Questão jurídica principal
Whether the building plot was sufficiently accessibly connected by Schmittenstrasse for the permit
Decisão extraída
The access was sufficient for the planned buildings, considering the required road works and the expected traffic from nine dwellings.
Fundamentação extraída
The lower authorities assessed the road under the applicable planning and access rules. The neighbor failed to show that their conclusion was arbitrary or wholly untenable.