ENGlobal U.S., Inc. v. AIC Energy Corp.

1:23-cv-00114Ndd9 de abr. de 2024

Abrir fonte

Texto completo

IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF NORTH DAKOTA
ENGlobal U.S., Inc.,, )
) ORDER DENYING PLAINTIFF’S
Plaintiff, ) MOTION TO DISMISS
)
vs. )
)
AIC Energy Corp. d/b/a SA Fuels X ) Case No. 1:23-cv-114
)
Defendants. )
______________________________________________________________________________
Before the Court is the Plaintiff’s Rule 12(b)(6) motion to dismiss the Defendant’s
counterclaim and motion to strike filed on August 8, 2023. See Doc. No. 9. The Defendant filed
a response in opposition to the motion on August 29, 2023. See Doc. No. 15. The Plaintiff filed
a reply brief on September 12, 2023. See Doc. No. 16. For the reasons set forth below, the motion
to dismiss is denied and the motion to strike is granted.
I. BACKGROUND
This is an action for breach of contract for failure to pay for engineering services provided
by the Plaintiff to the Defendant. On December 21, 2021, Defendant AIC Energy Corp. d/b/a SA
Fuels X (“AIC”) and Plaintiff ENGlobal U.S., Inc., (“ENGlobal”) entered into an agreement for
providing services. A project proposal was signed on March 22, 2022. Together the two contracts
called for ENGlobal to provide engineering services and associated deliverables for a sustainable
fuels refinery to be constructed in or near Trenton, North Dakota. The contract price to be paid by
AIC to ENGlobal was $5,180,000.00. The contract provides that it is governed by Texas law.
ENGlobal provided engineering services to AICfrom February 16, 2022 to October 20, 2022. AIC
1
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 1 of 9
paid ENGlobal $500,000. for services rendered. ENGlobal contends it is owed $3,712,000.00 plus
interest.
On March 14, 2023, ENGlobal recorded a construction lien on the property with the
Williams County Recorder’s Office. On June 14, 2023, ENGlobal filed this action in federal court.
The complaint contains four claims; (1) breach of contract; (2) quantum meruit; (3) account
stated/sworn account; and (4) foreclosure of construction lien.
AIC filed an answer and counterclaim on July 18, 2023. In its counterclaim, AIC alleges
ENGlobal breached the contract by failing to perform the agreed upon work and failing to complete
the work in a timely and satisfactory manner.
II. STANDARD OF REVIEW
Rule 8(a)(2) of the Federal Rules of Civil Procedure requires a pleading to contain a “short
and plain statement of the claim showing that the pleader is entitled to relief.” Fed. R. Civ. P.
8(a)(2). Rule 12(b)(6) of the Federal Rules of Civil Procedure mandates the dismissal of a claim
if there has been a failure to state a claim upon which relief can be granted. In order to survive a
motion to dismiss under Rule 12(b)(6), a complaint must contain “sufficient factual matter, accepted
as true, to state a claim to relief that is plausible on its face.” Ashcroft v. Iqbal, 556 U.S. 662, 678
(2009) (quotes omitted). A plaintiff must show that success on the merits is more than a “sheer
possibility.” Id. A complaint does not need to contain detailed factual allegations, but it must
contain more than labels and conclusions. Bell Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007).
The court must accept all factual allegations of the complaint as true, except for legal
conclusions or “formulaic recitation of the elements of a cause of action.” Iqbal, 556 U.S. at 678.
A complaint does not “suffice if it tenders ‘naked assertion[s]’ devoid of ‘further factual
2
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 2 of 9
enhancement.’” Id. The determination of whether a complaint states a claim upon which relief can
be granted is a “context-specific task that requires the reviewing court to draw on its judicial
experience and common sense.” Id. at 679. Dismissal will not be granted unless it appears beyond
doubt the plaintiff can prove no set of facts entitling him to relief. Ulrich v. Pope Cty., 715 F.3d
1054, 1058 (8th Cir. 2013).
