act-1988-0-102•"PENNSYLVANIA INFRASTRUCTURE INVESTMENT AUTHORITY PROJECT ITEMIZATION ACT OF 1987-1988" - REPEALED — 1988 Pa. Act 102 (historical enacted text)
"PENNSYLVANIA INFRASTRUCTURE INVESTMENT AUTHORITY PROJECT ITEMIZATION ACT OF 1987-1988" - REPEALED — 1988 Pa. Act 102 (historical enacted text)
act-1988-0-1021988 Pa. Act 102 (historical enacted text)Law
Historical Act text part 1
SENATE AMENDED
PRIOR PRINTER'S NOS. 2602, 3028, 3076, PRINTER'S NO. 3637
3119, 3627
INTRODUCED BY PIEVSKY, STEIGHNER, MANDERINO, F. TAYLOR, BALDWIN,
SHOWERS, STUBAN, DALEY, MAINE, CLARK, KUKOVICH, BATTISTO,
SWEET, LAUGHLIN, COY, LIVENGOOD, YANDRISEVITS, JAROLIN,
DISTLER, BUNT, DeLUCA, FOX, BROUJOS, RICHARDSON AND BOWLEY,
DECEMBER 2, 1987
AS AMENDED ON THIRD CONSIDERATION, IN SENATE, JULY 6, 1988
AN ACT
1 Itemizing water and sewer projects eligible for funding through
2 the Pennsylvania Infrastructure Investment Authority for
3 fiscal year 1987-1988 together with their estimated financial
4 costs; authorizing the incurring of debt without the approval
5 of the electors for the purpose of providing funds for the
6 itemized projects; stating the estimated useful life of the
7 projects; and making an appropriation.
8 The General Assembly of the Commonwealth of Pennsylvania
9 hereby enacts as follows:
10 Section 1. Short title.
11 This act shall be known and may be cited as the Pennsylvania
12 Infrastructure Investment Authority Project Itemization Act of
13 1987-1988.
14 Section 2. Total authorizations.
15 The total authorization for the water and sewer projects
16 itemized in section 3 and to be funded by the Pennsylvania
17 Infrastructure Investment Authority, its successors or assigns,
18 and to be financed by the incurring of debt, State <--
1 appropriations or such other financing mechanisms as may be
2 available to the authority, shall be $3,729,944,000 <--
3 $4,793,953,000 $4,847,717,000.
4 Section 3. Itemization of projects.
5 The water and sewer projects to be funded by the Pennsylvania
6 Infrastructure Investment Authority, its successors or assigns,
7 are hereby itemized, together with their respective estimated
8 financial costs, as follows:
9 Total
10 Project
11 Project Allocation
12 (a) Adams County
13 () Abbottstown Borough, sewer project, sewer <--
14 system 5,000,000
15 () ARENDTSVILLE BOROUGH, SEWER PROJECT, <--
16 UPGRADE SEWAGE TREATMENT PLANT 500,000
17 () ARENDTSVILLE BOROUGH, WATER PROJECT,
18 UPGRADE WATER SYSTEM AND DRILL NEW WELL 400,000
19 () ARENDTSVILLE MUNICIPAL WATER AUTHORITY,
20 WATER PROJECT, WELL DEVELOPMENT AND
21 STANDPIPE 150,000
22 () ASPERS WATER COMPANY, WATER PROJECT, WATER
23 SYSTEM IMPROVEMENTS 75,000
24 () BEAVER CREEK MOBILE HOME PARK, WATER
25 PROJECT, NEW DISTRIBUTION LINES 25,000
26 () BIGLERVILLE WATER COMPANY, WATER PROJECT,
27 WATER SYSTEM IMPROVEMENTS 800,000
28 () Bonneauville Borough, sewer project,
29 rehabilitate sewage treatment facility 3,198,000
30 () CARROLL VALLEY BOROUGH, SEWER PROJECT, <--
19870H2035B3637 - 2 -
1 SEWAGE TREATMENT PLANT UPGRADE 400,000
2 () East Berlin Borough, sewer project, sewer
3 system 678,000 <--
4 1,015,000
5 () EAST BERLIN BOROUGH WATER DEPARTMENT, WATER <--
6 PROJECT, DISTRIBUTION SYSTEM IMPROVEMENTS 100,000
7 () Fairfield Borough, sewer project,
8 rehabilitate sewage treatment facility 490,000
9 () FRANKLIN TOWNSHIP, SEWER PROJECT, SEWAGE <--
10 TREATMENT AND INTERCEPTOR SEWERS 1,439,000
11 () FRANKLIN TOWNSHIP MUNICIPAL AUTHORITY
12 (CASHTOWN), WATER PROJECT, LINE
13 REPLACEMENT 50,000
14 () GETTYSBURG MUNICIPAL AUTHORITY, WATER
15 PROJECT, WATER SYSTEM IMPROVEMENTS, NEW
16 WELL 1,567,000
17 () GETTYSBURG MUNICIPAL AUTHORITY, WATER
18 PROJECT 1,950,000
19 () GETTYSBURG MUNICIPAL AUTHORITY, SEWER
20 PROJECT 874,000
21 () LAKE HERITAGE UTILITIES, INCORPORATED,
22 WATER PROJECT, DISTRIBUTION SYSTEM
23 IMPROVEMENTS, NEW SOURCE 200,000
24 () LAKE MEADE MUNICIPAL AUTHORITY, WATER
25 PROJECT, WATER SYSTEM IMPROVEMENTS 50,000
26 () LITTLESTOWN BOROUGH, WATER PROJECT,
27 GROUNDWATER EXPLORATION AND DEVELOPMENT 225,000
28 () LITTLESTOWN BOROUGH MUNICIPAL AUTHORITY,
29 WATER PROJECT, TREATMENT AND NEW SOURCE 100,000
30 () NEW OXFORD BOROUGH MUNICIPAL WATER
19870H2035B3637 - 3 -
1 AUTHORITY, WATER PROJECT, WATER SYSTEM
2 IMPROVEMENTS 50,000
3 () YORK SPRINGS MUNICIPAL AUTHORITY, WATER <--
4 PROJECT, INSTALL NEW WATER DISTRIBUTION
5 MAIN 347,000
6 () YORK SPRINGS WATERWORKS, WATER PROJECT,
7 DISTRIBUTION REPAIR 100,000
8 (b) Allegheny County
9 () Allegheny County, water project, to
10 interconnect the water systems surrounding
11 metropolitan Pittsburgh 100,000,000
12 () Allegheny County Sanitary Authority, sewer
13 project, construct new sludge disposal
14 facility 57,222,000
15 () Allegheny County Sewer Authority, sewer
16 project, sewer interceptor line 25,000,000
17 () Allegheny Valley Joint Sewage Authority,
18 sewer project, sewer system and facilities 4,513,000
19 () ALLEGHENY VALLEY JOINT SEWAGE AUTHORITY, <--
20 SEWER PROJECT AND WASTEWATER 4,513,000
21 () Aspinwall Borough, water project, water
22 system trunk 138,000
23 () Baldwin Borough, sewer project, renovate
24 sewer lines 900,000
25 () BALDWIN TOWNSHIP, SEWER PROJECT 750,000 <--
26 () BELL ACRES BOROUGH, SEWER PROJECT, IMPROVE
27 SEWAGE TREATMENT PLANT 180,000
28 () Bell Acres Borough, water project, extend
29 water lines to correct contaminated water
30 problems and to provide lines to areas
19870H2035B3637 - 4 -
1 where wells are drying up 315,000 <--
2 665,000
3 () Bethel Park Borough, sewer project, replace
4 sanitary sewer sections 224,000
5 () Blawnox Borough, water project, revamp
6 water system 900,000
7 () Brackenridge Borough, water and sewer
8 project, replace and improve water and
9 sewer lines 10,000,000
10 () Brackenridge Borough, water project,
11 renovate water treatment facilities 2,000,000
12 () Braddock Borough, sewer project, general
13 sewer improvements 364,000
14 () Brentwood Borough, sewer project,
15 reconstruct section of sewer line 285,000
16 () BRIDGEVILLE BOROUGH, SEWER PROJECT, <--
17 RENOVATE SEWER SYSTEM 450,000
18 () Castle Shannon Borough, sewer project,
19 upgrade Saw Mill Run sanitary sewer
20 interceptor 1,000,000 <--
21 1,900,000
22 () Chalfant Borough, sewer project, replace
23 sewer systems 172,000
24 () Chalfant Borough, sewer project, West
25 Street, replace sanitary sewer line 200,000
26 () Cheswick Borough, water project,
27 rehabilitate water treatment facility,
28 distribution and tank 500,000
29 () Cheswick Borough, water project, construct
30 water lines 450,000
19870H2035B3637 - 5 -
1 () CHESWICK BOROUGH, SEWER PROJECT, <--
2 REHABILITATE VARIOUS DETERIORATED SANITARY
3 SEWER SYSTEM LINES 200,000
4 () Churchill Borough, sewer project, Beulah
5 Road sanitary sewer replacement 500,000
6 () Collier Township Municipal Authority, sewer
7 project, construct new interceptor sewer
8 and sewer system 16,983,000
9 () COLLIER TOWNSHIP, SEWER PROJECT 4,200,000 <--
10 () Coraopolis Municipal Sanitary Authority,
11 sewer project, sewage treatment plant re-
12 rating 100,000
13 () Coraopolis Municipal Sanitary Authority,
14 sewer project, expand sewage treatment
15 plant 4,000,000
16 () Coraopolis Municipal Sanitary Authority,
17 sewer project, sewer sludge processing and
18 disposal 500,000
19 () Crescent Township, water project, River
20 Road water line 45,000
21 () Dormont Borough, sewer project, Latonia
22 Avenue sanitary sewer 400,000
23 () DORMONT BOROUGH, WATER PROJECT, KELTON <--
24 VALLEY 30,000
25 () DORMONT BOROUGH, SEWER PROJECT, STORM AND
26 SANITARY SEWER PROJECTS IN KELTON VALLEY
27 WATERSHED 285,000
28 () Dravosburg, sewer project, rehabilitate
29 sewage treatment plant 150,000
30 () Dravosburg Borough, sewer project,
19870H2035B3637 - 6 -
1 construct new sewer system 1,910,000
2 () Duquesne City, sewer project, rehabilitate
3 sewage treatment facility 136,000
4 () Duquesne City, water project, water
5 treatment facility repair 197,000
6 () Duquesne City, water project, rehabilitate
7 city-water well 267,000
8 () East Deer Township, sewer project,
9 rehabilitate wastewater treatment plant
10 pumping facilities and replace sludge
11 dewatering facility 950,000
12 () East Deer Township, sewer project, sewer
13 system improvements 300,000
14 () East Pittsburgh Borough, water project,
15 Center Avenue water line replacement 200,000
16 () Edgewood Borough, sewer project,
17 rehabilitate sewer system 52,000
18 () Elizabeth Borough, water project, expand
19 sewage treatment plant 850,000
20 () Elizabeth Township, sewer project,
21 rehabilitate sewage treatment facility and
22 construct new interceptor sewer 1,293,000
23 () Elizabeth Township, sewer project,
24 rehabilitate sewage treatment facility and
25 construct new interceptor sewer 3,446,000
26 () EMSWORTH BOROUGH, WATER PROJECT, WATER <--
27 LINES 25,000
28 () Etna Borough, sewer project, improve sewer
29 and replace fire hydrant 240,000
30 () Etna Borough, water project, Borough water
19870H2035B3637 - 7 -
1 line replacement 215,000
2 () Fawn Township, sewer project, install
3 sewage lines, connects, and conveyance 12,000,000
4 () Findlay Township, water project, Clinton
5 water storage tank 350,000
6 () Findlay Township, sewer project, Moon
7 Clinton sanitary sewer 128,000
8 () Findlay Township, sewer project, Water
9 Parkway West interceptor 450,000
10 () Findlay Township, sewer project, Main
11 Street drainage plan and Gregg Lane's sewer
12 project 109,000
13 () Findlay Township Water Authority, water
14 project, McClaren - Aten Road project 450,000
15 () Findlay Township Water Authority, water
16 project, Route 30 West project 250,000
17 () Findlay Township Water Authority, water
18 project, Hebron Road project 90,000
19 () Forest Hills Borough, sewer project,
20 construct sewer systems for Braddock and
21 Glassglow, rehabilitate-replace main sewer
22 line Route 30 470,000
23 () Forward Township, sewer project, sanitary
24 sewer system construction 5,941,000
25 () Forward Township Municipal Authority, water
26 project, water lines extension 200,000
27 () Fox Chapel Borough, sewer project, relocate
28 sewage pumping station 1,486,000
29 () FOX CHAPEL BOROUGH, SEWER PROJECT, NEW <--
30 INTERCEPTOR SEWER FROM SQUAW RUN PUMP
19870H2035B3637 - 8 -
1 STATION TO ALCOSAN INTERCEPTOR IN
2 ASPINWALL 1,486,000
3 () Franklin Park Borough, sewer project,
4 construct Bear Run interceptor sewer 1,900,000
5 () Franklin Park Borough, water project,
6 construct Big Sewickly Creek water line 3,150,000
7 () Franklin Park Borough, sewer project,
8 construct Big Sewickley Creek interceptor 7,500,000
9 () Franklin Park Borough, water project,
10 construct Fairhill and Magee water line 135,000
11 () Franklin Park Borough, sewer project,
12 construct Morrow Road area sewer system 92,000
13 () Frazer Township, sewer project, install
14 sewage and connection lines 6,000,000
15 () Girty Run Sewer Authority, sewer project,
16 correct hydraulic overload of the sewer
17 system 3,300,000
18 () Glassport Borough, sewer project, construct
19 sewers and pumping station and upgrade
20 treatment plant 2,472,000
21 () Hampton Township, water and sewer project, <--
22 expand water storage and improve sewer
23 system 5,100,000
24 () Hampton Township Sanitary Authority, sewer
25 project, rehabilitate sewage treatment
26 facility 1,808,000
27 () HAMPTON TOWNSHIP SANITARY AUTHORITY, SEWER <--
28 PROJECT, WATER POLLUTION CONTROL PLANT
29 RENOVATION AND EXPANSION 5,000,000
30 () HAMPTON TOWNSHIP SANITARY AUTHORITY, SEWER
19870H2035B3637 - 9 -
1 PROJECT, SEWER LINE MAINTENANCE 800,000
2 () Harmar Township, sewer project, replace
3 Riverrow sanitary sewer system 150,000
4 () Harmar Township, sewer project, replace
5 Wenzel Drive sanitary sewer system 200,000
6 () Harmar Township, water project, Guys Run
7 Road water line extension 35,000
8 () Harmar Township, water project, Locust Hill
9 water line extension 430,000
10 () Harmar Township, water project,
11 transmission main replacement project 195,000
12 () Harmar Township, water project, water
13 treatment plant 825,000
14 () Harrison Township, sewer project, replace
15 and improve sewer system 4,000,000
16 () Harrison Township, water project, replace
17 and improve water system 4,000,000
18 () Harrison Township, water project, install
19 water lines on Karns Road 400,000
20 () Harrison Township, water and sewer project,
21 replace and improve water and sewer lines 10,000,000
22 () Indiana Township, sewer project, Fairview
23 Road sanitary service 165,000
24 () Indiana Township, water project, Wagon
25 Wheel Lane water line construction 56,000
26 () Indiana Township, water project, Rosedale
27 Road water line construction 150,000
28 () Indiana Township, water project, replace
29 water wells township-wide 200,000
30 () Indiana Township, water project, Crawford
19870H2035B3637 - 10 -
1 Run Road water line construction 184,000
2 () INDIANA TOWNSHIP, WATER PROJECT, PLACE <--
3 WATER LINE, SHORT STREET, GRANDVIEW AND
4 INDIANOLA DRIVE 36,000
5 () JEFFERSON BOROUGH, SEWER PROJECT, SPRUCE
6 HOLLOW ROAD AND ROUTE 51 165,000
7 () JEFFERSON BOROUGH, WATER PROJECT,
8 INSTALLATION OF TWO WATER LINES 285,000
9 () LEETSDALE MUNICIPAL AUTHORITY, SEWER
10 PROJECT, BELT FILTER PRESS 270,000
11 () LEETSDALE MUNICIPAL AUTHORITY, SEWER
12 PROJECT, EXPAND SEWER TREATMENT PLANT 1,200,000
13 () LEETSDALE MUNICIPAL AUTHORITY, SEWER
14 PROJECT, AERATION SYSTEM 40,000
15 () Lincoln Borough, sewer project, complete
16 sanitary sewer system 500,000
17 () McCandless Township Sanitary Authority,
18 sewer project, expand Pine Creek plant 9,000,000
19 () McCandless Township Sanitary Authority,
20 sewer project, Pine Creek North Fork second
21 sewer construction phase 2,300,000
22 () McCandless Township Sanitary Authority,
23 sewer project, rehabilitate sewer system 325,000
24 () McCandless Township Sanitary Authority,
25 sewer project, Fish Run sewer extension 300,000
26 () McCandless Township Sanitary Authority,
27 sewer project, Montour Run interceptor
28 construction 1,700,000
29 () McCandless Township Sanitary Authority,
30 sewer project, McKnight corridor's
19870H2035B3637 - 11 -
1 passavant pumping station 500,000
2 () McCandless Township Sanitary Authority,
3 sewer project, improve existing sewer
4 plant 100,000
5 () McCandless Township Sanitary Authority,
6 sewer project, Pine Creek North Fork
7 initial sewer construction phase 1,000,000
8 () McCandless Township, sewer project, upgrade
9 and replace sewer lines 120,000
10 () McDonald Borough, sewer project, sewer
11 interceptor 2,000,000
12 () McKeesport, sewer project, construct
13 sewerage facilities in unsewered areas 813,000
14 () McKeesport Municipal Authority, sewer
15 project, improve sludge dewatering
16 facilities at MWPCC 600,000
17 () Millvale Borough, sewer project,
18 rehabilitate sewer 2,076,000
19 () Millvale Borough, water project, water line
20 replacement 200,000
21 () Millvale Borough, water project, upgrade
22 water distribution system 106,000
23 () Monroeville Borough, sewer project, Johnson
24 Road sanitary sewer line construction 100,000
25 () Monroeville Borough, sewer project,
26 construct sanitary sewer system 2,640,000
27 () Moon Township Municipal Authority, sewer
28 project, treatment plant modifications 1,833,000
29 () MOUNT LEBANON TOWNSHIP, SEWER PROJECT, <--
30 CASTLE SHANNON BOULEVARD, SANITARY SERVICE 505,000
19870H2035B3637 - 12 -
1 () Munhall Borough, sewer project, West Run
2 Sanitary Sewer, sewer line replacement 650,000
3 () Munhall Borough, sewer project, Ravine
4 Street, sewer line replacement 650,000
5 () Neville Township, sewer project, main and
6 backchannel wastewater pump stations and
7 Third Street 8-inch sanitary sewer 100,000
8 () North Fayette Township, sewer project,
9 construct new interceptor sewer, pumping
10 station and sewer system 1,070,000 <--
11 6,759,000
12 () North Saint Clair, sewer project, construct
13 sewer system 1,200,000
14 () North and South Fayette Townships, sewer
15 project, Robinson Run sewer interceptor 3,840,000 <--
16 3,863,000
17 () Oakdale Borough Municipal Authority, sewer
18 project, rehabilitate sewage treatment
19 facility and construct new interceptor
20 sewer and sewer system 3,040,000
21 () Oakmont Borough, sewer project, extend
22 wastewater treatment facility 2,000,000
23 () OAKMONT BOROUGH, WATER PROJECT, CLEAN, <--
24 SANDBLAST, REPAIR AND PAINT RICH HILL
25 STANDPIPE 46,000
26 () OAKMONT BOROUGH, SEWER PROJECT, INSTALL
27 EFFLUENT CONTROLLERS FOR FILTERS 7 THROUGH
28 10 26,000
29 () OAKMONT BOROUGH, SEWER PROJECT, RENOVATE
30 FILTERS 1 THROUGH 6 400,000
19870H2035B3637 - 13 -
1 () OAKMONT BOROUGH, SEWER PROJECT, INSTALL
2 BELT PRESS FOR SLUDGE DEWATERING 350,000
3 () OAKMONT BOROUGH, SEWER PROJECT, REPLACE
4 HIGH SERVICE SWITCH GEAR AND MOTOR
5 STARTERS 53,000
6 () OAKMONT BOROUGH, WATER PROJECT, REPLACE
7 WATER LINE, ALLEGHENY RIVER BOULEVARD FROM
8 MARYLAND TO PENNSYLVANIA AVENUES 45,000
9 () OAKMONT BOROUGH, WATER PROJECT, REPLACE
10 WATER LINES, VIRGINIA AVENUE 140,000
11 () OAKMONT BOROUGH, WATER PROJECT, REPLACE
12 WATER LINE, COLLEGE AVENUE 76,000
13 () OAKMONT BOROUGH, WATER PROJECT, REPLACE
14 WATER LINE, FRONT STREET, PENN HILLS 36,000
15 () Oakmont Water Authority, water project,
16 replace water line and renovate filter
17 treatment plant 1,500,000
18 () O'Hara Township, water project, replace
19 contaminated wells 360,000
20 () O'Hara Township, sewer project, Saxonburg
21 Boulevard, sanitary sewer extension 1,712,000
22 () O'Hara Township, sewer project, Crawford
23 and Mission Lane area, sewer extension 250,000
24 () O'Hara Township, water project, Saxonburg
25 Boulevard, water line extension 365,000
26 () O'Hara Township, water project, Calmwood
27 Road, water line extension 80,000
28 () O'Hara Township, sewer project, Yorkshire
29 Drive, sanitary sewer improvement 100,000
30 () O'HARA TOWNSHIP, SEWER PROJECT, SAXONBURG <--
19870H2035B3637 - 14 -
1 BOULEVARD SANITARY SEWER EXTENSION 1,713,000
2 () O'HARA TOWNSHIP, SEWER PROJECT, CRAWFORD
3 AND MISSION LANE AREA SANITARY SEWER
4 EXTENSION 250,000
5 () O'HARA TOWNSHIP, SEWER PROJECT, YORKSHIRE
6 DRIVE SANITARY SEWER 100,000
7 () O'HARA TOWNSHIP, WATER PROJECT, SAXONBURG
8 BOULEVARD WATER LINE EXTENSION 365,000
9 () O'HARA TOWNSHIP, WATER PROJECT, CALMWOOD
10 ROAD WATER LINE EXTENSION 80,000
11 () Ohio Township, sewer project, Wetlands 190,000
12 () Ohio Township, sewer project, Kilbuck Run
13 and Toms Run, expand centralized sewage
14 system 2,554,000
15 () Ohio Township, sewer project, Franklin Park
16 Borough, expand Joint Bear Run sewage
17 system 2,600,000
18 () Penn Hills, sewer project, expand Penn Plum
19 sewage treatment plant per DER order 1,200,000
20 () Penn Hills Township, sewer project,
21 rehabilitate sewage treatment facility and
22 construct new pumping station and sewer
23 system 10,416,000
24 () PETERS TOWNSHIP, SEWER PROJECT, EXPAND <--
25 TREATMENT PLANT 4,500,000
26 () Pittsburgh City, sewer project,
27 rehabilitate Grant Street, Fourth Avenue,
28 Arlington Avenue, First Avenue, Wood Street
29 and Smithfield Street sewer systems 6,000,000
30 () Pittsburgh City, sewer project, construct
19870H2035B3637 - 15 -
1 new sewer systems at Station Square,
2 Washington's Landing and Armstrong Square 1,500,000
3 () Pittsburgh City, construct new Saw Mill
4 interceptor sewer 40,000,000
5 () Pittsburgh City, water project, concrete
6 covers for Highland One and Two, Herron
7 Hill, Bedford, Lanpher and McNaugher
8 reservoirs 200,000,000
9 () Pittsburgh City, sewer project, construct
10 new interceptor sewer 129,827,000
11 () Pleasant Hills Authority, sewer project,
12 rehabilitate sewage treatment facility 5,682,000 <--
13 14,000,000
14 () Pleasant Hills Borough, sewer project,
15 repair and replace sanitary sewer system 155,000 <--
16 200,000
17 () Plum Borough, sewer project, construct new
18 sewer system, sewage treatment plant and
19 interceptor sewer 25,788,000
20 () Plum Borough, water project, expand water
21 line along Route 909 150,000
22 () Port Vue Borough, sewer project, upgrade
23 Smith Street, Gray Avenue, Glenn Avenue and
24 New York Avenue sewers 250,000
25 () Rankin Borough, sewer project, general
26 sewer improvements 100,000
27 () Reserve Township, water and sewer project,
28 extend water and sewer lines 120,000
29 () Richland Township, sewer project,
30 Bakerstown Gravity collector system and
19870H2035B3637 - 16 -
1 pumping system 1,180,000
2 () Richland Township, sewer project, construct
3 new sewer system 1,130,000
4 () Richland Township, sewer project, construct
5 new sewer system 1,808,000
6 () Robinson Township Municipal Authority,
7 water project, water line replacements 1,050,000
8 () Robinson Township Municipal Authority,
9 water project, water plant wastewater
10 treatment facilities 380,000
11 () Robinson Township Municipal Authority,
12 sewer project, sewage sludge treatment
13 facilities 600,000
14 () Robinson Township Municipal Authority,
15 water project, water storage tank 700,000
16 () SCHOOL TOWNSHIP, SEWER PROJECT 380,000 <--
17 () Scott Township, sewer project, renovate
18 existing sewer on Lindsay Road and
19 Wynnecliff Road 110,000
20 () SCOTT TOWNSHIP, SEWER PROJECT, REHABILITATE <--
21 SEWER 500,000
22 () SCOTT TOWNSHIP, WATER PROJECT, NEW WATER
23 LINES 400,000
24 () SOUTH FAYETTE TOWNSHIP, SEWER PROJECT,
25 PARTICIPATION IN ALCOSAN INTERCEPTOR TO
26 MCDONALD 3,900,000
27 () South Versailles Township, sewer project,
28 complete sanitary sewer system 2,500,000
29 () Sewickley Heights Borough, sewer project,
30 construct new interceptor sewer and sewer
19870H2035B3637 - 17 -
1 system 1,224,000
2 () Sewickley Hills Borough, sewer project,
3 construct new interceptor sewer and sewer
4 system 487,000
5 () Shaler Township, water and sewer project,
6 relocate sewer and water lines in Shaler
7 Flats 132,000
8 () Shaler Township, water project, extend
9 water line on Wible Run Road 101,000
10 () Shaler Township, water and sewer project,
11 replace well and repair water and sewer
12 lines 1,284,000
13 () Sharpsburg Borough, water project, improve
14 water filtration system 720,000
15 () Springdale Borough, water project,
16 rehabilitate water treatment facilities
17 distribution and tank 500,000
18 () Springdale Township, water project, water
19 line extensions 100,000
20 () Springdale Township, water project, water
21 line replacements and relocations 364,000
22 () Springdale Township, sewer project,
23 sanitary sewer installations 230,000
24 () Swissvale Borough, sewer project, construct
25 and replace sewer systems 93,000
26 () Tarentum Borough, sewer project, replace
27 and improve sewer system 15,000,000
28 () UPPER ST. CLAIR, SEWER PROJECT 380,000 <--
29 () UPPER ST. CLAIR, WATER PROJECT, NEW WATER
30 LINE, PAINTERS RUN INTERCEPTOR 380,000
19870H2035B3637 - 18 -
1 () Verona Borough, sewer project, rehabilitate
2 sanitary sewer system 400,000
3 () VERONA BOROUGH, WATER PROJECT, REPLACE <--
4 WATER LINES, BRUNOT STREET 26,000
5 () VERONA BOROUGH, WATER PROJECT, REPLACE
6 WATER LINE, SCHOOL STREET 35,000
7 () VERONA BOROUGH, WATER PROJECT, REPLACE
8 WATER LINE, EAST RAILROAD AVENUE 22,000
9 () Wall Borough, water project, general water
10 system improvements 761,000
11 () West Allegheny School District, sewer
12 project, rehabilitate sewage treatment
13 system 40,000
14 () West Deer Township, water project, install
15 water distributions lines 12,000,000
16 () West Deer Township, sewer project, install
17 sewer lines 9,000,000
18 () West Deer Township, water and sewer
19 projects, construct water and sewer lines
20 for Shuster Road and extend water and sewer
21 lines 1,880,000
22 () WEST DEER TOWNSHIP, WATER PROJECT, REPLACE <--
23 WATER LINE, GARDEN STREET 19,000
24 () WEST DEER TOWNSHIP, WATER PROJECT, REPLACE
25 WATER LINE, PINE AND OAK STREETS 41,000
26 () WEST DEER TOWNSHIP, WATER PROJECT, REPLACE
27 WATER LINE, CHURCH STREET 50,000
28 () WEST DEER TOWNSHIP, WATER PROJECT, REPLACE
29 WATER LINE, SCHOOL STREET 21,000
30 () WEST DEER TOWNSHIP, WATER PROJECT, REPLACE
19870H2035B3637 - 19 -
1 WATER LINE, PLANT STREET 27,000
2 () WEST DEER TOWNSHIP, WATER PROJECT, WATER
3 LINE EXTENSION FOR LOGAN ROAD 100,000
4 () West Mifflin Borough, sewer project,
5 connect unconnected prop-sewer service 140,000
6 () West Mifflin Borough, sewer project,
7 construct trunk sewer 270,000
8 () West Mifflin Borough, sewer project,
9 construct sanitary sewer line 151,000
10 () West Mifflin Borough, sewer project,
11 construct sewer trunk line for Lebanon
12 Church Road 430,000
13 () West Pennsylvania Water Company (Pittsburgh
14 District), water project, water system
15 improvements 19,000,000
16 () West Pennsylvania Water Company (Pittsburgh
17 District), water project, erect two 1 mg
18 tanks 1,275,000
19 () West Pennsylvania Water Company (Pittsburgh
20 District), water project, improve hydrant
21 flows 1,000,000
22 () West Pennsylvania Water Company
23 (Washington-Valley District), water
24 project, water distribution system
25 improvements 1,395,000
26 () West View Borough Municipal Authority,
27 water project, main distribution line
28 improvement project 2,500,000
29 () West View Borough Municipal Authority,
30 water project, reservoir addition project 3,000,000
19870H2035B3637 - 20 -
1 () West View Borough Municipal Authority,
2 water project, Lowries Run Booster Station
3 project 300,000
4 () West View Water Authority, water project,
5 distribution main line improvement 2,500,000
6 () Whitaker Borough, sewer project, Whitaker
7 Street, replace sewer line 220,000
8 () Whitehall Borough, sewer project,
9 reconstruct sewer line and install new
10 manholes 300,000
11 () WHITEHALL BOROUGH, SEWER PROJECT, IMPROVE <--
12 WASTEWATER TREATMENT SYSTEMS IN THREE
13 WATERSHEDS 500,000
14 () WHITEHALL BOROUGH, SEWER PROJECT,
15 REHABILITATE ENTIRE SEWER SYSTEM 1,000,000
16 () Wilkins Township, water project, extend
17 public water lines 384,000
18 () Wilkins Township, sewer project, complete
19 sanitary sewer system 1,590,000
20 () Wilkinsburg Borough, sewer project,
21 replacements in sewer system 194,000
22 (c) Armstrong County
23 () Apollo Borough, sewer project, construct
24 storm sewer 480,000
25 () Applewold Borough, water project, water
26 system improvements 40,000
27 () Atwood Borough, sewer project, construct
28 new sewer system and plant 89,000
29 () Bradys Bend Township, water project, extend
30 water system 306,000
19870H2035B3637 - 21 -
1 () Cadogan Township, water project, renovate
2 water treatment plant 571,000
3 () Cadogan Township, sewer project, construct
4 new sewer system 399,000
5 () Cowanshannock Township, water project,
6 renovate water system and storage tank 1,294,000
7 () Dayton Borough, sewer project, construct
8 new sewer system 2,306,000
9 () Dayton Borough, water project, water system
10 improvements 110,000
11 () East Franklin Township, sewer project,
12 extend sewer line 100,000
13 () East Franklin Township, water project,
14 expand water system 3,150,000
15 () Ford City Borough Municipal Authority,
16 sewer project, rehabilitate sewage
17 treatment facility 1,900,000
18 () Ford City Borough, water project, water
19 system improvements 1,800,000
20 () FORD CITY MUNICIPAL WATERWORKS, WATER <--
21 PROJECT, WATER SYSTEM IMPROVEMENTS,
22 RESERVOIR IMPROVEMENTS 405,000
23 () Ford Cliff Borough, sewer project, storm
24 water collection system 100,000
25 () Freeport Borough Municipal Authority, sewer
26 project, construct new interceptor sewer 190,000
27 () Freeport Borough Municipal Authority, water
28 project, sanitary sewer system improvement 90,000
29 () Gilpin Township, water project, expand and
30 improve water system 550,000
19870H2035B3637 - 22 -
1 () Gilpin Township, sewer project, expand and
2 develop sewer system 2,541,000
3 () Kiskiminetas Township, water project,
4 extend water line 1,000,000
5 () Kiskiminetas Township Municipal Authority,
6 sewer project, construct new interceptor
7 sewer, force main, pumping station and
8 sewer system 2,397,000
9 () Kittanning Borough Municipal Authority,
10 sewer project, sewer and storm water system
11 separation 7,054,000
12 () Kittanning Township, water project, expand
13 water system 250,000
14 () Leechburg Borough, sewer project, improve
15 sewer system 4,300,000
16 () Mahoning Township, sewer project, construct
17 new sewage treatment plant 541,000
18 () Mahoning Township, sewer project, construct
19 new sewage treatment plant 3,198,000
20 () Mahoning Township, sewer project, construct
21 new sewage treatment plant 125,000
22 () Mahoning Township, water project, renovate
23 water system 130,000
24 () Manor Township, sewer project, expand sewer
25 system 6,240,000
26 () Manor Township, water project, expand water
27 system 630,000
28 () Manorville Borough, sewer project, develop
29 sewer system 760,000
30 () North Apollo Borough, sewer project,
19870H2035B3637 - 23 -
1 separate sewer and storm water 526,000
2 () North Buffalo Township, water project,
3 expand water system 450,000
4 () Parker City, water project, water system
5 improvements 100,000
6 () Parker City Borough, water project, improve
7 water treatment and distribution system 3,500,000
8 () Parker City Borough, sewer project, improve
9 sewer treatment system 800,000
10 () Parker City Municipality Authority, water
11 project, new standpipe and transmission
12 line 753,000
13 () Parks Township, water project, improve
14 water system 840,000
15 () Pine Township, sewer project, construct new
16 sewage treatment plant 204,000
17 () Plumcreek Township, water project, expand
18 water system 1,000,000
19 () Rayburn Township, sewer project, construct
20 new sewer system 6,199,000
21 () Rural Valley Borough, water project, water
22 system improvements 200,000
23 () Shannock Valley Municipal Authority, sewer
24 project, construct new sewer system 8,443,000
25 () South Buffalo Township, sewer project,
26 develop sewer system 1,417,000
27 () South Buffalo Township, water project,
28 expand water system 3,421,000
