23-1671•DANA NESSEL, Attorney General of the State of Michigan, on behalf of the people of… v. Enbridge Energy, Lp; Enbridge Energy Company, Inc.; Enbridge Energy Partners, L.p.
23-1671Court of Appeals for the Sixth Circuit17 de jun. de 2024
RECOMMENDED FOR PUBLICATION
Pursuant to Sixth Circuit I.O.P. 32.1(b)
File Name: 24a0134p.06
UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
DANA NESSEL, Attorney General of the State of
Michigan, on behalf of the people of the State of
Michigan,
Plaintiff-Appellant,
v.
ENBRIDGE ENERGY, LP; ENBRIDGE ENERGY COMPANY,
INC.; ENBRIDGE ENERGY PARTNERS, L.P.,
Defendants-Appellees.
┐
│
│
│
│
│
│
│
│
│
│
┘
No. 23-1671
Appeal from the United States District Court
for the Western District of Michigan at Grand Rapids.
No. 1:21-cv-01057—Janet T. Neff, District Judge.
Argued: March 21, 2024
Decided and Filed: June 17, 2024
Before: GRIFFIN, THAPAR, and NALBANDIAN, Circuit Judges.
_________________
COUNSEL
ARGUED: Daniel P. Bock, OFFICE OF THE ATTORNEY MICHIGAN GENERAL, Lansing,
Michigan, for Appellant. Alice Loughran, STEPTOE & JOHNSON LLP, Washington, D.C., for
Appellees. ON BRIEF: Daniel P. Bock, Keith D. Underkoffler, OFFICE OF THE
ATTORNEY MICHIGAN GENERAL, Lansing, Michigan, for Appellant. Alice Loughran,
David H. Coburn, Mark C. Savignac, STEPTOE & JOHNSON LLP, Washington, D.C., John J.
Bursch, BURSCH LAW PLLC, Caledonia, Michigan, Phillip J. DeRosier, DICKINSON
WRIGHT PLLC, Detroit, Michigan, Jeffery V. Stuckey, DICKINSON WRIGHT PLLC,
Lansing, Michigan, for Appellees. Andy Buchsbaum, BUCHSBAUM & ASSOCIATES LLC,
Ann Arbor, Michigan, Joseph T. Heegaard, OFFICE OF THE MINNESOTA ATTORNEY
GENERAL, St. Paul, Minnesota, James M. Olson, OLSON, BZDOK & HOWARD, PC,
Traverse City, Michigan, Christopher R. Clark, EARTHJUSTICE, Chicago, Illinois, Jonathan D.
Newman, SHERMAN DUNN, P.C., Washington, D.C., Elbert Lin, HUNTON ANDREWS
KURTH LLP, Richmond, Virginia, for Amici Curiae.
>
-- 1 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 2
_________________
OPINION
_________________
GRIFFIN, Circuit Judge.
Michigan Attorney General Dana Nessel seeks to shut down Enbridge’s Line 5 Pipeline,
which runs underwater across the Straits of Mackinac between Michigan’s Lower and Upper
Peninsulas. The merits of this litigation are not before us. Instead, we consider only which court
should decide this case: does it belong in Michigan state court (where the Attorney General filed
it in 2019) or in federal court (to where Enbridge removed it over two years later)? We hold that
Enbridge failed to timely remove this case to federal court under 28 U.S.C. § 1446(b), and there
are no equitable exceptions to the statute’s deadlines for removal. Thus, under these
circumstances, this case belongs in Michigan state court. Because the district court held to the
contrary, we reverse the district court and direct it to remand this case to Michigan’s 30th Circuit
Court for the County of Ingham.
I.
Defendant Enbridge1 owns and operates the Line 5 Pipeline, which is part of a pipeline
network that transports petroleum products to refineries in the Midwest, Ontario, and Quebec.
Line 5 runs from northwestern Wisconsin through Michigan’s Upper and Lower Peninsulas and
then into Canada—terminating in Sarnia, Ontario, just across the border from Port Huron,
Michigan. Between Michigan’s peninsulas, it traverses the Straits of Mackinac pursuant to a
1953 easement issued by the State of Michigan, which owns the Straits’ bottomlands. In recent
years, that easement has been the subject of litigation in several cases, two of which are relevant
here.
1The defendants here are Enbridge Energy, LP; Enbridge Energy Company, Inc.; and Enbridge Energy
Partners, L.P. (collectively, “Enbridge”).
-- 2 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 3
A.
The Attorney General’s case. On June 27, 2019, Michigan Attorney General Dana
Nessel filed this case in Michigan state court, the 30th Circuit Court for the County of Ingham.
The summons and complaint were served on Enbridge on July 12, 2019. The complaint seeks to
enjoin Enbridge’s continued operation of Line 5 based on alleged violations of three state laws:
the public-trust doctrine, common-law public nuisance, and the Michigan Environmental
Protection Act.
