Order No. PSC-2023-0122-PCO-EI•Florida Public Service Commission native order document 02603-2023
Florida Public Service Commission native order document 02603-2023
Order No. PSC-2023-0122-PCO-EIFlapubserv
Texto completo
FILED 4/11/2023 DOCUMENT NO. 02603-2023 FPSC - COMMISSION CLERK BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Fuel and purchased power cost recovery clause with generating performance incentive factor. DOCKET NO. 20230001-EI ------------------ ORDER NO. PSC-2023-0122-PCO-EI ISSUED: April 11 , 2023 The following Commissioners participated in the disposition of this matter: ANDREW GILES FAY, Chairman ARTGRAHAM GARY F. CLARK MIKE LAROSA GABRIELLA P ASSIDOMO ORDER APPROVING FLORIDA POWER & LIGHT COMP ANY'S MID-COURSE CORRECTION BY THE COMMISSION: BACKGROUND On March 1, 2023, Florida Power & Light Company (FPL or Company), filed for a mid- course correction of its 2023 fuel cost recovery charges (MCC Petition). 1 The Company last filed for a mid-course correction of its fuel charges in January 2023. The January 2023 mid- course correction was approved by Order No. PSC-2023-0108-PCO-EI. Following the January 2023 mid-course correction, the Company's projected fuel-related revenue requirement continued to shift downward. This projected cost shift prompted the Company to file for a subsequent mid-course correction (instant petition) to incorporate the reduction into customer rates. Mid-Course Corrections We use mid-course corrections between annual clause hearings whenever costs deviate from revenue by a significant margin. Under Rule 25-6.0424, Florida Administrative Code (F.A.C.), which is commonly referred to as the "mid-course correction rule ," a utility must notify us whenever it expects to experience an under- or over-recovery of certain service costs greater than 10 percent. The notification of a 10 percent cost-to-revenue variance shall include a petition for mid-course correction to the fuel cost recovery or capacity cost recovery factors, or shall include an explanation of why a mid-course correction is not practical. FPL' s Petition In its MCC Petition, the Company estimates an approximate $494 million reduction of fuel-related costs for the 2023 period relative to its previous estimate. FPL is proposing to apply approximately $379 million of this amount to the period May 2023 through December 2023, and 'Do cument No. 01638-2023.
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 2 the remaining approximate $115 million to be included in its 2024 fuel cost recovery factors. FPL states the purpose of implementing the cost reduction over this period is to partially offset the bill impact associated with the storm restoration costs approved for collection from April 2023 through March 2024 in Docket No. 20230017-EI.2 The Company is requesting that its revised fuel cost recovery factors and associated tariff become effective beginning with the May 2023 billing cycle. We are vested with jurisdiction over the subject matter of this proceeding by the provisions of Chapter 366, Florida Statutes (F.S.), including Sections 366.04, 366.05, and 366.06, F.S. DECISION FPL submitted its prior 2023 mid-course correction petition on January 23, 2023, for the purposes of addressing its under-recovery of 2022 fuel costs. The Company’s 2022 net under- recovery of fuel costs was approximately $2.1 billion. Through the January mid-course correction, FPL proposed to account for approximately $937 million of its 2022 under-recovery in the current, or 2023 period, and defer approximately $1.2 billion for collection in 2024. The request also included incorporating a reduction to FPL’s then-estimated 2023 fuel-related costs in the amount of approximately $1.0 billion. The January mid-course correction request was approved by Order No. PSC-2023-0108-PCO-EI. The Company subsequently updated its 2023 fuel cost projection. The results of this update indicate FPL’s projected 2023 fuel-related costs are approximately $494 million lower than estimated in January 2023. This reduction is primarily due to lower assumed prices for natural gas. The main factor influencing the decline in natural gas prices in 2023 is mild winter weather across large parts of the country resulting in lower natural gas consumption.3 The Company developed its proposed mid-course correction amount using 11 months of forecasted sales data (May 2023 through March 2024). The factors proposed in this proceeding are currently contemplated to be charged for eight months in 2023. As is typical procedure, later this year newly developed 12-month-applicable factors will be proposed for authorization to begin with the first billing cycle of January 2024. Projected 2023 Fuel Cost Recovery Position FPL’s estimated 2023 fuel-related costs have decreased substantially since the filing of its previous mid-course correction in January 2023.4 More specifically, the Company now estimates a reduction to its 2023 fuel-related costs in the amount of $493,878,360. The Company proposes to apply $378,598,949 of this amount to rates in 2023, and $115,279,411 to rates in 2024.5 2Order No. PSC-2023-0108-PCO-EI, issued March 23, 2023, in Docket No. 20230001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor.. 3March 2023 EIA Short-Term Energy Outlook, https://www.eia.gov/outlooks/steo/pdf/steo_full.pdf 4Document No. 00354-2023. 5Document No. 01638-2023.