29 () SOUTH BUFFALO TOWNSHIP MUNICIPAL AUTHORITY, <--
30 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 3,146,000
19870H2035B3637 - 24 -
1 () West Franklin Township, sewer project,
2 construct new sewage treatment plant 627,000
3 () West Kittanning Borough, water project,
4 develop water system and source 822,000
5 () Worthington Borough, sewer project, develop
6 sewer system 3,500,000
7 () Worthington Borough, water project, improve
8 water treatment and distribution system 800,000
9 (d) Beaver County
10 () Aliquippa City, sewer project, Boundary
11 Street and Sheffield Terrace, construct
12 sanitary sewer 200,000
13 () Aliquippa City, water project, construct
14 bulk chemical water softening plant 155,000
15 () Aliquippa City, water project, install
16 Ranney collector well 900,000
17 () ALIQUIPPA MUNICIPAL WATER AUTHORITY, SEWER <--
18 PROJECT, SANITARY SEWER COLLECTION SYSTEM
19 REPAIRS 500,000
20 () ALIQUIPPA MUNICIPAL WATER AUTHORITY, WATER
21 PROJECT, WATER STORAGE SYSTEM REPAIRS AND
22 MODIFICATIONS 500,000
23 () Ambridge Borough, sewer project, construct
24 pumping station and force main 205,000
25 () Ambridge Borough, water project, design and
26 construct water booster station and
27 transmission main 1,400,000
28 () Ambridge Borough, water project, design and
29 install water lines 101,000
30 () Ambridge Borough, sewer project, separate
19870H2035B3637 - 25 -
1 sewer and storm water system 3,501,000
2 () AMBRIDGE BOROUGH, SEWER PROJECT, REPLACE <--
3 FILTER PRESS 250,000
4 () AMBRIDGE BOROUGH, SEWER PROJECT, REPLACE
5 COMMINUTOR 15,000
6 () AMBRIDGE WATER AUTHORITY, WATER PROJECT,
7 INSTALL COVERS ON FIVE EXISTING STORAGE
8 TANKS 300,000
9 () AMBRIDGE WATER AUTHORITY, WATER PROJECT,
10 CONSTRUCT A 150,000 GALLON STORAGE TANK 200,000
11 () AMBRIDGE WATER AUTHORITY, WATER PROJECT,
12 INSTALL WATER MAINS TO REPLACE THE EXISTING
13 CONTAMINATED WELLS 2,500,000
14 () Baden Borough, water project, Phillips
15 Street water line extension 146,000
16 () Baden Borough, sewer project, rehabilitate
17 sewage treatment facility and construct new
18 interceptor sewer 732,000
19 () Baden Borough, sewer project, rehabilitate
20 sanitary sewer collection system 310,000
21 () Baden Borough, sewer project, expand
22 wastewater treatment plant 407,000
23 () BEAVER BOROUGH MUNICIPAL AUTHORITY, SEWER <--
24 PROJECT, SEWER TREATMENT FACILITY ADDITION 250,000
25 () BEAVER BOROUGH MUNICIPAL AUTHORITY, WATER
26 PROJECT, WATER TREATMENT PLANT 750,000
27 () Beaver Falls City, sewer project, construct
28 First Avenue interceptor 435,000
29 () Beaver Falls City, sewer project,
30 rehabilitate sanitary collection system 1,000,000
19870H2035B3637 - 26 -
1 () Beaver Falls City, sewer project, construct
2 wastewater treatment plant 500,000
3 () Center Township, sewer project, construct
4 municipal sewage collection and treatment
5 for Sylvancrest Area 566,000
6 () CENTER TOWNSHIP, SEWER PROJECT, COLLEGE <--
7 PUMPING STATION TRUNK SEWER 442,000
8 () CENTER TOWNSHIP, SEWER PROJECT, NEW COLLEGE
9 PUMPING STATION AND FORCE MAIN 949,000
10 () CENTER TOWNSHIP, SEWER PROJECT, MOON RUN
11 TRANSFER LINE 558,000
12 () CENTER TOWNSHIP, SEWER PROJECT, MOON RUN
13 AND ELKHORN RUN OUTFALL SEWER 1,056,000
14 () CENTER TOWNSHIP, SEWER PROJECT, ELKHORN RUN
15 PLANT EXPANSION 2,600,000
16 () CENTER TOWNSHIP, SEWER PROJECT, CONSTRUCT
17 SANITARY SEWER LINES 4,651,000
18 () Chippewa Township, sewer project, construct
19 new sewer system and pumping facilities
20 modifications 3,000,000
21 () Conway Borough Municipal Authority, sewer
22 project, construct new interceptor sewer 5,512,000
23 () Conway Borough, sewer project, repair and
24 replace municipal sewage treatment
25 facility 101,000
26 () CRESWELL HEIGHTS JOINT AUTHORITY, WATER <--
27 PROJECT, CONSTRUCT WATER LINE 180,000
28 () Economy Borough, water project, place water
29 line and install elevated tank 1,500,000
30 () Economy Borough, sewer project, construct
19870H2035B3637 - 27 -
1 new sewage treatment facility and sewer
2 system 6,160,000
3 () Economy Borough Municipal Authority, sewer
4 project, construct new sewer system 10,034,000
5 () Franklin Township, water project, water
6 lines 2,000,000
7 () Greene Township, water project, water line
8 extensions 1,000,000
9 () Hanover Township, water project, water line
10 extensions 1,000,000
11 () Harmony Township, sewer project, Forest
12 Road, construct sanitary sewer 197,000
13 () Hopewell Township, sewer project,
14 rehabilitate sewage treatment facility 204,000
15 () Independence Township, water project, water
16 line extension 500,000
17 () Industry Borough Municipal Authority, sewer
18 project, construct new sewage treatment
19 facility, interceptor, pumping station and
20 sewer system 6,293,000
21 () Industry Borough, water project, extend
22 municipal water lines to Kelly Road 160,000
23 () Koppel Borough, water project, upgrade
24 water system 2,500,000
25 () Koppel Borough Municipal Authority, sewer
26 project, construct new sewer system
27 extensions 1,994,000
28 () MAXATAWNY TOWNSHIP, SEWER PROJECT, NEW <--
29 CONSTRUCTION 4,000,000
30 () Midland Borough Municipal Authority, water
19870H2035B3637 - 28 -
1 project, locate supply of water for public
2 by using wells with pretreatment, replace
3 water line and valving and repair storage
4 tank 3,200,000
5 () Monaca Borough, sewer project, construct
6 new sewer system, sewer and storm water
7 system separation 14,297,000
8 () Monaca Borough, water project, water system
9 improvement 2,500,000
10 () New Sewickley Township, water project,
11 extend water system 7,000,000
12 () North Sewickley Township, sewer project,
13 construct new sewage treatment facility and
14 sewer system 1,876,000
15 () North Sewickley Township, sewer project,
16 construct new sewer system and pumping
17 station 1,255,000
18 () North Sewickley Township, sewer project,
19 construct new sewage treatment facility and
20 sewer system 1,772,000
21 () North Sewickley Township, water project,
22 construct new water treatment plant 2,000,000
23 () Ohioville Municipal Authority, sewer
24 project, construct new sewer system, sewage
25 treatment plant and interceptor sewer 1,996,000
26 () Ohioville Municipal Authority, sewer
27 project, construct new sewer system, sewage
28 treatment plant and interceptor sewer 188,000
29 () Orchard Estates, water project,
30 interconnection to Ambridge water system 195,000
19870H2035B3637 - 29 -
1 () Patterson Township, sewer project,
2 construct sewage conveyance system 3,000,000
3 () Patterson Township, water project, extend
4 municipal water lines to Beaver Falls 125,000
5 () Patterson Township, sewer project,
6 construct new interceptor sewer, pumping
7 station and sewer system 3,060,000
8 () POTTER TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
9 NEW SEWAGE TREATMENT FACILITY, INTERCEPTOR,
10 PUMPING STATION AND SEWER SYSTEM 1,366,000
11 () Raccoon Township, water project, water line
12 extensions 3,250,000
13 () ROCHESTER AREA JOINT SEWER AUTHORITY, SEWER <--
14 PROJECT, MODIFY THE INSTRUMENTATION PANEL
15 AT THE TREATMENT PLANT AND THE TELEMETERING
16 EQUIPMENT 125,000
17 () ROCHESTER AREA JOINT SEWER AUTHORITY, SEWER
18 PROJECT, REPLACE GRIT MACHINES AT THE THREE
19 LIFT STATIONS 225,000
20 () ROCHESTER AREA JOINT SEWER AUTHORITY, SEWER
21 PROJECT, CONSTRUCT
22 ADMINISTRATION/OPERATIONS/STORAGE BUILDING
23 AT TREATMENT PLANT SITE 100,000
24 () ROCHESTER AREA JOINT SEWER AUTHORITY, SEWER
25 PROJECT, MODIFY EQUIPMENT/FACILITIES 50,000
26 () ROCHESTER AREA JOINT SEWER AUTHORITY, SEWER
27 PROJECT, PROCESS MONITORING/REPORTING,
28 INVENTORY/MAINTENANCE, INDUSTRIAL POLLUTANT
29 MONITORING, PROCESS EVALUATION SYSTEM 35,000
30 () Rochester Township, sewer project,
19870H2035B3637 - 30 -
1 construct new sewer system 289,000
2 () Vanport Township, sewer project, blower
3 replacement project for Vanport water
4 pollution control plant 30,000
5 () Vanport Township, water project, value <--
6 VALVE replacement project for water <--
7 distribution system 10,000
8 () Vanport Township, sewer project, digester
9 rehabilitation project for Vanport water
10 pollution control plant 90,000 <--
11 155,000
12 () Vanport Township, water project,
13 rehabilitate center reservoir 45,000 <--
14 138,000
15 () VANPORT TOWNSHIP, WATER PROJECT, <--
16 TRICHLOROETHYLENE (TCE) REMOVAL 320,000
17 () VANPORT TOWNSHIP MUNICIPAL AUTHORITY, WATER <--
18 PROJECT, CONSTRUCT A NEW TRICHLOROETHYLENE
19 REMOVAL SYSTEM AT EXISTING WELL FIELD 320,000
20 (e) Bedford County
21 () Bedford Borough Water Authority, water
22 project, construct water lines, filtration
23 plant and reservoir 5,800,000
24 () East Providence Township Municipal
25 Authority, sewer project, construction of
26 additional treatment facility 425,000
27 () EAST ST. CLAIR TOWNSHIP, SEWER PROJECT, NEW <--
28 CONSTRUCTION 600,000
29 () HOPEWELL BOROUGH, SEWER PROJECT, SEWER
30 PLANT CONSTRUCTION (90% FUNDED THROUGH
19870H2035B3637 - 31 -
1 FEDERAL AND STATE GRANTS) 120,000
2 () Manns Choice Borough, sewer project,
3 construct new sewer system, sewage
4 treatment plant and interceptor sewer 663,000 <--
5 998,000
6 () Saxton Borough, sewer project, construct
7 new interceptor, sewage treatment plant and
8 sewer system 500,000
9 () Saxton Borough, sewer project, install
10 phosphate removal equipment and expand
11 plant 750,000 <--
12 1,000,000
13 () Schellsburg Borough, sewer project,
14 construct new interceptor sewer, pumping
15 station and sewer system 1,000,000
16 () SCHELLSBURG BOROUGH, SEWER PROJECT, <--
17 COLLECTION SYSTEM 1,200,000
18 () Snake Spring Township, sewer project,
19 construct new sewer system, sewage
20 treatment plant and interceptor sewer 2,214,000
21 () SNAKE SPRING TOWNSHIP SEWER PROJECT, NEW <--
22 TREATMENT AND COLLECTION SYSTEM 400,000
23 () WEST PROVIDENCE TOWNSHIP, SEWER PROJECT,
24 COLLECTION SYSTEM 2,100,000
25 (f) Berks County
26 () Amity Township, sewer project, sewer
27 expansion 4,000,000
28 () ANTIETAM VALLEY, SEWER PROJECT, UPGRADE AND <--
29 EXPAND SEWER 3,000,000
30 () BERKS COUNTY INSTITUTIONAL DISTRICT, SEWER
19870H2035B3637 - 32 -
1 PROJECT, UPGRADE AND EXPAND SEWER WHICH
2 SERVES THE COUNTY HOME AND PRISON AND PART
3 OF BERN TOWNSHIP 5,000,000
4 () BERKS/MONTGOMERY JOINT AUTHORITY, SEWER
5 PROJECT, UPGRADE SEWER 9,000,000
6 () Birdsboro Borough, sewer project, repair
7 flood damage to sewer system 150,000
8 () Birdsboro Borough, water project, repair
9 flood damage to water system 150,000
10 () Boyertown Borough, sewer project, sewer
11 system upgrade and phosphorous removal 355,000
12 () BOYERTOWN BOROUGH, SEWER PROJECT, SEWER <--
13 UPGRADE FOR PHOSPHORUS AND AMMONIA REMOVAL 335,000
14 () BOYERTOWN BOROUGH, WATER PROJECT, REPAIR OF <--
15 TROUT RUN DAM WATER RESERVOIR 450,000
16 () Colebrookdale Township, sewer project,
17 extend existing sewer line to unserviced
18 homes 165,000
19 () Douglass Township, sewer project,
20 construction of new sewer system and
21 pumping station 2,879,000
22 () Earl Township, sewer project, construct new
23 sewer system 450,000
24 () EXETER TOWNSHIP, SEWER PROJECT, EXTEND <--
25 SEWER TO HOMES NOT CURRENTLY SERVED BY
26 SEWER IN BAUMSTOWN 3,100,000
27 () Fleetwood Borough, sewer project, upgrade
28 wastewater treatment facility 2,000,000
29 () Hamburg Municipal Authority, sewer project,
30 upgrade sewage plant and cover 420,000
19870H2035B3637 - 33 -
1 () Kutztown Borough, sewer project, upgrade
2 sewage system 960,000
3 () Longswamp Township, sewer project,
4 construct new interceptor sewer, pumping
5 station and sewer system 3,912,000
6 () LYONS BOROUGH MUNICIPAL AUTHORITY, SEWER <--
7 PROJECT 1,000,000
8 () Maidencreek Township, sewer project,
9 upgrade sewer system 300,000
10 () Maidencreek Township, sewer project, sewer
11 improvement 700,000
12 () MAIDENCREEK TOWNSHIP WATER AUTHORITY, WATER <--
13 PROJECT, WATER FACILITY UPGRADE TO MEET
14 CURRENT WATER STANDARDS 700,000
15 () MAXATAWNY TOWNSHIP, SEWER PROJECT, EXPAND
16 AND UPGRADE SEWER 4,000,000
17 () MAXATAWNY TOWNSHIP, SEWER PROJECT, EXPAND
18 SEWER FROM KUTZTOWN BOROUGH SEWER PLANT
19 INTO MAXATAWNY TOWNSHIP 4,000,000
20 () Robesonia-Wernersville Boroughs, sewer
21 project, rehabilitate sewage treatment
22 facility 2,376,000 <--
23 6,000,000
24 () Ruscombmanor Township, sewer project,
25 construct new interceptor sewer, pumping
26 station and sewer system 3,212,000
27 () Shoemakersville Borough, water project,
28 upgrade water system 120,000
29 () SHOEMAKERSVILLE BOROUGH, SEWER PROJECT, <--
30 REPAIR HOLDING TANKS AT SEWAGE PLANT 75,000
19870H2035B3637 - 34 -
1 () Spring Township Municipal Authority, sewer
2 project, rehabilitate sewage treatment
3 facility 6,834,000
4 () Washington Township, sewer project,
5 construct new sewer system 2,639,000
6 () WOMELSDORF BOROUGH, WATER PROJECT, <--
7 PHOSPHORUS AND AMMONIA REMOVAL 80,000
8 () WOMELSDORF ROBESONIA JOINT AUTHORITY, WATER
9 PROJECT, IMPROVEMENTS TO ENTIRE SYSTEM 3,000,000
10 () WYOMISSING VALLEY JOINT MUNICIPAL
11 AUTHORITY, SEWER PROJECT, REPLACE DIGEST
12 COVER 250,000
13 (g) Blair County
14 () Allegheny Township, sewer project,
15 expansion of sewer lines 750,000
16 () ALLEGHENY TOWNSHIP, SEWER PROJECT, SANITARY <--
17 SEWER LINES 650,000
18 () Altoona City Authority, water project,
19 water system improvements 8,775,000
20 () ALTOONA CITY AUTHORITY, SEWER PROJECT, <--
21 WASTEWATER TREATMENT PLANT RENOVATIONS,
22 COMBINED SEWER OVERFLOW CONTROL FACILITY
23 AND SEWER REHABILITATION 8,757,000
24 () ALTOONA CITY AUTHORITY, SEWER PROJECT, <--
25 EASTERLY SYSTEM, SYSTEM IMPROVEMENTS, LOCAL
26 UNFUNDED SHARE 7,879,000
27 () ALTOONA CITY AUTHORITY, LOGAN TOWNSHIP,
28 SEWER PROJECT, SEWER SYSTEM IMPROVEMENTS,
29 LOCAL UNFUNDED SHARE 1,710,000
30 () ALTOONA CITY AUTHORITY, SEWER PROJECT,
19870H2035B3637 - 35 -
1 WESTERLY SYSTEM, SYSTEM IMPROVEMENTS, LOCAL
2 UNFUNDED SHARE 8,312,000
3 () Antis Township, sewer project, construct
4 new sewer system 514,000
5 () Bellmead Civic Water Association, water
6 project, water system improvement 176,000
7 () Bellwood Borough, sewer project, construct
8 new interceptor sewer 3,194,000
9 () Bellwood Borough, sewer project, construct
10 new sewerage treatment facility 1,300,000
11 () Bellwood Water and Sewer Authority, water
12 project, water system improvements 675,000
13 () Blair Township, water project, disposal of
14 wastewater 150,000
15 () BLAIR TOWNSHIP, SEWER PROJECT, NEW <--
16 CONSTRUCTION FOR FORT FETTER AREA 1,800,000
17 () Catharine Township, water project, replace
18 water system lines 400,000
19 () Central Blair County Sewer Authority, sewer
20 project, construct new sewer system 3,189,000
21 () Duncansville Borough, sewer project, expand
22 sewer system 200,000
23 () Duncansville Borough, water project,
24 project to increase water pressure 120,000
25 () Frankstown Township, sewer project, expand
26 sewer system 1,000,000
27 () Fredericksburg Water Association, water
28 project, improve water system 24,000
29 () Freedom Township, sewer project,
30 rehabilitate infiltration-inflow sewer 300,000
19870H2035B3637 - 36 -
1 () Freedom Township, sewer project, extend
2 sewer lines 670,000
3 () FREEDOM TOWNSHIP, SEWER PROJECT, SEWER LINE <--
4 EXTENTION AND PUMPING STATION 600,000
5 () Greenfield Township, sewer project,
6 rehabilitate infiltration-inflow sewer 300,000
7 () Hollidaysburg Borough, sewer project,
8 construct a new interceptor sewer 500,000
9 () Hollidaysburg Borough, sewer project,
10 enlarge sewage system 2,000,000
11 () Hollidaysburg Borough, water project, renew
12 and extend water supply system 1,500,000
13 () HOLLIDAYSBURG BOROUGH, SEWER PROJECT, <--
14 EXTEND SEWER LINE 130,000
15 () Logan Township, sewer project, extend sewer
16 lines 1,500,000
17 () Logan Township, water project, extend water
18 lines 1,500,000
19 () Martinsburg Borough, water project increase
20 water supply 500,000
21 () Martinsburg Borough, sewer project, extend
22 sewer lines and improve sewage disposal
23 plant facility 1,500,000
24 () Martinsburg Municipal Authority, sewer
25 project, rehabilitate sewage treatment
26 facility 146,000
27 () NEWRY BOROUGH, SEWER PROJECT, SEWAGE <--
28 COLLECTION AND TREATMENT FACILITY 830,000
29 () North Woodbury Township, sewer project,
30 construct new sewer system 613,000
19870H2035B3637 - 37 -
1 () Roaring Spring Borough, sewer project,
2 rehabilitate sewage treatment facility 2,244,000
3 () ROARING SPRING BOROUGH, SEWER PROJECT, NEW <--
4 TREATMENT PLANT 1,500,000
5 () VILLAGE OF CLAYSBURG/GREENFIELD TOWNSHIP,
6 SEWER PROJECT, REPAIR AND REPLACE EXISTING
7 SEWER LINES 500,000
8 () Williamsburg Borough, water project, extend
9 and improve water supply system 150,000
10 (h) Bradford County
11 () Athens-Sayre Joint Authority, sewer
12 project, rehabilitate sewage treatment
13 facility 4,846,000
14 () Herrick Township, sewer project, construct
15 new sewage treatment facility, interceptor,
16 pumping station and sewer system 908,000
17 () Leraysville Borough, sewer project,
18 rehabilitate sewage treatment facility 700,000
19 () New Albany Borough, sewer project,
20 construct new sewer system, sewage
21 treatment plant and interceptor sewer 752,000
22 () NEW ALBANY BOROUGH, WATER PROJECT, <--
23 REHABILITATE WATER DISTRIBUTION TREATMENT
24 AND STORAGE FACILITIES 852,000
25 () NEW ALBANY WATER COMPANY, WATER PROJECT,
26 IMPROVE DISTRIBUTION, TREATMENT AND
27 STORAGE 1,025,000
28 () Smithfield Township, sewer project,
29 construct new sewage treatment facility,
30 interceptor, pumping station and sewer
19870H2035B3637 - 38 -
1 system 1,979,000
2 () South Creek Township, sewer project,
3 construct new sewer system, sewage
4 treatment plant and interceptor sewer 1,536,000
5 () South Waverly Borough, sewer project,
6 construct new sewer system 90,000
7 () Terry Township, sewer project, construct
8 sewer system 1,099,000
9 () TOWANDA MUNICIPAL AUTHORITY, SEWER PROJECT, <--
10 SEWER SYSTEM IMPROVEMENTS 1,000,000
11 () TOWANDA MUNICIPAL AUTHORITY, WATER PROJECT,
12 WATER SYSTEM IMPROVEMENTS 500,000
13 () TROY TOWNSHIP, SEWER PROJECT, EXTEND SEWER
14 LINES 600,000
15 () Ulster Township, sewer project, construct
16 new sewage treatment facility, interceptor,
17 pumping station and sewer system 1,761,000
18 () Wyalusing Borough, sewer project, expand
19 sewage treatment plant 500,000
20 () WYALUSING BOROUGH, WATER PROJECT, <--
21 REHABILITATE WATER DISTRIBUTION TREATMENT
22 AND STORAGE FACILITIES 852,000
23 () WYALUSING MUNICIPAL WATERWORKS, WATER
24 PROJECT, IMPROVE DISTRIBUTION, TREATMENT
25 AND STORAGE 853,000
26 (i) Bucks County
27 () BUCKS COUNTY WATER AND SEWER AUTHORITY, <--
28 UPGRADE OF NESHAMINY INTERCEPTER SYSTEM,
29 INCLUDING THE TOTEM ROAD PUMP STATION AND A
30 NEW INTERCEPTER TO SERVE MIDDLETOWN
19870H2035B3637 - 39 -
1 TOWNSHIP, LANGHORNE MANOR BOROUGH, AND
2 PORTIONS OF NORTHAMPTON AND NEWTON
3 TOWNSHIPS 15,300,000
4 () Doylestown, sewer project, upgrade sewage
5 treatment plant 2,000,000
6 () DOYLESTOWN BOROUGH, SEWER PROJECT, PHASE <--
7 II 2,214,000
8 () DOYLESTOWN BOROUGH, SEWER PROJECT, PHASE
9 III 1,607,000
10 () Durham Village Residents Association, water
11 project, chlorination 30,000
12 () Falls Township, sewer project, sewage
13 treatment plant modification 7,139,000
14 () Fergusonville, water and sewer project,
15 construction 3,000,000
16 () Langhorne Manor Borough, sewer project,
17 construct sanitary collection system 2,589,000 <--
18 3,600,000
19 () Lower Bucks County Joint Municipal
20 Authority, sewer project, flow equalization
21 project, Bristol Township sewage plant 2,000,000
22 () MIDDLETOWN TOWNSHIP (LANGHORNE SPRING), <--
23 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 25,000
24 () Morrisville Borough Municipal Authority,
25 sewer project, construct new sewage
26 treatment plant 6,209,000
27 () Newportville, water and sewer project,
28 construction 3,000,000
29 () Penndel Borough, sewer project,
30 rehabilitate sewage treatment facility 612,000
19870H2035B3637 - 40 -
1 () Perkasie Borough Authority, water project,
2 air stripper 200,000
3 () Upper Southampton Township, sewer project,
4 construct new sewer system and interceptor
5 sewer 580,000
6 () Wrightstown Township, sewer project,
7 construct new sewer system, sewage
8 treatment plant and interceptor sewer 3,047,000
9 (j) Butler County
10 () Buffalo Township, sewer project, construct
11 new sewer system and interceptor sewer 8,307,000
12 () Butler Area Sewer Authority, sewer project,
13 construct relief sewer 95,000
14 () Butler Area Sewer Authority, sewer project,
15 construct relief sewer 138,000
16 () Chicora Borough, sewer project, construct
17 new sewer system, sewage treatment plant
18 and interceptor sewer 2,058,000
19 () Connoquenessing Borough, sewer project,
20 construct sewer system and sewage disposal
21 facility 1,500,000
22 () CRANBERRY TOWNSHIP MUNICIPAL SEWER AND <--
23 WATER AUTHORITY, SEWER PROJECT,
24 IMPROVEMENTS TO SEWAGE TREATMENT PLANT 588,000
25 () Cranberry Township Municipal Water
26 Authority, water project, build reservoir
27 on Brush Creek 2,500,000
28 () CRANBERRY TOWNSHIP MUNICIPAL WATER <--
29 AUTHORITY, WATER PROJECT, BUILD RESERVOIR,
30 16-INCH WATER LINE, 8-INCH RAWWATER,
19870H2035B3637 - 41 -
1 DEVELOP WELL 2,838,000
2 () Evans City Borough, water project,
3 Cranberry Township, construct new raw water
4 dam 650,000 <--
5 1,000,000
6 () Mars Borough, sewer project, sewage
7 treatment plant modification 1,347,000 <--
8 1,700,000
9 () Petrolia Borough, sewer project, upgrade
10 water treatment plant 100,000
11 () Petrolia Borough, water project, provide
12 alternate water supply system 160,000
13 () PROSPECT BOROUGH, SEWER PROJECT, CONSTRUCT <--
14 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT
15 AND INTERCEPTOR SEWER 3,180,000
16 () SAXONBURG BOROUGH, SEWER PROJECT,
17 REHABILITATE SEWER 36,000
18 () SLIPPERY ROCK BOROUGH, WATER PROJECT,
19 IMPROVE WATER TREATMENT AND DELIVERY
20 SYSTEM, CONSTRUCT ADDITIONAL WELL AND
21 REPLACE LINES 1,151,000
22 () Western Butler County Authority, sewer
23 project, new sewer system for Scott Ridge,
24 Seneca Valley, Maiden Lane, Old Perry
25 Highway, High Ridge areas 1,986,000
26 () Zelienople Borough, water project,
27 construct lining and cover for finished
28 water reservoir 150,000
29 (k) Cambria County
30 () Adams Township Water Authority, water
19870H2035B3637 - 42 -
1 project, distribution system improvements 400,000
2 () Ashville Borough, sewer project, construct
3 new sewage treatment plant 1,054,000
4 () Barnesboro and Spangler Boroughs, sewer
5 project, construct new sewer system 29,070,000
6 () BARR TOWNSHIP, WATKINS AREA WATER <--
7 AUTHORITY, WATER PROJECT, NEW WATER SYSTEM
8 TREATMENT AND DISTRIBUTION 900,000
9 () BLACKLICK TOWNSHIP, TWIN ROCKS, WATER
10 PROJECT, REPLACE AND RESTORE WATER LINES 500,000
11 () BROWNSTOWN BOROUGH, SEWER PROJECT, RESTORE
12 SEWER LINES 750,000
13 () CARROLLTOWN BOROUGH, WATER PROJECT,
14 CONSTRUCTION OF WATER TREATMENT PLANT,
15 WATER STORAGE STANDPIPE AND RECONSTRUCTION
16 OF DISTRIBUTION LINES 700,000
17 () Conemaugh Township, sewer project,
18 construct new interceptor sewer, pumping
19 station and sewer system 985,000
20 () Cresson Township Municipal Authority, sewer
21 project, construct new interceptor sewer 1,054,000
22 () Daisytown Borough, sewer project, construct
23 new interceptor sewer, pumping station and
24 sewer system 589,000
25 () Dornick Point, sewer project, upgrade
26 sewage treatment plant 30,000,000
27 () East Taylor Township, sewer project,
28 construct new interceptor sewer, pumping
29 station and sewer system 4,480,000
30 () Ebensburg Municipal Authority, sewer
19870H2035B3637 - 43 -
1 project, rehabilitate sewage treatment
2 facility 3,310,000
3 () Ferndale Borough Municipal Authority, sewer
4 project, construct new grit removal unit 36,000
5 () Forest Hills Municipal Authority, sewer
6 project, rehabilitate sewage treatment
7 facility 3,876,000 <--
8 30,000,000
9 () GALLITZIN BOROUGH WATER PROJECT, CONSTRUCT <--
10 WATER TREATMENT, DISTRIBUTION, STORAGE AND
11 PUMPING FACILITIES 4,593,000
12 () GREATER JOHNSTOWN WATER AUTHORITY, WATER
13 PROJECT, FILTRATION SYSTEM AND RESERVOIR
14 UPGRADE 12,050,000
15 () GREATER JOHNSTOWN WATER AUTHORITY, WATER
16 PROJECT, FILTRATION SYSTEM AND UPGRADE
17 RESERVOIR 12,050,000
18 () HASTINGS BOROUGH, SEWER PROJECT,
19 RECONSTRUCTION OF SEWER INTERCEPTOR 400,000
20 () Highland Sewer and Water, sewer project,
21 construct new interceptor sewer 204,000
22 () Highland Sewer and Water, sewer project,
23 construct new sewer system 3,264,000
24 () Johnstown City, sewer project, rehabilitate
25 sewage treatment facility 20,000,000 <--
26 31,500,000
27 () Lilly Borough, sewer project, construct new
28 sewer system and pumping station 1,965,000
29 () Lower Yoder Municipal Authority, sewer
30 project, construct new interceptor sewer,
19870H2035B3637 - 44 -
1 pumping station and sewer system 157,000
2 () LOWER YODER TOWNSHIP, WATER PROJECT, WATER <--
3 STORAGE TANK 600,000
4 () Middle Taylor Township, sewer project,
5 construct new interceptor sewer and sewer
6 system 1,023,000
7 () NANTY GLO SEWER AUTHORITY, SEWER PROJECT, <--
8 SLUDGE REMOVAL 150,000
9 () Nanty Glo Water Authority, water project,
10 filtration plant 3,500,000 <--
11 FILTRATION PLANT AND EXTEND WATER LINES 30,000,000 <--
12 () Patton Borough, sewer project, construct
13 new sewage treatment facility, interceptor,
14 pumping station and sewer system 1,688,000
15 () Patton Borough, water project, water system
16 improvements 1,225,000
17 () Portage Municipal Authority, water project,
18 water system improvements 1,890,000
19 () Reade Township, water project, extend water
20 service 450,000
21 () Upper Yoder Township Municipal Authority,
22 sewer project, construct new interceptor
23 sewer and sewer system 104,000
24 () VINTONDALE BOROUGH, SEWER PROJECT, NEW <--
25 SEWAGE TREATMENT PLANT AND INTERCEPTOR 2,114,000
26 () WEST CARROLL TOWNSHIP, WATER PROJECT, WATER
27 TREATMENT AND DISTRIBUTION 800,000
28 () Westmont Borough, sewer project, construct
29 new sewer system 49,000 <--
30 500,000
19870H2035B3637 - 45 -
1 (l) Cameron County
2 () MID-CAMERON AUTHORITY, SEWER PROJECT, <--
3 EXPAND SEWER 2,800,000
4 () Shippen Township, sewer project, construct
5 new interceptor sewer, pumping station and
6 sewer system 4,261,000
7 (m) Carbon County
8 () Banks Township, sewer project, construct
9 new sewer system and pumping station 928,000
10 () Beaver Meadows Municipal Authority, water <--
11 SEWER project, rehabilitate sewage <--
12 treatment plant and collection system and
13 improvements 339,000
14 () BOWMANSTOWN BOROUGH SEWER PROJECT, SEWAGE <--
15 TREATMENT COLLECTION SYSTEM 1,300,000
16 () BOWMANSTOWN BOROUGH, WATER PROJECT, WATER
17 SYSTEM IMPROVEMENT PROJECT 695,000
18 () Bowmanstown Municipal Authority, sewer
19 project, construct new sewage treatment
20 facility, pumping station and interceptor 1,489,000
21 () Coaldale - Lansford - Summit Hill Sewer
22 Authority, sewer project, replace existing
23 ejector station and rehabilitate sewage
24 treatment facility 300,000
25 () East Penn Township, sewer project, new
26 interceptor sewer, pumping station and
27 sewer system 2,415,000
28 () East Side Borough, sewer project, new
29 sewage treatment facility and sewer system 478,000
30 () FRANKLIN TOWNSHIP, SEWER PROJECT, BUILD <--
19870H2035B3637 - 46 -
1 SANITARY SEWER SYSTEM FOR FRANKLIN
2 TOWNSHIP, EAST WEISSPORT, NORTH WEISSPORT
3 AND UNION HILL SECTIONS 4,200,000
4 () Franklin Township, sewer project, construct
5 new interceptor sewer, pumping station and
6 sewer system 2,700,000 <--
7 4,200,000
8 () Jim Thorpe Municipal Authority, water
9 project, water system improvements 1,080,000
10 () Kidder Township, sewer project, new sewage
11 treatment plant 2,412,000
12 () LEHIGHTON BOROUGH, SEWER PROJECT, EXPANSION <--
13 OF EXISTING WASTEWATER TREATMENT PLANT 7,040,000
14 () Lehighton Water Authority, water project,
15 update water system and filtration plant 1,000,000
16 () Lehighton Borough, sewer project,
17 rehabilitate sewage treatment facility 4,792,000
18 () Lower Towamensing Township, sewer project,
19 construct new sewer system and pumping
20 station 3,541,000
21 () Mahoning Township Municipal Authority,
22 sewer project, construct new interceptor
23 sewer, pumping station and sewer system 3,197,000
24 () Nesquehoning Borough Authority, sewer
25 project, construct new sewer system, sewage
26 treatment plant and interceptor sewer 3,200,000
27 () NORTH UNION TOWNSHIP, SEWER PROJECT, SEWAGE <--
28 TREATMENT FACILITY 375,000
29 () PALMERTON BOROUGH, SEWER PROJECT, SEWER
30 UPGRADE PROJECTS 1,610,000
19870H2035B3637 - 47 -
1 () Palmerton Borough, sewer project, sanitary
2 sewer relief line for Lafayette Avenue,
3 inflow reductions, Lehigh Avenue flooding,
4 East District storm sewer and West District
5 sewer flooding 1,655,000
6 () SUMMIT HILL WATER AUTHORITY, WATER PROJECT, <--
7 REPLACE AND REHABILITATE PORTIONS OF
8 PRESENT SYSTEM 400,000
9 () WEATHERLY BOROUGH, SEWER PROJECT,
10 TELEVISING AND REPAIRING/REPLACING PORTIONS
11 OF SANITARY SEWER COLLECTION SYSTEM 285,000
12 () Weatherly Borough, sewer project, sewer
13 rehabilitation 147,000 <--
14 285,000
15 () WEATHERLY BOROUGH MUNICIPAL AUTHORITY, <--
16 WATER PROJECT, REHABILITATE WATER LINE 255,000
17 (n) Centre County
18 () Bellefonte Borough, sewer project, expand
19 and upgrade sewer plant 7,000,000
20 () Benner Township, water project, extend
21 water lines from Patton Township to
22 University Park Township 450,000
23 () Benner Township, water project, study
24 township's master water plan 20,000
25 () Centre Hall Borough, water project,
26 construct storage tank, lines and meters 989,000
27 () Centre Hall Borough, sewer project,
28 construct new sewer system, sewage
29 treatment plant and interceptor sewer 4,672,000
30 () College and Harris Townships Joint
19870H2035B3637 - 48 -
1 Authority, sewer project, Persia
2 subdivision sewer service 290,000
3 () Ferguson Township, sewer project, extend
