| (iii) Langhorne Borough | |
| (A) Expansion of Borough Hall/Fire House | 200,000 |
| (6) Butler County | |
| (i) Community Development Corporation | |
| (A) Construction of a youth athletic center | 1,500,000 |
| (ii) County of Butler | |
| (A) Improvements to Alameda Park, consisting of road construction and rehabilitation of grounds, riverfront and facilities | 1,000,000 |
| (iii) Chicora Borough and Donegal Township | |
| (A) Joint sewer project | 2,000,000 |
| (7) Cambria County | |
| (i) Johnstown | |
| (A) Renovations to Johnstown Point Stadium | 1,300,000 |
| (Base Project Allocation - $1,000,000) (Design and Contingencies - $300,000) | |
| (ii) County of Cambria | |
| (A) Construction of a collapsible dam on Stoneycreek River | 3,000,000 |
| (8) Cameron County | |
| (i) Emporium Borough/Shippen Township | |
| (A) Sewage treatment plant improvements | 1,500,000 |
| (9) Clearfield County | |
| (i) Philipsburg | |
| (A) Improvements to Philipsburg Area Hospital to provide for an acute-care nursing home | 2,000,000 |
| (ii) Cooper Township | |
| (A) Redevelopment of Severin Church site | 1,000,000 |
| (iii) Morris Township | |
| (A) Department of Environmental Resources mandated improvements to water distribution system | 1,000,000 |
| (iv) Graham Township | |
| (A) Infrastructure and water system improvements | 1,000,000 |
| (v) City of DuBois | |
| (A) Replacement/renovation of south side sewer interceptor | 900,000 |
| (10) Crawford County | |
| (i) Crawford County Fairgrounds | |
| (A) Restoration of grounds | 200,000 |
| (ii) Meadville | |
| (A) Demolition, restoration, reconstruction of dilapidated housing | 1,150,000 |
| (iii) Titusville | |
| (A) Demolition, restoration, reconstruction of dilapidated housing | 1,150,000 |
| (iv) Spartansburg Borough | |
| (A) Rails to Trails Project | 1,000,000 |
| (11) Elk County | |
| (i) Benzinger Township | |
| (A) Construction of sewage system | 1,100,000 |
| (B) Construction of solids-handling facility for water treatment plant | 500,000 |
| (ii) Fox Township | |
| (A) Sewer extension to Fairview subdivision | 200,000 |
| (B) Upgrade sewage treatment plant for removal of toxic metals | 700,000 |
| (C) Expansion of sewage treatment plant | 800,000 |
| (D) Sewer line extension to trailer park | 200,000 |
| (iii) Highland Township | |
| (A) Sewage collection and treatment plant for James City | 800,000 |
| (iv) Jay Township Water Authority | |
| (A) Renovations to Jay Township water system | 2,000,000 |
| (B) Water storage tank construction in Village of Weedville | 250,000 |
| (C) Engineering study for backup source water system | 500,000 |
| (v) Jones Township | |
| (A) Sanitary sewer collection system from Wilcox to Johnsonburg Borough facility | 3,800,000 |
| (vi) Johnsonburg Municipal Authority | |
| (A) Construction of Third Avenue reservoir tank No. 2 | 400,000 |
| (B) Construction of water storage reservoir and Silver Creek water line extension | 900,000 |
| (12) Erie County | |
| (i) Corry Redevelopment Authority | |
| (A) Acquisition of abandoned industrial building for multitenant facility | 1,000,000 |
| (Base Project Allocation - $1,000,000) | |
| (13) Fayette County | |
| (i) Brownsville | |
| (A) Architectural work and construction on Flatiron Building | 375,000 |
| (Base Project Allocation - $375,000) | |
| (14) Forest County | |
| (i) Tionesta Township | |
| (A) Acquisition of 25 acres, including 3 commercial buildings, for creation of an industrial park | 243,000 |
| (Base Project Allocation - $243,000) | |
| (ii) Tionesta Borough | |
| (A) Acquisition of 11 acres for an incubator project | 395,000 |
| (Base Project Allocation - $395,000) | |
| (iii) Jenks Township | |
| (A) Acquisition of 90 acres for an industrial park | 100,000 |
| (Base Project Allocation - $100,000) | |
| (15) Greene County | |
| (i) Rices Landing Borough | |
| (A) Planning, design and construction of W. A. Young Machine Shop | 250,000 |
| (Base Project Allocation - $250,000) | |
| (16) Jefferson County | |
| (i) Brockway Borough | |
| (A) Reline existing sanitary sewer lines along Green Way | 86,000 |
| (B) Installation of an elevator in Toby Terrace apartment building | 55,000 |
| (C) Improvements to roadway to Brockway Industrial Park | 200,000 |
| (ii) Brookville Borough | |
| (A) Restoration of Jefferson County Courthouse and acquisition of annex | 700,000 |
| (iii) Corsica Borough | |
| (A) Water line improvements/access road | 550,000 |
| (iv) Pine Creek Township | |
| (A) Restoration of Jefferson County Service Center | 450,000 |
| (B) Establish incubator/multitenant building | 750,000 |
| (v) Snyder Township | |
| (A) Construction of sanitary sewer lines along Kearney Road, Broad Street and Arch Street | 243,000 |
| (17) Lackawanna County | |
| (i) Civic center and hotel complex | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 55,000,000 |
| (Base Project Allocation - $50,000,000) (Design and Contingencies - $5,000,000) | |
| (ii) Heritage Valley Visitors Center | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 3,960,000 |
| (Base Project Allocation - $3,600,000) (Design and Contingencies - $360,000) | |
| (iii) Heritage Valley Trolley Museum | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 3,960,000 |
| (Base Project Allocation - $3,600,000) (Design and Contingencies - $360,000) | |
| (iv) Northeast Environmental Reclamation and Renewal Facility | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 4,400,000 |
| (Base Project Allocation - $4,000,000) (Design and Contingencies - $400,000) | |
| (v) Lackawanna Coal Mine | |
| (A) Expenditures, including, but not limited to, renovation, rehabilitation and restoration of land and buildings at McDade Park | 4,400,000 |
| (Base Project Allocation - $4,000,000) (Design and Contingencies - $400,000) | |
| (vi) Slocum Hollow Park Project | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 5,500,000 |
| (Base Project Allocation - $5,000,000) (Design and Contingencies - $500,000) | |
| (vii) Lackawanna County Park System | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs, renovation, rehabilitation and restoration of land and/or building within the Lackawanna County Park System | 5,500,000 |
| (Base Project Allocation - $5,000,000) (Design and Contingencies - $500,000) | |
| (viii) Montage Trolley Excursion Project | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs, renovation, rehabilitation and restoration of land, tunnels, bridges, trolley track and buildings | 6,600,000 |
| (Base Project Allocation - $6,000,000) (Design and Contingencies - $600,000) | |
| (ix) Lackawanna River Corridor Association | |
| (A) Greenway feasibility study | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (x) City of Scranton | |
| (A) Jason Miller Public Theater expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (B) Scranton Park System expenditures, including, but not limited to, design, construction, renovation and restoration to parks and museums within the City of Scranton | 7,700,000 |
| (Base Project Allocation - $7,000,000) (Design and Contingencies - $700,000) | |
| (xi) Lackawanna County Prison | |
| (A) Including, but not limited to, design, construction, rehabilitation and expansion of county prison | 5,500,000 |
| (Base Project Allocation - $5,000,000) (Design and Contingencies - $500,000) | |
| (xii) Dalton Borough | |
| (A) Repair retaining wall on Lily Lake Road | 300,000 |
| (Base Project Allocation - $300,000) | |
| (xiii) Newton Township | |
| (A) Drain pond and reconstruct dam on Ford's Pond Road | 100,000 |
| (Base Project Allocation - $100,000) | |
| (xiv) South Abington Township | |
| (A) Expand railroad culvert on Shady Lane Road in Chinchilla | 3,000,000 |
| (Base Project Allocation - $3,000,000) | |
| (B) Stream maintenance project on Leggett's Creek in Chinchilla | 2,000,000 |
| (Base Project Allocation - $2,000,000) | |
| (18) Lancaster County | |
| (i) City of Lancaster | |
| (A) Rehabilitation of the historic Fulton Opera House | 3,000,000 |
| (19) Luzerne County | |
| (i) City of Wilkes-Barre | |
| (A) ((A) repealed July 8, 1994, P.L.444, No.74) | |
| (B) Acquisition, renovation, rehabilitation and restoration of land and buildings for the Wyoming Valley Regional Food Bank | 1,000,000 |
| (ii) City of Pittston | |
| (A) Acquisition and development of Riverfront/downtown property | 6,500,000 |
| (B) Construction of a downtown parking garage | 2,800,000 |
| (Base Project Allocation - $2,500,000) (Design and Contingencies - $300,000) | |
| (iii) Hughestown Borough | |
| (A) Indoor/covered ice skating rink | 1,500,000 |
| (iv) Avoca Borough | |
| (A) Development of Avoca Flats Park | 1,000,000 |
| (v) Dupont Borough | |
| (A) Development of Borough Park | 800,000 |
| (vi) Jenkins Township | |
| (A) Development/improvements to Spadi Park | 1,000,000 |
| (vii) Duryea Borough | |
| (A) Development of baseball field and tennis/basketball courts | 1,200,000 |
| (viii) Yatesville Borough | |
| (A) Recreation improvements | 750,000 |
| (ix) Pittston Township | |
| (A) Acquisition of land and park development in Suscon | 800,000 |
| (B) Recreational park | 100,000 |
| (x) City of Nanticoke | |
| (A) Development of Industrial Park of Greater Nanticoke | 2,500,000 |
| (B) Reconstruct sidewalks to provide accessibility ramps | 30,000 |
| (C) Demolition or rehabilitation of low-income housing | 1,370,000 |
| (xi) Swoyersville Borough | |
| (A) Construction of senior citizens' recreation building | 350,000 |
| (20) Mercer County | |
| (i) Springfield Township | |
| (A) Improvements to water system | 898,000 |
| (Base Project Allocation - $690,000) (Land Allocation - $104,000) (Design and Contingencies - $104,000) | |
| (21) Monroe County | |
| (i) Borough of Mount Pocono | |
| (A) Extension of sewer line | 275,000 |
| (B) Reconstruction of central water distribution system | 5,350,000 |
| (ii) County of Monroe | |
| (A) Construction of countywide fire training school and center | 965,000 |
| (22) ((22) repealed July 8, 1994, P.L.444, No.74) | |
| (23) Philadelphia County | |
| (i) City of Philadelphia | |
| (A) North Broad Street streetscape | 3,150,000 |
| (B) South Broad Street streetscape | 1,400,000 |
| (C) Renovations and improvements to the Port of History building at Penn's Landing in Philadelphia so that the building can serve as the home of the Philadelphia Maritime Museum | 2,200,000 |
