Bader Ahmed Kaiksow Group v. Angelo Benedetti, LLC et al.

1:25-cv-01093Ohnd2 de fev. de 2026

Abrir fonte

Texto completo

UNITED STATES DISTRICT COURT
NORTHERN DISTRICT OF OHIO
EASTERN DIVISION
BADER AHMED KAIKSOW
GROUP,
Plaintiff,
v.
ANGELO BENEDETTI, LLC, et al.,
Defendants.
)
)
)
)
)
)
)
)
)
)
)
Case No. 1:25-cv-01093
Judge J. Philip Calabrese
Magistrate Judge
Jennifer Dowdell Armstrong
OPINION AND ORDER
Plaintiff Bader Ahmed Kaiksow Group (“BAK Group”) brings this action
against Defendants Angelo Benedetti, LLC, Angelo Benedetti Holdings, Inc., and
Albert E. Benedetti alleging that Defendants fraudulently induced Plaintiff to enter
into contracts for the purchase of an asphalt reheating and recycling machine
designed to repave roadways in Bahrain and the Gulf Cooperation Council region,
resulting in significant performance issues. 	Pursuant to the parties’ arbitration
agreement, the dispute was pending before the International Chamber of Commerce
but was dismissed after Defendants refused to pay their share of the arbitration costs.
Now Defendants move to compel arbitration and for judgment on the pleadings.
Plaintiff seeks leave to file a surreply to Defendant’s motion to compel arbitration. In
this ruling, the Court takes up all three motions.
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 1 of 38. PageID #: <pageID>
2
STATEMENT OF FACTS
On Defendants’ motions to compel arbitration and for judgment on the
pleadings, the complaint alleges the following facts, which the Court accepts as true
and construes in the light most favorable to Plaintiff as the non-moving party, as it
must in the present procedural posture. 	“In addition to the pleadings, courts may
consider any documents referenced in the complaint that are central to the dispute.”
Estate of Q.W. v. Lucas Cnty. Child. Servs., 682 F. Supp. 3d 671, 680 (N.D. Ohio 2023)
(citing United Food & Com. Workers, Loc. 1995 v. Kroger Co., 51 F.4th 197, 202 (6th
Cir. 	2022)). 	Included 	with 	the 	complaint 	are 	multiple 	agreements 	and
correspondence that feature prominently in Plaintiff’s allegations. 	(ECF No. 1,
PageID #30–119.) 	Further, the parties included with their briefs correspondence
with the ICC regarding the non-payment of arbitration fees. 	(ECF No. 15-1; ECF
No. 17-1, PageID #228–60.) Neither party objects to consideration of these materials.
Because these documents are integral to the allegations of the complaint, the Court
considers these documents without converting the motions into one for summary
judgment.
A. 	The Purchase Agreement
BAK Group is a collection of businesses registered in the Kingdom of Bahrain
that 	provides, 	among 	other 	things, 	construction, 	renovation, 	and 	professional
engineering services in international markets. (ECF No. 1, ¶ 1, PageID #3.) Angelo
Benedetti, LLC is a Cleveland company that manufactures and sells re-heat recycling
machines to lay recycled asphalt. (Id., ¶ 2, PageID #3.)
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 2 of 38. PageID #: <pageID>
3
A.1. 	Initial Negotiations
Sometime in 2012, the director of BAK Group, Hasan Bader Kaiksow, reached
out to Benedetti to inquire about purchasing one of its products, the “REHEAT
Machine.” (Id., ¶ 11, PageID #5.) Mr. Kaiksow was in discussions with the Ministry
of Works, Road Projects, and Maintenance Department for Bahrain regarding the use
of the REHEAT Machine for “Ministry tenders” in which vendors bid to work on
government projects. (Id., ¶ 12, PageID #5.) According to BAK Group, it intended to
purchase the REHEAT Machine from Benedetti to “perform demonstrations for the
Ministry and for other departments of work in the GCC Region” so that they would
require its use for government projects. (Id., ¶ 13, PageID #5.)
On 	August 	24, 	2012, 	BAK 	Group 	and 	Benedetti 	executed 	a 	letter 	of
understanding, which BAK Group claims acted as a “precursor to the Purchase
Agreement and a companion representative agreement.” (Id., ¶ 14, PageID #5 & #50.)
According to BAK Group, Mr. Kaiksow informed Benedetti multiple times of his
intended use of the REHEAT Machine to “repave long stretches of roadway in
Bahrain and in other areas of the GCC region.” (Id., ¶¶ 15–16, PageID #5–6.)
On 	October 	10, 	2012, 	BAK 	Group 	and 	Benedetti 	entered 	into 	a 	sales
representation agreement, which appointed BAK Group as Benedetti’s “exclusive
representative to secure sales of Benedetti, LLC REHEAT Machines in Bahrain and
the GCC Region.” 	(Id., ¶ 17, PageID #6 & #51–60.) 	Benedetti agreed to pay BAK
Group a five percent commission for its sales of the REHEAT Machine. 	(Id., ¶ 18,
PageID 	#6.) 	BAK 	Group 	intended 	to 	perform 	demonstrations 	to 	prospective
customers of the REHEAT Machine to earn its commission. 	(Id., ¶ 19, PageID #6.)
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 3 of 38. PageID #: <pageID>
4
That month, Benedetti informed BAK Group that it would begin to manufacture its
equipment upon receipt of payment. (Id., ¶ 20, PageID #6.)
In mid-2013, BAK Group brought members of the Ministry to Cleveland to
view a demonstration of the REHEAT Machine. 	(Id., ¶ 21, PageID #6.) 	However,
Benedetti allegedly only showed the Ministry “various roadways and claimed that the
asphalt on those roadways had been recycled using a REHEAT Machine.” (Id., ¶ 22,
PageID #6.) In July 2013, BAK Group requested that Benedetti build a new REHEAT
Machine following the Ministry’s specifications and intended use, which Benedetti
promised to build. 	(Id., ¶ 23, PageID #6–7.) 	On September 12, 2013, the Ministry
issued a correspondence that included the Benedetti REHEAT Machine specifications
as one of its tender jobs, which Mr. Kaiksow shared with the president of Benedetti,
Albert Benedetti. (Id., ¶ 24, PageID #7 & #61–66.)
A.2. 	The Purchase Agreement
On January 15, 2014, BAK Group and Benedetti entered into a purchase
agreement, which listed the intended use of the REHEAT Machine as being “for use
to lay new recycled road asphalt in Bahrain, Kuwait, United Arab Emirates, Oman,
and Qatar and Saudi Arabia.” 	(Id., ¶ 25, PageID #7 & #30.) 	BAK Group agreed to
purchase a new “ReHeat Asphalt Pavement Heater” and new “ReHeat Recycler” for
a total purchase price for the equipment and delivery to Bahrain of $2,575,000. (Id.,
¶¶ 26–27, PageID #7, #43–44 & #67.)
To make this purchase, BAK Group secured a line of credit with Kuwait
Finance House, to which Benedetti was named the beneficiary. 	(Id., ¶¶ 28–29,
PageID #8.) Benedetti received four draws for $643,750 each against the line of credit
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 4 of 38. PageID #: <pageID>
5
through PNC Bank. 	(Id., ¶ 29, PageID #8 & #68–70.) 	In October 2013, Benedetti
confirmed receipt of the first installment payment and indicated that it would begin
manufacturing the equipment. 	(Id., ¶ 30, PageID #8.) 	Benedetti provided BAK
Group with a build schedule, which included a timeline of the manufacturing of the
new equipment. (Id., ¶ 31, PageID #8 & #71.)
Over 	the 	course 	of 	the 	manufacturing 	process, 	BAK 	Group 	requested
photographs of the equipment, and Benedetti provided what it claimed to be
photographs of the new equipment being manufactured. 	(Id., ¶ 32, PageID #8 &
#72–79.) Unbeknownst to it at the time, BAK Group claims that these photographs
depicted “the building of another REHEAT Machine,” not the equipment that BAK
Group had purchased. (Id., ¶ 33, PageID #8.)
B. 	Demonstration and Performance
On May 5, 2014, the equipment was delivered to BAK Group in Bahrain. (Id.,
¶ 34, PageID #8.)
B.1. 	Early Demonstrations
BAK Group scheduled a demonstration of the equipment for the Ministry and
paid for members of Benedetti to travel from Cleveland to Bahrain to view the
demonstration. (Id., ¶ 35, PageID #8–9.) On June 20, 2014, BAK Group performed
the demonstration for the Ministry. (Id., ¶ 35, PageID #9.) According to BAK Group,
the equipment “failed to adequately perform” at the demonstration. (Id.)