4 sanitary sewer service 369,000
5 () Ferguson Township, sewer project, upgrade
6 sanitary sewer, Piney Ridge 771,000
7 () Ferguson Township, sewer project,
8 rehabilitate sewage treatment facility 682,000
9 () GREGG TOWNSHIP, SEWER PROJECT, IMPROVE <--
10 SPRING MILLS SEWER PLANT AND COLLECTION
11 SYSTEM 3,000,000
12 () Harris Township Authority, water project,
13 construct elevated water storage tank 1,287,000
14 () Harris Township Authority, water project,
15 interconnection with State College Borough
16 Water Authority 436,000
17 () Harris Township Authority, water project,
18 develop groundwater source suitable for use
19 as production well 578,000
20 () Harris Township Authority, water project,
21 renovate Galbraith Gap Reservoir and
22 install approved surface water filtration
23 system 725,000
24 () Howard Borough Authority, sewer project,
25 expand, rehabilitate and construct sewage
26 collection system and equipment 330,000
27 () Howard Borough Water Company, water
28 project, purchase land, protect reservoir
29 and water distribution system 675,000
30 () HUSTON TOWNSHIP, SEWER PROJECT, <--
19870H2035B3637 - 49 -
1 CONSTRUCTION 3,327,000
2 () Julian water and sewer project, construct
3 water and sewage treatment facility 3,192,000
4 () Martha Furnance Mobile Home Park, water
5 project, well and system improvements 52,000
6 () MID-STATE REGIONAL AIRPORT AUTHORITY, SEWER <--
7 PROJECT, CONSTRUCT SEWER LINE FROM THE MID-
8 STATE AIRPORT TO TREATMENT CENTER 600,000
9 () MILESBURG WATER AUTHORITY, WATER PROJECT,
10 EXTEND WATER LINES AND CONSTRUCT WATER
11 STORAGE TANK 850,000
12 () Millheim Borough, water project, water line
13 replacement 266,000
14 () Millheim Borough, sewer project, construct
15 new sewage treatment facility and sewer
16 system 2,851,000
17 () MOUNT EAGLE WATER ASSOCIATION, WATER <--
18 PROJECT, CONSTRUCTION AND INSTALLATION OF
19 WATER FILTERS, CHLORINATORS AND REPLACEMENT
20 OF WATER LINES 450,000
21 () NITTANY WATER COMPANY, WATER PROJECT, NEW
22 WELL, STORAGE AND DISTRIBUTION
23 IMPROVEMENTS 150,000
24 () PENN TOWNSHIP, WATER PROJECT, INSTALL
25 FILTERING SYSTEM, HOLDING TANK AND PIPE 320,000
26 () Point Lookout, sewer project, construct
27 wastewater collection system 170,000
28 () Port Matilda Borough, water and sewer
29 project, construct water and sewage
30 treatment facility 2,700,000
19870H2035B3637 - 50 -
1 () Rush Township, water project, construct
2 wastewater collection system 142,000
3 () Rush Township Municipal Authority, sewer
4 project, construct new sewer system 2,782,000
5 () Snow Shoe Area, sewer project, construct
6 new sewage treatment plant 6,900,000
7 () South Philipsburg Borough, sewer project,
8 construct new interceptor sewer and sewer
9 system 831,000
10 () Spring Mills, sewer project, construct new
11 sewage treatment facility and sewer system 669,000
12 () Spring Township, water project, water
13 system improvement 1,700,000
14 () Spring Township, water project, Milesburg
15 Borough Authority, equip and construct
16 waterpipe distribution system 1,050,000
17 () Spring Township, water project, purchase
18 land to preserve watershed 138,000
19 () Spring-Benner-Walker Joint Authority, sewer
20 project, Jacksonville sewer project for 60
21 edu's in Spring Township 1,248,000
22 () Spring-Benner-Walker Joint Authority, sewer
23 project, extend sewer line 3,000,000
24 () Spring-Benner-Walker Joint Authority, sewer
25 project, extend Spring Creek sewer project
26 in Benner Township 1,560,000
27 () State College Borough, sewer project,
28 divide sewer flows from Pennsylvania State
29 University to UAUA 484,000
30 () State College Borough, sewer project,
19870H2035B3637 - 51 -
1 divide pipes, Pennsylvania State University
2 plant to Claster station 528,000
3 () State College Borough, sewer project, Holly
4 Alley, enlarge sanitary sewer 648,000
5 () State College Borough, water project,
6 expand wastewater treatment, Spring Creek 15,000,000
7 () State College Borough, water and sewer
8 project, expand storm and sanitary sewer 2,119,000
9 () UPPER HALF MOON WATER ASSOCIATION, WATER <--
10 PROJECT, DESIGN/CONSTRUCTION OF WATER
11 DISTRIBUTION AND STORAGE FACILITY AND
12 DRILLING NEW WELL FIELD 500,000
13 () Walker Township Water Association, water
14 project, expand, rehabilitate and construct
15 water supply, filtration and distribution
16 system improvements 900,000
17 () Walker Township Water Association, water
18 project, new well and distribution system
19 improvements 200,000
20 (o) Chester County
21 () Chatwood Water Company, water project,
22 storage 75,000
23 () Coatesville City, sewer project, repairs
24 and upgrading of sewage treatment plant 452,000
25 () Coatesville City, sewer project, repair and
26 upgrade sanitary sewer system 490,000
27 () COATESVILLE CITY, SEWER PROJECT, SEWER <--
28 PLANT AND SYSTEM IMPROVEMENTS AND
29 ADDITIONS 3,900,000
30 () Coatesville Municipal Authority, water
19870H2035B3637 - 52 -
1 project, capital and extraordinary expenses
2 for public water plant and water system 3,955,000
3 () Downingtown Borough Water Department, water
4 project, new water treatment plant 1,500,000
5 () EAST COVENTRY TOWNSHIP, SEWER PROJECT, NEW <--
6 TREATMENT PLANT AND SYSTEM 2,600,000
7 () East Goshen Municipal Authority, sewer
8 project, construct sewer lines in
9 Meadowbrook Lane, Cornwallis Drive and
10 Highland Avenue/Taylor Avenue area of the
11 township 2,000,000
12 () EAST MARLBOROUGH TOWNSHIP, SEWER PROJECT, <--
13 NEW SEWER SYSTEM 800,000
14 () EAST VINCENT TOWNSHIP, SEWER PROJECT, SEWER
15 SYSTEM 5,600,000
16 () KENNETT TOWNSHIP, SEWER PROJECT, SEWER
17 UPGRADE AND EXPAND 3 PROJECTS 995,000
18 () LANDENBERG BOROUGH, SEWER PROJECT, NEW
19 SEWER SYSTEM 392,000
20 () LONDON GROVE TOWNSHIP, SEWER PROJECT, NEW
21 SEWER SYSTEM AND INTERCEPTOR SYSTEM 4,600,000
22 () NEW GARDEN TOWNSHIP, SEWER PROJECT,
23 TREATMENT PLANT AND COLLECTION SYSTEM 2,945,000
24 () Oxford Borough Water Department, water
25 project, storage tank improvement 150,000
26 () Parkesburg Borough Authority, sewer
27 project, rehabilitate sewage treatment
28 facility and construct new interceptor
29 sewer 4,859,000
30 () Philadelphia Suburban Water Company, water
19870H2035B3637 - 53 -
1 project, storage facility and distribution
2 system improvements 12,500,000
3 () Philadelphia Suburban Water Company, water
4 project, Pickering Plan new filtration
5 plant 2,500,000
6 () Phoenixville Borough, water and sewer
7 project, relocate water and sewer lines
8 from the Main Street Bridge 150,000
9 () Phoenixville Borough, water project,
10 replace 1500 feet of water line from Main
11 Street and Second Avenue to Nutt Road 225,000
12 () PHOENIXVILLE BOROUGH, SEWER PROJECT, <--
13 UPGRADE TREATMENT PLANT 137,000
14 () PHOENIXVILLE WATER DEPARTMENT, WATER
15 PROJECT, COVER FINISHED WATER RESERVOIR 100,000
16 () ROYERSFORD BOROUGH, SEWER PROJECT, GREEN
17 STREET PUMPING STATION 90,000
18 () ROYERSFORD BOROUGH, SEWER PROJECT, MAIN
19 STREET PUMPING STATION 85,000
20 () ROYERSFORD BOROUGH, SEWER PROJECT,
21 DEWATERING FACILITY 50,000
22 () SOUTH COATESVILLE BOROUGH, SEWER PROJECT,
23 SEWER PLANT PUMPING STATION 75,000
24 () SPRING CITY BOROUGH, SEWER PROJECT 153,000
25 () SPRING CITY BOROUGH, SEWER PROJECT, NEW
26 TREATMENT PLANT 4,046,000
27 () Tredyffrin Township, sewer project, modify
28 Matsunk sewerage treatment plant and
29 construct new pumping station and force
30 main 7,200,000
19870H2035B3637 - 54 -
1 () Tredyffrin Township, sewer project, modify
2 and expand Trout Run sewage treatment
3 plant 7,500,000
4 () Tredyffrin Township, sewer project, modify
5 and expand Valley Forge sewage treatment
6 plant 7,800,000
7 () UPPER UWCHLAN TOWNSHIP, SEWER PROJECT, <--
8 UPGRADE TREATMENT PLANT 146,000
9 () UPPER UWCHLAN TOWNSHIP, WATER PROJECT,
10 SAYBROOKE WELL 250,000
11 () UPPER UWCHLAN TOWNSHIP, WATER PROJECT,
12 COMPLETE MILFORD STATION EXPANSION 450,000
13 () UPPER UWCHLAN TOWNSHIP, WATER PROJECT,
14 BLACK HORSE TANK 690,000
15 () VALLEY TOWNSHIP, SEWER PROJECT, CONSTRUCT
16 WASTEWATER TREATMENT PLANT AND SANITARY
17 SEWERS 3,800,000
18 () Valley Forge Sewer Authority, sewer
19 project, expansion of the Valley Creek
20 Trunk Sewer System 11,000,000
21 () Valley Forge Sewer Authority, sewer
22 project, upgrade and expand the Valley
23 Forge Treatment Plant 8,000,000
24 () Valley Forge Sewer Authority, sewer
25 project, construction of Stoney Run Creek
26 interceptor system 1,400,000
27 () Valley Forge Sewer Authority, sewer
28 project, upgrade and expand septic dump
29 station 750,000
30 () Valley Forge Sewer Authority, sewer
19870H2035B3637 - 55 -
1 project, upgrade sludge processing and
2 storage facilities at the Valley Forge
3 treatment plant 2,000,000
4 () WEST BRANDYWINE TOWNSHIP, SEWER PROJECT, <--
5 PHASE I AND II, NEW TREATMENT PLANT,
6 PUMPING STATION, SEWER SYSTEM, INTERCEPTOR 3,700,000
7 () West Chester Area Municipal Authority,
8 water project, dam improvements 3,350,000
9 () West Chester Borough, sewer project,
10 rehabilitate sanitary sewer system 700,000
11 () West Grove Borough Authority, sewer
12 project, rehabilitate sewage treatment
13 facility 1,010,000
14 () West Whiteland Municipal Authority, water
15 project, wells and distribution
16 improvements 300,000
17 (p) Clarion County
18 () BEAVER TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
19 NEW SEWAGE FACILITY AND LINES 2,500,000
20 () CLARION TOWNSHIP, SEWER PROJECT, CONSTRUCT
21 NEW SEWAGE FACILITY 800,000
22 () CLARION TOWNSHIP, SEWER PROJECT, IMPROVE
23 SANITARY SEWER SYSTEM 700,000
24 () EAST BRADY BOROUGH, SEWER PROJECT,
25 REHABILITATE SANITARY SEWER SYSTEM 200,000
26 () East Brady Borough Water Works, water
27 project, loop distribution system 15,000
28 () FARMINGTON TOWNSHIP, SEWER PROJECT, <--
29 CONSTRUCT NEW SEWER FACILITY 1,500,000
30 () Foxburg Borough Municipal Authority, sewer
19870H2035B3637 - 56 -
1 project, rehabilitate sewage treatment
2 facility 626,000
3 () HAWTHORN BOROUGH, SEWER PROJECT, CONSTRUCT <--
4 SANITARY SEWER FACILITY 1,750,000
5 () NEW BETHLEHEM BOROUGH, REDBANK VALLEY
6 MUNICIPAL AUTHORITY, SEWER PROJECT, EXPAND
7 SEWER FACILITY AND LINES 1,000,000
8 () PAINT TOWNSHIP, SEWER PROJECT, RECONSTRUCT
9 SEWAGE FACILITY 1,500,000
10 () Rimersburg Borough, sewer project,
11 rehabilitate sewage treatment facility 854,000
12 () SLIGO BOROUGH, SEWER PROJECT, CONSTRUCT NEW <--
13 SEWER FACILITY 1,500,000
14 () Sligo Borough Water Department, water
15 project, distribution system upgrade 750,000
16 () Washington Township, sewer project,
17 rehabilitate sewage treatment facility 400,000
18 () West Pennsylvania Water Company (Clarion
19 District), water project, replace intake,
20 expand treatment facilities 3,085,000
21 (q) Clearfield County
22 () Brady Township, water project, extension of
23 water lines 185,000
24 () Clearfield Municipal Authority, water
25 project, water system and impounding
26 improvements 2,000,000 <--
27 8,000,000
28 () Curwensville Municipal Authority, sewer
29 project, rehabilitate sewage treatment
30 facility 1,601,000
19870H2035B3637 - 57 -
1 () DECATUR TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
2 SEWAGE TREATMENT FACILITY IN CONJUNCTION
3 WITH DEVELOPMENT OF THE OSCEOLA MILLS
4 INDUSTRIAL PARK 2,000,000
5 () Decatur Township, water project, complete
6 water line extensions 450,000
7 () DuBois City, water project, expand water
8 supply and distribution system 830,000
9 () DuBois Sanitary Authority, sewer project,
10 rehabilitate sewage treatment facility 1,313,000 <--
11 2,830,000
12 () DUBOIS CITY, SEWER PROJECT, REHABILITATE <--
13 SEWAGE TREATMENT FACILITY 3,725,000
14 () Glen Hope Water Association Incorporated,
15 water project, chlorinator repairs and ion
16 exchange system 25,000
17 () Goshen Township Water Authority, water
18 project, extend water lines 150,000
19 () Houtzdale Municipal Water Authority, water
20 project, water system improvements 698,000
21 () Houtzdale Municipal Sewer Authority, sewer
22 project, upgrade existing sewer collection
23 system 1,000,000
24 () Houtzdale Borough, water project,
25 Parsonville, extend water lines 200,000
26 () KARTHAUS TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
27 SEWER PLANT AND EXTENSION OF LINES 1,200,000
28 () Osceola Mills Borough, sewer project,
29 construct new interceptor sewer and sewer
30 system 3,296,000
19870H2035B3637 - 58 -
1 () Pike Township, water project, Bailey
2 Settlement, extend water lines 250,000
3 () Pike Township, water project, Chestnut
4 Grove, extend water lines 350,000
5 () Sandy Township, sewer project, expand and
6 upgrade sewer system 1,500,000
7 () Sandy Township, water project, extend water
8 lines 675,000
9 () UNION TOWNSHIP, WATER PROJECT, EXTEND WATER <--
10 LINES 165,000
11 () WOODWARD TOWNSHIP, SEWER PROJECT, SANITARY
12 SEWER LINES FOR APPROXIMATELY 298
13 CONNECTIONS 2,200,000
14 (r) Clinton County
15 () Bald Eagle Township, sewer project,
16 construct and expand sewage collection
17 system and equipment 825,000
18 () Beech Creek Sewer and Water Authority,
19 water project, expand, rehabilitate, modify
20 and construct water distribution system 350,000
21 () Beech Creek Sewer and Water Authority,
22 sewer project, expand and construct sewage
23 collection and treatment facility 1,250,000
24 () BOONEVILLE WATER ASSOCIATION, WATER <--
25 PROJECT, NEW SOURCE AND DISTRIBUTION SYSTEM
26 EXPANSION 75,000
27 () Castanea Township Municipal Authority,
28 sewer project, construct new sewer system 250,000
29 () Chapman Township, water project, construct
30 and expand water supply and distribution
19870H2035B3637 - 59 -
1 system 1,250,000
2 () Chatham Water Company, water project,
3 purchase land for additional right-of-way,
4 restore reservoir and rehabilitate water
5 system 450,000
6 () DUNNSTABLE TOWNSHIP, SEWER PROJECT, IMPROVE <--
7 SEWER FACILITIES 175,000
8 () FLEMINGTON BOROUGH, SEWER PROJECT,
9 REHABILITATE SEWER FACILITIES AND
10 INTERCEPTOR 165,000
11 () FLEMINGTON BOROUGH, SEWER PROJECT, RESTORE
12 SEWER FACILITIES AND MANHOLES 138,000
13 () FLEMINGTON BOROUGH, SEWER PROJECT, RESTORE
14 SEWER FACILITIES AND PUMPING STATION 248,000
15 () Lock Haven City, water project, expand and
16 construct water supply, distribution and
17 filtration system 5,000,000
18 () Lock Haven City, sewer project, expand and
19 construct sewage collection system and
20 treatment facility 2,900,000
21 () Lock Haven City for Wayne Township, water
22 project, construct water supply and
23 distribution system 125,000
24 () Loganton Borough, sewer project, construct
25 new sewer system, sewage treatment plant
26 and interceptor sewer 1,821,000
27 () Loganton Borough, water project, purchase
28 land to construct and expand water
29 distribution system 300,000
30 () Mackeyville Water Company, water project,
19870H2035B3637 - 60 -
1 purchase land to construct water storage
2 system, filtration and distribution
3 improvements 330,000
4 () MILL HALL BOROUGH, SEWER PROJECT, DESIGN <--
5 REHABILITATION AND CONSTRUCTION OF SEWER
6 INTERCEPTOR AND COLLECTION SYSTEM 550,000
7 () Nittany Water Company, water project,
8 Porter Township, restore, construct and
9 expand reservoir, water supply and
10 distribution system 1,000,000
11 () Pine Creek Municipal Authority, sewer
12 project, expand, modify and construct
13 sewage collection and treatment system 1,250,000
14 () Porter Township Municipal Authority, water
15 project, construction CONSTRUCT new water <--
16 system and filtration plant 7,500,000
17 () Porter Township Municipal Authority, sewer
18 project, construct sewage system, sewage
19 treatment plant and interceptor sewer 7,000,000
20 () Renovo Borough, water project, water
21 supply, distribution system and construct
22 filtration plant 7,000,000
23 () Sixty-four Water Company, water project,
24 expand and construct water supply and
25 distribution system 500,000
26 () South Renovo Borough, water project, expand
27 and construct water supply and distribution
28 system 330,000
29 () Suburban Lock Haven Water Authority, water
30 project, purchase land for reservoir and
19870H2035B3637 - 61 -
1 water supply and distribution system 1,500,000
2 () WAYNE TOWNSHIP MUNICIPAL AUTHORITY, SEWER <--
3 PROJECT, EXTEND LINES WEST OF MCELHATTAN-
4 YOUNGDALE 235,000
5 () West Clinton County Municipal Authority,
6 sewer project, rehabilitate and construct
7 sewer collection and treatment facility 250,000
8 () Woodward Township, sewer project, purchase
9 land and construct sewer collection system
10 and treatment plant 2,000,000
11 (s) Columbia County
12 () BLOOMSBURG WATER COMPANY, WATER PROJECT, <--
13 WATER SYSTEM IMPROVEMENTS 570,000
14 () Briar Creek Township, sewer project, sewer
15 interline construction 400,000
16 () Briar Creek Borough, sewer project,
17 construct new sewer system and interceptor
18 sewer 1,472,000
19 () CATAWISSA BOROUGH, SEWER PROJECT, MODIFY <--
20 SEWAGE TREATMENT FACILITY 100,000
21 () Greenwood Township, sewer project,
22 construct sewer line 82,000
23 () Hemlock Township, sewer project, construct
24 new sewage treatment facility and sewer
25 system 2,571,000
26 () Madison Township, sewer project,
27 rehabilitate sewage treatment facility and
28 construct new sewer system 751,000
29 () Montour Township, sewer project, construct
30 new interceptor sewer and sewer system 1,260,000
19870H2035B3637 - 62 -
1 () Orangeville Borough, sewer project,
2 construct new sewage treatment facility and
3 sewer system 721,000
4 () Scott Township, sewer project, construct
5 new sewer system and interceptor sewer 4,000,000
6 () Stillwater Borough, sewer project,
7 construct new sewage treatment facility and
8 sewer system 570,000
9 (t) Crawford County
10 () CAMBRIDGE SPRINGS BOROUGH, WATER PROJECT, <--
11 ELIMINATE STORM WATER INFLOW/INFILTRATION 200,000
12 () CAMBRIDGE SPRINGS BOROUGH, WATER PROJECT,
13 UPGRADE WATER FILTRATION PLANT 175,000
14 () Cochranton Municipality Water Works, water
15 project, storage and distribution
16 improvements 500,000
17 () CONNEAUT LAKE BOROUGH, SEWER PROJECT, <--
18 REPLACE DETERIORATED SEWER LINES 400,000
19 () CONNEAUT LAKE JOINT SEWER AUTHORITY, SEWER
20 PROJECT, UPGRADE AND REHABILITATE SANITARY
21 SEWERAGE FACILITY 1,000,000
22 () CONNEAUT LAKE BOROUGH, WATER PROJECT,
23 REPLACE DETERIORATED WATER LINES AND
24 DEVELOP ALTERNATE WATER SOURCE 400,000
25 () Conneautville Borough, water project,
26 automate reservoir, replace water lines,
27 provide chlorinator and booster pump 900,000
28 () Conneautville Borough Water Department,
29 water project, distribution improvements;
30 well renovation 1,100,000
19870H2035B3637 - 63 -
1 () Linesville Municipal Authority, sewer
2 project, update sewage plant 315,000
3 () Linesville Municipal Authority, water
4 project, construct standpipe and connecting
5 water lines 410,000 <--
6 717,000
7 () Meadville City Water Department, water
8 project, expand distribution area; form
9 joint authority 16,400,000
10 () NORTH & SOUTH SHENANGO SEWER AUTHORITY, <--
11 SEWER PROJECT, SLIP-LINING OF SANITARY
12 SEWERS, REHABILITATE INTERCEPTOR LINES AND
13 PUMPING STATIONS 2,500,000
14 () NORTHWEST CRAWFORD SEWER AUTHORITY, SEWER
15 PROJECT, UPGRADE SEWAGE TREATMENT PLANT 250,000
16 () OAKLAND BEACH WATER COMPANY, WATER PROJECT,
17 DISTRIBUTION SYSTEM IMPROVEMENTS, RESERVOIR
18 COVER, NEW WELLS 300,000
19 () OIL CREEK TOWNSHIP, SEWER PROJECT, EXTEND
20 8-INCH SANITARY SEWER ON WEST CENTRAL
21 AVENUE 400,000
22 () TITUSVILLE CITY, SEWER PROJECT, RECONSTRUCT
23 SEWAGE TREATMENT PLANT, REPLACE SEWER LINE,
24 SEPARATE STORM AND SANITARY SEWER LINES 11,900,000
25 () TITUSVILLE CITY, SEWER PROJECT 1,000,000
26 () TITUSVILLE CITY, WATER PROJECT, RENOVATE
27 WATER PLANT, CONSTRUCT AND RENOVATE PUMPING
28 STATIONS, CONSTRUCT WATER TANK 1,100,000
29 () Vernon Township Sanitary Authority, sewer
30 project, expand to two existing wastewater
19870H2035B3637 - 64 -
1 treatment facilities 1,305,000
2 () WEST MEAD TOWNSHIP, SEWER PROJECT, IMPROVE <--
3 SEWAGE TREATMENT PLANT 3,000,000
4 (u) Cumberland County
5 () Carlisle Borough, sewer projects,
6 rehabilitate roof system on operation
7 control building, repair, replace and
8 construct sewer system projects 2,438,000
9 () Carlisle Borough, water projects, extend,
10 upgrade, replace and construct wells,
11 intake screens, emergency generators,
12 storage facilities, water mains and other
13 water system projects 6,696,000
14 () CARLISLE BOROUGH MUNICIPAL WATER AUTHORITY, <--
15 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 3,350,000
16 () Carlisle Suburban, sewer project, construct
17 a new interceptor sewer 2,000,000
18 () EAST PENNSBORO TOWNSHIP, SEWER PROJECT, <--
19 COLLECTION SYSTEM, PUMPING STATIONS AND
20 TREATMENT PLANT 3,029,000
21 () FRANKLINTOWN BOROUGH MUNICIPAL AUTHORITY,
22 WATER PROJECT, SECONDARY WELL BACK-UP 150,000
23 () HAMPDEN TOWNSHIP, SEWER PROJECT 6,251,000
24 () HAMPDEN TOWNSHIP SEWER AUTHORITY, SEWER <--
25 PROJECT, CONSTRUCT WASTEWATER SLUDGE
26 COMPOSTING FACILITY, IMPROVEMENTS TO SLUDGE
27 HANDLING AND DEWATERING, PLANT IMPROVEMENTS
28 AT ROTH LANE AND PINEBROOK PLANTS 2,600,000
29 () HILLSIDE MOBILE HOME PARK, WATER PROJECT,
30 REPLACE WATER LINES, WATER SYSTEM
19870H2035B3637 - 65 -
1 IMPROVEMENTS 10,000
2 () LEMOYNE BOROUGH, SEWER PROJECT 1,050,000
3 () LOWER ALLEN TOWNSHIP AUTHORITY, SEWER
4 PROJECT, INSTALLATION OF SANITARY SEWERS
5 AND INCLUDING SATELLITE TREATMENT PLANT 4,000,000
6 () MECHANICSBURG WATER COMPANY, WATER PROJECT,
7 WATER SYSTEM IMPROVEMENTS 993,000
8 () MOUNT HOLLY SPRINGS BOROUGH, WATER PROJECT 2,000,000
9 () MOUNT HOLLY SPRINGS WATER AUTHORITY, WATER
10 PROJECT, WATER LINE 2,000,000
11 () Newville Borough, water project, replace
12 water mains, drill test wells and repaint
13 tank 740,000 <--
14 800,000
15 () Pennsylvania American Water Company (Silver
16 Spring Division), water project, expand 4
17 mgd water treatment plant 6,400,000
18 () PENNSYLVANIA AMERICAN WATER COMPANY <--
19 (CAPITAL DIVISION WEST), WATER PROJECT,
20 WATER SYSTEM IMPROVEMENTS 25,000
21 () Shippensburg Borough, water project, water
22 system improvements 3,150,000
23 () SILVER SPRING TOWNSHIP AUTHORITY, SEWER <--
24 PROJECT, CONSTRUCTION OF TRANSPORTATION
25 LINES IN VILLAGE OF NEW KINGSTON 1,500,000
26 () SILVER SPRING TOWNSHIP AUTHORITY, SEWER
27 PROJECT, CONSTRUCTION OF SEWAGE TREATMENT
28 FACILITY AND COLLECTION SYSTEM 2,200,000
29 () UPPER ALLEN TOWNSHIP, SEWER PROJECT 4,014,000
30 () WEST PENNSBORO TOWNSHIP, SEWER PROJECT,
19870H2035B3637 - 66 -
1 INSTALLATION OF SEWERS IN TOWNSHIP 2,400,000
2 () WHITE ROCK WATER CORPORATION, WATER
3 PROJECT, WELL RECONSTRUCTION AND PIPES 200,000
4 () WORMLEYSBURG BOROUGH, SEWER PROJECT,
5 REPLACE OR REPAIR MOTORS IN PUMPING STATION
6 NO. 2 (300 BLOCK OF N. 3RD STREET) 60,000
7 (v) Dauphin County
8 () CEDAR MANOR MOBILE HOME PARK, WATER <--
9 PROJECT, WATER SYSTEM IMPROVEMENTS 25,000
10 () CONEWAGO VALLEY MOTOR INN MOBILE HOME PARK,
11 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 25,000
12 () CRESTVIEW VILLAGE MOBILE HOME PARK, WATER
13 PROJECT, WATER SYSTEM IMPROVEMENTS 25,000
14 () Dauphin Borough, sewer project,
15 rehabilitate sewage treatment facility 2,639,000
16 () DAUPHIN CONSOLIDATED WATER COMPANY, WATER <--
17 PROJECT, WATER SYSTEM IMPROVEMENTS 3,049,000
18 () DERRY TOWNSHIP, WATER PROJECT, CONSTRUCT
19 ADDITIONAL FACILITIES TO REMOVE AMMONIA
20 NITROGEN AND UPGRADE SLUDGE MANAGEMENT
21 FACILITIES 4,000,000
22 () Elizabethville Borough, sewer project,
23 expand and improve capacity of the sewage
24 treatment plant 650,000
25 () ELIZABETHVILLE WATER COMPANY, WATER <--
26 PROJECT, TREATMENT PLANT, LINE REPLACEMENT,
27 COVER FOR RESERVOIR 250,000
28 () GRATZ BOROUGH, WATER PROJECT, UPGRADE
29 CURRENT WATER SYSTEM, PAINT WATER TANK,
30 INSTALL VALVE, REPLACE PIPING 175,000
19870H2035B3637 - 67 -
1 () GRATZ BOROUGH WATER REVENUE FUND, WATER
2 PROJECT, WATER SYSTEM IMPROVEMENTS 75,000
3 () HALIFAX AREA WATER AUTHORITY, WATER
4 PROJECT, CONSTRUCT WATER TANK AND PUMPING
5 STATION 500,000
6 () HALIFAX WATER AUTHORITY, WATER PROJECT,
7 WATER SYSTEM IMPROVEMENTS 250,000
8 () HARRISBURG MUNICIPAL WATERWORKS, WATER
9 PROJECT, WATER SYSTEM IMPROVEMENTS 30,307,000
10 () Harrisburg Water and Sewer Authority, sewer
11 project, upgrade wastewater treatment
12 plant, sewer conveyance improvement
13 collection 18,000,000
14 () Harrisburg Water and Sewer Authority, water
15 project, reconstruct portion of water
16 distribution system 2,594,000
17 () Harrisburg Water and Sewer Authority, water
18 project, new water filtration plant,
19 secondary water source and facility 22,415,000
20 () Lower Paxton Township, sewer project,
21 Spring Creek Interceptor project to remedy
22 sewage overload problems 733,000
23 () Lykens Borough, sewer project, rehabilitate <--
24 sewage treatment facility 479,000
25 () MIDDLE PAXTON TOWNSHIP, SEWER PROJECT, <--
26 CONSTRUCT NEW SEWER SYSTEM AND INTERCEPTOR
27 SEWER 1,466,000
28 () Middletown Borough, sewer project,
29 construct an interceptor sewer 4,000,000
30 () Millersburg Borough, water project,
19870H2035B3637 - 68 -
1 drilling of additional wells for water
2 system 250,000
3 () Millersburg Borough, sewer project, improve
4 sewage treatment facility and sewer lines 150,000
5 () MILLERSBURG BOROUGH AUTHORITY, WATER <--
6 PROJECT, NEW WELLS WITH TREATMENT 160,000
7 () Pennsylvania American Water Company (Derry
8 Township Division), water project, install
9 6,200 feet of 16-inch and 24-inch pipe 634,000
10 () Pennsylvania American Water Company (Derry
11 Township Division), water project, install
12 7,000 feet of 20-inch pipe 950,000
13 () Pennsylvania American Water Company
14 (Hanover Township Division), water project,
15 construct new Swatara Creek intake 1,166,000
16 () Pennsylvania American Water Company
17 (Hanover Township Division), water project,
18 construct 7.5 mgd water treatment plant 8,720,000
19 () Pillow Borough, water project, construct
20 new water distribution system 214,000
21 () PILLOW BOROUGH AUTHORITY, WATER PROJECT, <--
22 NEW CHLORINATION, STANDPIPE, WELL,
23 TRANSMISSION MAIN 250,000
24 () SOUTH HANOVER TOWNSHIP SEWER AUTHORITY,
25 SEWER PROJECT, CONSTRUCT NEW INTERCEPTOR
26 SEWER AND SEWER SYSTEM 2,581,000
27 () Susquehanna Township, sewer project, Spring
28 Creek Interceptor project to remedy sewage
29 overload problems 161,000
30 () Swatara Township, sewer project, Spring
19870H2035B3637 - 69 -
1 Creek Interceptor project to remedy sewage
2 overload problems 75,000
3 () Washington Township, sewer project,
4 construct new sewage treatment plant 2,040,000
5 () Washington Township, water project,
6 construct water distribution system for the
7 village of Loyalton 75,000
8 () West Hanover Township, sewer project,
9 construct sanitary sewer system 9,626,000
10 () Wiconisco Township AND LYKENS BOROUGH, <--
11 sewer project, construct new sewer system <--
12 and pumping station 4,094,000
13 ESTABLISH AND IMPROVE A WASTEWATER <--
14 TREATMENT PLANT 6,053,000
15 () Williams Township, sewer project, construct
16 new interceptor sewer, pumping station and
17 sewer system 918,000
18 () WILLIAMSTOWN BOROUGH, SEWER PROJECT, <--
19 UPGRADE SEWER PLANT AND CONTROL
20 CONTAMINATED SLUDGE 20,000
21 () WILLIAMSTOWN BOROUGH, WATER PROJECT, REPAIR
22 EXISTING WATER LINES 120,000
23 () Williamstown Borough, water project,
24 replace water lines and provide a cover for
25 reservoir 135,000
26 () WILLIAMSTOWN BOROUGH WATER AUTHORITY, WATER <--
27 PROJECT, REPLACE LINES 200,000
28 (w) Delaware County
29 () ASTON TOWNSHIP, NORTHWEST SECTION, SEWER <--
30 PROJECT, INSTALL SANITARY SEWER FACILITIES 5,542,000
19870H2035B3637 - 70 -
1 () BETHEL TOWNSHIP, SEWER PROJECT, SEWER
2 EXTENSION WITH OFF-SITE IMPROVEMENTS AND
3 EAST BETHEL TOWNSHIP SEWAGE COLLECTION
4 SYSTEM 3,600,000
5 () BROOKHAVEN BOROUGH, SEWER PROJECT, UPGRADE
6 EXISTING SEWAGE TREATMENT PLANT 500,000
7 () COLWYN BOROUGH, SEWER PROJECT, REPLACE
8 ANTIQUATED SEWER SYSTEM 2,125,000
9 () CONCORD TOWNSHIP, SEWER PROJECT, CENTRAL
10 SEWER SYSTEM, PURCHASE OF FOX VALLEY
11 TREATMENT PLANT, NEW PLANT ON GREEN CREEK,
12 SEWER ROUTE NO. 202 CORRIDOR 10,480,000
13 () DARBY BOROUGH, SEWER PROJECT, RECONSTRUCT
14 AND REHABILITATE EXISTING SEWER LINES 1,750,000
15 () DELAWARE COUNTY REGIONAL WATER QUALITY
16 CONTROL AUTHORITY, (DELCORA), SEWER
17 PROJECT, INTERCEPTORS, RESTORATION
18 PROJECTS 30,150,000
19 () Delaware County Regional Water Quality
20 Control Authority, sewer project, Eddystone
21 pump station 439,000
22 () Delaware County Regional Water Quality
23 Control Authority, sewer project,
24 (Chester), construct new sewer system and
25 interceptor sewer 9,000,000
26 () EDGMONT TOWNSHIP, WATER PROJECT, REPLACE <--
27 CASTLE ROCK WATER SUPPLY SYSTEM 270,000
28 () FOLCROFT BOROUGH, SEWER PROJECT, REPAIRS TO
29 SEWAGE PUMPING SYSTEM 28,000
30 () FOLCROFT BOROUGH, SEWER PROJECT, WASTEWATER
19870H2035B3637 - 71 -
1 PUMPING STATION 28,000
2 () HAVERFORD TOWNSHIP, SEWER PROJECT, REPAIR
3 AND REPLACE EXISTING SEWER LINES 2,000,000
4 () LANSDOWNE BOROUGH, SEWER PROJECT,
5 RECONSTRUCT AND REHABILITATE EXISTING SEWER
6 LINES 1,750,000
7 () MARPLE TOWNSHIP, SEWER PROJECT, EXTEND
8 SANITARY SEWERS 1,820,000
9 () MIDDLETOWN TOWNSHIP, SEWER PROJECT, EXTEND
10 SANITARY SEWERS 7,117,000
11 () MIDDLETOWN TOWNSHIP SEWER AUTHORITY, SEWER
12 PROJECT, PHASE I PROJECT 6,300,000
13 () MIDDLETOWN TOWNSHIP SEWER AUTHORITY, SEWER
14 PROJECT, PHASE II PROJECT 4,000,000
15 () MILLBOURNE BOROUGH, SEWER PROJECT, REPAIR
16 AND REPLACE EXISTING SEWER LINES 180,000
17 () NETHER PROVIDENCE TOWNSHIP, SEWER PROJECT,
18 EXTEND SANITARY SEWER 2,610,000
19 () NEWTOWN TOWNSHIP, WATER PROJECT, PROVIDE
20 PUBLIC WATER TO AREA CURRENTLY USING WELLS 165,000
21 () NORWOOD BOROUGH, SEWER PROJECT, UPGRADE
22 PUMPING STATION, REPLACE ONE-FOURTH MILE OF
23 SEWER LINE 400,000
24 () PHILADELPHIA SUBURBAN WATER COMPANY,
25 (PSWC), WATER PROJECTS 17,788,000
26 () RADNOR HAVERFORD MARPLE SEWER AUTHORITY,
27 (RHM), SEWER PROJECT, SEWER METERING
28 SYSTEM, REHABILITATE SEWER LINE,