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 3 The primary factor driving the change in projected 2023 fuel costs is lower assumed pricing for natural gas. More specifically, the underlying market-based natural gas price data used for the previous or January mid-course correction was sourced on January 3, 2023. 6 This underlying data was used to produce an estimated average 2023 delivered natural gas cost of $5.70 per million British thermal unit (MMBtu).7 However, as indicated in its MCC Petition, FPL now estimates its average cost of delivered natural gas in 2023 will be $4.95 per MMBtu, representing a decrease of (13.2) percent.8 The updated cost estimate was based on natural gas futures/prices sourced on February 1, 2023, or roughly one month later than the previous estimate used to set current rates.9 Mid-Course Percentage Using the values shown on Schedule E1-B of the MCC Petition and following the methodology prescribed in Rule 25-6.0424(1)(a), F.A.C., the mid-course percentage is equal to the estimated end-of-period total net true-up, including interest, divided by the current period’s total actual and estimated jurisdictional fuel revenue applicable to period, or ($707,462,276) / $3,829,271,573.10 This calculation results in a mid-course correction level of (18.5) percent at December 31, 2023.11 Fuel Factor FPL’s currently-approved annual levelized fuel factor beginning with the first April 2023 billing cycle is 3.957 cents per kilowatt-hour (kWh).12 The Company is requesting to decrease its currently-approved 2023 annual levelized fuel factor beginning May 2023 to 3.526 cents per kWh, or by (10.9) percent. Bill Impacts In Tables 1 and 2 below, the bill impacts of the mid-course correction proposal to typical residential customers using 1,000 kWh of electricity a month in FPL’s Peninsular and Northwest (former Gulf Power Company) service territories are stated. Following Tables 1 and 2, the impact of the proposed MCC on non-residential customers is addressed: 6Document No. 00354-2023. 7Id. 8Document No. 01638-2023. 9Id. 10 Document No. 01638-2023, Schedule E1-B. 11 Through its prior mid-course correction, FPL received authorization by Order No. PSC-2023-0108-PCO-EI to defer ($1,201,340,636) of its 2022 fuel cost under-recovery to 2024. Accounting for this deferral, the mid-course percentage is equal to $493,878,360 / $3,829,271,573, or 12.9 percent. 12 Approved by Order No. PSC-2023-0108-PCO-EI.
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 4 Table 1 FPL Peninsular Service Territory Monthly Residential Billing Detail for the First 1,000 kWh Invoice Component Currently- Approved Charges April 2023 ($) Proposed Charges Beginning May 2023 ($) Difference ($) Difference (%) Base Charge $80.11 $80.11 $0.00 0.0% Fuel Charge 36.56 32.24 (4.32) (11.8%) Conservation Charge 1.22 1.22 0.00 0.0% Capacity Charge 2.12 2.12 0.00 0.0% Environmental Charge 3.12 3.12 0.00 0.0% Storm Protection Plan Charge 3.82 3.82 0.00 0.0% Storm Restoration Surcharge 15.30 15.30 0.00 0.0% Transition Rider (1.58) (1.58) 0.00 0.0% Gross Receipts Tax and Regulatory Assessment Fee 3.71 3.60 (0.11) (3.0%) Total $144.38 $139.95 ($4.43) (3.1%) Source: Document No. 01638-2023. FPL’s currently-approved total residential charge for the first 1,000 kWh of usage for April 2023 is $144.38.13 If the Company’s mid-course correction proposal is approved, then the current total residential charge for the first 1,000 kWh of usage beginning in May will be $139.95, a decrease of approximately (3.1) percent. Concerning non-residential customers, FPL reported that bill decreases based on average levels of usage for small-sized commercial customers would range from approximately (3.0) to (3.9) percent, (3.9) percent for medium-sized commercial customers, (4.2) percent for large-sized commercial customers, and (6.8) percent for industrial customers.14 13 Document No. 01638-2023. 14 Document No. 02167-2023.