| (D) Schuylkill Waterfront Economic Rehabilitation | 14,026,000 |
| (E) Rehabilitation and improvements to the Urban Education Development Research and Retreat Center | 3,500,000 |
| (F) Renovation of the Pennsylvania Academy of the Fine Arts | 7,500,000 |
| (G) Renovation and rehabilitation of the International House of Philadelphia | 3,679,000 |
| (H) Renovation and expansion of the Philadelphia Dance Company | 2,100,000 |
| (I) Renovation and expansion of the Movement Theatre International into the Performing Arts Center | 3,500,000 |
| (J) Americans with Disabilities Accessibility renovations to the Annenberg Center for the Performing Arts | 1,000,000 |
| (K) Renovations, including Americans with Disabilities Accessibility to the Harrison Auditorium, University Museum of Archaeology and Anthropology | 2,916,000 |
| (L) Dredge Schuylkill River between Fairmount Dam and Falls Bridge | 15,000,000 |
| (M) Recreation Department to be allocated as follows: outdoor lighting - 350,000; roof repairs - 125,000; heating systems and controls - 125,000; outdoor basketball and tennis courts - 500,000; site improvements - 500,000; swimming pools - 250,000; replacement of Pepper Middle School - 250,000; reconstruction of Francis Myers Recreational Center - 560,000; replacement of L. Young Recreational Center - 950,000 | 3,610,000 |
| (N) Construction of the Ogontz Community Public Library | 1,731,000 |
| (O) Furniture and equipment for library | 300,000 |
| (P) Rehabilitation of 150 homes for habitation | 700,000 |
| (Q) Renovations of the Lonnie Young Recreation Center | 1,900,000 |
| (R) Conversion of Fairmont Park Stable Building into the Cobbs Creek Community Environmental Education Center | 540,000 |
| (S) Construction of education building and amphitheatre at the Philadelphia Zoo | 5,380,000 |
| (24) Potter County | |
| (i) Austin Borough | |
| (A) Construction of complete sewer system in Austin Borough | 2,750,000 |
| (ii) Coudersport Borough | |
| (A) Demolition, excavation and removal of dilapidated structure, tannery vats and abandoned industrial structures in the industrial park | 630,000 |
| (B) Upgrade and expansion of Coudersport Borough sewer system; elimination of infiltration inflow and plant expansion | 550,000 |
| (C) Extension of borough flood control to borough limits | 4,500,000 |
| (iii) Genesee Village | |
| (A) Repair, replacement and expansion of water system, including fire protection and potable water line distribution | 475,000 |
| (25) Venango County | |
| (i) Sandy Creek Township | |
| (A) Acquisition of 11-acre tract to supplement Sandy Creek Industrial Park | 200,000 |
| (B) Extension of water lines to new 11-acre tract | 10,000 |
| (C) Construction of access road through 11-acre tract | 50,000 |
| (26) Warren County | |
| (i) City of Warren | |
| (A) Acquisition, renovation and site preparation of former Warren Components building for economic opportunities | 200,000 |
| (ii) Pleasant Township | |
| (A) Provide a rail spur to former Phillips Building at the Warren Industrial Complex | 100,000 |
| (27) Washington County | |
| (i) Northwest Economic Development Project | |
| (A) Installation of water line | 1,000,000 |
| (ii) Marianna Borough | |
| (A) Engineering and design and correction work for slide problem | 200,000 |
| (iii) Carroll Township and Monongahela City | |
| (A) Sewage treatment system | 2,000,000 |
| (iv) Smith Township | |
| (A) Eliminate acid mine drainage problem | 750,000 |
| (28) Westmoreland County | |
| (i) Westmoreland Trust | |
| (A) Cultural district redevelopment, including the renovation and rehabilitation of Greensburg Train Station and the Palace Theatre | 5,100,000 |
| (ii) Rostraver | |
| (A) Acquisition and/or construction of a combination public library and senior citizen center | 1,300,000 |
| (iii) Hempfield Township | |
| (A) Install new water line extension to Stone Church Hill | 180,000 |
| (iv) Mt. Pleasant Township | |
| (A) Install new water line to the junction of Routes 819 and 981 | 200,000 |
| (v) Ligonier Township | |
| (A) Replace water lines in Loyalhanna Cottages | 150,000 |
| (vi) Seward Borough | |
| (A) Replace existing water lines | 220,000 |
| (vii) North Irwin Borough | |
| (A) Town Hall renovation | 150,000 |
| (viii) North Huntingdon Township | |
| (A) Winchester Road main water line extension | 145,000 |
| (B) Murrysville Road main water line extension | 116,000 |
| (C) Elevation of Winchester Road and Murrysville Road | 210,000 |
| (29) York County | |
| (i) City of York | |
| (A) Construction of new indoor Ice Arena/Convention Center at Memorial Park | 1,200,000 |
| (Base Project Allocation - $1,200,000) | |
| (B) Construction of George Street Revitalization Corridor | 1,642,000 |
| (Base Project Allocation - $1,642,000) | |
| (ii) County of York, Rails to Trails Project | |
| (A) Trail improvements, Maryland Line to Hanover Junction | 500,000 |
| (B) Trail improvements, Hanover Junction to York | 800,000 |
| (C) Station renovations at Hanover Junction | 150,000 |
| (D) Station renovations at New Freedom | 150,000 |
| (E) Relocation and renovation of Railroad House | 100,000 |
Section 8. Limited waiver of local requirements.
(a) Waiver for 1993-1994 itemization.--The limitation on Department of Transportation funding of capital projects under 74 Pa.C.S. § 1302(4) (relating to program authorizations) shall be totally waived for the capital projects in the category of transportation assistance projects for mass transit contained in section 5(a)(20)(iv) and (21)(vii) and those portions of section 5(a)(26) and (27) which are vehicle safety and overhaul.
(b) Waiver for 1992 itemization.--
(1) Notwithstanding any provision to the contrary, there shall be no local match funding requirement for the national magnetic levitation prototype proposal and development phase, as described in section 5(b)(15)(I)(A) of the act of December 28, 1992 (P.L.1694, No.188), known as the Capital Budget Project Itemization Act of 1991-1992.
(2) The Department of Transportation shall select a contractor for the project described in section 5(b)(15)(I)(A) of the Capital Budget Project Itemization Act of 1991-1992. Such selection shall be based on the following criteria: the contractor must have extensive knowledge of magnetic levitation technology and have been incorporated in this Commonwealth for at least two years for the express purpose of developing magnetic levitation technology. The contractor must also have demonstrated an ability to attract private sector investment, including corporate and labor participation, as well as Federal, State and local funding for magnetic levitation development.
Section 9. Delegation of public improvement projects.
For the public improvement projects specifically itemized in section 3(9)(ii) of this act, the Department of General Services may delegate the authority to construct, improve, equip, furnish, maintain, acquire or operate those projects to the Philadelphia Regional Port Authority.
Section 10. Use of existing funds.
The sum of $8,779,000, which is the amount authorized for the purchase of furniture and equipment for the projects which are included in section 4, shall be provided from excess funds available in the unallocated reserve of the Capital Facilities Fund from previous furniture and equipment appropriations.
Section 11. Debt authorization.
(a) Public improvements.--The Governor, the Auditor General and the State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $1,319,669,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.
(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $22,291,000 as may be found necessary to carry out the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.
(c) Transportation assistance.--The Governor, the Auditor General and the State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $296,344,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.
(d) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $82,850,000 as may be found necessary to carry out the construction of the flood control projects specifically itemized in a capital budget.
(e) Redevelopment assistance.--Subject to the limitation in section 1616.1-B(b) of the act of April 9, 1929 (P.L.343, No.176), known as The Fiscal Code, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $485,173,000 as may be found necessary to carry out the redevelopment assistance projects specifically itemized in a capital budget.
Section 12. Issue of bonds.
The indebtedness authorized in this act shall be incurred, from time to time, and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 13.
Section 13. Estimated useful life and term of debt.
(a) Estimated useful life.--The General Assembly states that the estimated useful life of the public improvement projects itemized in this act is as follows:
(1) Public improvement projects, 30 years.
(2) Furniture and equipment projects, 10 years.
(3) Transportation assistance projects:
(i) Rolling stock, 15 years.
(ii) Passenger buses, 12 years.
(iii) Furniture and equipment, 10 years.
(iv) All others, 30 years.
(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.
Section 14. Appropriations.
(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $1,319,669,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $22,291,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $296,344,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.
(d) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Resources in the maximum amount of $82,850,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Resources the moneys as required and certified by it to be legally due and payable.
(e) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $485,173,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.
Section 15. Federal funds.
In addition to those funds appropriated in section 14, all moneys received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.
Section 16. Repeals.
Sections 3(8)(vi)(C) and (D), (xxiii)(B) and 6(20)(iii)(A) of the act of October 21, 1988 (P.L.851, No.113), known as the Capital Budget Project Itemization Act for 1987-1988, are repealed.
Section 42(a)(3) of the act of December 14, 1992 (P.L.894, No.143), known as the Highway-Railroad and Highway Bridge Capital Budget Supplemental Act for 1991-1992, is repealed.
