The motion does not expressly identify for which of the two counterclaims1
judgment is sought. Upon review, however, it is likely that judgment is sought as to the first
counterclaim.
UNITED STATES BANKRUPTCY COURT
FOR THE EASTERN DISTRICT OF PENNSYLVANIA
In re 	: 	Chapter 11
COVENTRY ASSOCIATES, L.P. and 	:
JEEH, L.P. (Jointly Administered)
Debtors 	: 	Bankruptcy No. 05-11798F
____________________________________
COVENTRY ASSOCIATES, L.P., 	:
Plaintiff 	:
v. 	: 	Adversary No. 05-00451F
LANNETT COMPANY, INC. 	:
Defendant 	:
.................................................
MEMORANDUM
.................................................
The chapter 11 debtor, Coventry Associates, L.P., commenced an adversary
proceeding against one of its former tenants, Lannett Company, Inc., which proceeding
included an objection to Lannett’s proof of claim as well as an assertion that it breached
the lease. Lannett then filed an answer in opposition, along with two counterclaims,
averring that Coventry, rather than it, breached the terms of their lease. Coventry then
filed its response challenging the two counterclaims.
Presently before me is a motion by Lannett for judgment on the pleadings
“as to the claims of the complaint and counterclaim . . . .“ 	In response thereto, Coventry1
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 1 of 20
2
filed a pleading opposing Lannett’s motion and combined this response with a “motion
for leave to file an amended complaint.” Lannett opposes Coventry’s request for leave to
amend.
The parties have submitted memoranda in support of their respective
positions as well as presented oral argument. For the following reasons, I shall grant
Coventry leave to amend its complaint and deny Lannett’s motion for judgment on the
pleadings.
I.
A.
The original complaint, filed on July 7, 2005, alleged that on December 19,
1997, Coventry and Lannett entered into a lease agreement for warehouse space located at
500 State Road, Bensalem, Pennsylvania. The lease term was three years and three
months, beginning on December 29, 1997. Complaint Ex. A.
By letter agreement dated May 11, 2004, the parties amended the December
1997 lease agreement by extending the term of the lease until April 30, 2005 and fixing
the rent at $10,830.55 per month, commencing May 1, 2004. Complaint Ex. B. The
lessor had the right to terminate the lease after September 30, 2005, upon 90 days written
notice. This letter agreement incorporated all the provisions of the December 1997
agreement, except to the extent expressly modified.
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 2 of 20
Upon my review of Exhibit A, it appears that Coventry is referring to the2
following lease provisions in paragraphs 10 and 11 of its complaint:
“Lessee covenants and agrees that it will . . . surrender the demised
premises in the same condition in which Lessee has herein agreed
to keep them.”
Exhibit A, ¶ 8(b).
If Lessee shall retain possession of the demised premises or any
portion thereof without Lessor’s consent following the expiration
of the Lease or sooner termination for any reason, then Lessee shall
pay to Lessor for each day of such retention triple the amount of
the daily rental as of the last month prior to the date of expiration
or termination. Lessee shall also indemnify, defend, protect and
hold Lessor harmless from any loss, liability or cost, including
reasonable attorney’s fees, resulting from delay by Lessee in
surrendering the demised premises, including, without limitation,
any claims made by any succeeding Lessee founded on such delay.
. . . Additionally, in the event that upon termination of the Lease
Lessee has not fulfilled its obligation with respect to the repairs
and cleanup of the demised premises or any other Lessee
obligations as set forth in the Lease, then Lessor shall have the
right to perform any such obligations as it deems necessary at
Lessee’s sole cost and expense, and any time required by Lessor to
complete such obligations shall be considered a period of holding
over and the terms of this section shall apply.
(continued...)
3
Coventry further alleged in its original complaint that the lease required
Lannett to “surrender[] the Premises in the same condition and order as it was delivered
to Lannett at the commencement of the Lease term. Lannett was also responsible for
repairs to the Premises.” Complaint ¶ 10. Lannett denied this allegation. Answer ¶ 10.
Coventry also averred that the lease provided that Lannett’s failure to surrender the
leasehold in the original condition made it liable for “triple the amount of the rent for the
time period associated with the Debtor’s efforts to effectuate Lannett’s Lease obligations
with respect to repair and restoration of the Premises.” Complaint ¶ 11. Lannett also
denied this allegation. 2
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 3 of 20
(...continued)2
Id. ¶ 47.