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 5 Table 2 FPL Northwest Service Territory Monthly Residential Billing Detail for the First 1,000 kWh Invoice Component Currently- Approved Charges April 2023 ($) Proposed Charges Beginning May 2023 ($) Difference ($) Difference (%) Base Charge $80.11 $80.11 $0.00 0.0% Fuel Charge 36.56 32.24 (4.32) (11.8%) Conservation Charge 1.22 1.22 0.00 0.0% Capacity Charge 2.12 2.12 0.00 0.0% Environmental Charge 3.12 3.12 0.00 0.0% Storm Protection Plan Charge 3.82 3.82 0.00 0.0% Storm Restoration Surcharge 15.30 15.30 0.00 0.0% Transition Rider 16.85 16.85 0.00 0.0% Gross Receipts Tax and Regulatory Assessment Fee 4.20 4.08 (0.12) (2.9%) Total $163.30 $158.86 ($4.44) (2.7%) Source: Document No. 01638-2023. FPL’s currently-approved Northwest total residential charge for the first 1,000 kWh of usage for April 2023 is $163.30.15 If the Company’s mid-course correction proposal is approved, the current total Northwest residential charge for the first 1,000 kWh of usage beginning in May will be $158.86, a decrease of approximately (2.7) percent. Concerning non- residential customers, FPL reported that bill decreases based on average levels of usage for small-sized commercial customers would range from approximately (2.6) to (3.4) percent, (3.5) percent for medium-size commercial customers, and (3.7) percent for large-size commercial customers. A figure associated with an industrial class for the Northwest service territory was not identified.16 Based on the information stated above, we find that FPL’s projected 2023 fuel-related costs have been reduced by $493,878,360 and that $378,598,949 of this fuel cost reduction shall be accounted for in the current period and $115,279,411 shall be deferred to 2024. The revised fuel cost recovery factors associated with our decision are shown on Appendix A. 15 Document No. 01638-2023. 16 Document No. 02167-2023.
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 6 Effective date Over the last 20 years in the Fuel Clause docket, we have considered the effective date of rates and charges of revised fuel cost recovery factors on a case-by-case basis. We have approved fuel cost recovery factor rate decreases effective sooner than the next full billing cycle after the date of the our vote with the range between the vote and the effective date being from 25 to 2 days. The rationale for that action was that it was in the customers’ best interests to implement the lower rate as soon as possible.17 In its MCC Petition, FPL proposes to lower its 2023 fuel factors beginning with the first billing cycle of May 2023. In the instant case, there are 27 days between our vote on April 4th and the beginning of FPL’s May 2023 billing cycle (May 1st ).18 Concerning advisement of the instant request, the Company has engaged in numerous outreach efforts regarding the potential bill impacts of its proposal. Specifically, FPL issued a press release on March 1, 2023, informing its customers of the mid-course correction proposal. Further, on March 1, 2023, and subsequently on March 7, 2023, the Company informed its customers of the future potential adjustments related to the mid-course correction through a web- based billing information portal titled “2023 Bills”. The Company also sent emails to residential and small business customers on March 9, 2023, that included a description of the mid-course correction proposal. FPL also plans to separately contact numerous commercial, industrial, and governmental customers to inform them of its proposal and the potential impact on their bills.19 For these reasons, we find that the fuel cost recovery factors, as shown on Appendix A, shall become effective with the first billing cycle of May 2023. Therefore, it is ORDERED by the Florida Public Service Commission that adjustments to Florida Power & Light Company’s fuel cost recovery factors shall be made to reduce its currently-approved 2023 fuel cost recovery factors by $378,598,949. It is further 17 Order No. PSC-08-0825-PCO-EI, issued December 22, 2008, in Docket No. 080001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-09-0254-PCO-EI, issued April 27, 2009, in Docket No. 090001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-11-0581-PCO-EI, issued on December 19, 2011, in Docket No. 110001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-12-0342-PCO-EI, issued July 2, 2012, in Docket No. 120001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-2012-0082-PCO-EI, issued February 24, 2012, in Docket No. 120001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-15-0161-PCO-EI, issued April 30, 2015, in Docket No. 150001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC- 2018-0313-PCO-EI, issued June 18, 2018, in Docket No. 20180001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order PSC-2020-0154-PCO-EI, issued May 14, 2020, in Docket No. 20200001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor. 18 Document No. 02167-2023. 19Id.