On September 16, 2019, Enbridge responded to the complaint by moving for summary
disposition, arguing that the complaint failed to state a claim on which relief could be granted.
Enbridge argued, among other things, that the Attorney General’s claims under the public-trust
doctrine were preempted by the federal Pipeline Safety Act, which it claimed occupies the field
of pipeline-safety regulation. The Attorney General then filed her own dispositive motion.
In May 2020, the state court held oral argument on those dispositive motions. Before the
argument, the state court asked the parties to be prepared to answer questions about federal
preemption. Much of the argument indeed focused on preemption issues, including whether the
Attorney General’s claims were preempted by either the Pipeline Safety Act or the federal
Submerged Lands Act. The court requested post-argument briefing on these preemption issues.
In Enbridge’s supplemental brief, Enbridge reiterated its preemption defenses, arguing that the
Pipeline Safety Act and the Submerged Lands Act preempted Michigan’s public-trust authority
applied to an oil pipeline on submerged bottomlands.
While those dispositive motions were pending, the Attorney General filed a separate
motion for a temporary restraining order and preliminary injunction on June 25, 2020. That
motion stemmed from a recently disclosed report about issues with Line 5’s infrastructure at the
Straits. Enbridge actively participated in the briefing and argument that followed. The motion
resulted in a temporary restraining order that briefly enjoined the operation of the pipeline on the
Straits’ bottomlands. The court later authorized Enbridge to restart the pipeline’s operations after
complying with its federal safety regulator’s requirements.
-- 3 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 4
B.
The Governor’s case. On November 13, 2020, before a ruling by the Ingham County
Circuit Court on the competing motions in the Attorney General’s case, Michigan Governor
Gretchen Whitmer issued a notice of revocation of the 1953 easement, calling for Line 5 to be
shut down by May 2021, and simultaneously filed a complaint in state court to enforce the
notice. Her complaint closely paralleled the Attorney General’s. Indeed, according to Enbridge,
it “repeat[ed] the same basic facts and claims alleged in the Attorney General’s complaint,” and
these two lawsuits involved the “same controversy” between the “same parties or their privies.”
Enbridge timely removed the Governor’s case to the United States District Court for the
Western District of Michigan on November 24, 2020. See 28 U.S.C. § 1446(b)(1). Enbridge’s
notice of removal asserted that the district court had federal-question jurisdiction under
28 U.S.C. § 1331 because the action “ar[ose] under” federal law. Specifically, Enbridge argued
that the district court’s subject-matter jurisdiction derived from the “substantial federal question”
doctrine, as recognized in Grable & Sons Metal Products, Inc. v. Darue Engineering &
Manufacturing, 545 U.S. 308, 312–13 (2005). In Enbridge’s view, the Governor’s state-law
claims necessarily raised substantial questions of the federal government’s foreign-affairs powers
and preemption under the Pipeline Safety Act and the Submerged Lands Act. Still within 30
days of the complaint’s service, Enbridge then filed an amended notice of removal on December
10, 2020, asserting additional grounds for federal-question jurisdiction, including arguments that
the claims arise under federal common law.
The Governor moved to remand the case to state court, arguing that the district court
lacked jurisdiction over her exclusively state-law claims. The Canadian government then filed
an amicus brief in opposition to the motion to remand, arguing that “Michigan’s Shutdown Order
Presents Substantial and Important Treaty Issues” under the 1977 Transit Pipelines Treaty
between the United States and Canada. That treaty covers gas and oil pipelines crossing the
border between Canada and the United States and prevents any public authority from “interfering
with” the cross-border transmission of gas and oil. Agreement Between the Government of the
United States of America and the Government of Canada Concerning Transit Pipelines, art. I(a),
art. II(1), Jan. 28, 1977, 28 U.S.T. 7449. In its amicus brief, the Canadian government argued
-- 4 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 5
that “unilateral action by a single state” to shut down Line 5 “would impair important U.S. and
Canadian foreign policy interests by raising doubts about the capacity of the Government of the
United States to make and uphold commitments without being undermined by an individual
state.” On October 4, 2021, the Canadian government filed a supplemental amicus letter
notifying Enbridge and the district court that Canada had formally invoked the treaty’s dispute-
resolution provision, beginning negotiations between the governments of Canada and the United
States over Line 5. See id., art. IX.
The district court denied the Governor’s motion to remand on November 16, 2021, a date
critical to Enbridge’s argument for timely removal of this case. The court held that it had
federal-question jurisdiction under Grable because resolution of the Governor’s claims
necessarily requires interpretation of federal law (namely, the Submerged Lands Act, the
Pipeline Safety Act, and the 1977 Treaty) and the extent to which those laws “burden[]”
Michigan’s ownership of Great Lakes bottomlands. Michigan v. Enbridge Energy, Ltd. P’ship,
571 F. Supp. 3d 851, 859, 862 (W.D. Mich. 2021). Soon thereafter, the Governor voluntarily
dismissed her case.