In paragraph 4 of the complaint, Coventry asserted that this proceeding was a3
core matter. Under Fed. R. Bankr. P. 7012(b), Lannett was required to admit or deny the
allegation; moreover, if Lannett’s response is that the proceeding is non-core, then the answer
must state whether it consents to the entry of final orders or judgment by the bankruptcy court.
Instead of complying with Rule 7012(b), Lannett merely denied Coventry’s assertion as a legal
conclusion to which it need not respond. I note, however, that Lannett seems to believe this
court has the power to enter a final judgment against Coventry, via a motion for judgment on the
pleadings.
At present, I need not decide the jurisdiction issue, nor will I imply from Lannett’s
motion that it consents to my entry of a final judgment in this case. Even if this proceeding is not
a core proceeding, it is related to the pending bankruptcy case. Bankruptcy courts have the
power to issue interlocutory orders in non-core proceedings. See, e.g., Celotex Corp. v. Edwards,
514 U.S. 300, 309 n.7 (1995); In re CEI Roofing, Inc., 315 B.R. 61, 67 (Bankr. N.D. Tex. 2004).
Orders denying judgment on the pleadings and orders granting leave to amend the complaint are
only interlocutory. See generally, e.g., Walker v. City of Pine Bluff, 414 F.3d 989, 991 (8th Cir.
(continued...)
4
Based upon these averments, Coventry demanded in Count I of its
complaint that Lannett’s breach of the lease entitled it to damages of “$1,083.05 per day
from May 1, 2005 to the date of completion of the repairs and restoration of the
Premises,” plus the costs of the repairs, estimated to exceed $20,000.
In Count II, Coventry averred that Lannett filed a prepetition claim in the
bankruptcy case seeking recovery of the latter’s $15,000 security deposit. The claim,
Coventry asserted, must be disallowed due to Lannett’s breach of the lease. In Count III,
Coventry contended that Lannett filed an “administrative proof of claim” that must also
be disallowed, as it has no valid grounds for such a claim.
Lannett’s answer, filed August 5, 2005, admitted the existence of a lease
agreement as well as the later amendment between the parties, but denied that it
committed any breach. 	It acknowledged that it had filed a proof of claim in the amount3
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 4 of 20
(...continued)3
2005); Tensley Bey v. Virginia, 16 Fed. Appx. 271 (4th Cir. 2001).
5
of its security deposit “plus unliquidated contingent amounts for accruing interest, costs
and fees,” as well as an administrative claim. Answer ¶¶ 20, 24. It denied that these
claims should be disallowed.
Lannett’s first counterclaim sought recovery of its $15,000 security deposit,
plus interest, costs, and attorney’s fees. Its second counterclaim asserted that the “fire
supression system was out of compliance with code,” and this constituted a breach of the
lease by Coventry. Counterclaim II ¶¶ 8, 9. Unspecified damages and costs and fees
were demanded.
B.
Lannett’s instant motion for judgment on the pleadings asserts that on
October 5, 2005 (after the complaint was filed), this court confirmed Coventry’s proposed
chapter 11 plan. As part of this approved plan, Coventry then sold the leasehold for
$2,825,000. Lannett maintains that the agreement of sale for the realty did not require
that Coventry make any repairs to the property, and the buyer received it in “as is”
condition. Lannett reasons that even if it failed to make required repairs under the lease,
Coventry suffered no damages thereby, because there is no evidence that the purchase
price was reduced. And if there were no damages caused by an alleged failure to repair,
then Lannett believes it must be entitled to the return of its security deposit.
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 5 of 20
I could not locate any choice of law provision in the lease. The complaint and4
answer reveal that Coventry is a Pennsylvania limited partnership and Lannett is a Delaware
corporation with its principal place of business at the leasehold. As the leasehold was located in
Pennsylvania, and as there is no evidence that any other jurisdiction has any interest in the
matter, Lannett’s reliance upon Pennsylvania law seems appropriate and Coventry does not
protest.