ORDER N O. PS C-2023-0 122-PCO-EI DO CKET N O. 2023000 I -E l PAGE 7 ORDERED that the fue l cost recovery factors, as shown on Appendix A to this order, s ha ll become effective with t he first billi ng cycle of May 2023. It is furt he r ORDERED that the fu el and pu rchased power cost recove ry clause docket is an on-go in g proceed ing and s ha ll rema in ope n. SB r By ORDER of th e Florida Pub lic Service Co mmi ssion this .lJJb. day of A pri l, 2023. )J , Florida Publ ic Service Commiss ion 2540 Shumard Oak Boulevard Ta ll ahassee, Florida 32399 (85 0) 4 13-6770 'vVWW. noridapsc.com Cop ies furnished: A copy of t hi s doc um ent is provided to the pa11 ies of record at th e time of is suance and, if applicable, inte re sted perso ns. NOTICE OF FURTHER PROCEE DI NGS OR JUDI C IA L REV IEW The Florida Public Se rvice Commission is required by Section 12 0.569( 1), Florida Statutes, to notify parties of any administrative hearing or judicial rev ie w of Comm iss ion orders th at is availab le under Sections 120.57 or 120.68, Florida Statutes, as wel l as th e procedures a nd time limits that app ly. This notice shou ld not be construed to mean all requests for an adm ini strative hearing or j udicial review will be granted or re sult in the re li ef soug ht. Mediation may be ava il able on a case- by -ca se ba sis. If mediation is conducted, it does not affect a substantia l ly interes ted person's rig ht to a hea ring. Any party ad ver se ly affected by thi s order, which is preliminary, procedura l or intermediate in nature, ma y req ues t: ( I ) reconsideration within IO days pursuant to Rule 25 - 22.0376, Florida Administrative Code; or (2) judicial rev iew by the Florida Supreme Cou11, in th e case of an electric, gas or tele ph one util ity, or the First District Court of A pp ea l, in the case of a wa ter or waste wa ter uti l it y. A motion for recons id eration shal l be filed with the Office of Comm iss ion Cle rk , in th e fo rm pre sc ribed by Ru le 25-22.0376, Fl orida Administrative Code. Judicial review of a preliminary, procedural or intermediate ru lin g or order is ava il ab le if review of the fina l action wi ll not provide an adequate remedy. Such review ma y be req uested from the
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 8 appropriate court, as described above, pursuant to Rule 9.100, Florida Rules of Appellate Procedure.
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 9 APPENDIX A
ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 10
OCR transcription for search; preserved printed pages are authoritative
FILED 4/11/2023 DOCUMENT NO. 02603-2023 FPSC - COMMISSION CLERK BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Fuel and purchased power cost recovery || DOCKET NO. 20230001-EI clause with generating performance incentive || ORDER NO. PSC-2023-0122-PCO-EI factor. ISSUED: April 11, 2023 The following Commissioners participated in the disposition of this matter: ANDREW GILES FAY, Chairman ART GRAHAM GARY F. CLARK MIKE LA ROSA GABRIELLA PASSIDOMO ORDER APPROVING FLORIDA POWER & LIGHT COMPANY’S MID-COURSE CORRECTION BY THE COMMISSION: BACKGROUND On March 1, 2023, Florida Power & Light Company (FPL or Company), filed for a mid- course correction of its 2023 fuel cost recovery charges (MCC Petition).! The Company last filed for a mid-course correction of its fuel charges in January 2023. The January 2023 mid- course correction was approved by Order No. PSC-2023-0108-PCO-EI. Following the January 2023 mid-course correction, the Company’s projected fuel-related revenue requirement continued to shift downward. This projected cost shift prompted the Company to file for a subsequent mid-course correction (instant petition) to incorporate the reduction into customer rates. Mid-Course Corrections We use mid-course corrections between annual clause hearings whenever costs deviate from revenue by a significant margin. Under Rule 25-6.0424, Florida Administrative Code (F.A.C.), which is commonly referred to as the “mid-course correction rule,” a utility must notify us whenever it expects to experience an under- or over-recovery of certain service costs greater than 10 percent. The notification of a 10 percent cost-to-revenue variance shall include a petition for mid-course correction to the fuel cost recovery or capacity cost recovery factors, or shall include an explanation of why a mid-course correction is not practical. FPL’s Petition In its MCC Petition, the Company estimates an approximate $494 million reduction of fuel-related costs for the 2023 period relative to its previous estimate. FPL is proposing to apply approximately $379 million of this amount to the period May 2023 through December 2023, and ‘Document No. 01638-2023. ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 2 the remaining approximate $115 million to be included in its 2024 fuel cost recovery factors. FPL states the purpose of implementing the cost reduction over this period is to partially offset the bill impact associated with the storm restoration costs approved for collection from April 2023 through March 2024 in Docket No. 20230017-EI.2 The Company is requesting that its revised fuel cost recovery factors and associated tariff become effective beginning with the May 2023 billing cycle. We are vested with jurisdiction over the subject matter of this proceeding by the provisions of Chapter 366, Florida Statutes (F.S.), including Sections 366.04, 366.05, and 366.06, F.S. DECISION FPL submitted its prior 2023 mid-course correction petition on January 23, 2023, for the purposes of addressing its under-recovery of 2022 fuel costs. The Company’s 2022 net under- recovery of fuel costs was approximately $2.1 billion. Through the January mid-course correction, FPL proposed to account for approximately $937 million of its 2022 under-recovery in the current, or 2023 period, and defer approximately $1.2 billion for collection in 2024. The request also included incorporating a reduction to FPL’s then-estimated 2023 fuel-related costs in the amount of approximately $1.0 billion. The January mid-course correction request was approved by Order No. PSC-2023-0108-PCO-EI. The Company subsequently updated its 2023 fuel cost projection. The results of this update indicate FPL’s projected 2023 fuel-related costs are approximately $494 million lower than estimated in January 2023. This reduction is primarily due to lower assumed prices for natural gas. The main factor influencing the decline in natural gas prices in 2023 is mild winter weather across large parts of the country resulting in lower natural gas consumption.3 The Company developed its proposed mid-course correction amount using 11 months of forecasted sales data (May 2023 through March 2024). The factors proposed in this proceeding are currently contemplated to be charged for eight months in 2023. As is typical procedure, later this year newly developed 12-month-applicable factors will be proposed for authorization to begin with the first billing cycle of January 2024. Projected 2023 Fuel Cost Recovery Position FPL’s estimated 2023 fuel-related costs have decreased substantially since the filing of its previous mid-course correction in January 2023.4 More specifically, the Company now estimates a reduction to its 2023 fuel-related costs in the amount of $493,878,360. The Company proposes to apply $378,598,949 of this amount to rates in 2023, and $115,279,411 to rates in 2024.5 2Order No. PSC-2023-0108-PCO-EI, issued March 23, 2023, in Docket No. 20230001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor.. 3March 2023 EIA Short-Term Energy Outlook, https://www.eia.gov/outlooks/steo/pdf/steo_full.pdf 4Document No. 00354-2023. 5Document No. 01638-2023. ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 3 The primary factor driving the change in projected 2023 fuel costs is lower assumed pricing for natural gas. More specifically, the underlying market-based natural gas price data used for the previous or January mid-course correction was sourced on January 3, 2023. 