C.
Removal of the Attorney General’s case. Citing both the district court’s order denying
the motion to remand in the Governor’s case and § 1446(b)(3)’s provision that permits removal
within 30 days after the defendant’s receipt of an “order . . . from which it may first be
ascertained that the case is one which is or has become removable,” Enbridge removed this case
to federal court on December 15, 2021. Although 887 days had passed since receipt of the
Attorney General’s complaint, Enbridge argued removal was nonetheless timely because it could
not have ascertained that there were grounds for removal until the district court denied the
motion to remand in the Governor’s case.
On January 14, 2022, the Attorney General moved to remand this case to state court on
two grounds: untimely removal and lack of subject-matter jurisdiction. The district court denied
the motion on both grounds. It excused Enbridge’s untimely removal based on equitable
principles. And it estopped the Attorney General from challenging subject-matter jurisdiction in
-- 5 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 6
this case, relying on its finding of subject-matter jurisdiction in the Governor’s case. It then
certified its order for interlocutory appeal, and we granted the Attorney General permission to
appeal.
II.
We review a denial of a motion to remand de novo. Davis v. McCourt, 226 F.3d 506,
509 (6th Cir. 2000). The Attorney General seeks remand on the same two independent grounds
it raised below: untimely removal and lack of subject-matter jurisdiction.
In terms of sequencing, we need not address subject-matter jurisdiction before we address
the timeliness of removal. Although federal courts must resolve questions of subject-matter
jurisdiction before deciding a case on the merits, we have “leeway to choose among threshold
grounds for denying audience to a case on the merits.” Sinochem Int’l Co. v. Malaysia Int’l
Shipping Corp., 549 U.S. 422, 431 (2007) (internal quotation marks omitted); see also Scott
Dodson, In Search of Removal Jurisdiction, 102 Nw. U. L. Rev. 55, 69 (2008) (noting that, in
terms of “decisional sequencing,” Sinochem suggests that jurisdictional issues do not have “rigid
priority” over procedural issues). Consistent with this discretion and following other courts that
have remanded cases because of untimely removal without addressing questions of subject-
matter jurisdiction, see, e.g., Tr. Servs. of Carolina, LLC v. Rivera, 2012 WL 1664224, at *1–2
(W.D.N.C. May 2, 2012); In re Foreclosure of a Deed of Tr., 2008 WL 5234301, at *2
(E.D.N.C. Dec. 15, 2008); Laughlin Assocs., Inc. v. Durand, 1997 WL 998381, at *1 n.1 (D.
Nev. Oct. 17, 1997), aff’d, 156 F.3d 1236 (9th Cir. 1998) (unpublished table decision); Steadman
v. Sinclair, 1996 WL 257664, at *2 n.2 (S.D.N.Y. May 16, 1996),2 we do not decide whether the
district court had subject-matter jurisdiction over this case because Enbridge’s removal was
untimely.
2It gives us no pause that there appear to be few, if any, appellate cases deciding a question of removal
timeliness before deciding a question of subject-matter jurisdiction, considering 28 U.S.C. § 1447(d)’s prohibition of
appellate review of remand orders for removal cases. See Wisconsin v. Amgen, Inc., 516 F.3d 530, 533 (7th Cir.
2008).
-- 6 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 7
A.
“The party seeking removal bears the burden of establishing its right thereto.” Her
Majesty The Queen In Right of the Province of Ontario v. City of Detroit, 874 F.2d 332, 339 (6th
Cir. 1989). To remove a civil case from state to federal court, a defendant must meet the
requirements for removal detailed in § 1446. See Home Depot U.S.A., Inc. v. Jackson, 139 S. Ct.
1743, 1746 (2019). That statute requires the defendant to file a notice of removal, 28 U.S.C.
§ 1446(a), and provides time limits to do so, id. § 1446(b). Section 1446(b)(1) states that the
notice of removal “shall be filed within 30 days” of the defendant’s receipt of the complaint or
summons. Id. § 1446(b)(1). However, § 1446(b)(3) allows relief from that 30-day deadline
under the following specific circumstances:
[I]f the case stated by the initial pleading is not removable, a notice of removal
may be filed within 30 days after receipt by the defendant, through service or
otherwise, of a copy of an amended pleading, motion, order or other paper from
which it may first be ascertained that the case is one which is or has become
removable.
Id. § 1446(b)(3).
Enbridge unquestionably did not comply with § 1446(b)(1)’s initial 30-day removal
deadline from the date of service of the complaint. The Attorney General served Enbridge with
the complaint on July 12, 2019, so, under § 1446(b)(1), Enbridge needed to file its notice of
removal by August 12, 2019. See Fed. R. Civ. P. 6(a)(1)(C). Enbridge missed that deadline by
over two years.
Thus, at issue is whether Enbridge can avail itself of § 1446(b)(3)’s later 30-day window.
