Whether the unauthorized facade insulation must be fully removed or whether a milder restoration measure is required under proportionality and property protection.
Decisão extraída
A complete demolition order was disproportionate; the matter had to be remitted so the municipal authority could set a renovation solution based on the appellant's submitted concept.
Fundamentação extraída
Although the insulation violated zoning and heritage rules, the court held that environmental and energy-saving interests also had to be weighed. After the site inspection, the appellant's concept appeared to improve the situation overall, preserve energy benefits, avoid construction-physics problems, and be less onerous than full removal.