On July 10, 2014, Benedetti informed BAK Group that it would need to
purchase additional tools to “ensure performance of the Equipment” for $6,670. (Id.,
¶ 36, PageID #9.) 	Within two weeks, on July 23, 2014, BAK Group informed
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 5 of 38. PageID #: <pageID>
6
Benedetti of “continued performance issues with the Equipment,” to which Benedetti
allegedly responded that it “was normal for REHEAT Machines to have issues the
first time they are used.” (Id., ¶ 37, PageID #9.)
In September 2014, BAK Group scheduled another demonstration, this time
with representatives of the United Arab Emirates Public Works and Services
Department. (Id., ¶ 38, PageID #9.) It paid for members of Benedetti to travel to the
United Arab Emirates to inspect and service the equipment to “ensure the Equipment
was in good working order” and assist with the demonstration. 	(Id., ¶ 39, PageID
#9.) Benedetti again told BAK Group that it could remedy issues with the equipment
by purchasing additional equipment, which BAK Group purchased. 	(Id., ¶¶ 40–41,
PageID #9.) The September 2014 demonstration took place over a 100-meter stretch
of road, and the equipment “performed adequately.” (Id., ¶ 42, PageID #9.)
In November 2014, BAK Group informed Benedetti that it was in the process
of trying to secure partnerships with Saudi Arabia and the United Arab Emirates
that would involve REHEAT Machines in their department of transportation tenders.
(Id., ¶ 43, PageID #10.) That same month, BAK Group informed Benedetti that “the
Equipment was not functioning properly” and that it “could not secure commitments
from the Ministry, other governmental authorities in the GCC Region, and potential
customers per the Sales Rep Agreement.” 	(Id., ¶ 44, PageID #10.) 	Benedetti told
BAK Group that it would need to purchase additional parts and equipment to “ensure
performance of the Equipment” and that it would need to secure experienced
operators. (Id., ¶ 45, PageID #10.)
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 6 of 38. PageID #: <pageID>
7
B.2. 	The United Arab Emirates Job
In December 2014, the United Arab Emirates Public Works and Services
Department awarded BAK Group a job to repave a 16 kilometer stretch of road for
roughly $1.4 million. 	(Id., ¶ 46, PageID #10 & #80–81.) 	BAK Group and the UAE
memorialized this award in a signed agreement on January 22, 2015. 	(Id., ¶ 47,
PageID #10 & #82–90.) 	The same month, Benedetti informed BAK Group that it
would send two representatives to the UAE to “provide professional labor service on
the Equipment” for $8,500 because of continued performance issues. 	(Id., ¶ 48,
PageID #10.)
In February 2015, two members of Benedetti traveled to the UAE and
performed services on the equipment. (Id., ¶ 49, PageID #11.) The same month, BAK
Group began to perform the UAE job, but claimed that, “[a]lmost immediately,” the
equipment “did not perform as expected.” 	(Id., ¶¶ 50–51, PageID #11.) 	In March
2015, the UAE Department told BAK Group that it would cancel the job contract if
BAK Group did not correct the performance issues within two weeks. 	(Id., ¶ 52,
PageID #11.) Benedetti blamed the performance issues on “improper road selection.”
(Id., ¶ 53, PageID #11.)
On April 26, 2015, the UAE Department sent a letter to BAK Group in which
it stated that it would inspect the UAE job and the performance of the equipment on
April 30, 2015. 	(Id., ¶ 55, PageID #11 & #91–93.) 	On May 3, 2015, the UAE
Department sent BAK Group a letter which stated that, “following repeated field visit
by [its] technical team, it ha[d] been found that the quality of the executed works
[was] technically unacceptable despite giving [it] more than one opportunity to
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 7 of 38. PageID #: <pageID>
8
improve the execution performance” and that the contract was cancelled. (Id., ¶ 56,
PageID #11–12 & #94–96.)
B.3. 	Further Performance Issues Alleged
According 	to 	BAK 	Group, 	the 	performance 	issues 	with 	the 	equipment
continued through 2015 and 2016. 	(Id., ¶ 57, PageID #12.) 	In February 2016,
Benedetti informed BAK Group that it needed to purchase valves for the equipment
to “ensure performance” for $6,200 along with shipping costs, which BAK Group
purchased. (Id.) In September 2016, Benedetti informed BAK Group that it needed
to purchase a flow meter for the equipment to “ensure performance” for $6,458, which
BAK Group purchased. (Id., ¶ 58, PageID #12.)
B.4. 	The May 2017 Demonstration
BAK Group claimed that, by December 2016, it “made significant progress
towards becoming an approved contractor with the Ministry.” (Id., ¶ 59, PageID #12.)
BAK Group informed Benedetti that, if it performed a successful road demonstration
for the Ministry, the Ministry “would include the REHEAT Machine specification in
all Ministrey tenders,” which would require any bidding contractor to either purchase
the equipment through BAK Group as Benedetti’s representative or lease the
equipment from BAK Group. (Id.) BAK Group informed Benedetti that it intended
to renew efforts to include the REHEAT Machine specification with tenders with the
UAE and Saudi Arabia as well. (Id., ¶ 60, PageID #13.)
In May 2017, BAK Group shared its concerns about the performance of the
equipment with Benedetti, who suggested that BAK Group make “several passes on
the roadway with the Equipment” or purchase another re-heater. (Id., ¶ 62, PageID
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 8 of 38. PageID #: <pageID>
9
#13.) 	On May 21, 2017, the equipment failed to perform adequately during the
demonstration, and the Ministry decided not to include the REHEAT Machine with
its government tenders. (Id., ¶ 63, PageID #13.)
In February 2018, BAK Group found prospective purchasers for REHEAT
Machines in Bahrain. 	(Id., ¶ 65, PageID #13.) 	However, according to BAK Group,
because of the failure of the equipment during the Ministry demonstration, the
prospective purchasers decided not to purchase the REHEAT Machines. (Id.)
B.5. 	Further Demonstrations
In July 2018, the Ministry sent BAK Group a letter of intent to include the
REHEAT Machine specification in all Ministry tenders. 	(Id., ¶ 66, PageID #14 &
#97–98.) 	This commitment was contingent on a successful demonstration of the
equipment. (Id., ¶ 67, PageID #14.)
In October 2018, BAK Group informed Benedetti that it “had not made a single
dollar on its investment due to the Equipment’s repeated failures to perform.” 	(Id.,
¶ 68, PageID #14.) 	In March 2019, BAK Group purchased $3,000 worth of valves
from Benedetti in an attempt to remedy performance issues. (Id., ¶ 69, PageID #14.)
After a delay of several years because of the Covid-19 pandemic, BAK Group
renewed its efforts to complete a demonstration for the Ministry in 2022. (Id., ¶ 71,
PageID #14.) On May 20, 2022, Benedetti sent instructions to the Ministry regarding
how to correct the performance issues. 	(Id., ¶ 72, PageID #14 & #99–104.) 	After a
demonstration, on June 1, 2022, the Ministry sent BAK Group a “Quality Audit
Report” which provided observations by the Roads-Project Assessment Committee.
(Id., ¶ 73, PageID #14 & #105–06.) 	The report indicated a “[n]oticeable number of
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 9 of 38. PageID #: <pageID>
10
irregularities” and “many complaints on the riding quality . . . as raised by local
residents being regular users of the subject roads.” (Id., ¶ 74, PageID #15 & #105.)
On June 12, 2022, the Ministry sent BAK Group a letter in response to further
demonstrations of the equipment stating that the equipment “failed to give a ride-
able asphalt surface in long roadways,” despite the fact that the equipment was
“supposed to be utilized for maintaining long distances of asphalt-paved highways.”
(Id., ¶ 76, PageID #15 & #107–08.) The Ministry indicated that it “[would] not bear
the cost of rectifying the failed product . . . if occurred in [the] future.” 	(Id., ¶ 76,
PageID #15 & #107.)
B.6 	End of the Relationship
On July 13, 2022, Mr. Kaiksow sent Benedetti an email discussing the
continued performance issues, detailing a recent failure of the equipment during
another demonstration for the Ministry, claiming that BAK Group had not recouped
a “dollar on its investment,” and requesting assistance. 	(Id., ¶ 77, PageID #15–16.)
Benedetti responded that the performance issues could be remedied if BAK Group
purchased $3,500 worth of tools and equipment to help with rideability issues. (Id.,
¶ 78, PageID #16.)