By the statute’s plain terms, that extension applies only if three elements are met. See A.S. ex
rel. Miller v. SmithKline Beecham Corp., 769 F.3d 204, 209–10 (3d Cir. 2014). First, Enbridge
must show that “the case stated by the initial pleading [was] not removable.” 28 U.S.C.
§ 1446(b)(3). Second, it must show that some variable changed that transformed this initially
non-removable case into one that was removable. And third, Enbridge must show that, no more
than 30 days before December 15, 2021—when it filed its notice of removal—it received “a
copy of an amended pleading, motion, order or other paper from which it [could] first be
ascertained that the case is one which is or has become removable.” Id.
-- 7 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 8
For a case to be removable, a federal district court must have “original jurisdiction” over
the case.3 Id. § 1441(a); see Caterpillar Inc. v. Williams, 482 U.S. 386, 392 (1987); 14C Charles
Alan Wright & Arthur R. Miller, Federal Practice and Procedure § 3721.1 (Rev. 4th ed. 2023).
Enbridge bases its removal arguments on 28 U.S.C. § 1331’s grant of “original jurisdiction
[over] all civil actions arising under the Constitution, laws, or treaties of the United States”—i.e.,
federal-question jurisdiction. On that ground, if any one of the plaintiff’s claims depends on the
application of federal law, the entire case may be removed. 28 U.S.C. § 1441(c); see also 14C
Wright & Miller § 3722. Further, removability requires that a defendant be able to articulate that
ground in its notice of removal, which must be “signed pursuant to Rule 11 of the Federal Rules
of Civil Procedure.” 28 U.S.C. § 1446(a). Under that standard, a signature certifies that, to the
best of counsel’s “knowledge, information, and belief,” the contentions in the notice of removal
are supported by existing law or a “nonfrivolous” argument for extending existing law. Fed. R.
Civ. P. 11(b). In other words, a defendant must have a “good-faith” basis for legal arguments in
the notice of removal. King v. Whitmer, 71 F.4th 511, 528 (6th Cir. 2023); see also Dahl v. R.J.
Reynolds Tobacco Co., 478 F.3d 965, 970 (8th Cir. 2007) (applying Rule 11 in removal context).
Thus, a case becomes removable on federal-question grounds when the defendant has a good-
faith basis to argue that at least one of the plaintiff’s claims depends on the application of federal
law.
B.
Enbridge asserts that federal-question jurisdiction now exists in either of two ways. First,
under the Grable doctrine, the Attorney General’s state-law claims necessarily turn on a
substantial and disputed issue of federal law—the extent to which the Submerged Lands Act, the
Pipeline Safety Act, and the 1977 Treaty “burden” Michigan’s authority over the Straits’
bottomlands. See Grable, 545 U.S. at 312–13. Second, because the Attorney General’s state-
law claims could cause major implications for foreign affairs, an area of “uniquely federal
interest[],” those claims arise under federal common law via the foreign-affairs doctrine.
3The jurisdiction and removal statutes—and thus this opinion—alternatively use the terms “original
jurisdiction” and “subject matter jurisdiction.” Compare 28 U.S.C. § 1441(a) (referring to “original jurisdiction”),
with id. § 1447(c) (referring to “subject matter jurisdiction”). For our purposes, these terms are synonymous, and
§ 1331 is a fount of both.
-- 8 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 9
See Cassirer v. Thyssen-Bornemisza Collection Found., 596 U.S. 107, 116 (2022) (citation
omitted); see also Republic of Phil. v. Marcos, 806 F.2d 344, 352–53 (2d Cir. 1986); Torres v. S.
Peru Copper Corp., 113 F.3d 540, 543 (5th Cir. 1997).
We express no opinion on the merits of Enbridge’s jurisdictional theories. Rather, to
determine whether Enbridge can avail itself of § 1446(b)(3)’s later removal window, we assume
that either theory could give rise to federal jurisdiction and decide only (1) whether that theory
made this case removable when the complaint was filed; (2) if not, whether some later change
made the case removable; and (3) when Enbridge could have first “ascertained” that the case was
removable. As set forth next, we agree with the Attorney General that Enbridge did not comply
with § 1446(b)(3)’s requirements.
1.
Viewed through this timing lens, both of Enbridge’s jurisdictional theories fail on
§ 1446(b)(3)’s first or third elements. First, Enbridge cannot establish that “the case stated by
the initial pleading [was] not removable.” 28 U.S.C. § 1446(b)(3). Enbridge’s own actions
support this conclusion—it timely removed the Governor’s case on Grable grounds in November
2020, and soon after amended that notice of removal in December 2020 with its argument about
federal common law. As Enbridge admits, the Attorney General’s and Governor’s complaints
both featured “the same basic facts and claims” and involved the “same controversy” between
the “same parties or their privies.” Thus, assuming either of Enbridge’s jurisdictional theories
are meritorious, the Attorney General’s case was removable on those grounds from its outset,
just like the Governor’s case was.