6 This underlying data was used to produce an estimated average 2023 delivered natural gas cost of $5.70 per million British thermal unit (MMBtu).7 However, as indicated in its MCC Petition, FPL now estimates its average cost of delivered natural gas in 2023 will be $4.95 per MMBtu, representing a decrease of (13.2) percent.8 The updated cost estimate was based on natural gas futures/prices sourced on February 1, 2023, or roughly one month later than the previous estimate used to set current rates.9 Mid-Course Percentage Using the values shown on Schedule E1-B of the MCC Petition and following the methodology prescribed in Rule 25-6.0424(1)(a), F.A.C., the mid-course percentage is equal to the estimated end-of-period total net true-up, including interest, divided by the current period’s total actual and estimated jurisdictional fuel revenue applicable to period, or ($707,462,276) / $3,829,271,573.10 This calculation results in a mid-course correction level of (18.5) percent at December 31, 2023.11 Fuel Factor FPL’s currently-approved annual levelized fuel factor beginning with the first April 2023 billing cycle is 3.957 cents per kilowatt-hour (kWh).12 The Company is requesting to decrease its currently-approved 2023 annual levelized fuel factor beginning May 2023 to 3.526 cents per kWh, or by (10.9) percent. Bill Impacts In Tables 1 and 2 below, the bill impacts of the mid-course correction proposal to typical residential customers using 1,000 kWh of electricity a month in FPL’s Peninsular and Northwest (former Gulf Power Company) service territories are stated. Following Tables 1 and 2, the impact of the proposed MCC on non-residential customers is addressed: 6Document No. 00354-2023. 7Id. 8Document No. 01638-2023. 9Id. 10 Document No. 01638-2023, Schedule E1-B. 11 Through its prior mid-course correction, FPL received authorization by Order No. PSC-2023-0108-PCO-EI to defer ($1,201,340,636) of its 2022 fuel cost under-recovery to 2024. Accounting for this deferral, the mid-course percentage is equal to $493,878,360 / $3,829,271,573, or 12.9 percent. 12 Approved by Order No. PSC-2023-0108-PCO-EI. ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 4 Table 1 FPL Peninsular Service Territory Monthly Residential Billing Detail for the First 1,000 kWh Invoice Component Currently- Approved Charges April 2023 ($) Proposed Charges Beginning May 2023 ($) Difference ($) Difference (%) Base Charge $80.11 $80.11 $0.00 0.0% Fuel Charge 36.56 32.24 (4.32) (11.8%) Conservation Charge 1.22 1.22 0.00 0.0% Capacity Charge 2.12 2.12 0.00 0.0% Environmental Charge 3.12 3.12 0.00 0.0% Storm Protection Plan Charge 3.82 3.82 0.00 0.0% Storm Restoration Surcharge 15.30 15.30 0.00 0.0% Transition Rider (1.58) (1.58) 0.00 0.0% Gross Receipts Tax and Regulatory Assessment Fee 3.71 3.60 (0.11) (3.0%) Total $144.38 $139.95 ($4.43) (3.1%) Source: Document No. 01638-2023. FPL’s currently-approved total residential charge for the first 1,000 kWh of usage for April 2023 is $144.38.13 If the Company’s mid-course correction proposal is approved, then the current total residential charge for the first 1,000 kWh of usage beginning in May will be $139.95, a decrease of approximately (3.1) percent. Concerning non-residential customers, FPL reported that bill decreases based on average levels of usage for small-sized commercial customers would range from approximately (3.0) to (3.9) percent, (3.9) percent for medium-sized commercial customers, (4.2) percent for large-sized commercial customers, and (6.8) percent for industrial customers.14 13 Document No. 01638-2023. 14 Document No. 02167-2023. ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 5 Table 2 FPL Northwest Service Territory Monthly Residential Billing Detail for the First 1,000 kWh Invoice Component Currently- Approved Charges April 2023 ($) Proposed Charges Beginning May 2023 ($) Difference ($) Difference (%) Base Charge $80.11 $80.11 $0.00 0.0% Fuel Charge 36.56 32.24 (4.32) (11.8%) Conservation Charge 1.22 1.22 0.00 0.0% Capacity Charge 2.12 2.12 0.00 0.0% Environmental Charge 3.12 3.12 0.00 0.0% Storm Protection Plan Charge 3.82 3.82 0.00 0.0% Storm Restoration Surcharge 15.30 15.30 0.00 0.0% Transition Rider 16.85 16.85 0.00 0.0% Gross Receipts Tax and Regulatory Assessment Fee 4.20 4.08 (0.12) (2.9%) Total $163.30 $158.86 ($4.44) (2.7%) Source: Document No. 01638-2023. FPL’s currently-approved Northwest total residential charge for the first 1,000 kWh of usage for April 2023 is $163.30.15 If the Company’s mid-course correction proposal is approved, the current total Northwest residential charge for the first 1,000 kWh of usage beginning in May will be $158.86, a decrease of approximately (2.7) percent. Concerning non- residential customers, FPL reported that bill decreases based on average levels of usage for small-sized commercial customers would range from approximately (2.6) to (3.4) percent, (3.5) percent for medium-size commercial customers, and (3.7) percent for large-size commercial customers. A figure associated with an industrial class for the Northwest service territory was not identified.16 Based on the information stated above, we find that FPL’s projected 2023 fuel-related costs have been reduced by $493,878,360 and that $378,598,949 of this fuel cost reduction shall be accounted for in the current period and $115,279,411 shall be deferred to 2024. The revised fuel cost recovery factors associated with our decision are shown on Appendix A. 15 Document No. 01638-2023. 