According to BAK Group, it continued correspondence with Benedetti about
performance issues, often resulting in BAK Group purchasing additional tools and
equipment. 	(Id., ¶ 79, PageID #16.) 	However, BAK Group claimed that “the
performance issues remained.” (Id.)
On August 27, 2023, Benedetti sent BAK Group an email acknowledging the
performance issues with the equipment and suggesting that BAK Group should
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 10 of 38. PageID #: <pageID>
11
either purchase a new REHEAT Machine for roughly $3.25 million or modify the
equipment for between $350,000 and $500,000. 	(Id., ¶¶ 80–81, PageID #16 &
#109–11.) 	Benedetti sent BAK Group an invoice for proposed modifications to the
equipment for $486,000. (Id., ¶ 82, PageID #16.) BAK Group declined the proposal
and decided not to spend more money to cure problems with the equipment. 	(Id.,
¶¶ 83–84, PageID #16–17.) According to BAK Group, the equipment remains stored
in its storage facilities and has not been used. (Id., ¶ 84, PageID #17.)
C. 	Alleged Fraud
In Spring 2024, BAK Group claims that it first learned of what it alleges to be
“extensive fraud that had been perpetrated on it by Defendants.” (Id., ¶ 85, PageID
#17.) 	According to BAK Group, sometime in 2012, before its purchase of the
equipment, Benedetti contracted to build and sell the equipment to another customer
in the United States. (Id., ¶ 86, PageID #17.) That customer hd requested a REHEAT
Machine for use in parking lots that should be “smaller and lighter than a typical
REHEAT Machine.” (Id., ¶ 87, PageID #17.) BAK Group claims that the smaller and
lighter machine was not suitable for long stretches of roadways because it would
bounce up and down and create rideability issues. (Id., ¶ 89, PageID #17.)
BAK 	Group claims that 	the 	other customer returned the 	equipment 	to
Benedetti in 2012, which coincided with when BAK Group expressed an interest in
the design and purchase of a new REHEAT Machine. (Id., ¶ 91, PageID #18.) BAK
Group claims that Benedetti did not build a new machine for BAK Group despite its
promise to do so, but instead “passed off the Equipment as being new and sold it to
BAK Group.” (Id., ¶ 92, PageID #18.)
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 11 of 38. PageID #: <pageID>
12
Allegedly, Benedetti and Mr. Benedetti did not disclose to BAK Group that the
equipment had been used, was built for another customer, was returned by that
customer, was smaller and lighter than a typical REHEAT Machine, and was made
to pave parking lots. 	(Id., ¶ 93, PageID #18.) 	Further, BAK Group claims that
Benedetti and Mr. Benedetti failed to disclose to BAK Group that the equipment was
not built for the intended use of paving long stretches of roadway, was modified with
larger cutting blades, a road paving screed, and a rear furnace to appear that it was
intended for that intend use, and “was insufficient to perform long road paving.” (Id.)
In addition, BAK Group claims that Benedetti and Mr. Benedetti failed to
disclose 	to 	BAK 	Group 	that 	the 	performance 	issues 	were 	likely 	due 	to 	the
manufacture and design of the equipment and that Benedetti employees told
Mr. Benedetti and other employees that the equipment was too small and too light to
accomplish the intended use. 	(Id.) 	Finally, BAK Group claims that Benedetti and
Mr. Benedetti failed to disclose to BAK Group that Benedetti’s proposed solutions to
the performance issues would not solve the problems and that the photographs of
what Benedetti claimed was the new REHEAT Machine were not of that machine.
(Id.)
BAK Group claims that Benedetti sold the equipment to BAK Group to “avoid
the cost associated with building a new REHEAT Machine” for the intended use and
concealed the alleged scheme from BAK Group. (Id., ¶¶ 94–95, PageID #18–19.)
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 12 of 38. PageID #: <pageID>
13
D. 	ICC Arbitration
Pursuant to the arbitration provision in the parties’ purchase agreement, BAK
Group initiated arbitration with Benedetti on July 25, 2024. (Id., ¶ 96, PageID #19.)
The arbitration provision reads in relevant part:
All disputes arising out of or in connection with this Agreement shall be
finally settled under the Rules of Arbitration of the International
Chamber 	of 	Commerce 	by 	one 	or 	more 	arbitrators 	appointed 	in
accordance with the said Rules.
(Id., ¶ 97, PageID #19 & #40.) 	BAK Group paid a $5,000 non-refundable filing fee
when it filed the arbitration. (Id., ¶ 98, PageID #19.)
Pursuant to Article 37(1) of the ICC Arbitration Rules, on or about August 7,
2024, the ICC requested a provisional advance on costs in the amount of $62,000.
(Id., ¶¶ 99–100, PageID #19.) On August 27, 2024, BAK Group paid $57,000, and its
non-refundable $5,000 filing fee was credited toward the provisional advance. 	(Id.,
¶ 101, PageID #19.) On October 3, 2024, Defendants filed their answer. (Id., ¶ 102,
PageID #19.)
According to BAK Group, it incurred significant attorneys’ fees related to the
selection of an arbitrator, negotiation of a schedule for case management and
preparation for the case management conference, development of its evidence and
witness testimony, negotiation of the draft arbitration terms of reference, and
discovery. (Id., ¶ 103, PageID #20.)
Pursuant to Article 37(2) of the ICC Arbitration Rules, on December 23, 2024,
the ICC requested an advance on costs to cover the fees and expenses of the
arbitrators, administrative expenses, and other expenses related to the arbitration in
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 13 of 38. PageID #: <pageID>
14
the amount of $190,000 in equal shares to the parties. (Id., ¶¶ 104–05, PageID #20
& #112–17.)
Pursuant to Article 37(6) of the ICC Arbitration Rules, if the parties did not
comply with their payment obligations regarding an advance on costs, the arbitration
claims would be withdrawn. 	(Id., ¶¶ 106–07, PageID #20.) 	On January 13, 2025,
BAK Group paid its share of the ICC advance on costs of $33,000. (Id., ¶ 108, PageID
#21.) 	According to BAK Group, after the ICC provided Defendants with multiple
extensions and notifications to make payment, Defendants did not make their
payment, which BAK Group claims was a “concerted effort to cause the Arbitration
claims to be withdrawn.” (Id., ¶¶ 109–10, PageID #21; ECF No. 15-1; ECF No. 17-1,
PageID #228–60.)
On May 27, 2025, the ICC informed the parties that the arbitration claims
were considered withdrawn as of May 26, 2025 due to a lack of payment. (Id., ¶ 111,
PageID #21 & #118–19.)
STATEMENT OF THE CASE
Based on these events, on May 28, 2025, Plaintiff filed suit in federal court
against 	Defendants, 	alleging 	fraudulent 	inducement, 	misrepresentation, 	and
concealment 	against 	all 	Defendants 	(Count 	One); 	breach 	of 	contract 	against
Benedetti, 	LLC 	(Count 	Two); 	breach 	of 	the 	purchase 	agreement’s 	arbitration
agreement 	against 	all 	Defendants 	(Count 	Three); 	tortious 	interference 	with
contractual and business relations against all Defendants (Count Four); negligent
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 14 of 38. PageID #: <pageID>
15
misrepresentation against Benedetti, LLC (Count Five); and personal liability on the
part of Albert Benedetti (Count Six). (ECF No. 1, ¶¶ 112–163, PageID #21–27.)
Defendants moved for judgment on the pleadings and moved to compel
arbitration. (ECF No. 14; ECF No. 15.) Both motions are fully briefed. On November
17, 2025, Plaintiff moved for leave to file a surreply to Defendant’s motion to compel
arbitration. (ECF No. 22; ECF No. 23.)
ANALYSIS
First, the Court addresses Plaintiff’s motion to file a surreply to Benedetti’s
motion to compel arbitration. (ECF No. 22.) Then, the Court will turn to Benedetti’s
motion 	to 	compel 	arbitration. 	(ECF 	No. 15.) 	Finally, 	the 	Court 	will 	assess
Defendants’ motion for judgment on the pleadings. (ECF No. 14.)
I. 	Motion for Leave to File Surreply
Plaintiff moves for leave to file a surreply to Benedetti’s reply in support of its
motion to compel arbitration. (ECF No. 22.) Pursuant to Section 9.D. of the Court’s
Civil Standing Order, “[n]o surreplies will be permitted absent leave of Court, which
will be given rarely and only for truly good cause.” 	Section 9.C. of the Court’s Civil
Standing Order states that, “[a[bsent unusual or extraordinary circumstances, reply
briefs should not present new evidence or arguments.”