29 INTERCEPTOR 1,190,000
30 () RIDLEY PARK BOROUGH, SEWER PROJECT, REPAIR
19870H2035B3637 - 72 -
1 SANITARY SEWER, I/I STUDY 300,000
2 () SOUTHERN DELAWARE COUNTY AUTHORITY, SEWER
3 PROJECT 2,953,000
4 () SOUTHWEST DELAWARE COUNTY MUNICIPAL
5 AUTHORITY, SEWER PROJECT, COLLECTION AND
6 CONVEYANCE SYSTEM 8,342,000
7 () SPRINGFIELD TOWNSHIP, SEWER PROJECT, EXTEND
8 SANITARY SEWER SYSTEM, RECONSTRUCT EXISTING
9 SEWER LINES 1,583,000
10 () TINICUM TOWNSHIP, SEWER PROJECT, I/I STUDY,
11 REHABILITATE EXISTING SEWER LINES 400,000
12 () TRAINER BOROUGH, SEWER PROJECT, RENOVATE
13 PUMPING STATION, REPLACE SEWER LINE 220,000
14 () UPPER DARBY TOWNSHIP, SEWER PROJECT, REPAIR
15 AND REPLACE EXISTING SEWER LINES 800,000
16 () UPPER PROVIDENCE TOWNSHIP SEWER AUTHORITY,
17 SEWER PROJECT 11,750,000
18 () YEADON BOROUGH, SEWER PROJECT, RECONSTRUCT
19 AND REHABILITATE EXISTING SEWER LINES 1,750,000
20 (x) Elk County
21 () Benzinger Township, sewer project, extend
22 and add to sanitary sewer system 1,500,000
23 () Fox Township, sewer project, sanitary
24 sewers 3,100,000
25 () Fox Township, sewer project, lagoon for
26 present sewer project 300,000 <--
27 600,000 <--
28 626,000
29 () Highland Township, sewer project, James
30 City, sewage collection system 700,000
19870H2035B3637 - 73 -
1 () Horton Township, water project, Brandy Camp
2 Drive, drinking water 600,000
3 () Jay Township, sewer project, Weedville and
4 Caledonia, sanitation sewer collection and
5 treatment system 7,800,000
6 () JAY TOWNSHIP WATER AUTHORITY, WATER <--
7 PROJECT, DISTRIBUTION AND TREATMENT
8 IMPROVEMENT, ADMINISTRATION, ETC. 1,015,000
9 () Johnsonburg Borough, water project,
10 industrial and drinking water 650,000
11 () Johnsonburg Municipal Authority, sewer
12 project, upgrade and extend sewer lines 612,000
13 () JOHNSONBURG MUNICIPAL AUTHORITY, WATER <--
14 PROJECT, CONSTRUCT NEW AND REPLACE EXISTING
15 STORAGE 600,000
16 () Jones Township, sewer project, construct
17 sewage collection system 700,000
18 () NEWTOWN TOWNSHIP, WATER PROJECT, EXTEND <--
19 PHILADELPHIA SUBURBAN WATER COMPANY'S WATER
20 SYSTEM TO INCLUDE PORTION OF FLORIDA
21 AVENUE, PROVIDING FIRE PROTECTION AND
22 POTABLE WATER SERVICES TO APPROXIMATELY 20
23 RESIDENTS 130,000
24 () Ridgway Borough, water project, drinking
25 water 4,500,000
26 () RIDGWAY MUNICIPAL AUTHORITY, SEWER PROJECT, <--
27 UPGRADE SEWER SYSTEM FACILITIES 2,500,000
28 () Spring Creek Township, sewer project,
29 Portland Mills 1,500,000
30 () St. Marys Borough, sewer project,
19870H2035B3637 - 74 -
1 rehabilitate sewer treatment facility 870,000
2 () St. Marys Borough, water project, drinking
3 water 550,000
4 (y) Erie County
5 () Albion Borough, sewer project, install
6 2,400 linear feet sanitary sewer line 270,000
7 () Albion Borough Municipal Authority, water
8 project, water line extension and
9 replacement 270,000
10 () Corry City, water project, water
11 development, additional drinking water
12 supply 200,000
13 () Cranesville Borough, water project, replace
14 water lines and provide mini booster
15 station 475,000
16 () Edinboro Municipal Authority, sewer
17 project, upgrade and improve wastewater
18 treatment plant 3,380,000
19 () Elk Creek Township, sewer project,
20 construction of sewer lines and extension
21 of sewer lines 3,411,000 <--
22 76,000
23 () Elk Creek Township, water project, water
24 main extension 411,000
25 () Erie City, Department of Public Works,
26 water projects, filter plant improvements 3,000,000
27 () Erie City, sewer project, construct new
28 sewage treatment plant 32,999,000
29 () Erie City, sewer and water project,
30 Chestnut Street filtration plant,
19870H2035B3637 - 75 -
1 improvements and pollution abatement 9,000,000
2 () Erie City, water project, water
3 distribution system improvements 6,400,000
4 () Erie City, sewer project, Millcreek tube,
5 eliminate combined sewer overflows 2,340,000
6 () Erie City, sewer project, canal sewer,
7 separation of combined sewer 6,230,000
8 () Erie City, water project, improve water
9 distribution system, storage and pumping
10 facilities 12,100,000
11 () Fairview Borough Water Authority, sewer
12 project, replace sewer lines on Main
13 Street 225,000
14 () Fairview Borough Water Authority, water
15 project, replace water line on Main Street 750,000
16 () Fairview Township Sewer Authority, sewer
17 project, construct new interceptor sewer,
18 pumping station and sewer system 3,601,000 <--
19 3,822,000
20 () Girard Borough, sewer project, rehabilitate
21 sewage treatment facility and construct new
22 interceptor, pumping station and sewer
23 system 2,261,000
24 () Girard Borough, sewer project, update sewer
25 plant to be able to remove ammonia and
26 phosphates 570,000
27 () Greene Township, water project, source and
28 distribution improvements 3,000,000
29 () Greene Township, sewer project, construct
30 new interceptor sewer, pumping station and
19870H2035B3637 - 76 -
1 sewer system 2,095,000
2 () Harborcreek Township, water project,
3 improve water distribution system, storage
4 and pumping facilities 12,100,000
5 () Harborcreek Township, water and sewer
6 project, water and sewer line extensions 900,000
7 () Harborcreek Township, water and sewer
8 project, construct water and sewer
9 connection to I-90 and SR531 intersection 900,000
10 () Lake City Sewer Authority, sewer project,
11 expand and extend sewer lines 300,000
12 () Lawrence Park Township, sewer project,
13 construct new interceptor sewer 6,680,000
14 () Millcreek Township, sewer project,
15 construct new sewer system and interceptor
16 sewer 8,361,000
17 () Millcreek Township Water Authority, water
18 project, 10,000 foot water line; booster
19 station 250,000 <--
20 630,000
21 () North East Borough Water Department, water
22 project, cover storage, other additions;
23 distribution system upgrade 1,000,000
24 () NORTH EAST BOROUGH WATER DEPARTMENT, WATER <--
25 PROJECT, COVER STORAGE, OTHER ADDITIONS,
26 DISTRIBUTION SYSTEM UPGRADE 1,000,000
27 () North East Borough, sewer project,
28 rehabilitate sewage treatment facility 6,281,000
29 () NORTH EAST BOROUGH, SEWER PROJECT, <--
30 CONSTRUCT NEW SEWAGE FACILITY 6,300,000
19870H2035B3637 - 77 -
1 () NORTH EAST BOROUGH, WATER PROJECT,
2 CONSTRUCT SEDIMENTATION SYSTEM 350,000
3 () NORTH EAST BOROUGH, WATER PROJECT, COVER
4 TREATMENT RESERVOIR 200,000
5 () North East Township, water project,
6 Fairchild Reservoir cover 200,000
7 () North East Township, water project, Smith
8 Reservoir row water bypass line 250,000
9 () North East Township, water project, two
10 additional filters at township filter
11 plant 250,000
12 () North East Township, water and sewer
13 project, Exit 11, construct water
14 distribution and sewer collection 888,000
15 () North East Township, sewer project, sewer
16 collection system for South Shore Heights 510,000
17 () North East Township, water project, Peck's
18 subdivision water distribution system 150,000
19 () North East Township, water and sewer
20 project, Exit 12, construct water district
21 and sewer circulation 2,150,000
22 () North East Township Sewer Authority, sewer
23 project, construct new interceptor sewer,
24 pumping station and sewer system 9,527,000
25 () North East Township Water, water project,
26 water distribution, storage and booster
27 pumps improvements 2,100,000
28 () SUMMIT TOWNSHIP, SEWAGE PROJECT, CONSTRUCT <--
29 NEW SEWAGE FACILITY 1,000,000
30 () Summit Township, water projects,
19870H2035B3637 - 78 -
1 distribution, storage and booster pumps
2 improvements 4,000,000
3 () Union City Municipal Authority, sewer
4 project, rehabilitate sewage treatment
5 facility and construct new interceptor,
6 pumping station and sewer system 1,410,000
7 () Union Township, sewer project, construct
8 new interceptor sewer and sewer system 337,000
9 () Venango Township, sewer project, construct
10 new sewer system and interceptor sewer 447,000
11 () Washington Township Sewer and Water
12 Authority, sewer project, sludge disposal
13 project 250,000
14 () Waterford Borough Municipal Authority,
15 sewer project, upgrade and expansion of
16 sewage treatment plant 209,000
17 () Waterford Borough Municipal Authority,
18 water project, replace water line center
19 city and move water tank 260,000
20 () Waterford Municipal Authority, water
21 project, distribution system improvements 150,000
22 () Waterford Township, sewer project, extend
23 sewer line and improve sewage plant 230,000
24 () Wattsburg Borough, sewer project, construct
25 new sewer system, sewage treatment plant
26 and interceptor sewer 1,231,000
27 (z) Fayette County
28 () Belle Vernon, water project, replace old
29 water lines 200,000
30 () Belle Vernon Municipal Authority, sewer
19870H2035B3637 - 79 -
1 project, sewer and storm water system
2 separation 2,234,000
3 () Brownsville Borough, sewer project, improve
4 sanitary sewer system 400,000
5 () Brownsville Township, water project,
6 replace and install new water lines 125,000
7 () BROWNSVILLE WATER COMPANY, WATER PROJECT, <--
8 DISTRIBUTION SYSTEM IMPROVEMENTS 521,000
9 () Bullskin Township, water project, install
10 water storage tanks 300,000
11 () Bullskin Township, water project, extend
12 public water service 660,000
13 () Bullskin Township, sewer project, merit
14 manor expand sewage treatment plant 120,000
15 () Bullskin Township, water project, install
16 water lines 300,000
17 () Connellsville Municipal Authority, sewer
18 project, rehabilitate sewage treatment
19 facility and construct new interceptor,
20 pumping station and sewer system 5,610,000
21 () Connellsville Township, sewer project,
22 install public sewerage 600,000
23 () Connellsville Township, water project,
24 extend public water service 540,000
25 () Dunbar Borough, sewer project, sewage
26 collection and treatment 3,500,000
27 () Dunbar Township, water project, water line
28 extension 390,000
29 () Dunbar Township, sewer project, sewer
30 wastewater treatment facility 2,500,000
19870H2035B3637 - 80 -
1 () Dunbar Township, sewer project, construct
2 new interceptor sewer and sewer system 3,911,000
3 () FAIRCHANCE BOROUGH, WATER PROJECT, <--
4 INSTALLATION OF WATER METERS TO OVER 1,000
5 CUSTOMERS ON THE BOROUGH WATER SYSTEM 231,000
Historical Act text part 2
6 () Fayette City Borough, sewer project,
7 rehabilitate sewage treatment facility and
8 construct new interceptor sewer and sewer
9 system 1,269,000
10 () Franklin Township, water project, water
11 line extension 103,000
12 () Franklin Township, water project, Flatwoods
13 water storage tank 203,000
14 () Franklin Township, sewer project, construct
15 new sewage treatment plant 136,000
16 () Franklin Township, sewer project, construct
17 new sewage treatment plant 356,000
18 () Franklin Township, sewer project, construct
19 new sewage treatment plant 802,000
20 () Georges Creek Municipal Authority, sewer
21 project, construct new sewage treatment
22 plant and interceptor sewer 2,533,000
23 () Georges Township, sewer project, construct
24 new sewage treatment plant 193,000
25 () Georges Township, sewer project, construct
26 new sewage treatment plant 413,000
27 () Georges Township, sewer project, construct
28 new sewage treatment plant 224,000
29 () Indian Creek Water Authority, water
30 project, rehabilitate and relocate water
19870H2035B3637 - 81 -
1 line 600,000
2 () Jefferson Township, water project, water
3 line 318,000
4 () Jefferson Township, sewer project,
5 construct new sewage treatment plant 7,307,000
6 () Lower Tyrone Township, water project,
7 extend water lines 123,000
8 () Luzerne Township, sewer project, construct
9 new sewage treatment plant 182,000
10 () Menallen Township, sewer project, construct
11 new sewage treatment plant 2,179,000
12 () Menallen Township, sewer project, construct
13 new sewer system, sewage treatment plant
14 and interceptor sewer 2,325,000
15 () North Fayette Municipal Authority, water
16 project, expand and upgrade treatment plant
17 to handle additional capacity and to meet
18 the requirements of the Department of
19 Environmental Resources concerning sludge
20 disposal 2,000,000
21 () North Union Township, sewer project,
22 construct new interceptor sewer and sewer
23 system 1,885,000
24 () North Union Township, sewer project, sewer
25 extension 500,000
26 () Ohiopyle Borough, sewer project, construct
27 new sewer system 832,000
28 () Perry Township, sewer project, construct
29 new sewage treatment plant 589,000
30 () Perry Township, sewer project, Star
19870H2035B3637 - 82 -
1 Junction 1,951,000
2 () Perry Township, water project, Wickhaven 105,000
3 () Perryopolis Borough Municipal Authority,
4 sewer project, rehabilitate sewage
5 treatment facility and construct new
6 interceptor sewer and sewer system 4,989,000
7 () POINT MARION BOROUGH, WATER PROJECT, <--
8 REPLACE WATER FILTRATION SYSTEM 2,000,000
9 () South Connellsville Borough, sewer project,
10 upgrade treatment plant 1,800,000
11 () South Connellsville Borough, sewer project,
12 convert present plant 300,000
13 () Smithfield Borough, water project, water
14 system improvements 365,000
15 () South Union Township Sewer Authority, sewer
16 project, construct new interceptor sewer
17 and sewer system 6,928,000
18 () Uniontown City, sewer project, rehabilitate
19 sewage treatment facility and construct new
20 interceptor sewer 23,946,000
21 () Upper Tyrone Township, sewer project,
22 construct sanitary sewer lines 1,500,000
23 () Washington Township, sewer project,
24 construct sanitary sewer 750,000
25 () Washington Township, water project,
26 construct new clear well, water treatment 125,000
27 () Washington Township Municipal Authority,
28 sewer project, construct new sewer system,
29 sewage treatment plant and interceptor
30 sewer 10,794,000
19870H2035B3637 - 83 -
1 () Yough Sanitary Authority, sewer project,
2 construct new sewage treatment facility and
3 sewer system 2,168,000
4 (aa) Forest County
5 () Jenks Township Municipal Authority, sewer
6 project, construct new sewage treatment
7 facility and sewer system 1,792,000
8 () Tionesta Borough, water project, new water
9 well 195,000
10 () TIONESTA BOROUGH, WATER PROJECT, PROTECT <--
11 SPRING SUPPLY SYSTEM 75,000
12 () TIONESTA BOROUGH, WATER PROJECT, COVER
13 TREATMENT RESERVOIR 45,000
14 () TIONESTA BOROUGH, WATER PROJECT, DEVELOP
15 NEW WATER WELLS 65,000
16 () TIONESTA BOROUGH, WATER PROJECT, CHANGE
17 CHLORINE SYSTEM 10,000
18 () TIONESTA BOROUGH WATER SUPPLY, WATER
19 PROJECT, WATER SYSTEM IMPROVEMENTS 195,000
20 (bb) Franklin County
21 () BEAR VALLEY JOINT AUTHORITY, WATER PROJECT, <--
22 TURBIDITY TREATMENT, STANDPIPE 1,200,000
23 () CALEDONIA WATER COMPANY, WATER PROJECT,
24 WATER SYSTEM IMPROVEMENTS 100,000
25 () CHAMBERSBURG BOROUGH WATER DEPARTMENT,
26 WATER PROJECT, WARNING SYSTEM AT WATER
27 SUPPLY DAM, OTHER IMPROVEMENTS 930,000
28 () Fannett Township, sewer project, construct
29 new sewage treatment plant 1,322,000
30 () GREENCASTLE AREA, FRANKLIN COUNTY WATER <--
19870H2035B3637 - 84 -
1 AUTHORITY, WATER PROJECT, NITRATE REMOVAL,
2 FILTRATION 3,000,000
3 () Greencastle Borough, sewer project,
4 construct new sewage treatment plant 1,608,000
5 () GUILFORD WATER AUTHORITY, WATER PROJECT, <--
6 WATER SYSTEM IMPROVEMENTS, DAM CONSTRUCTION
7 AND FILTER PLANT 15,200,000
8 () Guilford Water Authority, water project,
9 new water reservoir, filtration plant and
10 transmission line 21,100,000
11 () Letterkenny Township Municipal Authority,
12 sewer project, construct new sewer system 2,767,000
13 () Lurgan Township, sewer project, construct
14 new sewer system 614,000
15 () Mercersburg Borough, sewer project,
16 rehabilitate sewage treatment facility 799,000
17 () Metal Township Municipal Authority, sewer
18 project, construct new sewer system 1,931,000
19 () MONT ALTO BOROUGH WATERWORKS, WATER <--
20 PROJECT, FILTRATION PLANT AT RESERVOIR 670,000
21 () Pennsylvania Joint Authority, water
22 project, upgrade water transmission lines
23 for Bear Valley 1,200,000
24 () Peters Township, sewer project, construct
25 new sewage treatment facility, pumping
26 station and sewer system 3,070,000
27 () Quincy Township, sewer project, construct
28 new sewer system and interceptor sewer 3,568,000
29 () SAINT THOMAS TOWNSHIP, WATER PROJECT, <--
30 DEVELOP SUPPLEMENTAL WATER SUPPLY SOURCES 700,000
19870H2035B3637 - 85 -
1 () SAINT THOMAS TOWNSHIP, WATER PROJECT,
2 INCREASE CAPACITY AND ERECT STANDPIPE TO
3 PROVIDE ADDED STORAGE 500,000
4 () SHIPPENSBURG BOROUGH, WATER PROJECT, SYSTEM
5 IMPROVEMENT PROJECT 3,150,000
6 () Waynesboro Borough, sewer project,
7 rehabilitation of sewage treatment
8 facility 3,652,000
9 (cc) Fulton County
10 () McConnellsburg Borough, sewer project,
11 modify sewage treatment plant 836,000
12 () TODD TOWNSHIP, SEWER PROJECT, SEWAGE <--
13 TREATMENT PLANT AND COLLECTION SYSTEM
14 (KNOBSVILLE AREA) 78,000
15 (dd) Greene County
16 () Carmichaels Borough Municipal Authority,
17 water project, construct additional water
18 storage tank 300,000 <--
19 () Carmichaels Borough Municipal Authority,
20 water project, replace water lines 165,000
21 STORAGE TANK AND REPLACE WATER LINES 500,000 <--
22 () Center Township, sewer project, construct
23 new sewage treatment facility, interceptor,
24 pumping station and sewer system 980,000
25 () Dunkard Township - Bobtown Municipal
26 Authority, sewer project, rehabilitate
27 sewage treatment facility 1,861,000
28 () Greensboro Borough, sewer project,
29 construct new sewage treatment facility,
30 interceptor, pumping station and sewer
19870H2035B3637 - 86 -
1 system 2,485,000
2 () Jefferson Township, sewer project, Dry
3 Tavern, sewage treatment plant 640,000
4 () Rices Landing Borough, water project,
5 extend water line to provide potable water
6 supply 100,000
7 () Rices Landing Borough, sewer project,
8 construct new sewer system, sewage
9 treatment plant and interceptor sewer 4,157,000
10 () South Western Pennsylvania Water Authority,
11 water project, construct Monongahela water
12 treatment facility and transmission main 10,000,000
13 () TODD TOWNSHIP BOARD OF SUPERVISORS, SEWER <--
14 PROJECT, CONSTRUCT SEWAGE TREATMENT PLANT
15 AND SEWER COLLECTION SYSTEM FOR VILLAGE OF
16 KNOBSVILLE 100,000
17 () Wayne Township, water project, expand water
18 conveyance system to develop alternate
19 source 400,000
20 () Waynesburg Borough, sewer project,
21 rehabilitate sewage treatment facility 2,856,000
22 () Waynesburg Borough, sewer project, upgrade
23 sewer system to be in compliance with DER 700,000
24 (ee) Huntingdon County
25 () Birmingham Borough, sewer project,
26 construct new sewage system 675,000
27 () Broad Top Borough Water Authority, water
28 project, improve water supply and
29 treatment, and improve water storage and
30 distribution 100,000
19870H2035B3637 - 87 -
1 () Broad Top City Borough, sewer project,
2 construct new sewage system 1,288,000
3 () Cassville Borough, sewer project, construct
4 new sewage system 694,000
5 () Coalmont Borough, sewer project, construct
6 new sewer system (Middletown) 1,328,000
7 () Dudley Borough, sewer project, construct
8 new sewer system (Barnettstown) 1,666,000
9 () Hopewell Township, sewer project, construct
10 new sewer system (Cherrytown) and extend
11 Saxton sewer system to serve Puttstown 732,000
12 () Lincoln Township, sewer project, construct
13 new sewage system 353,000
14 () Mapleton Borough, sewer project, construct
15 new sewage system 4,000,000
16 () Marklesburg Borough, sewer project,
17 construct new sewage system 986,000
18 () Mill Creek Borough, sewer project,
19 construct new sewage system 4,800,000
20 () Penn Township, sewer project, construct new
21 sewage system (Hesston) 432,000
22 () Shade Gap Borough/Dublin Township, sewer
23 project, construct new sewage system 2,300,000
24 () Shade Gap Borough, sewer project, construct
25 new sewage treatment facility and sewer
26 system 668,000
27 () Smithfield Township, sewer project,
28 extension of sewage system and
29 rehabilitation of existing lines 600,000
30 () SMITHFIELD TOWNSHIP, SEWER PROJECT, NEW <--
19870H2035B3637 - 88 -
1 CONSTRUCTION 200,000
2 () Todd Township, sewer project, construct new
3 sewer system (Newburg/Todd) 593,000
4 () Union Township, sewer project, construct
5 new sewage system (Calvin) 128,000
6 () Walker Township, sewer project, construct
7 new sewage system 4,670,000
8 () Wood Township, sewer project, construct new
9 sewer system 6,000,000
10 (ff) Indiana County
11 () Armagh Borough, sewer project, feasibility
12 study, sewerage system 9,000
13 () Armagh Borough, sewer project, construct
14 new sewage treatment facility and sewage
15 system 500,000
16 () Banks Township, sewer project, construct
17 new sewage treatment plant 500,000
18 () Blacklick Township, water project, extend
19 water service, Grafton-Route 217 250,000
20 () Blacklick Township, water project,
21 construct package treatment plant 40,000
22 () Blairsville Borough, sewer project,
23 construct secondary sewage treatment
24 system 1,500,000
25 () Blairsville Borough, sewer project,
26 rehabilitate sewage treatment facility 2,868,000
27 () Blairsville Borough Water Authority, water
28 project, construct water filtration plant 900,000
29 () Blairsville Borough Water Authority, water
30 project, dredging water reservoir 300,000
19870H2035B3637 - 89 -
1 () Blairsville Borough Water Authority, water
2 project, install new altitude valve for
3 water system 30,000
4 () Blairsville Borough Water Authority, water
5 project, renovate gate house for watershed 50,000
6 () Blairsville Borough Water Authority, water
7 project, replace water line 50,000
8 () Brush Valley Township, sewer project,
9 feasibility study, sewerage system 5,000
10 () Brush Valley Township, sewer project,
11 construct new sewage treatment facility and
12 sewer system 750,000
13 () Buffington and East Wheatfield, water
14 project, extend water service to Dilltown
15 area 500,000
16 () Burrell Township, water project, extend <--
17 water service, Route 217 150,000
18 () BUFFINGTON TOWNSHIP, WATER PROJECT, WATER <--
19 DISTRIBUTION LINES 500,000
20 () BURRELL TOWNSHIP, SEWER AND WATER PROJECT,
21 EXTEND WATER AND SEWER LINES 1,000,000
22 () Burrell Township, water project,
23 feasibility study, public water service 5,000
24 () Burrell Township, sewer project, ICMSA,
25 Chestnut Ridge sewage treatment 60,000
26 () Burrell Township, sewer project, Josephine, <--
27 construct sewage treatment plant 500,000
28 () BURRELL TOWNSHIP, SEWER PROJECT, <--
29 CONSTRUCTION OF SEWERAGE TREATMENT PLANT
30 AND COLLECTION SYSTEM WITHIN JOSEPHINE AND
19870H2035B3637 - 90 -
1 STRANGFORD AREAS 4,000,000
2 () Canoe Township, sewer project, construct
3 new sewage treatment facility and sewer
4 system 1,226,000
5 () Canoe Township, sewer project, ICMSA,
6 construct sedimentation retaining pond 25,000
7 () Center Township, sewer project, install
8 flow equalizer system 34,000
9 () Center Township, water project, various
10 water line extensions 400,000
11 () Center Township, water project, extend
12 water service, ICMSA water lines 285,000
13 () Center Township, sewer project, complete
14 feasibility study 15,000
15 () Central Indiana County Joint Sanitary
16 Authority, sewer project, construct new
17 sewage treatment plant and interceptor
18 sewer in Homer City and Center Township 7,500,000
19 () Central Indiana County Joint Sanitary
20 Authority, sewer project, Centre Township,
21 construct sewage lines 3,000,000
22 () Central Indiana County Joint Sanitary
23 Authority, sewer project, construct sewer
24 lines in Homer City Borough 2,000,000
25 () Central Indiana County Joint Sanitary
26 Authority, Homer City Borough, sewer
27 project, rehabilitate and construct sewer
28 lines 2,000,000
29 () Central Indiana County Water Authority,
30 water project, Homer City Borough,
19870H2035B3637 - 91 -
1 construct a 200,000 gallon water tank 500,000
2 () Cherryhill Township, sewer project,
3 construct new sewage treatment plant 750,000
4 () Cherry Tree Borough, sewer project,
5 construct new sewer system, sewage
6 treatment plant and interceptor sewer 750,000
7 () Cherry Tree Borough, water project, replace
8 iron water lines with plastic 500,000
9 () Cherry Tree Borough, water project, install
10 water meters, borough's system 20,000
11 () Cherry Tree Borough, water project, repair
12 reservoirs breast 200,000
13 () Cherry Tree Borough, sewer project,
14 feasibility study 5,000
15 () Clymer Borough, water project, acquire
16 second water storage tank 150,000
17 () Clymer Borough, water project, install
18 filtration system 200,000
19 () Clymer Borough, water project, repair
20 grouting in manhole walls for water system 10,000
21 () Commodore Water Service Company, water
22 project, water improvements 156,000
23 () Commodore Water and Sewer Company, sewer
24 project, construct new sewer system 3,538,000
25 () Conemaugh Township, sewer project,
26 construct new sewer system 1,874,000
27 () Conemaugh Township, water project, Vine
28 Street water line extension 7,000
29 () Conemaugh Township, water project, ICMSA,
30 extend water service 250,000
19870H2035B3637 - 92 -
1 () Conemaugh Township, sewer project,
2 Nowrytown sewage system construction 175,000
3 () Conemaugh Township, sewer project,
4 construct new sewer system 156,000
5 () Creekside Borough, sewer project, ICMSA,
6 feasibility study 5,000
7 () Creekside Borough, water project, ICMSA,
8 develop well, replace distribution lines 210,000
9 () Creekside and Ernest Boroughs, sewer
10 project, construct new sewage treatment
11 plant 5,570,000
12 () East Wheatfield, Burrell and Young Township
13 sewer project, Iselin ICMSA sewer system 75,000
14 () East Wheatfield Township, sewer project,
15 ICMSA, Robindale sewage plant 15,000
16 () East Wheatfield Township, sewer project,
17 construct new sewage treatment plant 2,285,000
18 () East Wheatfield Township, water project,
19 feasibility study 5,000
20 () EAST WHEATFIELD TOWNSHIP, WATER PROJECT, <--
21 EXTEND WATER SERVICE LINES 576,000
22 () East Wheatfield Township, sewer project,
23 feasibility study 7,000
24 () Ernest Borough, water project, replace
25 water lines, hydrants and valves 257,000
26 () Glen Campbell Borough, water project,
27 replace water distribution lines 100,000
28 () Glen Campbell Borough, sewer project,
29 construct new sewage treatment plant and
30 interceptor sewer 1,105,000
19870H2035B3637 - 93 -
1 () Grant Township, sewer project, construct
2 new sewage treatment plant 500,000
3 () Green Township, sewer project, Barr Slope
4 and Dixonville, construct new sewage
5 treatment plant 1,500,000
6 () Green Township, sewer project, Starford
7 sewer and water feasibility study 5,000
8 () Green Township, water project, extend
9 public water service, Dixonville 350,000
10 () Green Township, water project, improve
11 Commodore water system 350,000
12 () Green Township, sewer project, sewage
13 feasibility studies 10,000
14 () Green Township, water project, Barr Slope
15 water distribution system 170,000
16 () Green Township Municipal Authority,
17 Commodore, sewer project, separate sewer
18 and storm water systems 750,000
19 () HOMER CITY BOROUGH, SEWER PROJECT, STORM <--
20 SEWER REPLACEMENT 250,000
21 () Homer City Borough, water project, water
22 line replacement 250,000
23 () Indiana Borough, water project, continue to
24 improve manholes 250,000
25 () Indiana Borough, sewer project, purchase
26 and install filter and frame presses 720,000
27 () Indiana Borough, sewer project, flow
28 analysis, replace sewer line 250,000
29 () Indiana Borough, sewer project, replace
30 main interceptor sewer 200,000
19870H2035B3637 - 94 -
1 () Indiana Municipal Authority, water project,
2 preliminary stages, impounding water 500,000
3 () Jacksonville Borough, water project,
4 replace water well 25,000
5 () Jacksonville Borough, sewer project,
6 construct new sewer system, sewage
7 treatment plant and interceptor 125,000
8 () Marion Center Borough, sewer project,
9 complete study, construct sewerage system 1,500,000
10 () Marion Center Borough, water project,
11 feasibility study, construct water system 800,000
12 () Montgomery Township, water project, ICMSA,
13 dredging clay lining reservoir 25,000
14 () Montgomery Township, sewer project,
15 Arcadia, construct new sewage treatment
16 plant 500,000
17 () Montgomery Township, sewer project,
18 Hillsdale, construct new sewage treatment
19 plant 500,000
20 () Montgomery Township, sewer project, Gypsy,
21 construct new sewage treatment plant 500,000
22 () Ninevah Water Company, water project,
23 improve water system 675,000
24 () North Mahoning Township, sewer project,
25 construct new sewage treatment plant 500,000
26 () Pine Township, sewer project, Alverda,
27 construct new sewage treatment plant 485,000
28 () Pine Township, sewer project, Heilwood,
29 Brownstone and Mentcle, construct new
30 sewage treatment plant 2,172,000
19870H2035B3637 - 95 -
1 () Pine Township, water project, feasibility
2 study, water line extension 15,000
3 () Pine Township, water project, ICMSA,
4 replace feeder and mentcle lines 250,000
5 () Pine Township, sewer project, feasibility
6 study 25,000
7 () Plumville Borough, sewer project,
8 feasibility study, construct sewer system 1,160,000
9 () Rayne Township, water project, feasibility
10 study, extend water service 105,000
11 () Rayne Township, sewer project, feasibility
12 study, sewerage system 25,000
13 () Rayne Township, sewer project, construct
14 new sewage treatment plant 500,000
15 () Saltsburg Borough, water project, improve
16 and repair storage reservoir 350,000
17 () Saltsburg Borough, water project, improve
18 water plant 500,000
19 () Saltsburg Borough, water project,
20 feasibility study for extension of water
21 line into Conemaugh Township 10,000
22 () Saltsburg Borough, water project,
23 rehabilitate water distribution system 1,000,000
24 () Saltsburg Borough, sewer project, construct
25 storm sewer system to separate from sewage
26 collection system 1,000,000
27 () Saltsburg Borough, sewer project, extend