Section 17. Editorial changes.
In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects.
Section 18. Effective date.
This act shall take effect immediately.
APPROVED--The 2nd day of July, A.D. 1993, except as to the following:
Section 14. Appropriations.
(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $1,319,669,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
This item is approved in the sum of $297,386,000.
(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $22,291,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
This item is approved in the sum of $2,419,000.
(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $296,344,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.
This item is approved in the sum of $173,251,000.
(d) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Resources in the maximum amount of $82,850,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Resources the moneys as required and certified by it to be legally due and payable.
This item is approved in the sum of $3,500,000.
(e) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $485,173,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.
This item is approved in the sum of $177,488,000.
As in previous capital project itemization bills received by this Administration, parts of the above appropriations have been deleted because some projects included in this bill are not legal or are duplicates of projects approved in previous capital project authorization acts. In addition, significant reductions have been made for projects which were not included in an agency five-year capital plan. Those projects would not have received or passed an agency review as to need or legality. These reductions are necessary because the total contained in this bill, added to the projects remaining from prior capital project authorization acts which are still pending implementation, is beyond the financial capability of the Commonwealth to undertake.
The aggregate capital debt authorized but not issued now stands at over $14.4 billion for all categories of projects. The aggregate capital debt authorized but not issued for public improvement projects accounts for over $2.9 billion of the total Senate Bill 1098 without reduction would have increased this amount by over $1.3 billion, to a total of over $4.2 billion for public improvement projects alone. This Administration remains committed to maintaining our financial integrity through exercising restraint in the amount of new construction and other capital projects undertaken, and approving the substantial increase which Senate Bill 1098 contained without disapproval could have a negative impact on our bond rating which would result in higher costs to issue those bonds needed to insure the continued operation of the Commonwealth and its programs, including the capital program.
Substantial capital project itemization acts have been passed in 1986, 1988, 1990, 1992 and now 1993. It is beyond reasonable expectations that all projects approved in those acts could be started and still maintain our financial integrity. Therefore, consideration was given to approving projects which are most likely to be undertaken.
Some recurring problems with recent capital project itemization acts should be noted here. The first is the number of projects which cannot be undertaken by the Commonwealth which are included in the acts. Some of these projects are in the wrong category, such as community college projects in the public improvement projects and furniture and equipment categories which are reserved exclusively for Commonwealth-owned facilities. Community college projects, like the Montgomery Community College projects, are not funded through the capital budget process but receive funding for the State share of capital costs from the annual General Fund appropriation to community colleges. Other projects contained in the bill do not meet additional requirements of the category of project, such as sewer, water and housing projects are not eligible for funding under the redevelopment assistance category or are below the minimum required for bond funding.
A second problem is the number of duplicates contained in the bill. Some projects are placed in more than one category and other projects, like the Nescopek State Park project in public improvement and the Wyoming Valley flood control project in flood control, are already approved in prior acts.
Finally, projects which were vetoed in previous acts because they were not included in an agency five-year plan are again appearing in this bill and must again be vetoed for the same reason. Such projects have not received the needed review and inclusion in an agency plan which allows us to prioritize projects and move them in an orderly way through the capital process. This is especially true for the higher education institutions whose voluminous projects are again vetoed for lack of review. The higher education institutions need to work more closely with the Department of Education to assure that those projects which the institutions view as needed can pass department review and be included in the five-year plan so that in future years these projects could be approved.
Some of the projects vetoed from Senate Bill 1098 could be funded from the Keystone Recreation, Park and Conservation Fund which is in House Bill 52, also on the Governor's desk for approval. If approved by the electorate, $50 million in bond funds will be available for both State and local parks and cultural facilities in addition to other uses. The Fund will also receive 15% of the Realty Transfer Tax collected by the Commonwealth beginning in 1994-95. This will be an estimated $30 million annually for the purposes of the Fund.
As in previous item vetoes of capital project authorization acts, those projects which will not be undertaken are listed below.
Section 3. Itemization of public improvement projects.
| (1) Department of Corrections | $38,694,000 |
|---|---|
| (i) State Correctional Institution - Cambridge Springs | |
| * * * | |
| (B) Improvements to the water line from the water plant to the existing tank | 590,000 |
| (Base Project Allocation - $500,000) | |
| (Design and Contingencies - $90,000) | |
| (C) Construction of a 500,000-gallon water storage tank | 367,000 |
| (Base Project Allocation - $250,000) | |
| (Land Allocation - $37,000) | |
| (Design and Contingencies - $80,000) | |
| (D) Replacement of sewer line from the Cambridge Springs Correctional Facility to the sewer plant | 350,000 |
| (Base Project Allocation - $300,000) (Design and Contingencies - $50,000) | |
| (E) Improvements to the water filtration plant | 402,000 |
| (Base Project Allocation - $350,000) (Design and Contingencies - $52,000) | |
| (F) Increase of hydraulic capacity of sewage treatment plant to eliminate discharge into French Creek | 978,000 |
| (Base Project Allocation - $850,000) (Design and Contingencies - $128,000) | |
| * * * | |
| (iii) State Correctional Institution - Clearfield | |
| (A) Construction of sewage system for facility | 2,000,000 |
| * * * | |
| (2) Department of Education | $543,468,000 |
| (i) The Pennsylvania State University | |
| (A) University Park Campus | |
| * * * | |
| (IV) Classroom building - Phase II | 10,500,000 |
| (V) Renovation of and addition to Ferguson Building | 8,570,000 |
| (VI) Academic support services complex - Phase I | 15,750,000 |
| (VII) Conversion of electrical engineering - East Building | 3,990,000 |
| (VIII) Chilled water distribution system for West Campus - Phase II | 12,730,000 |
| (IX) Renovation of Sparks Building | 5,220,000 |
| (X) Renovate and construct addition to Support Services Facilities | 6,930,000 |
| (XI) Expansion and improvements to Telecommunications Infrastructure | 15,000,000 |
| (XII) New electrical distribution system DGS 800-217, to provide electrical service to the Convocation Events Center and existing academic research facilities | 2,583,000 |
| (XIII) Construction of a new Engineering Research Center - Phase I | 32,750,000 |
| (XIV) Renovations to Schwab Auditorium | 3,150,000 |
| (XV) Construction of addition to Computer Building | 9,650,000 |
| (XVI) Construction of a new centralized Biological Laboratory | 11,025,000 |
| (XVII) Construction of new library | 20,000,000 |
| (XVIII) Renovation of Osmond Laboratory | 28,000,000 |
| (XIX) Academic Support Services Complex - Phase II | 15,000,000 |
| (XX) Construction of addition to Mitchell Building | 4,400,000 |
| (XXI) Construction of addition to Carnegie Building | 4,000,000 |
| (XXII) Construction of new library for College of Education | 5,000,000 |
| (B) Allentown Campus | |
| (I) Construction of library | 2,750,000 |
| (II) Construct multipurpose building | 2,020,000 |
| (Base Project Allocation - $1,500,000) (Design and Contingencies - $120,000) (Furniture and Equipment - $400,000) | |
| (C) Altoona Campus | |
| (I) Construct multistory Classroom Building | 4,620,000 |
| (II) Construction of new maintenance building | 1,050,000 |
| (D) Berks Campus | |
| (I) Construct Academic Building | 4,390,000 |
| (E) Behrend College, Erie | |
| (I) Improvements and expansion of utility systems | 18,240,000 |
| (F) Harrisburg Campus (Capital College) | |
| (I) Renovation to utility systems | 11,580,000 |
| (G) Fayette Campus | |
| (I) Improvements and expansion of utility systems | 2,760,000 |