Plaintiff contends that Benedetti misstated the amount of damages that
Plaintiff sought. 	(ECF No. 22, PageID #318.) 	But the complaint claims damages,
and no surreply is necessary to correct or clarify the record in that regard. 	Also,
Plaintiff argues that the Court should grant leave to file a surreply because
Benedetti’s reply provides new arguments that the ICC arbitration was withdrawn
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 15 of 38. PageID #: <pageID>
16
due to a failure by BAK Group to substitute payment and that Plaintiff’s damages
demand was exorbitant and constituted an abuse of process. 	(ECF No. 22, PageID
#318.) In response, Benedetti maintains that it raised those arguments in its initial
brief. 	(ECF No. 23, PageID #325–26.) 	Based on the Court’s review of Benedetti’s
initial 	brief, 	the 	Court 	agrees 	that 	these 	arguments, 	although 	not 	presented
verbatim, are present in Benedetti’s initial brief. (Compare ECF No. 15, PageID #203
with ECF No. 20, PageID #294–95 (arguing that Plaintiff failed to pursue remedies);
compare ECF No. 15, PageID #197 with ECF No. 20, PageID #295–96 (arguing that
Plaintiff inflated its damages).) 	Therefore, including these arguments in reply is
proper.
For these reasons, the Court determines that Plaintiff has not demonstrated
“truly good cause” for the Court to grant it leave to file a surreply pursuant to Section
9.D. of the Court’s Civil Standing Order. Accordingly, the Court DENIES Plaintiff’s
motion for leave to file a surreply. (ECF No. 22.)
II. 	Motion to Compel Arbitration
Benedetti moves to dismiss or stay these proceedings pending arbitration
under the Federal Arbitration Act. 	(ECF No. 15.) 	A “written provision in . . . a
contract evidencing a transaction involving commerce to settle by arbitration a
controversy thereafter arising out of such contract or transaction, . . . shall be valid,
irrevocable, and enforceable[.]” 9 U.S.C. § 2. The “principal purpose” of the Federal
Arbitration Act is to ensure “that private agreements to arbitrate are enforced
according to their terms.” 	Volt Info. Scis., Inc. v. Board of Trs. of Leland Stanford
Junior Univ., 489 U.S. 468, 478 (1989); see also Stolt-Nielsen S.A. v. AnimalFeeds
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 16 of 38. PageID #: <pageID>
17
Int’l Corp., 559 U.S. 662, 664 (2010). 	Section 2 of the Act “makes arbitration
agreements ‘valid, irrevocable, and enforceable’ as written.” 	AT&T Mobility LLC v.
Concepcion, 563 U.S. 333, 344 (2011).
Where an action is referable to arbitration, a court “shall on application of one
of the parties stay” the case pending arbitration. 9 U.S.C. § 3; see Smith v. Spizzirri,
601 U.S. 472, 473–74 (2024). Section 3 of the Act does not permit the Court to dismiss
the case instead of issuing a stay where the dispute is subject to arbitration and a
party requests a stay pending arbitration. Smith, 601 U.S. at 478.
“Congress enacted the FAA to replace judicial indisposition to arbitration with
a ‘national policy favoring [it.]’” Hall St. Assocs., L.L.C. v. Mattel, Inc., 552 U.S. 576,
581 (2008) (quoting Buckeye Check Cashing, Inc. v. Cardegna, 546 U.S. 440, 443
(2006)). The Act embodies “a liberal federal policy favoring arbitration agreements,
notwithstanding any state substantive or procedural policies to the contrary.”
Concepcion, 563 U.S. at 346 (quoting Moses H. Cone Mem’l Hosp. v. Mercury Constr.
Corp., 460 U.S. 1, 24 (1983)). 	The language of the Act creates “a body of federal
substantive law of arbitrability.” Moses, 460 U.S. 1 at 24.
Typically, 	courts 	have 	four 	tasks 	when 	considering 	a 	motion 	to 	stay
proceedings pending arbitration under the Federal Arbitration Act: 	(1) “determine
whether the parties agreed to arbitrate”; (2) “determine the scope of that agreement”;
(3) if a party asserts federal statutory claims, “consider whether Congress intended
those claims to be nonarbitrable”; and (4) if the court concludes that some, but not
all, of the claims in the action are subject to arbitration, “determine whether to stay
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 17 of 38. PageID #: <pageID>
18
the remainder of the proceedings pending arbitration.” 	Stout v. J.D. Byrider, 228
F.3d 709, 714 (6th Cir. 2000). 	However, Plaintiff does not dispute Benedetti’s
argument that these factors are met. (See generally ECF No. 17.) Indeed, pursuant
to the arbitration provision in the parties’ purchase agreement, Plaintiff already
initiated arbitration once before. (ECF No. 1, ¶ 96, PageID #19.)
The parties dispute whether Benedetti defaulted in arbitration when it failed
to pay the ICC fees in advance, resulting in withdrawal of the claims. (ECF No. 15,
PageID #202–03; ECF No. 17, PageID #218–23; ECF No. 20, PageID #292–96.)
II.A. 	Default
The Federal Arbitration Act provides that a court “shall on application of one
of the parties stay the trial of the action until such arbitration has been had in
accordance with the terms of the agreement, providing the applicant for the stay is
not in default in proceeding with such arbitration.” 	9 U.S.C. § 3. 	“A party defaults
on an arbitration agreement when it takes actions that are ‘completely inconsistent’
with an intent to arbitrate.” 	Schnatter v. 247 Group, Inc., 155 F.4th 543, 555 (6th
Cir. 2025) (quoting Kloosterman v. Metropolitan Hosp., 153 F.4th 501, 506 (6th Cir.
2025); see also O.J. Distrib., Inc. v. Hornell Brewing Co., 340 F.3d 345, 356 (6th Cir.
2003) (describing a similar analysis for waiver) (quoting General Star Na’l. Ins. Co.
v. Administratia Asigurarilor de Stat, 289 F.3d 434, 438 (6th Cir. 2002)) (abrogated
on other grounds by Morgan v. Sundance, Inc., 596 U.S. 411, 419 (2022)).
II.B. 	Defendants’ Failure to Pay Arbitral Fees
“Failure to pay arbitration fees constitutes a ‘default’ under § 3.” 	Pre-Paid
Legal Servs., Inc. v. Cahill, 786 F.3d 1287, 1298 (10th Cir. 2015).
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 18 of 38. PageID #: <pageID>
19
II.B.1. ICC Rules
To try to avoid this result, Benedetti contends that the letter from the ICC
withdrawing the claims from arbitration did not constitute a dismissal with prejudice
because she stated that it was pursuant to Article 37(6) of the ICC Arbitration Rules.
(ECF No. 15, PageID #202; ECF No. 1, ¶ 111, PageID #21 & #118–19.) 	That rule
reads that, if claims are withdrawn because an advance on costs had not been paid,
“[s]uch a party shall not be prevented, on the ground of such withdrawal, from
reintroducing the same claims at a later date in another proceeding.” Article 37(6) of
the ICC Rules (2021). 	The Court agrees with Benedetti that, based on the plain
language of the rule, Plaintiff’s claims may be filed again.
Also, Benedetti contends that Article 37(5) provided Plaintiff with a remedy
for Benedetti’s refusal to pay. 	(ECF No. 15, PageID #203.) 	Specifically, that rule
provides that “any party shall be free to pay any other party’s share of any advance
on costs should such other party fail to pay its share.” Article 37(5) of the ICC Rules
(2021). 	Further, Article 37(6) provides that, “[s]hould the party in question wish to
object to [withdrawal due to failure to pay], it must make a request within [a certain
time] period for the matter to be decided by the Court.” Article 37(6) of the ICC Rules
(2021). 	The arbitrator advised Plaintiff’s counsel of these options in an email on
February 26, 2025. (ECF No. 15-1.)
But “the absence of a formal finding of default by the arbitrators does not
preclude the district court from making that determination under § 3.” 	Pre-Paid
Legal Servs., 786 F.3d at 1298. 	In Pre-Paid Legal Services, 786 F.3d at 1294, the
tribunal terminated the arbitration between the parties because the defendant failed
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 19 of 38. PageID #: <pageID>
20
to pay the arbitration fees. The defendant argued that the court could not determine
that he was in default because “the arbitrators did not make a formal finding of
default when they terminated the proceedings.” Id. at 1295. But the Tenth Circuit
determined that courts were free to make such a determination pursuant to Section 3
of the Federal Arbitration Act where: 	(1) the arbitrator “repeatedly asked [the
defendant] to pay”; (2) the defendant “did not show he was unable to afford payment”;
(3) the defendant did not “ask the arbitrators to modify his payment schedule”; and
(4) the defendant did not “move for an order requiring [the plaintiff] to pay his share
for him so that arbitration could continue.” Id. at 1294. The Tenth Circuit concluded
that, “by refusing multiple requests to pay, [the defendant] allowed arbitration to
terminate” and, therefore, defaulted. 	Id. 	On the record presented, the Court finds
the Tenth Circuit’s analysis persuasive.