6
Finally, Lannett argues in its present motion that the holdover damage
provision of the lease, paragraph 47, must be construed as applying only to the period of
time between when the lessor commences making the required repairs to the leasehold
and when such repairs are completed. Thus it challenges Coventry’s interpretation—that
the holdover period with its concomitant damage clause starts from the end of the lease to
whenever the repairs are completed—as not consistent with the parties’ intent. Lannett
also maintains that Coventry’s interpretation would cause paragraph 47 to become an
“unenforceable penalty” under Pennsylvania law. 4
C.
Coventry’s proposed amended complaint, attached to its motion for leave to
amend, would add four paragraphs to its factual averments. These paragraphs assert that
the State Road realty was sold to an entity known as 1329 Ford Road Associates on
October 17, 2005 for $2,825,000, pursuant to the terms of a confirmed chapter 11 plan.
In addition, the proposed amended complaint adds to Count I the allegation that Coventry
found that certain necessary repairs to the property were not made by Lannett, that these
repairs reduced the value of the property, and that Lannett is liable for triple holdover rent
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 6 of 20
7
from May 1, 2005 until October 17, 2005 (the date of sale). The proposed amended
complaint did not change the averments of Counts II and III.
II.
Before considering Lannett’s motion for judgment on the pleadings, I shall
determine Coventry’s request for leave to amend. See generally Overton v. Southeastern
Pennsylvania Transportation Authority, 2004 WL 1243666, at *5 (E.D. Pa. 2004) (court
determines the Rule 12(c) motion after first granting leave to amend the complaint);
Grelach v. Volvo Cars of North America, 1997 WL 129004 (E.D. Pa. 1997) (same). The
causes of action are unchanged by the proposed amendment.
Amendments to pleadings in bankruptcy adversary proceedings are
governed by Fed. R. Civ. P. 15, which rule is wholly incorporated by Fed. R. Bankr. P.
7015. Rule 15 provides in relevant part:
(a) Amendments. A party may amend the party’s pleading
once as a matter of course at any time before a responsive
pleading is served or, if the pleading is one to which no
responsive pleading is permitted and the action has not been
placed upon the trial calendar, the party may so amend it at
any time within 20 days after it is served. Otherwise a party
may amend the party’s pleading only by leave of court or by
written consent of the adverse party; and leave shall be freely
given when justice so requires. A party shall plead in response
to an amended pleading within the time remaining for
response to the original pleading or within 10 days after
service of the amended pleading, whichever period may be
the longer, unless the court otherwise orders.
Since Lannett has already filed its answer to Coventry’s complaint, leave of
court to amend is required. The rule itself declares that “leave shall be freely given when
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 7 of 20
8
justice so requires.” The significance of this phrase in determining a motion for leave to
amend has been explicated by the Supreme Court in the following manner:
Rule 15(a) declares that leave to amend “shall be freely given
when justice so requires”; this mandate is to be heeded. . . . If
the underlying facts or circumstances relied upon by a
plaintiff may be a proper subject of relief, he ought to be
afforded an opportunity to test his claim on the merits. In the
absence of any apparent or declared reason--such as undue
delay, bad faith or dilatory motive on the part of the movant,
repeated failure to cure deficiencies by amendments
previously allowed, undue prejudice to the opposing party by
virtue of allowance of the amendment, futility of amendment,
etc.--the leave sought should, as the rules require, be “freely
given.”
Foman v. Davis, 371 U.S. 178, 182 (1962) (citation omitted); accord United States v.
Duffus, 174 F.3d 333, 337 (3d Cir.), cert. denied, 528 U.S. 866 (1999):
The Supreme Court has indicated that in the absence of
evidence of “undue delay, bad faith or dilatory motive on the
part of the movant, repeated failure to cure deficiencies by
amendments previously allowed, undue prejudice to the
opposing party by virtue of allowing the amendment [or]
futility of amendment,” leave to amend should be freely
given.
Therefore, if there is either prejudice to the defendant or undue delay by the
plaintiff, or if the amendment would be futile, then leave to amend can, in the discretion
of the trial court, be denied. See, e.g., Lindquist v. Buckingham Township, 106 Fed.
Appx. 768, 2004 WL 1598735, at *6 (3d Cir. 2004); In re Kellogg, 166 B.R. 504, 510
(Bankr. D. Conn. 1994); In re Suburban Motor Freight, Inc., 114 B.R. 943, 951-52
(Bankr. S.D. Ohio 1990).
