814.201WPOFederal Council OrdinanceJan 1, 1999Original source
The cantons shall draw up a sludge disposal plan and bring it into line with the new requirements within the deadlines imposed by experts.
The disposal plan sets the following as a minimum:
how sludge from the central wastewater treatment plants should be disposed of;
which procedures, including construction and modification of installations used for disposal of sludge, are required at what time;
1 how phosphorus is recovered in accordance with Articles 1 and 15a of the Waste Ordinance of 4 December 20152, unless this process is described in the waste management plan in accordance with Article 4 of the Waste Ordinance.
The sludge disposal plan shall be accessible to the public.
Footnotes
Inserted by No I of the O of 29 Oct. 2025, in force since 1 Dec. 2025 (AS 2025 745). See also the transitional provision to the Amendment of 29.10.2025 at the end of the text. ↩