Questão jurídica principal
Whether a specific cantonal master-plan basis was required for the project
Decisão extraída
No specific cantonal master-plan designation was required for this small hydropower project.
Fundamentação extraída
The cantonal plan contained sufficient coordination principles for hydropower; the project's size did not make a prior plan amendment indispensable.