Benedetti was asked multiple times to pay the outstanding arbitration fees.
(ECF No. 17-1, PageID #228–60.) Further, Benedetti did not argue that it was unable
to afford the payment, just that it refused to “pay an artificially inflated cost share.”
(ECF No. 20, PageID #296.) 	Arbitration is expensive. 	That is just one of the many
downsides of arbitration. There is no evidence in the record, and Benedetti does not
argue, that it asked the arbitrators to modify its payment schedule. 	Nor does
Benedetti provide any reason to believe that a second arbitration would turn out any
differently. That is, Benedetti provides no assurance that, this time, it is prepared to
pay its share of arbitral fees.
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 20 of 38. PageID #: <pageID>
21
Finally, although the ICC Rules and the arbitrator presented the option of
Plaintiff paying Benedetti’s outstanding arbitration fees, Benedetti cites no authority
requiring Plaintiff to do so. (See generally ECF No. 15; ECF No. 20.) Nor is the Court
aware of any. Nothing in the ICC’s rules or correspondence suggests that a plaintiff’s
failure to pay all the fees, including those of another party, attributes any default to
it. Any rule to that effect makes little sense and creates an endless loop: “The same
offending party could then default a second time, and the prejudiced party’s sole
remedy, again, would be another order compelling arbitration.” Sink v. Aden Enters.,
Inc., 352 F.3d 1197, 1199 (9th Cir. 2003). 	Defendants’ arguments are inconsistent
with “the expeditious resolution of disputes” which “Congress was no doubt aware
that the Act would encourage.” Volt Info. Scis., 489 U.S. at 478.
II.B.2. Authority Regarding the Arbitral Forum
Benedetti argues that “Plaintiff does not cite a single case arising under ICC
Rules—because the ICC rules . . . expressly enabled Plaintiff to advance costs and/or
make a motion regarding costs assessment.” 	(ECF No. 20, PageID #292.) 	Indeed,
Plaintiff’s authorities come from JAMS, USA&M, and AAA, not the ICC. 	See, e.g.,
Noble Capital Fund Mgmt., L.L.C. v. US Capital Global Inv/ Mgmt., LLC, 31 F.4th
333, 336 (5th Cir. 2022); Sink v. Aden Enters., Inc., 352 F.3d 1197, 1199 (9th Cir.
2003); 5-Star Gen. Store v. Amex, 759 F. Supp. 3d 317, 322 (D.R.I. 2024). 	Based on
the Court’s review of the case law within and outside the Circuit, little authority
addresses the issue of non-payment of arbitration fees under the ICC rules. But other
tribunals operate under a similar rule. 	See, e.g., JAMS Rule 31(a) (providing for
administrative suspension of an arbitration if one party fails to pay its share of fees).
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 21 of 38. PageID #: <pageID>
22
In any event, Benedetti misses the point of these cases. 	Regardless of the
arbitral forum, courts apply the principles underlying Section 3 of the Federal
Arbitration Act to rely on “the record, which showed the defendants had received
multiple notices to pay, did not report inability to pay, and had not made genuine
efforts to make alternative arrangements.” Pre-Paid Legal Servs., 786 F.3d at 1296
(citing Sink, 352 F.3d at 119). As noted, Benedetti provides no authority interpreting
the relevant ICC Rules as shielding it from a determination that its failure to pay
constitutes a default under Section 3. (See generally ECF No. 15; ECF No. 20.) What
matters for the Court’s inquiry is that there “is no arbitration to return this case to
and parties may not avoid resolution of live claims through compelling a new
arbitration proceeding after having let the first arbitration proceeding fail.” 	Noble
Capital Fund Mgmt., 31 F.4th at 336.
* 	* 	*
For these reasons, the Court determines that Benedetti has acted “‘completely
inconsistent’ with an intent to arbitrate” and, therefore, defaulted in arbitration.
Schnatter, 155 F.4th at 555 (quoting Kloosterman, 153 F.4th at 506); Pre-Paid Legal
Servs., 786 F.3d at 1298; 9 U.S.C. § 3. 	Accordingly, the Court DENIES Benedetti’s
motion to compel arbitration. (ECF No. 15.)
III. 	Motion for Judgment on the Pleadings
“The only difference between Rule 12(c) and Rule 12(b)(6)” is timing. 	Hunter
v. Ohio Veterans Home, 272 F. Supp. 2d 692, 694 (N.D. Ohio 2003). 	Rule 12(c)
provides that, once “the pleadings are closed” a party may “move for judgment on the
pleadings.” 	Fed. 	R. 	Civ. 	P. 	12(c). 	“A 	motion 	for 	judgment 	on 	the 	pleadings
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 22 of 38. PageID #: <pageID>
23
. . . generally follows the same rules as a motion to dismiss the complaint under
Rule 12(b)(6).” Bates v. Green Farms Condo. Ass’n, 958 F.3d 470, 480 (6th Cir. 2020)
(citing D’Ambrosio v. Marino, 747 F.3d 378, 383 (6th Cir. 2014)); see also Holland v.
FCA US LLC, 656 F. App’x 232, 236 (6th Cir. 2016). 	“In other words, judgment on
the pleadings is appropriate where, construing the material allegations of the
pleadings and all reasonable inferences in the light most favorable to the non-moving
party, the Court concludes that the moving party is entitled to judgment as a matter
of law. 	Anders v. Cuevas, 984 F.3d 1166, 1174 (6th Cir. 2021). 	In construing the
pleadings, the Court accepts the factual allegations of the non-movant as true, but
not unwarranted inferences or legal conclusions. 	Holland, 656 F. App’x at 236–37
(citing Gregory v. Shelby Cnty., 220 F.3d 433, 446 (6th Cir. 2000)).
While “[t]he court’s decision rests primarily upon the allegations of the
complaint[,]” “exhibits attached to the complaint may also be taken into account.”
JTO, Inc. v. Travelers Indem. Co. of Am., 242 F. Supp. 3d 599, 602 (N.D. Ohio 2017)
(citation modified). “In addition to the pleadings, courts may consider any documents
referenced in the complaint that are central to the dispute.” 	Estate of Q.W., 682 F.
Supp. 3d at 680 (citing United Food & Com. Workers, Loc. 1995, 51 F.4th at 202).
Only “well-pleaded factual allegations” that “plausibly give rise to an entitlement of
relief” and “allow the court to draw the reasonable inference that the defendant is
liable for the misconduct alleged” will survive. Bates, 958 F.3d at 480 (quotation and
citation omitted). 	Conversely, “[m]ere labels and conclusions are not enough[.]”
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 23 of 38. PageID #: <pageID>
24
Engler, 862 F.3d at 575. 	Nor are facts that are “merely consistent with” liability.
Bates, 958 F.3d at 480 (quotation omitted).
Benedetti Holdings and Albert Benedetti move for judgment on the pleadings.
(ECF No. 14.) 	In addition, in a footnote on the first page of their brief, Defendants
write that, if the Court denied Benedetti’s motion to compel arbitration, then
Benedetti, LLC “reserve[d] the right to seek dismissal on the basis that Plaintiff’s
contract claims are untimely and its fraud-based claims are fatally flawed.” 	(Id.,
PageID #181.) 	To that end, Defendants include Benedetti, LLC in their arguments
regarding Plaintiff’s fraudulent inducement claim. 	(ECF No. 14, PageID #184–88.)
Defendants contend that (1) Plaintiff’s fraudulent inducement claim is time-barred
and Plaintiff’s fraud-based claims lack particularity; (2) Benedetti Holdings and
Albert Benedetti were not parties to any contract with Plaintiff; (3) Plaintiff fails to
allege the required elements of tortious interference with contractual and business
relations as to Benedetti Holdings and Albert Benedetti; and (4) Plaintiff’s personal
liability claim against Albert Benedetti fails because piercing the corporate veil is not
a cause of action under Ohio law. (ECF No. 14, PageID #184–92.)