28 sewage collection lines 140,000
29 () Shelocta Borough, sewer project, construct
30 new sewer system, sewage treatment plant
19870H2035B3637 - 96 -
1 and interceptor sewer 1,500,000
2 () Smicksburg Borough, sewer project, new
3 sewage treatment plant 600,000
4 () Southeastern Indiana County Water
5 Authority, water project, improve lines and
6 valves 200,000
7 () West Wheatfield Township, water project,
8 install fire hydrants on water system 30,000
9 () West Wheatfield Township, water project,
10 extend water line 500,000
11 () White Township, sewer project, extend water
12 and sewer lines to airport 850,000
13 () White Township Municipal Authority, sewer
14 project, construct new sewer system and
15 pumping station 18,054,000
16 () White Township Municipal Authority, sewer
17 project, construct new sewer system and
18 pumping station 2,500,000
19 () Young Township, sewer project, West
20 Lebanon, construct new sewage treatment
21 plant 750,000
22 () Young Township, sewer project, ICMSA,
23 develop central sewage treatment and
24 collection, Coal Run - McIntyre 1,500,000
25 () Young Township, water project, water tank
26 and line extensions 100,000
27 () Young Township, sewer project, ICMSA,
28 preparation of engineering study 5,000
29 (gg) Jefferson County
30 () Bell Township, sewer project, construct
19870H2035B3637 - 97 -
1 sewer lines and treatment plant 1,650,000
2 () Big Run Borough, sewer project, construct
3 new interceptor sewer and sewer system 1,908,000
4 () Brockway Borough Municipal Authority, water
5 project, water filtration plant 610,000
6 () Brockway Borough Municipal Authority, water
7 project, water transmission main 90,000
8 () Brookville Borough, water project,
9 construct protective cover for water
10 reservoir 117,000
11 () Corsica Borough, sewer project, construct
12 new sewage treatment facility and sewer
13 pipes 948,000
14 () Eldred, sewer project, construct treatment
15 plant and sewer lines 915,000
16 () Falls Creek Borough, Sandy, Washington and
17 Winslow Townships, sewer project, construct
18 new sewage treatment facility and sewer
19 pipes 2,946,000
20 () Henderson Township, sewer project,
21 construct sewage treatment plant 300,000
22 () Knox Township, sewer project, construct
23 treatment plant and sewer lines 860,000
24 () McCalmont Township, sewer project,
25 construct sewage treatment plant 780,000
26 () Oliver Township, sewer project, construct
27 sewage treatment plant 957,000
28 () Punxsutawney Borough, sewer project,
29 construct addition to existing sewage
30 treatment facility and sewer pipes 2,500,000
19870H2035B3637 - 98 -
1 () Reynoldsville Borough, sewer project,
2 upgrade sewer lines 600,000
3 () Rose Township, water project, construct
4 water distribution system 480,000
5 () Rose Township, sewer project, construct new
6 sewer system and interceptor sewer 324,000
7 () Snyder Township Municipal Authority, sewer
8 project, construct new sewer system 2,075,000
9 () Summerville Borough Municipal Authority,
10 sewer project, construct new sewer system
11 and treatment facility 1,909,000
12 () Sykesville Borough, sewer project,
13 construct new sewer system, sewage
14 treatment plant and interceptor sewer 970,000
15 () Young Township, sewer project, construct
16 sewer lines 735,000
17 (HH) JUNIATA COUNTY <--
18 () MIFFLINTOWN BOROUGH, SEWER PROJECT,
19 REHABILITATE EXISTING SEWAGE LINES 110,000
20 () MONROE TOWNSHIP, WATER PROJECT, IMPROVE AND
21 EXTEND WATER LINES 1,500,000
22 () MONROE TOWNSHIP, SEWER PROJECT, CONSTRUCT
23 SEWER PLANT AND EXTEND LINES 4,500,000
24 () PORT ROYAL BOROUGH, SEWER PROJECT,
25 REHABILITATE EXISTING SEWAGE LINES 1,500,000
26 () PERRY TOWNSHIP MUNICIPAL AUTHORITY, SEWER
27 PROJECT, CONSTRUCT SEWER PLANT 200,000
28 (ii) Lackawanna County
29 () ARCHBALD BOROUGH, SEWER PROJECT, CONSTRUCT <--
30 SEWER LINES AND APPURTENANCES 955,000
19870H2035B3637 - 99 -
1 () Carbondale City, sewer project, upgrade and
2 reconstruct sewer system 12,000,000
3 () CARBONDALE TOWNSHIP, SEWER PROJECT, UPGRADE <--
4 SEWER LINES 500,000
5 () CHINCHILLA WATER COMPANY, WATER PROJECT,
6 RENOVATE WATER SYSTEM 800,000
7 () Clarks Summit, sewer project, State and
8 Grove Streets, etc., repair sewers 294,000
9 () Clarks Summit, sewer project, South
10 Abington, update sewer construction 6,800,000
11 () Covington Township, sewer project,
12 construct sewage collection system and
13 treatment plant 5,660,000
14 () DICKSON CITY, SEWER PROJECT, SEWER LINE <--
15 REPLACEMENT 818,000
16 () Dunmore Borough, sewer project, Dunmore
17 Cemetery sewer construction 358,000
18 () Dunmore Borough, sewer project, Blakely
19 Street at Drinker Street, sewer
20 reconstruction 743,000
21 () Dunmore Borough, sewer project, Smith and
22 Mill Streets, sewer reconstruction 330,000
23 () Dunmore Borough, sewer project, Erie and
24 Lake Streets, sewer construction 440,000
25 () Dunmore Borough, sewer project, Jefferson
26 Avenue, siphon reconstruction 220,000
27 () ELMBROOK WATER COMPANY, WATER PROJECT, <--
28 IMPROVE WATER SYSTEM 130,000
29 () Fell Township, Lackawanna River sewer
30 project, sewers and storm drains 540,000
19870H2035B3637 - 100 -
1 () GLENBURN WATER COMPANY, WATER PROJECT, <--
2 IMPROVE WATER SYSTEM 160,000
3 () Greenfield Township, sewer project, sewer
4 constructs and improve sewers 510,000
5 () Greenfield Township, sewer project, improve
6 sanitary sewers 1,600,000
7 () Jefferson Township, sewer project,
8 construct new interceptor sewer and sewer
9 system 2,621,000
10 () JESSUP BOROUGH, SEWER PROJECT, REPLACE <--
11 SANITARY SEWER LINES 690,000
12 () Lackawanna River Basin Sewer Authority,
13 sewer project, Archbald, rehabilitate
14 sewage treatment facility 8,928,000
15 () La Plume Township, sewer project, improve
16 sanitary sewers 800,000
17 () Moosic Borough, sewer project, sewer
18 construction and repair 641,000
19 () Moosic Borough, sewer project, construct
20 sanitary sewer to Rocky Glen Road 490,000
21 () Moosic Borough, sewer project, construct
22 Greenwood Sanitary Sewer, Roth and Stone
23 Streets 106,000
24 () Moosic Borough, sewer project, extend
25 Greenwood Sanitary Sewer to Route 502
26 Bridge 118,000
27 () MOSCOW WATER COMPANY, WATER PROJECT, <--
28 RENOVATE WATER SYSTEM 520,000
29 () Old Forge Borough, sewer project, improve
30 sanitary sewers 1,400,000
19870H2035B3637 - 101 -
1 () Olwen Heights Water Service Company, water
2 project, water storage and water line 300,000
3 () Pennsylvania American Water Company
4 (Abington District) (Olwen Heights), water
5 project, construct aeration facility 100,000
6 () Pennsylvania American Water Company
7 (Abington District), water project,
8 additional water supply 200,000
9 () Pennsylvania American Water Company
10 (Abington District), water project,
11 construct additional water storage tank 925,000
12 () PENNSYLVANIA GAS AND WATER COMPANY, WATER <--
13 PROJECT, WATER SYSTEM IMPROVEMENTS 106,000,000
14 () Pennsylvania Gas and Water Company
15 (Brownell), water project, water filtration
16 improvements 5,290,000
17 () Pennsylvania Gas and Water Company
18 (Chinchilla), water project, water
19 filtration improvements 2,780,000
20 () Pennsylvania Gas and Water Company (Dunmore
21 1), water project, water transmission line 2,330,000
22 () Pennsylvania Gas and Water Company (Dunmore
23 1), water project, water storage
24 improvements 750,000
25 () Pennsylvania Gas and Water Company (Griffin
26 Lake), water project, water pumping
27 station 1,210,000
28 () Pennsylvania Gas and Water Company (Griffin
29 Lake), water project, water dam repair 780,000
30 () Pennsylvania Gas and Water Company
19870H2035B3637 - 102 -
1 (Olyphant 1), water project, dam repair 100,000
2 () Pennsylvania Gas and Water Company
3 (Williams Bridge), water project, water
4 pumping station 440,000
5 () Pennsylvania Gas and Water Company
6 (Williams Bridge), water project, water
7 storage 630,000
8 () Pennsylvania Gas and Water Company
9 (Williams Bridge and Oakmont) water
10 project, water pumping station 130,000
11 () Scranton City, sewer project, Meridian and
12 10th Streets, sewer reconstruction 1,100,000
13 () Scranton City, sewer project, East Elm
14 Street at Stafford Meadow Brook, sewer
15 reconstruction 523,000
16 () Scranton City, sewer project, Moosic
17 Street, sewer replacement 710,000
18 () Scranton City, sewer project,
19 regulator/overflow repair/relocation and
20 Richmont Street sewer realignment 1,045,000
21 () Scranton City, sewer project, East Elm
22 Street/Mountain Lake sewer extension with
23 pumping station 495,000
24 () Scranton City, sewer project, sewer
25 replacement at 22nd Street 1,100,000
26 () Scott Mobile Home Park, water project,
27 water chlorination and storage 25,000
28 () Scott Township, sewer project, sanitary
29 sewers 1,200,000
30 () Simpson Borough, Main Street, sewer
19870H2035B3637 - 103 -
1 project, construct sanitary sewers 2,200,000
2 () South Abington Township, sewer project,
3 construct sewers 600,000
4 () Taylor Borough, sewer project, replace
5 sanitary sewers 51,000
6 () Taylor Borough, sewer project, North Main
7 Street and Oak Street construct sanitary
8 sewer 428,000
9 () Taylor Borough, sewer project, construction
10 and/or reconstruction of sanitary and/or
11 combination sanitary/storm sewer projects 2,000,000
12 () Vandling Borough, sewer project, sewer
13 construction 900,000
14 (jj) Lancaster County
15 () ADAMSTOWN BOROUGH AUTHORITY, SEWER PROJECT, <--
16 INCREASE PLANT CAPACITY, NEW CONSTRUCTION
17 AND UPGRADE 1,600,000
18 () BAINBRIDGE VILLAGE, SEWER PROJECT,
19 CONSTRUCT SEWER SYSTEM 3,000,000
20 () Bart Township, sewer project, construct new
21 sewer system, sewage treatment plant and
22 interceptor sewer 1,020,000
23 () CHRISTIANA BOROUGH WATER COMPANY, WATER <--
24 PROJECT, WATER SYSTEM IMPROVEMENTS 400,000
25 () Christiana Borough Sewer Authority, sewer
26 project, rehabilitate sewage treatment
27 facility and construct new interceptor,
28 pumping station and sewer system 728,000
29 () City of Lancaster Authority, West Lampeter
30 Township, water project, improve water
19870H2035B3637 - 104 -
1 system 2,400,000
2 () COLUMBIA BOROUGH, SEWER PROJECT, EXTEND <--
3 SEWER LINE 50,000
4 () COLUMBIA WATER COMPANY, WATER PROJECT,
5 WATER SYSTEM IMPROVEMENTS 1,500,000
6 () Denver Borough, water project, improve and
7 increase water supply 800,000
8 () DENVER BOROUGH, WATER PROJECT, BRING TWO <--
9 WATER WELLS ON LINE TO PRESENT SYSTEM 2,000,000
10 () DRUMORE MOBILE HOME PARK, WATER PROJECT,
11 WATER SYSTEM IMPROVEMENTS 40,000
12 () EARL TOWNSHIP, SEWER PROJECT, NEW
13 CONSTRUCTION AND SEWER LINES 3,075,000
14 () EAST DONEGAL TOWNSHIP, SEWER PROJECT,
15 EXTEND SEWER PROJECT 1,500,000
16 () EAST DONEGAL TOWNSHIP MUNICIPAL WATER
17 AUTHORITY, WATER PROJECT, WATER SYSTEM
18 IMPROVEMENTS 500,000
19 () EAST EARL TOWNSHIP, SEWER PROJECT, NEW
20 CONSTRUCTION AND SEWER LINES 3,075,000
21 () EAST HEMPFIELD TOWNSHIP WATER AUTHORITY,
22 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 800,000
23 () EAST PETERSBURG BOROUGH, WATER PROJECT,
24 REPLACE WATER LINE 1,000,000
25 () EAST PETERSBURG BOROUGH, SEWER PROJECT,
26 NITRATE REMOVAL SYSTEM 500,000
27 () EAST PETERSBURG WATER SYSTEM, WATER
28 PROJECT, WATER SYSTEM IMPROVEMENTS 500,000
29 () ELIZABETH BOROUGH, WATER PROJECT,
30 REHABILITATE WATER MAINS 750,000
19870H2035B3637 - 105 -
1 () HOLTWOOD MOBILE HOME PARK, WATER PROJECT,
2 WATER SYSTEM IMPROVEMENTS 40,000
3 () INTERCOURSE, SEWER PROJECT, NEW PLANT AND
4 COLLECTION SYSTEM 1,316,000
5 () LANCASTER ESTATES, WATER PROJECT, WATER
6 SYSTEM IMPROVEMENTS 60,000
7 () LANCASTER MUNICIPAL WATER SYSTEM, WATER
8 PROJECT, WATER SYSTEM IMPROVEMENTS 3,000,000
9 () LANCASTER TOWNSHIP, SEWER PROJECT, EXTEND
10 SEWER LINE 40,000
11 () LANDIS HOME RETIREMENT COMMUNITY, WATER
12 PROJECT, WATER SYSTEM IMPROVEMENTS 200,000
13 () LITITZ BOROUGH, SEWER PROJECT, NITRATE
14 REMOVAL SYSTEM 2,500,000
15 () LITITZ BOROUGH, SEWER PROJECT, SEWAGE
16 PELLETIZATION SYSTEM 4,500,000
17 () LITITZ MOBILE HOME COURT, WATER PROJECT,
18 WATER SYSTEM IMPROVEMENTS 50,000
19 () LITITZ MUNICIPAL WATERWORKS, WATER PROJECT,
20 WATER SYSTEM IMPROVEMENTS 1,000,000
21 () MANHEIM TOWNSHIP, WATER PROJECT, EXTEND
22 WATER LINE 4,000,000
23 () Manheim Borough Authority, sewer project,
24 rehabilitate sewage treatment facility 1,000,000
25 () Manor Township, Letort Manor, sewer
26 project, construct conveyance system,
27 aeration plant and new lines 4,773,000
28 () MILLERSVILLE BOROUGH, WATER PROJECT, <--
29 INSTALL WATER MAIN 250,000
30 () MILLERSVILLE BOROUGH MUNICIPAL AUTHORITY,
19870H2035B3637 - 106 -
1 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 250,000
2 () MOBILE VILLAGE, WATER PROJECT, WATER SYSTEM
3 IMPROVEMENTS 40,000
4 () MOUNT JOY BOROUGH, WATER PROJECT, NITRATE
5 REMOVAL SYSTEM 725,000
6 () MOUNT JOY BOROUGH AUTHORITY, WATER PROJECT,
7 WATER SYSTEM IMPROVEMENTS 1,500,000
8 () MOUNT JOY TOWNSHIP, SEWER PROJECT, EXTEND
9 SEWER 435,000
10 () MOUNT JOY TOWNSHIP, WATER PROJECT, WELL
11 CONSTRUCTION 250,000
12 () NEW HOLLAND BOROUGH, WATER PROJECT, WATER
13 FILTER TREATMENT PLANT 1,900,000
14 () NEW HOLLAND BOROUGH, WATER PROJECT, PLANT
15 EXTENSION OF WELL SUPPLY AND SOFTENING
16 PLANT 380,000
17 () NEW HOLLAND BOROUGH, WATER PROJECT,
18 ELEVATED 1 MILLION GALLON TANK 1,000,000
19 () Northwestern Lancaster County Authority,
20 sewer project, construct new sewer system
21 and interceptor sewer 4,150,000
22 () Paradise Township, sewer project, construct
23 new sewer system, sewage treatment plant
24 and interceptor system 5,684,000
25 () PENN TOWNSHIP, SEWER PROJECT, UPGRADE AND <--
26 EXPAND SEWER SYSTEM 3,600,000
27 () PENN TOWNSHIP, WATER PROJECT, UPGRADE AND
28 EXPAND WATER SYSTEM 500,000
29 () PENN VALLEY MOBILE VILLAGE, WATER PROJECT,
30 WATER SYSTEM IMPROVEMENTS 15,000
19870H2035B3637 - 107 -
1 () PEQUEA WATER COOPERATIVE, WATER PROJECT,
2 WATER SYSTEM IMPROVEMENTS 500,000
3 () QUARRYVILLE BOROUGH, SEWER SYSTEM, IMPROVE
4 EXISTING SYSTEM 225,000
5 () ROWENNA WATER SYSTEM, WATER PROJECT, WATER
6 SYSTEM IMPROVEMENTS 105,000
7 () STRASBURG BOROUGH, WATER PROJECT, REPLACE
8 WATER LINE 125,000
9 () Terre Hill Borough, sewer project,
10 construct new sewer system, sewage
11 treatment plant and interceptor sewer 601,000
12 () TRAILER VILLAGE, INCORPORATED, C/O R. <--
13 MOYER, WATER PROJECT, NEW DISTRIBUTION
14 LINES AND CONNECTION TO LANCASTER 45,000
15 () UPPER LEACOCK TOWNSHIP WATER DEPARTMENT,
16 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 900,000
17 () VICTORIA MANOR PARK, WATER PROJECT, NEW
18 WELL 3,000
19 () VILLAGE OF RIVERMOOR, WATER PROJECT, WATER
20 SYSTEM CHLORINATION 10,000
21 () Village of Washington Borough, sewer
22 project, construct gravity collector,
23 pumping station and main 1,280,000
24 () WEST HEMPFIELD TOWNSHIP, SEWER PROJECT, NEW <--
25 LINES ALONG IRONVILLE PIKE FROM PROSPECT
26 ROAD TO THE COLUMBIA BOROUGH LINE 1,452,000
27 () WEST LAMPETER TOWNSHIP, WATER PROJECT,
28 EXTEND WATER LINE 75,000
29 (kk) Lawrence County
30 () Bessemer Borough, water project, install
19870H2035B3637 - 108 -
1 new water lines 105,000
2 () Bessemer Borough, water project, install
3 independent pressured water system 100,000
4 () Bessemer Borough, sewer project, construct
5 new sewer system, sewage treatment plant
6 and interceptor sewer 2,345,000
7 () Enon Valley Borough, construct new sewage
8 treatment plant and interceptor sewer 939,000
9 () Mahoning Township, water project, construct
10 wells in Hillsville 760,000
11 () MOHAWK MOBILE HOME PARK, WATER PROJECT, <--
12 DISTRIBUTION SYSTEM IMPROVEMENTS, NEW WELL 10,000
13 () Neshannock Township, sewer project,
14 construct western sewer trunk line 1,461,000
15 () Neshannock Township, sewer project, North
16 Gate Industrial Park, construct sewer line 165,000
17 () Neshannock Township, sewer project,
18 Coronado Drive sewer, extend collection 180,000
19 () New Castle City, sewer project,
20 rehabilitate sewer line 20,000
21 () New Castle City, sewer project, sludge
22 lagoon cleanup, wastewater treatment 425,000
23 () New Wilmington Borough, water project,
24 modify existing water line 24,000
25 () North Beaver Township, sewer project,
26 construct sanitary sewer system 4,200,000
27 () Perry Township, water project, extend water
28 lines from Elwood City Borough into
29 township 2,000,000
30 () Pulaski Township, sewer project, construct
19870H2035B3637 - 109 -
1 new sewage treatment facility, interceptor,
2 pumping station and sewer system 6,922,000
3 () Shenango Township, water project, extend
4 water lines in township 5,000,000
5 () TAYLOR TOWNSHIP WATERWORKS, WATER PROJECT, <--
6 WATER LINE EXTENSION 450,000
7 () Union Township, sewer project, construct
8 sewer lines and pumping station 414,000
9 () VOLANT BOROUGH, SEWER PROJECT, CONSTRUCT <--
10 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT
11 AND INTERCEPTOR SEWER 565,000
12 () Wayne Township, sewer project, sewage line
13 extensions 1,000,000
14 () West Pennsylvania Water Company (Ellwood
15 District), water project, water treatment
16 plant improvements 1,500,000
17 () West Pennsylvania Water Company (New Castle
18 District), water project, construct 1 mg
19 elevated water tank 2,000,000
20 () Wampum Borough, water project, renovate
21 water lines 1,000,000
22 () Wilmington Township, sewer project,
23 construct new interceptor sewer and sewer
24 system 2,081,000
25 (ll) Lebanon County
26 () Cornwall Borough, sewer project, construct
27 new sewage treatment plant 844,000
28 () Cornwall Borough, sewer project, construct
29 new sewage treatment plant 4,389,000
30 () CORNWALL BOROUGH WATER SYSTEM, WATER <--
19870H2035B3637 - 110 -
1 PROJECT, WATER SYSTEM IMPROVEMENTS 1,100,000
2 () HEIDELBERG TOWNSHIP, WATER PROJECT, IMPROVE
3 WATER SYSTEM 170,000
4 () Heidelberg Township Municipal Authority,
5 water project, expand water line to
6 Hillcrest View system 290,000
7 () HEIDELBERG TOWNSHIP MUNICIPAL WATER <--
8 AUTHORITY, WATER PROJECT, WATER SYSTEM
9 IMPROVEMENTS 650,000
10 () Jackson Township, water project, extend
11 water line 500,000
12 () Lebanon City Authority, water project,
13 improve water system 10,500,000
14 () LEBANON MUNICIPAL WATER AUTHORITY, WATER <--
15 PROJECT, EXPANSION OF DAM RESERVOIR, NEW
16 TRANSMISSION 15,000,000
17 () NEWMANSTOWN WATER AUTHORITY, WATER PROJECT,
18 WATER SYSTEM IMPROVEMENTS 1,500,000
19 () NORTHERN LEBANON TOWNSHIP, SEWER PROJECT,
20 EBENEZER AREA COLLECTION SYSTEM, ESTABLISH
21 IN NEW AREA 2,300,000
22 () RICHLAND BOROUGH, WATER PROJECT, CONSTRUCT
23 WATER STORAGE TANK AND WATER DISTRIBUTION
24 LINES AND RELATED CONSTRUCTION 2,979,000
25 () RICHLAND BOROUGH, WATER PROJECT, WATER
26 DISTRIBUTION LINES, VALVING, FIRE HYDRANTS,
27 REPLACE AND CONSTRUCT ROADWAY 2,590,000
28 () RICHLAND BOROUGH WATER SYSTEM, WATER
29 PROJECT, WATER SYSTEM IMPROVEMENTS 1,350,000
30 () SOUTH LEBANON TOWNSHIP, SEWER PROJECT,
19870H2035B3637 - 111 -
1 EXPAND SEWER, IONA 2,232,000
2 () UNION TOWNSHIP, SEWER AND WATER PROJECT,
3 WATER AND SEWER SYSTEMS CONSTRUCTION 2,780,000
4 () West Cornwall Township, sewer project,
5 construct new sewer system and interceptor
6 sewer 1,585,000
7 (mm) Lehigh County
8 () Alburtis Borough, sewer project, construct
9 sewer pipe 315,000
10 () Allentown City, water project, replace
11 deteriorated water lines 1,885,000
12 () Allentown City, water and sewer project,
13 replace water and sewer lines along Mill
14 Street 206,000
15 () ALLENTOWN CITY, WATER PROJECT, UPGRADE <--
16 WATER TREATMENT PLANT 8,000,000
17 () Catasauqua Borough, sewer project,
18 wastewater treatment plant upgrade to
19 include new construction of drying bed,
20 grit chamber, final clarifier, operations
21 building and laboratory 500,000
22 () Catasauqua Municipal Water Works, water
23 project, new well and storage improvements 296,000
24 () Coopersburg Borough, sewer project, sewage
25 wastewater treatment plant 12,346,000
26 () COOPERSBURG BOROUGH, WATER PROJECT, UPGRADE <--
27 WATER SYSTEM BY REPLACING OLD WATER LINES 100,000
28 () EMMAUS BOROUGH, WATER PROJECT, CONSTRUCT
29 1.2 MILLION GALLON WATER RESERVOIR TO
30 UPGRADE WATER SUPPLY SYSTEM 416,000
19870H2035B3637 - 112 -
1 () Emmaus municipal waterworks, water project,
2 air stripper 200,000
3 () Grandview Water Company System Replacement,
4 water project, replace old 1 1/4-inch and
5 2-inch galvanized steel lines with 8-inch
6 ductile iron pipe 595,000
7 () Hanover Township, water and sewer project,
8 water and sewer installation to include new
9 construction of pumping and water stations 594,000
10 () Heidelburg Township Sanitary Authority,
11 sewer project, construct new sewer system 4,231,000
12 () Slatington Borough, water project, replace
13 water mains, add storage 1,000,000 <--
14 3,000,000
15 () South Whitehall Township, sewer project,
16 install 1,000 linear feet of 8-inch
17 diameter sewer and four manholes from Elk
18 Road west to the township line 80,000
19 () South Whitehall Township, sewer project,
20 install 2,000 linear feet of 10-inch
21 diameter sewer and eight manholes from
22 Broadway Street across U.S. Route 309 and
23 north to Pumping Station No. 2 200,000
24 () South Whitehall Township Authority, water
25 project, install 3,000 linear feet of 12-
26 inch diameter water line to connect with
27 existing 12-inch diameter main in Hamilton
28 Boulevard 190,000
29 () South Whitehall Township Authority, water
30 project, install 30,000 linear feet of
19870H2035B3637 - 113 -
1 various diameter transmission mains to
2 provide interconnection of existing and
3 proposed water systems along Parkland
4 Terrace and Orefield Road 3,750,000
5 () South Whitehall Township Authority, water
6 project, replace Parkway Manor System with
7 8-inch ductile iron pipe 700,000
8 () South Whitehall Township Authority, water
9 project, installation of loops at various
10 locations 390,000
11 () South Whitehall Township Authority, water
12 project, installation of a major loop to
13 provide a secondary distribution feed to
14 the Crackersport and Eck Road area 264,000
15 () South Whitehall Township Authority, water
16 project, extend the township system to
17 serve existing development accessible to
18 public water 292,000
19 () Upper Milford Township, sewer project,
20 Route 28 corridor, provide sewer service 553,000
21 () Upper Saucon Township, sewer project,
22 construct wastewater treatment plant 12,334,000
23 () Upper Saucon Township, water project, new
24 potable water source 941,000
25 () Upper Saucon Township, water project,
26 construct pumping and treatment facility 891,000
27 () Washington Township, water project, improve
28 distribution system 300,000
29 () Washington Township, sewer project,
30 construct new interceptor sewer, pumping
19870H2035B3637 - 114 -
1 station and sewer system 5,052,000
2 () Whitehall Township, water project,
3 construct water storage 3,740,000
4 (nn) Luzerne County
5 () ASHLEY BOROUGH, SEWER PROJECT, REHABILITATE <--
6 AND REPLACE SANITARY SEWER SYSTEM 369,000
7 () Avoca Borough, sewer project, new sewer and
8 various sewer-storm water separation
9 projects 963,000
10 () Barret Water Company, water project,
11 improve water distribution and storage 105,000
12 () Beaver Brook Water Company, water project,
13 study water distribution and storage 33,000
14 () BUTLER TOWNSHIP, SEWER PROJECT, EXTEND LINE <--
15 OF SEWAGE SYSTEM 250,000
16 () Conyngham Township, sewer project,
17 construct new interceptor sewer, pumping
18 station and sewer system 2,147,000
19 () Courtdale Borough, sewer project, construct
20 new sewer system 1,900,000
21 () Dallas Area Municipal Authority, sewer
22 project, rehabilitate sewage treatment
23 facility 2,733,000
24 () Duryea Borough, sewer project, construct
25 and rehabilitate sewer systems and pumping
26 stations 457,000
27 () Edwardsville Borough, sewer project,
28 replace and repair sewer system 180,000
29 () Exeter Borough, sewer project, construct
30 new sewer system 288,000
19870H2035B3637 - 115 -
1 () Exeter Borough, sewer project, construct
2 sanitary sewer system in Exeter Park 1,235,000
3 () Exeter Township, sewer project, construct
4 new sewer system, sewage treatment plant
5 and interceptor sewer 3,000,000
6 () Freeland Borough Municipal Water Authority,
7 water project, well treatment and
8 development 800,000 <--
9 997,000
10 () Freeland Borough Municipal Water Authority,
11 water project, construct water storage tank
12 and drill wells 850,000
13 () Freeland Borough Municipal Water Authority,
14 water and sewer project, improve water
15 distribution and sewage collection system 2,500,000
16 () Hazelton City Authority, water project,
17 water system improvements, filtration
18 plant 10,200,000
19 () Hex Acres Water Company, water project,
20 improve water distribution and storage 86,000
21 () Hughestown Borough, sewer project,
22 reconstruct storm water sewage tunnel 495,000
23 () Jackson Township, sewer project, assistance
24 to finance EPA sewage project 600,000
25 () Larksville Borough, sewer project, expand
26 sewer system for Larksville Mountain area 500,000
27 () Lattimer Sewer Authority, sewer project,
28 rehabilitate sewage treatment facility 1,530,000
29 () Lehman Township, sewer project, construct
30 sewer lines in Lake Silkworth area 1,000,000
19870H2035B3637 - 116 -
1 () Midway Manor Water Company, water project,
2 new well and storage tank 170,000
3 () MOCANAQUA CONYNGHAM TOWNSHIP, WATER <--
4 PROJECT, IMPROVE PRESSURE SUPPLY TO THE
5 SYSTEMS 1,000,000
6 () Nanticoke City, sewer project, construct
7 new sewer system extensions 377,000
8 () Nanticoke City, sewer project, Honeypot,
9 construct sewer system 3,750,000
10 () Nanticoke City, sewer project, replace
11 sewer catch basins 80,000
12 () Nescopeck Borough Authority, sewer project,
13 rehabilitate sewage treatment facility and
14 construct new interceptor, pumping station
15 and sewer system 1,638,000
16 () Nuangola Borough, sewer project, install
17 lines, force main, pumping station and
18 inspection ports 1,745,000
19 () ONEIDA WATER COMPANY, WATER PROJECT, <--
20 ADDITIONAL WELL, TRANSMISSION AND
21 DISTRIBUTION LINE, SERVICES AND METERS 586,000
22 () PITTSTON CITY, SEWER PROJECT, IMPROVE <--
23 SANITARY SEWER SYSTEM, WILLIAM AND BUTLER
24 STREETS 238,000
25 () PITTSTON CITY, SEWER PROJECT, COMBINE AND
26 REHABILITATE SEWER SYSTEM, CHERRY ALLEY 845,000
27 () PITTSTON CITY, SEWER PROJECT, IMPROVE
28 SANITARY SEWER SYSTEM, RIVER STREET 281,000
29 () PITTSTON CITY, SEWER PROJECT, PREPARE BASE
30 SEWER MAPPING 25,000
19870H2035B3637 - 117 -
1 () PITTSTON CITY, SEWER PROJECT, IMPROVE
2 SANITARY SEWER SYSTEM, PARSONAGE STREET 150,000
3 () Pittston Township, sewer project, Brown
4 Street, construct sewers 500,000
5 () Plains Township, sewer project, expand
6 sewers 2,350,000
7 () Plymouth Borough, sewer project, Fairview
8 Street, replace sanitary sewers 46,000
9 () Plymouth Borough, sewer project, North
10 Street area, extend sanitary sewers 97,000
11 () Plymouth Borough, sewer project, Beverly
12 Drive area, replace sanitary sewers 23,000
13 () Plymouth Borough, sewer project, Carver
14 Street, connect sanitary sewer lines 11,000
15 () Plymouth Borough, sewer project, Powell
16 Street, replace sanitary sewers 6,000
17 () Plymouth Township, sewer project, construct
18 sanitary sewers 389,000
19 () Pringle Borough, sewer project, construct
20 new sewer system 1,533,000
21 () Salem Township, sewer project, construct
22 new interceptor sewer and sewer system 400,000
23 () Shickshinny Borough, sewer project,
24 rehabilitate collection system and relocate
25 force main 723,000
26 () SHICKSHINNY WATER COMPANY, WATER PROJECT, <--
27 ADDITIONAL WELL, TRANSMISSION AND
28 DISTRIBUTION LINE, SERVICES AND METERS 3,520,000
29 () Sugar Notch Borough, sewer project,
30 construct new sewer system extensions 1,500,000
19870H2035B3637 - 118 -
1 () Tambur Water Company, water project,
2 rehabilitate water distribution and system 5,000
3 () Warrior Run Borough, sewer project,
4 construct new sewer system 1,464,000
5 () West Pittston Borough, sewer project,
6 construct new gravity sanitary sewer and
7 repair and replace existing sewer 1,800,000
8 () West Wyoming Borough, sewer project,
9 Atherton Park sanitary sewer system 1,123,000
10 () WEST WYOMING BOROUGH, SEWER PROJECT, <--
11 ATHERTON PARK, SANITARY SEWER SYSTEM 1,680,000
12 () WEST WYOMING BOROUGH, SEWER PROJECT,
13 DISTRICTS 1, 2 AND 3, SANITARY SEWER
14 SYSTEMS 5,380,000
15 () White Haven Municipal Authority, sewer
16 project, rehabilitate sewage treatment
17 facility 623,000
18 () White Haven Municipal Authority, water
19 project, construct water distribution,
20 storage and treatment improvements 1,185,000
21 () Yatesville Borough, sewer project, flood
22 control and sewer project 228,000
23 (oo) Lycoming County
24 () Cummings Township, water project, improve
25 water system 95,000
26 () Duboistown Borough, sewer project,
27 rehabilitate sewer 579,000
28 () Fairfield Township, sewer project,
29 construct new interceptor sewer, pumping
30 station and sewer system 1,000,000
19870H2035B3637 - 119 -
1 () Hidden Valley Mobile Home Court, water
2 project, improve water chlorination and
3 wells 4,000
4 () Hughesville Borough, water project, water
5 reservoir cover and liner 300,000
6 () Jersey Shore Area Joint Water Authority,
7 water project, improve water system 4,314,000
8 () Jersey Shore Sanitary Authority, sewer
9 project, rehabilitate sewage treatment
10 facility 379,000
11 () Limestone Township, sewer project,
12 construct new sewer system, sewage
13 treatment plant and interceptor sewer 641,000
14 () Limestone Township, water project,
15 rehabilitate, expand and reconstruct water
16 supply and distribution 350,000
17 () Loyalsock Township Authority, water
18 project, extend water line 394,000
19 () Loyalsock Township Authority, sewer
20 project, extend sewer system 2,846,000
21 () Montgomery Borough, water project, expand
22 water capacity 2,245,000
23 () Montgomery Water Authority, sewer project,
24 sewer system and treatment plant expansion 2,053,000