16 Document No. 02167-2023. ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 6 Effective date Over the last 20 years in the Fuel Clause docket, we have considered the effective date of rates and charges of revised fuel cost recovery factors on a case-by-case basis. We have approved fuel cost recovery factor rate decreases effective sooner than the next full billing cycle after the date of the our vote with the range between the vote and the effective date being from 25 to 2 days. The rationale for that action was that it was in the customers’ best interests to implement the lower rate as soon as possible.17 In its MCC Petition, FPL proposes to lower its 2023 fuel factors beginning with the first billing cycle of May 2023. In the instant case, there are 27 days between our vote on April 4th and the beginning of FPL’s May 2023 billing cycle (May 1st ).18 Concerning advisement of the instant request, the Company has engaged in numerous outreach efforts regarding the potential bill impacts of its proposal. Specifically, FPL issued a press release on March 1, 2023, informing its customers of the mid-course correction proposal. Further, on March 1, 2023, and subsequently on March 7, 2023, the Company informed its customers of the future potential adjustments related to the mid-course correction through a web- based billing information portal titled “2023 Bills”. The Company also sent emails to residential and small business customers on March 9, 2023, that included a description of the mid-course correction proposal. FPL also plans to separately contact numerous commercial, industrial, and governmental customers to inform them of its proposal and the potential impact on their bills.19 For these reasons, we find that the fuel cost recovery factors, as shown on Appendix A, shall become effective with the first billing cycle of May 2023. Therefore, it is ORDERED by the Florida Public Service Commission that adjustments to Florida Power & Light Company’s fuel cost recovery factors shall be made to reduce its currently-approved 2023 fuel cost recovery factors by $378,598,949. It is further 17 Order No. PSC-08-0825-PCO-EI, issued December 22, 2008, in Docket No. 080001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-09-0254-PCO-EI, issued April 27, 2009, in Docket No. 090001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-11-0581-PCO-EI, issued on December 19, 2011, in Docket No. 110001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-12-0342-PCO-EI, issued July 2, 2012, in Docket No. 120001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-2012-0082-PCO-EI, issued February 24, 2012, in Docket No. 120001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC-15-0161-PCO-EI, issued April 30, 2015, in Docket No. 150001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order No. PSC- 2018-0313-PCO-EI, issued June 18, 2018, in Docket No. 20180001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor; Order PSC-2020-0154-PCO-EI, issued May 14, 2020, in Docket No. 20200001-EI, In re: Fuel and purchased power cost recovery clause with generating performance incentive factor. 18 Document No. 02167-2023. 