Here, there is no suggestion of undue delay. Lannett’s motion for judgment
on the pleadings was filed a few weeks after Coventry sold the realty. Coventry’s
proposal to amend the complaint quickly followed in response. Moreover, the allegations
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 8 of 20
9
that Coventry seeks to add could not have been included in the original complaint.
Therefore, I find there is no undue delay.
There also is no suggestion that Lannett would be prejudiced by the
proposed amendments. No new causes of action are added. Indeed, the only factual
additions concern the sale of the leasehold realty, which sale Lannett relies upon as a
defense to Coventry’s claims.
Lannett does contend, however, that Coventry’s proposed amendment
would be futile. And futility does serve as a basis for denial of leave to amend. See, e.g.,
Sarfaty v. Nowak, 369 F.2d 256, 259 (7th Cir. 1966), cert. denied, 387 U.S. 909 (1967)
(Rule 15(a) does not require a court to do a futile thing); Malmros v. Jones, 2004 WL
632726, at *5 (E.D. Pa. 2004). However, as will be discussed below, the proposed
amendments to the complaint are not futile and support a possibly viable cause of action.
Accordingly, Coventry’s motion to amend shall be granted.
III.
I turn next to Lannett’s motion for judgment on the pleadings, utilizing the
amended complaint as the relevant pleading.
Federal Rule of Civil Procedure 12(c) (incorporated into bankruptcy
adversary proceedings by Fed. R. Bankr. P. 7012(b)) states:
After the pleadings are closed but within such time as not to
delay the trial, any party may move for judgment on the
pleadings. If, on a motion for judgment on the pleadings,
matters outside the pleadings are presented to and not
excluded by the court, the motion shall be treated as one for
summary judgment and disposed of as provided in Rule 56,
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 9 of 20
10
and all parties shall be given reasonable opportunity to present
all material made pertinent to such a motion by Rule 56.
As explained by the Third Circuit Court of Appeals, a trial court may not
grant a motion for judgment on the pleadings
unless the movant clearly establishes there are no material
issues of fact, and he is entitled to judgment as a matter of
law. . . . We must view the facts presented in the pleadings
and the inferences to be drawn therefrom in the light most
favorable to the nonmoving party.
Sikirica v. Nationwide Insurance Co., 416 F.3d at 214, 220 (3d Cir. 2005); see, e.g.,
Hayes v. Community General Osteopathic Hosp., 940 F.2d 54, 56 (3d Cir. 1991), cert.
denied, 502 U.S. 1060 (1992); Institute for Scientific Information, Inc. v. Gordon &
Breach, Science Publishers, Inc., 931 F.2d 1002, 1004 (3d Cir.), cert. denied, 502 U.S.
909 (1991); Society Hill Civic Ass’n. v. Harris, 632 F.2d 1045, 1054 (3d Cir. 1980).
Thus, for purposes of a Rule 12(c) motion raised by a defendant, the factual
assertions made in the plaintiff’s amended complaint are accepted as true. Accordingly,
when a defendant files a Rule 12(c) motion, the appropriate standard for determination is
identical to that used in deciding whether to grant a Rule 12(b)(6) motion to dismiss a
complaint for failure to state a cause of action. One technical difference between a
motion under Rule 12(b)(6) and under Rule 12(c) is the timing. The former motion must
be filed before any responsive pleading, while the latter motion is filed after the close of
the pleadings. See Turbe v. Government of Virgin Islands, 938 F.2d 427, 428 (3d Cir.
1991).
Since granting a Rule 12(c) motion results in a determination on the merits
at an early stage in the litigation, I may not grant judgment unless the movant clearly
establishes that no material issue of fact remains to be resolved and that the movant is
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 10 of 20
11
entitled to judgment as a matter of law. See Institute For Scientific Information, Inc. v.
Gordon and Breach, Science Publishers Inc, 931 F.2d at 1004. “In this fashion the courts
hope to insure that the rights of the nonmoving party are decided as fully and fairly on a
rule 12(c) motion, as if there had been a trial.” Society Hill Civic Ass’n v. Harris, 632
F.2d at 1054 (quoting 5 C. Wright & A. Miller, Federal Practice and Procedure, § 1368, at
690 (1969)).