25 () Montoursville Borough, water project,
26 improve water system 460,000
27 () Muncy Borough, sewer project, rehabilitate
28 sewer system 1,513,000
29 () Muncy Township, sewer project, construct
30 new sewer system, sewage treatment plant
19870H2035B3637 - 120 -
1 and interceptor sewer 811,000
2 () Old Lycoming Township, sewer project,
3 construct new sewer system and interceptor
4 sewer 504,000
5 () Porter Township, sewer project, extend
6 sewer system 495,000
7 () South Williamsport Borough, sewer project,
8 improve sewer system 306,000
9 () Williamsport City, sewer project, construct
10 sewer and storm sewer separation and
11 pumping station 15,075,000
12 () Williamsport Municipal Water Authority,
13 water project, replace and rehabilitate
14 water mains 2,300,000
15 () Williamsport Municipal Water Authority,
16 water project, construct water treatment
17 plant 21,400,000
18 () Williamsport Sanitary Authority, sewer
19 project, construct west plant effluent
20 pumping station 853,000
21 () Williamsport Sanitary Authority, sewer
22 project, odor control 953,000
23 () WOLF TOWNSHIP, SEWER PROJECT, INSTALLATION <--
24 OF SEWER COLLECTION SYSTEM AND WASTEWATER
25 TREATMENT FACILITY 872,000
26 (pp) McKean County
27 () BRADFORD SANITARY AUTHORITY, SEWER PROJECT, <--
28 SEWER SYSTEM REHABILITATION 2,000,000
29 () BRADFORD TOWNSHIP, WATER PROJECT, IMPROVE
30 WATER SYSTEM 1,000,000
19870H2035B3637 - 121 -
1 () Hamilton Township, sewer project, Ludlow,
2 construct new sewage treatment facility and
3 sewer system 630,000
4 () HAMLIN TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
5 SEWAGE TREATMENT FACILITY 1,500,000
6 () Kane Borough, sewer project, rehabilitate
7 sewage treatment facility 2,546,000
8 () Kane Borough, sewer project, rehabilitate
9 sewage treatment facility 1,233,000
10 () Keating Township, sewer project, construct
11 new sewer system and pumping station 6,480,000
12 () Lewis Run, water project, water treatment,
13 storage and distribution 200,000 <--
14 350,000
15 () Lewis Run Water Company, water project,
16 cover reservoir; upgrade distribution 850,000
17 () MT. JEWETT BOROUGH, SEWER PROJECT, SEWER <--
18 SYSTEM REHABILITATION 250,000
19 () MT. JEWETT BOROUGH, SEWER PROJECT,
20 TREATMENT PLANT EXPANSION AND UPGRADE 250,000
21 () OTTO TOWNSHIP, SEWER PROJECT, CONSTRUCT
22 SEWAGE TREATMENT FACILITY 2,000,000
23 () PORT ALLEGHENY BOROUGH, SEWER PROJECT,
24 RECONSTRUCT SEWAGE TREATMENT FACILITY 250,000
25 () SMETHPORT BOROUGH, WATER PROJECT, CONSTRUCT
26 WATER SYSTEM FACILITY 180,000
27 () Smethport Borough, water project, purchase
28 of water system 180,000
29 () Smethport Water Company, water project,
30 reservoir, source, treatment and
19870H2035B3637 - 122 -
1 distribution improvements 3,000,000
2 (qq) Mercer County
3 () Farrell Sanitary Authority, sewer project,
4 sewer and storm water system separation 4,824,000
5 () FREDONIA BOROUGH, WATER PROJECT, IMPROVE <--
6 DISTRIBUTION SYSTEM 90,000
7 () Greenville Borough, sewer project, renovate
8 and improve sewage treatment plant, replace
9 deteriorated sanitary sewer lines 1,500,000
10 () Greenville Municipal Authority, water
11 project, construct new water filtration
12 plant 2,100,000
13 () Grove City Borough, sewer project,
14 construct interceptor sewers on West Main
15 Street and also Madison Street 1,335,000
16 () Grove City Borough, sewer project,
17 reconstruct wastewater lift station 250,000
18 () Grove City Borough, water project, water
19 treatment plant improvement 350,000
20 () HEMPFIELD TOWNSHIP MUNICIPAL AUTHORITY, <--
21 SEWER PROJECT, CONSTRUCT NEW SEWER SYSTEM 1,286,000
22 () Hermitage City, sewer project, expand water
23 pollution control 4,500,000
24 () JAMESTOWN BOROUGH, SEWER PROJECT, RENOVATE <--
25 SEWER TREATMENT FACILITY 80,000
26 () JAMESTOWN BOROUGH, SEWER PROJECT, REPAIRS
27 TO SANITARY SEWER SYSTEMS 119,000
28 () Lakeview Joint Sewer Authority, sewer
29 project, expansion of sewage treatment
30 plant 250,000
19870H2035B3637 - 123 -
1 () Mercer Borough, sewer project, upgrade
2 sewage treatment plant 1,070,000
3 () Mercer Borough, sewer project, replace
4 sewer lines to County Home, replace
5 interceptor sewer, construct lift station
6 and collection system 600,000
7 () Mercer Water Company, water project, water
8 treatment plant and distribution
9 improvements 750,000 <--
10 850,000
11 () Sandy Lake Borough, water project, upgrade
12 water distribution system and improve water
13 reservoir 708,000
14 () Sharpsville Borough, sewer project,
15 rehabilitate sewer collector system 750,000
16 () Sharon City, sewer project, upgrade and
17 replace sanitary sewer system 2,000,000
18 () Sharon City, sewer project, rehabilitate
19 sewage treatment facility 8,160,000
20 () Sharpsville Borough, water project, upgrade
21 municipal water treatment system 801,000
22 () Shenango Township, sewer project, West
23 Middlesex, rehabilitate sewage treatment
24 facility and construct new interceptor,
25 pumping station and sewer system 8,960,000
26 () Slippery Rock Borough, water project, <--
27 improve water treatment and delivery
28 system, construct additional water well and
29 replace water lines 1,151,000
30 () Stoneboro Borough, water project, replace
19870H2035B3637 - 124 -
1 deteriorated and undersized water lines and
2 renovate water storage reservoir 334,000
3 () STONEBORO WATERWORKS, WATER PROJECT, WATER <--
4 REPLACEMENT AND RESERVOIR COVER 428,000
5 () West Middlesex Borough, water project, Penn
6 Avenue project, protect fresh water supply 35,000
7 () Wheatland Borough, water and sewer project,
8 extend water and sewer lines 49,000
9 () WOLF CREEK AND PINE TOWNSHIPS, SEWER <--
10 PROJECT, JOINT PROJECT TO CONSTRUCT NEW
11 SEWER SYSTEM 1,000,000
12 (rr) Mifflin County
13 () ALLENSVILLE MUNICIPAL AUTHORITY, WATER <--
14 PROJECT, DEVELOP GROUNDWATER SOURCES,
15 PLUMBING, METERING AND STORAGE 125,000
16 () ARMAUGH TOWNSHIP, SEWER AND WATER PROJECT,
17 IMPROVEMENTS FOR POTLICKER FLATS AREA 800,000
18 () ARMAUGH TOWNSHIP, WATER IMPROVEMENT FOR
19 MILROY 700,000
20 () ARMAUGH TOWNSHIP, WATER PROJECT, EXTEND
21 WATER LINES 150,000
22 () Brown Township Municipal Authority, sewer
23 project, rehabilitate sewage treatment
24 facility 610,000 <--
25 660,000
26 () Burnham Borough Authority, sewer project,
27 rehabilitate sewage treatment facility 3,060,000
28 () DERRY TOWNSHIP, SEWER PROJECT, REPLACEMENT <--
29 IN HIGHLAND AREA 1,500,000
30 () DERRY TOWNSHIP, SEWER PROJECT, SEWER
19870H2035B3637 - 125 -
1 WASTEWATER AND SEWAGE SYSTEM FOR MAITLAND 2,500,000
2 () DERRY TOWNSHIP, WATER PROJECT, CONSTRUCTION
3 OF WATER LINES IN GLENWOOD AREA 1,500,000
4 () Granville Township, sewer project,
5 construct new sewer system 2,685,000
6 () JUNIATA TERRACE BOROUGH, SEWER PROJECT, <--
7 REPLACE LINES 1,000,000
8 () JUNIATA TERRACE BOROUGH, SEWER PROJECT,
9 SEWAGE TREATMENT PLANT AND IMPROVEMENT 50,000
10 () LEWISTOWN BOROUGH, WATER PROJECT, MUNICIPAL
11 WATER DISTRIBUTION IMPROVEMENT 400,000
12 () LEWISTOWN BOROUGH, SEWER PROJECT, REDESIGN
13 AND INSTALL WASTEWATER TREATMENT PLANT 625,000
14 () MENNO TOWNSHIP, WATER PROJECT, DEVELOP NEW
15 WATER SUPPLY 75,000
16 () MENNO WATER COMPANY, WATER PROJECT, WATER
17 SYSTEM IMPROVEMENTS 350,000
18 () OLIVER TOWNSHIP, SEWER PROJECT, CONSTRUCT
19 NEW SEWERS AND SEWAGE TREATMENT PLANT FOR
20 STRODES MILL 2,500,000
21 () UNION TOWNSHIP, SEWER PROJECT, REHABILITATE
22 SEWER FACILITIES 585,000
23 () UNION TOWNSHIP, WATER PROJECT, INSTALLATION
24 OF LINES, RESTORATION, REHABILITATION 1,484,000
25 () Union Township Municipal Authority, water
26 project, construct new water treatment
27 plant and rehabilitate treatment facility 1,110,000
28 () Union Township Municipal Water Authority,
29 water project, water system improvements 473,000
30 (ss) Monroe County
19870H2035B3637 - 126 -
1 () East Stroudsburg, sewer project, upgrade
2 and expand sewage treatment plant 8,500,000
3 () HAMILTON WATER COMPANY, WATER PROJECT, <--
4 RENOVATE WATER SYSTEM IN SAYLORSBURG 325,000
5 () Manwalamink Water Company water project,
6 water metering and emergency generators 200,000
7 () Middle Smithfield Township, sewer project,
8 rehabilitate and expand existing sewer
9 facility 2,500,000
10 () Middle Smithfield Township, sewer project,
11 construct sewer interceptor lines from new
12 developments 1,600,000
13 () Mt. Pocono Borough, water project, metering
14 and rehabilitation of water system 2,200,000
15 () Mt. Pocono Borough, sewer project, extend
16 collection system on Upper Winona Road 100,000
17 () Mt. Pocono Borough, sewer project,
18 rehabilitate and expand sewage treatment
19 facility 2,800,000
20 () Mountainhome Water Company, water project,
21 improve water distribution system 200,000 <--
22 1,347,000
23 () MOUNTAINHOME WATER COMPANY, WATER PROJECT, <--
24 WATER SYSTEM IMPROVEMENTS 761,000
25 () Pocono Water Company, water project, new
26 storage tank and well improvements 290,000 <--
27 463,000
28 () POCONO WATER COMPANY, WATER PROJECT, <--
29 IMPROVE WATER SYSTEM 330,000
30 () Smithfield Township, sewer project,
19870H2035B3637 - 127 -
1 construct sanitary sewer system 4,459,000
2 () Stroud Township, sewer project, construct
3 sanitary sewer system 20,000,000
4 () Stroudsburg Borough, sewer project,
5 construct new sewage treatment plant 7,418,000
6 () Stroudsburg Borough, sewer project,
7 separate storm water system from sanitary
8 sewer 1,614,000
9 () TOBYHANNA WATER COMPANY, WATER PROJECT, <--
10 RENOVATE WATER SYSTEM 635,000
11 (tt) Montgomery County
12 () Abington Township, sewer project, upgrade
13 and reconstruct former C & A sewer system 500,000 <--
14 5,000,000
15 () Abington Township, sewer project, construct
16 sewer system, treatment plant and
17 interceptor 4,915,000 <--
18 8,000,000
19 () ABINGTON TOWNSHIP, SEWER PROJECT, <--
20 CHELTENHAM & ABINGTON SANITARY SEWER SYSTEM
21 REPLACEMENT 6,000,000
22 () ABINGTON TOWNSHIP, SEWER PROJECT, PENNYPACK
23 INTERCEPTOR, SANITARY SEWERS 12,000,000
24 () Abington Township, sewer project, Rydal
25 Sewer Plant reconstruction 1,750,000
26 () ABINGTON TOWNSHIP, SEWER PROJECT, RYDAL- <--
27 MEADOWBROOK SECTION, INSTALL COLLECTION
28 SEWER SYSTEMS 5,000,000
29 () ABINGTON TOWNSHIP, STORM SEWER PROJECT,
30 CUMBERLAND ROAD 150,000
19870H2035B3637 - 128 -
1 () ABINGTON TOWNSHIP, STORM SEWER PROJECT,
2 GROVANIA AVENUE 400,000
3 () ABINGTON TOWNSHIP, STORM SEWER PROJECT,
4 WILLOW GROVE HEIGHTS 100,000
5 () Cheltenham Township, sewer project, replace
6 sewer lines 620,000
7 () Collegeville Borough, sewer project,
8 construct local collection system 5,731,000
9 () East Greenville Borough, water project,
10 upgrade drinking water treatment facility 432,000
11 () EAST NORRITON TOWNSHIP, SEWER PROJECT, WEST <--
12 END SEWER PROJECT 1,000,000
13 () Franconia Township, sewer project,
14 construct new sewage treatment facility and
15 sewer system 4,887,000
16 () GRATERFORD STATE CORRECTIONAL INSTITUTE, <--
17 SEWER PROJECT, NEW SEWAGE TREATMENT PLANT 1,800,000
18 () Hatfield Borough, sewer project, construct
19 a new interceptor sewer 248,000 <--
20 2,965,000
21 () Horsham Township, sewer project, construct
22 sewage treatment plant 1,750,000
23 () Horsham Township, sewer project, construct
24 sewer system 500,000
25 () JENKINTOWN BOROUGH, STORM SEWER PROJECT, <--
26 REHABILITATION 62,000
27 () Lower Frederick Township, sewer project,
28 extend sewerage lines through Zieglerville
29 area, upgrade manholes, rehabilitate sewage
30 treatment facility 790,000
19870H2035B3637 - 129 -
1 () LOWER GWYNEDD TOWNSHIP, SEWER PROJECT, <--
2 SEWER LINES TO NEW TOWNSHIP BUILDING 53,000
3 () LOWER GWYNEDD TOWNSHIP, SEWER PROJECT,
4 SEWER LATERAL EXTENSION, SCHOOL HOUSE ROAD
5 FROM PENRITH PLACE 213,000
6 () LOWER GWYNEDD TOWNSHIP, SEWER PROJECT,
7 SEWER CONNECTION, SUNSET ROAD TO SUMMEYTOWN
8 PIKE AREA 680,000
9 () Lower Moreland Township Authority and Board
10 of Commissioners, sewer project, sewer
11 construction projects 4,000,000
12 () Montgomery Township Municipal Sewer
13 Authority, sewer project, wastewater
14 treatment facility 8,760,000
15 () NORTH PENN WATER AUTHORITY, WATER PROJECT, <--
16 REMOVAL OF TCE FROM WELLS 500,000
17 () NORTH WALES, SEWER PROJECT, SEWER
18 MAINTENANCE BUILDING AT SEWAGE TREATMENT
19 PLANT 130,000
20 () NORTH WALES, SEWER PROJECT, INSTALLATION OF
21 INFLUENCE INSTRUCTOR 200,000
22 () NORTH WALES, SEWER PROJECT, SEWER TV CAMERA
23 INSPECTION 65,000
24 () Philadelphia Suburban Water Company, water
25 project, new filtration plant 6,000,000
26 () Pottstown Borough, sewer project, upgrade
27 facilities of sewer authority 27,600,000
28 () Schwenksville Borough Authority, sewer
29 project, rehabilitate sewage treatment
30 facility 881,000
19870H2035B3637 - 130 -
1 () Skippack Township, sewer project, extend
2 sanitary sewer system 3,373,000
3 () Souderton Borough, sewer project, expand
4 and improve sewage treatment plant 10,200,000 <--
5 10,900,000
6 () Telford Borough, sewer project, expand and
7 improve sewage treatment plant 4,761,000
8 () TELFORD BOROUGH WATER AUTHORITY, SEWER <--
9 PROJECT, INSTALL T & E STRIPPER TOWERS ON
10 TWO WELLS 400,000
11 () Towamencin Township, sewer project, replace
12 sewer line and manholes 574,000
13 () UPPER GWYNEDD TOWNSHIP, SEWER PROJECT, <--
14 INSTALLATION OF NEW BELT FILTER PRESS AND
15 RELOCATION OF POLYMER MIXING TANK AT
16 TREATMENT PLANT 156,000
17 () UPPER MORELAND TOWNSHIP, SEWER PROJECT,
18 SANITARY SEWERS, CASTELLO AVENUE 62,000
19 () UPPER MORELAND TOWNSHIP, SEWER PROJECT,
20 STORM SEWERS, CASTELLO AVENUE 129,000
21 () Upper Providence Township, sewer project,
22 construct gravity sewer, submersible
23 pumping station and force main 550,000
24 () Upper Providence Township, sewer project,
25 construct gravity sewer and treatment
26 plant 600,000
27 () Upper Providence Township, sewer project,
28 install sewer line, manholes and bypass
29 pumping 2,780,000
30 () West Conshohocken Borough, sewer project,
19870H2035B3637 - 131 -
1 upgrade municipal sewage pump station 632,000
2 () West Norriton Township Municipal Authority,
3 sewer project, sewage system expansions and
4 improvements 3,437,000
5 () Whitemarsh Township, sewer project,
6 installation of sewer lines and pump
7 stations 1,080,000
8 (uu) Montour County
9 () Danville Borough, sewer project, replace
10 filters 650,000
11 () VALLEY TOWNSHIP, SEWER PROJECT, PURCHASE <--
12 EXISTING COLLECTION AND TREATMENT
13 FACILITIES FROM PRIVATE OWNER 560,000
14 (vv) Northampton County
15 () Bangor Borough Authority, sewer project,
16 rehabilitate sewage treatment facility and
17 construct new interceptor sewer and sewer
18 system 12,700,000
19 () Bath Municipal Water Works, water project,
20 water reservoir cover 250,000
21 () Bethlehem City, water project, Water
22 Treatment and Filtration Plant 30,000,000
23 () Bethlehem City, water project, parallel
24 water transmission lines 12,500,000
25 () Bethlehem City, water project, Northeast
26 Water Reservoir 1,500,000
27 () Bethlehem City, sewer project, digestor
28 repair and rehabilitation program 1,940,000
29 () East Bangor Municipal Authority, sewer
30 project, construct new sewage treatment
19870H2035B3637 - 132 -
1 facility, pumping station and sewer system 3,000,000
2 () Easton Municipal Authority, sewer project,
3 rehabilitate sewage treatment facility,
4 sewer and storm water system separation 14,423,000
5 () Glendon Borough, sewer project, construct
6 new sewer system 276,000
7 () Lower Saucon Township Authority, sewer
8 project, construct new interceptor sewer,
9 pumping station and sewer system 4,287,000 <--
10 4,877,000
11 () Nazareth Borough, sewer project,
12 rehabilitate sewage treatment facility and
13 construct new interceptor sewer 3,095,000
14 () Northampton Borough, sewer project, add and
15 alter wastewater treatment facility 6,000,000
16 () Northampton Borough Municipal Authority,
17 water projects, construct east side
18 transmission main, Phase I infrastructure
19 rehabilitation and new intake on Lehigh
20 River 1,760,000
21 () Palmer Township, sewer project, construct
22 new sewer system 350,000
23 () Plainfield Township, sewer project,
24 construct new interceptor sewer, pumping
25 station and sewer system 2,987,000
26 () Portland Borough Water Company, water
27 project, water chlorination and reservoir
28 cover 300,000
29 () ROSETO BOROUGH, SEWER PROJECT, CONSTRUCT <--
30 COLLECTION SEWERS 100,000
19870H2035B3637 - 133 -
1 () Stockertown Borough, sewer project,
2 rehabilitate sewage treatment facility and
3 construct new interceptor sewer and sewer
4 system 1,972,000
5 () TATAMY BOROUGH, SEWER PROJECT, CONSTRUCT <--
6 COLLECTION SEWERS AND INTERCEPTORS 2,900,000
7 () Walnutport Municipal Water Works, water
8 project, water reservoir cover and
9 transmission main 500,000
10 () Wind Gap Sewer Authority, sewer project,
11 rehabilitate sewage treatment facility 653,000
12 (ww) Northumberland County
13 () Delaware Township, sewer project,
14 improvements to sewage treatment plant 2,080,000
15 () Herndon Borough, sewer project, construct
16 sewage treatment facility, interceptor,
17 pumping station and sewer system 708,000
18 () Jackson Township, sewer project, construct <--
19 sewage treatment plant 293,000
20 () Kulpmont Borough, sewer project, construct
21 new sewer system 2,547,000
22 () Marion Heights Borough, sewer project,
23 construct new interceptor sewer 922,000
24 () KULPMONT/MARION HEIGHTS BOROUGH, SEWER <--
25 PROJECT, CONSTRUCT SEWAGE FACILITY 3,000,000
26 () Mt. Carmel Area, sewer project, sewer and
27 storm water system separation 1,617,000
28 () Mt. Carmel Township, sewer project,
29 construct sewage conveyance lines and
30 pumping station 2,785,000
19870H2035B3637 - 134 -
1 () Mt. Carmel Township, sewer project,
2 construct new sewage treatment facility,
3 interceptor, pumping station and sewer
4 system 2,705,000
5 () Northumberland Borough, sewer project,
6 upgrade and expand sewage treatment
7 facility 1,734,000
8 () Northumberland Borough, sewer project,
9 repairs to sewage collection system 380,000 <--
10 606,000
11 () Pennsylvania American Water Company (White
12 Deer and Milton Borough), improve water
13 project, water plant 940,000
14 () Pennsylvania American Water Company (White
15 Deer District), water project, water
16 improvements, construct steel tank 550,000
17 () Pennsylvania American Water Company (White
18 Deer District), water project, improve
19 water plant 1,320,000
20 () Pennsylvania American Water Company (White
21 Deer District), water project, water
22 improvements, transmission mains 3,110,000
23 () POINT TOWNSHIP MUNICIPAL AUTHORITY, SEWER <--
24 PROJECT, SEWER EXTENSION 1,000,000
25 () Shamokin Dam Borough, water project,
26 construct new water filtration unit 500,000
27 () Shamokin Township, sewer project, construct
28 new interceptor sewer, pumping station and
29 sewer system 1,019,000
30 () Snydertown Borough, sewer project,
19870H2035B3637 - 135 -
1 construct new sewage treatment facility and
2 sewer system 654,000 <--
3 800,000
4 () Turbotville Municipal Authority, sewer
5 project, rehabilitate sewage treatment
6 facility 777,000
7 () Upper Augusta Township, water project,
8 extend water lines 18,000 <--
9 336,000
10 () Watsontown Borough, sewer project, upgrade
11 and improve sewage treatment plant 100,000
12 () Watsontown Borough, water project, extend
13 water lines to increase fire protection 110,000
14 () WEST CHILLISQUAQUE TOWNSHIP, SEWER PROJECT, <--
15 EXPAND SEWAGE TREATMENT PLANT AND
16 COLLECTION SYSTEM 1,000,000
17 (xx) Perry County
18 () BAILEY RUN MOBILE HOME PARK, WATER PROJECT, <--
19 NEW WELL, PERMITTING 15,000
20 () BLOOMFIELD BOROUGH, SEWER PROJECT,
21 REHABILITATE SEWER SYSTEM 2,000,000
22 () Duncannon Borough, sewer project, construct
23 new sewage treatment facility and sewer
24 system 1,630,000
25 () DUNCANNON BOROUGH, WATER PROJECT, DEVELOP <--
26 NEW WELL AND INSTALL NEW STANDPIPE 400,000
27 () LANDISBURG BOROUGH, WATER PROJECT, INSTALL
28 SYSTEM 450,000
29 () Landisburg Borough, Tyrone Township, sewer
30 project, construct new sewage treatment
19870H2035B3637 - 136 -
1 facility, interceptor, pumping station and
2 sewer system 945,000
3 () LIVERPOOL MUNICIPAL WATER AUTHORITY, WATER <--
4 PROJECT, NEW WELL, CHLORINATION FACILITIES,
5 ETC. 30,000
6 () Marysville Borough, sewer project,
7 rehabilitate river interceptor and plant
8 and separate storm sewer 2,119,000
9 () MARYSVILLE BOROUGH, WATER PROJECT 500,000 <--
10 () MILLERSTOWN BOROUGH, SEWER PROJECT,
11 REHABILITATE SEWAGE COLLECTION LINES 250,000
12 () MILLERSTOWN BOROUGH, WATER PROJECT, UPGRADE
13 SYSTEM AND INSTALL NEW STANDPIPE 500,000
14 () NEW BLOOMFIELD BOROUGH, WATER PROJECT,
15 DEVELOP ADDITIONAL SUPPLY AND REHABILITATE
16 SYSTEM 1,000,000
17 () NEWPORT BOROUGH, SEWER PROJECT,
18 REHABILITATE SEWAGE COLLECTING LINES 110,000
19 () NEWPORT BOROUGH, SEWER PROJECT, SEWER
20 SYSTEM SEPARATION PROJECT 1,200,000
21 () NEWPORT BOROUGH, WATER PROJECT, FILTRATION
22 AND REHABILITATION 1,500,000
23 () ORCHARDS HILLS MOBILE HOME PARK, WATER
24 PROJECT, TREATMENT, EMERGENCY GENERATOR,
25 NEW WELL 17,000
26 () PENN TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW
27 SEWAGE TREATMENT FACILITY 4,250,000
28 () Penn Township Municipal Authority,
29 Duncannon, sewer project, construct new
30 sewage treatment facility and sewer system 1,663,000
19870H2035B3637 - 137 -
1 (yy) Philadelphia County
2 () Philadelphia City, water project, upgrade
3 and improve Baxter Water Treatment Plant 14,500,000
4 () Philadelphia City, water project, upgrade
5 and improve East Park Water Pumping
6 Station 4,800,000
7 () Philadelphia City, water project,
8 rehabilitate Queen Lane Water Treatment
9 Plant 6,000,000
10 () Philadelphia City, water project, upgrade
11 and improve Belmont High service finished
12 water pumping station 8,400,000
13 () Philadelphia City, water project, upgrade
14 and rehabilitate water distribution system
15 citywide 67,000,000
16 () Philadelphia City, water project, upgrade
17 and improve Northeast Water Pollution
18 Control Plant 7,200,000
19 () Philadelphia City, water project, upgrade
20 Southwest Water Pollution Control Plant 1,200,000
21 () Philadelphia City, water project, improve
22 East Park filtered water basin 6,000,000
23 () Philadelphia City, sewer project, upgrade
24 and rehabilitate combined sewer system
25 citywide 87,000,000
26 () Philadelphia City, water project, upgrade
27 and improve Lardner's Point finished water
28 pumping station 1,200,000
29 () Philadelphia City, sewer project, improve
30 remote pumping station control system 2,400,000
19870H2035B3637 - 138 -
1 (zz) Pike County
2 () MATAMORAS BOROUGH WATER AUTHORITY, WATER <--
3 PROJECT, UPGRADE SYSTEM 100,000
4 () Pocono Ranch Lands, water project, water
5 chlorination and filtration plant 200,000 <--
6 306,000
7 (aaa) Potter County
8 () Austin Borough, sewer project, construct
9 new sewer system, sewage treatment plant
10 and interceptor sewer 1,236,000
11 () AUSTIN BOROUGH, WATER PROJECT, CONSTRUCT <--
12 NEW GROUNDWATER SOURCE, DISINFECTION
13 FACILITIES, SYSTEM CONTROLS, DISTRIBUTION
14 NETWORK REPLACEMENT AND FINISHED STORAGE
15 RESERVOIR 589,000
16 () COUDERSPORT BOROUGH, SEWER PROJECT, EXTEND <--
17 SANITARY SEWER 1,500,000
18 () Galeton Water Company, water project,
19 improve water system chlorination and
20 filtration plant 306,000
21 () ROULETTE TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
22 NEW SEWAGE TREATMENT FACILITY 100,000
23 () Ulysses Borough, sewer project, improve
24 sewer system 86,000
25 (bbb) Schuylkill County
26 () Ashland Borough, water project, install <--
27 water filtration system 1,250,000
28 () ASHLAND BOROUGH, WATER PROJECT, INSTALL <--
29 WATER METERS, BUILD FILTRATION SYSTEM 1,550,000
30 () Ashland State General Hospital, water
19870H2035B3637 - 139 -
1 project, improve water system 44,000
2 () AUBURN MUNICIPAL AUTHORITY, SEWER PROJECT, <--
3 CONSTRUCT NEW SEWAGE TREATMENT FACILITY,
4 INTERCEPTOR, PUMPING STATION AND SEWER
5 SYSTEM 2,209,000
6 () BLYTHE TOWNSHIP, WATER PROJECT, SYSTEM
7 IMPROVEMENTS FOR MOSS GLENN, CRYSTAL, AND
8 SILVER CREEK SUPPLIES 1,210,000
9 () Blythe Township Municipal Water Authority,
10 water project, improve water system,
11 filtration plant 2,565,000
12 () Butler Township Water Company, water
13 project, improve water system 459,000
14 () CASS TOWNSHIP, WATER PROJECT, UPDATE WATER <--
15 LINES 40,000
16 () EAST NORWEGIAN TOWNSHIP, SEWER PROJECT,
17 EXTEND SEWER COLLECTORS AND INTERCEPTORS
18 UNDER DEPARTMENT OF ENVIRONMENTAL RESOURCES
19 ORDER 1,900,000
20 () Cressona Borough, sewer project,
21 rehabilitate sewage treatment facility 1,090,000
22 () Deer Lake Borough, sewer project, fix storm
23 water infiltration into sewers 36,000
24 () East Norwegian Township, sewer project,
25 Diener's Hill, Mill Creek 2,500,000
26 () East Norwegian Township, water project,
27 Five Points drinking water line 200,000
28 () East Union Township Municipal Authority, <--
29 sewer project, construct new sewage
30 treatment facility and sewer system 2,645,000
19870H2035B3637 - 140 -
1 () EAST UNION TOWNSHIP, SEWER PROJECT, NEW <--
2 SEWER SYSTEM 5,000,000
3 () FRACKVILLE AREA MUNICIPAL AUTHORITY, SEWER
4 PROJECT, WASTEWATER TREATMENT AND
5 COLLECTION SYSTEM 2,000,000
6 () FRACKVILLE BOROUGH, SEWER PROJECT, SEPARATE
7 STORMWATER AND SEWAGE TREATMENT SYSTEMS 500,000
8 () Frackville Borough, sewer project,
9 construct new interceptor sewer, pumping
10 station and sewer system 5,778,000
11 () GILBERTON BOROUGH, SEWER PROJECT, NEW PLANT <--
12 AND REPLACEMENT OF PIPES 5,000,000
13 () GREATER POTTSVILLE AREA SEWER AUTHORITY,
14 SEWER PROJECT, WEST END TREATMENT PLANT,
15 MAIN TREATMENT PLANT, COLLECTION SYSTEM
16 REHABILITATION, GREENHOUSES, AND CONCRETE
17 TREATMENT TANKS 2,010,000
18 () HEGINS TOWNSHIP, SEWER PROJECT, CONSTRUCT
19 NEW SEWER SYSTEM, INTERCEPTOR, SEWAGE
20 TREATMENT PLANT AND PUMPING STATIONS 7,530,000
21 () HEGINS TOWNSHIP AUTHORITY, WATER PROJECT,
22 WATER SYSTEM IMPROVEMENTS 378,000
23 () HUBLEY TOWNSHIP, WATER PROJECT, IMPROVE
24 WATER FACILITIES AND UPGRADE FILTRATION
25 SYSTEM 1,000,000
26 () Kline Township, sewer project, construct
27 new sewer system 1,578,000
28 () Mahanoy City Borough, sewer project,
29 rehabilitate storm sewers 1,100,000
30 () MAHANOY CITY MUNICIPAL AUTHORITY, SEWER <--
19870H2035B3637 - 141 -
1 PROJECT, SEWAGE TREATMENT PLANT UPGRADE 350,000
2 () Mahanoy Township, water project, improve
3 water distribution and rehabilitate 8,500,000
4 () MAHANOY TOWNSHIP AUTHORITY, WATER PROJECT, <--
5 REHABILITATE SIX AUTHORITY-OWNED DAMS BY
6 12/92 UNDER CONSENT DECREE 8,058,000
7 () MARY D. COMMUNITY ASSOCIATION WATER
8 DEPARTMENT, WATER PROJECT, FILTRATION AND
9 STORAGE SYSTEM 180,000
10 () McAdoo Borough, sewer project, construct
11 new sewer system, sewage treatment plant
12 and interceptor sewer 2,389,000
13 () MINERSVILLE BOROUGH, WATER PROJECTS, WATER <--
14 DAMS THREE AND FOUR AND INSTALLATION OF
15 TRANSMISSION LINE 1,175,000
16 () Mountain Spring Water Company, water
17 project, improve water system 68,000
18 () NEW PHILADELPHIA BOROUGH, SEWER PROJECT, <--
19 NEW SEWAGE SYSTEM 750,000
20 () New Ringgold Borough Authority, sewer
21 project, construct new sewage treatment
22 plant and sewer system 783,000
23 () NORTH MANHEIM TOWNSHIP, SEWER PROJECT, <--
24 ADDITION OF 25 HOMES TO POTTSVILLE SEWER
25 SYSTEM 177,000
26 () North Manheim Township, sewer project,
27 construct new interceptor sewer and sewer
28 system 912,000
29 () North Union Township, sewer project,
30 construct new sewer system, sewage
19870H2035B3637 - 142 -
1 treatment plant and interceptor sewer 2,902,000
2 () Oneida Water Company, water project, new
3 well, distribution and storage
4 improvements 1,172,000
5 () Oneida Water Company, water project, new
6 well, storage, transmission main 250,000
7 () Orwigsburg Borough, water project, improve
8 water treatment, distribution, reservoir 5,568,000
9 () Pine Grove Borough, sewer project, study
10 sewer plant improvement 120,000
11 () Pine Grove Borough, water project, upgrade
12 water system 300,000
13 () Pine Grove Borough, water project, spillway
14 project, Sweet Arrow Lake 150,000
15 () Pine Grove Borough, water project, add to
16 existing water supply distribution 1,600,000
17 () Pine Grove Borough, sewer project, study
18 sewer system infiltration and inflow 200,000
19 () RINGTOWN BOROUGH, WATER PROJECT, PUBLIC <--
20 WATER SYSTEM IMPROVEMENTS 210,000
21 () Ringtown Borough, water project, improve
22 water supply, reservoir 253,000
23 () Rush Township, sewer project, construct new
24 sewer system 3,170,000
25 () RUSH TOWNSHIP, SEWER PROJECT, IMPROVE SEWER <--
26 LINES NEAR THE LITTLE SCHUYLKILL RIVER 200,000
27 () Rush-Ryan Sewer Authority, Lake Hanto,
28 sewer project, construct new sewer system
29 and pumping station 1,785,000
30 () Ryan Township, sewer project, rehabilitate
19870H2035B3637 - 143 -
1 sewer system 1,500,000
2 () Schuylkill County Municipal Authority,
3 sewer project, upgrade sewer 1,300,000
4 () Schuylkill County Municipal Authority,
5 water project, water upgrade for new
6 Federal prison facility 3,300,000
7 () Schuylkill County Municipal Authority,
8 water project, construct water treatment
9 facilities for the 16 inch Wolfe Creek
10 System, the 20 inch Broad Mountain System,
11 and the 14 inch Indian Run System to comply
12 with the State drinking water regulations 8,800,000
13 (1) Schuylkill Haven, water project, improve
14 reservoirs as mandated 3,840,000
15 () Schuylkill Haven Borough, water project,
16 construct water holding tank 180,000
17 () Schuylkill Haven Borough, sewer project,
18 modify dry sludge process 180,000
19 () Schuylkill Haven Borough, sewer project,
20 fix storm water infiltration 180,000
21 () Schuylkill Haven Borough, water project,
22 replace water lines 350,000
23 () SCHUYLKILL HAVEN BOROUGH, WATER PROJECT, <--
24 ENVIRONMENTAL COVER FOR POTABLE WATER
25 TREATMENT PLANT CLARIFIERS 95,000
26 () SCHUYLKILL HAVEN BOROUGH, WATER PROJECT,