III. LEGAL DISCUSSION
In its motion, ENGlobal contends AIC’s counterclaim fails to plausibly state a claim upon
which relief may be granted, AIC failed to file a certificate of merit along with its counterclaim as
required by Texas law, and paragraph 50 of AIC’s answer should be stricken because it refers to the
North Dakota Rules of Civil Procedure rather than the Federal Rules of Civil Procedure. AIC
maintains otherwise. The parties agree their dispute is governed by Texas law.
A. AIC’s Counterclaim
ENGlobal contends AIC’s counterclaim does not allege a plausible breach of contract claim
under Fed. R. Civ. P. 12(b)(6) because the pleadings establish, as a matter of law, AIC materially
breached the contract first which excused ENGlobal’s performance. AIC contends ENGlobal’s
argument overlooks allegations in the pleadings (including its own) that show the parties have
competing claims about performance and which party materially breached first. The Court agrees
with AIC. ENGlobal’s argument merely raises disputed fact questions, including whether ENGlobal
performed under the parties’ agreement (which AIC denies) and whether ENGlobal was excused
from performing (which AIC denies).
The Court declines ENGlobal’s invitation to make factual determinations at this stage of the
3
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 3 of 9
proceedings. AIC does not concede a breach, much less a material one. Whether there has been a
material breach of contract can rarely be determined based solely on the pleadings. All three cases
cited by ENGlobal in support of its contention were decided after a jury trial. Bartush-Schnitzius
Foods Co. v. Cimco Refrigeration, Inc., 518 S.W.3d 432 (Tex. 2017) (jury found both parties
breached agreement)); Mustang Pipeline Co. v. Driver Pipeline Co., 134 S.W.3d 195 (Tex. 2004)
(jury finding that plaintiff breached contract but defendant was not justified in terminating contract);
Gupta v. E. Idaho Tumor Inst., Inc., 140 S.W.3d 747 (Tex. App. 2004) (affirming jury verdict).
None of these cases speak to the Court determining one party committed a material breach based
upon the pleadings.
The Court has carefully reviewed the complaint, answer, and counterclaim and finds
numerous fact disputes exist, including who breached the contract and when. AIC’s statement in
its answer that the contract speaks for itself does not establish a material breach in and of itself. The
answer must be read as a whole and AIC repeatedly states its belief that it does not owe any
additional money to ENGlobal under the contract. The claims made in support of AIC’s
counterclaim must be taken as true and they are certainly plausible. That is all that is required at this
stage of the case. Rule 8 has been satisfied. Dismissal, at this early stage, is unwarranted.
B. Texas Certificate of Merit
ENGlobal contends AIC’s counterclaim should be dismissed for failure to comply with
Section 150.002 of the Texas Civil Practice & Remedies Code. Section 150.002 requires the
claimant to file an affidavit setting forth with specificity the alleged act, error, or omission for each
theory for which damages are sought. Tex. Civ. Prac. & Rem. Code § 150.002. It is undisputed
AIC did not file a certificate of merit in support of its counterclaim. AIC maintains that under
4
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 4 of 9
Section 150.002(h), a certificate of merit is not required for a counterclaim when the action is one
for payment of fees arising out of the provision of professional services. AIC also maintains the
Federal Rules of Civil Procedure govern the sufficiency of the counterclaim rather than Section
150.002 and no certificate of merit is required by the Federal Rules of Civil Procedure.
ENGlobal contends that the Court must look to the Texas Rules, which require a certificate
of merit, to determine whether the pleadings are sufficient. AIC maintains the Federal Rules alone
apply. The issue is complex and so to is the distinction between procedural and substantive law for
Erie purposes. In this diversity jurisdiction case, the Court must apply Texas substantive law and
federal procedural law. To determine Section 150.002 applies the Court must ask if it and Rule 8
of the Federal Rules of Civil Procedure conflict and if they do whether the federal rule violates the
Rules Enabling Act. See Hanna v. Plumer, 380 U.S. 460 (1965); see also Shady Grove Orthopedic
Assocs. v. Allstate Ins. Co., 559 U.S. 393 (2010). The test is murky and has lead to inconsistent
results.