| (II) Renovations and addition to Gymnasium Building | 1,500,000 |
| * * * | |
| (H) Hazleton Campus | |
| (I) Construction of new library and classroom building | 2,600,000 |
| (Base Project Allocation - $2,600,000) | |
| (II) Construction of new maintenance building | 1,050,000 |
| (I) Hershey Medical Center | |
| (I) Construction of a new Nursing Education Facility | 6,895,000 |
| (J) Mont Alto Campus | |
| (I) Renovation of General Studies Building | 3,000,000 |
| * * * | |
| (L) York Campus | |
| (I) Construct library addition and auditorium and classroom building | 11,320,000 |
| (II) Construct new Maintenance Building | 1,100,000 |
| (M) Pennsylvania College of Technology - Williamsport | |
| (I) Construction of new diesel center | 2,000,000 |
| (II) Construction of an Academic/Library Building | 8,000,000 |
| (N) All Locations | |
| (I) Alterations of facilities for compliance with Federal law, the Americans with Disabilities Act | 20,000,000 |
| (ii) Montgomery County Community College - West Campus | |
| (A) Acquisition of property, construction of new building and parking lot for a new approved branch campus of Montgomery County Community College to serve the western portion of the service area | 12,983,000 |
| (Base Project Allocation - $11,190,000) (Land Allocation - $240,000) (Design and Contingencies - $1,553,000) | |
| (iii) University of Pittsburgh | |
| (A) Bradford Campus | |
| (I) Fine Arts Building | 12,300,000 |
| (Base Project Allocation - $12,000,000) (Land Allocation - $300,000) | |
| (II) Frame-Westerberg Commons Expansion | 7,500,000 |
| (Base Project Allocation - $7,500,000) | |
| (III) Sports Center Expansion | 6,000,000 |
| (Base Project Allocation - $6,000,000) | |
| (IV) Maintenance Building | 1,800,000 |
| (Base Project Allocation - $1,800,000) | |
| (V) Construction of academic building classrooms, offices, laboratories | 2,600,000 |
| (Base Project Allocation - $2,600,000) | |
| (iv) Reading Area Community College | |
| (A) Construction of learning resource center and humanities center | 5,000,000 |
| (B) Renovation of former East Shore Office Building into classrooms | 2,300,000 |
| (v) Temple University | |
| (A) Library and Learning Resources Center - H.S.C. Campus | 16,400,000 |
| (Base Construction Allocation - $13,660,000) (Design and Contingencies - $2,740,000) | |
| (B) Renovations to Beury Hall DGS 1104-03 - Main Campus | 8,640,000 |
| (Base Construction Allocation - $7,200,000) | |
| (Design and Contingencies - $1,440,000) | |
| (C) Renovations to Barton Hall DGS 1104-01 - Main Campus | 10,624,000 |
| (Base Construction Allocation - $8,853,000) (Design and Contingencies - $1,771,000) | |
| (D) Paley Library Expansion | 18,100,000 |
| (Base Construction Allocation - $15,083,000) | |
| (Design and Contingencies - $3,017,000) | |
| (E) Renovations to Bio-Life Sciences Building DGS 1104-11 - Main Campus | 18,700,000 |
| (Base Construction Allocation - $15,583,000) (Design and Contingencies - $3,117,000) | |
| (F) Renovations to Dental School-Health Sciences Center Facility - Phase IV - H.S.C. Campus | 14,800,000 |
| (Base Construction Allocation - $12,333,000) (Design and Contingencies - $2,467,000) | |
| (G) Landscape Architecture and Horticulture Education Center - Ambler Campus | 5,460,000 |
| (Base Construction Allocation - $4,550,000) (Design and Contingencies - $910,000) | |
| * * * | |
| (I) Renovation of Mitten Hall, including Fire and Life Safety Improvements | 1,128,000 |
| (Base Construction Allocation - $940,000) (Design and Contingencies - $188,000) | |
| (J) Renovation of Curtis Hall for Mathematics Learning Center | 870,000 |
| (Base Construction Allocation - $725,000) | |
| (Design and Contingencies - $145,000) | |
| (vi) Allegheny County Community College | |
| (A) Construction of Braddock branch | 1,000,000 |
| * * * | |
| (4) Department of Environmental Resources | $38,150,000 |
| * * * | |
| (iii) State Forest District Number 15 | |
| * * * | |
| (B) Capping and revegetating of Thompson-Hollow Landfill | 2,000,000 |
| (Base Project Allocation - $2,000,000) | |
| * * * | |
| (ix) Nescopeck State Park | |
| (A) Development of recreational facility | 5,400,000 |
| (Base Project Allocation - $5,400,000) | |
| * * * | |
| (xi) Little Buffalo State Park | |
| (A) Construction of an arts building | 80,000 |
| (Base Project Allocation - $80,000) | |
| (B) Construction of a permanent performance pavilion. The pavilion is to be constructed using native wood, where possible, and be designed to complement local terrain and other park buildings | 105,000 |
| * * * | |
| (xiii) Gifford Pinchot State Park | |
| (A) Construction of swimming pool complex consisting of bathhouses, concession stand, parking facilities and an 18,800 square foot pool | 6,900,000 |
| (Base Project Allocation - $5,300,000) | |
| (Design and Contingencies - $1,600,000) | |
| * * * | |
| (xv) Schuylkill Canal | |
| (A) Restoration and maintenance | 200,000 |
| * * * | |
| (xviii) Clearfield Borough | |
| (A) Restoration of bank along Little Susquehanna Creek | 1,000,000 |
| (xix) Gulich Township | |
| (A) Improvements to Janesville Dam | 500,000 |
| (xx) Bigler Township | |
| (A) Restoration of Little Muddy Run | 1,000,000 |
| * * * | |
| (xxii) Montgomery County | |
| (A) Reconstruction of the MarlBorough Township Dam on Unami Creek | 100,000 |
| (B) Reconstruction of dam on the creek between Perkiomen and Skippack | 120,000 |
| (xxiii) Bucks County | |
| (A) To stabilize 2,000 lineal feet of serious bank erosion on the East Branch of the Perkiomen Creek, Sellersville side, as required | 100,000 |
| (5) Department of General Services | $58,850,000 |
| * * * | |
| (iii) Former Byberry Hospital site | |
| * * * | |
| (C) Renovate laundry building for community recreation center | 500,000 |
| * * * | |
| (v) State Record Center - Harrisburg | |
| (A) Construction of addition to and renovation of existing facility | 2,400,000 |
| (Base Project Allocation - $2,000,000) | |
| (Design and Contingencies - $400,000) | |
| (B) Purchase and installation of shelving | 1,600,000 |
| (Base Project Allocation - $1,400,000) | |
| (Design and Contingencies - $200,000) | |
| (6) Historical and Museum Commission | $12,141,000 |
| (i) Butler Industrial Museum | |
| (A) Building and site improvement | 500,000 |
| (Base Project Allocation - $415,000) | |
| (Design and Contingencies - $85,000) | |
| * * * | |
| (ix) Muhlenberg House | 450,000 |
| (Base Project Allocation - $400,000) | |
| (Design and Contingencies - $50,000) | |
| (x) Old Economy Village | |
| (A) Restoration and preservation of Great House | 540,000 |
| (Base Project Allocation - $450,000) | |
| (Design and Contingencies - $90,000) | |
| (B) Rehabilitation of George Rapp House | 650,000 |
| * * * | |
| (xv) The Highlands, Ft. Washington, Pa. | |
| (A) Restoration and maintenance | 100,000 |
| (xvi) Schuylkill County | |
| (A) Anthracite Museum of Mining, construct a multiuse auditorium/community room | 484,000 |
| (Base Project Allocation - $421,000) | |
| (Design and Contingencies - $63,000) | |
| * * * | |
| (9) Department of Transportation | $134,650,000 |
| (i) City of Philadelphia | |
| * * * | |
| (C) Purchase of two helicopters for police department | 2,600,000 |
| (ii) Port of Philadelphia | |
| * * * | |
| (F) Property acquisition and facility construction | 80,000,000 |
| (G) Basic infrastructure maintenance and improvements | 15,000,000 |
| * * * | |
| (11) State System of Higher Education | $443,564,000 |
| (i) Bloomsburg State University | |
| (A) Addition to Hartline Science | 7,648,000 |
| (Base Construction Allocation - $6,373,000) | |
| (Design and Contingencies - $1,275,000) | |
| (B) Renovation of Ben Franklin Building | 4,312,000 |
| (Base Construction Allocation - $3,593,000) | |
| (Design and Contingencies - $719,000) | |
| (C) Renovation of Navy Hall | 5,381,000 |
| (Base Construction Allocation - $4,484,000) | |
| (Design and Contingencies - $897,000) | |
| (D) Renovation of Bakeless Center | 4,862,000 |
| (Base Construction Allocation - $4,052,000) | |
| (Design and Contingencies - $810,000) | |
| (E) Construction of parking areas | 1,386,000 |
| (Base Construction Allocation - $1,155,000) | |
| (Design and Contingencies - $231,000) | |
| (ii) California State University | |
| (A) Renovation of Old Main | 5,831,000 |
| (Base Construction Allocation - $4,859,000) | |
| (Design and Contingencies - $972,000) | |
| (B) Renovation of Old Industrial Arts Building | 3,296,000 |
| (Base Construction Allocation - $2,747,000) | |
| (Design and Contingencies - $549,000) | |
| (C) Construction of central stores/maintenance facility | 2,053,000 |
| (Base Construction Allocation - $1,711,000) (Design and Contingencies - $342,000) | |
| (D) Renovation of Vulcan Hall | 1,145,000 |
| (Base Construction Allocation - $954,000) (Design and Contingencies - $191,000) | |
| * * * | |
| (iv) Clarion State University | |
| (A) Addition to Carrier Hall | 1,403,000 |
| (Base Construction Allocation - $1,169,000) | |
| (Design and Contingencies - $234,000) | |
| (B) Oil City Campus | |
| (I) Construction of Carlson Library | 14,353,000 |
| (Base Project Allocation - $14,353,000) | |
| (II) Renovation of Pierce Science Center | 6,436,000 |
| (Base Project Allocation - $6,436,000) | |
| (v) East Stroudsburg State University | |
| (A) Supplemental 405-49, renovation of Gessner Science | 900,000 |