In general, a court is constrained to consider only the actual pleadings in
deciding a motion for judgment on the pleadings. See Sikirica v. Nationwide Insurance
Co., 416 F.3d at 220. However, in Pryor v. NCAA, 288 F.3d 548, 560 (3d Cir. 2002), the
Circuit Court explained in the context of an analogous motion under Rule 12(b)(6):
“[D]ocuments whose contents are alleged in the complaint
and whose authenticity no party questions, but which are not
physically attached to the pleading, may be considered. ***
Documents that the defendant attaches to the motion to
dismiss are considered part of the pleadings if they are
referred to in the plaintiff’s complaint and are central to the
claim; as such, they may be considered by the court.”
(quoting 62 Fed. Proc., L. Ed. § 62:508); see also Pension Benefit Guaranty Corp. v.
White Consolidated Industries, Inc., 998 F.2d 1192, 196-97 (3d Cir. 1993). A similar
exception exists for motions under Rule 12(c). See Mele v. Federal Reserve Bank, 359
F.3d 251, 256 n.5 (3d Cir. 2004) (stating that a document that is “‘integral to or explicitly
relied upon in the complaint’ may be considered” without converting the motion to one
for summary judgment) (quoting In re Burlington Coat Factory Securities Litigation, 1114
F.3d 1410, 1426 (3d Cir. 1997)); Steinhardt Group, Inc. v. Citicorp, 126 F.3d 144, 145
(3d Cir. 1997).
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 11 of 20
12
To the extent that this exception would not apply, Lannett also requests that
this court take judicial notice of Coventry’s confirmed third amended plan of
reorganization, as well the exhibits attached thereto, including the agreement to sell the
former leasehold. Motion at 3. Insofar as judicial notice is concerned, Fed R. Evid.
201(b) states “[a] judicially noticed fact must be one not subject to reasonable dispute in
that it is either 1) generally known within the territorial jurisdiction of the trial court or 2)
capable of accurate and ready determination by resort to sources whose accuracy cannot
reasonably be questioned.”
Judicial notice can be taken of the terms of a confirmed chapter 11 plan.
See In re American Plumbing & Mechanical, Inc., 323 B.R. 442, 448 (Bankr. W.D. Tex.
2005); In re Blue Diamond Coal Co., 163 B.R. 798, 803 (Bankr. E.D. Tenn. 1994).
Moreover, as Coventry’s amended complaint makes reference to the reorganization plan,
see Complaint ¶ 12, I shall consider the terms of the debtor’s third amended plan,
including the sale agreement for the leasehold attached thereto, in connection with the
instant 12(c) motion. See generally In re Geotek Communications, Inc., 282 B.R. 165
(Bankr. D. Del. 2002) (terms of confirmed plan warrant entry of judgment on the
pleadings).
A.
I will first address Lannett’s contention that it is entitled to judgment on the
pleadings with regard to Coventry’s claims for damages due to the defendant’s alleged
failure to make necessary repairs to the leasehold. Lannett’s contention that dismissal is
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 12 of 20
13
required is premised primarily upon the common law principle that only nominal damages
can be awarded for a breach of contract when there is not a sufficient showing of actual
damages. See generally Coca-Cola Bottling Co. v. Coca-Cola Co., 988 F.2d 386, 409 (3d
Cir. 1993); Restatement (Second) of Contracts § 346(2) (1981).
Coventry’s breach of contract claim, as mentioned above, is based upon the
assertion that the defendant altered the physical condition of the leasehold and then failed
to restore the premises as contractually promised. Lannett concedes that I must accept
this assertion as true for purposes of deciding its motion for judgment on the pleadings. It
is further agreed for purposes of this Rule 12(c) motion that Coventry sold the leasehold
realty to 1329 Ford Associates. Lannett then examines the sale agreement and notes that
the agreement of sale attached to the confirmed third amended plan was dated in March
2005. This date is prior to Lannett vacating the leasehold; thus, at that time it could not
have been known that Lannett was not going to make the required repairs. Furthermore,
there is no provision in the agreement of sale addressing any needed repairs to the
property. The property was sold in “as is” condition.
Accordingly, Lannett argues that 1329 Ford Road’s purchase offer must
have implicitly assumed either that Lannett would make the necessary repairs, or that the
condition of the leasehold did not affect the value of the property. In either instance, the
purchase price would not be diminished and Coventry would suffer no damages.