Enbridge’s appellate brief offers no explanation regarding how the Governor’s case could
be removable from its outset but this case was not. At oral argument, Enbridge argued (for the
first time) that the Governor’s easement-revocation notice, calling for the shutdown of Line 5
within six months, sparked a “significant foreign-affairs controversy” that, in turn, made the
Governor’s and Attorney General’s cases such that they arose under federal law under either
Grable or federal common law. See Resurrection Sch. v. Hertel, 35 F.4th 524, 530 (6th Cir.
2022) (en banc) (suggesting forfeiture).
-- 9 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 10
But while this unpreserved argument might explain how this case initially was not
removable and then later became so, it cannot satisfy § 1446(b)(3)’s third element because it
clashes with Enbridge’s argument about the first “paper” it received that allowed it to
“ascertain[]” that this case had become removable. Enbridge asserts that first “paper” was the
district court’s November 2021 order denying remand in the Governor’s case. Even if papers
filed in one case could trigger § 1446(b)(3)’s later removal window in another, but see Amgen,
516 F.3d at 533–34 (collecting cases suggesting that § 1446(b)(3)’s reference to “an amended
pleading, motion, order or other paper” refers only to papers in the suit to be removed),
Enbridge’s removal in the Governor’s case shows that it was the Governor’s complaint, not the
district court’s order denying remand, that first gave Enbridge good-faith grounds to remove.
Regardless of whether the Governor’s notice sparked a “foreign-affairs controversy,” Enbridge
plainly had good-faith grounds to remove when it received the Governor’s complaint, and then
promptly removed, in November 2020. Indeed, by December 2020, Enbridge had already
articulated both of its jurisdictional theories in its amended notice of removal in the Governor’s
case. Yet Enbridge did not remove this case until a full year later—far exceeding § 1446(b)(3)’s
window of 30 days. Thus, under either of Enbridge’s jurisdictional theories, its arguments for
timely removal fail under § 1446(b)(3)’s first or third elements.
2.
Enbridge’s arguments to the contrary are not persuasive. Enbridge tries to justify the
delay between its late 2020 removal of the Governor’s case and December 2021 removal of this
case by focusing on the word “ascertain” in § 1446(b)(3) and our interpretation of that statute in
Berera v. Mesa Medical Group, PLLC, 779 F.3d 352, 364 (6th Cir. 2015). There, we stated that
“[t]he 30-day period in § 1446(b)(1) starts to run only if the initial pleading contains solid and
unambiguous information that the case is removable.” Id. (internal quotation marks omitted).
We added that, “[i]f the initial pleading lacks solid and unambiguous information that the case is
removable,” then the defendant must remove “‘within 30 days after receipt of a copy of an
amended pleading, motion, order or other paper’ that contains solid and unambiguous
information that the case is removable.” Id. (ellipses omitted) (quoting § 1446(b)(3)). Applying
this language, Enbridge argues that the question is not just whether the case was “removable”
-- 10 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 11
when the complaint was filed but whether it was “unambiguously removable.” It further
contends that the first time it had “solid and unambiguous information” that this action was
removable—i.e., the first time it “ascertained” removability—was when it received the district
court’s November 2021 order denying remand in the Governor’s case.
But, for two reasons, Berera cannot save Enbridge’s belated removal. First, Berera is
distinguishable on its facts. It was a case of artful pleading, in which the plaintiff tried to
circumvent federal jurisdiction “by artfully casting [her] essentially federal law claims as state-
law claims.” Id. at 358 (citation omitted). There, in response to the plaintiff’s threadbare
complaint, which purported to assert only state-law claims, the defendant had to file a motion for
a more definitive statement to learn about the claims’ true nature. Id. at 355. The plaintiff’s
intention to assert federal claims became clear only after her counsel’s admissions at a hearing
on that motion. Id. at 356. Such obfuscation by the plaintiff deprived the defendant of the
opportunity to learn of grounds for removal.
Here, by contrast, Enbridge does not argue that the Attorney General “carefully crafted
her complaint to circumvent federal jurisdiction.” Id. at 358. Rather, Enbridge argues only that
the Attorney General’s complaint is the rare case in which federal jurisdiction exists but was
uncertain because the complaint alleges only state-law claims, the parties are not diverse, and the
Grable and foreign-affairs doctrines are “anything but clear.” See Grable, 545 U.S. at 321
(Thomas, J., concurring). At bottom, Enbridge contends that its jurisdictional theories were
complex, necessitating additional time to remove. While we appreciate the difficulty of
navigating complicated doctrines and applying them to unique facts under time constraints, that
is what § 1446(b) requires. And Enbridge showed that it could make these arguments under a
tight deadline—it timely filed its notice of removal (and amended notice of removal) articulating
these theories within 30 days of its receipt of the complaint in the Governor’s case.