The federal district courts in Texas which have addressed the issue have been not been
uniform in their determination of whether Section150.002 is procedural or substantive. See Estate
of C.A. v. Grier, 752 F. Supp. 2d 763 (S.D. Tex. 2010) (holding Section 150.002 is a procedural rule
that does not apply in a federal-court diversity case because it conflicts with the federal pleading
standards); Stephenson v. Util. Serv. Co., Inc., No. 2:19-CV-237, 2020 WL 13413679 (S.D. Tex.
Jan. 14, 2020) (holding Section 150.002 conflicts with the Federal Rules of Civil Procedure and does
not violate the Rules Enabling Act); State Auto. Mut. Ins. Co. v. Dunhill Partners, Inc., No.
3:12-CV-03770, 2013 WL 11821466 (N.D. Tex. May 28, 2013) (finding Section 150.002 is
substantive and thus applies in federal). The Court finds Grier and Stephenson to be persuasive.
The Court concludes Section 150.002 is a state procedural rule that does not apply in federal court
5
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 5 of 9
because it imposes additional pleading requirements that are not found in Rule 8 or 12 of the Federal
Rules of Civil Procedure. The federal pleading rules are comprehensive and additional requirements
create a conflict. Even if Section 150.002 does apply, the law itself provides an exception which
clearly exempts AIC from the need to file a Texas certificate of merit along with its counterclaim.
The relevant portion of Texas statute provides as follows:
(a) In any action or arbitration proceeding for damages arising out of the provision
of professional services by a licensed or registered professional, a claimant shall be
required to file with the complaint an affidavit of a third-party licensed architect,
licensed professional engineer, registered landscape architect, or registered
professional land surveyor who is competent to testify…holds the same professional
license or registration as the defendant… practices in the area of practice of the
defendant… offers testimony based on the person’s knowledge; skill; experience;
education; training; and practice.
***
(e) A claimant’s failure to file the affidavit in accordance with this section shall
result in dismissal of the complaint against the defendant. This dismissal may be
with prejudice.
***
(h) This statute does not apply to any suit or action for the payment of fees
arising out of the provision of professional services.
Tex. Civ. Prac. & Rem. Code § 150.002 (emphasis added).
In this case, ENGlobal is seeking payment of fees for professional services rendered. See
Doc. No. 1, ¶¶ 5, 9, 20, 28. The plain language of Section 150.002(h) provides that a certificate of
merit is not required for “any suit or action” for the payment of fees arising out of the provision of
professional services. The plain language of the statute clearly provides that a certificate of merit
is not required in a case such as that between ENGLobal and AIC. Three separate panels from the
Texas Court of Appeals interpreting Section150.002(h) have held that no certificate of merit is
required for a counterclaim when the plaintiff seeks the payment of fees for professional services.
6
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 6 of 9
Stillwater Cap. v. HKS, Inc., No. 05-20-00749, 2021 WL 2154617 (Tex. App. May 27, 2021);
Zachry Eng’g Corp. v. Encina Dev. Grp., LLC, 672 S.W.3d 534 (Tex. App. 2023); McDowell
Owens Eng’g, Inc. v. Timaeus L. Firm, PLLC, 679 S.W.3d 754 (Tex. App. 2023). The Court has
carefully reviewed these cases and finds them to be directly on point and persuasive.
In Stillwater, an architectural firm sued a investment company for nonpayment of fees.
Stillwater, 2021 WL 2154617 at *1. The investment company filed a counterclaim and the
architectural firm filed a motion to dismiss for failure to file a certificate of merit along with the
counterclaim. Id. The Texas Court of Appeals held the exception in Section 150.002(h) applied so
as to make it “unnecessary for any party to file a certificate of merit in an action for payment of fees
arising out of the provision of professional services.” Id. at *3. The court explained the exclusion
is broad and encompasses the entire action, including any counterclaims. Id. at *2. The exception
“makes it unnecessary for any party to file a certificate of merit in an action for the payment of fees
arising out of the provision of professional services.” Id. at *3.