27 ENVIRONMENTAL COVER FOR FINISHED WATER
28 STORAGE FACILITY 125,000
29 () SCHUYLKILL HAVEN BOROUGH, WATER PROJECT,
30 IMPROVE WATER TREATMENT PLANT 150,000
19870H2035B3637 - 144 -
1 () SCHUYLKILL VALLEY SEWER AUTHORITY, SEWER
2 PROJECT, TO COMPLY WITH ENVIRONMENTAL
3 PROTECTION AGENCY ORDER 6,325,000
4 () Schuylkill Valley Sewer Authority, sewer
5 project, construct new interceptor sewer,
6 pumping station and sewer system 4,252,000
7 () SHENANDOAH BOROUGH, SEWER PROJECT 250,000 <--
8 () Shenandoah Municipal Water Authority, water
9 project, improve water system 4,050,000
10 () Shenandoah Municipal Water Authority, water
11 project, Shenandoah Borough, improve water
12 distribution and rehabilitate dam 1,300,000
13 () TAMAQUA BOROUGH, SEWER PROJECT, INCREASE <--
14 SEWAGE CAPACITY 3,500,000
15 () Tower City Borough, water project, improve
16 water system 125,000
17 () Tremont Borough, sewer project, sludge
18 removal and disposal 390,000
19 () Wayne Township, sewer project, wastewater
20 management 7,000
21 () West Brunswick Township, sewer project,
22 construct new sewer system and pumping
23 station 2,225,000
24 (ccc) Snyder County
25 () BEAVER SPRINGS MUNICIPAL AUTHORITY, SEWER <--
26 PROJECT, IMPROVE SEWAGE TREATMENT PLANT 40,000
27 () Beavertown Borough, sewer project, update
28 water system 500,000
29 () Beavertown Borough, water project, improve
30 water system 250,000
19870H2035B3637 - 145 -
1 () Centre Township, water project, Penns
2 Creek, develop water system 200,000
3 () Freeburg Borough, water project, improve
4 water system 500,000
5 () McClure Borough, sewer project, update
6 sewer system 500,000
7 () McClure Municipal Authority, sewer project,
8 rehabilitate sewage treatment facility 727,000
9 () Middleburg Municipal Authority, sewer
10 project, rehabilitate sewage treatment
11 facility 172,000
12 () Middleburg Municipal Authority, water
13 project, Middleburg Borough, filtration
14 system and improvements 500,000
15 () Middleburg Municipal Authority, water
16 project, main relocation and renovation 500,000
17 () Middleburg Municipal Authority, water
18 project, storage facilities 250,000
19 () MT. PLEASANT MILLS, SEWER PROJECT, <--
20 CONSTRUCT SEWAGE TREATMENT PLANT 100,000
21 () Penn Township, sewer project, expand sewer
22 system, Selinsgrove-Shamokin Dam 500,000
23 () Penn Township, sewer project, expand sewer
24 system 1,000,000
25 () Penn Township, water project, construct
26 water system 1,000,000
27 () Perry Township Municipal Authority, sewer <--
28 project, construction of new sewer system,
29 sewage treatment plant and interceptor
30 system 180,000
19870H2035B3637 - 146 -
1 () PERRY TOWNSHIP MUNICIPAL AUTHORITY, SEWER <--
2 PROJECT, CONSTRUCT SEWAGE TREATMENT PLANT 200,000 <--
3 215,000
4 () Richfield Area, water project, improve
5 water system 500,000
6 () Richfield Area, sewer project, construct
7 sewer system 2,000,000
8 () Selinsgrove Borough, water project, improve
9 water system 500,000
10 () Spring Township, sewer project, expand
11 sewer system 500,000
12 () Spring Township, water project, upgrade
13 water system 500,000
14 (ddd) Somerset County
15 () Addison Borough, sewer project, construct
16 new sewer system, sewage treatment plant
17 and interceptor sewer 975,000
18 () Berlin Borough, sewer project, expand and
19 rehabilitate sewage treatment facility 1,300,000
20 () Berlin Borough, water project, upgrade
21 water wells and distribution system and
22 construct reservoir cover 1,750,000
23 () Black Township, sewer project, construct
24 new sewer system 137,000
25 () Boswell Borough, sewer project, separate
26 sanitary and storm sewer systems by
27 constructing storm water collection system 600,000
28 () Boswell Borough Municipal Authority, water
29 project, construct water filtration plant 600,000
30 () CAIRNBROOK IMPROVEMENT ASSOCIATION, WATER <--
19870H2035B3637 - 147 -
1 PROJECT, EXTEND AND REPLACE WATER LINES IN
2 THE COTTAGETOWN AND MINE AVENUE AREAS 150,000
3 () Central City Water Authority, water
4 project, replace water lines 400,000
5 () Conemaugh Township, Davidsville,
6 Hollsopple, sewer project, construct new
7 sewage treatment facility and sewer system 8,165,000
8 () Conemaugh Township Area Sewer Authority,
9 Johnstown, sewer project, construct new
10 interceptor sewer, pumping station and
11 sewer system 2,448,000
12 () Conemaugh Township Area Sewer Authority,
13 Tire Hill, sewer project, construct new
14 sewage treatment facility and sewer system 12,029,000
15 () Conemaugh Township Area Sewer Authority,
16 Ben's Creek, sewer project, construct new
17 sewer system, sewage treatment plant and
18 interceptor sewer 5,435,000
19 () Conemaugh Township Municipal Authority,
20 water project, improve water system
21 filtration plant 1,080,000
22 () Garrett Borough, sewer project, separate
23 storm water and sanitary sewer system 1,000,000
24 () Garrett Borough, water project, upgrade
25 water system 125,000
26 () Garrett Borough, sewer project, upgrade
27 sewage collection and treatment system 125,000
28 () Hooversville Borough, water project,
29 construct water line and pumping station
30 and upgrade distribution system 400,000
19870H2035B3637 - 148 -
1 () Jefferson Township, sewer project,
2 construct new sewage treatment facility,
3 interceptor, pumping station and sewer
4 system 2,693,000
5 () Jenner Area Joint Sewer Authority, sewer
6 project, construct new sewer system 7,650,000
7 () Jennerstown Borough, water project,
8 construct and upgrade water storage
9 reservoirs 1,000,000
10 () Jennerstown Borough, water project, replace
11 water lines and extend water distribution
12 system 1,000,000
13 () Jennerstown Borough, water project,
14 construct and upgrade water treatment
15 facility 850,000
16 () Meyersdale Water Authority, water project,
17 construct water filtration plant and water
18 storage facility 1,100,000
19 () Rockwood Borough Municipal Authority, sewer
20 project, rehabilitate sewage treatment
21 facility 1,168,000
22 () Salisbury Borough, sewer project, construct
23 new sewer system, sewage treatment plant
24 and interceptor sewer 4,742,000
25 () Shade-Central City Joint Authority, sewer
26 project, Central City, Middletown and
27 Bunker Hill areas of Shade Township,
28 construct sanitary sewer collection system 1,250,000
29 () Sipesville Water Company, Incorporated,
30 water project, improve water system 257,000
19870H2035B3637 - 149 -
1 () Somerset Borough Municipal Authority, water
2 project, construct parallel water line from
3 pumping station to reservoir 1,000,000
4 () Somerset Borough Municipal Authority, sewer
5 project, replace sewer collection lines on
6 West Catherine Avenue 100,000
7 () Somerset Borough Municipal Authority, sewer
8 project, replace sewer collection lines on
9 South Columbia Avenue 100,000
10 () Somerset Borough Municipal Authority, sewer
11 project, replace sewer collection lines on
12 South Edgewood Avenue 1,875,000
13 () Somerset Borough Municipal Authority, water
14 project, construct parallel water line from
15 plant to pumping station 1,500,000
16 () Somerset Borough Municipal Authority, water
17 project, establish supplemental water
18 source 1,000,000
19 () Somerset Borough Municipal Authority, water
20 project, replace deteriorating water lines
21 on West Main Street 200,000
22 () Somerset Borough Municipal Authority, water
23 project, replace deteriorating water lines
24 on North Center Avenue 200,000
25 () Somerset Borough Municipal Authority, sewer
26 project, construct sewage collection system
27 in the area of Clover Hill Road 500,000
28 () Somerset Township Municipal Authority,
29 sewer project, construct sewage collection
30 system and treatment facility for the
19870H2035B3637 - 150 -
1 Village of Lavansville 1,500,000
2 () Somerset Township Municipal Authority,
3 sewer project, construct sewage collection
4 system near airport 600,000
5 () Somerset Township Municipal Authority,
6 sewer project, construct new sewer system 7,869,000
7 () Somerset Township Municipal Authority,
8 sewer project, expand Wells Creek sewage
9 treatment plant 1,000,000
10 () Somerset Township Municipal Authority,
11 sewer project, construct sewage collection
12 system for the area near Somerset Borough 6,250,000
13 () Stonycreek Valley Sewer Authority, sewer
14 project, construct new sewage treatment
15 facility and sewer system for Indian Lake
16 area 8,507,000
17 () Stonycreek Valley, Shanksville, sewer
18 project, construct new sewage treatment
19 facility and sewer system 1,812,000
20 () Summit Township, sewer project, construct
21 new interceptor sewer and sewer system 969,000
22 () Wellersburg Borough, sewer project,
23 construct new sewer system, sewage
24 treatment plant and interceptor sewer 614,000
25 (eee) Sullivan County
26 () Cherry Township, sewer project, construct
27 new sewage treatment facility, interceptor,
28 pumping station and sewer system 2,896,000
29 () Colley Township, sewer project, construct
30 sewage treatment facility, interceptor,
19870H2035B3637 - 151 -
1 pumping station and sewer system 1,337,000
2 () Eagles Mere Borough, sewer project,
3 construct new sewage treatment facility,
4 interceptor, pumping station and sewer
5 system 2,000,000
6 () Laporte Borough, sewer project, construct
7 sewer system, sewage treatment facility and
8 interceptor sewer 145,000
9 () LAPORTE BOROUGH, WATER PROJECT, IMPROVE <--
10 WATER SYSTEM 350,000
11 () LAPORTE BOROUGH MUNICIPAL WATER SYSTEM,
12 WATER PROJECT, WATER SYSTEM IMPROVEMENTS 350,000
13 (fff) Susquehanna County
14 () Bridgewater Township Board of Supervisors,
15 sewer project, construct new sewer system,
16 sewage treatment plant and interceptor
17 sewer 1,100,000
18 () Forest Lake Township, sewer project,
19 construct sewage treatment plant 1,006,000
20 () Harford Township, sewer project, construct
21 sewage treatment plant 1,432,000
22 () HARFORD TOWNSHIP, SEWER PROJECT, SEWER <--
23 COLLECTION AND TREATMENT FACILITY 1,200,000
24 () Hop Bottom Borough, sewer project,
25 construct sewer system including treatment
26 plant 1,000,000
27 () Montrose Municipality Authority, sewer
28 project, expand and upgrade sewer system 500,000
29 () NEW MILFORD BOROUGH, WATER PROJECT, IMPROVE <--
30 WATER SYSTEM 1,500,000
19870H2035B3637 - 152 -
1 () NEW MILFORD MUNICIPAL AUTHORITY, WATER
2 PROJECT, WATER SYSTEM IMPROVEMENTS 1,500,000
3 () Pennsylvania American Water Company
4 (Hallstead District), water project,
5 improve water system 300,000
6 () Silver Lake Township Municipal Authority,
7 sewer project, construct new sewage
8 treatment facility, pumping station and
9 sewer system 763,000
10 () Thompson Borough, sewer project, construct
11 new sewage treatment facility and sewer
12 system 1,000,000
13 (ggg) Tioga County
14 () Blossburg Water Company MUNICIPAL <--
15 AUTHORITY, water project, improve water
16 system 2,430,000
17 () Charleston Township, sewer project,
18 construct new sewer system 792,000
19 () Clymer Township, sewer project, construct
20 new sewage treatment facility, interceptor,
21 pumping station and sewer system 934,000
22 () Duncan Township, sewer project, construct
23 new sewer system, sewage treatment plant
24 and interceptor sewer 250,000
25 () Gaines Township Authority, sewer project,
26 construct new sewer system, sewage
27 treatment plant and interceptor sewer 43,000
28 () Jackson Township, sewer project, construct
29 new sewer system, sewage treatment plant
30 and interceptor sewer 2,626,000
19870H2035B3637 - 153 -
1 () Knoxville Borough, sewer project, construct
2 new sewage treatment facility, interceptor,
3 pumping station and sewer system 1,132,000
4 () Liberty Township, sewer project, construct
5 new sewer system, sewage treatment plant
6 and interceptor sewer 320,000
7 () Mansfield Borough, sewer project,
8 rehabilitate sewage plant and sewer system 1,200,000
9 () Morris Township, sewer project, construct
10 new sewer system, sewage treatment plant
11 and interceptor sewer 376,000
12 () Putnam Township, sewer project, construct
13 new sewer system, sewage treatment plant
14 and interceptor sewer 1,890,000
15 () Richmond Township, sewer and water
16 projects, construct sewer and water lines 1,000,000
17 () Tioga Borough, sewer project, construct new
18 sewer system, sewage treatment plant and
19 interceptor sewer 2,632,000
20 () Wellsboro Borough, water project,
21 reconstruct water distribution system 1,000,000
22 () WELLSBORO MUNICIPAL AUTHORITY, WATER <--
23 PROJECT, DISTRIBUTION SYSTEM IMPROVEMENTS 1,000,000
24 (hhh) Union County
25 () Buffalo Township, sewer project, construct
26 new sewage treatment facility and sewer
27 system 2,272,000
28 () East Buffalo Township, sewer project,
29 Armory Park Sewer Extension 100,000
30 () Gregg Township, sewer project, Allenwood
19870H2035B3637 - 154 -
1 Village, sewage collection and treatment 600,000
2 () Hartleton Borough, sewer project, sewage
3 collection and treatment system 700,000
4 () Hartley Township, sewer project, extend
5 Laurelton sewer system 1,000,000
6 () Kelly Township, sewer project, extend
7 sewers to International Paper Company 60,000
8 () Kelly Township Municipal Authority, sewer
9 project, relocation of sewage treatment
10 facility 1,725,000
11 () KELLY TOWNSHIP, SEWER PROJECT, INCREASE <--
12 CAPACITY OF BUFFALO CREEK PUMPING STATION 160,000
13 () KELLY TOWNSHIP, SEWER PROJECT, REDUCTION OF
14 INFLOW/INFILTRATION 500,000
15 () KELLY TOWNSHIP, SEWER PROJECT, SEWER
16 EXTENSION, WEST MILTON 100,000
17 () Laurelton Center, water project, water
18 system improvements 513,000
19 () LEWISBURG JOINT SEWER AUTHORITY, SEWER <--
20 PROJECT, COLONIAL PARK SEWER/ARMORY PARK 150,000
21 () Mifflinburg Borough, sewer project, new
22 sewage treatment plant, extend to Buffalo
23 Road 1,750,000
24 () Mifflinburg Borough, water project, water
25 filtration system 142,000 <--
26 200,000
27 () Mifflinburg Municipal Authority, sewer
28 project, rehabilitate sewers 1,125,000
29 () New Berlin Borough, water project, water
30 storage tank 80,000
19870H2035B3637 - 155 -
1 () New Columbia, sewer project, repair and
2 improve sewer system 150,000
3 () WHITE DEER TOWNSHIP, SEWER PROJECT, <--
4 INFILTRATION AND INFLOW REMOVAL, THREE
5 STAGES 540,000
6 (iii) Venango County
7 () Cherrytree Township, sewer project,
8 construct new interceptor sewer and sewer
9 system 2,154,000
10 () CITY OF OIL CITY, SEWER PROJECT, <--
11 REHABILITATE WASTEWATER TREATMENT PLANT AND
12 SANITARY SEWERS 865,000
13 () City of Oil City, water project, replace
14 two water storage tanks 565,000
15 () Clintonville Borough, water project,
16 improve water treatment plant and extend
17 water line 200,000
18 () Clintonville Borough, sewer project,
19 rehabilitate sanitary sewer system, plant
20 control building and sludge dewatering
21 facilities 300,000
22 () Cranberry Township, sewer project,
23 Cranberry Village sewer extension for
24 Rockland Road 190,000
25 () Emlenton Borough, water project, upgrade
26 water supply system 500,000
27 () FRANKLIN CITY, SEWER PROJECT, REHABILITATE <--
28 SEWER 6,836,000
29 () Frenchcreek Township, sewer project,
30 construct main sewer line on Route 62 100,000
19870H2035B3637 - 156 -
1 () Frenchcreek Township, water project,
2 construct water main on Route 62 100,000
3 () Oakland Township, sewer project, construct
4 new sewage treatment facility and sewer
5 system 1,342,000
6 () OIL CITY, WATER PROJECT, REPLACE WATER <--
7 TANK 500,000
8 () Pleasantville Borough, sewer project,
9 construct new interceptor sewer, pumping
10 station and sewer system 1,350,000 <--
11 1,559,000
12 () ROUSEVILLE WATER DEPARTMENT, WATER PROJECT, <--
13 TRANSMISSION LINE 225,000
14 () SANDYCREEK TOWNSHIP, SEWER PROJECT,
15 CONSTRUCT NEW SEWER SYSTEM, PUMPING
16 STATION, FORCE MAIN AND INTERCEPTOR SEWER 2,500,000
17 () SANDYCREEK TOWNSHIP, WATER PROJECT,
18 CONSTRUCT WATER DISTRIBUTION SYSTEM AND
19 WATER STORAGE FACILITY 1,500,000
20 () Sugar Creek Borough, sewer project,
21 rehabilitate or replace sanitary sewer
22 line 600,000
23 (jjj) Warren County
24 () Bear Lake Borough, sewer project, construct
25 new sewer system, sewage treatment plant
26 and interceptor sewer 850,000
27 () BRADFORD CITY, WATER PROJECT, IMPROVE WATER <--
28 TREATMENT SYSTEM 1,000,000
29 () BROKENSTRAW TOWNSHIP, SEWER PROJECT, NEW
30 COLLECTION LINES 2,000,000
19870H2035B3637 - 157 -
1 () Clarendon Borough-Mead Township, sewer
2 project, construct new interceptor sewer,
3 pumping station and sewer system 3,400,000
4 () Conewango Township, sewer project,
5 construct new sewer system and pumping
6 station 4,373,000
7 () CONEWAGO TOWNSHIP AT HILLCREST, WATER <--
8 PROJECT, NEW WATER LINES 250,000
9 () Eldred Township, sewer project, construct
10 new sewer system, sewage treatment plant
11 and interceptor sewer 557,000
12 () Farmington Township, sewer project,
13 construct new sewer system, sewage
14 treatment plant and interceptor sewer 584,000 <--
15 585,000
16 () GLADE TOWNSHIP, SEWER PROJECT, CONSTRUCT <--
17 SEWER COLLECTION EXTENSION 500,000
18 () MEADE TOWNSHIP AND CLARENDON BOROUGH, SEWER
19 PROJECT, NEW SEWER TREATMENT SYSTEM 3,400,000
20 () North Warren Municipal Water Authority,
21 water project, extension of system, improve
22 distribution system 600,000
23 () Pine Grove Township, water project, water
24 line extension and new reservoir 375,000
25 () Pine Grove Township, sewer project,
26 construct new sewer system, sewage
27 treatment plant and interceptor sewer 550,000
28 () Russell/Pine Grove Township, water project,
29 extension of water lines, expand
30 distribution system and storage 1,075,000
19870H2035B3637 - 158 -
1 () Sheffield Township Municipal Authority,
2 water project, add additional well and
3 storage and upgrade distribution system 800,000
4 () Sheffield Township, water project,
5 construct new water holding storage tank 200,000
6 () Sheffield Township, sewer project, sewer
7 rehabilitation 300,000
8 () Sugar Grove Borough, sewer project,
9 construct new sewer system, sewage
10 treatment plant and interceptor sewer 2,020,000
11 () Tidioute Borough, water project, replace
12 water lines 230,000
13 () TIDIOUTE PUBLIC UTILITY SYSTEM, WATER <--
14 PROJECT, REPLACE WATER MAIN 230,000
15 () WARREN BOROUGH, SEWER PROJECT, REPLACEMENT,
16 IMPROVEMENTS, REHABILITATION 4,550,000
17 () Youngsville Municipal Authority, sewer
18 project, construct new interceptor sewer,
19 pumping station and sewer system 2,700,000
20 () YOUNGSVILLE MUNICIPAL AUTHORITY, SEWER <--
21 PROJECT, NEW SEWER TREATMENT PLANT
22 EXPANSION 250,000
23 (kkk) Washington County
24 () BENTLEYVILLE MUNICIPAL AUTHORITY, WATER <--
25 PROJECT, CONSTRUCT WATER LINE TO THE
26 BENTWORTH HIGH SCHOOL 80,000
27 () BROWNVILLE WATER COMPANY, WATER PROJECT,
28 DISTRIBUTION SYSTEM IMPROVEMENTS 545,000
29 () Burgettstown-Smith Joint Sanitary
30 Authority, sewer project, construct new
19870H2035B3637 - 159 -
1 sewer system, sewage treatment plant and
2 interceptor sewer 12,612,000
3 () Canonsburg-Houston Joint Authority, sewer
4 project, construct addition to sewage
5 treatment plant 1,700,000
6 () Canonsburg-Houston Joint Authority, sewer
7 project, repair and replace existing sewer
8 lines 724,000
9 () Carrol Township Authority, sewer project,
10 repair and replace sewer lines 2,500,000
11 () Cecil Township, sewer project, construct
12 new sewer system 5,406,000
13 () Cecil Township, Henderson-Lawrence, sewer
14 project, construct new sewage treatment
15 facility, interceptor, pumping station and
16 sewer system 3,901,000
17 () Centerville Borough, water project,
18 construct water lines 50,000
19 () Centerville Borough, sewer project,
20 sanitary sewer project 6,000,000
21 () Centerville Borough, Monongahela Drain,
22 sewer project, rehabilitate sewage
23 treatment facility and construct new
24 interceptor, pump station and sewer system 3,027,000
25 () Charleroi Borough, water improvement
26 projects 2,500,000
27 () Charleroi Borough, sewage treatment
28 improvement 1,500,000
29 () Charleroi Borough, rehabilitate sewer
30 lines 1,200,000
19870H2035B3637 - 160 -
Historical Act text part 3
1 () Chartiers Township Sanitary Authority,
2 sewer project, Westland area, construct new
3 sewer system 10,628,000
4 () Chartiers Township Sanitary Authority,
5 sewer project, Midland, construct new sewer
6 system 5,950,000
7 () Claysville-Donegal Joint Municipal
8 Authority, water project, upgrade or add to
9 water system 2,301,000
10 () Coal Center Borough, sewer project,
11 construct new sewer system 523,000
12 () COKEBURG BOROUGH, WATER PROJECT, CONSTRUCT <--
13 SPILLWAY FOR EXISTING WATER SUPPLY DAM 81,000
14 () Cross Creek Township, sewer project, sewage
15 system 1,310,000
16 () Fallowfield Township, sewer project,
17 construct new interceptor sewer, force
18 main, pumping station and sewer system 18,407,000
19 () Fallowfield Township, sewer project,
20 Reddsmill, construct new interceptor sewer,
21 force main, pumping station and sewer
22 system 249,000
23 () Fallowfield Township, sewer project, Van
24 Voorhis, construct new interceptor sewer,
25 force main and pumping station 8,429,000
26 () INDEPENDENCE TOWNSHIP, SEWER PROJECT, <--
27 CONSTRUCT NEW SEWAGE TREATMENT PLANT 612,000
28 () INDEPENDENCE TOWNSHIP, SEWER PROJECT,
29 CONSTRUCT NEW SEWAGE TREATMENT PLANT 2,448,000
30 () Independence Township Municipal Authority,
19870H2035B3637 - 161 -
1 water project, for water lines 1,385,000
2 () Jefferson Township, sewer project,
3 Eldersville, construct new sewage treatment
4 facility, interceptor, pumping station and
5 sewer system 239,000
6 () Marianna Borough, sewer project, sanitary
7 sewer service project 5,640,000
8 () McDonald Borough, sewer project 6,738,000
9 () Mid-Mon Valley Pollution Control Authority,
10 water project, extend water lines 100,000
11 () Midway Sewerage Authority, sewer project,
12 sewage treatment plant construction 3,000,000
13 () Monongahela Municipal Authority, sewer
14 project, construct sewer lines and repair
15 and replace sewage treatment plant 4,810,000
16 () Mon Valley Sewer Authority, Monesson and
17 Donora, sewer project, construct sewer
18 lines 3,600,000
19 () Morris Township, sewer project, Prosperity,
20 construct new sewage treatment facility,
21 interceptor, pumping station and sewer
22 system 388,000
23 () Mt. Pleasant Township, water project,
24 construct public water supply system 100,000
25 () Mt. Pleasant Township, sewer project,
26 Hickory, construct new sewer system, sewage
27 treatment plant and interceptor sewer 7,133,000
28 () Mt. Pleasant Township, water project, water
29 line extensions 1,800,000
30 () North Strabane and Chartiers Townships,
19870H2035B3637 - 162 -
1 sewer project, Canonsburg and Houston
2 sewers 724,000
3 () New Eagle Borough, sewer project, upgrade
4 and improve sewer system and sewage
5 treatment plant 2,500,000
6 () Peters Township Sanitary Authority, sewer
7 project, Ivy Lane and Valleyview Drive
8 areas, construct sewers 500,000
9 () Peters Township Sanitary Authority, sewer
10 project, expand Brush Run plant and Valley
11 Brook interceptor 3,560,000
12 () Peters Township-Peters Township Sanitary
13 Authority, sewer project, sewer system 409,000
14 () Robinson Township, water project, Route 22,
15 extend water line 400,000
16 () Smith Township Water Authority, water
17 project, renovate treatment plant 900,000
18 () Smith Township Water Authority, water
19 project, water line extension on Route 22 1,100,000
20 () South Franklin Township, sewer project,
21 construct new sewer system 2,208,000
22 () South Strabane Township Sewer Authority,
23 sewer project, construct new interceptor
24 sewer, pumping station and sewer system 3,144,000
25 () Tri-County Joint Municipal Authority, water
26 project, East Bethlehem and Centerville,
27 extend water lines 700,000
28 () TWILIGHT BOROUGH, WATER PROJECT, CONSTRUCT <--
29 AND EXTEND WATER DISTRIBUTION LINES 350,000
30 () Union Township, sewer project, Elrama,
19870H2035B3637 - 163 -
1 construct new interceptor sewer 384,000
2 () Washington-East Washington Joint Authority,
3 sewer project, construct new interceptor
4 sewer, pumping station and sewer system 2,000,000
5 () Washington-East Washington Joint Authority,
6 sewer project, improve sewage treatment
7 plant 3,300,000
8 () West Alexander Borough, sewer project,
9 construct new sewer system, sewage
10 treatment plant and interceptor sewer 1,670,000
11 () West Brownsville Borough, sewer project,
12 construct new sewer system extensions 5,520,000
13 () West Brownsville Borough, water project,
14 construct new water holding storage tank 1,000,000
15 () West Pike Run Township, sewer project,
16 construct new sewer system, sewage
17 treatment plant and interceptor sewer 1,738,000
18 (lll) Wayne County
19 () Bethany Borough, sewer project, construct
20 new sewer lines, sewage treatment plant 1,000,000
21 () Manchester Township Municipal Sewer and
22 Water Authority, sewer project, upgrade
23 existing sewer lines to expand the service
24 area, install package treatment plant 450,000
25 () Wallenpaupack Lake Estates, sewer project,
26 expansion and restoration of existing
27 sewage treatment plant and collection
28 system in Paupack Township 1,200,000
29 () WALLENPAUPACK LAKE ESTATES, SEWER PROJECT, <--
30 EXPAND SEWER TREATMENT FACILITY 600,000
19870H2035B3637 - 164 -
1 () Wallenpaupack Lake Estates, water project,
2 water distribution system replacement 1,026,000
3 (mmm) Westmoreland County
4 () Allegheny Township, water project,
5 Community Park Road, construct water line 279,000
6 () Allegheny Township, water project, Finnin
7 Road, construct water line 204,000
8 () Allegheny Township Municipal Authority,
9 sewer project, Markle, construct new sewer
10 system 1,090,000
11 () Allegheny Township Municipal Authority,
12 sewer project, Chartiers, rehabilitate
13 sewage treatment plant and sewer
14 interceptor 300,000
15 () Arona Borough, sewer project, construct new
16 sewer system 812,000
17 () Bell Township Municipal Authority, sewer
18 project, construct new sewer system, sewage
19 treatment plant and interceptor sewer 2,599,000
20 () Bell Township Municipal Authority, sewer
21 project, construct new sewer system, sewage
22 treatment plant and interceptor sewer 171,000
23 () Bell Township Municipal Authority, water
24 project, Truxal Village, construct pumping
25 station and line 160,000
26 () Derry Borough, sewer project, rehabilitate
27 sewage treatment facility and construct new
28 interceptor sewer and sewer system 2,125,000
29 () Derry Borough Municipal Authority, water
30 project, install water tank and
19870H2035B3637 - 165 -
1 rehabilitate treatment plant 750,000
2 () Derry Township Municipal Authority, sewer
3 project, Hillside, rehabilitate sewage
4 treatment facility and construct new
5 interceptor sewer and sewer system 952,000
6 () Derry Township Municipal Authority, sewer
7 project, Torrance, rehabilitate sewage
8 treatment facility and construct new
9 interceptor sewer and sewer system 497,000
10 () Donegal Borough, water project, extend
11 water line to service entire borough 750,000
12 () Donegal Township, water project, extend
13 water line from present terminus to Donegal
14 Borough line 1,750,000
15 () East Huntingdon Township, sewer project,
16 Ruffs Drive, construct new sewer system 4,598,000
17 () East Huntington HUNTINGDON Township, water <--
18 project, extend water line 128,000
19 () EAST HUNTINGDON TOWNSHIP, WATER PROJECT, <--
20 SCHULTZ ROAD, CONSTRUCT WATER LINES 250,000
21 () Export Borough, sewer project, stream
22 improvement - pollution control 30,000
23 () Franklin Township, sewer project, addition
24 to sewage treatment facility 5,000,000 <--
25 5,480,000
26 () FRANKLIN TOWNSHIP MUNICIPAL SANITARY <--
27 AUTHORITY, SEWER PROJECT, SEWER
28 REHABILITATION WORK AND CONSTRUCTION OF
29 RETENTION BASINS 3,333,000
30 () FRANKLIN TOWNSHIP MUNICIPAL SANITARY
19870H2035B3637 - 166 -
1 AUTHORITY, SEWER PROJECT, CONSTRUCTION OF
2 PUBLIC SEWER SYSTEM IN AREAS PRESENTLY
3 SERVED BY ON-LOT SEPTIC SYSTEMS 3,044,000
4 () Greater Greensburg Sewer Authority, sewer
5 project, rehabilitate sewage treatment
6 facility and construct new interceptor
7 sewer and sewer system 5,100,000
8 () Hempfield Township, sewer project,
9 Maplewood Terrace, construct sewage
10 facilities and system 500,000 <--
11 595,000
12 () Hempfield Township, water project, extend
13 water lines on Stone Hill Church Road 340,000
14 () Hempfield Township, water project, extend
15 water line on Stone Hill Church Road 333,000
16 () Hempfield Township, water project, extend
17 water line on Township Route 679 48,000
18 () Hempfield Township, sewer project, sewer
19 line, Willow Crossing 425,000
20 () Hempfield Township, water project, water
21 line, Route 30 and Blackenberry Road 143,000
22 () Hempfield Township, sewer project, sewer
23 line, Midway-St. Clair 1,000,000 <--
24 1,199,000
25 () Hempfield Township, water project, drinking
26 water line, Legislative Route 64038 44,000
27 () Hempfield Township, sewer project,
28 construct new sewer system and interceptor
29 sewer 6,341,000
30 () Hempfield Township, sewer project, sewer
19870H2035B3637 - 167 -
1 line project, Maryland Avenue 20,000
2 () Hempfield Township, water project, drinking
3 water line, Smartnik Road 69,000
4 () Hempfield Township, sewer project, sewer
5 line, Swede Hill 165,000
6 () Hempfield Township, sewer project,
7 rehabilitate Darragh sewage treatment
8 facility 9,890,000
9 () Hempfield Township, sewer project, east of
10 Manor, construct new sewer system and
11 interceptor sewer 843,000 <--
12 1,502,000
13 () Hempfield Township, sewer project, Midway-
14 St. Clair, construct new sewer system and
15 interceptor sewer 1,000,000
16 () Hempfield Township, water project, New
17 Stanton (D.A.), extend water line 55,000
18 () Hempfield Township, water project, Waltz
19 Mills Hunker Road, Legislative Route 64164,
20 construct water line 138,000
21 () Hempfield Township, water project, install
22 water line along Barnhart Road and S.R.