The two inferences that Lannett draws from these documents are indeed
possible. However, in deciding a judgment on the pleadings, I must consider the facts
alleged as true and draw any reasonable inferences in favor of the non-moving party.
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 13 of 20
14
Based on the facts presented in Coventry’s amended complaint, I believe two alternative
inferences can be drawn, which inferences could lead to liability.
It is conceivable that at the time Coventry and 1329 Ford Road entered into
the sale agreement they were aware of the possibility that Lannett might not make the
specified repairs at the end of its lease term. If so, then the purchaser, 1329 Ford Road,
may have discounted the purchase price and assumed that the repairs would not be made.
Furthermore, paragraph 6.1 of the confirmed plan called for the sale of the
State Road realty at an auction, at which auction the purchase proposal offered by 1329
Ford Road would be the opening bid. Apparently, no higher bids were received, since the
sale price and purchaser were unchanged. Another reasonable inference from these facts
is that the absence of higher bids was caused by the condition of the leasehold with its
needed repairs. If so, then Coventry indeed suffered damages for which Lannett may
liable.
Added to these two possible inferences is the express allegation in the
amended complaint that Lannett’s failure to repair the leasehold, as contractually
required, resulted in a diminishment of value of the property.
Whether Coventry will be able to prove its assertions at trial is unknown.
Indeed, I do not know whether it will be able to quantify its damages at trial. However, I
cannot now conclude that it should not be given that opportunity and that Lannett is
entitled to judgment on the pleadings as to that issue, given the standard I must now apply
to a motion under Rule 12(c).
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 14 of 20
15
B.
Lannett’s alternative argument concerns the measure of damages asserted
by the plaintiff. Coventry alleges that it is entitled to liquidated damages under paragraph
47 of the lease. Lannett argues that this provision is an unenforceable penalty or is
inapplicable by its own terms.
Under Pennsylvania law, a court will enforce a liquidated damages clause if
the amount sought is reasonable, and at the time the parties entered into the contract it
was believed difficult to measure the amount of actual damages occurring from any future
breach of the contract. See Commonwealth v. Mitchell, 517 Pa. 203, 214 (1987)
(“[L]iquidated damages [will] be awarded only in cases where the amount is reasonable
and there is a difficulty in assessing the harm that would be caused by a breach.”). Courts
will not enforce a liquidated damages clause if it acts only as a penalty, rather than as a
reasonable estimation of the potential damages from a breach. See Palmieri v. Partridge,
853 A.2d 1076, 1080 (Pa. Super. 2004); Brinich v. Jencka, 757 A.2d 388, 402 (Pa. Super.
2000).
This standard applies even when both parties are sophisticated business
entities which have entered into an arms-length agreement. See In the Matter of Plywood
Co., 425 F.2d 151, 155 (3d Cir. 1970) (applying the same liquidated damages standard to
a commercial lease under New Jersey law); Giant Food Stores, Inc. v. Kmart Corp., 1996
WL 432487, at * 1 (E.D. Pa. 1996) (“[C]ourts will not enforce a liquidated damages
clause that is in reality a penalty cause. [citation omitted]. This is true even if parties of
equal bargaining power, negotiating at arms length agreed to the penalty provision.”);
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 15 of 20
16
Holt’s Cigar Co. v. 222 Liberty Associates, 404 Pa. Super. 578, 590-91 (1991) (liquidated
damages clause functioning as a penalty was unenforceable as a violation of public
policy).
In determining whether liquidated damages are really a penalty or a
reasonable estimation of the anticipated damages, a court must balance several factors.
These include:
‘the intention of the parties, drawn from the words of the
whole contract, examined in the light of its subject matter and
its surroundings; . . . relation which the sum stipulated bears
to the extent of the injury which may be caused by the several
breaches provided against, the ease or difficulty of measuring
a breach of damages, and such other matters as are legally or
necessarily inherent in the transaction.’
Commonwealth v. Musser Forests, Inc., 394 Pa. 205, 212 (1958) (quoting March v.
Allabough 103 Pa. 335, 341 (1883)); see Brinich v. Jencka, 757 A.2d at 402; Olmo v.
Matos, 439 Pa. Super. 1, 8 (1994).