| (B) Renovation of Koehler Field House | 5,987,000 |
| (Base Construction Allocation - $4,989,000) | |
| (Design and Contingencies - $998,000) | |
| (C) Renovation of auditorium | 1,674,000 |
| (Base Construction Allocation - $1,395,000) (Design and Contingencies - $279,000) | |
| (D) Construction of physics and computer science facility | 14,391,000 |
| (Base Construction Allocation - $10,384,000) (Design and Contingencies - $2,077,000) (Land Allocation - $1,930,000) | |
| (E) Renovation of ROTC & Upward Bound Building | 163,000 |
| (Base Construction Allocation - $136,000) | |
| (Design and Contingencies - $27,000) | |
| (F) Addition/renovation instructional complex and stadium | 5,232,000 |
| (Base Construction Allocation - $4,360,000) (Design and Contingencies - $872,000) | |
| (G) Construction of instructional complex for physical education | 5,312,000 |
| (Base Construction Allocation - $4,427,000) (Design and Contingencies - $885,000) | |
| (H) Construction of maintenance building and garage | 6,520,000 |
| (Base Construction Allocation - $5,433,000) (Design and Contingencies - $1,087,000) | |
| (I) Construction of parking areas | 815,000 |
| (Base Construction Allocation - $679,000) (Design and Contingencies - $136,000) | |
| (vi) Edinboro State University | |
| (A) Renovation of McComb Field House bleachers | 864,000 |
| (Base Construction Allocation - $720,000) | |
| (Design and Contingencies - $144,000) | |
| (B) Rehabilitation of campus drainage | 610,000 |
| (Base Construction Allocation - $508,000) (Design and Contingencies - $102,000) | |
| (C) Renovation of Memorial Auditorium | 1,560,000 |
| (Base Construction Allocation - $1,300,000) (Design and Contingencies - $260,000) | |
| (D) Renovation of Loveland Hall | 2,027,000 |
| (Base Construction Allocation - $1,689,000) (Design and Contingencies - $338,000) | |
| (E) Construction of maintenance/storage facility | 5,851,000 |
| (Base Construction Allocation - $4,876,000) (Design and Contingencies - $975,000) | |
| (F) Addition to McComb Field House | 5,044,000 |
| (Base Construction Allocation - $4,203,000) (Design and Contingencies - $841,000) | |
| (G) Replacement of White Hall | 839,000 |
| (Base Construction Allocation - $699,000) (Design and Contingencies - $140,000) | |
| (H) Construction of new classroom building | 6,854,000 |
| (Base Construction Allocation - $5,711,000) (Design and Contingencies - $1,143,000) | |
| (vii) Indiana State University | |
| (A) Rehabilitation of Miller Stadium | 6,682,000 |
| (Base Construction Allocation - $5,568,000) (Design and Contingencies - $1,114,000) | |
| (B) Renovation of Stabley Library | 5,843,000 |
| (Base Construction Allocation - $4,869,000) (Design and Contingencies - $974,000) | |
| (C) Renovation of Elcher Hall | 2,405,000 |
| (Base Construction Allocation - $2,004,000) (Design and Contingencies - $401,000) | |
| (D) Addition/renovation of Ackerman Hall | 6,046,000 |
| (Base Construction Allocation - $5,038,000) (Design and Contingencies - $1,008,000) | |
| (E) Addition/renovation of Cogswell Hall | 6,925,000 |
| (Base Construction Allocation - $5,771,000) (Design and Contingencies - $1,154,000) | |
| (F) Renovation of Keith Hall | 9,307,000 |
| (Base Construction Allocation - $7,756,000) (Design and Contingencies - $1,551,000) | |
| (G) Renovation of Sutton Hall | 13,621,000 |
| (Base Construction Allocation - $11,351,000) (Design and Contingencies - $2,270,000) | |
| (H) Renovation of Leonard Hall | 7,189,000 |
| (Base Construction Allocation - $5,991,000) (Design and Contingencies - $1,198,000) | |
| (I) Addition/renovation Fisher Auditorium | 9,289,000 |
| (Base Construction Allocation - $7,741,000) (Design and Contingencies - $1,548,000) | |
| (J) Renovation of Wilson Hall | 3,007,000 |
| (Base Construction Allocation - $2,506,000) (Design and Contingencies - $501,000) | |
| * * * | |
| (L) Construction of behavioral science classroom building | 15,950,000 |
| (Base Construction Allocation - $11,146,000) (Design and Contingencies - $2,229,000) (Land Allocation - $2,575,000) | |
| (viii) Kutztown State University | |
| (A) Construction of College of Business Building | 7,084,000 |
| (Base Construction Allocation - $5,903,000) (Design and Contingencies - $1,181,000) | |
| (B) Construction of Communications Design Building | 5,622,000 |
| (Base Construction Allocation - $4,685,000) (Design and Contingencies - $937,000) | |
| (C) Addition to maintenance building and garage | 2,849,000 |
| (Base Construction Allocation - $2,374,000) (Design and Contingencies - $475,000) | |
| (D) Addition and renovation to science building | 9,907,000 |
| (Base Construction Allocation - $8,256,000) (Design and Contingencies - $1,651,000) | |
| (ix) Lock Haven State University | |
| (A) Renovation of Rogers Gym | 2,954,000 |
| (Base Construction Allocation - $2,462,000) (Design and Contingencies - $492,000) | |
| (B) Additional funds for DGS 409-54 | 500,000 |
| (C) Purchase and renovation of Army Reserve Center for use as Clearfield Branch Campus Building | 850,000 |
| (Base Project Allocation - $750,000) (Design and Contingencies - $100,000) | |
| (D) Land acquisition for and construction of Clearfield Center of Lock Haven University | 10,000,000 |
| This item is approved in the sum of $5,000,000. | |
| (E) Acquisition and construction of south parking facility | 860,000 |
| (Base Project Allocation - $300,000) (Land Allocation - $500,000) (Design and Contingencies - $60,000) | |
| (F) Additional funds for DGS 409-53 - Ulmer Hall | 821,000 |
| (Base Project Allocation - $684,000) (Design and Contingencies - $137,000) | |
| (G) Additional funds for DGS 409-52 - Jack Stadium, Phase III | 600,000 |
| (Base Project Allocation - $500,000) (Design and Contingencies - $100,000) | |
| (x) Mansfield State University | |
| (A) Addition to Grant Science - Phase III | 3,715,000 |
| (Base Construction Allocation - $3,096,000) (Design and Contingencies - $619,000) | |
| (xi) Millersville State University | |
| (A) Addition to McComsey Hall | 7,840,000 |
| (Base Construction Allocation - $6,533,000) (Design and Contingencies - $1,307,000) | |
| (B) Construction of instructional arts complex | 17,945,000 |
| (Base Construction Allocation - $14,954,000) (Design and Contingencies - $2,991,000) | |
| (C) Construction of parking areas | 2,150,000 |
| (Base Construction Allocation - $1,792,000) (Design and Contingencies - $358,000) | |
| (xii) Shippensburg State University | |
| (A) Renovation of athletic service facility | 895,000 |
| (Base Construction Allocation - $746,000) (Design and Contingencies - $149,000) | |
| (B) Renovation of Gilbert and Stewart Halls | 4,255,000 |
| (Base Construction Allocation - $3,546,000) (Design and Contingencies - $709,000) | |
| (C) Construction of instructional arts facility | 16,483,000 |
| (Base Construction Allocation - $16,483,000) | |
| (D) Addition to Lehman Library | 9,034,000 |
| (Base Construction Allocation - $7,528,000) | |
| (Design and Contingencies - $1,506,000) | |
| (E) Construction of central services/receiving facility | 1,231,000 |
| (Base Construction Allocation - $1,026,000) (Design and Contingencies - $205,000) | |
| (F) Construction of roadways and parking | 3,708,000 |
| (Base Construction Allocation - $3,090,000) (Design and Contingencies - $618,000) | |
| (G) Renovation of Franklin Science Center | 10,494,000 |
| (Base Construction Allocation - $8,745,000) (Design and Contingencies - $1,749,000) | |
| (H) Addition and renovation of Memorial Auditorium | 9,332,000 |
| (Base Construction Allocation - $7,777,000) (Design and Contingencies - $1,555,000) | |
| (I) Renovation of Shippen Hall | 4,622,000 |
| (Base Construction Allocation - $3,852,000) (Design and Contingencies - $770,000) | |
| (xiii) Slippery Rock State University | |
| (A) Renovation of Vincent Science Building | 17,422,000 |
| (Base Construction Allocation - $14,518,000) (Design and Contingencies - $2,904,000) | |
| (B) Renovation of McKay Educational Building | 8,232,000 |
| (Base Construction Allocation - $6,860,000) (Design and Contingencies - $1,372,000) | |
| (C) Renovation of Morrow Field House | 12,666,000 |
| (Base Construction Allocation - $10,555,000) (Design and Contingencies - $2,111,000) | |
| (D) Reconstruction of roadways/parking | 3,220,000 |
| (Base Construction Allocation - $2,683,000) (Design and Contingencies - $537,000) | |
| (E) Construction of health professionals building | 7,800,000 |
| (Base Construction Allocation - $6,500,000) (Design and Contingencies - $1,300,000) | |
| (xiv) West Chester State University | |
| (A) Renovation of McCoy Center | 577,000 |
| (Base Construction Allocation - $464,000) (Design and Contingencies - $113,000) | |
| (B) Construction of arts complex | 20,300,000 |
| (Base Construction Allocation - $16,997,000) (Design and Contingencies - $3,303,000) | |
| (C) Renovation of Old Library | 3,046,000 |
| (Base Construction Allocation - $2,538,000) (Design and Contingencies - $508,000) | |
| (D) Addition and renovation to Mitchell Hall | 8,287,000 |
| (Base Construction Allocation - $6,906,000) (Design and Contingencies - $1,381,000) | |
| (xv) State System of Higher Education | |
| (A) Asbestos abatement - Phase II | 10,625,000 |
| (Base Construction Allocation - $8,854,000) (Design and Contingencies - $1,771,000) |
Section 4. Itemization of furniture and equipment projects.