Second, § 1446(b)(3)’s use of “ascertain[]” and Berera’s reference to “solid and
unambiguous information” does not transform the removability inquiry into whether and when a
case was “unambiguously removable.” Granted, as Enbridge points out, to “ascertain” means “to
learn with certainty.” Ascertain, Random House Webster’s Unabridged Dictionary (2d ed.
2001). But to ascertain that a case is removable does not mean to learn with certainty that there
-- 11 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 12
is federal jurisdiction. Rather, it means to learn with certainty that there are good-faith grounds
on which to argue for federal jurisdiction. In other words, as Berera states: “Section 1446(b)’s
requirement of solid and unambiguous information is akin to actual notice.” 779 F.3d at 364. If
at first a case is not removable, § 1446(b)(3) ensures that the defendant “has an opportunity to
remove upon being given notice” of grounds on which it can exercise that right. Id. (citation and
ellipses omitted). Enbridge had notice of good-faith grounds for removability because it
removed the “same controversy” on the same grounds a full year before it removed this case.
Given this conclusion, Enbridge’s additional argument that Canada’s later invocation of
the 1977 Treaty first made this case removable is without merit. And even if that argument
could somehow show that this case first became removable based on Canada’s declarations, it
too fails under § 1446(b)(3)’s third element. On October 4, 2021, the Canadian government filed
a supplemental amicus letter in the Governor’s case notifying Enbridge and the court that Canada
had formally invoked the treaty’s dispute-resolution provision. Enbridge confirmed its
understanding of that letter’s importance in a filing of its own on October 12, 2021, arguing that
“Michigan’s claims have directly and significantly affected U.S. foreign relations with Canada,
making removal appropriate.” Thus, Canada’s October 4 letter in the Governor’s case was a
paper from which Enbridge could ascertain removability of this case—the “same controversy” as
the Governor’s case. But Enbridge did not remove this case within 30 days of its receipt of that
letter; it instead waited until December 15, 2021—72 days later.
C.
In sum, under either of Enbridge’s jurisdictional theories, Enbridge had good-faith
grounds to argue for federal jurisdiction more than 30 days before it removed this case.
Enbridge missed § 1446(b)(1)’s initial window for removal, and to the extent § 1446(b)(3)’s later
removal window was ever open, Enbridge missed that one too. Enbridge’s removal was
therefore untimely under § 1446(b).
III.
Next, we must decide whether the district court correctly ruled that § 1446(b) permits an
equitable exception to the statutory deadlines. Although Enbridge argues that we should review
-- 12 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 13
the district court’s determination that equity favored Enbridge for abuse of discretion, whether a
statute permits an equitable exception in the first place is a legal question that we review de
novo. Cf. In re Maughan, 340 F.3d 337, 341 (6th Cir. 2003).
Statutory time limits exist on a spectrum of how strictly courts enforce them. They range
from “jurisdictional” conditions on the stricter end to mere “time-related directives” on the laxer.
See Dolan v. United States, 560 U.S. 605, 610–11 (2010). In the middle is the broad category of
“claims-processing rules,” which “do not limit a court’s jurisdiction, but rather regulate the
timing of [requests] brought before the court.” Id.
Federal courts have “no authority to create equitable exceptions to jurisdictional
requirements.” Bowles v. Russell, 551 U.S. 205, 214 (2007). Indeed, immunity from equitable
exceptions is one of several hallmark characteristics of a jurisdictional rule. If a statutory time
limitation “is taken to be jurisdictional, waiver becomes impossible, meritorious excuse
irrelevant (unless the statute so provides), and sua sponte consideration in the courts of appeals
mandatory.” Id. at 216–17 (2007) (Souter, J., dissenting) (citing Arbaugh v. Y&H Corp., 546
U.S. 500, 514 (2006)); see also Day v. McDonough, 547 U.S. 198, 205 (2006).
We know that § 1446(b)’s time limits are not jurisdictional because they do not possess
all these characteristics—specifically, removal-timing issues may be raised only by the plaintiff
and only within a strict window of time. Section 1447(c) provides that a plaintiff’s motion to
remand “on the basis of any defect other than lack of subject matter jurisdiction,” such as
untimely removal, “must be made within 30 days after the filing of the notice of removal.” Thus,
unlike “jurisdictional” statutory deadlines, § 1446(b)’s removal deadlines are not ones that
“authorize sua sponte remands for purely procedural defects,” and they are subject to forfeiture if
not raised in a timely motion to remand. Page v. City of Southfield, 45 F.3d 128, 133 (6th Cir.
1995); cf. Smith v. State of Ohio Dep’t of Rehab. & Corr., 463 F.3d 426, 429 n.2 (6th Cir. 2006).