In Zachry Eng’g Corp., a engineering firm brought an action against a developer for breach
of contract. The developer filed a counterclaim for breach of contract. 672 S.W.3d at 537. The
engineering firm moved to dismiss the counterclaim for failure to file a certificate of merit. Id. The
Texas Court of Appeals held that no certificate of merit was required to support a counterclaim when
the plaintiff seeks the payment of professional fees under Section 150.002(h). Id. at 541. The court
noted the plain language of the statute provides that “it does not apply to any suit or action for the
payment of fees arising out of the provision of professional services.” Id. at 539. The court
explained “the plain text of the statute indicates that the language used—“action” and “suit”—are
interchangeable and broad terms covering an entire legal proceeding, including a defendant’s
counterclaims against a provider of professional services.” Id. at 540. The court further explained
7
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 7 of 9
when the Texas Legislature amended the statute in 2019 it indicated an intent that counterclaims for
damages required a certificate of merit but left in place the exemption for any action or suit arising
out of the payment of fees. Id.
Similarly, in McDowell Owens Eng’g, the Texas Court of Appeals relied on Section
150.002(h) to reject the plaintiff’s motion to dismiss a counterclaim that lacked a certificate of merit.
679 S.W.2d at 757. The court framed the issue as “ whether, in a suit for the payment of fees
initially filed by a design professional, a counterclaiming defendant seeking damages from the
design professional is required to file a certificate of merit with its complaint.” Id. The Texas Court
of Appeals concluded that no certificate of merit was required for the counterclaim under subpart
(h) because “the plain language of Section 150.002 provides that when a design professional files
suit for the payment of fees arising out of the provision of professional services, and the defendant
counterclaims for damages arising out of the provision of professional services, the counterclaiming
defendant is not required to file a certificate of merit with its counterclaim.” Id. at 760.
The Court finds the older federal district court cases from the district of Texas relied upon
by ENGlobal to be unpersuasive as they were decided based on an older version of the law, did not
involve counterclaims, and did not discuss the exception in Section 150.002 (h). See Garland Dollar
Gen. LLC v. Reeves Dev., LLC, No. 3:09-CV-0707-D, 2010 WL 4259818, at *6 (N.D. Tex. Oct.
21, 2010); Garrison Realty, L.P. v. Fouse Architecture & Interiors, P.C., No. 2:10-CV-576, 2011
WL 3740849, at *3 (E.D. Tex. Aug. 4, 2011), report and recommendation adopted, No.
2:10-CV-576 2011 WL 3739532 (E.D. Tex. Aug. 23, 2011).
The present case, like Stillwater, Zachry Eng’g Corp., and McDowell Owens Eng’g, involves
an engineering firm that has sued for nonpayment of professional fees. In such a case, Texas law
does not require a certificate of merit in support of a counterclaim.
8
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 8 of 9
C. Motion to Strike
ENGlobal contends paragraph 50 in AIC’s answer should be stricken under Fed. R. Civ. P.
12(f). Paragraph 50 invokes the affirmative defenses available pursuant to Rules 8, 9, and 12 of the
North Dakota Rules of Civil Procedure. Both parties agree this is a typographical error and the
reference should have been to the Federal Rules of Civil Procedure rather than the North Dakota
Rules of Civil Procedure. Nevertheless, the Court will grant the motion while noting that leave to
file an amended pleading should be freely given when justice so requires. See Fed. R. Civ. P.
12(a)(2).
IV. CONCLUSION
For the reasons set forth above, the Plaintiff’s motion to dismiss the Defendant’s
counterclaim is DENIED. The motion to strike is GRANTED.
IT IS SO ORDERED.
Dated this 9th day of April, 2024.
/s/ Daniel L. Hovland
Daniel L. Hovland, District Judge
United States District Court
9
Case 1:23-cv-00114-DLH-CRH Document 17 Filed 04/09/24 Page 9 of 9