| (1) Department of Education | $28,970,000 |
|---|---|
| * * * | |
| (iii) The Pennsylvania State University | |
| (A) Original furniture and equipment for Agriculture Instruction Center DGS 800-204 - Berks Campus | 850,000 |
| (B) Original furniture and equipment for the utility systems expansion and improvements - Berks Campus | 140,000 |
| (C) Original furniture and equipment for the Academic Building - Berks Campus | 420,000 |
| (D) Original furniture and equipment for classroom building DGS 800-208 - Delaware Campus | 620,000 |
| (E) Original furniture and equipment for the Academic Support Services Building - Dubois Campus | 150,000 |
| (F) Original furniture and equipment for multipurpose facility for student activities DGS 800-220 - Behrend College, Erie | 1,550,000 |
| (G) Original furniture and equipment for the utility systems improvement - Behrend College, Erie | 870,000 |
| (H) Original furniture and equipment for the renovation of the Reed Building and Carriage House - Behrend College, Erie | 225,000 |
| (I) Original furniture and equipment for the Library and classroom building - Capital College, Harrisburg | 1,650,000 |
| (J) Original furniture and equipment for multipurpose technological cultural "Southwest Institute" support regional socioeconomic development DGS 800-209 - Fayette Campus | 620,000 |
| (K) Original furniture and equipment for Agriculture Sci Classroom Lab Building DGS 800-210 - Fayette Campus | 460,000 |
| (L) Original furniture and equipment for the utility systems improvements - Fayette Campus | 130,000 |
| (M) Original furniture and equipment for Academic Building DGS 800-212 - New Kensington Campus | 260,000 |
| (N) Original furniture and equipment for the water, electrical and telecommunications systems - Mont Alto Campus | 165,000 |
| (O) Original furniture and equipment for the renovations of Conklin Hall, the Wiestling Building and the General Studies Building - Mont Alto Campus | 670,000 |
| (P) Original furniture and equipment for the expansion of the HUB/Paul Robeson Cultural Center - University Park Campus | 2,000,000 |
| (Q) Original furniture and equipment for the new Chemistry Building - University Park Campus | 6,000,000 |
| (R) Original furniture and equipment for the improvements and expansion of the Utility System - University Park Campus | 1,700,000 |
| (S) Original furniture and equipment for the renovations of and additions to four buildings - University Park Campus | 2,600,000 |
| (T) Original furniture and equipment for the classroom building - Phase I - University Park Campus | 1,000,000 |
| (U) Original furniture and equipment for the Academic Support Services Complex - Phase I - University Park Campus | 1,500,000 |
| (V) Original furniture and equipment for the Library addition and Auditorium - York Campus | 1,075,000 |
| (iv) Montgomery County Community College - West Campus | |
| (A) Furniture and equipment | 2,000,000 |
| * * * | |
| (3) State System of Higher Education | $1,996,000 |
| (i) California University | |
| (A) Original furniture and equipment - Dixon Hall - DGS 402-5 | 684,000 |
| (ii) Edinboro University | |
| (A) Original furniture and equipment - Loveland Hall - DGS 406-47 | 30,000 |
| (B) Original furniture and equipment - Cooper Science - DGS 406-51 | 234,000 |
| (iii) Kutztown University | |
| (A) Original furniture and equipment - athletic facility - DGS 408-54 | 280,000 |
| (iv) Mansfield University | |
| (A) Original furniture and equipment - Belknap/Retan - DGS 410-49 | 768,000 |
Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--* * *
| (2) Bedford County Air Industrial Authority, Bedford County | |
|---|---|
| (i) Improvements to facility | 300,000 |
| (Base Project Allocation - $250,000) (Design and Contingencies - $50,000) | |
| * * * | |
| (4) Blair County Airport Authority, Blair County | |
| (i) Access road, parking lot and terminal expansion | 2,600,000 |
| (Base Project Allocation - $2,000,000) (Design and Contingencies - $600,000) | |
| (5) Bradford Regional Airport | |
| (i) Parallel taxiway for Runway 1432 | 2,500,000 |
| (6) Cambria County Transit Authority | |
| * * * | |
| (iii) Garage roof | 10,000 |
| * * * | |
| (v) Storm water system | 10,000 |
| (vi) Floor replacement | 34,000 |
| (vii) Building repairs | 5,000 |
| (viii) Inclined plane fare collection equipment | 4,000 |
| * * * | |
| (x) Accessible vans (2) | 9,000 |
| (xi) Bus wash/water recycler | 6,000 |
| (xii) Road safety vehicle | 4,000 |
| * * * | |
| (8) Centre Area Transportation Authority | |
| * * * | |
| (ii) Bus replacement (16 vehicles) | 534,000 |
| * * * | |
| (iv) Office, shop, bus and capital maintenance items | 42,000 |
| (v) Update, replace and expand bus signage and passenger shelters | 22,000 |
| (vi) Equip fixed routes buses with bicycle racks | 5,000 |
| * * * | |
| (viii) Service vehicle replacement | 13,000 |
| * * * | |
| (12) Dubois-Jefferson County Airport | |
| (i) Paving taxiway parallel to Runway 7 | 300,000 |
| (ii) De-icing pad | 10,000 |
| (iii) State Route 830 terminal area relocation | 19,000 |
| (iv) Resurface Runway 25 | 63,000 |
| (v) Snow removal equipment and storage building | 8,000 |
| (13) Elk County | |
| (i) ATA-Area Transportation Authority | 50,000 |
| (A) Compressed natural gas compression station and conversion of vehicles | |
| (Base Project Allocation - $50,000) | |
| * * * | |
| (15) Erie Metropolitan Transit Authority | |
| * * * | |
| (iii) Fiscal Year 1992-1993 Section 9 Program of Projects, including facility rehabilitation, renovations and acquisition of equipment | 13,000 |
| * * * | |
| (16) Transportation Assistance Projects | |
| (i) Lackawanna County Transit Authority county projects, including, but not limited to, purchase of transit vehicles, improvements to transit facility, service vehicle replacement and office, shop, bus and capital maintenance items and vehicle renovations | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| This item is approved in the sum of $3,000,000. | |
| (17) Lehigh and Northampton Transportation Authority | |
| * * * | |
| (ii) Purchase five community service transit buses | 130,000 |
| (iii) Purchase ten vans/minibuses for special service division - Metro Plus | 55,000 |
| (18) Luzerne County Transportation Authority | |
| (i) Maintenance area improvements and purchase of office equipment | 39,000 |
| (ii) Purchase of transit vehicles | 450,000 |
| (iii) Improvements to facilities | 250,000 |
| (Base Project Allocation - $220,000) (Design and Contingencies - $30,000) | |
| * * * | |
| (20) Port Authority of Allegheny County | |
| (i) Bus procurement and related equipment and facilities | 13,600,000 |
| This item is approved in the sum of $3,333,000. | |
| (ii) Fiscal Year 1994 fixed guideway modernization | 4,000,000 |
| This item is approved in the sum of $3,667,000. | |
| (iii) Fiscal Year 1994 Section 9 Program of Projects | 4,000,000 |
| * * * | |
| (21) Southeastern Pennsylvania Transportation Authority | |
| * * * | |
| (ix) Fiscal Year 1993 Section 3 Fixed Guideway Program of Projects - additional | 2,000,000 |
| (x) Frankford elevated reconstruction - Fiscal Year 1994 requirement | 8,334,000 |
| * * * | |
| (xii) For construction of an intrasuburban transit line from Downingtown, Chester County, to Morrisville, Bucks County | 16,000,000 |
| (22) St. Marys Airport | |
| (i) Runway reconstruction Phase I and access road relocation | 750,000 |
| (ii) Runway reconstruction Phase II | 750,000 |
| (iii) Runway extension - 700 feet | 500,000 |
| (iv) Instrument Landing System | 150,000 |
| * * * | |
| (28) Reading Regional Airport, Berks County | |
| (i) Replacement of HVAC system in passenger terminal building | 500,000 |
| (Base Project Allocation - $450,000) (Design and Contingencies - $50,000) | |
| (ii) Removal of storage tanks during property cleanup | 250,000 |
| (iii) Demolition of Hangar 501 | 300,000 |
| * * * | |
| (b) Rural and intercity rail.--* * * | |
| (2) Bucks County | |
| (i) Morrisville Transportation Center | |
| (A) Construction of transportation center | 25,000,000 |
| (3) Butler County | |
| (i) Buffalo and Pittsburgh Railroad | |
| (A) Butler to Bruin main line track road crossing and bridge work rehabilitation | 1,625,000 |
| (4) Centre County | |
| (i) Nittany and Bald Eagle Railroad | |
| (A) Rail replacement between Milepost 34 and Milepost 40 | 1,200,000 |
| * * * | |
| This item is approved in the sum of $580,000. | |
| (6) Columbia County | |
| (i) North Shore Railroad | |
| (A) Rail replacement between Milepost 191 and Milepost 199 | 1,440,000 |
| (7) Crawford County | |
| (i) Southern Tier Rail Coalition | |
| (A) Purchase of Conrail line between Hornell, New York, and Meadville | 20,000,000 |
| (8) Cumberland County | |
| (i) Cumberland Valley Railroad | |
| (A) Purchase of Cumberland Valley Railroad Bridge | 40,000 |
| * * * | |
| (10) Fayette County | |
| (i) LaBelle Processing Plant | |
| (A) Upgrade and relocate leased Conrail track and construct clean coal storage area and high-speed loadout in Brownsville | 3,920,000 |
| (ii) Greater Uniontown Industrial Fund | |
| (A) Capital acquisition and rehabilitation of CSX Transportation, Inc., FM&P subdivision between Smithfield and Greene Junction and connecting trackage to Connellsville | 4,000,000 |
| (11) Luzerne County | |
| (i) Canadian Pacific Rail System/Delaware and Hudson Railway Company, Inc., or their successor in interest | |
| (A) Upgrade track, bridges and other facilities between Dupont in Luzerne County and Sunbury in Northumberland County, including design, engineering and all other associated costs | 5,500,000 |
| * * * | |
| This item is approved in the sum of $2,500,000. | |
| (12) Montgomery County | |
| (i) Southeastern Pennsylvania Transportation Authority | |
| (A) Repair and restoration and feasibility study for developing a comprehensive plan for utilization of the Stony Creek railroad for freight and mass transportation purposes between Norristown Borough and Lansdale Borough | 500,000 |
| (Base Project Allocation - $500,000) | |
| * * * | |
| (16) York County | |
| * * * | |
| (ii) Maryland and Pennsylvania Railroad | |
| (A) Rehabilitation and renovation of West Branch | 657,000 |
| * * * | |
| This item is approved in the sum of $328,000. | |
| (19) Department of Transportation | |
| (i) Acquisition of trainsets | |
| (A) Acquisition of two complete trainsets for the purpose of providing passenger service on a proposed route to be known as the Valley Special serving the municipalities of Easton, Bethlehem/Allentown, Reading, Lebanon, Harrisburg, Lewistown, Huntingdon, Tyrone, Altoona, Johnstown, Blairsville, Vandergrift, Tarentum/New Kensington, Harmarville, Pittsburgh, Sewickley and Beaver Falls | 10,000,000 |
This item is approved in the sum of $2,000,000.