23 1028 89,000
24 () Hempfield Township Municipal Authority,
25 sewer project, New Stanton, construct new
26 sewage treatment facility, interceptor,
27 pumping station and sewer system 17,701,000
28 () Irwin Borough, sewer project, sewer and
29 storm water system separation 4,582,000
30 () Jeannette City, sewer project, Wylie
19870H2035B3637 - 168 -
1 Avenue, improve sewer 110,000
2 () Jeannette City, sewer project, compliance
3 with NPDES permit for sewer system 180,000
4 () Jeannette City, sewer project, extend
5 diocese sewer 55,000
6 () Jeannette City, water project, plan to
7 prevent hydraulic overload for water
8 system 165,000
9 () Jeannette City, sewer project, Magee Avenue
10 sanitary sewer 40,000
11 () Jeannette City, sewer project, repair sewer
12 manholes diocese project 90,000
13 () Jeannette Municipal Authority, sewer
14 project, rehabilitate sewage treatment
15 facility 23,349,000
16 () Kiski Valley Water Pollution Control
17 Authority, sewer project, upgrade Allegheny
18 Township sewer plant 2,500,000
19 () Ligonier Township Municipal Authority,
20 water project, replace water lines and
21 appurtenances 100,000
22 () Ligonier Township Municipal Authority,
23 water project, upgrade water filtration
24 facilities 1,076,000
25 () Ligonier Township, water project, construct
26 water storage tank 3,720,000
27 () Ligonier Township Sanitary Authority, sewer
28 project, Laughlintown, construct new
29 interceptor sewer, pumping station and
30 sewer system 2,693,000
19870H2035B3637 - 169 -
1 () Ligonier Township Sanitary Authority, sewer
2 project, construct new interceptor sewer,
3 pumping station and sewer system 13,615,000
4 () Ligonier Township Sanitary Authority, sewer
5 project, Rector, construct new interceptor
6 sewer, pumping station and sewer system 404,000
7 () Ligonier Township Sanitary Authority, sewer
8 project, Stahl, construct new interceptor
9 sewer, pumping station and sewer system 2,363,000
10 () Lower Burrell Municipal Authority, sewer
11 project, construct new sewer system, sewage
12 treatment plant and interceptor sewer 2,561,000
13 () Lower Burrell City, sewer project,
14 rehabilitate sewer 400,000
15 () Madison Borough, sewer project, construct
16 new sewage treatment facility, interceptor,
17 pumping system and sewer system 1,059,000
18 () Manor Borough, sewer project, construct
19 sewer line along Brush Creek 75,000
20 () Manor Borough, water project, construct
21 water line along Rowe Lane 125,000
22 () Manor Borough, sewer project, construct
23 sewer line along Sandy Hill Road 450,000
24 () Monessen City, sewer project, Monessen City
25 and Donora Borough, expand sewage
26 collection system 3,600,000
27 () Mt. Pleasant Borough, sewer project,
28 rehabilitate sewage treatment facility and
29 construct new sewer system 2,550,000 <--
30 2,964,000
19870H2035B3637 - 170 -
1 () Mt. Pleasant Township, water project,
2 extend water line 120,000
3 () Mt. Pleasant Township, sewer project,
4 Cummingswood, construct new interceptor
5 sewer and sewer system 203,000
6 () Mt. Pleasant Township, sewer project,
7 Hecla, construct new interceptor sewer and
8 sewer system 169,000
9 () Mt. Pleasant Township, sewer project,
10 Mammoth, construct new interceptor sewer
11 and sewer system 2,240,000
12 () Mt. Pleasant Township, sewer project,
13 Norvelt Traugher, construct new interceptor
14 sewer and sewer system 5,326,000
15 () MUNICIPAL AUTHORITY OF WESTMORELAND COUNTY, <--
16 WATER PROJECT, INSTALLATION OF WATER LINE
17 IN VILLAGE OF MUTUAL, UNITY TOWNSHIP 381,000
18 () New Kensington Municipal Authority, water
19 project, rehabilitate water treatment
20 facility and construct water storage
21 reservoirs 4,000,000
22 () New Kensington Municipal Sanitary
23 Authority, sewer project, rehabilitate
24 sanitary sewer system 1,200,000
25 () North Huntingdon Township, water project,
26 water line for Hohntown Wendel Road 50,000
27 () North Huntingdon Township, water project,
28 water line, phase 2 49,000
29 () North Huntingdon Township, water project,
30 Greer Street water line 5,000
19870H2035B3637 - 171 -
1 () North Huntingdon Township, water project,
2 Guffey Road water line 18,000
3 () North Huntingdon Township, water project,
4 Brokers Lane water line 32,000
5 () North Huntingdon Township, water project,
6 Stevens Drive water line 5,000
7 () North Huntingdon Township, sewer project,
8 Drennen Heights sewers 3,893,000
9 () North Huntingdon Township, water project,
10 Tinkers Run water line 801,000
11 () North Huntingdon Township, sewer project,
12 Lincoln Way equalization basin 671,000
13 () North Huntingdon Township, sewer project,
14 Long Run equalization basin 671,000
15 () North Huntingdon Township, sewer project,
16 Yough sewage treatment plant, new units 2,137,000
17 () North Huntingdon Township, water project,
18 Schade Hill water line 20,000
19 () North Huntingdon Township, sewer project,
20 convert Indian plant to sewer pumping
21 station 909,000
22 () North Huntingdon Township, water project,
23 water line 44,000
24 () North Huntingdon Township, sewer project,
25 Yough sewage treatment equalization basin 1,131,000
26 () New Alexandria Municipal Authority, sewer
27 project, construct new sewage treatment
28 facility and sewer system 1,884,000
29 () New Florence Borough, water project,
30 construct water filtration system 288,000
19870H2035B3637 - 172 -
1 () New Stanton Borough, sewer project, replace
2 and extend sanitary sewer line 250,000
3 () North Huntingdon Township Municipal
4 Authority, sewer project, rehabilitate
5 sewage treatment facility 1,326,000
6 () NORTH HUNTINGDON TOWNSHIP MUNICIPAL <--
7 AUTHORITY, SEWER PROJECT, CONSTRUCT ARDARA
8 ROAD AND MASTERS LANE SEWERS 478,000
9 () NORTH HUNTINGDON TOWNSHIP MUNICIPAL
10 AUTHORITY, SEWER PROJECT, SEWER LINE
11 EXTENSIONS 730,000
12 () NORTH HUNTINGDON TOWNSHIP MUNICIPAL
13 AUTHORITY, SEWER PROJECT, INDIAN LAKE
14 EQUALIZATION BASIN PROJECT 1,028,000
15 () North Huntingdon Township - Yough, sewer
16 project, sewage treatment and sludge
17 dewatering facility 600,000
18 () Oklahoma Borough, sewer project,
19 rehabilitate Colonial Acres sanitary sewer
20 system 250,000
21 () Penn Township, sewer project, construct and
22 rehabilitate sanitary sewer system and
23 interceptors 2,165,000
24 () Rostraver Township, water project, extend
25 water lines 3,314,000
26 () Rostraver Township, sewer project,
27 construct sewage treatment plant and
28 connector 4,400,000
29 () Salem Township, sewer project, Forbes Road,
30 rehabilitate sewage treatment facility and
19870H2035B3637 - 173 -
1 construct new sewer system 1,282,000
2 () Salem Township, sewer project, Slickville,
3 construct new sewer system 1,967,000
4 () Seward Borough, water project, reconstruct
5 and replace water lines and related
6 components 823,000
7 () Sewickley Township, water project, extend
8 water lines 1,147,000
9 () Sewickley Township, sewer project,
10 Cowansburg, construct new sewer system 166,000
11 () Sewickley Township, sewer project,
12 Herminie-Rillton, construct sewage
13 facilities and system 11,688,000
14 () Sewickley Township, sewer project, Lomber
15 sewage treatment plant, construct sewage
16 facilities and system 2,265,000
17 () Smithton Borough Municipal Authority, sewer
18 project, construct new sewage treatment
19 plant 983,000
20 () South Huntingdon Township, sewer project,
21 construct sewage treatment plant for Yukon 2,035,000
22 () South Huntingdon Township, water project,
23 extend water lines 900,000
24 () Tri-Community Authority, sewer project,
25 Bolivar, rehabilitate sewage treatment
26 plant and sewer interceptor 2,000,000
27 () Tri-county Water and Sewer Authority, sewer
28 project, construct sewer manholes, pumping
29 station and force mains 3,876,000
30 () Unity Township Municipal Authority, sewer
19870H2035B3637 - 174 -
1 project, construct new sewer system, sewage
2 treatment plant and interceptor sewer 2,692,000
3 () Upper Burrell Township, water project,
4 construct water line 1,400,000
5 () Vandergrift Borough, sewer project, West
6 Vandergrift, extend sanitary sewer lines 350,000
7 () Washington Township, sewer project, North,
8 construct sewage treatment plant and sewer
9 lines 1,100,000
10 () Washington Township, sewer project, Utopia
11 Road, construct sewage treatment plant and
12 sewer lines 1,900,000
13 () Washington Township, water project, Muffley
14 Drive, construct water line 19,000
15 () West Leechburg Borough, sewer project,
16 install, extend and separate sanitary sewer
17 lines and pumping stations 395,000
18 () West Leechburg Water Authority, water
19 project, West Leechburg Borough, install
20 and replace water lines 240,000
21 () Westmoreland - Fayette Municipal Authority,
22 sewer project, construct sewage facilities
23 and system 4,192,000
24 () Westmoreland - Sewickley Township -
25 Sutersville Borough, sewer project,
26 construct sewage treatment facilities and
27 system 2,347,000
28 () YOUNGSTOWN WATER AUTHORITY, WATER PROJECT, <--
29 CONSTRUCT NEW WATER LINE IN UNITY TOWNSHIP 400,000
30 () Youngwood Borough, water project, extend
19870H2035B3637 - 175 -
1 water lines 138,000
2 () Youngwood Borough Authority, sewer project,
3 rehabilitate sewage treatment facility 862,000
4 (nnn) Wyoming County
5 () Factoryville Borough, sewer project, expand
6 sewer system 500,000
7 () FACTORYVILLE BOROUGH, WATER PROJECT, <--
8 IMPROVE WATER SYSTEM 300,000
9 () FACTORYVILLE WATER COMPANY, WATER PROJECT, <--
10 CONSTRUCT FILTRATION PLANT, INSTALL
11 RESIDENTIAL METERS, REPLACE TRANSMISSION
12 LINE AND SERVICES 515,000
13 () Laceyville Borough, sewer project,
14 construct new sewage treatment plant 669,000
15 () Lemon Township, sewer project, construct
16 new sewage treatment plant 989,000
17 () Meshoppen Borough, sewer project, construct
18 new sewage treatment plant 959,000
19 () MESHOPPEN WATER COMPANY, WATER PROJECT, <--
20 WATER SYSTEM IMPROVEMENTS 928,000
21 () MESHOPPEN BOROUGH, WATER PROJECT, IMPROVE
22 WATER SYSTEM 928,000
23 () NICHOLSON BOROUGH, WATER PROJECT, IMPROVE
24 WATER SYSTEM 750,000
25 () Nicholson Borough Authority, sewer project,
26 construct new sewage treatment plant 1,053,000
27 () NICHOLSON MUNICIPAL WATER AUTHORITY, WATER <--
28 PROJECT, WATER SYSTEM IMPROVEMENTS 750,000
29 () Northmoreland Township, sewer project,
30 construct new sewage treatment plant 1,047,000
19870H2035B3637 - 176 -
1 () North Penn Utility, water project,
2 Factoryville, new water well 60,000
3 () Noxen Township, sewer project, construct
4 new sewage treatment plant 1,033,000
5 () Tunkhannock Borough Municipal Authority,
6 sewer project, construct new sewer system 2,282,000
7 (ooo) York County
8 () Abbottstown-Paradise Joint Sewer Authority,
9 sewer project, construct new sewer lines
10 and treatment plant 7,000,000
11 () BRIAR WATER COMPANY, WATER PROJECT, REPLACE <--
12 FILTER EQUIPMENT, EXPAND RESERVOIR 50,000
13 () Carroll Township, sewer project, construct
14 sewer plant and sewer lines 2,000,000
15 () Carroll Township, water project, construct
16 water distribution system 500,000
17 () Conewago Township Sewer Authority, sewer
18 project, construct new sewage treatment
19 facility and sewer system 3,580,000 <--
20 4,700,000
21 () Delta Borough, water project, pump,
22 pumphouse and generator for new well 60,000
23 () DELTA BOROUGH WATER SYSTEM, WATER PROJECT, <--
24 WATER SYSTEM IMPROVEMENTS 60,000
25 () DILLSBURG BOROUGH WATER SYSTEM, WATER
26 PROJECT, RESERVOIR COVER AND LINE 150,000
27 () DILLSBURG BOROUGH, SEWER PROJECT 1,825,000
28 () DILLSBURG BOROUGH, WATER PROJECT 1,000,000
29 () Dillsburg Borough, water project, place
30 rubber liner on 500,000 gallon reservoir
19870H2035B3637 - 177 -
1 and install cover 200,000
2 () Dillsburg Borough, water project, drill new
3 well and outfit for service 300,000
4 () Dillsburg Borough, water project, construct
5 1 million gallon treated water storage
6 reservoir 500,000
7 () Dillsburg Borough, sewer project, enlarge
8 wastewater treatment plant 1,825,000
9 () Dover Borough, sewer project, sewage
10 system 137,000
11 () Dover Township, sewer project, improve
12 sewer system 1,500,000
13 () DOVER BOROUGH WATERWORKS, WATER PROJECT, <--
14 CORROSION CONTROL 100,000
15 () DOVER TOWNSHIP (YORK COUNTY AUTHORITY),
16 WATER PROJECT, NEW WELL 100,000
17 () DOVER TOWNSHIP, SEWER PROJECT, WASTEWATER
18 TREATMENT PLANT EXPANSION 1,000,000
19 () EAST MANCHESTER TOWNSHIP, SEWER PROJECT,
20 COLLECTION SYSTEM EXTENSION 2,500,000
21 () EAST MANCHESTER TOWNSHIP, SEWER PROJECT,
22 SEWER CONSTRUCTION, MUSSER RUN PUMPING
23 STATION 1,000,000
24 () EAST PROSPECT MUNICIPAL WATER, WATER
25 PROJECT, WATER SYSTEM IMPROVEMENTS 50,000
26 () Fairview Township, sewer project, upgrade
27 existing plant 1,000,000
28 () Fairview Township, sewer project, extend
29 sewage system 1,400,000
30 () Fairview Township, sewer project,
19870H2035B3637 - 178 -
1 construction of two sewage treatment
2 plants 2,000,000
3 () Fairview Township, sewer project,
4 construction of sewage collection system 4,404,000
5 () Fairview Township, sewer project, upgrade
6 sewage treatment plant and sewer system 1,000,000
7 () Felton Borough, water project, construct
8 new public water system based on results of
9 York County water study 1,925,000
10 () FELTON WATER COMPANY, WATER PROJECT, WATER <--
11 SYSTEM IMPROVEMENTS OR EXTENSION 677,000
12 () FOREST LAKES WATER SYSTEM, WATER PROJECT,
13 NEW MAIN DISTRIBUTION LINE AND PUMPING
14 STATION 100,000
15 () Franklintown Borough, sewer project, sewage
16 system 140,000
17 () FRANKLINTOWN BOROUGH MUNICIPAL AUTHORITY, <--
18 WATER PROJECT, NEW WELL, OTHER
19 IMPROVEMENTS 200,000
20 () GLEN ROCK WATER AUTHORITY, WATER PROJECT,
21 RESERVOIR COVER, PROTECTION AND
22 DEVELOPMENT 500,000
23 () GOLDSBORO BOROUGH, SEWER PROJECT,
24 WASTEWATER COLLECTION SYSTEM 1,100,000
25 () GOLDSBORO BOROUGH, SEWER PROJECT, TO SEWER
26 200 ADDITIONAL UNITS IN BOROUGH 1,200,000
27 () HALLAM BOROUGH & HELLAM TOWNSHIP, SEWER <--
28 PROJECT, SYSTEM EXTENSION 150,000
29 () Hanover Borough, water project, expansion
30 of water capacity and service area 4,500,000
19870H2035B3637 - 179 -
1 () HANOVER MUNICIPAL WATERWORKS, WATER <--
2 PROJECT, NEW SOURCE, TRANSMISSION LINES,
3 RESERVOIR COVER 4,900,000
4 () Heidelberg Water Company, water project,
5 distribution system 25,000
6 () Hellam Township, sewer project, extend
7 sewer system 150,000
8 () Jackson Township Water District, water
9 project, new source, upgrade existing
10 source 100,000
11 () Jacobus Borough Council, sewer project,
12 collection system and package treatment
13 plant 2,000,000
14 () Jefferson Borough Waterworks, water
15 project, new sources and distribution
16 system 1,900,000
17 () Lewisberry Road, water project, new source,
18 treatment and distribution lines 350,000
19 () Manchester Township, sewer project, install
20 sewer system in township 710,000
21 () Mid-Penn Water Works, Jackson Township,
22 water project, upgrade water treatment and
23 supply capacity 100,000
24 () NEWBERRY SEWER COMPANY, SEWER PROJECT 2,460,000 <--
25 () NEWBERRY WATER COMPANY, WATER PROJECT, NEW
26 WELLS AND LINES 475,000
27 () NEW FREEDOM BOROUGH, SEWER PROJECT, SLUDGE
28 HANDLING FACILITIES 250,000
29 () NORTH CODORUS TOWNSHIP AND YORK WATER
30 COMPANY, WATER PROJECT, WATER SYSTEM
19870H2035B3637 - 180 -
1 EXTENSION AND STORAGE TANK CONSTRUCTION 1,000,000
2 () Pennsylvania American Water Company, water
3 project, replace filter bottoms for New
4 Cumberland Borough 100,000
5 () PENNSYLVANIA AMERICAN WATER COMPANY (YELLOW <--
6 BREECHES II), WATER PROJECT, LINE
7 EXTENSION 60,000
8 () PARADISE MOBILE HOME PARK, WATER PROJECT,
9 NEW DISTRIBUTION LINES 5,000
10 () RAILROAD BOROUGH WATER SYSTEM, WATER
11 PROJECT, NITRATE TREATMENT, BOOSTER
12 STATION 100,000
13 () Red Lion Borough, water project, complete <--
14 and expand water system, upgrade project 7,000,000
15 () SEVEN VALLEYS WATER DEPARTMENT, WATER <--
16 PROJECT, NITRATE TREATMENT 70,000
17 () SHREWSBURY BOROUGH WATER COMPANY, WATER
18 PROJECT, NITRATE TREATMENT, DISTRIBUTION
19 SYSTEM IMPROVEMENTS 205,000
20 () SPRING GARDEN TOWNSHIP, WATER PROJECT OR
21 SEWER PROJECT, SYSTEM EXTENSION 900,000
22 () Springettsbury Township, sewer project,
23 Alcott Road wastewater treatment facility 108,000
24 () Springettsbury Township, sewer project,
25 Pleasant Valley, wastewater treatment
26 facility 164,000
27 () Springettsbury Township, sewer project,
28 Barwood, wastewater treatment facility 40,000
29 () Springettsbury Township, sewer project,
30 Glades Auction, wastewater treatment
19870H2035B3637 - 181 -
1 facility 500,000
2 () Springettsbury Township, sewer project,
3 Deamerlyn Drive, wastewater treatment
4 facility 63,000
5 () Springettsbury Township, sewer project,
6 Caterpillar Extension, wastewater treatment
7 facility 66,000
8 () Springettsbury Township, sewer project,
9 relocation of Stonewood pumping station 535,000
10 () Springettsbury Township, sewer project,
11 upgrade and replace East York pumping
12 station 2,310,000
13 () Springettsbury Township, sewer project,
14 install sluice gate 106,000
15 () Springettsbury Township, sewer project,
16 construct pool building on compost cover to
17 protect compost from elements 132,000
18 () Springettsbury Township, sewer project,
19 install sluice gate on Mill Creek Road 120,000
20 () Springettsbury Township Regional Wastewater
21 Treatment Facility, sewer project, includes
22 extending current system, new interceptor
23 lines, relocation and upgrade of existing
24 pump stations, construction of new pump
25 station (East York), construct sluice gates
26 and new building 4,143,000
27 () Spring Grove Borough, water project, water
28 system improvements 275,000
29 () SPRING GROVE WATER COMPANY, WATER PROJECT, <--
30 PUMP, STORAGE AND MAIN LINES IMPROVEMENTS 675,000
19870H2035B3637 - 182 -
1 () STEWARTSTOWN BOROUGH WATER AUTHORITY, WATER
2 PROJECT, NEW WATER TOWER, WATER MAIN
3 REPLACEMENT, NEW WATER SOURCE 390,000
4 () Stewartstown Borough, water project,
5 upgrade and expand water system, including
6 new water tower 500,000
7 () WEST MANCHESTER TOWNSHIP, SEWER PROJECT, <--
8 SYSTEM EXTENSION, WILLIS ROAD AREA 1,200,000
9 () WEST MANCHESTER TOWNSHIP AUTHORITY, WATER <--
10 PROJECT, WATER SYSTEM IMPROVEMENTS 600,000
11 () West Manheim Township, sewer project,
12 construct sewage collection system and
13 connection to Penn Township treatment
14 plant 2,000,000
15 () WEST MANHEIM AND PENN TOWNSHIPS, SEWER <--
16 PROJECT, BREEZWOOD INTERCEPTOR 500,000
17 () Windsor Borough, water project, telemetry
18 equipment for providing public water from
19 Red Lion Water Authority 7,000
20 () WINDSOR MUNICIPAL WATERWORKS, WATER <--
21 PROJECT, WATER SYSTEM IMPROVEMENTS 285,000
22 () Windsor Township, sewer project, sewer
23 extension to include Springvalle area 3,000,000
24 () WRIGHTSVILLE WATER SUPPLY COMPANY, WATER <--
25 PROJECT, WATER SYSTEM IMPROVEMENTS 70,000
26 () WRIGHTSVILLE BOROUGH COUNCIL, WATER
27 PROJECT, ACQUISITION AND IMPROVEMENT OF
28 WATER SYSTEM 1,500,000
29 () YORK CITY, SEWER PROJECT, CODORUS CREEK
30 TRUNKLINE, REPLACE SEWER LINE 1,100,000
19870H2035B3637 - 183 -
1 () YORK CITY, SEWER PROJECT, INDUSTRIAL PARK,
2 UPGRADE AND IMPROVE SEWER SYSTEM 300,000
3 () YORK TOWNSHIP, SEWER PROJECT, EXTEND SEWER
4 SYSTEM 1,400,000
5 () YORK WATER COMPANY, WATER PROJECT,
6 EXTENSION OF DISTRIBUTION SYSTEM 500,000
7 () Yorkana Borough, water and sewer project,
8 establish new public water and sewer
9 system 2,000,000
10 Section 4. Debt authorization.
11 The Governor, Auditor General and State Treasurer are hereby
12 authorized and directed to borrow, from time to time, in <--
13 addition to any authorization heretofore or hereafter enacted,
14 on the credit of the Commonwealth, subject to the limitations
15 provided in the current capital budget, money not exceeding in
16 the aggregate the sum of $3,729,944,000 less any amounts <--
17 received as a result of State appropriations or other financing
18 mechanisms that may be available to the authority as may be
19 found necessary to carry out the acquisition and construction of
20 the water and sewer projects specifically itemized in this act.
21 THE AGGREGATE THE SUM OF $150,000,000, CONSISTENT WITH THE <--
22 PROVISIONS AND LIMITATIONS SPECIFICALLY SET FORTH IN SECTION
23 5(A)(5) OF THE ACT OF MARCH 1, 1988 (P.L.82, NO.16), KNOWN AS
24 THE PENNSYLVANIA INFRASTRUCTURE INVESTMENT AUTHORITY ACT.
25 Section 5. Issue of bonds.
26 The $150,000,000 indebtedness authorized in this act shall be <--
27 incurred, from time to time, and shall be evidenced by one or
28 more series of general obligation bonds of the Commonwealth in
29 such aggregate principal amount for each series as the Governor,
30 Auditor General and State Treasurer shall determine, but the
19870H2035B3637 - 184 -
1 latest stated maturity date shall not exceed the estimated
2 useful life of the projects being financed as stated in section
3 6.
4 Section 6. Estimated useful life and term of debt.
5 The General Assembly states that the estimated useful life of
6 the water and sewer projects itemized in this act is 30 years.
7 Section 7. Appropriation.
8 The net proceeds of the sale of the obligations authorized in
9 this act are hereby appropriated from the Capital Facilities
10 Fund to the Pennsylvania Infrastructure Investment Authority in
11 the maximum amount of $3,729,944,000 less any amounts received <--
12 as a result of State appropriations or other financing
13 mechanisms that may be available to the authority to THE MAXIMUM <--
14 AMOUNT OF $150,000,000 TO be used by it exclusively to defray
15 the financial cost of the water and sewer projects specifically <--
16 itemized in this act. After reserving or paying the expenses of
17 the sale of the obligation, the State Treasurer shall pay to the
18 Pennsylvania Infrastructure Investment Authority the moneys as
19 required and certified by it to be legally due and payable.
20 Section 8. Federal funds.
21 In addition to those funds appropriated in section 7, all
22 moneys received from the Federal Government for the projects
23 specifically itemized in this act are also hereby appropriated
24 for those projects.
25 Section 9. Editorial changes.
26 In editing and preparing this act for printing following its
27 final enactment, the Legislative Reference Bureau shall insert
28 or revise letters or numbers for projects where the letters or
29 numbers are missing or require revision. The bureau shall also
30 revise the total monetary amounts for the total authorization,
19870H2035B3637 - 185 -
1 debt authorization and appropriations as necessary to agree with
2 the total monetary amounts of the projects.
3 Section 10. Effective date.
4 This act shall take effect immediately.
K19L72RZ/19870H2035B3637 - 186 -
Continue sua pesquisa no ChatGPT ou Claude
Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.