In determining whether the amount in damages is reasonable, a court must
look to “what it was that the parties were bargaining for.” Commonwealth v. Mitchell,
517 Pa. at 215. Where a liquidated damages clause is valid and enforceable, it may
preclude an injured party from recovering actual damages resulting from the breach. See
Carlos R. Leffler, Inc. v. Hutter, 696 A.2d 157, 162 (Pa. Super. 1997).
An analysis of a liquidated damages clause under Pennsylvania law requires
certain factual determinations, including the intent of the parties and the reasonableness
of the provision as of the time of the agreement. In the context of this motion, I have no
basis to make any such determinations. Indeed, there are not even averments as to the
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 16 of 20
17
precise cost of the alleged repairs or the reduction in value of the realty, by which one
might determine whether the lease provision is punitive.
Furthermore, even if Lannett is ultimately proven correct that the liquidated
damage provision is unenforceable, or that Coventry’s interpretation is untenable or
illogical, or that Coventry cannot both receive judgment for actual and liquidated
damages, it does not follow that Coventry would not be entitled to some other measure of
damages for the breach of contract: i.e., the estimated or actual repair costs, offset by the
security deposit. See Olmo v. Matos, 439 Pa. Super. at 8. A complaint cannot be
dismissed because a plaintiff, who is entitled to relief, asserts an incorrect measure of
damages. See Raymond A. McPherson, Inc. v. Veneziale, 18 Pa. D. & C.2d 757, 761 (Pa.
Com. Pl. 1959) (although liquidated damage provision was unenforceable, plaintiff given
leave to replead actual damages); see generally Fed. R. Bankr. P. 7054 (incorporating
Fed. R. Civ. P. 54(c)); Brown v. Burr-Brown Research Corp., 378 F.2d 822, 824 (5th Cir.
1967) (“It may be well to remark at this point that under Rule 54(c), Federal Rules of
Civil Procedure, in a litigated case the prayer does not limit the amount of recoverable
damages.”).
At this stage of the proceeding, Coventry alleges that Lannett damaged its
property and, as a result, it is entitled to liquidated damages, actual damages and the
retention of the lessee’s security deposit. Lannett denies that it damaged the realty and
denies the applicability and enforeceability of the contractual damage provision relied
upon by Coventry. As the correctness of these assertions and denials cannot be
determined by a review of the pleadings themselves, even accompanied by the terms of
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 17 of 20
18
the confirmed plan and the agreement of sale, I must deny Lannett’s motion for judgment
on the pleadings.
An appropriate order shall be entered.
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 18 of 20
UNITED STATES BANKRUPTCY COURT
FOR THE EASTERN DISTRICT OF PENNSYLVANIA
In re 	: 	Chapter 11
COVENTRY ASSOCIATES, L.P. 	:
JEEH, L.P.
(Jointly Administered) 	:
Debtors 	: 	Bankruptcy No. 05-11798F
____________________________________
COVENTRY ASSOCIATES, L.P., 	:
Plaintiff 	:
v. 	: 	Adversary No. 05-00451F
LANNETT COMPANY, INC. 	:
Defendant 	:
.................................................
ORDER
.................................................
AND NOW, this 28th day of February 2006, for the reasons stated in the
accompanying memorandum, it is hereby ordered that:
1. Coventry’s motion for leave to amend its complaint is granted. Its
amended complaint, as attached to its motion, shall be filed and served within ten (10)
days from the date of this order;
2. Lannett shall file a response to the amended complaint within fifteen (15)
days from service. This response shall comply with Fed. R. Bankr. P. 7012(b);
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 19 of 20
3. Lannett’s motion for judgment on the pleadings is denied.
BRUCE FOX
United States Bankruptcy Judge
copies to:
Kristin T. Mihelic, Esquire
Monica S. Mathews, Esquire
Spector, Gadon & Rosen, P.C.
Seven Penn Center, 7th Floor
1635 Market Street
Philadelphia, PA 19103
Joshua T. Klein, Esquire
Samuel H. Israel, Esquire
Fox Rothschild, LLP
2000 Market Street, Tenth Floor
Philadelphia, PA 19103
Case 05-00451-bif Doc 18 Filed 02/28/06 Entered 02/28/06 15:49:47 Desc Main
Document Page 20 of 20

Continue sua pesquisa no ChatGPT ou Claude

Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.