Section 6. Itemization of flood control projects.
| (1) Department of Environmental Resources | $82,850,000 |
|---|---|
| (i) Clearfield County | |
| (A) Tanners Run Flood Control Project - Curwensville Borough | 2,000,000 |
| (B) Flood control project for Beccaria Township, Coalport and Irvona Boroughs by BCI Authority | 2,000,000 |
| (ii) Delaware County | |
| (A) Ridley Park Borough, replacement of East Lake Dam | 400,000 |
| (iii) Lackawanna County | |
| (A) City of Scranton, including, but not limited to, property and land acquisition, design, construction and start-up flood control costs on the Lackawanna River and all streams within the City of Scranton, including existing flood control projects | 11,000,000 |
| (Base Project Allocation - $10,000,000) (Design and Contingencies - $1,000,000) | |
| This item is approved in the sum of $2,500,000. | |
| (B) Borough of Taylor, including, but not limited to, property and land acquisition, design, construction and start-up costs of flood control and storm water projects | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (C) Borough of Dunmore, including, but not limited to, property and land acquisition, design, construction and start-up costs of flood control and storm water projects | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (D) Borough of Throop, including, but not limited to, property and land acquisition, design, construction and start-up costs of flood control and storm water projects | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| * * * | |
| (v) Luzerne County | |
| (A) Wyoming Valley flood protection | 45,000,000 |
| (B) Jenkins Township, Port Blanchard flood control project | 800,000 |
| (Base Project Allocation - $725,000) (Design and Contingencies - $75,000) | |
| (C) Construct Fabri-Dam on the Susquehanna River | 8,000,000 |
| (Design and Contingencies - $800,000) | |
| (D) Repair and renovation of Plymouth Borough pump stations and flood dams | 1,300,000 |
| (E) Repair and renovation of Hanover Township flood control pump stations | 1,450,000 |
Section 7. Itemization of redevelopment assistance projects.
| (1) Allegheny County | |
|---|---|
| (i) City of Pittsburgh | |
| (A) Acquisition and renovation of five additional properties at 500 Sampsonia Way for the Mattress Factory Art Institution | 500,000 |
| (Base Project Allocation - $500,000) | |
| (B) Feasibility study to evaluate construction of moving sidewalk to connect the City of Pittsburgh with the Northside | 500,000 |
| (Design and Contingencies - $500,000) | |
| (C) Lawrenceville Industrial Park Project - Phase II site development | 3,000,000 |
| (Base Project Allocation - $3,000,000) | |
| (D) Fifth and Forbes, infrastructure and public space improvements | 9,000,000 |
| (Base Project Allocation - $9,000,000) | |
| (E) Women's Research Institute, restoration of land and renovation and rehabilitation of buildings | 5,000,000 |
| (F) Carnegie Museum of Art for the Andy Warhol Museum | 6,000,000 |
| (G) Redevelopment of the Bank Center Building into a "Library Center" in downtown Pittsburgh | 1,000,000 |
| (H) Cultural District Development - Phase II | 17,750,000 |
| (I) Pittsburgh Regional History Center | 7,000,000 |
| (J) Federal/North Development | 3,000,000 |
| * * * | |
| (M) Keystone Commons Development | 2,100,000 |
| (N) Rehabilitation and expansion of community center in Homewood-Brushton | 1,800,000 |
| (O) Regent Square Theatre Project | 200,000 |
| (P) Construction of multipurpose community center serving Lincoln, Lemington, Larimer and Belmar | 3,000,000 |
| (Q) Pittsburgh Children's Museum, renovations and building expansion | 5,000,000 |
| (R) Restoration, rehabilitation and construct parking for New Granada Theatre | 5,000,000 |
| (S) Pittsburgh Zoo, construction of an education complex | 250,000 |
| (Base Project Allocation - $250,000) | |
| (T) Phipps Conservatory, renovation of the Palm Court | 150,000 |
| (Base Project Allocation - $150,000) | |
| (U) National Aviary, renovations | 100,000 |
| (Base Project Allocation - $100,000) | |
| (V) Boys and Girls Club of Western Pennsylvania, renovation and construction of juvenile justice and youth development facilities | 2,500,000 |
| (Base Project Allocation - $2,500,000) | |
| (W) Rehabilitation and expansion of the MacIntosh and Hempfield Building for the Pittsburgh Filmmakers | 500,000 |
| (ii) City of Duquesne and City of McKeesport | |
| (A) Center City of Duquesne/McKeesport Industrial Center | 3,485,000 |
| (iii) Moon Township | |
| (A) Conversion of the abandoned terminal at the Greater Pittsburgh International Airport into an air and space museum | 10,000,000 |
| (iv) Borough of Wilkinsburg | |
| (A) Construction of multipurpose center serving Wilkinsburg | 3,000,000 |
| * * * | |
| (vii) Harrison Township | |
| (A) Natrona River and housing development project | 2,000,000 |
| (viii) Rankin Borough | |
| (A) Rankin Marina and fishing docks on Monongahela River | 500,000 |
| * * * | |
| (x) Millvale Borough | |
| (A) Replacement of potable water storage facility | 275,000 |
| (xi) Aspinwall Borough | |
| (A) Construction of potable water well for public consumption | 125,000 |
| (xii) County of Allegheny | |
| (A) Additional funds for Allegheny River Boulevard | 300,000 |
| (2) Bedford County | |
| (i) Bedford County Center | |
| (A) Construct facility | 1,000,000 |
| (3) Berks County | |
| * * * | |
| (ii) Bern Township | |
| (A) Construction of new county juvenile detention facility | 3,500,000 |
| * * * | |
| (5) Bucks County | |
| (i) Middletown Township | |
| (A) Public Works Department, building addition | 121,000 |
| (B) Public Works substation and operation site | 169,000 |
| (C) Public Works Department, underground storage tank replacements | 320,000 |
| (D) Police Department building renovations | 130,000 |
| (E) Fire companies apparatus replacement and refurbishment plan | 1,700,000 |
| (F) Development of community park in northern area of township | 2,000,000 |
| (G) Beechwood Community Park development | 250,000 |
| (H) Twin Oaks Recreational Facility rehabilitation | 200,000 |
| (I) Mill Creek and Queen Anne Creek drainage improvements | 2,207,000 |
| (J) Langhorne Gables area drainage improvements | 451,000 |
| (ii) Bristol Township | |
| (A) Improvements to drainage and road surface in township | 2,000,000 |
| (iii) Langhorne Borough | |
| (A) Expansion of Borough Hall/Fire House | 200,000 |
| (6) Butler County | |
| (i) Community Development Corporation | |
| (A) Construction of a youth athletic center | 1,500,000 |
| (ii) County of Butler | |
| (A) Improvements to Alameda Park, consisting of road construction and rehabilitation of grounds, riverfront and facilities | 1,000,000 |
| (iii) Chicora Borough and Donegal Township | |
| (A) Joint sewer project | 2,000,000 |
| * * * | |
| (8) Cameron County | |
| (i) Emporium Borough/Shippen Township | |
| (A) Sewage treatment plant improvements | 1,500,000 |
| (9) Clearfield County | |
| (i) Philipsburg | |
| (A) Improvements to Philipsburg Area Hospital to provide for an acute-care nursing home | 2,000,000 |
| (ii) Cooper Township | |
| (A) Redevelopment of Severin Church site | 1,000,000 |
| (iii) Morris Township | |
| (A) Department of Environmental Resources mandated improvements to water distribution system | 1,000,000 |
| (iv) Graham Township | |
| (A) Infrastructure and water system improvements | 1,000,000 |
| (v) City of DuBois | |
| (A) Replacement/renovation of south side sewer interceptor | 900,000 |
| (10) Crawford County | |
| (i) Crawford County Fairgrounds | |
| (A) Restoration of grounds | 200,000 |
| (ii) Meadville | |
| (A) Demolition, restoration, reconstruction of dilapidated housing | 1,150,000 |
| (iii) Titusville | |
| (A) Demolition, restoration, reconstruction of dilapidated housing | 1,150,000 |
| (iv) Spartansburg Borough | |
| (A) Rails to Trails Project | 1,000,000 |
| (11) Elk County | |
| (i) Benzinger Township | |
| (A) Construction of sewage system | 1,100,000 |
| (B) Construction of solids-handling facility for water treatment plant | 500,000 |
| (ii) Fox Township | |
| (A) Sewer extension to Fairview subdivision | 200,000 |
| (B) Upgrade sewage treatment plant for removal of toxic metals | 700,000 |
| (C) Expansion of sewage treatment plant | 800,000 |
| (D) Sewer line extension to trailer park | 200,000 |
| (iii) Highland Township | |
| (A) Sewage collection and treatment plant for James City | 800,000 |
| (iv) Jay Township Water Authority | |
| (A) Renovations to Jay Township water system | 2,000,000 |
| (B) Water storage tank construction in Village of Weedville | 250,000 |
| (C) Engineering study for backup source water system | 500,000 |
| (v) Jones Township | |
| (A) Sanitary sewer collection system from Wilcox to Johnsonburg Borough facility | 3,800,000 |
| (vi) Johnsonburg Municipal Authority | |
| (A) Construction of Third Avenue reservoir tank No. 2 | 400,000 |
| (B) Construction of water storage reservoir and Silver Creek water line extension | 900,000 |
| (12) Erie County | |
| (i) Corry Redevelopment Authority | |
| (A) Acquisition of abandoned industrial building for multitenant facility | 1,000,000 |
| (Base Project Allocation - $1,000,000) | |
| * * * | |
| (14) Forest County | |
| (i) Tionesta Township | |
| (A) Acquisition of 25 acres, including 3 commercial buildings, for creation of an industrial park | 243,000 |
| (Base Project Allocation - $243,000) | |
| (ii) Tionesta Borough | |
| (A) Acquisition of 11 acres for an incubator project | 395,000 |
| (Base Project Allocation - $395,000) | |
| (iii) Jenks Township | |
| (A) Acquisition of 90 acres for an industrial park | 100,000 |
| (Base Project Allocation - $100,000) | |
| * * * | |
| (16) Jefferson County | |
| (i) Brockway Borough | |
| (A) Reline existing sanitary sewer lines along Green Way | 86,000 |
| (B) Installation of an elevator in Toby Terrace apartment building | 55,000 |
| (C) Improvements to roadway to Brockway Industrial Park | 200,000 |