But simply confirming that § 1446(b)’s deadlines are non-jurisdictional does not resolve
the question before us. After all, “[t]he mere fact that a time limit lacks jurisdictional
force . . . does not render it malleable in every respect.” Nutraceutical Corp. v. Lambert,
586 U.S. 188, 192 (2019). Certain deadlines, though non-jurisdictional, are “not subject to
-- 13 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 14
equitable tolling.” Id. When properly raised by an opposing party, these “mandatory” claims-
processing rules “are ‘unalterable,’” id. (quoting Manrique v. United States, 581 U.S. 116, 121
(2017)), and “assure relief to a party properly raising them,” Eberhart v. United States, 546 U.S.
12, 19 (2005) (per curiam). In other words, “[r]ules in this mandatory camp are not susceptible
of the equitable approach” the district court applied here. Nutraceutical, 586 U.S. at 192; see
also Scott Dodson, Mandatory Rules, 61 Stan. L. Rev. 1, 5–9 (2008). Because the Attorney
General properly invoked § 1446(b)’s removal time limits in a timely motion to remand, see
28 U.S.C. § 1447(c), we must determine whether those non-jurisdictional time limits are
mandatory and thus immune from equitable exceptions.
Although we presume that we can grant equitable exceptions to non-jurisdictional
statutes, Holland v. Florida, 560 U.S. 631, 645–46 (2010), that presumption is rebuttable, see
Harrow v. Dep’t of Def., 144 S. Ct. 1178, 1186 (2024) (remanding for consideration of whether a
non-jurisdictional appeal deadline is subject to equitable tolling). Whether “equitable tolling is
available” under a particular statute “is fundamentally a question of statutory intent.” Lozano v.
Montoya Alvarez, 572 U.S. 1, 10 (2014). Here, applying our usual tools of statutory
construction, we have “good reason to believe that Congress did not want” equitable exceptions
to apply to § 1446(b)’s time limitations. United States v. Brockamp, 519 U.S. 347, 350 (1997).
We begin with the text, focusing on whether the statute as a whole allows flexibility for
extra-textual exceptions. See Nutraceutical, 586 U.S. at 192–93; see also Harrow, 144 S. Ct. at
1183–84. Section 1446(b)(1) sets the default rule: a notice of removal “shall be filed within
30 days” after the defendant’s receipt of the initial pleading or summons. If the defendant
receives those documents at different times, the applicable deadline is “whichever period is
shorter,” suggesting an intent for strict enforcement. Id.
The statute then includes explicit exceptions—and carveouts from those exceptions—to
that default rule. It first includes an exception in cases involving multiple defendants served at
different times (which is not applicable here). Id. § 1446(b)(2)(C). It then provides for
§ 1446(b)(3)’s later 30-day removal window, which, as discussed above, applies only “if the case
stated by the initial pleading is not removable” and a later-received paper gives the defendant
notice that the case has become removable. Id. § 1446(b)(3). But Congress further limited that
-- 14 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 15
exception—it applies “[e]xcept as provided in subsection (c).” Id. Subsection (c), in turn,
provides that “[a] case may not be removed under subsection (b)(3) on the basis of [diversity
jurisdiction] more than 1 year after commencement of the action, unless the district court finds
that the plaintiff has acted in bad faith in order to prevent a defendant from removing the action.”
Id. § 1446(c).4
This statutory text expresses “a clear intent to compel rigorous enforcement” of its
deadlines, limited only by its explicit exceptions. Nutraceutical, 586 U.S. at 193. Applying
equitable tolling to either 30-day window in (b)(1) or (b)(3) would require adding a judicially
made exception to Congress’s detailed, express scheme of exceptions and carveouts, an action
the Supreme Court has cautioned against. See id. at 194; United States v. Beggerly, 524 U.S. 38,
48–49 (1998); Brockamp, 519 U.S. at 352.
Next, we look to context. One relevant consideration for whether a deadline has
“jurisdictional attributes”—like immunity to equitable exceptions—is where Congress placed it
in the overall statutory scheme. See Henderson ex rel. Henderson v. Shinseki, 562 U.S. 428, 439
(2011); see also West Virginia v. Env’t Prot. Agency, 597 U.S. 697, 721 (2022). The removal
statutes, including § 1446, are nested within U.S. Code Title 28, Part IV, titled “Jurisdiction and
Venue.” (Emphasis Added). Indeed, as discussed above, whether a case is removable is
intertwined with questions of whether and when the defendant had grounds to argue for federal
jurisdiction. Although § 1446(b) may not be jurisdictional, its placement near and interrelation
with the jurisdictional statutes suggests stricter enforcement. Cf. Henderson, 562 U.S. at 439;
see also United States v. Wong, 575 U.S. 402, 411–12 (2015).