19Id. ORDER N O. PS C-2023-0 122-PCO-EI DO CKET N O. 2023000 I -E l PAGE 7 ORDERED that the fue l cost recovery factors, as shown on Appendix A to this order, s ha ll become effective with t he first billi ng cycle of May 2023. It is furt he r ORDERED that the fu el and pu rchased power cost recove ry clause docket is an on-go in g proceed ing and s ha ll rema in ope n. SB r By ORDER of th e Florida Pub lic Service Co mmi ssion this .lJJb. day of A pri l, 2023. )J , Florida Publ ic Service Commiss ion 2540 Shumard Oak Boulevard Ta ll ahassee, Florida 32399 (85 0) 4 13-6770 'vVWW. noridapsc.com Cop ies furnished: A copy of t hi s doc um ent is provided to the pa11 ies of record at th e time of is suance and, if applicable, inte re sted perso ns. NOTICE OF FURTHER PROCEE DI NGS OR JUDI C IA L REV IEW The Florida Public Se rvice Commission is required by Section 12 0.569( 1), Florida Statutes, to notify parties of any administrative hearing or judicial rev ie w of Comm iss ion orders th at is availab le under Sections 120.57 or 120.68, Florida Statutes, as wel l as th e procedures a nd time limits that app ly. This notice shou ld not be construed to mean all requests for an adm ini strative hearing or j udicial review will be granted or re sult in the re li ef soug ht. Mediation may be ava il able on a case- by -ca se ba sis. If mediation is conducted, it does not affect a substantia l ly interes ted person's rig ht to a hea ring. Any party ad ver se ly affected by thi s order, which is preliminary, procedura l or intermediate in nature, ma y req ues t: ( I ) reconsideration within IO days pursuant to Rule 25 - 22.0376, Florida Administrative Code; or (2) judicial rev iew by the Florida Supreme Cou11, in th e case of an electric, gas or tele ph one util ity, or the First District Court of A pp ea l, in the case of a wa ter or waste wa ter uti l it y. A motion for recons id eration shal l be filed with the Office of Comm iss ion Cle rk , in th e fo rm pre sc ribed by Ru le 25-22.0376, Fl orida Administrative Code. Judicial review of a preliminary, procedural or intermediate ru lin g or order is ava il ab le if review of the fina l action wi ll not provide an adequate remedy. Such review ma y be req uested from the ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 8 appropriate court, as described above, pursuant to Rule 9.100, Florida Rules of Appellate Procedure. ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 9 FLORIDA POWER APPENDIX A SixtySecondSixty-Third Revised Sheet No.3.030 & LIGHT COMPANY Cancels Sixty-Second Six-Fiest Revised Sheet No. 8.030 BILLING ADJUSTMENTS The following charges are applied to the Monthly Rate of each rate schedule as indicated and are calculated im accordance with the formula 5 RATE the Flonda Public Service Commission. CONSERVATION STORM PROTECTION SCHEDULE ckWa $kWw ekWh SEW RS-1, R5-l w/RIR-1 1° 1,000 kWh RS-1, RS-1 w/ RTR-1 all addon kWh RS-1 w/RIR-1 AlkWh GS-1 GST-1 GSD-1, GSD1-EV, GSD-1 w/SDTR (an — May)(Oct —Dec) GSD-1 w/SDTR (Jun-Sept) GSDT-1, HLFT-1 GSDT-lw/SDTR (an — May)(Oct —Dec) GSDT-1 w/SDTR (un-Sept) GSLD-1, CS-1, GSLD1-EV GSLD-lw/SDTR (Jan - May)(Oct -Dec) GSLD-1 w/SDTR Gun-Sept) GSLDT-1, CST-1, HLFT-2, GSLDT-1 w/SDTR (Jan-May & Oct-Dec) GSLDT-1 w/SDTR (un-Sept) GSLD-2, CS-2, GSLD-2 w/SDTR (Jan - May)(Oct —Dec) GSLD-2 w/SDTR (@un-Sept) GSLDT-2, CST-2, HLFT-3, GSLDT-2 w/SDTR (Jan - May)(Oct -Dec) 0.49 GSLDT-2 w/SDTR (Qun-Sept) 0.49 GSLD-3, CS-3 0.45 GSLDT-3, CST-3 0.45 (Continued on Sheet No. 8.030.1) Issued by: Tiffamy Cohen, Executive Director, Rate Development & Strategy | Effective: -*Aprt-hoti ORDER NO. PSC-2023-0122-PCO-EI DOCKET NO. 20230001-EI PAGE 10 FLORIDA POWER & LIGHT COMPANY Thirty-Ninth Thirty Eighth Revised Sheet No.8.030.1 Cancels Thirty-Eighth Thisty Seventh-Revised Sheet No. 8.030.1 (Continued from Sheet No. 8.030) BILLING ADJUSTMENTS (Continued) RATE FUEL CONSERVATION CAPACITY ENVIRON- MENTAL STORM PROTECTION SCHEDULE e/kWh c/kWh c/kWh ckWh S/KW S/KW c/kWh S/KW $/KW c/kWh ekW S/KW $/KW Levelized On-Peak Off-Peak OS-2 3-0333.505 0.085 0.127 0.211 0.815 MET 3.0323.505 0.42 0.69 0.258 0.74 CILC-1(G) 4-2543.915 3.8453. 375 0.51 0.81 0.234 0.68 CILC-1(D) 4-2193.882 3.8133.347 0.51 0.81 0.234 0.68 CILC-1(T) 4.1353.796 3.3383 273 0.51 0.79 0.208 0.11 SL-1,OL-1, RL-1. PL- 1/SL-1M, LT-1,OS I/II 3.0113.462 0.038 0.016 0.044 0.288 SL-2, GSCU- 1/SL-2M 2.9683.536 0.090 0.137 0.207 0.316 RDC DDC RDC DDC RDC DDC SST-1(T) 4.1353.796 3.7383 273 0.05 0.03 0.09 0.04 0.292 0.01 0.01 SST-1(D1) 4.3543.915 3.8453 375 0.05 0.03 0.09 0.04 0.565 0.12 0.05 SST-1(D2) 4-2493.910 3.8403 371 0.05 0.03 0.09 0.04 0.565 0.12 0.05 SST-1(D3) 4-5173.881 3.0123 346 0.05 0.03 0.09 0.04 0.565 0.12 0.05 ISST-1(D) 4-3193.882 3-0133 347 0.05 0.03 0.09 0.04 0.565 0.12 0.05 ISST-1(T) 4.1253.796 3.7283 273 0.05 0.03 0.09 0.04 0.292 0.01 0.01 (Continued on Sheet No. 8.030.2) Issued by: Tiffany Cohen, Executive Director, Rate Development & Strategy Effective: April 1, 2012