| (ii) Brookville Borough | |
| (A) Restoration of Jefferson County Courthouse and acquisition of annex | 700,000 |
| (iii) Corsica Borough | |
| (A) Water line improvements/access road | 550,000 |
| (iv) Pine Creek Township | |
| (A) Restoration of Jefferson County Service Center | 450,000 |
| (B) Establish incubator/multitenant building | 750,000 |
| (v) Snyder Township | |
| (A) Construction of sanitary sewer lines along Kearney Road, Broad Street and Arch Street | 243,000 |
| (17) Lackawanna County | |
| (i) Civic center and hotel complex | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 55,000,000 |
| (Base Project Allocation - $50,000,000) | |
| (Design and Contingencies - $5,000,000) | |
| This item is approved in the sum of $22,000,000. | |
| (ii) Heritage Valley Visitors Center | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 3,960,000 |
| (Base Project Allocation - $3,600,000) (Design and Contingencies - $360,000) | |
| This item is approved in the sum of $1,750,000. | |
| (iii) Heritage Valley Trolley Museum | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 3,960,000 |
| (Base Project Allocation - $3,600,000) (Design and Contingencies - $360,000) | |
| * * * | |
| This item is approved in the sum of $1,750,000. | |
| (v) Lackawanna Coal Mine | |
| (A) Expenditures, including, but not limited to, renovation, rehabilitation and restoration of land and buildings at McDade Park | 4,400,000 |
| (Base Project Allocation - $4,000,000) (Design and Contingencies - $400,000) | |
| (vi) Slocum Hollow Park Project | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 5,500,000 |
| (Base Project Allocation - $5,000,000) (Design and Contingencies - $500,000) | |
| (vii) Lackawanna County Park System | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs, renovation, rehabilitation and restoration of land and/or building within the Lackawanna County Park System | 5,500,000 |
| (Base Project Allocation - $5,000,000) (Design and Contingencies - $500,000) | |
| (viii) Montage Trolley Excursion Project | |
| (A) Expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs, renovation, rehabilitation and restoration of land, tunnels, bridges, trolley track and buildings | 6,600,000 |
| (Base Project Allocation - $6,000,000) (Design and Contingencies - $600,000) | |
| * * * | |
| This item is approved in the sum of $1,750,000. | |
| (x) City of Scranton | |
| (A) Jason Miller Public Theater expenditures, including, but not limited to, property and land acquisition, design, construction and start-up costs | 3,300,000 |
| (Base Project Allocation - $3,000,000) (Design and Contingencies - $300,000) | |
| (B) Scranton Park System expenditures, including, but not limited to, design, construction, renovation and restoration to parks and museums within the City of Scranton | 7,700,000 |
| (Base Project Allocation - $7,000,000) (Design and Contingencies - $700,000) | |
| (xi) Lackawanna County Prison | |
| (A) Including, but not limited to, design, construction, rehabilitation and expansion of county prison | 5,500,000 |
| (Base Project Allocation - $5,000,000) (Design and Contingencies - $500,000) | |
| (xii) Dalton Borough | |
| (A) Repair retaining wall on Lily Lake Road | 300,000 |
| (Base Project Allocation - $300,000) | |
| (xiii) Newton Township | |
| (A) Drain pond and reconstruct dam on Ford's Pond Road | 100,000 |
| (Base Project Allocation - $100,000) | |
| (xiv) South Abington Township | |
| (A) Expand railroad culvert on Shady Lane Road in Chinchilla | 3,000,000 |
| (Base Project Allocation - $3,000,000) | |
| (B) Stream maintenance project on Leggett's Creek in Chinchilla | 2,000,000 |
| (Base Project Allocation - $2,000,000) | |
| * * * | |
| (19) Luzerne County | |
| * * * | |
| (ii) City of Pittston | |
| * * * | |
| (B) Construction of a downtown parking garage | 2,800,000 |
| (Base Project Allocation - $2,500,000) (Design and Contingencies - $300,000) | |
| (iii) Hughestown Borough | |
| (A) Indoor/covered ice skating rink | 1,500,000 |
| (iv) Avoca Borough | |
| (A) Development of Avoca Flats Park | 1,000,000 |
| (v) Dupont Borough | |
| (A) Development of Borough Park | 800,000 |
| (vi) Jenkins Township | |
| (A) Development/improvements to Spadi Park | 1,000,000 |
| (vii) Duryea Borough | |
| (A) Development of baseball field and tennis/basketball courts | 1,200,000 |
| (viii) Yatesville Borough | |
| (A) Recreation improvements | 750,000 |
| (ix) Pittston Township | |
| (A) Acquisition of land and park development in Suscon | 800,000 |
| (B) Recreational park | 100,000 |
| (x) City of Nanticoke | |
| (A) Development of Industrial Park of Greater Nanticoke | 2,500,000 |
| (B) Reconstruct sidewalks to provide accessibility ramps | 30,000 |
| (C) Demolition or rehabilitation of low-income housing | 1,370,000 |
| (xi) Swoyersville Borough | |
| (A) Construction of senior citizens' recreation building | 350,000 |
| (20) Mercer County | |
| (i) Springfield Township | |
| (A) Improvements to water system | 898,000 |
| (Base Project Allocation - $690,000) | |
| (Land Allocation - $104,000) (Design and Contingencies - $104,000) | |
| (21) Monroe County | |
| (i) Borough of Mount Pocono | |
| (A) Extension of sewer line | 275,000 |
| (B) Reconstruction of central water distribution system | 5,350,000 |
| (ii) County of Monroe | |
| (A) Construction of countywide fire training school and center | 965,000 |
| * * * | |
| (23) Philadelphia County | |
| (i) City of Philadelphia | |
| * * * | |
| (F) Renovation of the Pennsylvania Academy of the Fine Arts | 7,500,000 |
| (G) Renovation and rehabilitation of the International House of Philadelphia | 3,679,000 |
| (H) Renovation and expansion of the Philadelphia Dance Company | 2,100,000 |
| (I) Renovation and expansion of the Movement Theatre International into the Performing Arts Center | 3,500,000 |
| (J) Americans with Disabilities Accessibility renovations to the Annenberg Center for the Performing Arts | 1,000,000 |
| (K) Renovations, including Americans with Disabilities Accessibility to the Harrison Auditorium, University Museum of Archaeology and Anthropology | 2,916,000 |
| (L) Dredge Schuylkill River between Fairmount Dam and Falls Bridge | 15,000,000 |
| (M) Recreation Department to be allocated as follows: outdoor lighting - 350,000; roof repairs - 125,000; heating systems and controls - 125,000; outdoor basketball and tennis courts - 500,000; site improvements - 500,000; swimming pools - 250,000; replacement of Pepper Middle School - 250,000; reconstruction of Francis Myers Recreational Center - 560,000; replacement of L. Young Recreational Center - 950,000 | 3,610,000 |
| (N) Construction of the Ogontz Community Public Library | 1,731,000 |
| (O) Furniture and equipment for library | 300,000 |
| (P) Rehabilitation of 150 homes for habitation | 700,000 |
| (Q) Renovations of the Lonnie Young Recreation Center | 1,900,000 |
| * * * | |
| (24) Potter County | |
| (i) Austin Borough | |
| (A) Construction of complete sewer system in Austin Borough | 2,750,000 |
| (ii) Coudersport Borough | |
| (A) Demolition, excavation and removal of dilapidated structure, tannery vats and abandoned industrial structures in the industrial park | 630,000 |
| (B) Upgrade and expansion of Coudersport Borough sewer system; elimination of infiltration inflow and plant expansion | 550,000 |
| (C) Extension of borough flood control to borough limits | 4,500,000 |
| (iii) Genesee Village | |
| (A) Repair, replacement and expansion of water system, including fire protection and potable water line distribution | 475,000 |
| (25) Venango County | |
| (i) Sandy Creek Township | |
| (A) Acquisition of 11-acre tract to supplement Sandy Creek Industrial Park | 200,000 |
| (B) Extension of water lines to new 11-acre tract | 10,000 |
| (C) Construction of access road through 11-acre tract | 50,000 |
| (26) Warren County | |
| (i) City of Warren | |
| (A) Acquisition, renovation and site preparation of former Warren Components building for economic opportunities | 200,000 |
| (ii) Pleasant Township | |
| (A) Provide a rail spur to former Phillips Building at the Warren Industrial Complex | 100,000 |
| (27) Washington County | |
| (i) Northwest Economic Development Project | |
| (A) Installation of water line | 1,000,000 |
| (ii) Marianna Borough | |
| (A) Engineering and design and correction work for slide problem | 200,000 |
| (iii) Carroll Township and Monongahela City | |
| (A) Sewage treatment system | 2,000,000 |
| (iv) Smith Township | |
| (A) Eliminate acid mine drainage problem | 750,000 |
| (28) Westmoreland County | |
| (i) Westmoreland Trust | |
| (A) Cultural district redevelopment, including the renovation and rehabilitation of Greensburg Train Station and the Palace Theatre | 5,100,000 |
| (ii) Rostraver | |
| (A) Acquisition and/or construction of a combination public library and senior citizen center | 1,300,000 |
| (iii) Hempfield Township | |
| (A) Install new water line extension to Stone Church Hill | 180,000 |
| (iv) Mt. Pleasant Township | |
| (A) Install new water line to the junction of Routes 819 and 981 | 200,000 |
| (v) Ligonier Township | |
| (A) Replace water lines in Loyalhanna Cottages | 150,000 |
| (vi) Seward Borough | |
| (A) Replace existing water lines | 220,000 |
| (vii) North Irwin Borough | |
| (A) Town Hall renovation | 150,000 |
| (viii) North Huntingdon Township | |
| (A) Winchester Road main water line extension | 145,000 |
| (B) Murrysville Road main water line extension | 116,000 |
| (C) Elevation of Winchester Road and Murrysville Road | 210,000 |
| (29) York County | |
| * * * | |
| (ii) County of York, Rails to Trails Project | |
| (A) Trail improvements, Maryland Line to Hanover Junction | 500,000 |
| (B) Trail improvements, Hanover Junction to York | 800,000 |
| (C) Station renovations at Hanover Junction | 150,000 |
| (D) Station renovations at New Freedom | 150,000 |
| (E) Relocation and renovation of Railroad House | 100,000 |
Continua la tua ricerca in ChatGPT o Claude