Finally, we look to precedent. Overwhelming authority provides that removal statutes—
such as § 1446(b)—are to be strictly construed against removal out of respect for state
sovereignty. Syngenta Crop Prot., Inc. v. Henson, 537 U.S. 28, 32 (2002) (“[S]tatutory
procedures for removal are to be strictly construed.”); Shamrock Oil & Gas Corp. v. Sheets,
4Congress added this last exception—the bad-faith exception to the one-year limit on removal of diversity
actions—in 2011 as part of the Federal Courts Jurisdiction and Venue Clarification Act. Pub. L. No. 112-63, 125
Stat. 758 (2011). That amendment was intended “to resolve the conflict” over whether the one-year limit was
subject to equitable tolling. See H.R. Rep. No. 112–10, at 15 (2011), reprinted in 2011 U.S.C.C.A.N. 576, 580. The
language “makes clear that the exception to the bar of removal after one year is limited in scope.” Id.
-- 15 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 16
313 U.S. 100, 108 (1941) (explaining that language and policy of removal statutes “call[] for the
strict construction of such legislation”); Holston v. Carolina Freight Carriers Corp., 936 F.2d
573, 1991 WL 112809, at *3 (6th Cir. 1991) (unpublished table decision) (interpreting § 1446(b)
and stating that “the statutes conferring removal jurisdiction are to be construed strictly”);
Brierly v. Alusuisse Flexible Packaging, Inc., 184 F.3d 527, 534 (6th Cir. 1999) (interpreting
§ 1446(b) and observing that “statutes conferring removal jurisdiction are to be construed strictly
because removal jurisdiction encroaches on a state court’s jurisdiction”); see also 14C Wright
& Miller § 3731 & n.62 (noting that “[t]he two 30-day time limitations in Section 1446 are
mandatory” and collecting cases). “[S]trict construction does not allow a court to disregard the
purpose of Congress.” United States v. Klingler, 61 F.3d 1234, 1237 (6th Cir. 1995). Thus, we
do not “snatch[]” cases from state courts “unless some clear rule demands it.” Nessel ex rel.
Michigan v. AmeriGas Partners, L.P., 954 F.3d 831, 837 (6th Cir. 2020) (citation omitted).
For these reasons, several district courts in this Circuit have rejected equitable exceptions
as incompatible with a strict construction of § 1446(b). See, e.g., Gray v. Martin, 2013 WL
6019335, at *6 (E.D. Ky. Nov. 13, 2013) (Thapar, J.) (noting that courts in this Circuit have
consistently rejected invitations to engraft unwritten equitable exceptions into the removal
statute); Riley v. Ohio Cas. Ins., 855 F. Supp. 2d 662, 671 (W.D. Ky. 2012) (refusing to
recognize a judicially crafted equitable exception to § 1446(b)’s one-year limitation for removal
of actions based on diversity jurisdiction); City of Albion v. Guar. Nat’l Ins., 35 F. Supp. 2d 542,
544 (W.D. Mich. 1998) (“Although not jurisdictional, the thirty-day period for removal is
mandatory and must be strictly applied.”); McCraw v. Lyons, 863 F. Supp. 430, 434 (W.D. Ky.
1994) (“[A] defendant’s failure to comply with the statute’s thirty-day limitation is an absolute
bar to removal regardless of whether the removal would have been proper if timely filed.”). We
agree—there is no equitable exception to § 1446(b)’s timing requirements.
The cases Enbridge cites in support of an equitable exception are not persuasive. For
instance, some are factually distinct, like two multi-defendant cases in which every defendant
except one filed a timely notice of removal but one defendant filed one day late. Hernandez v.
Six Flags Magic Mountain, Inc., 688 F. Supp. 560, 561 (C.D. Cal. 1988); Farm & City Ins. v.
Johnson, 190 F. Supp. 2d 1232, 1237 (D. Kan. 2002). Others disfavor an equitable exception
-- 16 of 17 --
No. 23-1671 Nessel v. Enbridge Energy, LP, et al. Page 17
because they resulted in remand to state court for untimely removal. Brown v. Demco, Inc., 792
F.2d 478, 482 (5th Cir. 1986); Holder v. City of Atlanta, 925 F. Supp. 783, 786 (N.D. Ga. 1996).
Enbridge’s best case is Loftin v. Rush, 767 F.2d 800, 801, 805–06 (11th Cir. 1985), which held
that a state court’s improper entry of default judgment against the United States Navy, in
derogation of federal-government immunity, warranted excusing a late removal. But this single,
39-year-old, distinguishable, and out-of-circuit case hardly constitutes a “clear rule” that
“demands” an equitable exception here, Nessel, 954 F.3d at 837, especially considering the
overwhelming weight of authority against it.
Accordingly, we hold that § 1446(b)’s time limitations are mandatory. When invoked in
a timely motion to remand, these limitations leave no room for equitable exceptions. Enbridge’s
failure to comply with these mandatory rules requires remand.
IV.
For these reasons, we reverse the district court’s denial of the motion to remand. We
remand for the district court to enter an order remanding this case to Michigan’s 30th Circuit
Court for the County of Ingham.
-- 17 of 17 --