III.A. Fraudulent Inducement
To state a claim for fraudulent inducement, a plaintiff must allege: (1) a false
representation concerning a fact or concealment of a material fact where there is a
duty to disclose; (2) knowledge of the falsity of the representation or utter disregard
for its truth; (3) intent to induce reliance on the representation; (4) justifiable reliance
on the representation; and (5) injury proximately caused by the reliance. Micrel, Inc.
v. TRW, Inc., 486 F.3d 866, 874 (6th Cir. 2007) (citations omitted).
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 24 of 38. PageID #: <pageID>
25
Claims 	for 	fraud, 	including 	for 	fraudulent 	inducement, 	must 	meet 	the
heightened pleading standard of Rule 9(b). 	That Rule requires a plaintiff to “state
with particularity the circumstances constituting fraud or mistake.” 	Fed. R. Civ.
P. 9(b). 	To satisfy the Rule, “a plaintiff must (1) specify the allegedly fraudulent
statements, (2) identify the speaker, (3) state when and where the statements were
made, 	and 	(4) 	explain 	what 	made 	the 	statements 	fraudulent.” 	Newberry 	v.
Silverman, 789 F.3d 636, 645 (6th Cir. 2015) (quoting Republic Bank & Trust Co. v.
Bear Stearns & Co., Inc., 683 F.3d 239, 247 (6th Cir. 2012)) (internal quotations
omitted). 	But “[m]alice, intent, knowledge, and other conditions of a person’s mind
may be alleged generally.” Fed. R. Civ. P. 9(b).
As a threshold matter, Defendants claim that Plaintiff “essentially contends
that it was provided with a machine that did not match what was contemplated in
the contract . . . [which] is a breach of contract claim, not a fraudulent inducement
claim.” 	(ECF No. 14, PageID #185; ECF No. 21, PageID #305.) 	But Plaintiff’s
complaint alleges that Defendants made multiple misrepresentations regarding the
REHEAT Machine, including its intended use and provided false photographs of the
machine. 	(ECF No. 1, ¶ 93, PageID #18.) 	Moreover, alleged misrepresentations to
induce parties to enter into a contract resulting in products that do not conform to
what the parties agreed to can constitute a fraudulent inducement claim. 	See, e.g.,
Benedettini Cabinets, L.P. v. Sherwin-Williams Co., 695 F. Supp. 3d 948, 956 (N.D.
Ohio 2023).
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 25 of 38. PageID #: <pageID>
26
Defendants raise multiple arguments regarding why Plaintiff’s fraudulent
inducement claim should be dismissed. 	Defendants claim that it is time-barred.
(ECF No. 14, PageID #185–87.) Also, Defendants claim that Plaintiff’s complaint “is
devoid of any allegations about any representations—false or otherwise—by ABH or
Albert.” 	(Id., PageID #185.) 	Finally, Defendants allege that Plaintiff’s fraudulent
inducement claim lacks particularity. (Id., PageID #187.)
III.A.1. Statute of Limitations
Under Ohio law, an action for fraud “shall be brought within four years after
the cause thereof accrued.” 	Ohio Rev. Code § 2305.09(C). 	However, an action for
fraud “shall not accrue until . . . the fraud is discovered.” 	Id. “[T]his standard does
not require the victim of the alleged fraud to possess concrete and detailed knowledge,
down to the exact penny of damages, of the alleged fraud; rather, the standard
requires only facts sufficient to alert a reasonable person of the possibility of fraud.”
Cundall v. U.S. Bank, 122 Ohio St. 3d 188, 2009-Ohio-2523, 909 N.E.2d 1244, ¶ 30
(citation omitted). “[C]onstructive knowledge of facts, rather than actual knowledge
of their legal significance, is enough to start the statute of limitations running under
the discovery rule.” Id. (citing Flowers v. Walker, 63 Ohio St. 3d 546, 549, 589 N.E.2d
1284 (1992)) (citation modified).
According to Plaintiff, it did not know that Defendants allegedly did not
provide the machine that it requested and made false representations about it until
Spring 2024. 	(ECF No. 1, ¶ 85, PageID #17.) 	Because Plaintiff filed this action in
May 2025, Plaintiff would be well within the statute of limitations after it discovered
Defendants’ alleged fraud.
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 26 of 38. PageID #: <pageID>
27
Defendants argue that Plaintiff had constructive knowledge of the issues with
the REHEAT Machine because Plaintiff “had all the technical and mechanical
information for the REHEAT Machine as well as any additional training documents
provided by the Benedetti LLC employees.” 	(ECF No. 14, PageID #186.) 	Further,
Defendants claim that Plaintiff did not “make any form of inquiry other than merely
complaining about the alleged nonperformance of the machine” and that Plaintiff
“had been put on notice that the REHEAT Machine was allegedly ‘too small’ to meet
Plaintiff’s intended needs while Plaintiff and Plaintiff’s employees were being
trained.” (Id.; ECF No. 21, PageID #306–07.)
Based on the allegations in the complaint, which the Court must accept as true
at this stage of the proceedings, Plaintiff had no way to know that the machine was
allegedly not the one for which it contracted. As Defendants note, Plaintiff had access
to the technical and mechanical information regarding the equipment and was on
notice as early as 2014 that the equipment had performance issues (ECF No. 1, ¶ 37,
PageID #9), but in the current procedural posture there is no indication that Plaintiff
knew, should have known, or could have known why those performance issues were
occurring. In other words, had Plaintiff known at the start of its business relationship
with Defendants that the new machines for which it contracted were allegedly not
new and designed for another use, the near decade of performance issues that
followed might have played out differently. And Plaintiff might have filed arbitration
much sooner. 	Instead, based on the facts alleged in the complaint, Defendants
provided Plaintiff with correspondence for several years that the machine required
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 27 of 38. PageID #: <pageID>
28
additional parts at additional cost to be remedied or that there were other issues with
the roads. (Id., ¶¶ 36, 40–41, 45, 53, 58 69, 78–79 & 80–81, PageID #9–12, #14, #16
& #109–11.) 	Further, Defendants told Plaintiff that it would receive new machines
and allegedly provided Plaintiff with photographs of the machine that Plaintiff claims
that it later learned were in fact not of the machine for which it contracted. 	(Id.,
¶¶ 26–27 & 93, PageID #7, #18, #43–44 & #67.) 	On these facts, taken as true, a
reasonable person would not be aware of the possibility of fraud. Cundall, 2009-Ohio-
2523, at ¶ 30. And Defendant can lull Plaintiff into complacency then argue it slept
on it rights.
Moreover, the cases on which Defendants rely do not help their argument. In
Carl L. Brown, Inc. v. Lincoln Nat’l Life Ins., 2003-Ohio-2577, ¶ 61 (Ohio Ct. App.),
the court determined that the substantial increase in an insurance premium, along
with a signed rider, “was sufficient to put [the plaintiff] on notice” regarding billing
that was allegedly not proper. In Riddick v. Taylor, 2018-Ohio-171, 105 N.E.3d 446,
¶ 14 (Ohio Ct. App.), the court determined that the plaintiff knew about his allegedly
fraudulent diagnosis at the time it was made. 	Finally, in Trohoske v. Chicago Title
Ins. Co., No. 1:11-cv-877, 2011 WL 6012412, at *8 (N.D. Ohio Nov. 30, 2011), the court
determined 	that 	settlement 	statements 	disclosed 	material 	information 	to 	the
plaintiffs regarding the title insurance. These cases are distinguishable because each
provides an objective point of reference outside the limitations period. 	Here, in
contrast, Plaintiff could not reasonably have known that the machine provided to it
was allegedly not what the one for which it contracted. For these reasons, the Court
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 28 of 38. PageID #: <pageID>
29
determines 	that 	the 	statute 	of 	limitations 	does 	not 	bar 	Plaintiff’s 	fraudulent
inducement claim. Cundall, 2009-Ohio-2523, at ¶ 30.
III.A.2. Particularity
Defendants argue that the complaint “is devoid of any allegations about any
representations—false or otherwise—by ABH or Albert” and that therefore Plaintiff’s
fraudulent inducement claim against Benedetti Holdings and Mr. Benedetti cannot
survive. (ECF No. 14, PageID #185.) Further, Defendants claim that Plaintiff fails
to allege fraudulent inducement with particularity against Benedetti, LLC. 	(Id.,
PageID #187.)
