Questão jurídica principal
Whether the planned terrain alteration was subject to a building permit under planning law.
Decisão extraída
The terrain alteration was substantial enough to require a permit.
Fundamentação extraída
A 1.5 m cut-and-fill over about 340 m3 on a small area could significantly alter the landscape and therefore fell within the permit requirement for structures and installations.