III.A.2.i. Benedetti Holdings
A 	review 	of 	the 	complaint 	shows 	that 	Plaintiff 	has 	not 	satisfied 	the
particularity 	requirement 	of 	Rule 	9(b) 	for Benedetti 	Holdings. 	There 	are 	no
allegations in the complaint regarding any alleged fraudulent statements made by
anyone on behalf of Benedetti Holdings. 	Indeed, Benedetti Holdings is not even
mentioned in the section of the complaint regarding fraudulent inducement. 	(ECF
No. 1, ¶¶ 112–21, PageID #22.) 	Therefore, Plaintiff has not satisfied any of the
elements of particularity for Benedetti Holdings. Newberry, 789 F.3d at 645.
III.A.2.ii. Albert Benedetti
Although Plaintiff identifies Mr. Benedetti in the complaint, it only claims that
he did not disclose to BAK Group certain details about the REHEAT Machine,
including that it had allegedly been used, built for another customer, and not built
for the contracted or intended purpose. (ECF No. 1, ¶ 93, PageID #18.) But even if
true, Plaintiff only generally alleges that Mr. Benedetti made these omissions
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 29 of 38. PageID #: <pageID>
30
throughout the course of the business relationship and does not specify when and
where the statements were made. Newberry, 789 F.3d at 645.
The only alleged fraudulent statement that satisfies the time and place
requirement is that on January 15, 2014, BAK Group and Benedetti entered into a
purchase agreement, which listed the intended use of the REHEAT Machine as being
“for use to lay new recycled road asphalt in Bahrain, Kuwait, United Arab Emirates,
Oman, and Qatar and Saudi Arabia.” 	(ECF No. 1, ¶ 25, PageID #7 & #30.) 	BAK
Group agreed to purchase a new “ReHeat Asphalt Pavement Heater” and new
“ReHeat Recycler” for a total purchase price of $2,575,000 for the equipment and
delivery to Bahrain. (Id., ¶¶ 26–27, PageID #7, #43–44 & #67.)
Defendants claim that Plaintiff admitted in the complaint that Mr. Benedetti
was not a party to the contract. 	(ECF No. 14, PageID #185 (citing Paragraph 25 of
the complaint).) But that is not the case. Although Mr. Benedetti is not mentioned
in that paragraph, Plaintiff alleges later (in Paragraph 93) that Mr. Benedetti took
part in the alleged misrepresentation that the REHEAT Machine was new when
really it was allegedly not. (ECF No. 1, ¶ 93, PageID #18.) Mr. Benedetti’s signature
is on every page of the purchase agreement, including the pages that list a new
“ReHeat Asphalt Pavement Heater” and new “ReHeat Recycler.” (ECF No. 1, PageID
#30–49.)
Therefore, 	Plaintiff’s 	only 	claim 	of 	fraudulent 	inducement 	against
Mr. Benedetti pled with particularity is that, on January 15, 2014, Mr. Benedetti
represented that Benedetti, LLC would provide new REHEAT machines to Plaintiff.
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 30 of 38. PageID #: <pageID>
31
(ECF No. 1, ¶ 93, PageID #18 & #30–49.) This is the only allegation that satisfies the
heightened 	pleading 	standard 	of 	Rule 	9(b) 	because 	it 	specifies 	the 	allegedly
fraudulent statements, identifies the speaker, states when and where the statements
were made, and explains what made the statements allegedly fraudulent. Newberry,
789 F.3d at 645.
III.A.2.iii. Benedetti, LLC
As 	for 	Benedetti, 	LLC, 	although 	Plaintiff 	identifies 	several 	allegedly
fraudulent statements and representations, Plaintiff fails to attribute any of these
statements to a speaker. (See generally ECF No. 1.) Some employee or agent had to
make the alleged representations on behalf of Benedetti, LLC, but the only person
Plaintiff identifies is Mr. Benedetti, which the Court previously discussed. (Id., ¶ 93,
PageID #18.) 	Therefore, any statements that Plaintiff attributes to Benedetti, LLC
without listing an employee or agent fail to meet the heightened pleading standard
of Rule 9(b). Newberry, 789 F.3d at 645.
* 	* 	*
Defendants contend only that Plaintiff did not plead its fraudulent inducement
claim with particularity. (ECF No. 14, PageID #184–85 & #187–88.) Therefore, the
Court does not address the remaining elements of fraud. 	Plaintiff claims that a
“dismissal of a fraud claim based on particularity requirements is inappropriate”
without a motion for a more definite statement pursuant to Rule 12(e). (ECF No. 18,
PageID #284.) Indeed, the Sixth Circuit has determined that, “despite the plaintiffs’
failure to satisfy the requirements of Rule 9(b), in the absence of defendants’ motion
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 31 of 38. PageID #: <pageID>
32
for more definite statement under Rule 12(e), dismissal on this basis alone would not
be appropriate.” Coffey v. Foamex L.P., 2 F.3d 157, 162 (6th Cir. 1993).
For these reasons, if Plaintiff wants to pursue its fraudulent inducement claim,
the Court ORDERS Plaintiff to amend its pleading to allege the specific fraudulent
statements, speakers, dates, locations, and reasons why such statements were
fraudulent no later than February 17, 2026. Resource Title Agency, Inc. v. Morreale
Real Est. Servs., Inc., 314 F. Supp. 2d 763, 776 (N.D. Ohio 2004).)
III.B. Breach of Contract
Under Ohio law, “[t]o establish a claim for breach of contract, a plaintiff must
prove: (1) the existence of a contract, (2) performance by the plaintiff, (3) breach by
the defendant, and (4) damages or loss resulting from the breach.” In re Fifth Third
Early Access Cash Advance Litig., 925 F.3d 265, 276 (6th Cir. 2019) (citing Claris,
Ltd. v. Hotel Dev. Servs., LLC, 2018-Ohio-2602, 104 N.E.3d 1076, ¶ 28 (Ohio Ct.
App.)).
Defendants argue that Plaintiff’s breach of contract claim regarding the
purchase 	agreement’s 	arbitration 	agreement 	as 	to 	Benedetti 	Holdings 	and
Mr. Benedetti “fails on its face” because “[n]owhere within the Complaint does
Plaintiff allege that either ABH or Albert was a party to the purchase agreement.”
(ECF No. 14, PageID #187.) 	Plaintiff argues that Defendants made the same
argument before the arbitrator, and the arbitrator determined that they should be
included in the arbitration “based on the broad scope of the arbitration provision in
the Purchase Agreement.” 	(ECF No. 18, PageID #279.) 	Plaintiff provides no
argument how such a determination would have effect here. 	(Id.) 	In any event,
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 32 of 38. PageID #: <pageID>
33
Plaintiff maintains that the Court should “consider the language of the contract and
the 	attending 	circumstances” 	in 	determining 	whether 	Benedetti 	Holdings 	and
Mr. Benedetti were parties to the purchase agreement and the arbitration provision.
(Id. (quoting West v. Household Life Ins. Co., 2007-Ohio-845, 170 Ohio App.3d 463,
867 N.E.2d 868, ¶ 13).)
The Sixth Circuit has observed that Ohio law “generally prevents nonparties
from 	enforcing 	arbitration 	clauses 	unless 	they 	are 	intended 	third-party
beneficiaries.” 	AtriCure, Inc. v. Meng, 12 F.4th 516, 526 (6th Cir. 2021) (citations
omitted). In AtriCure, the Sixth Circuit determined that, “although the Distribution
Agreement’s arbitration clause is broad (it covers claims ‘relating to’ the agreement),
the clause does not expressly say whether it reaches claims against nonparties.” Id.
So too here. 	There is nothing in the record or the purchase agreement itself that
provides for Benedetti Holdings being a party to the agreement. (See generally ECF
No. 1.)
Regarding Mr. Benedetti, “when a party resisting arbitration is not a signatory
to an arbitration agreement, a presumption against arbitration arises.” 	Peters v.
Columbus Steel Castings Co., 2006-Ohio-382, 2006 WL 225274, ¶ 11 (Ohio Ct. App.)
(citation omitted). 	But the Court has already determined that Mr. Benedetti’s
signature is on every page of the purchase agreement. (ECF No. 1, PageID #30–49.)
Therefore, Mr. Benedetti was a party to the purchase agreement and its arbitration
provision.
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 33 of 38. PageID #: <pageID>
34
For these reasons, because Defendants only argue that Benedetti Holdings and
Mr. Benedetti were not parties to the purchase agreement, the Court does not address
the other elements of a breach of contract claim. 	(ECF No. 14, PageID #187.)
Accordingly, the Court determines that Count Three of Plaintiff’s complaint survives
against Benedetti, LLC and Albert Benedetti, and DISMISSES Count Three as to
Benedetti Holdings.
III.C. Tortious Interference
Count 	Four 	of 	Plaintiff’s 	complaint 	alleges 	tortious 	interference 	with
contractual and business relations against all Defendants. 	(ECF No. 1, ¶¶ 136–42,
PageID #24–25.) “Ohio law recognizes causes of action for both tortious interference
with a business relationship and tortious interference with contract rights.” 	Super
Sulky, Inc. v. U.S. Trotting Ass’n, 174 F.3d 733, 741 (6th Cir. 1999) (citing A & B-
Abell Elevator Co., Inc. v. Columbus/Central Ohio Bldg. & Constr. Trades Council,
73 Ohio St. 3d 1, 1995-Ohio-66, 651 N.E.2d 1283, 1294). The only difference between
the two causes of action is that tortious interference with a business relationship
“does not require proof of a contractual relationship.” Id. “The torts of interference
with business relationships and contract rights generally occur when a person,
without a privilege to do so, induces or otherwise causes a third person not to enter
into or continue a business relation with another, or not to perform a contract with
another.” Id. (quoting A & B-Abbell, 651 N.E.2d at 1294).
“Under Ohio law, a cause of action for [tortious interference with business
relations] is made out when ‘. . . one who, without a privilege to do so, induces or
otherwise purposely causes a third party not to enter into, or continue, a business
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 34 of 38. PageID #: <pageID>
35
relationship with another . . . .’” Franklin Tractor Sales v. New Holland N. Am., Inc.,
106 F. App’x 342, 344 (6th Cir. 2004) (quoting Wright v. MetroHealth Med. Ctr., 58
F.3d 1130, 1138 (6th Cir. 1995)). 	To prevail on this claim, Plaintiff must establish:
“(1) the existence or the prospect of a business relationship; (2) that [Defendants]
knew 	of 	the 	[Plaintiff’s] 	relationship; 	(3) 	that 	[Defendants] 	intentionally 	and
materially 	interfered 	with 	the 	[Plaintiff’s] 	prospective 	relationship; 	(4) 	the
interference was without justification; and (5) the interference causes [Plaintiff] to
suffer damages.” Bodine Perry, PLLC v. Bodine, 667 F. Supp. 3d 617, 635 (N.D. Ohio
2023) (citation omitted).
Defendants argue that Plaintiff fails to allege any intentional conduct by
Benedetti Holdings and Albert Benedetti. 	(ECF No. 14, PageID #188–91; ECF
No. 21, PageID #307–08.)
III.C.1. Benedetti Holdings
There is no specific mention of Benedetti Holdings in the complaint regarding
an alleged tortious interference with contractual or business relations. (See generally
ECF No. 1.) Instead, Plaintiff makes a conclusory allegation that “Defendants have
knowledge of [Plaintiff’s] contractual and business relations” and took “intentional
actions including . . . the Fraudulent Conduct in order to cause a breach and/or
termination of the contractual and business relations between BAK Group and the
Ministry, other governmental entities, and prospective customers.” (Id., ¶¶ 138–39,
PageID #24.) Such allegations constitute “[m]ere labels and conclusions,” which are
“not enough” to state a claim. 	Engler, 862 F.3d at 575. 	Accordingly, the Court
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 35 of 38. PageID #: <pageID>
36
determines 	that 	Plaintiff 	fails 	to 	state 	a 	claim 	for 	tortious 	interference 	with
contractual and business relations against Benedetti Holdings.
III.C.2. Albert Benedetti
Plaintiff’s complaint alleges several prospective and established business
relationships with the Ministry and other government entities, including being
awarded at least one job. (ECF No. 1, ¶¶ 13, 24, 38, 43, 52, 59–60, 77, PageID #5, #7,
#9–13, #15–16 & #61–66.) 	Although the majority of references to correspondence
with Defendants in the complaint refer to Benedetti only, there is at least one
allegation 	that 	Plaintiff 	informed 	Mr. 	Benedetti 	that 	the 	Ministry 	issued
correspondence that included the REHEAT Machine specifications as one of its
tender jobs in 2013. 	(Id., ¶ 24, PageID #7 & #61–66.) 	Based on the complaint,
Mr. Benedetti allegedly knew that the intended use of the REHEAT Machine was for
paving long stretches of roadway but provided a machine that was meant for paving
parking lots. 	(Id., ¶ 93, PageID #18.) 	Such an omission would likely have to be
intentional, and the machine not performing its intended purpose would be material.
Defendants provide no alleged privilege or justification for Mr. Benedetti. 	(See
generally ECF No. 14; ECF No. 21.) 	Finally, Plaintiff alleges that the interference
caused it economic damages and that it had not recouped a “dollar on its investment.”
(ECF No. 1, ¶ 77, PageID #15–16.)
Defendants argue that Plaintiff did not address “the nature of the actor’s
conduct” and “the actor’s motive,” citing the factors that the Ohio Supreme Court
listed in Fred Siegel Co., L.P.A. v. Arter & Hadden, 85 Ohio St.3d 171, 178–79, 1999-
Ohio-260, 707 N.E.2d 853 (citation omitted). (ECF No. 14, PageID #189–90.) But the
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 36 of 38. PageID #: <pageID>
37
Ohio Supreme Court addressed these factors at the summary judgment stage. Id. In
the 	procedural 	posture 	of 	Defendants’ 	motion 	for 	judgment 	on 	the 	pleadings,
Plaintiff’s 	allegations 	regarding 	Mr. 	Benedetti 	“allow 	the 	court 	to 	draw 	the
reasonable inference that the defendant is liable for the misconduct alleged.” Bates,
958 	F.3d 	at 	480. 	Accordingly, 	Plaintiff’s 	tortious 	interference 	claim 	as 	to
Mr. Benedetti withstands Defendants’ motion.
* 	* 	*
For these reasons, the Court determines that Plaintiff’s tortious interference
claim as to Mr. Benedetti survives. 	Further, the Court DISMISSES Count Four
against Benedetti Holdings.
III.D. Corporate Veil
Count Six of Plaintiff’s complaint brings a claim for piercing the corporate veil
against Albert Benedetti. (ECF No. 1, ¶¶ 152–63, PageID #26–27.) But piercing the
corporate veil is not an independent cause of action. 	Trinity Health Sys. v. MDX
Corp., 180 Ohio App. 3d 815, 2009-Ohio-417, 907 N.E.2d 746, ¶ 26 (Ohio Ct. App.)
(citing Belvedere Condo. Unit Owners’ Assn. v. R.E. Roark Cos., Inc., 67 Ohio St. 3d
274, 287, 1993-Ohio-119, 617 N.E.2d 1075 (1993)). Piercing the corporate veil permits
individual shareholder liability for the actions of a corporation. 	Id. at ¶ 26.
Accordingly, it requires success or the likelihood of success of the merits of an
underlying claim. 	Although Plaintiff cites two cases in the Sixth Circuit that have
not 	outright 	dismissed 	claims 	for 	piercing 	the 	corporate 	veil, 	neither 	case
acknowledges Ohio law to the contrary, and the Court declines to follow the approach
of these courts. RAM Const. Servs. of Michigan, Inc. v. TH Restoration, Inc., No. 11
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 37 of 38. PageID #: <pageID>
38
CV 2507, 2012 WL 1854703, at *5 (N.D. Ohio May 21, 2012); Allied Diversified
Constr., Inc. v. Elite Mechanical, Inc., No. 1:16cv334, 2016 WL 7034238, at *4 (S.D.
Ohio Dec. 2, 2016). Therefore, the Court DISMISSES Count Six of the complaint.
CONCLUSION
For the foregoing reasons, the Court DENIES Plaintiff’s motion for leave to
file a surreply. 	(ECF No. 22.) 	Further, the Court DENIES Benedetti’s motion to
compel arbitration. 	(ECF No. 15.) 	Finally, the Court GRANTS IN PART AND
DENIES IN PART Defendants’ motion for judgment on the pleadings. (ECF No. 14.)
Specifically, the Court DISMISSES Counts Three and Four as to Benedetti Holdings
and Count Six. 	Regarding Count One, the Court ORDERS Plaintiff to amend its
pleading to allege the specific fraudulent statements, speakers, dates, locations, and
reasons why such statements were fraudulent no later than February 17, 2026.
SO ORDERED.
Dated: February 2, 2026
`
J. Philip Calabrese
United States District Judge
Northern District of Ohio
Case: 1:25-cv-01093-JPC Doc #: 24 Filed: 02/02/26 38 of 38. PageID #: <pageID>